					              Construction of New Railway Line
                Qazigund-Srinagar-Baramulla
                                  Tender
                                     For

CONSTRUCTION OF MISC. EXTERNAL DEVELOPMENT
WORKS INCLUDING APPROACH ROADS FOR RPF/GRP
BARRACKS AT SRINAGAR, PAMPORE AND KAKAPORE
RAILWAY STATION YARDS (PACKAGE M-17) ON
QAZIGUND-BARAMULLA SECTION OF NEW BG RAIL
LINE PROJECT (J&K).
                           TECHNICAL BID
                                   (Packet-I)
                               (Package M-17)
                                 February, 2009

                  IRCON INTERNATIONAL LIMITED
                   (A Government of India Undertaking)
                          Ministry of Railways


Site Office                                   Delhi Office
Railway Holiday Home                          4th Floor, Palika Bhawan
Behind Bakshi Stadium                         Sector-XIII, R.K.Puram.
Tulsi Bagh,                                   NEW DELHI –110 066
SRINAGAR – 190 001

                             Corporate Office
                          C-4, District Centre, Saket
                           NEW DELHI – 110 017




Signature of Tenderer/s                                                  1
                          INDEX


 1.    TOP SHEET                           Page – 3

 2.    TENDER FORM                       Page – 4 to 5

 3.    GENERAL INFORMATION                 Page – 6

 4.    INSTRUCTIONS TO TENDERERS        Page – 7 to 14

 5.    NOTICE INVITING TENDER           Page – 15 to 20

 6.    GENERAL CONDITION OF CONTRACT      Page – 21

 7.    SPECIAL CONDITIONS OF CONTRACT   Page – 22 to 38

 8.    SPECIFICATIONS AND ADDITIONAL    Page – 39 to 56

       SPECIAL CONDITIONS OF CONTRACT

 9.    ANNEXURES                        Page – 57 to 66




Signature of Tenderer/s                                   2
                              TOP SHEET

IRCON/1008/J&K-DLI/ Barracks Ext. Dev. Works-Sgr.,Pamp.&Kakp./M-17
Date: 11.02.2009


 Name of work                 :   Construction of Misc. external development works
                                  including approach roads for RPF/GRP Barracks
                                  at Srinagar, Pampore and Kakapore Railway
                                  Station yards (Package M-17) on Qazigund-
                                  Baramulla Section of New BG Rail Line Project
                                  (J&K).
 Approx. Cost                 :   Rs. 46.72 Lacs

 Earnest Money                :   Rs. 0.93 Lacs

 Completion Period            :   04 (Four) Months
 Date of Opening              :   05.03.2009 at 15.30 hrs.



Tender Issued to: -




D.D.No. & Issuing Bank: -




                                                          For and on behalf of
                                             IRCON INTERNATIONAL LIMITED




Signature of Tenderer/s                                                         3
                          TENDER FORM (FIRST SHEET)

                                                                                     Place:
                                                                                      Date:

To

     The General Manager / J&K-I
      IRCON INTERNATIONAL LTD.
     4th Floor, Palika Bhawan,
     Sectot-13, R.K.Puram,
     NEW DELHI – 110 066.


Sir,
        I / We ………………………………………………………………………… have
read the various conditions of tender attached hereto and hereby agree to abide by the
said conditions. I / We also agree to keep this tender open for your acceptance for a
period of 90 days from the date fixed as last date for receipt of completed tender in your
office. In the event of my/our default, I/We will be liable for forfeiture of my/our earnest
money.

1.      I / We offer to do the Work of “Construction of Misc. external development
        works including approach roads for RPF/GRP Barracks at Srinagar,
        Pampore and Kakapore Railway Station yards (Package M-17) on Qazigund-
        Baramulla Section of New BG Rail Line Project (J&K).” and the
        percentage/rate quoted by me/us in the tender schedule bind myself/ourselves to
        complete the work in 04 (Four) months from the date of issue of Letter of
        Acceptance of the tender by IRCON. I / We also hereby agree to abide by all the
        Conditions mentioned in the tender and to carry out the works according to
        specifications of material and works laid down by IRCON for the present
        contract.

2.      The full value of the earnest money deposited shall stand forfeited without
        prejudice to any other rights or remedies if:

a)       I / We do not execute the contract document within seven days after receipt of
        notice issued by IRCON that such documents are ready.
                                            OR
b)      I / We do not commence the work within ten days after receipt of orders to that
        effect.

3.      Until a formal agreement is prepared and executed, acceptance of this tender shall
        constitute a binding contract between us subject to modifications, as may be



Signature of Tenderer/s                                                                   4
       mutually agreed to between us and indicated in the letter of acceptance of my/our
       offer for this work.

4.     Payment of stamp duty on the agreement to be executed in pursuance of this
       tender will be borne by IRCON.




Signature of witnesses:                                 Signature of Tenderer(s) & Date
                                                              Tenderer(s) address



1.




Signature of Tenderer/s                                                               5
                            GENERAL INFORMATION

Tender Notice No.               No.IRCON/1008/J&K-DLI/ Barracks Ext. Dev.
                                Works-Sgr.,Pamp.&Kakp./M-17  Date: 11.02.2009


Name of the work                Construction of Misc. external development works
                                including approach roads for RPF/GRP Barracks at
                                Srinagar, Pampore and Kakapore Railway Station
                                yards (Package M-17) on Qazigund-Baramulla
                                Section of New BG Rail Line Project (J&K).
a) Approximate cost             Rs. 46.72 Lacs
b) Completion period            04 (Four) Months

c) Earnest Money                Rs. 0.93 Lacs

d) Date and time of issue       From 18.02.2009 to 04.03.2009 on all working days
  of tenders                    from 10.30 hrs. to 15.30 hrs. against the prescribed fee of
                                Rs. 5,000/- which is not refundable. Rs.500/- shall be
                                charged extra if required by post.
e) Last date and time of        05.03.2009 upto 15.00 hrs.
   submission of Tender
f) Date and time of             On 05.03.2009 at 15.30 hrs. Financial Bid will be
  opening of Tenders            opened after the decision on Technical Bids is taken by
                                IRCON. Separate notice will be sent to the selected
                                tenders.
g) Validity of Offer            90 days
h) Retention Money /            Earnest Money deposit of the successful tenderer shall be
  Security deposit              converted into security deposit. Balance security deposit
                                shall be recovered @10% through running account bills
                                till it reaches 5% of the contract value.
i) Performance Bank             To be submitted within 28 days from the date of issue of
   Guarantee                    Acceptance Letter by IRCON; an unconditional Bank
                                Guarantee for the amount 2% of the contract value.
j) Minimum amount of           5.0% of the contract value.
   interim payment certificate
k) Amount of liquidated         0.50% (Zero point five percent) per week upto a
  damages                       maximum of 10% of contract value.




Signature of Tenderer/s                                                                 6
                          INSTRUCTIONS TO TENDERER/S

1.0    Care in Submission: Before submitting the tender, the tenderer will be deemed
       to have satisfied himself by his actual inspection of the site and the locality of the
       works that all conditions liable to be encountered during execution of the works
       are taken into account and that the percentage entered by the tenderer in the tender
       schedule is adequate and all inclusive for the completion of works to the entire
       satisfaction of the Engineer in charge.
1.1    When the work is tendered for by a firm or company, the tender shall be signed
       by the individual legally authorized to enter into commitments on their behalf.
1.2    IRCON will not be bound by any Power of Attorney granted by the tenderer or by
       changes in the composition of the firm made subsequent to the execution of
       contract. It may, however, recognize such Power of Attorney and changes after
       obtaining proper legal advice, the cost of which will be chargeable to the
       contractor.
2.0    RIGHT OF IRCON TO DEAL WITH TENDERS
       IRCON reserves the right of not to invite tenders for any work or works, to invite
       open or limited tenders and when tenders are called, to accept a tender in whole or
       in part or reject any tender or all tenders without assigning reasons for any such
       action.
3.0    ELIGIBILITY CRITERIA
       Each tenderer has to satisfy the eligibility criteria for technical capability and
       competence as well as for financial capacity and organizational resources as
       specified in the tender documents to qualify for opening of his/their financial bid.
3.1   For Firms/Companies
3.1.1 As a proof of technical capability and competence, the tenderer should have
      experience of having successfully completed similar works during last 5 years
      ending 31st March‟2008 and should be either of the following:
a)     At least one completed work of similar nature costing not less than the amount
       equal to 1/3rd of the value of the tender,
                                            OR
b)    Two completed works of similar nature each costing not less than the amount
      equal to 20% of the value of the tender,
                                          OR
c)    Three completed works of similar nature each costing not less than the amount
      equal to 15% of the value of the tender.
3.1.2 As a proof of sufficient financial capacity, the tenderer/s should have an average
      annual turnover of at least 30% of the tender value. Average annual turnover shall
      be calculated for the best three years out of last five years ending on 31st
      March‟2008. The turnover shall comprise of payment accrued from contracts
      only.
3.2   For Joint Ventures



Signature of Tenderer/s                                                                    7
3.2.1 Technical Capability
(i)      Each member of the Joint Venture should have satisfactorily completed at least
         one work of similar nature costing more than 1/10th value of the respective tender
         cost in last 5 years ending 31st March‟2008.
(ii)     At least one of the members of the joint venture must have experience as required
         as per Para 3.1.1 above.
3.2.2 Financial Capability
(i)   The arithmetic sum of average annual turn over of all members of the joint
      venture in last five years ending 31st March‟2008 should be more than 30% of the
      tender cost.
(ii)  At least one of the members of the joint venture must have average annual
      turnover in the preceding five years ending 31st March‟2008 not less than 25% of
      the tender cost.
(iii) Each member of the joint venture should have a minimum average annual
      turnover of not less than 10% of the tender cost in the preceding five years ending
      31st March 2008.
The average annual turnover shall be calculated for the best three years out of last five
years ending on 31st March‟2008.
3.2.3 All the members of the joint venture shall be jointly and severally responsible for
        all the acts done on behalf of the joint venture & tender bids shall be jointly
        signed by all members of the Joint Venture or their authorized representative so as
        to legally bind them jointly and severally. All bids must be submitted with a copy
        of Joint Venture agreement duly notarized. At least the lead member should be a
        Kashmiri Contractor having majority share.
3.2.4 All the above conditions must be satisfied by the Joint Venture to qualify for
        opening of their financial bid
3.3     Bidders must submit Tax Deduction at Source (TDS) certificate in support of
        their eligibility criteria, in case of experience of execution of works for private
        organization.
Note:
     i) Work of Construction of Earthwork, Building work, Road work, CC/RCC
        and Bridge works shall be considered as work of similar nature.
       ii) The completed works shall include the completed works in last five years ending
           31.03.2008 as well as works that are in progress but the value of completed
           portion up to the date of tender opening is as per Para 3.1.1 and 3.2.1 above for
           firms & JV‟s respectively.
3.4      The tenderer should be a local Kashmiri Contractor. As a proof of being a
         Kashmiri contractor, the following conditions are to be satisfied.

         (a)     The tenderer considered should have an office in Kashmir Valley and




Signature of Tenderer/s                                                                   8
       (b)    The tenderer should be operating in Kashmir Valley and their
              owner/partner or partners having majority share should be State
              Subject of Kashmir Valley.
The documentary proof regarding (a) & (b) above should be submitted as part of
the tender document.
3.5    Copy of JV Agreement is attached.
3.6    Any tenderer can participate in the same tender in one entity only i.e. either as an
       individual firm/company or a joint venture with other firms/companies. In case,
       any tenderer submits the offer in more than one entity for same tender, such offers
       shall be liable to be rejected.
NOTE: -
“Tenderer(s) may please note that their offer will be evaluated as per the credentials /
documents attached by the tenderer(s) along with the tender”
4.0    SIGNING OF TENDER
       Tenders must be duly signed, dated and witnessed. An attested copy of Power of
       Attorney/Affidavit/Board Resolution as under shall accompany the tender
       documents:
       a)     In case of sole proprietorship, an Affidavit of Sole Proprietorship and
              if the tender is signed by any other person, Power of Attorney by the Sole
              Proprietor in favour of Signatory.
       b)     In case of Partnership, if tender is not signed by all the partners, Power of
              Attorney in favour of the signatory authorizing him to sign the documents.
              The person signing the documents should also have a specific authority to
              refer disputes with the partnership firm to arbitration.
       c)     In case of a Company, copy of the Board Resolution authorizing the
              signatory to sign on behalf of the Company.
       d)    All the members of the joint venture shall be jointly and severely responsible
             for all the acts done on behalf of the joint venture & tender bids shall be
             jointly signed by all members of the Joint Venture so as to legally bind them
             jointly and severely. In case tender is signed by legally authorized signatory, a
             certified copy of Power of Attorney from each partner of the joint venture
             should be submitted. All bids must be submitted with a copy of Joint Venture
             agreement as per Annexure-VIII.
5.0    EXECUTION OF CONTRACT DOCUMENT
       The tenderer whose tender is accepted shall be required to appear at the office of
       the GM/IRCON, Srinagar in person or if a firm or corporation, the duly
       authorized representative shall so appear, to sign the contract documents within
       seven days after notice that such documents are ready. Failure to do so shall
       constitute a breach of the agreement effected by the acceptance of tender in which
       case the full value of the earnest money accompanying the tender shall stand
       forfeited without prejudice to any other rights or remedies.



Signature of Tenderer/s                                                                  9
5.1   In the event of any tenderer whose tender is accepted shall refuse to execute the
      contract document as here in before provided, IRCON may determine that such
      tenderer has abandoned the contract and there upon his tender and the acceptance
      thereof shall be treated as cancelled and IRCON shall be entitled to forfeit the full
      amount of earnest money and to recover the liquidated damages for such default.
6.0   FORM OF CONTRACT DOCUMENTS
      Every contract shall be complete in respect of the documents it shall constitute.
      Necessary copies of the contract documents shall be signed by the competent
      authority and the contractor and one copy given to the contractor.
7.0   FORM OF QUOTATIONS
      The tender shall be submitted in the prescribed form as mentioned in tender
      documents. The quotations will be subject to the general instructions contained in
      tender notice to which the tenderer‟s special attention is drawn.
7.1   The schedule of item rates and quantities issued with this tender document is
      priced by IRCON for the information of the tenderers. Tenderer is to quote a
      percentage above or below or at par for total amount indicated for Schedule “A”,
      “B”, “C” and “D”.
7.2   Tenderer should quote only a single percentage (above/below or at par) for
      all items of Schedule “A”, “B”, “C” and “D” individually as indicated in
      BOQ (Schedule of items, rates & quantities) and not different percentages
      for different items of works given in Schedule “A”, “B”, “C” and “D”.
7.3   Along with percentage the tenderer should also quote either “above” or “below”
      or “At par” failing which the percentage quoted shall be considered as “below”.
7.4   Tenderer should quote percentage above/below/at par and rates in figures as well
      as in words. If there is variation between percentage/rate quoted in figures and
      in words, the percentage/rate quoted in words shall be taken as correct.
7.5   Each page of the tender document shall be signed by the tenderer and submitted in
      original to IRCON for evaluation. Besides, Tender Form, Certificate of
      Familiarization, Undertaking by Tenderer should be signed at appropriate places.
7.6   Tenders containing erasures and alterations in tender documents are liable to be
      rejected. Any corrections made by the tenderer/s in his/their entries should be in
      INK and must be attested by him/them under full signature and date.
8.0   DEVIATIONS
      No deviation shall be allowed from the terms and conditions stipulated in the
      Tender Documents and tenders containing deviations are liable to be rejected.
      Deviation, if insisted upon, must be brought out in a separate “Deviation Sheet”
      detailing clause No. (of the Tender document), stipulation as per clause and
      deviation asked for. Otherwise the tenderer shall be deemed to have accepted all
      provisions of the Tender Documents.
9.0   EARNEST MONEY
      The tenderer shall be required to submit a sum as specified in the conditions given
      in the tender as Earnest Money Deposit for the due performance of stipulation for


Signature of Tenderer/s                                                                 10
       keeping the offer open till such date as might be specified in the tender. It shall be
       understood that the tender documents have been sold/issued to the tenderer and
       the tenderer is permitted to tender in considerations of the stipulation on his part,
       that after submitting his tender, he will not resile from his offer or modify the
       terms and conditions thereof in a manner not acceptable to IRCON.
9.1    MODE OF EARNEST MONEY
       In respect of this work, the tender must be accompanied with an Earnest Money
       Deposit for a sum as prescribed in tender notice in any of the forms mentioned
       below failing which the tender will not be considered and will be
       summarily rejected. The EMD shall be valid for at least the validity period of
       offer unless otherwise specifically indicated and shall be extended if required for
       by IRCON.
       (i)    By a Demand Draft / Pay Order from any Scheduled Bank in India in
              favour of , payable at New Delhi.
       (ii)   By a Fixed Deposit Receipt issued by any Scheduled Bank in India
              endorsed in favour of IRCON International Limited, New Delhi.
NOTE:
a)     The EMD shall be valid for not less than 90 days from the date of opening of
       Tender.
b)     Cash remittances will not be accepted as EMD.
c)     Cheque, war bonds, Govt. Promissory notes and cash certificates will not be
       accepted as EMD.
d)     The Earnest Money required to be deposited for each package will be as
       prescribed in tender notice.
e)     No interest shall be payable on the Earnest Money Deposit.
f)     Any request for recovery from outstanding bills for Earnest money against present
       tender will not be entertained. Tender submitted with Earnest Money in any form
       other than those specified above shall not be considered.
9.2    CONVERSION/RETURN OF EARNEST MONEY
       If the tender is accepted, this earnest money will be retained as a part of security
       for due and faithful fulfilment of the contract. The earnest money of the other
       tenderer‟s shall save as herein before provided be returned to them but IRCON
       will not be responsible for any loss or depreciation that may happen thereto while
       in its possession nor be liable to pay any interest thereon.
9.3    Tenders not accompanied with earnest money deposit shall be summarily
       rejected.
9.4    In case it is found that, the tenderer/s has furnished misleading/wrong or
       fraudulent information / documents, the Earnest Money of the tenderer/s will be
       forfeited.
10.0   DRAWINGS & DOCUMENTS



Signature of Tenderer/s                                                                   11
       Conceptual drawings are available in the office of GM/J&K Cell, 4th Floor, Palika
       Bhawan, Sector-XIII, R.K.Puram, New Delhi-110066, which can be seen in his
       office during working hours. Work will be done as per final approved drawings
       and contractor will have no claim on account of deviation in approved drawing
       with reference to tender drawings.
       Specifications for materials and works of CPWD may also be seen at the office of
       General Manager, IRCON, Delhi as well as in the office of IRCON, Srinagar.

11.0   QUANTITIES
       The quantities shown in the schedule are given as a guide and are approximate
       and subject to variation according to needs. IRCON shall accept no responsibility
       for the accuracy of quantities and IRCON shall not guarantee work under each
       item of the schedules.
12.0   GROUNDS FOR REJECTION
       It shall not be obligatory on the Accepting Authority to accept the lowest tender
       and no tenderer/tenderers shall demand any explanation for the cause of rejection
       of his/their tender.
12.1   Tenders containing erasure and alterations of the tender documents are liable to be
       rejected. Any corrections made by the tenderer in his entries must be attested by
       him.
12.2   If the tenderer deliberately gives wrong information in his tender or creates
       circumstances for the acceptance of his tender, IRCON reserves right to reject
       such tender at any stage. Such tenderer shall also be liable to be debarred from all
       future tendering in the project.
12.3   If a tenderer expires after the submission of his tender, or after the acceptance of
       his tender, IRCON, shall deem such tender as cancelled. If the partner of a firm
       expires after the submission of tender or after the acceptance of the tender,
       IRCON shall deem such tender as cancelled unless the firm retains the character.
12.4   Documents testifying to the tenderer/s previous experience and financial status
       should be submitted along with the tender. Information as required as per
       Annexure to the tender document should be submitted by the tenderer
       without fail strictly as per formats.
12.5   Non compliance of any of the conditions set forth herein is liable to result in the
       tender being rejected.
12.6   Tenders received after the specified date/time may be rejected.
12.7   In case it is found that performance of tenderer in any work awarded earlier is not
       satisfactory, IRCON reserves right to reject such tender. The decision of IRCON
       in this connection shall be final and binding.
13.0   NEGOTIATION
       Should IRCON decide to negotiate with a view to bring down the rates, the
       tenderer called for negotiations should furnish the following form of declaration
       before commencement of negotiations:


Signature of Tenderer/s                                                                 12
       “I ______________________________________________ do declare that in the
       event of failure of contemplated negotiations relating to Tender No.
       ___________________________________________ dated _____________ my
       original tender shall remain open for acceptance on its original terms and
       conditions.”
14.0   IDENTITY OF TENDERER
       Tenderer/s should specifically and fully disclose in their respective tenders, their
       respective constitutions and submit along with each tender attested Photostat
       copies of documents like partnership deed, Articles and Memorandum of
       Association, Certificate of incorporation etc., if a tenderer is a firm i.e. partnership
       business, it should be stated whether the same is registered under the Indian
       Partnership Act, and the name and address of all the partners of the firm should be
       fully disclosed. IRCON shall always have the liberty to demand production of the
       original of the said documents and also to make such further and other
       requisitions regarding the constitution of the tenderer as may be considered
       necessary. In case the tenderer has already submitted these documents and there is
       no change in them subsequently, reference under which these were submitted
       should be mentioned.
15.0   In case the tender cannot be submitted for any reason the complete set of tender
       Documents in full shall be returned promptly to the General Manager/IRCON at
       New Delhi failing which the defaulting tenderer may not be considered for issue
       of future inquiries by IRCON.
16.0   The tenderer/s are required to submit the analysis of rates for the key items like
       Earthwork, Concrete, protection works etc. in support of the rates quoted by them.
16.1   The term “Correction slip” if and where referred to in this tender document
       includes the following terms also.
       a)     Addendum slip.
       b)     Correction slip.
       c)     Addendum slip and Corrigendum slip which are issued in consecutive
              serials.
17.0   These instructions to the tenders shall be deemed to form a part of the tender
       documents.
18.0   DOCUMENTS TO BE SUBMITTED BY TENDERERS
       The documents required under the tender conditions for submission along with
       the tender are listed below. The tenderer/s are advised to examine the various
       conditions and submit necessary documents accordingly.
18.1   In support of Technical Capability: -
18.1.1 Statement of similar works completed satisfactorily in last five years, works being
       executed along with certificate from the department as per Annexure-II/III.
18.1.2 List of Plant & Equipment as per Annexure IV & V.
18.1.3 List of Skilled & trained manpower to be deployed for the work.


Signature of Tenderer/s                                                                     13
18.2   In support of Financial Capability: -
18.2.1 Certified copies of Audited Balance Sheet and Profit & Loss Account (Notarized
       copy only) with Chartered Accountant Certificate for last 5 years.
18.2.2 Latest Solvency certificate from the Bank.
18.3 As a proof of Kashmiri contractor: -
       -       Proof of address of office in Kashmir Valley.
       -       Proof of owner/partner or partners having majority share are state
               subjects of Kashmir Valley.
18.4   For JV– Joint Venture Agreement duly Notarized should be given as per
       Annexure-VII.
18.5 Certificates of Familiarization as per Annexure-I, duly signed at appropriate
       place.
18.6 Undertaking by Tenderer as per Annexure-IX, duly signed at appropriate place.
In addition the following information is also to be given
a)     Copy of Article of Association / Partnership Deed and Power of Attorney.
b)     Copy of Registration under Labour Law.
c)     Copy of Registration under Sales Tax / works contract Tax Act.

Tenderer must note that they must submit all the desired informations as above
along with the Tender document. All documents/ certificates in original or copies
attested by gazetted officer/Notarised should be submitted. The evaluation of their
offer will be done on the merit of these documents so submitted. In case of non-
submission of any of the desired informations, tenderers may not be qualified for
which IRCON will not be responsible.
Working Contractors also have to submit necessary documents as
mentioned above along with each tender. Letter like “Documents have
been submitted in earlier tender / earlier work” shall not be entertained /
considered. The documents/certificates submitted by tenderer/s in support
of technical capability should clearly indicate the type of work done
satisfying the criteria of similar nature of work mentioned in this tender.
This document/Certificate shall clearly indicate the LOA/Agt No., cost of
work executed, date of completion and authority issuing the certificate
with complete address. Work experience certificate of work of similar
nature should not be ambigious.




Signature of Tenderer/s                                                             14
                            IRCON INTERNATIONAL LIMITED
                              (A Government of India Undertaking)


No.IRCON/1008/J&K-DLI/Barracks Ext. Dev. Works-Sgr.,Pamp.&Kakp./M-17 Dt. 11.02.2009




  To
  M/S «NAME_OF_CONTRACTORS»
  «ADDRESS__1»
  «ADDRESS__2»
  «CITY»
  «STATE»




                                    NOTICE INVITING TENDER
   Dear Sirs;

   Sub:     Construction of Misc. external development works including approach roads
            for RPF/GRP Barracks at Srinagar, Pampore and Kakapore Railway Station
            yards (Package M-17) on Qazigund-Baramulla Section of New BG Rail Line
            Project (J&K).

   1.0      General Manager/J&K-I, IRCON INTERNATIONAL LIMITED, 4th Floor,
            Sector-XIII, R.K. Puram, New Delhi-110066, invites sealed tenders on Two
            Packet System on prescribed forms from bonafied Kashmiri
            firms/companies/joint ventures having requisite experience and financial capacity
            for execution of the following works: -
   S.     Name of Package             Name of Work                 Approx.    Earnest   Completi
   No       (Stations)                                             Cost of    Money     on Period
                                                                  Work (Rs)    (Rs)
                            Construction of Misc. external
   1      M-17              development      works   including      46.72      0.93      04
                            approach roads for RPF/GRP              Lacs       Lacs     Months
                            Barracks at Srinagar, Pampore and
                            Kakapore Railway Station yards
                            (Package M-17) on Qazigund-
                            Baramulla Section of New BG Rail
                            Line Project (J&K).




   Signature of Tenderer/s                                                                15
ELIGIBILITY CRITERIA
2.0  Eligibility shall be assessed on applicants, fulfilling the technical capability and
     competence as well as for financial capacity and organizational resources as
     specified in Annexure-A.
3.0    Tender documents (for this package) can be obtained from 10.30 hours to 16.00
       hours on all working days from 18.02.2009 to 04.03.2009 from the office of
       General Manager/J&K-I, IRCON INTERNATIONAL LIMITED, 4th Floor,
       Sector-XIII, R.K.Puram, New Delhi – 110066 on payment (non-refundable) of
       Rs. 5,000/- in cash or Demand Draft/Pay order drawn in favour of IRCON
       INTERNATIONAL LIMITED, New Delhi towards the cost of one set of the
       tender documents. Tender documents can also be obtained by post, for which an
       amount of Rs. 500/- shall be charged extra (for this package). IRCON
       INTERNATIONAL LIMITED shall not be responsible for any postal delay in
       receiving the tender documents. The tender documents shall be sold only to the
       persons authorized in writing by the firm, company or joint venture.
        Tender document can also be downloaded from IRCON‟s web site
       www.ircon.org and in such a case, the tenderer shall deposit the cost of tender
       documents along with the submission of the tender, failing which his tender shall
       not be opened. The cost of tender documents shall be deposited in the form of
       demand draft / pay order and enclosed in the envelope containing the Earnest
       Money Deposit. Tenderer(s) are advised not to make any corrections, additions or
       alterations in the downloaded tender documents. If any such
       corrections/additions/alterations in the downloaded tender documents are made,
       such tender shall not be considered.
4.0    IRCON may issue addendum(s)/corrigendum(s) to the tender documents. In such
       case, the addendum(s)/corrigendum(s) shall be issued and placed on IRCON‟s
       website at least three days in advance of date fixed for opening of tenders. The
       tenderer who have downloaded the tender documents from website must visit the
       website and ensure that such addendum(s) /corrigendum(s) (if any) is also
       downloaded by them. Such addendum(s)/corrigendum(s) (if any) shall also be
       submitted, duly stamped and signed along with the submission of tenders. Any
       tender submitted without addendum(s)/corrigendum(s) (if any) shall be summarily
       rejected.
5.0    The tender documents shall be in two separate sealed packets viz. Packet-I
       containing Technical Bid and Packet-II containing Financial Bid. Detailed
       credentials as per the requirement of eligibility criteria and all tender papers
       except Bill of Quantities are to be submitted in “Technical Bid”. Bill of Quantities
       with rates duly filled in are to be submitted in “Financial Bid”.
6.0    Completed tender documents in two packets viz. Packet-I and Packet-II shall be
       sealed separately in envelopes super-scribing as Packet-I (Technical Bid) and
       Packet-II (Financial Bid) along with the name of the work. These two sealed
       envelopes and the envelop (super-scribing “Earnest Money for the work”
       containing the Earnest Money) in the form as prescribed in the tender documents
       shall further be sealed in a larger envelope super-scribing the name of the work as


Signature of Tenderer/s                                                                 16
       stated above (along with date and time of opening of tenders) which should be
       deposited in the tender box at IRCON‟s office at address given in Para 1.0 before
       15.00 hours of 05.03.2009. Tenders shall be opened (Technical Bids only) at
       15:30 hours on the same day i.e 05.03.2009 in the presence of the tenderers or
       their authorized representatives intending to attend the opening. The Financial
       Bids shall be opened only after assessing suitability as per the technical bids by
       IRCON. Tenders duly sealed in the prescribed manner above can also be sent
       through Registered Post/Speed Post/Courier so as to reach in this office not later
       than the time and date of opening of tenders. Any tender received later than the
       time and date of opening of tenders shall be rejected and returned to the tenderer
       unopened.
7.0    Tender shall be submitted as per “Instructions to Tenderers” forming a part of the
       tender document.
8.0    Any tender received without Earnest Money in the form as specified in the
       tender documents shall not be considered and shall be summarily rejected.
9.0    IRCON reserves the right to cancel the tender before submission/opening of
       tenders, postpone the tender submission/opening date and to accept/reject any or
       all tenders without assigning any reasons thereof. IRCON‟s assessment of
       suitability as per eligibility criteria shall be final and binding.
10.0   Tenderers may note that they are liable to be disqualified at any time during
       tendering process in case any of the information furnished by them is not found to
       be true. EMD of such tenderer shall be forfeited. The decision of IRCON in this
       regard shall be final and binding.

11.0   Information as required as per various Annexure to Tender Document should be
       submitted by the tenderers without fail strictly as per formats.

12.0   The validity of the offer shall be 90 days from the date of opening (Technical Bid)
       of the tender of the said package.

13.0   The transfer of tender documents purchased by one intending tenderer to another
       tenderer is not admissible. Tenderer can submit tenders only on the documents
       purchased / downloaded from IRCON‟s website by them.

14.0   Purchase preference to Central Public Sector Enterprises (CPSEs) as admissible
       under Government‟s existing policy on the date of acceptance of tender shall be
       applicable. Other things being equal, Purchase preference will be granted to
       CPSEs at the lowest valid Price bid (L1) if the price quoted by the CPSEs is
       within 10% of the L1 price. Purchase preference is admissible only in case: -

       i)     The value of the work is more than Rs. 5.00 Crores and less than Rs. 100.0
              Crores as given in Notice Inviting Tender.




Signature of Tenderer/s                                                                17
       ii)    Purchase preference Policy will apply only to CPSEs and their subsidiaries
              (i.e. where PSE owns 51% or above shareholding) but not to a join venture
              owned by a PSE and a private sector partner.

       iii)   A minimum value addition of 20% by the CPSEs/Subsidiary companies
              by way of manufacturing and/or services would be prerequisite for
              availing this facility.

15.0   SCOPE OF WORK: - The scope of work includes Construction of Misc.
       external development works including approach roads for RPF/GRP Barracks at
       Srinagar, Pampore and Kakapore Railway Station yards. The work mainly
       involves earthwork, concrete work, Finishing, Roads & Pathways works, brick
       works, Drainage, Sewerage, Steel, pre-cast paver block, kerb stone works, SRFC
       work and other allied works.

16.0   The tenderer/s are requested to visit the sites of work and ascertain
       himself/themselves with the details of works required to be carried out and
       completed, surroundings and prevailing law and order conditions.

17.0   The work is to be carried out in Srinagar, Pampore and Kakapore Railway
       Station yards. There may be difficulty in transportation of materials/ working
       due to tracks already laid and movement of Railway traffic. Commercial Services
       on Railway tracks have already started. All works shall be done safely. The
       Contractor shall carry out the work safely and no unsafe practice shall be
       followed. The tenderers are expected to take into account above factors while
       quoting the rates

18.0   In case of any disputes/differences, the jurisdiction shall be Delhi courts only.

We look forward for your active participation.

DA: Annexure „A‟

                                               For & on behalf of
                                               IRCON INTERNATIONAL LIMITED


                                               General Manager/J&K-I
                                               IRCON INTERNATIONAL LIMITED,
                                               4th Floor, Sector-XIII, R.K.Puram
                                                New Delhi 110066




Signature of Tenderer/s                                                                    18
                                                                         ANNEXURE - A

1.0     ELIGIBILITY CRITERIA
        Each tenderer has to satisfy the eligibility criteria for technical capability and
        competence as well as for financial capacity and organizational resources as
        specified in the tender documents to qualify for opening of his/their financial bid.

1.1   For Firms/Companies
1.1.1 As a proof of technical capability and competence, the tenderer should have
      experience of having successfully completed similar works during last 5 years
      ending 31st March‟2008 and should be either of the following:
        At least one completed work of similar nature costing not less than the amount
        equal to 1/3rd of the value of the tender,
                                                 OR
        Two completed works of similar nature each costing not less than the amount
        equal to 20% of the value of the tender,
                                                 OR
        Three completed works of similar nature each costing not less than the amount
        equal to 15% of the value of the tender.

1.1.2   As a proof of sufficient financial capacity, the tenderer/s should have an average
        annual turnover of at least 30% of the tender value. Average annual turnover shall
        be calculated for the best three years out of last five years ending on 31st
        March‟2008. The turnover shall comprise of payment accrued from contracts
        only.

1.2   For Joint Ventures
1.2.1 Technical Capability
      (i)    Each member of the Joint Venture should have satisfactorily completed at
             least one work of similar nature costing more than 1/10th value of the
             respective tender cost in last 5 years ending 31st March‟2008.
      (ii)   At least one of the members of the joint venture must have experience as
             required as per Para 1.1.1 above.
1.2.2 Financial Capability
      (i)   The arithmetic sum of average annual turn over of all members of the joint
            venture in last five years ending 31st March‟2008 should be more than
            30% of the tender cost.
        (ii)    At least one of the members of the joint venture must have average annual
                turnover in the preceding five years ending 31st March‟2008 not less than
                25% of the tender cost.
        (iii)   Each member of the joint venture should have a minimum average annual
                turnover of not less than 10% of the tender cost in the preceding five years
                ending 31st March 2008.
        The average annual turnover shall be calculated for the best three years out of last
        five years ending on 31st March‟2008.


Signature of Tenderer/s                                                                  19
1.2.3 All the members of the joint venture shall be jointly and severally responsible for
      all the acts done on behalf of the joint venture & tender bids shall be jointly
      signed by all members of the Joint Venture or their authorized representative so as
      to legally bind them jointly and severally. All bids must be submitted with a copy
      of Joint Venture agreement duly notarized. At least the lead member should be a
      Kashmiri Contractor having majority share.

1.2.4 All the above conditions must be satisfied by the Joint Venture to qualify for
      opening of their financial bid.

1.3     Bidders must submit Tax Deduction at Source (TDS) certificate in support of their
        eligibility criteria, in case of experience of execution of works for private
        organization.

Note:
i)      Work of Construction of Earthwork, Building work, Road work, CC/RCC
        and Bridge works shall be considered as work of similar nature.
ii)     The completed works shall include the completed works in last five years ending
        31.03.2008 as well as works that are in progress but the value of completed
        portion up to the date of tender opening is as per Para 1.1.1 and 1.2.1 above for
        firms & JV‟s respectively.

1.4     The tenderer should be a local Kashmiri Contractor. As a proof of being a
        Kashmiri contractor, the following conditions are to be satisfied.

        a)     The tenderer considered should have an office in Kashmir Valley and
        b)     The tenderer should be operating in Kashmir Valley and their
               owner/partner or partners having majority share should be State
               Subject of Kashmir Valley.

        The documentary proof regarding (a) & (b) above should be submitted as
        part of the tender document.

1.5     Copy of JV Agreement is attached.

1.6     Any tenderer can participate in the same tender in one entity only i.e. either as an
        individual firm/company or a joint venture with other firms/companies. In case,
        any tenderer submits the offer in more than one entity for same tender, such offers
        shall be liable to be rejected.

NOTE: -
“Tenderer(s) may please note that their offer will be evaluated as per the credentials /
documents attached by the tenderer(s) along with the tender”




Signature of Tenderer/s                                                                  20
              GENERAL CONDITIONS OF CONTRACT
General Condition of Contract is attached in a separate booklet. Bidder is instructed to
sign on each page of General Condition of Contract. This will form an integral part of
Agreement.




                                            For and on behalf of
                                            IRCON INTERNATIONAL LIMITED.



                                            Signature …………………………………..
                                            Designation :General Manager/ J&K-1




Signature of Tenderer/s                                                              21
              SPECIAL CONDITIONS OF CONTRACT

1.0   GENERAL DESCRIPTION
      Kashmir Valley is formed by the basin of the upper Jhelum River, which flows
      through its middle and with its outlet at Baramulla, which is the western end of
      the valley. The proposed work is part of the Qazigund-Baramulla rail link project
      joining Qazigund to Baramulla passing through Srinagar. The portion of the
      alignment between Qazigund-Baramulla is relatively flat.

2.0   SCOPE OF WORK, SITE LOCATION & CLIMATIC CONDITIONS
2.1   The J&K state climatically is distinctly divided in three parts namely the Jammu
      region, the valley region and the Leh Ladakh region. The climate in the valley for
      most parts of the year is temperate. The site is located between Qazigund &
      Baramulla from Chainage Km.0.00 to Km.45.00 of Railway alignment. The
      normal mean daily maximum temperature in July is around 300 -310 C in day time
      and from 100-110 C during nights in the hottest months. The normal mean daily
      maximum temperature in January is 4.40 C. During the winter season depending
      upon the amount of snowfall on the high mountains surrounding the valley the
      minimum temperature drops down below zero degree in January, which is the
      coldest month.

2.2   SCOPE OF WORK: - The scope of work includes Construction of Misc.
      external development works including approach roads for RPF/GRP Barracks at
      Srinagar, Pampore and Kakapore Railway Station yards. The work mainly
      involves earthwork, concrete work, Finishing, Roads & Pathways works, brick
      works, Drainage, Sewerage, Steel, pre-cast paver block, kerb stone works, SRFC
      work and other allied works.

2.3   The tenderer/s are requested to visit the sites of work and ascertain
      himself/themselves with the details of works required to be carried out and
      completed, surroundings and prevailing law and order conditions.

2.4   The work is to be carried out in Srinagar, Pampore and Kakapore Railway
      Station yards. There may be difficulty in transportation of materials/ working
      due to tracks already laid and movement of Railway traffic. Commercial Services
      on Railway tracks have already started. All works shall be done safely. The
      Contractor shall carry out the work safely and no unsafe practice shall be
      followed. The tenderers are expected to take into account above factors while
      quoting the rates

2.4   The regional geology and tectonic framework of the area indicate that the region
      is capable of generating earthquakes of severe intensity. The area falls in seismic
      Zone 5 of Indian Standard Seismic Zoning map of the country.




Signature of Tenderer/s                                                               22
2.5   RAINFALL
      The valley is much more affected by western disturbances from December to May
      and the maximum precipitation is in form of heavy snowfall in these ranges.
      While there is rainfall through out the year in the valley, March is generally the
      wettest month and November is the driest.

3.0   SITE REQUIREMENTS
3.1   WATER SUPPLY
      Water for drinking and for the works is scarce to get in the project area. The
      contractor shall be responsible for the arrangements to obtain water supply for
      drinking and necessary for the works. Railway/IRCON shall not supply water.
      Rates quoted by contractor shall include the cost of arranging water supply at the
      site of works.

3.2   POWER SUPPLY
      Any electric supply required at the site of works for whatsoever purpose shall be
      arranged by the contractor. The contractor shall make his own arrangements for
      electric power supply/installation of Diesel generating sets etc. as required for the
      work at his own cost and the rates quoted shall include the cost of providing such
      electric supply arrangements required for the works and offices / accommodations
      etc.
      If with the recommendation of Northern Railway, the State Electricity Board
      provides electric connection, the contractor may be given the facility on
      chargeable basis however the contractor shall have no claim on this account.

3.3   SERVICE ROADS
      The contractor/s shall make his/their arrangements for service roads, paths etc. for
      carrying his/their tools and plants labour and materials etc. and will also allow
      IRCON and other Govt. bodies use of such paths and service roads etc. for plying
      its own vehicles free of cost. The tender/s will be deemed to have included the
      cost of making any service roads, roads or paths etc. that may be required by
      him/them for plying his/their vehicles for the carriage of his/their men and
      materials, tools, plants and machinery for successful completion of the work.
      Similarly any other feeder road connecting any of the existing roads will be made
      by the contractor at his/their own cost including any compensation that may be
      required to be paid for the temporary and or private land and without in any way
      involving the IRCON in any dispute for damage and/or compensation.

      In case IRCON has its own paths, service roads, the contractor/s will be allowed
      to use of such paths or service roads free of cost. He/they shall however in no way
      involve IRCON in any claims or dispute of whatsoever kind due to the in
      accessibility of such paths or service roads or due to their poor condition and or
      maintenance or their being to be blocked and/or closed.

3.4   LIGHTING


Signature of Tenderer/s                                                                 23
       If lighting is required as per instructions of the Engineer, the contractor shall
       abide by the directions of the Engineer in this regard. The rates quoted by
       contractor shall include the cost of arranging such lighting and nothing extra shall
       be paid.

3.5    ANTILARVAL WORK
       During execution of the works against this contract, the contractor shall be
       responsible for anti larval works at his own cost.

3.6    LABOUR CAMP
       The contract or must establish proper labour camps with proper water supply and
       toilet facilities and should keep the areas in a neat and hygienic condition. If
       female labourers are employed, crèches for their children must also be organized.

       The Engineer will have right to impose a fine upto Rs. 10,000/- on each occasions
       he finds the contractor at default of proper arrangements in the labour camp and
       such amounts of fine will be deducted from the bills of the contractor.

       The contractor shall engage local labour for unskilled work as far as practicable.
       The rates quoted shall be inclusive of cost of the labour, skilled and semi skilled
       workers, cost of supervision etc.

3.7    ENABLING WORKS
       The rates quoted shall be inclusive of all enabling works such as construction
       vats, stores, godowns, workshops, maintenance places, offices, housing, labour
       camp, access roads, service roads, transport arrangements, drinking water facility,
       lighting etc. whether expressly specified or not. All temporary access facility
       created during execution of works including ramps in earthwork, concrete or
       masonry steps, ladders, etc. shall be treated as enabling works.

3.8    SITE CLEARANCE
       Before the work is started, the contractor shall clear all the jungle, grass, shrubs,
       trees etc., to the extent needed for the works and as directed by the Engineer-in-
       charge.
       The ground has to be levelled and rolled to achieve desired level of compaction
       before starting the earthwork. The reference levels have to be taken at initially
       rolled ground level. These levels will have to be taken at site by the contractor and
       IRCON representatives.
4.0   TIME SCHEDULE
4.1   TIME OF START AND COMPLETION
4.1.1 The time allowed for execution of the works is 04 (Four) months from the date
      of issue of Letter of Acceptance by IRCON.

4.1.2 The Contractor shall be expected to mobilize to the site of works and commence
      execution of the works within 10 (ten) days from the date of issue of Acceptance
      Letter by IRCON.


Signature of Tenderer/s                                                                  24
4.1.3 The contractor shall be expected to complete the whole of the works ordered on
      the contractor, within overall 04 months from the date of issue of Acceptance
      Letter by IRCON.

4.1.4 If the contractor commits defaults in commencing execution of the works as
      aforestated, IRCON shall without prejudice to any other right or remedy, be at
      liberty to forfeit fully the Earnest Money Deposit of the contractor.

4.2    INTEGRATION
       As the total works are divided into many packages there may be a requirement of
       integration between / among packages so that completion of whole of the works
       envisaged in all the packages put together is achieved as if executed by a single
       agency. For this purpose, the Engineer-in-charge shall have right to instruct a
       contractor to carry out the work between end of one package and beginning of the
       next package or both ends of a single package in a way that continuity and
       completion are achieved with respect to whole of the works envisaged between
       Km. 0.00 and Km.120.00.

       It will be the endeavour of the Engineering-in-charge, as far as possible, to
       instruct a contractor to carry out the work between continuous packages though
       the Engineer-in-charge shall have right to instruct any contractor to fill the gap
       between any two packages.

       The contractor shall not have any claim whatsoever, other than the entitled
       payment by measurement for the work carried out between among the various
       packages. The contractor shall carry out the work of integration within the overall
       time allowed for the contract work by extending corporation and coordination to
       other agencies and by avoiding obstruction.

4.3    PROGRAMME OF WORKS
       The tenderer shall submit with his offer a programme of works in the form of a
       Bar Chart of all activities in Consistence with milestone targets envisaged at
       clause 4.4 below. In case this bar chart requires to be modified, the Engineer-in-
       charge and the contractor shall agree upon a time and progress chart. The chart
       shall be prepared in direct relation to the time stated as 04 months for completion
       of the works and the milestone targets specified at clause 4.4 of these Special
       Conditions. It shall indicate the forecast of the dates of commencement and
       completion of various activities of the work and may be amended as necessary by
       agreement between the Engineer-in-charge and the contractor within the
       limitation of 04 months as overall completion period.

4.4    ACHIEVEMENT OF MILESTONE PROGRESS
       In order to ensure progress during execution of the work, the contractor will be
       expected to achieve the following milestone targets ahead of dates mentioned
       against each. Failure to accomplish milestone targets within allocated time frame,



Signature of Tenderer/s                                                                25
       save for reasons accepted as valid by the Engineer-in-charge, shall create and
       constitute ground for failure on the part of contractor for maintaining progress of
       the work as per agreed programme sufficient enough to invoke Risk and cost
       clause of these Special Conditions against the contractor.

Milestone Targets                                     Time within which to achieve
                                                                 04 Months
a)    Physical Commencement of work                         :    D + 10 Days
b)    Full mobilisation of plant and Machinery              :    D + 15 Days
c)    Completion of 25% work.                               :    D + 40 Days
d)    Completion of 50% work.                               :    D + 65 Days
e)    Completion of 75% work.                               :    D + 85 Days
f)    Final 100% work including finishing works and handing :    D + 110 Days
      over after site clearance

Note: (i)     „D‟ is the date of issue of Letter of Acceptance by IRCON to the
              contractor.
       (ii)   Ten (10) days period has been kept in floating period considering non
              working period due to snowfall, strike etc.

5.0    PAYMENT OF MOBILISATION ADVANCE
       The contractor, on his written request, shall be entitled to receiving a mobilization
       advance of 10% of total value of the contract sum as an interest-bearing advance.

       A simple interest shall be levied on the advance paid to the contractor, which shall
       be PLR + 1%, where PLR is Prime Landing Rate as per State Bank of India as on
       date of opening of the tender.

       The payment of advance shall be made after signing of contract agreement &
       shall be regulated as follows: -
       STAGE – I
       50% of the advance (i.e. 5% of value of the contract sum) upon submission by
       contractor of:
       a)     A Bank guarantee from a scheduled bank in India for advance as per
              proforma issued / approved by IRCON for equivalent sum plus a simple
              interest at PLR+1% per annum. BG shall be kept valid till the recovery of
              the advance is completed.

       b)     Performance Bank Guarantee as per Proforma issued /approved by
              IRCON from a scheduled bank.

       STAGE – II
       Balance 50% of the advance (i.e. balance 5% of value of the contract sum) upon
       submission by contractor of:




Signature of Tenderer/s                                                                  26
      a)     A second Bank Guarantee as per Proforma issued/approved by IRCON
             from a scheduled bank in India for advance for equivalent sum plus a
             simple interest at PLR+1% per annum. BG shall be kept valid till the
             recovery of the advance is completed.
                                          AND UPON
      b)     The contractor mobilizing at the site of works the sufficient number of
             Plant and Equipment in good working condition and commencement by
             the contractor as an on going part of contract works to the satisfaction of
             Engineer-in-charge.

5.1   RELEASE OF STAGE-II ADVANCE
      The stage-II payment of advance subject to provisions above, will only be made
      after satisfactory evidence that the stage I amount advanced earlier has actually
      been utilized for mobilization of resources for which details are to be furnished by
      the contractor to the Engineer-in-charge.
.
5.2   ADJUSTMENT OF ADVANCE
      The advance carries an interest equal to PLR+1% per annum. The advance
      together with interest occurred thereon, will be recovered through on account bills
      in installments, the recovery commencing when work executed reaches 15% of
      the contract value and shall be completed when the value of work executed
      reaches 85% of the contract value. The installment of recovery from each „on
      account‟ bill will be on pro-rata basis.

5.3   CALCULATION OF INTEREST
      Interest will be computed on diminishing balance basis on the amount of advance
      outstanding. The date of issue of Cheque will be reckoned as the date on which
      the recovery has been made for purposes of computing the outstanding and
      working out the interest.
6.0   PLANT & MACHINERY ADVANCE
      The advance to the extent of 10% (Ten percent) of the contract amount shall be
      paid to the contractor for which a simple interest of PLR+1% per annum shall be
      recovered. The advance shall be paid subject to following conditions-
      i)     Advance on security of machinery and equipment brought to the site shall
             be limited only to new machinery and equipment, which are essentially
             required for the work and involve a substantial outlay. The advance will
             not exceed 75% of the purchase price of such equipment and will be
             limited to a maximum of 10% of the contract value.

      ii)    The purchase of plant & machinery shall be done with prior approval of
             engineer-in –charge.
      iii)   The plant & machinery is to be utilized on that corresponding work till its
             completion.
      iv)    The total amount of advance for plant and machinery shall be least of the
             following-


Signature of Tenderer/s                                                                27
              a)     75% of the purchase value (as per bill)
              b)     10% of the contract value.

      v)      The recovery of advance shall be made on similar terms and conditions as
              defined for mobilization advance.
      vi)     No advance is admissible for consumables, store and spare parts.

      vii)    The contractor/s shall hypothecate all plant & machinery to IRCON
              against which advances are to be taken by him from IRCON. The
              document of hypothecation shall be registered with appropriate authority
              and the cost thereof shall be borne by the contractor. He/they shall also
              take following measures:
              a)        Proper endorsement to be done in the registration certificate, if
                        applicable, regarding hypothecation by the concerned transport
                        authorities.
              b)        The contractor shall display words “Hypothecated to IRCON
                        INTERNATIONAL LTD.” in bold letter on each plant &
                        machinery against which advance is given.
              c)        The contractor shall not take away the Plant & Machinery from
                        site of work nor deploy the same at any work other than work site
                        as per contract agreement without written permission of site
                        engineer.
              d)        Machinery for which advance is taken shall be insured for full
                        value.
      viii)   If it is considered necessary by IRCON, the registration certificate shall be
              submitted by the contractor for custody of IRCON for grant of advance for
              such machinery.
      ix)     In case the contractor/s abandons the works, the advance will be recovered
              by disposal of the plant & machinery so hypothecated. It will not be
              binding on IRCON to take possession of plant & machinery to utilize for
              the work and IRCON shall be free to dispose off the plant & machinery by
              auction or any other mode. The difference between the amount of advance
              or adjusted from other assets of the contractor.

7.0   USE OF MATERIALS
7.1   No material shall be used by contractor until unless the same has been tested and
      passed by Engineer in Charge.

7.2   The contractor has to arrange at his own cost cement & steel after taking approval
      from engineer-in-charge for samples he intends to use. The material must be
      conforming to the laid specifications and suitability of the site.

7.3   Cement brought by contractor for use should be from reputed manufacturers such
      as ACC, Ultra-Tech (Earlier named as L&T), Gujarat Ambuja, Aditya Birla
      Group or similar brand from their authorized dealers only. Similarly steel brought
      by contractor should be from reputed manufacturers such as SAIL/TISCO/RINL.



Signature of Tenderer/s                                                                 28
7.4    ALL OTHER MATERIALS: Like cement and steel, all other materials for the
       contract works shall be arranged by the contractor at his own cost.

8.0    CONSTRUCTION PLANTS AND EQUIPMENTS

8.1    The contractor shall be required to install, commission and use at site a batching
       plant of suitable capacity or any other machinery as approved by Engineer-in-
       charge for production of concrete for use for building work. The contractor shall
       also be required to make arrangements for curing of concrete It will entirely be
       the responsibility of the contractor to mobilize plant and machinery in very good
       working condition to the satisfaction of Engineer – in – charge from his own
       possession and if not, procure all the machinery, tools and plant including spare
       parts, fuel, consumable stores and labour that are required for the efficient and
       methodical execution of the works.
8.2    The quoted rates shall be deemed to be inclusive of all charges of such plant &
       machinery as well as manpower required to operate such plant and machinery.
8.3    If during the course of execution of works, it is found that the plant and
       equipment mobilized by the contractor are inadequate for the timely completion
       of works, the contractor shall undertake to augment the supply of plant and
       equipment to the satisfaction of Engineer- in- charge.
8.4    The contractor should also make sure that he has ready access to expert
       manpower to operate the plant and machinery efficiently and effectively and
       indicate accordingly in his offer.
8.5    The contractor shall not remove from the site of works any plant and machinery
       mobilized by him without prior written permission of the Engineer- in- charge
       during the course of or on completion of works.
9.0    DEFECT LIABILITY PERIOD
       The defects liability/maintenance period shall be 6 (six) months from the date of
       issue of completion certificate by the Engineer-in-charge to the contractor after
       satisfying himself that the works have been carried out by the contractor fully
       according to specifications and quality requirements and are suitable for the
       intended purpose.
10.0   TAXES AND DUTIES
10.1   Works Contract tax, Sales tax, VAT, Octroi, Royalty, Toll tax, Levy, or any
       other tax, taxes / levied by the Central or State Govt. or local bodies, upto the
       last date of receipt of Tender shall be borne by the tenderer. No part of such
       taxes on contractors‟ labour/materials or any other amount will be paid by
       IRCON. This should be kept in view before tendering.
10.2   LEVY OF SERVICE/SALES TAX

       Finance Deptt. of J&K Govt. has levied tax on the services in the shape of works
       contract rendered by the contractor at the rate of 8% plus surcharge of 5%.


Signature of Tenderer/s                                                               29
       Therefore this service tax at the rate of 8% on gross payment to the contractor and
       5% surcharge on the amount of service tax will be recovered by the Department
       from the Contractor at source. Service tax of 8% plus surcharge of 5% is deemed
       to be included in the Lump sum/Contract sum amount quoted by the tenderer.

10.3   If any further increase to the existing rates of taxes is made or levies is imposed
       by the State Govt/Central Govt., after the date of receipt of tender and the same is
       required to be borne by the contractors, then the recovery of said amount will first
       be made as required under law and subsequently the same will be reimbursed to
       the contractors only on production of certificates from the concerned Tax
       Authority to the effect that the sum as already deposited is not refundable to the
       contractor.

10.4   PERMANENT ACCOUNT NUMBER FOR INCOME TAX
       Firms should provide their PAN No. to ED/IRCON/Srinagar office in connection
       with all payments/bills.

11.0   DEDUCTIONS OF INCOME TAX AT SOURCE
       In terms of new section 194 C inserted by the Finance Act 1972 in the Income
       Tax Act 1961, IRCON shall act, at the time of arranging payments to the
       contractor, be entitled to deduct income tax at source on income comprised in the
       sum of such payments.

       The deductions towards income tax to be made at source from the payments due
       to the non-residents shall continue to be governed by Section 195 of the Income
       Tax Act, 1961.
12.0   INSURANCES
12.1   Before commencing of works, it shall be obligatory for the Contractor to obtain,
       at his own cost, insurance cover in the joint name of the Contractor and Employer
       from reputed companies under the following requirements:
       a)     Liability for death of or injury to any person or loss of or damage to any
              property (other than the work) arising out the performance of the Contract.
       b)     Construction Plant, Machinery and Equipment brought to site by the
              Contractor.
       c)     Any other insurance cover as may be required by the law of the land.
       The Contractor shall provide evidence to the Employer/Engineer before
       commencement of work at site that the insurances required under the contract
       have been effected and shall within 60 days of the commencement date, provide
       the insurance policies to the Employer/Engineer. The Contractor shall, whenever,
       called upon, produce to the Engineer or his representative the evidence of
       payment of premiums paid by him to ensure that the policies indeed continue to
       be in force.
       The Contractor shall also obtain any additional insurance cover as per the
       requirements of the Contract.


Signature of Tenderer/s                                                                 30
       The Employer/Engineer shall not be liable for or in respect of any damages or
       compensation payable to any workman or other person in the employment of the
       Contractor or his sub-contractor or petty contractor. The Contractor shall
       indemnify and keep indemnified the Employer/Engineer against all such damages
       and compensation for which the Contractor is liable.

       The Policies of the Contractor shall remain in force through out the period of
       execution of the works and till the expiry of the defect liability period except for
       any specific insurance covers necessary for shorter period.

       If the Contractor fails to effect or keep in force or provide adequate cover as
       acceptable to the Engineer in the insurance policies mentioned above, then in such
       cases, the Engineer may effect and keep in force any such insurance or further
       insurance on behalf of the Contractor. The recovery shall be made at the rate of
       1.5 times the premium/premiums paid by the Engineer in this regard from the
       payment due to the Contractor or from the Contractor‟s Performance Security.
       However, the Contractor shall not be absolved from his responsibility and/or
       liability in this regard.

13.0   PRICES AND PAYMENT TERMS
13.1   The schedule of Items, rates and Quantities (BOQ) as given in Financial Bid
       (Packet-II) has been priced by IRCON taking all aspects and conditions of work
       into proper consideration and the unit rates (for Schedule “A”, “B”, “C” and
       “D”) arrived are given for information of the tenderers. The tenderers are to quote
       their rates in figures as well as words as a percentage ABOVE, BELOW or AT
       PAR with the total sum arrived by IRCON for Schedule “A”, “B”, “C” and
       “D”.
13.2   It is to be understood that the percentages quoted by the tenderer as
       ABOVE, BELOW, AT PAR with IRCON‟s schedule “A”, “B”, “C” and “D”
       shall be applied equally for each and every item of the schedule “A”, “B”,
       “C” and “D” of items rates and quantities (BOQ) to represent the items
       rates of the tenderer. The items rates as derived above will form the basis of
       payment for such items (of Schedule “A”, “B”, “C” and “D”) under this
       contract. The percentage/rates quoted by the tenderer should take into account and
       include the cost of all works incidental to their execution.

13.3   Where there is a discrepancy in the percentage/rates quoted by the tenderer in
       figures and in words, the quote made in words shall be taken as final.

13.4 PAYMENT TERMS
13.4.1 The contractor shall be allowed one Running Account payment each month and
       payment shall be made upon verifications of measurements and works carried out
       in conformity with specifications and quality requirements after deducting dues
       on account of mobilization advance paid to the contractor, security deposit,
       Income Tax at sources etc. and any other dues that may have accrued.



Signature of Tenderer/s                                                                 31
13.4.2 All items of work having a financial value shall be entered in Measurement Book,
       Level Book etc., and maintained by IRCON so that a complete record is obtained
       for all work performed under the contract. The Contractor shall be authorized to
       depute his representative for joint measurement of works.

13.4.3 No material price variation or wages escalation on any account whatsoever the
       compensation for „Force Majure” etc. shall be payable under this contract except
       price escalation clause payable as per price escalation clause if any, provided
       separately in the tender documents.

13.4.4 The rates for any item of work not included in the (Schedule of rates and
       quantities) and which the contractor may be called upon to do by IRCON shall be
       fixed by the supplementary written agreement between the contractor and the
       IRCON before the particular item or items of work is/are executed. In the event of
       such agreement not being entered into and executed the IRCON may execute
       these works by making alternative arrangements. IRCON will not be responsible
       for any loss or damages on this account.

13.4.5 Payment for the work done will be made to the contractor only when the formal
       agreement has been executed between the parties.

13.4.6 MODE OF PAYMENT:
       13.4.6.1       All payments to the contractors shall be made through Electronic
                      Clearing System (ECS). The contractor shall furnish his Banker‟s
                      details in addition to his own bank account details. All amounts
                      payable to the contractor shall be directly credited to his bank
                      account.
       13.4.6.2       In case, the contractor is having his account with a bank not having
                      Electronic Clearing System (ECS), the contractor may open a bank
                      account with the bank having this facility.
       13.4.6.3       All payments to the contractor shall be made by above means only
                      unless specifically otherwise agreed by the Engineer in specual
                      circumstances for petty payments.

14.0   FORCE MAJEURE CLAUSE
       If at any time, during the continuance of this contract, the performance in whole
       or in part by either party of any obligation under this contract shall be prevented
       or delayed by reason of any war, hostility, acts of public enemy, civil commotion,
       sabotage, serious loss or damage by fire, explosions, epidemics, strikes, lockouts
       or acts of God (hereinafter referred to „events‟) provided, notice of the happening
       of any such event is given by either party to the other within 30 days from the
       date of occurrence thereof, neither party shall by reason of such event, be entitled
       to terminate this contract nor shall either party have any claim for damages
       against the other in respect of such non-performance of delay in performance, and
       works under the contract shall be resumed as soon as practicable after such event
       has come to an end or ceased to exist, and decision of the Engineer as to whether


Signature of Tenderer/s                                                                 32
       the works have been so resumed or not shall be final and conclusive, PROVIDED
       FURTHER that if the performance in whole or in part of any obligation under this
       contract is prevented or delayed by reason of any such event for a period
       exceeding 120 days, either party may at its option terminate the contract by
       giving notice to the other party.

14.1   Subject to any requirement in the contract as to completion of any portion or
       portions of the works before completion of the whole, the contractor shall fully
       and finally complete the whole of the works comprised in the contract (with such
       modifications as may be directed under conditions of this contract) by the date
       entered in the contract or extended date in terms of the following clauses:-
       (i)    If any modifications have been ordered which in the opinion of the
              Engineer have materially increased the magnitude of the work, then such
              extension of the contracted date of completion may be granted as shall
              appear to the Engineer to be reasonable in the circumstances, provided
              moreover that the contractor shall be responsible for requesting such
              extension of the date as may be considered necessary as soon as the cause
              thereof shall arise and in any case not less than one month before the
              expiry of the date fixed for completion of the works.

       (ii)   If in the opinion of the Engineer the progress of work has any time been
              delayed by any act or neglect of IRCON‟s employees or by other
              contractor employed by IRCON or in executing the work not forming part
              of the contract but on which contractor‟s performance necessarily depends
              or by reason of proceeding taken or threatened by or dispute with
              adjoining or neighbouring owners or public authority arising otherwise
              through the Contractor‟s own default etc. or by the delay authorised by the
              Engineer pending arbitration or in consequences of the contractor not
              having received in due time necessary instructions from IRCON for which
              he shall have specially applied in writing to the Engineer or his authorised
              representative then upon happening of any such event causing delay, the
              contractor shall immediately give notice thereof in writing to the Engineer
              within 15 days of such happening but shall nevertheless make constantly
              his best endeavours to bring down or make good the delay and shall do all
              that may be reasonably required for him to the satisfaction of the Engineer
              to proceed with the works. The contractor may also indicate the period for
              which the works is likely to be delayed and shall be bound to ask for
              necessary extension of time. The engineer on receipt of such request from
              the contractor shall consider the same and shall grant such extension of
              time as in his opinion is reasonable having regard to the nature and period
              of delay and the type and quantum of work affected thereby. No other
              compensation shall be payable for works so carried forward to the
              extended period of time, the same rates, terms and conditions of contract
              being applicable as if such extended period of time was originally in the
              original contract itself.




Signature of Tenderer/s                                                                33
       (iii)   In the event of any failure or delay by IRCON to hand over the Contractor
               possession of the lands necessary for the execution of the works or to give
               the necessary notice to commence the works or to provide the necessary
               drawings or instructions or any other delay caused by IRCON due to any
               other cause whatsoever, then such failure or delay shall in no way affect or
               vitiate the contract or alter the character thereof or entitle the contractor to
               damages or compensation therefore, but in any such case, IRCON may
               grant such extension or extensions of the completion date as may be
               considered reasonable.

14.2   EXTENSION OF TIME FOR DELAY DUE TO CONTRACTOR.
       The time for the execution of the work or part of the works specified in the
       contract documents shall be deemed to be the essence of the contract and the
       works must be completed not later than the date(s) as specified in the contract. If
       the contractor fails to complete the works within the time as specified in the
       contract for the reasons other than the reasons specified in clause 14.0 and 14.1,
       IRCON may, if satisfied that the works can be completed by the contractor within
       reasonable short time thereafter, allow the contractor further extension of time as
       the Engineer may decide. On such extension, IRCON will be entitled without
       prejudice to any other right and remedy available on that behalf, to recover from
       the contractor as agreed damages and not by way of penalty a sum equivalent to
       0.5% of the contract value of the works for each week or part of the week subject
       to maximum of 10% of contract value.

       For the purpose of this clause, the contract value of the works shall be taken as
       value of work as per contract agreement including any supplementary work
       order/contract agreement issued.

       Provided further, that if IRCON is not satisfied that the works can be completed
       by the Contractor and in the event of failure on the part of the contractor to
       complete the work within further extension of time allowed as aforesaid, IRCON
       shall be entitled, without prejudice to any other right or remedy available in that
       behalf, to appropriate the contractor‟s security deposit and rescind/terminate the
       contract under relevant clause of these conditions whether or not actual damage is
       caused by such default.

15.0   LABORATORY TESTING
       Contractor will be required to establish a field laboratory to carry out all requisite
       tests at his own cost. If so desired by Engineer-in-Charge the tests may also be
       carried out in Govt. approved labs at a place chosen by the Engineer-in-charge.
       The tests shall be conducted in the presence of IRCON and contractor‟s
       representative

15.1   TESTING OF CEMENT CONCRETE
       The contractor shall prepare at his own cost the standard cubes of concrete
       according to the direction of the Engineer-in-charge both for the preliminary tests
       and the works tests. Necessary moulds, slump cone apparatus etc., shall be owned


Signature of Tenderer/s                                                                     34
       and arranged by the Contractor. Labour, transport and moulds required for
       obtaining samples, carrying samples to the field laboratory and for the conduct of
       tests at the field laboratory shall be provided by the Contractor at his own cost.

       The criteria for acceptance of concrete work shall be results of tests carried out at
       28 days age.

NOTE:         All tests have to be carried out conforming to laid out Indian
              standards or specifications of CPWD-2002 as per direction of
              Engineer-in-Charge and shall be done at contractor‟s cost.

15.2   CHARGES FOR TESTING
       It is re-interpreted that no additional payment shall be made to the Contractor for
       any testing and rate quoted shall be deemed to include all testing and other
       incidental expenses.

15.3   MOULDS AND APPARATUS REQUIRED FOR TESTING
       The Contractor shall arrange at his own cost following moulds, apparatus etc.
       required for field samples and for tests to be conducted at field laboratory.

16.0   VARIATION IN QUANTITY
16.1   The IRCON reserve the right to alter the designs and drawings. If due to change
       in drawing or design or any other reasons, there be variations, either increase or
       decrease in quantities, payment will be made for actual quantities executed at the
       accepted rates. If there be sufficient cause, the IRCON may grant an extension for
       the date of completion suitably. Such circumstances, shall, in no way affect or
       vitiate the contract to alter the character thereof, or entitle the Contractor to
       damages or compensation therefore except as provided for in this tender.
       The quantities of items shown in the bill of quantities are approximate, and liable
       to vary during the actual execution of the work. The contractor shall be bound to
       carry out and complete the stipulated work, irrespective of the variations in
       individual items, specified in the bill of quantities.
16.2   Such variations in quantities shall be paid for in the manner laid down below:
        (a) In case the variation in individual items goes beyond (+) 25% in respect of
            the specialized nature of works like tunnelling works, Earthwork including
            rock blasting in hilly terrain for construction of access roads and the
            consequential works like protection works etc., where it is not possible to
            prepare fairly accurate estimate of quantities before award of the contract
            and it is not practical to bring a new agency for doing the increased quantity
            of work beyond (+) 25% variation, 1% reduction in the accepted rate will be
            effected for payment to the contractor beyond (+) 25% variation and upto
            (+)50% variation.
        (b) In other works where it is generally possible to work out fairly accurate
            estimate before award of the contract, 2% reduction in the accepted rate will
            be effected beyond (+) 25% variation and upto (+) 50% variation.



Signature of Tenderer/s                                                                  35
       (c) In case the variations in individual items is more than (+) 50%, the rate for
           the increased quantities beyond (+)50% shall be negotiated between the
           Engineer and the Contractor. Provided further that for the quantities
           exceeding (+) 50% of each item of Bill of Quantities, the Engineer shall
           have a right to get these executed from any other agency or by his own
           labour, materials and resources.
       (d) Decrease in quantity of individual items up to (-) 50% due to site conditions
           shall not form ground for revision of rates or claim on this account. Beyond
           (-) 50% variation, rate shall be negotiated between the Engineer and the
           contractor.
       (e) The above limit of variation shall not be applicable for small value items
           and no negotiations for rates for such items shall be done. Small value items
           shall be those items whose sum, starting from the lowest value items, is upto
           2% of the original contract value and shall be decided between the Engineer
           and the contractor.

17.0   PRICE VARIATION CLAUSE
       Not Applicable
18.0   RISK AND COST IN CASE OF FAILURE OF THE CONTRACTOR
18.1   Time is the essence of the contract. All works awarded to the contractor shall be
       completed in all respects within 04 months from the date of issue of Letter of
       Acceptance by IRCON.

18.2   In the event of failure on the part of the Contractor for maintaining the pro-rata
       progress of work as per agreed programme, IRCON reserves its right to make
       good the balance total quantity of work awarded to the Contractor by fixing any
       other agency on single tender basis or through departmental means as decided by
       the Engineer-in-Charge at the risk and cost of the Contractor and the cost so
       incurred on this shall be to the account of the contractor.

18.3   The decision of the Engineer-in-Charge regarding the quantity of work to be
       carried out at the risk and cost of the Contractor, the rates at which various items
       of work to be executed and the selection of the alternate agency to carry out such
       works will be final and binding on the Contractor. The extra amount incurred by
       IRCON due to such risk and cost a contract will be recovered from the
       Contractor‟s running bills, security deposit, or any other dues available with
       IRCON.
19.0   LIQUIDATED DAMAGES
       If the Contractor fails to maintain the required progress of work in terms of clause
       4.0 of these conditions with particular reference to sub clause 4.4 and eventually
       delays the completion of work due to faults and shortcomings attributable to the
       contractor beyond the completion time of 04 (Four) Months or any extended
       period thereof, the Engineer-in-Charge shall be at liberty to levy liquidated
       damages on the contractor at ½ (one half) percent of contract value for each week
       of delay or part thereof subject to a maximum of 10% of the contract value.



Signature of Tenderer/s                                                                 36
          The amount of liquidated damages may be adjusted or set off against any sum
          payable to the Contractor under this or any other contract with IRCON.

20.0      SAFEETY PROECAUTIONS TO BE TAKEN AT WORK SITE.
          The contractor shall not allow any road vehicle belonging to his or his suppliers
          etc. to ply in railway land next to the running line. If for execution of certain
          works. Viz., earthwork and supply of ballast, transportation of materials etc. road
          vehicles are necessary to be used in railway land next to the railway line the
          contractor shall apply to the Engineer-in-charge for permission giving the type
          and number of individual vehicles, names and license particulars of the drivers
          location duration and timings for such works/movement. The Engineer-in-charge
          or his authorized representative will personally counsel, examine and certify the
          road vehicle drivers, contractor‟s flagmen and Supervisor and will give written
          permission giving names of road vehicle drivers, contractor‟s flagmen and
          supervisor, to be deployed on the work, location, period and timing to the work.
          This permission will be subject to the following obligatory conditions.
   i)        Road vehicles can ply along the track after suitable cordoning of track with
             minimum distance of 6m from the center of the nearest track. For ply of road
             vehicles during night hours, adequate measures to be communicated in writing
             along with a site sketch to the contractor/contractor‟s representative and
             controlling engineers/supervisors incharge of the work including officers and
             the incharge of the sections.
   ii)       Nominated vehicles and drivers will be utilized for work in the presence of at
             least one flagmen and one supervisor certified for such work. The
             flagmen/supervisor as required shall be arranged by contractor and no separate
             payment shall be made for this.
   iii)      The vehicles shall ply 6M. clear of track. Any movement/work at less than
             6M. and upto minimum 3.5M clear of track center shall be done only in the
             presence of IRCON employees authorized by the engineer-incharge. No part
             of the road vehicle will be allowed at less than 3.5M. from track center.
   iv)       The Contractor shall remain fully responsible for ensuring safety and in case
             of any accident, shall bear cost of all damages to this equipment and men and
             also damages to railway and its passengers.
   v)        Engineer-in-charge may impose any other conditions necessary for a
             particular work or site.




Signature of Tenderer/s                                                                   37
21.0   ORDER OF PRIORITY OF CONTRACT DOCUMENTS:

       Where there is any conflict between the various documents in the contract, the
       following order of priority shall be followed i.e. a document appearing earlier
       shall override the document appearing subsequently:

       1)     Agreement
       2)     Letter of Acceptance of Tender
       3)     Notice Inviting Tender
       4)     Instructions to the Tenderers
       5)     Form of Bid
       6)     Special Conditions of the Contract
       7)     General Conditions of Contract
       8)     Technical Specifications
       9)     Relevant Code & Standards
       10)    Bill of Quantities /Drawings (Engineer-in-charge decision will be final
              and binding)




                                                      For and on behalf of
                                              IRCON INTERNATIONAL LIMITED.



                                              Signature …………………………………..
                                              Designation General Manager/J&K-I




Signature of Tenderer/s                                                            38
                   SPECIFICATIONS AND ADDITIONAL
                 SPECIAL CONDITIONS OF CONTRACT

Note:
i)    In these Specifications and Additional Special Conditions of Contract, wherever
      the name of N. Railways is mentioned, it should be read as N. Railway/ IRCON
      or IRCON as the Context would require for the purpose of this tender.
ii)   The word 'Contractor' shall be understood to mean "the Sub Contractor" as well &
      vice-versa.
1.0     CODES AND SPECIFICATION
1.1     The execution of all works under this tender shall conform to the specifications
        and codes of practice mentioned below as amended from time to time and as per
        the Instruction of Engineer-in-Charge.
1.1.1   N. Railway specifications for materials and work                 1987.
1.1.2   Northern Railway General Conditions of Contract                  1999.
1.1.3   CPWD Specification 2002 for material and works
1.1.4   Any other relevant IRS / IS / Other Code as per the instruction of Engineer-in-
        charge.
1.2     CODES OF PRACTICE TO BE FOLLOWED: -
        The following codes of Practice as amended from time to time shall be followed
        generally unless otherwise specified in the Additional Special Conditions of
        Contract or Schedules.
        IS: 5878 (Part I) 1971 Precision Survey and setting out.
        IS: 4081-1967 - Safety Code for Blasting and Related drilling operations.
        IS:4082-1996 - Carriage of materials, recommendations of stacking & storage of
        construction material at site.
        IS:1200 (Part I) – 1992 Earthwork, methods of measurement.
        IS:11134-1984 – Code of practice for setting out of works.
        IS: 3764-1966 - Safety Code for Excavation work.
        IS:1904-1978 – Code of practice for structural safety of building foundations.
        IS:1256-1967 – Code of Building By-laws.
        IS: 4138-1977 - Safety Code for Working on Compressed Air.
        IS: 7293-1974 - Safety Code for Working with construction Machinery.
        IS:3696 (Part I) 1987 – Safety code for scaffoldings and ladders (scaffoldings).
        IS:3696 (Part II) 1987 – Safety code for scaffoldings and ladders (ladders).
        IS:8112-1989 – Specification for 43 grade Ordinary Portland Cement.
        IS:1727 – Specification for sand for plaster.
        IS:2250 – Specification for sand for masonry.
        IS:1905-1980 – Code of practice for structural safety of building masonry walls.
        IS:383-1970 – Specification for fine & coarse aggregates.
        IS:456-2000 – Code of practice for plain and reinforced concrete for general
        building construction.


Signature of Tenderer/s                                                              39
      IS:7861 (Part I & II) – Code of practice for hot weather and cold weather
      concreting.
      IS:516 - Method of test for strength of concrete.
      IS:432 (Part I & II) – Specification for mild steel, medium tensile steel and hard
      drawn steel wire for concrete reinforcement.
      IS:1786-Specification for high strength deformed steel for concrete reinforcement.
      IS:12502-Code of practice for bending and fixing of bars for concrete
      reinforcement.
      IS:1077-1992-Specifications of common burnt clay building bricks (5th revision).
      IS:1123-1975 – Method of identification of natural stones.
      IS:1126-1976 – Method of tests or determination of durability of natural building
      stones (reaffirmed 1990).
      IS:1003 (Part I) 1991 – Specification for timber panelled and glazed shutters
      (door shutters).
      IS:1003 (Part II) 1993 – Specification for timber panelled and glazed shutters
      (window & ventilator shutters).
      IS:1200 (Part XII) – 1973 – Wood work Joinery (reaffirmed 1992).
      IS:1038-1983 – Steel doors, windows and ventilators (reaffirmed 1991).
      IS:2571-1990 – Code of practice for laying cast in situ cement concrete flooring.
      IS:277-1992 – Galvanised steel sheets (plain & corrugated).
      IS:1230-1979 – Cast iron Rain Water Pipes & fittings (reaffirmed 1991).
      IS:427-1965 – Distemper dry, colour as required.
      IS:428-1969 – Distemper oil emulsion, colour as required.
      IS:2932-1994 – Synthetic enamel paints exterior.
      IS:5410-1992 – Cement paints.
      IS:5411-1974 – Plastic emulsion paints.
      IS:1729-1979 – Sand cast iron spigot and socket soil waste and ventilating pipes
      and fittings.
      IS:771 (Part I & II)-1985- Glazed fire clay sanitary appliances.
      IS:458-1988 – Precast concrete pipes (with and without reinforcement).
      IS:651-1992 – Specification for salt glazed stone ware pipes and fittings.
      IS:1726-1991 – Specification for cast iron manhole covers and frames.
      IS : 226-1975 - Structural steel (Standard Quality)
      IS : 1893-1975 - Criteria for Earth quake resistant design of structures.
      IS : 1200 (Part - XXV) 1971 - Methods of Measurement of Building and Civil
      Engineering works.
      IS : 800 - Code of Practice for use of Structural steel in General Building
      Construction.
      Indian Railway's Schedule of Dimensions of Broad Gauge.
      Indian Explosive Act-1988.
      Indian Explosive Rules-1983.
      All other relevant IS /IRC codes as applicable for completion of work.
      All other approved plans & drawings for building work, water supply, sewerage
      and drainage works.




Signature of Tenderer/s                                                              40
1.3   The IRCON reserves the right to reject of alter any part of the work executed by
      the Contractor which in the judgement of the IRCON does not comply with the
      requirements of the above specifications. The decision of the IRCON shall be
      final and conclusive for all purpose and contractor shall have no claim on this
      account whatsoever.

2.0   SETTING OUT OF WORKS
2.1   The contractor is to set out the whole of the works in consultation with the official
      to be deputed by the Engineer and during the progress of work to amend on the
      requisition of the Engineer any errors, which may arise there in and provide
      efficient and sufficient staff and labour therefore. The contractor shall alter or
      amend any error in the dimensions, lines or levels to the satisfaction of the
      Engineer or his authorised representative without claiming any compensation for
      the same.

2.2   The contractor at his own cost shall also provide, fix and be responsible for the
      maintenance of all stacks, templates, profiles, land marks points, burjies,
      monuments, center line pillars, reference pillars etc. and shall take all necessary
      precautions to prevent their being removed, altered or disturbed and will be
      responsible for the consequences of such removal, alterations or disturbances and
      for their efficient reinstatement.

2.3   Before the work is started by the contractor, the ground between where
      filling/excavation is to be done shall be cleared of all trees along with their roots,
      shrubs, heavy grass and undergrowth of every kind. None of the items of work
      mentioned in this area will entitle the contractor/s to any extra payment. The trees
      which have been planted by IRCON and removed by the contractor will be the
      property of the contractor/s and the trees which have been planted by other than
      IRCON will be cut by the contractor free of cost and will be lead to the store of
      concerned authority as directed by the Engineer-in-charge. No extra claim will be
      entertained whatsoever. No trees falls outside railway land of the trees but any
      delay on this account will not basis for claim.

3.0   MATERIALS
3.1   The materials used on the works and supply by the contractor shall conform to
      CPWD Specifications 2002 for material and works and relevant IS/IRC/IRS
      specifications.
3.2   The samples of material, which the contractor intends to use on works, shall be
      got approved in advance from the Engineer-in-charge before commencing the use.
3.3   If any material is rejected at site due to its non-conformity to specifications, the
      contractor shall arrange to remove all such materials from Railway/IRCON land
      at his own cost within 7 days from receipt of notice do so. In case of default, the
      removal from Railway / IRCON land to the place decided by the Engineer-in-
      charge shall be got done by IRCON at the risk and cost of the contractor.




Signature of Tenderer/s                                                                  41
4.0   WATER
      The quality of water shall be as per its relevant specifications and fit for use in
      different cement & concrete works and curing etc.

5.0   CEMENT
5.1   Cement brought by contractor for use should be from reputed manufacturers such
      as ACC, Ultra-Tech (Earlier named as L&T), Gujarat Ambuja, Aditya Birla
      Group or similar brand from their authorized dealers only. Similarly steel brought
      by contractor should be from reputed manufacturers such as SAIL/TISCO/RINL.
5.2   Cement older than 3 months from the date of manufacture as marked on the bags
      shall not be accepted. The cement bags in proper bag packing should bear the
      following marking:
      i)    Manufacturer‟s name.
      ii) Registered trade mark of manufacturer if any.
      iii) Type of cement.
      iv) Weight of each bag in kgs.
      v) Date of manufacture, generally marked as week of the year.

5.3   Quality test certificate along with purchase bill in original for cement as per IS-
      4081 shall be furnished by the contractor at his own cost from the manufacturer
      before use of cement.

5.4   IRCON may also take samples during the course of execution of works and get
      the cement tested to ascertain the conformity to relevant IS specifications at
      contractor‟s cost before particular lot is put to use. Frequency of testing shall be
      as prescribed by the relevant IS codes. Following tests interalia shall be carried
      out:
      i)    Fineness
      ii) Compressive strength
      iii) Initial and final setting time
      iv) Soundness
      v) Other tests if necessitated

5.5   Cement shall be stored above ground level in perfectly dry and water tight sheds.
      Stacking of cement in godown shall be done on a layer of wooden sleepers so as
      to avoid contact of cement bags with the floor or alternately scrap GI sheets may
      also be used in place of sleepers but those shall be stacked at least 30cm clear of
      the walls to prevent deterioration. Cement shall be stacked not more than 8 layers
      high to prevent bursting of bags in the bottom layer and formation of clods.
      Cement shall be stored in such a manner to permit easy access for proper
      inspection. Stacks of cement bags shall be covered with tarpaulin during monsoon
      so as to obviate the possibility of deterioration of cement by moisture in the
      atmosphere. Cement, which is partially set, is on no account to be used on works.




Signature of Tenderer/s                                                                42
6.0   EARTH WORK
6.1   EARTH WORK IN EMBANKMENT FOR ROAD AND OTHER PLACES:
6.1.1 Earthwork in embankment shall be done as per approved profile or as directed by
      engineer in charge. This will also include trolley refuges at locations as desired by
      Engineer in charge. Earthwork in embankment shall be carried out generally
      conforming to guidelines for Earthworks in Railway Projects (May, 1987) issued
      by RDSO, Lucknow and amended from time to time. Attention is invited to
      guidelines for execution of earthwork in embankments and cuttings for new
      construction, doubling and conversion projects issued by RDSO and approved by
      railway Board. The embankment will be formed by contractor's own earth.
6.1.2 While bringing earth contractor (s) shall ensure that the safety of Govt. assets is
      not endangered.
6.1.3 The earth obtained from the excavation of bridge foundations and protection
      works and drains if found suitable by Engineer-in-charge shall be led into
      adjacent banks as directed by the Engineer-in-charge of the work without any
      extra payment and quantity payable under earthwork in bank shall be reduced by
      that extent.
6.1.4 The rate includes all jungle clearance, cutting uprooting of tree upto 30 (thirty)-
      cm girths at one metre above G.L. The trees so cut shall be the property of the
      railway and they shall be stacked as per directions of the Engineer-in-charge.
6.1.5 Cutting of trees shall be done by contractor as per State forest dept. regulations.
6.1.6 Earthwork required for making level crossing and platforms shall also be paid for
      at the rate quoted.
6.1.7 The contractor shall bail out/pump water from pockets, ditches, ponds etc., at his
      own cost, before commencing earthwork in bank formation.
6.1.8 Wherever crossing of existing Railway tracks is necessary all safety precautions
      shall be observed and such crossing of tracks can be permitted only by the
      Engineer. The contractor shall be fully responsible for payment of compensation
      arising out of accident, if any.
6.1.9 The fill materials to be used shall be free from stumps, trees, roots, etc., and shall
      be used only after approval by the Engineer-in-charge.

7.0    MECHANICAL COMPACTION OF EARTHWORK
7.1    After site clearance, all pockets and depressions left in the soil, if any, shall be
       made good and compacted. Earthwork shall be done in layers not exceeding
       30mm (12") thick in the loose state and compacted preferably at or near the OMC
       with suitable rollers to obtain the density specified.
7.2    Smooth wheel self propelled roller of three wheels weighing 8 to 10 tonnes or
       Caterpillar tractor drawn tamping sheep foot rollers or vibratory compactors
       should be used for compaction of earthwork in embankment. The tamping rollers


Signature of Tenderer/s                                                                     43
       shall have their feet projecting from the surface by not less than 75mm and the
       feet shall not be less than 150 mm apart. It is also advisable that the contractor
       uses vibratory compactors for compaction of earthwork in embankment.
7.3    The number of passes of the rollers and the optimum thickness of each layer shall
       be fixed after carrying out field trials with the roller proposed to be used from
       time to time and from location to location, the main criteria being to obtain the
       required density.
7.4    Each layer shall continue to be rolled until no further compaction results. The
       layers shall be free from ruts.
7.5    In parts of embankment, inaccessible to the specified rolling equipment, around
       and in contact with culverts, abutments or in proximity to structure where it will
       not be possible to operate rolling equipment, compaction shall be accomplished
       by hand tamping with hand or mechanical tampers of approved type. Roller shall
       not be permitted to operate within 1500 mm of masonry/concrete structure and all
       fills within this distance shall be made hand tamped. All materials to be tamped
       shall be spread in layers not over 100mm thick. The moisture content at the time
       of tamping shall be such as to produce a degree of compaction equal to that
       specified for rolled fill. Final rolling of the top layer of the fill shall be completed
       with a self propelled smooth wheel power driven roller or multiple pneumatic tyre
       wheeled roller or hand tamped to the required profile.
7.6    The filling over culverts shall be made up simultaneously from both sides.
7.7    In back filling, above or against or in filling over masonry or other structures, the
       materials shall be deposited more than 100mm thick, sloping away from the
       structure with each layer carefully tamped. Only the selected materials shall be
       used for this purpose. Highly cohesive, wet, impervious material shall not be
       used.
7.8    (i)     Cohesion less soil shall be compacted to get a minimum density index
               (Relative density) of 70% as obtained in accordance with I.S.2720 (part
               XIV)-1983.
       (ii)    All other types of soils when compacted shall attain at least 98% of the
               maximum dry density as determined using heavy compaction in
               accordance with I.S. 2720 (Part VIII) 1983 followed by field trials as per
               IS: 10379 -1982.
7.9    Where the moisture content of the earth in any layer is above OMC it shall be left
       drying for a suitable period to bring down the moisture content very near to OMC
       before rolling is commenced. If the soil is dry, water shall be sprinkled either in
       the borrow pit or over the spread layer, as convenient, in order to attain a moisture
       content near to OMC before rolling is commenced.
7.10   Each layer shall be compacted to the desired density over its entire width
       commencing from the two sides before another layer is started.



Signature of Tenderer/s                                                                     44
7.11   While compacting it shall be ensured that there is a minimum overlap of 15 cms
       (6") between successive runs of the rollers.
7.12   Care shall be taken during the compaction operation to slope the surface of the
       bank facilitate the shedding and to minimize the absorption of rainwater,
       particular attention being given to the prevention of ponding.
7.13   The density of each layer of compacted soil shall be ascertained by the Railway
       by testing an adequate number of soil samples.
7.14   The quality of work shall be determined by considering the mean density of the
       samples in each layer. The mean dry density shall be equal to or exceed the
       minimum specified density. In no individual case shall the density be less than the
       minimum value specified by more than 5% otherwise further rolling shall be done
       at the appropriate location.
7.15   The contractor shall be allowed to lay a further layer of soil only after the
       compaction of a particular layer has been satisfactory.
7.16   The top of the formation shall be finished as required and as per the instructions
       of Engineer – in-charge.
7.17   All works including the surface of the fill shall be finished to a smooth and
       compact profile in conformity with the plans and the contractor must not leave
       any depressions or irregularities that will hold water or prevent drainage. Slopes
       shall be finished by hand shovelling. The inside slopes of embankment shall be
       neatly dressed to line as the placing of the fill progresses.
7.18   Adequate arrangements for control of compaction must be ensured during the
       construction so that the required degree of density is obtained in each layer of
       earthwork.
7.19   The density of each layer of compacted soil shall be ascertained by taking soil
       samples collected mostly on either side of the centre line at intervals of 25 metres
       or so, with a few taken at random near the two sides or using sand replacement (as
       per IS:2720 pt. VIII, 1974) or core cutter method (as per IS: 2720 pt. XXIX,
       1975). The number of tests will of course depend on the width of the formation.
7.20   In making earth work in embankment or due to movement of compaction
       equipment, if there is natural subsidence or sinking of the natural ground under
       the embankment due to any reason, the contractor shall make up the deficiency in
       the quantity or earth work due to natural sinking at his own cost. No additional
       payment, compaction shall be made on this account.
7.21   Extra width of 50 cm. shall be rolled on either side, which after finishing the bank
       upto final height shall be dressed by removing the loose earth of rollers not able to
       compact the soil at the end of the formation width.
7.22   The rate quoted for earthwork in embankment shall include the cost of testing of
       soils at field laboratories set up by Contractor. The contractor shall carry out field


Signature of Tenderer/s                                                                   45
       tests under the guidance of the Engineer in charge and maintain necessary records
       as detailed in the guidelines for execution of earth in embankment and cutting of
       new construction, doubling and conversion projects. The Railway/IRCON will
       carry out 10% test check for the quality of the spoil used and the compaction
       obtained under OMC conditions. The Contractor shall be liable to remove the
       bank and re-do when the results are not up to the approved stipulations, as per
       specifications issued by R.D.S.O for execution of earthwork in embankment &
       cutting of new construction, doubling conversion projects.
7.23   Profiles for banks shall be set up by the contractor at interval of 25m on the
       straight as well as curves and at every 15 metres on curves with radius sharper
       than 600 metres. Profiles shall be set up in additional places as ordered by the
       Engineer.
7.24   Wherever the proposed embankment is to be formed in contact with the side slope
       of the existing bank, the same should be benched as directed by the Engineer
       before depositing earth. No extra rate will be made for benching of the existing
       bank and the rates quoted by the contractor for earthwork items are deemed to
       include the charges for benching.
7.25   In case there are rain cuts in embankment constructed by contractor during
       currency of the contract or during maintenance period the same shall be made
       good by him at his own cost to the entire satisfaction of engineer in charge.
7.26   Contractor shall make toe line and provide vertical reference pillars at uniform
       interval as desired by engineer in charge. No extra payment shall be made on this
       account and rates quoted by contractor shall be inclusive of this.
7.27   Considering the type of base soil available stage wise construction will be
       required to execute the work in the manner as approved by IRCON. No extra
       payment on this account shall be payable.

8.0    EARTHWORK IN CUTTING:
8.1    The cutting shall be carried out as per specifications of N. Railway Standard
       Specifications for materials and work and as per the guidelines for execution of
       earthwork in embankment and cuttings of new construction, doubling and
       conversion projects issued by R.D.S.O and approved by Railway Board.
8.2    Cut spoils shall not be dumped within 10 Metres from the top edge of the cutting.

9.0    PAYMENT FOR EARTHWORK:
9.1    All payments for earthwork, unless otherwise specified, will be made on the basis
       of cross-sectional measurements of the finished works of embankment as per
       approved plans. It shall be the responsibility of the contractor to ensure that no
       work on embankment shall be commenced until the existing ground levels at the
       different cross-sections have been observed and recorded and such record of
       levels have been jointly signed by the contractor and the Engineer or their
       authorised representative.



Signature of Tenderer/s                                                               46
9.2    Cross-sectional profiles, plotted on the basis of the observed ground levels shall
       also be jointly signed by the contractor and the Engineer or their authorised
       representatives. The point at which cross-sectional ground levels are to be
       recorded and the extent of levelling work to be done shall be decided by the
       Engineer. Due regard shall be given to correct assessment of quantity. The
       contractor may bring to the notice of the Engineer such additional cross-sections
       that in his opinion should be observed for proper assessment of quantities. Such
       representations, however should be made before the commencement of any
       earthwork. The Engineer‟s decision thereon shall, however, be final and binding
       on the contractor.
9.3    No extra for “Wet excavation” is admissible for earthwork in formation (cutting)
       side drains catch water drains, etc. No extra payment towards the cost of bailing
       or pumping out water from borrow pits cuttings will be made. It would be deemed
       that the accepted rates are inclusive of all charges for such items incidental to
       earthwork.

10.0   CONCRETE WORKS
10.1   The aggregates used shall be of approved quality, satisfying all codal
       requirements.
10.2   Concrete required for all works shall be machine mixed only. Hand mixing will
       be permitted only with specific approval of the Engineer and shall generally be
       limited to small quantities and for use in locations where strength is not a
       criterion. The concrete must also be properly vibrated with mechanical vibrators.
10.3   The contractor shall prepare at his own cost standard cubes of concrete at suitable
       intervals during concreting operations and test them under the supervision of the
       Engineer or his authorized representatives and submit the test results for approval.
10.4   While executing all concrete works below sub-soil water level, the foundation pit
       must be kept free of all seepage water by bailing or pumping or in any other
       manner. The rates quoted for concrete items shall include the charges for all such
       works.

11.0   PROTECTION WORKS AND PITCHING WORKS
11.1   Pitching of the banks should not be commenced until the banks have been
       completed to approve profiles and passed by the Engineer-in-charge.
11.2   Protection works should be done in the open during the dry season as far as
       possible when the water level in the river is low. Stones will not be permitted to
       be thrown or dumped under water.
11.3   All protection works including pitching will be done in accordance with Northern
       Railway Standard Specifications or as directed by Engineer-in-charge.




Signature of Tenderer/s                                                                 47
12.0   RANDOM RUBBLE MASONRY
       It will be provided in the toe walls, bands for pitching panel in training works and
       guide bunds and as may be directed by the Engineer. This masonry will be
       provided as per Northern Railway standard specifications-1987. River boulders
       and large pebbles hammer dressed quarry stone will be allowed to be used in this
       masonry.

13.0   PROVISION OF PITCHING
       Slopes of the guide bunds and embankments, whenever required shall be
       protected by providing hand packed dry boulder pitching or grouted pitching as
       specified in drawings.
13.1   The dry pitching shall be required to be done either in continuous stretches or in
       panels as per approved drawings/or as directed by Engineer-in-charge. It shall be
       sufficiently and closely hand packed by filling voids.
13.2   The stone/boulder in the slopes of the guide bunds and in the aprons should be
       carefully hand packed and also hammer dressed lightly wherever necessary and it
       is only in the incidental filling of the voids and hollows that smaller size boulders
       may be allowed to be used.

14.0   BRICK WORK
14.1   All brickwork shall be done in well-burnt bricks of class designation-75 as per
       CPWD 2002 Specifications in cement mortar in proportions as may be specified
       in the drawings or as instructed by the Engineer-in-Charge.
14.2   The contractor will get the samples of bricks, which he intends to use and the
       source of supply approved from the Engineer-in-charge. However, this will not
       absolve the contractor from his liability to ensure the quality of bricks.
14.3   After bringing the bricks at site, the contractor will stack and offer to the
       Engineer-in-charge for inspection. After inspecting the stacks, the Engineer-in-
       charge will either reject or pass the bricks in writing. The stacks passed by the
       Engineer-in-charge shall be used at site and rejected stacks shall be removed from
       the site within 7 days of the rejection. In case, the rejected bricks are not removed
       from site, within the prescribed period, the Engineer-in-charge may order the
       removal of such stacks from the site at the cost of the contractor.
14.4   All pipes, clamps or other fittings as may be required, shall be fixed in position as
       the work proceeds in the brick wall before housing the fittings.
14.5   No claim for any additional labour involved in doing masonry work around
       switchboard, junction boxes etc. shall be entertained.
15.0   FORM WORK AND SHUTTERING
15.1   Shuttering shall be either of plywood of approved quality on wooden frame or of
       steel plates stiffened by steel angles. During casting of concrete, the shuttering
       shall be supported on wooden battens and props of vertical ballies properly cross-
       braced to make the form rigid.


Signature of Tenderer/s                                                                  48
15.2   The formwork shall conform to the shape, lines and dimensions as shown on the
       plan. It shall be sufficiently rigid and to maintain correct shape of the members
       during deposit of concrete and shall be able to resist forces caused by vibration of
       concrete and incidental loads associates with men working over it. The shuttering
       shall have smooth and even surface and its joints shall not permit leakage of
       cement slurry.
15.3   If at any stage of work during or after placing concrete in the structure, the form
       work bulges out beyond their required shape of the structure, the concrete shall be
       removed and work done with fresh concrete inadequately rigid form work. Details
       of the shuttering and centering shall be subject to the approval of Engineer-in-
       Charge. The formwork shall be inspected and approved by the Engineer-in-
       Charge before the reinforcement bars placed in position.
15.4   The shuttering for beams and slabs shall have camber of 4 mm per metre (1 in
       250) or as directed by the Engineer-in-Charge so as to effect the subsequent,
       deflection. For cantilevers the camber at free end shall be 1/50th of the projected
       length or as directed by the Engineer-in-Charge.
15.5   In the case of structures with RCC frame work, such as multi storied structures,
       concrete piers and abutments of important bridges, folded plates etc. which should
       have exposed surface of steel shuttering or shuttering manufactured out of good
       quality water proof plywood (like anchor ply) shall be permitted. In the case of
       such important concrete structure where high quality concrete finish is a must or
       where controlled concrete has been specified for use, the shuttering will be
       assembled to ensure leakage proof formwork.
15.6   Provision shall be make in the shuttering for inserting fan hooks clamps,
       provision for conduit etc. for concealed wiring and providing architectural finish
       in grooves, if any, at the junction of slab with beams of wall columns wherever
       required for architectural consideration or concealed sanitary and water
       connection with the provision of various services in the building for service or
       architectural reasons. It may also be necessary to make holes in the shuttering of
       RCC columns for projecting bars. The tendered rates shall include cost of
       providing above-mentioned services etc. and no extra payment shall be made to
       the contractor for making these provisions nor any deduction shall be on account
       of any saving in the RCC work due to these.
15.7   The formwork for the RCC Chajjas will be so made that the drip coarse and
       (including the putty and the drip) the cast along with the Chajjas. No extra
       payment shall be made for this drip coarse.
16.0   PLAIN CONCRETE AND RCC WORKS
16.1   After completing the formwork and shuttering, the same shall be offered for
       inspection to the Engineer-in-charge and only after his clearance further work of
       placing the reinforcement in position and casting of concrete shall be taken in
       hand. The material used in CC/RCC works shall conform to relevant CPWD and
       IS specifications.


Signature of Tenderer/s                                                                 49
       i) These specifications shall be read in conjunction with any other specifications
           for concreting work given elsewhere in tender document.
       ii) Clear cover will be provided as per drawing or as directed by Engineer-in-
           charge.

16.2   AGGREGATES FOR CONCRETING
16.2.1 Coarse Aggregates
       Coarse aggregates shall be as per specification and shall conform to requirements
       of IS 383/IS 456 & IS: 1343.
16.2.2 All coarse aggregate material shall be chemically inert, strong, hard, of limited
       porosity and free from adhering coatings, clay and organic or other impurities that
       may cause corrosion of the reinforcement or affect the strength and durability of
       the concrete.

16.3   FINE AGGREGATE
16.3.1 Fine aggregate shall be of approved quality and grading conforming to IS: 383,
       IS: 456 & IS 1343 standards. It shall be free from impurities and deleterious
       substances.
16.3.2 The decision of Engineer-in-charge shall be final regarding approval of the coarse
       and fine aggregates for the concreting works. The contractor shall be required to
       carry out washing and sieving of aggregates if directed by Engineer-in-charge and
       all costs for the same shall be borne by the contractor.

16.4   STORAGE OF AGGREGATES
       Coarse aggregates shall be delivered at site and stored in separate sizes as ordered
       by the Engineer-in-charge. The Engineer-in-charge shall decide and direct the
       contractor to bring, stack and store aggregates in different sizes as he deems
       necessary for the proper quality control. Aggregates shall be stored or stock piled
       in such a manner that segregation of fine and coarse sizes will be avoided and also
       that the various sizes will not become intermixed before proportioning. These
       shall be stored, stock piled and handled in such a manner that will prevent
       contamination by foreign deleterious materials. In the case of fine aggregates they
       shall be deposited at the mixing site for not less than 8 hours before use and
       should be got tested and approved by the Engineer.

16.5   REINFORCED CEMENT CONCRETE
16.5.1 All concrete works whether plain or RCC should conform to CPWD & IS
       specification for plain / reinforced concrete, mix design (mix design to be
       submitted by contractor & approved by Engineer-in-charge.
16.5.2 All concrete shall be mixed in an approved concrete mixing machine. All such
       cement concrete should be vibrated by use of mechanical vibrators and nothing
       extra over and above the rates for mass concrete/RCC will be payable for these
       operations.



Signature of Tenderer/s                                                                 50
16.5.3 Welding of reinforcement will not generally be permitted except in special
       circumstances under the written approval of the Engineer in accordance with the
       relevant IS codes.
16.5.4 The exposed surface of mass cement concrete and RCC work shall be rendered to
       leave the surface smooth and even. Nothing extra will be payable for rendering
       the exposed surface, the cost of which will be considered as having been included
       in the item rates quoted in the schedule of items, quantities and rates.
16.5.5 In addition to the routine tests of materials, tests will be carried out whenever
       required by the Engineer-in-Charge. The cost of the special test will be borne by
       the contractor. Necessary facility in the form of moulds cones, scales, material,
       labour for casting, curing specimens and such other facility as are pre-requisite to
       any standard concrete test will be in any case, afforded by the contractor free of
       cost.
17.0   REINFORCEMENT
17.1   The contractor is required to arrange steel at his own required for works as per
       approved drawings and conforming to specifications. The Contractor shall be
       required to use TMT reinforcement steel of SAIL, TISCO, RINL as per approved
       drawings and nothing extra over and above the percentage quoted by him in
       financial bid shall be payable. The rate shall be inclusive of providing, cutting,
       straightening, hooking, bending, binding & placing in position the reinforcement
       steel.
17.2   Payment of fabricated structural steel work with steel of SAIL/TISCO/RINL only
       approved shall be made based on calculated weight of finished work as per
       standard weights and approved drawings. In calculating the weight, the overall
       length of the members used will be taken into account and no deduction made for
       rivets / bolt holes / skew cuts, notches etc. Gussets etc.
17.3   Payment for reinforcement steel shall be made as per total weight calculated
       based on total length of different dia steel bars used as per approved drawings or
       as directed by Engineer-in-Charge considering standard weights of steel bars as
       gives in steel tables.
17.4   Payment shall be made for actual quantity of steel used as per approved drawings
       excluding all the wastages thereof.
18.0   MEASUREMENTS
       All works will be paid for at the tendered rates on the basis of actual measurement
       taken at site as per CPWD specifications.
19.0   RATES
19.1   The tendered rate shall include all labour and material and its placing in position
       as per plan, screening and washing of the aggregate if required, weigh batching
       mixing the concrete mechanically and placing the same at different locations as
       per plan, provision and use of equipments, including mechanical mixer, vibrator
       etc. and curing & finishing the exposed surface. Nothing extra whatsoever shall be
       paid.


Signature of Tenderer/s                                                                 51
19.2   Controlled concrete with TMT reinforcement bars will be used wherever so
       specified in the approved drawings or as instructed by the Engineer-in-Charge.
19.2.1 The provisions specified in IS: 456:2000 for preparation of proportioning and mix
       design for controlled concrete will apply in general unless otherwise modified by
       the Engineer-in-Charge.
19.2.2 For all concrete work the aggregate will be analysed as per standard test to
       determine their property and their grading from the laboratory approved by the
       Engineer-in-Charge.
       As far as possible the stock piling of the aggregates shall be done in accordance
       with Standard practice to enable standard analyst being made for each batch that
       is brought to the site. The design of the mix will be got done along with
       representative samples of the aggregate & water. The preliminary test results
       along with the analysis of aggregate and mix design calculation should be
       submitted to the Engineer-in-Charge for his approval and expenditure involved
       for mix design will be borne by the contractor.
19.2.3 The contractor/s will modify/carrying out and submit the mix design to the
       satisfaction of the Engineer-in-Charge, if so required and get his final approval,
       such approval, however, does not relieve the contractor/s for his/their
       responsibility and obligations regarding the minimum strength requirement.
19.2.4 All controlled concrete shall be weigh batched. For this, it will be preferably to
       have mixer with device for automatic weighing and adding their required quantity
       of water. For controlled concrete work moisture content in the aggregate shall
       also have to be taken into consideration.
19.2.5 All test shall be carried out in accordance with IS Codes of practice and as
       decided by the Engineer-in-Charge.
19.2.6 The contractor shall establish a filed laboratory/and provided but necessary
       equipments to carry our preliminary tests and working out the grading and
       proportioning the aggregates assessing the moisture contents, casting of cubes etc.
       to obtain and maintain uniform quality of work conforming practices.
19.2.7 The tenderers shall formulate his rates for controlled items taking into account the
       extra work involved as the above and no claim for extra payment on this account
       shall be entertained.
19.2.8 In case of any dispute regarding interpretation any of the above quoted clause,
       decision of GM/IRCON will be final and binding on the contractor.
19.2.9 IRCON may also take samples of aggregate use in the concrete during the
       execution of work and get the material tested from the laboratory to ascertain the
       conformity of material as per mix design at the contractor‟s own cost.
20.0   CURING
       The CC/RCC, brick work including plastering and pointing etc. shall be
       continuously kept moist for the periods prescribed in CPWD specification. Curing
       of CC/RCC surfaces shall be done by covering the newly laid concrete with wet
       Hessian cloth or by filling water over the surface. Curing with water is very


Signature of Tenderer/s                                                                 52
       important aspect for quality and strength and is not to be ignored. Nothing extra
       on this account shall be payable. If it is found, curing is not being done properly
       by observing above instructions, the Engineer-in-charge may undertake curing
       through alternate means without any notice, at the risk and cost of the contractor.
       Intimation of employment of another agency for curing will be given to the
       contractor as soon as possible. This intimation in writing to the contractor under
       the signatures of Engineer-in-charge shall be conclusive evidence of the
       employment of another agency.
21.0   STEEL WORK WELDED IN BUILT UP SECTIONS
21.1   The IS Code of practice for electric welding of mild steel structures shall be
       followed wherever welding is required to be carried out.
21.2   As far as possible effort shall be made to limit the welding when the structure is
       erected to rectify the defects only so as to avoid improper welding and damage to
       structure.
22.0   WATER SUPPLY AND SANITARY INSTALLATIONS
22.1   For execution of sanitary installation and water supply work the contractor shall
       arrange a licensed plumber and specifically skilled artisan shall be employed by
       the contractor for sanitary installation work. The work shall be executed as per
       CPWD-2002 and IS specifications.
22.2   The work of providing GI and/or SCI pipe required shall proceed along with the
       construction of building to avoid demolition if breaking up of masonry at later
       stage.
22.3   Size of MS clamps for fixing of pipes of different dia shall be as per size of the
       pipes.
22.4   Samples of sanitary installation and fittings such as G. I. Pipes & fitting, Stone
       ware Pipes, R.C.C Pipes etc. shall be submitted to the Engineer-in-charge for
       approval before supplying and fixing the same and the contractor shall ensure that
       all fittings provided by him are strictly accordance with the approved samples.
22.5   Salt glazed stoneware pipes as per relevant IS specifications shall be used for
       disposal of sewerage. Pipes brought shall be supported by requisite test
       certificates and approved by the Engineer-in-charge before use.
23.0   WHITE WASHING, DISTEMPERING & PAINTING
      Standard brand of lime, distempers, primers, cement paints and enamel paints as
      per relevant IS specifications and as approved by Engineer-in-charge shall be
      used for white washing, distempering and painting of wood work, steel works and
      exteriors. The rates cover the cost of all labours and materials, cleaning materials,
      ladders, scaffolding, tools, plants and equipments including brushes of approved
      pattern at the contractor‟s cost.
24.0 In case of any disputes regarding interpretation of any of the above quoted clauses,
     the decision of PD/Srinagar, will be final and binding on the contractor/s.



Signature of Tenderer/s                                                                 53
25.0   GALVANISED IRON PIPES
       25.1   The pipes (tubes) shall be galvanized mild steel hot finished seamless
              (HFS) or welded (ERW) HRIW or HFW screwed and socketed
              conforming to the requirements of IS:1239 Part-I for medium grade. They
              shall be of the diameter (nominal bore) specified in the description of the
              item. The sockets shall be designated by the respective nominal bores of
              the pipes for which they are intended.
       25.2   Galvanizing shall confirm to IS:4736. The Zinc coating shall be uniform
              adherent, reasonably smooth and free from such imperfections as flux, ash
              and dross inclusions, bare batches, black spots, pimples, lumpings, runs,
              rust stains, bulky white deposits and blisters. The pipes and sockets shall
              be cleanly finished, well galvanized in and out and free from cracks,
              surface flaws laminations and other defects. All screw threads shall be
              clean and well cut. The ends shall be cut cleanly, and square with the axis
              of the tube.
       25.3   The dimensions and weights of pipes and sockets and tolerances shall be
              as prescribed in Appendix „C‟ page 92 of CPWD Specifications-1996
              (Vol-VI).
       25.4   All screwed tubes and sockets shall have pipe threads confirming to the
              requirements of IS:554. Screwed tubes shall have taper threads while the
              sockets shall have parallel threads.
       25.5   All tubes shall withstand a test pressure of 50 Kg./sq.cm without showing
              defects of any kind.
       25.6    Fitting: - The fittings shall be of mild steel tubular or wrought steel
               fittings confirming to IS:1239 (Part-II) or as specified. The fittings shall be
               designated by the respective nominal bores of the pipes for which they are
               intended.
       Note: - Storage, cutting, jointing, making of trenches, laying of pipe line in
               trenches, testing of hydrostatic pressure and leakage of pipes & back
               filling of trenches & measurements shall be done as per CPWD
               Specifications-1996 (Vol-VI) duly updated.
26.0   BRASS/GUN-METAL VALVES
       The sluice valves are used in a pipe line for controlling or stopping flow of water.
       These shall be of specified size and class and shall be of inside non-raising screw
       type upto 300mm size and raising or non-raising screw type above 300mm with
       either double flange or double socket ends and cap or hand wheel. These shall in
       all respects comply with the Indian Standard Specification IS:780 for valves upto
       and including 300mm size and IS:2906 for valves above 300mm size. Class I
       sluice valves are used for maximum working pressure of 10kg/sq.cm (100 meter
       head) and class II sluice valve for 15kg/sq.cm (150 meter head).
       The body, domes, covers, wedge gate and stuffing box shall be of good quality
       cast iron, the spindle of bronze, the nut and valve seats of leaded tin bronze. The
       bodies, spindles and other parts shall be truly machined with surface smoothly


Signature of Tenderer/s                                                                    54
       finished. The area of the water way of the fitting shall be not less than the area
       equal to the nominal bore of the pipe.
       The valve shall be marked with an arrow to show the direction of turn for closing
       of the valve.
27.0   STONE WARE PIPE & FITTING
       27.1   All pipes with spigot and socket ends and fittings shall conform to IS:651.
              These shall be sound, free from visible effects such as fire cracks or hair
              cracks. The glaze of the pipes shall be free from crazing. The pipes shall
              give a sharp clear tone when struck with a light hammer. These shall be no
              broken blisters. The thickness of pipes shall be as given in the table below:
              STONEWARE PIPES
                        Internal Diameter                     Thickness of the
                                                             barrel and socket
                              (mm)                                  (mm)
                               100                                    12
                               150                                    16
                               200                                    17
                               230                                    19
                               250                                    20
                               300                                    25
                               350                                    30
                               400                                    35
                               450                                    38
              The length of pipes shall be 60, 75, 90cm exclusive of the internal depth of
              the socket. The pipes shall be handled with sufficient care to avoid
              damage to them.
28.0   LAYING & JOINTING OF STONE WARE PIPES & MEASUREMENT
       Shall be constructed as per Para 21.7 of CPWD Specification 1996 (Vol-VI) duly
       updated.
29.0   MAN-HOLES: - Shall be constructed as per Para 21.12 of CPWD Specification-
       1996 (Vol-VI) duly updated
30.0   SEPTIC TANKS: - Shall be constructed as per Para 21.12 of CPWD
       Specification-1996 (Vol-VI) duly updated.
31.0   SOAKAGE PITS: - Shall be constructed as per Para 21.13 of CPWD
       Specification-1996 (Vol-VI) duly updated
32.0   All other relevant IS codes shall be applicable for completion of work.
33.0   The Railway / IRCON reserves the right to reject of alter any part of the work
       executed by the Contractor which in the judgement of the Railway / IRCON does
       not comply with the requirements of the above specifications. The decision of the
       Railway / IRCON shall be final and conclusive for all purpose and contractor
       shall have no claim on this account whatsoever.


Signature of Tenderer/s                                                                 55
34.0   GRANULAR SUB-BASE
34.1   The work shall be carried out as per clause no. 401 of MOST/MORTH-2001
       specification and as shown in the approved drawings. The work consist of laying
       and compacting well graded material to the specified thickness as per approved
       drawings on prepared sub grade in accordance with the requirement specified in
       the specification in clause 401 of MOST/MORTH-2001 or as directed by
       Engineer-in-charge.
34.2   The material to be used for the work shall be natural sand, moorum, gravel,
       crushed stone etc. depending upon grading required. The grading requirement and
       the physical properties of various materials to be used in the work shall conform
       to the relevant specification of MOST/MORTH -2001 under section 401.
34.3   The sub base material of approved grading shall be spread on the prepared sub
       grade with the help of a motor grader of adequate capacity and shall be compacted
       with smooth wheeled roller of 80 to 100 KN as per clause 401.4.2 of
       MOST/MORTH-2001 under section 401. The quality control and payment shall
       be made as per clause no. 903.3.1 under section 900 & clause no. 401.7 of
       MOST/MORTH-2001 under section 401 respectively. No extra payment shall be
       made towards Laboratory Testing.
34.4   Payment for GSB shall be made as per relevant item of BOQ on volume basis
       worked out as per cross-sectional area of compacted thickness as per approved
       drawings.
35.0   ANCILLARY WORKS
       All other ancillary works and works incidental to main works shall be carried out
       as per codes of practices and manual of instructions of Railways and as per the
       instructions of Engineer-in-charge.




                                                 For and on behalf of
                                            IRCON INTERNATIONAL LIMITED.


                                           Signature …………………………………..
                                           Designation : General Manager, J&K-1




Signature of Tenderer/s                                                              56
                                                                    ANNEXURE – I
                   CERTIFICATION OF FAMILIARISATION

A.    I/We hereby solemnly declare that I/We have visited the site of work and have
      familiarized myself/ourselves of the working conditions therein all respects and in
      particular, the following:

      a)     Topography of the Area.
      b)     Soil conditions at the site of work.
      c)     Sources & availability of Construction material.
      d)     Borrow areas of earth.
      e)     Rates for construction materials.
      f)     Availability of local labour, both skilled and unskilled and the prevailing
             labour rates.
      g)     Availability of water & electricity.
      h)     The existing roads and access to the site of work.
      i)     Availability of space for putting labour camps. Officers, stores, godown,
             engineering yard etc.
      j)     Climatic condition and availability of working days.

B.    I/We have kept myself/ourselves fully informed of the provisions of this tender
      document comprising Instructions to the Tenderers, General Conditions of the
      Contract, Special Conditions, Specifications and Additional special conditions
      apart from information conveyed to me/us through various other provisions in this
      tender document.

C.    I/We have quoted my / our rates as „Percentage above / below / at par “of total
      cost as per Schedule of Items Rates and Quantities (BOQ) in Schedule “A,
      Schedule “B”, Schedule „C‟ and Schedule „D‟ in FINANCIAL BID taking into
      account all the factors given above.




                                                             (Signature of Tenderer/s)




Signature of Tenderer/s                                                               57
                                                                                                       ANNEXURE – II
           STATEMENT OF WORKS COMPLETED DURING LAST 5 YEARS BY THE CONTRACTOR/S



Sl.   Name of    Name of the       Date   of Date          of        Cost of the work Total      Component of     Whether
No    work       Client     /      Award & Completion as per         as per           Payment    similar nature   relevant
.     with       Agency   for      Agreemen                                           Receive    work in the      certificate
      address    whom     the      t No. &                                            d so far   entire work in   attached, if
                 work carried      date                                                          %age             so, Sl.No.
                 out                         Agreemen Actua          Agreemen   Actua
                                             t         l             t          l
1.    2.         3.                4.        5.        6.            7.         8.    9.         10.              11.




Note: - Tenderer/s should submit the informations in the format without fail.




Signature of Tenderer/s                                                                                                 58
                                                                                                    ANNEXURE - III
                 STATEMENT OF WORKS BEING EXECUTED / IN HAND BY THE CONTRACTOR/S


Sl.   Name        Name         of   Date       of Date   of    Agreementa Paymen Percentag       Whether    the   Whether
No    and         Client        /   Award      of Completio    l Cost of t taken e of work       work       has   relevant
.     place of    Agency      for   work    with n             work/likely till date completed   component of     certificate
      work        whom        the   Agreement                  cost                  so far      similar nature   attached, if
      with        work is being     No. & date                                                   work, if so,     so, Sl.No.
      address     carried out                                                                    %age
1.    2.          3.                4.            5.           6.               7.   8.          9.               10.




Note: - Tenderer/s should submit the informations in the format without fail.




Signature of Tenderer/s                                                                                                 59
                                                                   ANNEXURE-IV


                         LIST OF PLANT & EQUIPMENTS


 A.       Details of Plant and Machinery already available with the firm

SL.    Type    of Type & Make Number        Date of Capacity    Work    on Date by which Remarks
No. Machinery / of Machinery /              purchase            which it is the plant will be
       Equipment   Equipment                                    being used available for use
                                                                presently   on this work




      Signature of Tenderer/s                                                      60
                                                                   ANNEXURE-V


                          LIST OF PLANT & EQUIPMENTS


A.       Details of Plant & Machinery proposed to be hired by tenderer for use in the
         tendered work.


SL.     Name         of Number         Capacity    Date/time by which the Remarks
No.     Machinery     /                            equipment will be put on
        Equipment                                  use




     Signature of Tenderer/s                                                    61
                                                                     ANNEXURE – VI
                        SUPPLEMENTARY AGREEMENT

Articles of Agreement made on this …………………………. in the year …………. and
between IRCON International Limited acting through the General Manager hereinafter
called as one party and ……………………………………………….. of the second part.

Where the party hereto of the second part executed an agreement with the party hereto of
the first part being agreement No. ……………………. dated ………. for the
performance of ……………………………. herein called the principal agreement.

And whereas it was agreed by and between the parties hereto that the works would be
completed by the party hereto of the second part on ………… “date last extended” and
whereas the party hereto of the second part has executed the work to the entire
satisfaction of the party hereto of the first part and whereas the party hereto of the first
part already made payments to the party hereto of the second part diverse sums from time
to time aggregating to Rs. …………….. including the final bill bearing voucher No.
……………… dated …………. (the receipt of which is hereby acknowledged by the
party hereto of the second part) in full and final settlement of all his claim under the
principal agreement.

Now it is hereby agreed by and between the parties in the consideration of sums already
paid by the party hereto of the first part to the party hereto of the second part against all
outstanding dues and claims for all works done under the aforesaid principal agreement
including / excluding security deposit, the party hereto of the second part have no further
dues / claims against the party hereto of the first part under the said principal agreement.

It is further agreed by and between the parties that they party hereto of the second part
has accepted the said sums mentioned above in full and final satisfaction of all its dues
and claims under the said principal agreement.

It is further agreed and understood by and between the party that in consideration of the
payment already made under the agreement the said principle agreement shall finally
discharged and rescinded all the terms and conditions including the arbitration clause.

It is further agreed and understood by and between the parties that the arbitration clause
contained in the said principal agreement shall cease to have any effect and / or shall
seems to be non existent for all purposes.

Signature of the Tenderer/s                                   For & on behalf of


Witness of the signatures                             Witness …………………..
                                                      ……………………………
1.

2.

     Signature of Tenderer/s                                                           62
                                                                      ANNEXURE - VII



                          JOINT VENTURE AGREEMENT


This Joint Venture Agreement executed at …………………………….. on ………….
Day of …………. , 2008 between M/s. ………………………………… Registered office
at ………………………. as the first party and M/s……………………………………..
Registered office at ………………………………… represented trough their constituted
attorney    Sh……………           S/o    Sh…………………………                     as    the    second
party………………………………….. as the third party (The expression and words of
the first and second and third party shall mean and include their heirs, successors,
assigns, nominees execution, administrators and legal representative respectively)

WHEREAS all the parties are engaged mainly in the business of Civil Engineering and
General Contracts for various Government departments and Organisations.

WHEREAS the parties herein above mentioned are desirous of entering into a Joint
Venture for carrying on Engineering and/or contract works, in connection with
……………………………………………………… and other works mentioned in tender
notice no. ……………… dated of , in connection with Qazigund - Baramulla New Rail
Line Project or any other work or works, as mutually decided between the parties of this
Joint Venture.

NOW THIS AGREEMENT WITNESSES AS UNDER:

1.       That in and under this Joint Venture Agreement the work will be done jointly by
         the first party and second party in the name & style of M/s. ………………….
         (Joint                Venture                  M/s…………………………………..,
         M/s………………………………. and M/s. …………………………………..)
2.       That all the parties shall be legally liable, severally and or jointly responsible for
         the satisfactory/ successful execution/ completion of the work in all respects and
         in accordance with terms & conditions of the contract.

3.       That the role of each constituent of the said Joint Venture in details shall be as
         under

         The first party shall be responsible for …………………..
         The second party shall be responsible for …………………..
         The third party shall be responsible for …………………..

4.       The share of profit & Loss of each constituent of the said Joint Venture shall be as
         under :-



     Signature of Tenderer/s                                                             63
5.       That all the parties of this Joint Venture shall depute their experienced staff as
         committed commensurating with their role and responsibilities and as required for
         the successful completion of the works in close consultation with each other.

6.       That the investment required for the works under this Joint Venture shall be
         brought in by the parties as agreed between them from time to time.

7.       That all the Bank Guarantees shall be furnished jointly by all the parties in the
         name of Joint Venture.

8.       That the party number ………………… to this Joint Venture shall be the prime
         (lead) contractor and will be responsible for timely completion of work and to
         coordinate with the to receive payments and also to make all correspondence on
         behalf of this Consortium/Joint Venture.

9.       That all the above noted parties i.e. ………………….…………. not to make any
         changes in the agreement without prior written consent of the


NOW THE PARTIES HAVE JOINED HANDS TO FORM THIS JOINT VENTURE
ON THIS…………………. DAY OF ……………. TWO THOUSAND FIVE WITH
REFERENCE TO AND IN CONFIRMATION OF THEIR DISCUSSIONS AND
UNDERSTANDING BROUGHT ON RECORD ON …………………….

IN WITNESS THEREOF THE ABOVE NAMED PARTIES HAVE SET THEIR
RESPECTIVE HANDS ON THIS JOINT VENTURE AGREEMENT ON THE DAY,
MONTH AND YEAR ABOVE MENTIONED IN THE PRESENCE OF THE
FOLLOWING WITNESSES :



WITNESSES


1.                                    First Party
2.                                    Second Party
3.                                    Third Party




     Signature of Tenderer/s                                                          64
                                                               ANNEXURE-VIII

                              LIST OF DRAWINGS



S.NO.     TITLE                              DRAWING NO.

1         LOCATION OF RPF & GRP IRCON/J&K/KAKPORA/BARRACK-04
          BARRACKS       AT    KAKPORA
          STATION
2         LOCATION OF RPF & GRP IRCON/J&K/PAMPORE/BARRACK-05
          BARRACKS       AT     PAMPORE
          STATION
3         LOCATION OF RPF & GRP IRCON/J&K/SRINAGAR/BARRACK-09
          BARRACKS       AT    SRINAGAR
          STATION

Note:
     1.    Conceptual drawings are available in the office of GM/J&K Cell, 4th Floor,
           Palika Bhawan, Sector-XIII, R.K.Puram, New Delhi-110066, which can be
           seen in his office during working hours. Work will be done as per final
           approved drawings/As per the instructions of Engineer-in-charge and
           contractor will have no claim on account of deviation in approved drawing
           with reference to tender drawings.




    Signature of Tenderer/s                                                     65
                                                                          ANNEXURE-IX

                           UNDERTAKING BY TENDERER

1.       Being duly authorized to represent and act on behalf of …………………. and
         having fully understood all the tender conditions and requirements for fulfilling
         eligibility criteria including residual / available bid capacity, the undersigned
         hereby declare that:

         i)     the informations / statements given in support of technical and financial
                capability, proof of being Kashmere Contractor as required as per para 18
                of Instruction to Tenderers of tender document are true and correct in
                every detail.

         ii)    this tender offer is made in the full understanding that:
                a)      all informations / documents submitted along with tender offers by
                        tenderer/s will be subject to verification by IRCON or its any
                        authorized representative who may conduct any inquiries or
                        investigations to verify the statements, documents and information
                        submitted in connection with the tender offer and to seek
                        clarification from our bankers, clients regarding any financial &
                        technical aspects;
                (b)     in the event that the information/document submitted are found to
                        be false or misleading, the tender shall be disqualified and the
                        earnest money deposited shall be forfeited.

2.       The client reserves the right to:

         (i) reject or accept any application, cancel the tender and reject all applications.

                                                                    _____________________
                                                                                   Signed

                                                                    _____________________
                                                                                    Name

                                                                   _____________________
                                                                          For & on behalf of
                                                                  Name of Firm/Company/JV

NOTE:

In case of JV, this undertaking should be given by all the members of the Joint Venture or
by their authorized representative.




     Signature of Tenderer/s                                                               66

				