UNIVERSITY OF MICHIGAN HOSPITALS AND HEALTH CARE CENTERS
FACILITIES PLANNING AND DEVELOPMENT
2101 Commonwealth, Suite B
Ann Arbor, MI 48105-5759
RTN NUMBER & PROJECT NAME HERE Date:
CONSTRUCTION COST OPINION SUMMARY Prepared by: -
CONSTRUCTION SPECIFICATION INSTITUTE (CSI)
COST PER % OF 0-16
ESTIMATE SUMMARY TOTAL $ BLDG. SF TOTAL
01 GENERAL REQUIREMENTS
TOTAL GENERAL REQUIREMENTS $0
02 DEMOLITION/SITE WORK
TOTAL DEMOLITION/SITE WORK $0
03 CONCRETE
TOTAL CONCRETE $0
04 MASONRY
TOTAL MASONRY $0
05 METALS
TOTAL METALS $0
06 WOOD & PLASTICS
TOTAL WOOD & PLASTICS $0
07 THERMAL & MOISTURE PROTECTION
TOTAL THERMAL & MOISTURE PROTECTION $0
08 DOORS & WINDOWS
TOTAL DOORS & WINDOWS $0
09 FINISHES
TOTAL FINISHES $0
10 SPECIALTIES
TOTAL SPECIALTIES $0
11 EQUIPMENT
TOTAL EQUIPMENT $0
12 FURNISHINGS
TOTAL FURNISHINGS $0
13 SPECIAL CONSTRUCTION
TOTAL SPECIAL CONSTRUCTION $0
14 CONVEYING SYSTEMS
TOTAL CONVEYING SYSTEMS $0
15 MECHANICAL
TOTAL MECHANICAL $0
16 ELECTRICAL
TOTAL ELECTRICAL $0
PROJECT SUBTOTAL CONSTRUCTION $0
FOR INFORMATION ONLY, AMOUNT OF ABOVE SUBTOTAL FACTORED FOR PREMIUM TIME $0
99 99010 - DESIGN CONTINGENCY AND
ESCALATION
TOTAL CONTINGENCIES $0
PROJECT SUBTOTAL $0
99030 - CONSTRUCTION MANAGER/ 99033 - CM FEE/GC PROFIT $0 7.5%
GENERAL CONTRACTOR TOTAL AE FIXED LIMITS OF CONSTRUCTION $0
PROJECT SUBTOTAL $0
99040 - CONSTRUCTION MANAGER
TOTAL CM FIXED LIMITS OF CONSTRUCTION $0
PROJECT SUBTOTAL $0
99050 - ALLOWANCES
TOTAL ALLOWANCES $0
PROJECT SUBTOTAL $0
99090 - ALTERNATES 99091 - ALTERNATE #1
99091A - DESCRIPTION #1
99091B - DESCRIPTION #2
99091C - CONTINGENCY $0 0.0%
TOTAL ALTERNATE #1 $0
99092 - ALTERNATE #2
99092A - DESCRIPTION #1
99092B - DESCRIPTION #2
99092C - CONTINGENCY $0 0.0%
TOTAL ALTERNATE #2 $0
TOTAL ALL ALTERNATES $0
PROJECT TOTAL $0
D:\Docstoc\Working\pdf\1a5271ea-8ddc-4fa0-bb3a-cf8090a260bf.xls (UPDATED 8/11/08) 1 1/18/201111:23 AM
UNIVERSITY OF MICHIGAN HOSPITALS AND HEALTH CARE CENTERS
FACILITIES PLANNING AND DEVELOPMENT
2101 Commonwealth, Suite B
Ann Arbor, MI 48105-5759
RTN NUMBER & PROJECT NAME HERE Date:
CONSTRUCTION COST OPINION BREAKDOWN Prepared By: -
ASSUMPTIONS:
PHASE:
Costs are estimated assuming that project will be competively bid by General Contractors.
Estimated costs are in year 2011 dollars based on industry averages and are for budgeting purposes only
Estimated labor costs are estimated to be performed during normal working hours unless noted with "Y" under premium time column. Average
Standard time average hourly rate: $80.00 per hour YES
Premium time average hourly rate: $112.00 per hour
Estimated construction costs DO NOT include owner provided equipment, furniture, window coverings, furnishings, hazardous material
Estimated construction costs DO NOT include allowances for escalation or contingencies
Approximate area of work: GSF
QUANTITY MATERIAL LABOR
SUBTOTAL
DIV WORK ITEM # OF UNIT $ PER $ PER HOURLY LABOR
TOTAL COST
UNITS MEAS. UNIT UNIT HRS PER TOTAL PREMIU TOTAL
Infection Control Measures UNIT
of Total Labor Cost LABOR M TIME
$0.00 0.0 $0.00
DIVISION 01 TOTALS: $0 0 $0 $0
$0.00 0.0 $0.00
DIVISION 2 SUBTOTALS: $0 0 $0 $0
DIVISION 2 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 2 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 3 SUBTOTALS: $0 0 $0 $0
DIVISION 3 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 3 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 4 SUBTOTALS: $0 0 $0 $0
DIVISION 4 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 4 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 5 SUBTOTALS: $0 0 $0 $0
DIVISION 5 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 5 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 6 SUBTOTALS: $0 0 $0 $0
DIVISION 6 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 6 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 7 SUBTOTALS: $0 0 $0 $0
DIVISION 7 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 7 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 8 SUBTOTALS: $0 0 $0 $0
DIVISION 8 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 8 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 9 SUBTOTALS: $0 0 $0 $0
DIVISION 9 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 9 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 10 SUBTOTALS: $0 0 $0 $0
DIVISION 10 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 10 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 11 SUBTOTALS: $0 0 $0 $0
DIVISION 11 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 11 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 12 SUBTOTALS: $0 0 $0 $0
DIVISION 12 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 12 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 13 SUBTOTALS: $0 0 $0 $0
DIVISION 13 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 13 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 14 SUBTOTALS: $0 0 $0 $0
DIVISION 14 SUBCONTRACTOR OH&P: 0.0% $0
DIVISION 14 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 15 SUBTOTALS: $0 0 $0 $0
DIVISION 15 SUBCONTRACTOR OH&P: 7.5% $0
DIVISION 15 TOTAL: $0
$0.00 0.0 $0.00
DIVISION 16 SUBTOTALS: $0 0 $0 $0
DIVISION 16 SUBCONTRACTOR OH&P: 7.5% $0
DIVISION 16 TOTAL: $0
D:\Docstoc\Working\pdf\1a5271ea-8ddc-4fa0-bb3a-cf8090a260bf.xls (UPDATED 8/11/08) 2 1/18/201111:23 AM
Related docs
Other docs by ujy16181
Department of Emergency Management and Homeland Security Emergency Support Functions
Views: 18 | Downloads: 0
Denr Environmental Compliance Certificate N C Department of Environment and Natural
Views: 310 | Downloads: 0
Dental Clinic Business Proposal Letter Sample Commercial Contracting Office Remodel Proposal
Views: 623 | Downloads: 0
Get documents about "