Consultand Work Record

W
Description

Consultand Work Record document sample

Shared by: vdc12050
Categories
Tags
-
Stats
views:
7
posted:
1/12/2011
language:
English
pages:
30
Document Sample
scope of work template
							DRAFT FOR CONSULTATION




Ealing’s 14-19 Strategic Plan



2006 to 2009




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc   Page 1 of 30
Ealing 14 – 19 Strategic Plan


Introduction
A key part of the government’s agenda to improve outcomes for young people
is to transform the opportunities for those aged 14 to 19.. The 14 to 19 White
Paper set out the government’s plans to transform opportunity for young
people. This is to be achieved through changes to the curriculum,
qualifications and organisation of education and training. The objective is for
every young person is able to pursue a course of study that prepare them for
success in life. The recently published Education and Inspections Bill, 2006
gives effect to the most important changes. Central to this is the introduction
of 14 new specialised Diplomas. Every young people will have an entitlement
to study vocational diplomas in an area. To achieve this and other objectives
it will be essential that schools, colleges and other providers will need to work
together.

In Ealing we have a good record in improving services for children and young
people. In 2005 Education and Children’s Services Inspectors rated us as
serving most children well. In 2005 at GCSE Ealing Schools achieved the
third best value added score between Key Stage 2 and GCSE. Our school VI
forms perform well, and five of the eight schools with VI forms are amongst
the top 25 percent of VI forms in terms of value added.

Collaboration between providers has improved. Through the Increased
Flexibility Programme High schools have developed good links with
Hammersmith and West London College at Key Stage 4. However, we know
that more can be done. We need to develop more vocational learning
opportunities and improve pathways into further education and training. The
plan focuses on those areas that are priorities for improvement.

The purpose of the consultation exercise is to ensure that the final plan
reflects a shared approach to improving provision available for young people
in Ealing. This draft plan sets out how this exciting new Agenda could be
developed in Ealing and the actions that could be taken over the next 3 years.
It has been drawn up by a group, jointly chaired by the West London Learning
and Skills Council and the Authority and includes representation from schools,
the local college, the Youth and Connexions Service and other providers. The
draft plan has been informed by 42 stakeholder interviews carried out by Mo
Sabur, consultant Headteacher, and Jan Parnell, 14 to 19 Adviser.

We very much welcome comments on this draft, the deadline for comments is
Friday 30th June 2006. These should be set to:

Ranee Sidhu
Ealing Schools Service
1st Floor Perceval House
14-16 Uxbridge Road
Ealing Council W5 2HL
rsidhu@ealing.gov.uk


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc         Page 2 of 30
Further copies of the plan can be downloaded from:
http://www.lgfl.net/lgfl/leas/ealing/

Context
Current provision
Ealing has 13 High Schools of which 8 have VI form provision. Post 16 study
is provided in the borough through Ealing, Hammersmith and West London
College which has three sites based in Acton, Ealing and Southall. Students
in Ealing are also able to access provision in neighbouring boroughs,
particularly Richmond, Hammersmith and Fulham and Uxbridge. Post 16
provision in funded and co-ordinated by the West London Learning and Skills
Council.

Ealing, Hammersmith, and West London College [EHWLC] is the large
Further Education college that sits within the borough boundaries. The college
has recently refurbished and developed new provision on each of the sites.
Acton College will primarily focus upon Construction and Engineering and is
developing significant links with Employers. Ealing Green has a sixth form
centre and has been awarded CoVE [Centre of Vocational Excellence] status
for Media whilst Southall College has a thriving new sixth form and ESOL
provision. The college’s adult work has an emphasis on essential skills and
ESOL provision within the constraints of LSC funding priorities.

Population
Ealing is a unique and highly diverse borough with a young and growing
population. Ealing has a population of about 303,000. Between 1991 and
2001 it experienced a significant growth, in line with London’s population as a
whole. Ealing has a relatively young population with people aged under 24
making up 34 percent of the total.

Overall the population growth is expected to continue in line with that for
London as a whole. However, in terms the number of young people aged 14
to 19 growth is projected in the next few years but by 2011 the GLA
population projections indicate that the number of 14 to 19 year olds will
decline by 5.3 percent compared to the 2001 census. The largest drop being
in students aged 19. The fall in population will not necessarily lead to a
reduction in children in school or college. Ealing and GLA school roll
projections indicate a modest increase in the number of students aged 14 to
19 in Ealing schools by 2011 and this increase will be more should the staying
on rate increase.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc        Page 3 of 30
Population 14 to 19 Year Olds
                          Aged 14       Aged 15      Aged 16      Aged 17   Aged 18 Aged 19 Age 14 -
Source
                           years         years        years        years     years   years    19

1991 census                 2919          2831         2970        3034      3263     3429       18446


2001 census                 3649          3742         3711        3722      3550     3144       21518

2004 Mid year
                            3422          3448         3759        3891      3970     3773       22263
estimates
2011 GLA
Projections (2005           3690          3536         3533        3656      3679     2274       20368
round)
Change 2001 to
                            1.1%          -5.5%        -4.8%       -1.8%     3.6%    -27.7%      -5.3%
2011



Deprivation
Twenty- eight percent of areas in Ealing are in the top 20 percent of the most
deprived areas nationally in terms of income deprivation affecting children.
The average masks differences between areas in the Borough. The most
deprived areas are concentrated in Northolt, Norwood Green, Dormers Wells,
social housing estates in West and central Ealing and South Acton. In South
Acton 76 percent of children are affected by income deprivation.

The Northolt West End ward, which is part of Northolt Sure Start and
Education Action Zone, is the only area in the borough, which is below
national averages on all measures of educational attainment. Currently there
is limited college presence in this area.

Entitlement to FSM is an indicator of deprivation levels. Nationally the
average figure is 14% in High Schools. These figures are much higher in
Ealing at 30% at high school level, clearly reflecting a high level of pupils from
low income families in Ealing’s schools.

Ethnicity in schools:
Ealing’s maintained school population is highly ethnically diverse.
    72% of pupils were classified as being of minority ethnic origin in
       PLASC 2005 compared to 17% nationally.
    34% of pupils are White
    30% Asian or Asian British
    18% Black or Black British
    6% from mixed or dual backgrounds
    10% are Chinese or other ethnic heritage.

The population of Black African pupils has doubled in the last 5 years. This
has been partly due to the large increase in Somali pupils who now make up
6% of the total pupil population. There has also been a significant increase in
the proportion of Eastern European pupils (up from 814 to 1226 in the last
three years).


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                        Page 4 of 30
Ealing’s Economy:
In overall economic terms Ealing is reasonably prosperous with successful IT,
media and finance industries. Ealing is also a borough undergoing significant
economic development. The Community Plan for Ealing has identified growth
opportunities in health, retail, construction and multi-media industries. There
are recruitment and upskilling opportunities through Heathrow T5, 2012
Olympics related development, and the London West Media Corridor. These
areas have also been identified through the LSC needs assessment.

However the key challenge is the wide gap between those in prosperity and
those excluded, which includes many of the vulnerable children and families
whose needs this Plan addresses, through improving education outcomes
and focusing on increasing economic well being.

Tackling social exclusion and enabling Ealing residents to attain the skills to
access the high skill job market of the Ealing, West London and indeed
Central London economy are the key challenges which underpin this plan.
The issue of poor adult literacy and numeracy skills need be addressed
through a coherent Essential Skills provision.

Housing Need
There is a shortage of affordable accommodation in the borough both to buy
and rent. Unless the housing market keeps up with the population growth we
should expect the price of housing continue to rise and overcrowding to
increase.

This has significant implications for Ealing’s young population as access to
quality, decent homes becomes more difficult. It will also make it more
difficult for Ealing to attract and retain teaching and support staff. Steps are
being taken through keyworker schemes to address these issues.

Destinations of Students Post 16
CfBT Advice & Guidance provides information, advice and guidance services
in the London Borough of Ealing in partnership with Connexions London
West. The table below shows the destination of students over the last five
years.

The number in full-time education has increased and reflects the increasing
successes of Ealing pupils at GCSE. The percentage of young people not in
education, employment and training continues to reduce as does the number
that entered employment with no training.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc          Page 5 of 30
  Destinations of all students leaving full-time education in Year 11 from
                             schools in Ealing


                                                                                National
             Destination                  2005    2004     2003   2002   2001
                                                                                 2003
Number of pupils                          2760    2896     3095   3095   2680     n/a
Full Time Education                       86%     84%      84%    77%    80%     72%
Work based learning                                2%       1%     2%     2%
                                           1%
Emploment with training                            1%       1%     1%     1%     12%
Employment no training                     2%      2%       3%     3%     3%
Voluntary and part time activities*        1%      1%       1%
Active in the labour market *              5%      6%       6%    10%    8%      13%
Not active in the labour market *          1%      1%       1%
Moved out of contact                       3%      4%       2%    7%     4%
No response                                2%      1%       1%    2%     3%       3%


* Before 2002 these category were defined as not settled. Active in labour market and not
active in labour market make up the NEET group. NEET population has decreased from 6.5%
in 2004 to 5.6% of 2005 cohort



Of the young people who continued in full-time education, the table below
shows the type of study undertaken. A/AS levels are the most popular
choices and have grown over the five year period. At the same time there has
been a marked reduction in all forms of vocational courses. However, for the
staying on rate to increase further, as well as A/AS levels, high quality
vocational courses will need to be developed as part of the government’s 14
to 19 strategy.

Of those in full time education:          2005    2004     2003   2002   2001
AS / A Levels                             55%     48%      54%    42%    49%
Vocation A Levels (AVCE)                   4%      2%       7%     4%     5%
GNVQ Intermediate                          9%      8%      13%    10%    17%
GNVQ Foundation                            3%      3%       3%     3%     4%
NVQ Courses (Level 1-3)                    3%      3%       3%     2%     3%
GCSEs                                      2%      4%       3%     2%     4%
Other courses                             25%     32%      17%    37%    18%



The increase in staying on in full-time education has been across all ethnic
groups except other ethnic groups. The largest increase has been amongst
white and black groups. Similarly, the percentage of young people
categorised as NEET has fallen between 2003 and 2004 in all ethnic groups.
The highest proportion of NEETS is amongst White students.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                        Page 6 of 30
                                                                        Mixed
             Destination                  Year Asian Black Chinese                White   Other      Unc
                                                                        Race
Full Time Education                                93%     90%    91%    88%      79%      84%     80%
Employment and Training                             1%      1%     0%     4%       6%       2%      1%
Voluntary and part time activities                  1%      1%     0%     0%       1%       0%      0%
                                          2005
Active in the labour market                         2%      4%     0%     4%       9%       3%      4%
Not active in the labour market                     0%      0%     0%     1%       1%       0%      1%
Moved out of contact / no response                  3%      4%     9%     3%       4%      10%     14%
Full Time Education                                95%     88%    88%    86%      78%          63%
Employment and Training                             1%      2%     0%     4%       8%           6%
Voluntary and part time activities                  0%      1%     0%     0%       0%           0%
                                          2004
Active in the labour market                         2%      3%     0%     5%      10%           8%
Not active in the labour market                     0%      0%     0%     2%       1%           1%
Moved out of contact / no response                  1%      5%    12%     3%       4%          22%
Full Time Education                                93%     86%           84%      71%          79%
Employment and Training                             1%      3%            6%      10%           2%
Voluntary and part time activities                  1%      0%            1%       1%           1%
                                          2003                    n/a
Active in the labour market                         4%      7%            8%      13%           3%
Not active in the labour market                     1%      1%            0%       1%           1%
Moved out of contact / no response                  1%      3%            1%       5%          14%
Full Time Education                                88%     78%           78%      65%          87%
Employment and Training                             2%      2%            6%       9%           1%
                                          2002                    n/a
Not settled                                         5%     11%            7%      15%           5%
Other destinations                                  5%      9%            9%      11%           7%



In the 2005, of the 2,373 students remaining in full-time education 1,536 (65
percent) attended 15 schools or colleges in Ealing. The table below shows
the percentage of students at each type of institution. Just over a quarter of
all students attended Hammersmith and West London College, with school VI
forms being the most popular places to study.

School /College                              % of those studying in
                                             Ealing borough
Ealing High School with VI Form                        70.7
Hammersmith and West London
                                                         27.0
college (All sites)
Ealing Special School                                     1.6
Other                                                     0.7
Total                                                    100.0



837 (35 percent) of all pupils chose to continue their education out of the
borough of Ealing. The table below shows the percent of students attending
each school or college where five or more students in Year 12 attend. As
expected the most popular colleges are Uxbridge and Richmond.

School /college                                       % of those being educated
                                                      outside of Ealing borough
Bishopshalt School                                                  0.9
College of North West London                                        0.9


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                       Page 7 of 30
School /college                                       % of those being educated
                                                      outside of Ealing borough
Cranford Community College Ho                                       1.3
East Berkshire College                                              2.5
Harrow College                                                       5
Hayes Manor School Hill                                             0.8
Heathland School Ho                                                 4.3
Heston Community School Ho                                           2
Kingston College                                                    3.2
Lampton School HO                                                   1.3
Langley Grammar Sl                                                  0.6
Richmond upon Thames College                                       19.7
             th
St Charles 6 form College                                           1.8
St Dominic’s                                                        1.3
Uxbridge College                                                    40
West Thames College                                                 7.9
Westminster Kingsway                                                0.6
William Morris Academy                                              5.7
Others (50 institutions)                                            9.2



In 2005, 75 students left school and went straight into employment and
training. The table below compares the percentage of students by sector.
Unskilled occupations, skilled construction and personal services (catering,
child care, protective services and hairdressing) have remained relative stable
sectors over the last three years accounting for nearly 70 percent of the
students in employment. Clerical and administrative occupations have shown
the most growth. The reduction in retail reflects the current difficult
competitive situation in this sector.

                                          Ealing 2003             Ealing 2004     Ealing 2005
Clerical and business                           9%                   10%             17%
administration
Skilled construction                           11%                  12.5%            11%
Engineering (excluding motor                    3%                   0%               3%
vehicle)
                                                5%                   7.5%             4%
Vehicle trades
                                                4%                   6.5%             3%
Other skilled trades
                                               10%                  10.5%             5%
Retail and sales
                                               25%                   22%             24%
Personal services*
Labouring/unskilled /others                    33%                   31%             33%

For the small number of students entering employment straight from school in
2005, the choice of occupations is very gender stereotypical. There were no
females in catering, construction and engineering and vehicle trades. All of
those in hairdressing and child-care were female. However, retail and
administration were more gender balanced.

Students with additional needs are less likely to remain in full-time education.
The table below shows compares the destinations of all Year 11 students to
those with additional needs.


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 8 of 30
All Year 11                                        Year 11 with Additional Needs
Ealing 2005                              %         Ealing 2005                          %
Full-time education                      86%       Full-time education                  78%
Employed with training                   1.2%      Employed with training               1%
Employed no training                     1.5%      Employed no training                 3%
Voluntary and part time activities       0.5       Voluntary and part time activities   1%
NEET Active in the labour market         5%        NEET Active in the labour market     11%
NEET                                               NEET
Not active in the labour market          0.6%      Not active in the labour market      2%
Moved out of contact                     3%        Moved out of contact                 3%



In summary, the demographic and information on the destinations of students
at the end of Year 11 suggests that within the live time of the plan the main
issues to address are:

        between 14 and 16 improving pathways into education, training and
         employment of vulnerable and under-achieving groups, particularly for
         white working class and black pupils
        educational and training opportunities for students with additional
         needs
        non-traditional career opportunities for young women particularly those
         not entering further and higher education
        widening vocational provision at Levels 1 to 3


Links with the LSC, Connexions and ~Youth Service and Youth
Offending Service
The draft strategy for 14-19 provision in the area recognises that more needs
to be done in schools to broaden the curriculum offer and develop greater
collaboration between providers. The London West Learning and Skills
Council has identified eight areas of the West London economy that are
expected to grow including media, construction, retail engineering, health and
social care. During the period of the plan it is intended to develop specialist
diplomas and other courses at Key Stages 4 and 5 to address these gaps.

Links between education and employment are also being strengthened
through initiatives such as the Excellence in Cities programme - Aim Higher
Project. The authority will continue to build on this by strengthening its 14 – 19
Strategy and implementing the Youth Matters Green Paper. This year a
successful mentoring Aim Higher Project focused on training older care
leavers as peer mentors and positive role models for children in education in
Years 10 and 11, in partnership with Thames Valley University. This scheme
will continue to develop over the next 3 years and integrate with a new
Council wide young apprentice scheme, currently in the planning stage with
West London LSC.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                         Page 9 of 30
Ealing has had an integrated Youth and Connexions service, based in the
local authority – as recommended by the recent Youth Matters Green paper -
over the past 3 years. This plan will complement the work the Youth and
Connexions Service will undertake to develop a broader Youth offer which is
aimed at ensuring that young people have a range of positive activities.

Similarly in broadening the curriculum offer in schools will play an important
part in the authority’s strategy to reduce crime and anti-social behaviour and
re-offending. Ealing’s youth offending service provides a positive, well
established partnership model in which police, youth offending, connexions,
education and youth service staff work in an integrated service to reduce
levels of offending and target crime reduction amongst those young people
most at risk.


Policy Context
This 14-19 Strategic Plan for 2006-2009 has been compiled from the following
national and local policy priorities:

        the ongoing challenge to all providers to collaborate and bring together
         the widening participation and raising achievement agendas
        the opportunities for 14-19 thinking opened up by 14-19 Excellence
         and Opportunity and the DfES Principles of 16-19 provision
        the need to raise the achievement of specific pupil groups (African/
         Caribbean, mixed heritage, Somail and Looked-after Children)
        The London Challenge Student Entitlement & the London West LSC
         learner offer
        the successful track record of the Ealing Excellence in Cities
         Partnership in meeting the local inclusion and widening participation
         agenda
        the priorities for improvement identified by the London Borough of
         Ealing Education Department, identified as outcomes from the post-
         2003 Area Inspection Plan
        the priorities identified by education and training providers in Ealing
         and West London
        the need to provide joined-up services arsing from the Every Child
         matters agenda and deliver the 5 outcomes
        the priorities identified in the government’s white paper on skills
         to respond to the Green Paper Youth Matters




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc         Page 10 of 30
Objectives
The strategic plan demonstrate a commitment by all stakeholders in Ealing to
widen the approach to the development of 14-19 provision building on the 14 -
19 protocol and strategy agreed by the extended EiC Partnership.

The strategy seeks to build upon what is already happening in the borough
and in particular to build upon what works well and has already been proven
to be successful in meeting the needs of young people in Ealing. This work
has been recognised and acknowledged in the LEA/EiC Inspection Report
(2002), Area Inspection for Post 16 in Ealing & Hammersmith and Fulham
(2003).


Strategic Objectives
    To develop effective strategic collaboration which improves the range,
      choice and quality of learning in Ealing.
    To improve access, achievement, retention, participation and
      progression through an increased range of curriculum provision,
      matched to the needs of all young people.
    To develop the capacity, relevance and quality of work-based learning
      for young people and employers.
    To sustain current good practice and build a culture of continuous
      quality improvement across all providers.
    To develop high quality information, advice and guidance for all young
      people to support their successful transition into education, training and
      employment.
    To improve links and promote joined up thinking between all agencies
      and service providers
    To improve multi-agency working to engage young people who are not
      in education, employment and training.

Aims
To deliver the vision and values and address the inclusion and skills agenda
in the borough the 14-19 Strategic group has agreed the following set of
strategic aims:

Aim 1: Developing Leadership and Partnership – Continue to develop key
structures and processes to
     facilitate the expansion of existing collaboration and collective strategic
       leadership arrangements
     create new opportunities for clustering and partnership working
     effective partnerships with employer forums and sector skills councils

Aim 2: Developing the Curriculum – To continue to develop and implement
a sustainable 14-19 learner offer for Ealing which allows every student access
to a mix of general and specialist qualifications and courses designed to
maximise individual achievement.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc         Page 11 of 30
Aim 3: Developing Information, Advice and Guidance – Continuing
development of good quality and impartial information, advice, support and
guidance for all young people in Ealing, including Statutory requirements.

Aim 4: Developing Quality – Continued development of improved quality
teaching and learning across all Ealing providers supported by an effective
programme of Continuing Professional Development


Supporting Delivery
The main responsibility for the implementation and monitoring of this strategy
will lie with the 14-19 JAR group jointly chaired by the LEA and London West
LSC and with a secretariat function supplied by the local authority. All
stakeholders are represented on the group and it has links with the
EiC/Headteachers’ group (currently under review), the Local Management
Committee of Connexions and the local FE college senior management team.

Delivery of actions will be through designated lead organisations acting on
behalf of the 14-19 Strategic Group and through the following task groups:

        a data group linked to the London West StAR Data Group
        Curriculum Planning Group
        Secondary Heads Forum
        Work related learning & enterprise task group
        Connexions Local Management Committee
        Vulnerable Children’s Group
        14-16 School-College Partnership Steering Group
        Enterprise Centre
        NEET Task Group

All stakeholders will assess their commitment to 14-19 development and
ensure that capital and revenue priorities in their individual plans are
consistent with the aims of the joint strategy. The LEA has a 14-19 Adviser
and a fulltime Aim Higher Consultant who will support operational
developments. The last year of the post 16 Area Action Plan will fund an
operational 14 -19 Consultant on secondment from a local High school


Measuring the success of the strategy
To monitor and evaluate the strategy, the 14-19 JAR Group will develop
processes to agree measures of success and local targets linked to the
current statutory and contractual targets agreed nationally by each of the
stakeholders. As a first draft, the 14-19 Strategic Group will build on the
following measures of success proposed by the London Challenge and those
associated with Aim Higher and the DfES 16-19 Principles paper: The key
indicators from the Children and Young People’s plan are set out in appendix
1.

        ensure strategic leadership and planning of provision
        better test and exam results at 14, 16 and 18


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc      Page 12 of 30
        reductions in the gap between the lowest and the highest levels of
         achievements by schools and colleges measured by class, gender and
         ethnicity, while raising the level of the best
        ensuring no maintained school has fewer than 30% of pupils achieving
         five or more A*-C grade GCSEs including English and Maths by 2007
        ensuring marked improvement in A*-C passrate [including maths and
         English]
        improvements to the quality of all schools and their leadership, as
         measured by Ofsted inspection and by ‘value added’ measures of the
         progress that students make at school
        Increases in rates for young people participating in learning after key
         Stage 4.
        increased participation, progression and attainment levels amongst our
         most vulnerable young people
        increases in the proportion of young people who are Ealing residents
         ‘staying on’ in Ealing-based education and training after KS4
        increases in parental satisfaction with education as measured by
         annual surveys
        increases in young people - satisfaction with education guidance and
         training measured by stakeholder surveys & focus groups.
        Reduction in the proportion of young people 16-18 not in education,
         training and employment.
        Increased achievement at level 2 for young people at age 19.




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc        Page 13 of 30
Appendix 1


Relevant targets from Children and young 2004/05 2005/06 2006/07 2007/08 2008/09
                                         Actual
People’s Plan

Enjoy and Achieve
               % of 15 year-old pupils in schools
               maintained by the local education authority
BV038                                                      53.0%          59.5%   60%        61%          62%
               schools achieving 5 or more GCSEs at
               grades A*-C or equivalent


               Educational qualifications of children
               looked after by reference to the percentage
               of young people leaving care aged 16 or
BV050                                                      58.7%          62%     63%        89%
               over with at least 1 GCSE at grades A*-G,
               or General National Vocational
               Qualification

               % of Black Pupils aged 15 achieving 5 A*-
DfES                                                     36%              47%     37%        45%          52%
               C at GCSE
               Average Points Score of Black pupils aged
DfES                                                     302.9            332.5   313.1     333.0         333.7
               15 at GCSE
               % of White Pupils entitled to FSM aged 15
DfES                                                     28%              39%     39%        42%          42%
               achieving 5 A*-C at GCSE

               Average Points Score of White Pupils
DfES                                                              255.9   295.5   308.6     304.6         310.1
               entitled to FSM aged 15 at GCSE


Economic Well-being
               % of 16 to 18 Year Olds not in
  BV161        Employment, education and training                         9.6%    8.7%      8.3%          7.8%
               (Adjusted Method Target)
               % of Care Leavers in Employment,
BV161                                                             54.1%   63%     65%        68%
               education and training
               Average Points Score of students in
BV161          schools maintained by the authority for            263.5   258.5   263.7     268.9         273.0
               GCE/VCE/A/AS




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                           Page 14 of 30
7.1 Developing Leadership and Partnership – Continue to develop key structures and processes to;
     facilitate the expansion of existing collaboration and collective strategic leadership arrangements
     create new opportunities for clustering and partnership working


Focus For                  Activities/milestones/dates                Impact              Delivery/ Lead    Monitoring    Costs          Links to
Actions: Key                                                          Measures/           Responsibility    Processes                    other
Tasks                                                                 outcomes                              & evidence                   strategic
                                                                                                            sources                      initiatives

1. Improve the co-         Introduce 14-19 strategic group, jointly   Consistent          LA                Minutes/      None           ECM T5
ordination of              chaired by LSC and LEA – Sept 2005         application of                        Agendas
service planning                                                      policy,
and delivery within                                                   Improved
the borough                                                           Communication

                           Establish 14-19 curriculum group and       Increased co-       LSC/LA            Agendas/      None –         Post-16 AIP/
                           hold curriculum & timetabling              ordination/                           programme     other source   14-19
                           conferences (in partnership with           sharing of good                                                    learner offer
                           LBHF) – Dec 2005 – Jun 2008                practise

                           Provide ongoing timetable and              As Above            LSC/LA            Interviews,   Consultancy
                           curriculum consultancy to schools                                                school        Fees
                           -review Sept 2006                                                                literature

                           Expand Thinking Skills Pilot to other      Increased           EHWLC/            14-16         % core         Secondary
                           partners – Sept 2006                       student             Elthorne Park &   partnership   funding box-   Strategy
                                                                      involvement (30     Northolt high     group         in
                                                                      learners in 2       schools
                                                                      more schools)

                           Through the September Guarantee,           Increased           Connexions/LSC Connexions       Within         CYP Plan
                           identity post 16 provision requirements    movement into                      Annual           funding
                           and link into LSC and local authority      learning after                     Survey                          Connexions


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                   Page 15 of 30
Focus For                  Activities/milestones/dates               Impact              Delivery/ Lead   Monitoring   Costs     Links to
Actions: Key                                                         Measures/           Responsibility   Processes              other
Tasks                                                                outcomes                             & evidence             strategic
                                                                                                          sources                initiatives
                           planning                                  KS4                                                         Plan


2. Create a model          Inserts (Gary Redhead & Linda
of the new merged          Prince)
service (single
conversation)


3. Identify priority       Support rigorous analysis of pupil data   Understanding       LSC/ LA/         Target       INSET     7.4.3/
client groups              at all Key Stages to identify areas of    of who the          Schools          groups for             ECM T3/
                           under-achievement.                        priority client                      2006                   CYP 3.5
                                                                     groups are in
                                                                     each school

                           Support development of School Action      Targeted            LA               School       INSET     7.4.3/
                           Plans and School Evaluation Forms to      support                              Action                 ECM T3
                           develop school-specific programmes -      programmes in                        Plans
                           ongoing                                   each school


4. Achieve the             Extend vocational excellence              Involve at least    LA/ Aim Higher                          Post-16 AIP
increased                  programme to Key Stage 4 provision        four schools        LW
involvement of local       - Sept 2006
employers in the
education and              Increase employer understanding of        Increased           LSC/ LA          Minutes/     LSC met
training of students       Ealing 14-19 provision (strategy          employer                             programme
in the borough             launch, presentation to Chamber of        involvement
                           Commerce & EBP) – Sept 2006


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                  Page 16 of 30
Focus For                  Activities/milestones/dates                 Impact              Delivery/ Lead    Monitoring    Costs          Links to
Actions: Key                                                           Measures/           Responsibility    Processes                    other
Tasks                                                                  outcomes                              & evidence                   strategic
                                                                                                             sources                      initiatives

                           Operate a modern apprentice bank            Increase take       Connexions        Annual        Within         Connexions
                           programme for Ealing employers to           up of modern                          Modern        Funding        Business
                           match young people with opportunities       apprenticeship                        Apprentice                   Plan
                                                                                                             Bank
                                                                                                             Report
4. (cont.)                 Joint meetings with employers via           More work           EBP/ Enterprise   Minutes       EBP funding    Post-16
                           EBP network                                 placements for      co-ordinator                                   AIP/
                                                                       students                                                           ECM T5/
                                                                                                                                          CYP 5.1

                           Pilot of First Flight project to be                             EDP               Reports       Schools        7.2.3
                           expanded to other schools within the
                           borough – Currently 2

5. Establish link          Pilot ‘fast – track’ programme              12 places for       LA/ Brunel        Student       LA funded      Aim Higher/
with Brunel                - Sept 2006                                 Ealing students     Academy/          take-up       (sliding       ECM
Academy                                                                                    target schools                  scale)
                                                                                           TBA                             matched by
                                                                                                                           Brunel

6. Develop local           Agree strategic response to national        Increased           LA/ HTs           Minutes       None           SEP, 14-19
School clustering          14-19 implementation plan – May             awareness                                                          plan
arrangements               2006

                           Create opportunities for schools to         Improved            14-19 Advisor/    Shared        Core funding   Post-16
                           share provision (either externally or ‘in   partnerships,       co-ordinator      provision                    AIP/
                           house’) – Feb 2007                          Increased                             established                  ECM T5
                                                                       diversity                                                          7.2.3,4


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 17 of 30
Focus For                  Activities/milestones/dates               Impact              Delivery/ Lead   Monitoring    Costs          Links to
Actions: Key                                                         Measures/           Responsibility   Processes                    other
Tasks                                                                outcomes                             & evidence                   strategic
                                                                                                          sources                      initiatives

                           Facilitate sharing of provision between   Increased joint     14-19 Advisor    EIPs or       Development Post-16 AIP
                           school – Sept 2007                        working                              similar

7. Student voice           Create opportunities via Youth and        Arrange joint  14-19 co-             Focus         £5k from 14-   Post 16
                           Connexion Service and CYSP to             focus groups   ordinator/Youth       groups        19 budget      AIP/CYSP
                           consultand engage 14-19 year olds in                     Service               established                  Connexions
                           development services.                     Impact Measure Youth and             and feed                     Business
                                                                     Report         Connexions            into                         Plan
                                                                                    Service               operational
                                                                                                          plan




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                  Page 18 of 30
7.2 Developing the Curriculum – To continue to develop and implement a sustainable 14-19 learner offer for Ealing which allows every student
access to a mix of general and specialist qualifications and courses designed to maximise individual achievement.


Focus For                   Activities/milestones/dates             Impact                Delivery/ Lead   Monitoring     Costs       Links to
Actions: Key                                                        Measures/             Responsibility   Processes                  other
Tasks                                                               outcomes                               & evidence                 strategic
                                                                                                           sources                    initiatives

1. Review of                Curriculum Audit & Stakeholder Gap      Agreed                LA/ LSC/ LWLP    Interviews
existing curricular         Analysis – completed July 2006          priorities for                         with HTs
provision and                                                       development
analysis of need                                                    via 14-19
                                                                    SWA+ plan


2. Further develop          Providing consultancy to schools to     School                LA/ curriculum   HT             14-19 co-   Post-16
alternative provision       help them identify student need         curriculum            leaders          meetings       ordinator   AIP/ 14-19
within schools              - Sept 2007                             review                                                            learner offer
(focus on vocational                                                                                                                  ECM T3,5/
courses)                    CPD for staff to enable them to         Enhanced              LA/ exam         Provider                   CYP 3.4,
                            implement and deliver new courses       curriculum offer      boards/ school   Information                5.2
                             – Sept 2007                                                  leadership                                  (all below)
                                                                                          teams

                            Consultancy support to schools          Success in            LA               Verification
                            already delivering vocational courses   verification and                       &
                            – Review July 2006                      moderation                             moderation
                                                                    processes                              reports

                            Continue to develop local vocational    As Above              Schools          As Above
                            ‘subject area’ networks for teachers                          /Clusters
                            - Sept 2007



D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                  Page 19 of 30
Focus For                   Activities/milestones/dates             Impact               Delivery/ Lead   Monitoring      Costs         Links to
Actions: Key                                                        Measures/            Responsibility   Processes                     other
Tasks                                                               outcomes                              & evidence                    strategic
                                                                                                          sources                       initiatives
                            Further develop the knowledge base of   Number of            14-19 co-        Training
                            Connexions Personal Advisors and        young people         ordinator/       Record
                            School Staff on 14-16 alternative       taking up and        Connexions/LA
                            provision; to support young people’s    sustaining 14-                        MI reports
                            choices.                                16 alternative
                                                                    provision

2. (cont.)                  Develop EGFL resources for              More teaching        LA/ EGFL staff   User            Space/ time
                            Citizenship & Ethics and 14-19          resources                             feedback
                            programmes – Sept 2007                  available &
                                                                    increased
                                                                    usage


3. Further develop          Further development of Quality          Improved             14-19 school     Qualification   None          Post-16 AIP/
alternative provision       Assurance and communication             student              college          results                       14-19
through partnership         protocols with partner organisations    outcomes             partnership                                    learner
working                     - Jul 2006                                                   group/ LEA/                                    offer/
                                                                                         providers                                      ECM T3,5/
                                                                                                                                        CYP 3.4,
                            Agreement of clear and fair costing     Maintain             Providers/ LA/   Student         None-         5.2
                            structure from all providers – April    student              LSC brokered     enrolments      allocated     (all below)
                            2006                                    numbers in off-                                       funding
                                                                    site provision

                            Increasing participation in existing    More students        LA/ schools/     Student         Funding
                            partnership provision                   accessing            providers        enrolments
                            (EHWLC/NTF/Harrow) - June 2006          provision



D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                 Page 20 of 30
Focus For                   Activities/milestones/dates             Impact                 Delivery/ Lead     Monitoring   Costs         Links to
Actions: Key                                                        Measures/              Responsibility     Processes                  other
Tasks                                                               outcomes                                  & evidence                 strategic
                                                                                                              sources                    initiatives
                            Developing partnerships with a range    More schools           LA/ schools/       Contracts    Subsidy
                            of providers to identify need and to    involved in            providers          and SLAs     where
                            increase capacity for E2E and WRL       partnership                                            appropriate
                            (Connexions/Uxbridge/NTF/Harrow)        provision              Connexions
                             Jan 2006


3. (cont)                   Developing brand new capacity in        Creation of            Northolt/ School   Business     Capital
                            partnership between providers           Diploma                LA/ EHWLC/         Plan         funding
                            (Diploma Centre) – Sept 2007            Centre                 Mears PLC

                            Develop teaching resources in           Assignments/           WRL/ Kew           Resources    AH/ WRL       Aim Higher/
                            partnership with local business         resources              Gardens            produced     Funding       Enterprise
                            - review every year

                            Develop programme of Public Sector      15 training            LA/ children’s     Connexions   Training      Children’s
                            Apprenticeships for care leavers and    places                 services/          data/        Costs         Plan/ ECM
                            vulnerable young adults – Sept 2006     available/             Apprenticeship     Student      (LSC)/ LA/    T3/ CYP 3.6
                                                                    Improved               Project            feedback     APM
                                                                    progression            Manager (APM)

                            Support delivery of London College of   Increased              LA/? School        Enrolments   ???           Post-16 AIP
                            Fashions’ level 2 qualifications        curriculum                                                           ECM T5
                            - Sept 2006                             breadth

                            Support creation of Fashion CoVE        New provision          EHWLC/ LSF/        Enrolments   Capital/
                            - Sept 2007                                                    LA                              other costs




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                   Page 21 of 30
Focus For                   Activities/milestones/dates                Impact               Delivery/ Lead     Monitoring      Costs          Links to
Actions: Key                                                           Measures/            Responsibility     Processes                      other
Tasks                                                                  outcomes                                & evidence                     strategic
                                                                                                               sources                        initiatives
5. Develop capacity         Complete Report on school’s need and       Audit                CLC                Interviews &    Fee            Post-16
for delivering ICT          capacity for delivering new ICT                                                    discussion                     AIP/ 14-19
courses                     courses – June 2005                                                                                               learner offer
                                                                                                                                              CYP 5.2
                            Introduce programme to support future      All schools to       CLC/ LA/ SLTs      School          Training
                            ‘roll out’ of courses – CPD/ facilities/   offer A/C/DiDa                          Information
                            curriculum mapping                         Ipro or CISCO
                            - July 2007                                qualifications

                            Increase digital capacity to support       Integrated use       CLC with Acton/    School          Capital/
                            School Specialisms – July 2008             of ICT in            Northolt/ Twford   Information/    training
                                                                       programmes/          high schools       CLC report
                                                                       Development of
                                                                       new courses


6. Raise the                Complete Secondary Pilot for African,      Improved             LA with            Exam            DfES grant     ECM/
achievement of              Caribbean and Mixed-heritage boys          attainment of        Twyford/ Acton/    results/        (LA            Secondary
specific pupil              -Sept 2005 to Sept 2008                    cohort               Brentside high     student         matched)       Strategy/
groups                                                                                      schools            voice                          Aim Higher
                                                                                                                                              ECM T5/
                            Aim Higher/Connexions                      Increased            LA/ ‘Southall’     Participation   Aim Higher /   CYP 5.1
                            Somali Achievement Programme               Capacity in          schools cluster    rates           Connexions
                            - review each year                         schools and
                                                                       community
                                                                       groups




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 22 of 30
Focus For                   Activities/milestones/dates                Impact               Delivery/ Lead   Monitoring   Costs         Links to
Actions: Key                                                           Measures/            Responsibility   Processes                  other
Tasks                                                                  outcomes                              & evidence                 strategic
                                                                                                             sources                    initiatives
7. Develop                  Launch borough-wide schools                Increased            WRL/             Registers/   WRL/          Enterprise
Enterprise                  enterprise competition (focus for 2005-    student              Enterprise       entries      Enterprise    Strategy
Education within the        6: fair trade) – review for 2007 in June   participation,       Advisor/ EBP                                CYP 5.2/
curriculum                  06                                         Improved links                                                   ECM T5
                                                                       with the
                                                                       traditional
                                                                       curriculum

                            Expand WRL network for key school          Increased            WRL/             Minutes of   WRL/
                            staff – Jan 2006                           participation in     Enterprise       meetings/    Enterprise
                                                                       collective           Advisor/ EBP     new
                                                                       events/                               projects
                                                                       collaborative
                                                                       planning

                            Develop First Flight project in Southall   Increased            Youth and        Take up of   LDA Grant     Economic
                            in partnership with Southall               student              Connexions       units                      Development
                            Regeneration Partnership                   participation        Service                                     Strategy
                                                                       and opportunity
                                                                       18 + to develop      Regeneration
                                                                       business ‘ideas’     and Major
                                                                                            Projects



8. Develop Core             Integrate functional literacy and          Increase in          Schools/ LA      Exam         Consultancy   Post-16
curriculum provision        numeracy – Sept 2007 to Sept 2008          literacy and                          results                    AIP, 14-19
                                                                       numeracy                                                         learner
                                                                       attainment at L1                                                 offer, 7.1.1


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 23 of 30
Focus For                   Activities/milestones/dates           Impact               Delivery/ Lead   Monitoring    Costs         Links to
Actions: Key                                                      Measures/            Responsibility   Processes                   other
Tasks                                                             outcomes                              & evidence                  strategic
                                                                                                        sources                     initiatives
                                                                  & L2                                                              CYP 3.4

                            Implement changes to Science          Increased            Schools/ LA      Schemes of    Consultancy
                            curriculum – Sept 2006                success at KS4                        work/ exam
                                                                                                        results
9. Develop the CEG          Review and revise CEG programmes      Increase             Connexions/      Connexions    Consultancy
offer with                                                        number of            14-19 Co-        Quarterly
educational and             Support accreditation of programmes   educational          ordinator        Performance
training                    and staff                             establishments                        Report
establishments.                                                   working
                                                                  towards
                                                                  Investors in
                                                                  Careers
                                                                  Quality Mark




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc               Page 24 of 30
7.3 Developing information and guidance
Continuing development of good quality and impartial information, support and guidance for all young people in Ealing.

Focus For                 Activities/milestones/dates             Impact              Delivery/ Lead       Monitoring     Costs     Links to
Actions: Key                                                      Measures/           Responsibility       Processes                other
Tasks                                                             outcomes                                 & evidence               strategic
                                                                                                           sources                  initiatives
1. Continue to            Expand programme of taster days,        Increased           Aim Higher co-       HEI            EIC/ AH   Aim
raise awareness           master classes and link visits (HEI     number of           ordinator/Connexions monitoring,    strand    Higher/
and take up of HE         and FE partners)                        students from                            evaluation,              ECM         5/
progression                                                       Aim Higher                               Connexions               CYP 5.1
opportunities             Deliver an exam results service to      cohort                                   data,
                          support young people through            progressing to                           HEFCE                    Connexions
                          clearing                                Level 5 study                                                     Business
                                                                                                                                    Plan

2. Ensure every           Target young people in Year 11 who      Every Year 11       Youth and            Connexions     Within    Connexions
year 11 learner is        are unsure about their career           learner will be     Connexions/LSC       annual         funding   Business
supported into an         intentions and offer enhanced           supported into      14-19 Workstream     Destinations             Plan
offer of                  guidance and support                    an offer of an                           Survey
appropriate                                                       appropriate                                                       Pan London
learning                  Work with the LSC to develop            learning                                                          September
opportunity by            adequate numbers of suitable and        programme or                                                      Guarantee
September of              appropriate opportunities for young     employment by
each year                 people                                  the end of
                                                                  September
                          Continue to develop appropriate         after the
                          opportunities and undertake review      completion of
                                                                  Year 11
3. Reduce number Increase number of young people                  By 06-07 8.7%       Youth and            Connexions     Within    Connexions
of 16-18 young      targeted in schools for early and             are NEETs;          Connexions/LA        MI Reports     funding   Business
people that are not sustained intervention by                     07-08 8.3% are      14- 19 Workstream                             Plan
in education,       Connexions PA                                 NEETs and by
training and                                                      08-09 7.8% are                                                    CYPP


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 25 of 30
Focus For                 Activities/milestones/dates             Impact              Delivery/ Lead        Monitoring   Costs     Links to
Actions: Key                                                      Measures/           Responsibility        Processes              other
Tasks                                                             outcomes                                  & evidence             strategic
                                                                                                            sources                initiatives
employment                Continue to target young people and     NEETs
                          improve tracking and monitoring of
                          young people moving in and out of
                          borough
                          Establish multi-agency NEET Task
                          Group

                          Monitor and review targeted
                          approach and ensure data shared
                          between full range of agencies

4. Improve the            Agree proportion of Extended            By 2009 80%         14-19 Co-ordinator/   Connexions   Within    Connexions
number of children        School funding to support schools to    of young            LA/Connexions         MI Reports   funding   Business
and young people          reduce the number of children not in    people aged                                                      Plan
engaged in further        education, training or employment       16-18 will be in                          Ealing
education,                (NEETs)                                 EET                                       Learning
employment or                                                                                               Prospectus
training                  100% of high schools in Ealing to       Movement into
                          have developed careers education        learning after
                          and guidance programmes                 KS4

                          Offer CEG accredited programme to
                          all Educational Establishments
                          across Ealing

                          Ensure IAG services are targeted at
                          vulnerable young people through
                          developments in Extended Schools,
                          Vulnerable Children’s Service,
                          Children with Disabilities Trust.


D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                    Page 26 of 30
Focus For                 Activities/milestones/dates             Impact         Delivery/ Lead   Monitoring   Costs   Links to
Actions: Key                                                      Measures/      Responsibility   Processes            other
Tasks                                                             outcomes                        & evidence           strategic
                                                                                                  sources              initiatives

                          Explore the feasibility of the
                          development of One Stop Shop
                          model for delivery of IAG and other
                          support service.

                          Increase awareness of post 16
                          learning offer through publication of
                          prospectus




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc               Page 27 of 30
7.4 Quality
Continued development of improved quality teaching and learning across all Ealing providers supported by an effective programme of continuing
professional development


Focus For                   Activities/milestones/dates               Impact               Delivery/ Lead   Monitoring     Costs    Links to
Actions: Key                                                          Measures/            Responsibility   Processes               other
Tasks                                                                 outcomes                              & evidence              strategic
                                                                                                            sources                 initiatives

1. Improve                  Conference to brief schools on the        SLTs to have         LA                              Funded   EIC /
performance in              requirements of the amended league        clear                                                         Secondary
English and Maths           tables – Nov 2005                         understanding                                                 Strategy/
                                                                                                                                    CYP 3.4
                            Provide targeted school, subject and      Better               SiPs/ subject    GCSE
                            cohort specific support to increase the   performance in       consultants/     results
                            number of students who convert L5+ at     functional           schools
                            KS3 into C+ at GCSE – Aug 2006            English and
                                                                      Maths

                            Introduce alternative qualifications in   More students        LA/ Subject      Key Skills/
                            functional English and Maths – Aug        achieving L2         consultants/     Adult skills
                            2006                                      numeracy and         schools (EPHS,   take up
                                                                      literacy             NHS)



2. Develop best             Implement agreed principles of self –     Shared best          LA               SEF            None     CYP 3.4/
practice in                 assessment                                practice and                                                  ECM T3
institutional self          - Jun 2006                                identification of
assessment and                                                        areas for further
use of value added                                                    improvement
data



D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                   Page 28 of 30
Focus For                   Activities/milestones/dates              Impact               Delivery/ Lead   Monitoring      Costs     Links to
Actions: Key                                                         Measures/            Responsibility   Processes                 other
Tasks                                                                outcomes                              & evidence                strategic
                                                                                                           sources                   initiatives

2. (cont.)                  Conduct review of partnership quality    Improved             EHWLC/ 14-19     Student         Minimal   Secondary
                            protocols                                student              partnership      surveys                   Strategy
                            – Dec 2005                               satisfaction         group

                            Implement protocol on data sharing for   Consistent,          14-19            Provider        Admin
                            ‘off site’ provision – Jun 2006          realistic and        partnership      response
                                                                     challenging          group
                                                                     targets for all
                                                                     students

                            Implement 14-19 teaching and learning    Improved target      LA/ BHS/ GHS     ALPS VA         Cover     CYP 5.2
                            project in pilot school – Jan 2006       setting method                        analysis, A
                                                                     and better                            level results
                                                                     student
                                                                     outcomes


3. Agree a                  Produce a protocol for data sharing –    Increased            LSC/ LA          Documents       Admin     Post-16
framework for               Dec 2006                                 sharing of data                                                 AIP/
quality monitoring                                                                                                                   Secondary
and use of Value            Develop area value added framework       Increased use        LSC/ LA/ Data                              Strategy
Added data                  – Sept 2005                              of VA                providers
                                                                     methodology in
                                                                     self – analysis




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                  Page 29 of 30
Focus For                   Activities/milestones/dates              Impact                Delivery/ Lead    Monitoring     Costs         Links to
Actions: Key                                                         Measures/             Responsibility    Processes                    other
Tasks                                                                outcomes                                & evidence                   strategic
                                                                                                             sources                      initiatives

4. Develop the use          Pilot use of virtual learning            Improved              14-16             Exam           Funded        Post-16
of ICT for student          environment (VLE) with students in the   student               Partnership       results/                     AIP/
tracking and                14-16 school-college partnership         attainment            Group             student                      secondary
monitoring                                                                                                   feedback                     strategy

                            Introduce Managed Learning               Better tracking       EHWLC/            School         None
                            Environment (MLE) to all students in     and monitoring        partner schools   feedback/
                            the 14-16 school-college partnership     of students in                          14-16
                                                                     off site                                partnership
                                                                     provision                               group

                            Support the use of MLEs to monitor       Better                LA/ CLC           School         Purchase
                            student progress in schools              monitoring of all                       evaluations/   and support
                                                                     students                                SIVs/          cost
                                                                                                             OFSTED

                            Align the Connexions CCIS to local                             Connexions        Destination    With funding Connexions
                            authority /other provider data systems                                           Survey                      Business
                                                                                                                                         Plan




D:\Docstoc\Working\pdf\f0425c4e-88c6-4c25-b799-8fe2c90bd4f2.doc                   Page 30 of 30

						
Related docs
Other docs by vdc12050
Constution Contract
Views: 26  |  Downloads: 0
Construction Work Performed Invoice
Views: 326  |  Downloads: 0
Construction Work Order Contract
Views: 219  |  Downloads: 2
Construction Work Orther Form - DOC
Views: 15  |  Downloads: 0
Consultation Template - DOC
Views: 19  |  Downloads: 0
Consultants Agreements
Views: 7  |  Downloads: 0
Constructon Management Contract
Views: 15  |  Downloads: 0
Construction Worker Evaluation Forms
Views: 597  |  Downloads: 0
Constructions Company Profile Samples - DOC
Views: 497  |  Downloads: 5