Contract title:             Supply of AMESD Thematic receiving stations & PUMA Stations Upgrade
                            and Maintenance

Publication reference:      EUROPEAID/128227/D/SUP/ET



Preamble
When the term “Tenderer” is included in a requirement, an analysis shall be included in the technical
and/or the financial offers. In that case, these requirements and the related analysis will be applicable to the
successful tenderer during the phase of execution of the contract.

The term “Contractor” is used to refer to the contractor of the AMESD Supply Contract #1.

The tenderer are requested to complete the template on the next pages:

         Column 2 is completed by the Contracting Authority shows the required specifications (Not to be
          modified by the tenderer

         Column 3 is to be filled in by the tenderer and must detail what is actually offered ( for example the
          words " compliant", "Fully Compliant" or "yes" or even a simple copy-paste are insufficient and
          unacceptable)

         Column 4 allows the tenderer to make comments on his proposed supply and to make eventual
          references to the documentation

         Column 5 is to be left empty for the evaluators

    The eventual documentation supplied should clearly indicate (highlight, mark) the models offered and
    the specifications so that the evaluators can identify the exact configuration. Offers that do not permit to
    identify precisely the models and the specifications may be rejected by the Committee.

    The technical offer must be clear enough to allow the evaluators to make an easy comparison between
    the requested specifications and the offered specifications


1. BACKGROUND INFORMATION
        1.1.   Beneficiary countries

The ACP countries of the five Regional Economic Communities (RECs) of sub-Saharan Africa, namely
CEMAC, ECOWAS, IGAD, IOC and SADC.

        1.2.   Contracting Authority

The African Union Commission on behalf of the ACP Secretariat, CEMAC, ECOWAS, IGAD, IOC, SADC.

        1.3.   AMESD programme

This contract is part of the programme African Monitoring of the Environment for Sustainable
Development (AMESD).
2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc                                                       Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                         Page 1 of 64
Launched in 2007, AMESD is scheduled to run to 2012 and receive funding of 21 million euro from the
European Commission through the European Development Fund. The programme is managed by the African
Union Commission in Addis Ababa, Ethiopia. A steering committee, composed by the main AMESD
stakeholders: five Regional Economic Communities (ECOWAS, SADC, CEMAC, IGAD, IOC) and the
ACP secretariat, is providing guidance to the programme.

AMESD objective is to provide all African nations with the resources they need to manage their environment
more effectively and ensure long-term sustainable development in the region. Most importantly, AMESD
aims to improve the lives and prospects of the 350 million disadvantaged people in Africa currently enduring
poverty and hardship, and whose livelihoods depend heavily on their environment.

AMESD aims to provide decision-makers in the Regional Economic Communities, the Commission of the
African Union and at national level with full access to the environmental data and products they need to
improve national and regional policy and decision-making processes.

AMESD initiative takes the Preparation for Use of MSG in Africa (PUMA) project a stage further by
extending the operational use of Earth observation technologies and data to environmental and climate
monitoring applications. It will also be the precursor of the extension of Europe's Global Monitoring of the
Environment and Security (GMES) initiative to Africa.

     1.4.    MTAP/PUMA

Through the precursor activities of the Meteorological Transition in Africa Project
(MTAP /PUMA), the EU has already developed a harmonised approach to use satellite data for monitoring
environmental change throughout Africa. During this project, a network of 49 satellite data receiving
stations, the so-called PUMA stations, has been deployed in the beneficiary countries, namely 46 Sub-
Saharan ACP countries. This network included 4 PUMA/MTAP Regional Centres (1) The Centre Régional
AGRHYMET in Niamey, (2) The Agence pour la Sécurité de la Navigation Aérienne en Afrique et à
Madagascar (ASECNA) in Dakar, now deployed in Niamey at the EAMAC, (3) The Drought Monitoring
Centre (currently IGAD Climate Prediction and Applications Centre, ICPAC) in Nairobi, (4) The Drought
Monitoring Centre of SADC in Harare.

Through these stations, the latest broadcasted meteorological data are available free of charge thanks to the
EUMETCast service of EUMETSAT, including data from satellite like Meteosat Second Generation (MSG)
and forecast data from weather services. EUMETCast uses the services of a satellite telecommunications
operator. The data files are transmitted in accordance with the DVB-S standard (Digital Video Broadcast via
Satellite). In Africa, data is disseminated in C-Band via the Atlantic Bird-3 satellite positioned over the
Atlantic. Information about the EUMETCast system can be found in the EUMETSAT web site at the
following address:

http://www.eumetsat.int/Home/Main/What_We_Do/EUMETCast/index.htm?l=en

The contract for the delivery and one-year warranty of these stations was awarded to Alcatel Alenia Space
(now Thales Alenia Space). As highlighted in Table 1, 49 EUMETCast-Africa reception stations have been
effectively deployed. The MTAP/PUMA project is now finished and the stations are no longer under
warranty. The proposed contract aims at upgrading these stations and maintaining their operational status
during the lifetime of the AMESD programme.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                       Page 2 of 64
                                                       Site Accep-    End of
         MTAP                                             tance      warranty
                                                                                         Soft           Perm Licence PC2
                                     STATUS
                                                       PMU and/or
                                    CONTROL               FP
                                                                      1 year           VCS/Vision        Confirmed installation



 N°       TEST and NMS Stations    Lang    Ant    nb       Date        Date              Versus

  1   KENYA (Nairobi)               A      3m     3     16/03/2004   12/03/2005   V1.8/V6.34.2.3dec04             OK
  2   NIGER                         F      3m     3     03/05/2004   28/04/2005   V1.8/V6.34.2.3dec04             OK
  6   MAURITIUS (Vacoas) :          A     3,7 m   1     24/07/2004   20/07/2005   V1.8/V6.34.2.3dec05             OK
  4   SENEGAL (Dakar) :             F      3m     1     03/07/2004   29/06/2005   V1.8/V6.34.2.3dec04             OK
  3   ZIMBABWE (Harare)             A      3m     2     17/06/2004   13/06/2005   V1.8/V6.34.2.3dec04             OK
  5   CAMEROUN (Douala) :           F      3m     1     17/07/2004   13/07/2005   V1.8/V6.34.2.3dec04             OK
  7   CONGO (Brazzaville)           F      3m     1     23/09/2004   19/09/2005   V1.8/V6.34.2.3dec04             OK
 10   TANZANIA (Dar Es Salaam)      A      3m     1     15/12/2004   11/12/2005   V1.8/V6.34.2.3dec04             OK
 13   GHANA (Accra)                 A      3m     1     20/01/2005   16/01/2006   V1.8/V6.34.2.3dec04             OK
 14   KENYA BIS (Nairobi)           A      NA     1     25/01/2005   19/01/2006   V1.8/V6.34.2.3dec05             OK
  8   MALI                          F      3m     1     26/11/2004   21/11/2005   V1.8/V6.34.2.3dec04             OK
  9   MAURITANIA                    F      3m     1     06/12/2004   02/12/2005   V1.8/V6.34.2.3dec04             OK
 11   SENEGAL BIS (Dakar)           F      3m     1     16/12/2004   12/12/2005   V1.8/V6.34.2.3dec04             OK
 12   DJIBOUTI                      F      3m     1     13/01/2005   09/01/2006   V1.6/V6.34.2.3Aug04             OK
 21   ETHIOPIA                      A      3m     1     01/04/2005   27/03/2006   V1.8/V6.34.2.3dec04             OK
 15   SUDAN (Khartoum)              A      3m     1     21/02/2005   16/02/2006   V1.8/V6.34.2.3dec04             OK
 19   MOZAMBIQUE                    A      3m     1     14/03/2005   09/03/2006   V1.8/V6.34.2.3dec04             OK
 24   SWAZILAND                     A      3m     1     19/04/2005   14/03/2006   V1.8/V6.34.2.3dec04             OK
 17   LESOTHO                       A      3m     1     07/03/2005   02/03/2006   V1.8/V6.34.2.3dec04             OK
 23   ZAMBIA                        A      3m     1     19/04/2005   14/04/2006   V1.8/V6.34.2.3dec04             OK
 20   BOTSWANA                      A      3m     1     25/03/2005   20/03/2006   V1.8/V6.34.2.3dec04             OK
 43   GUINEE EQUATORIALE            F      3m     1     16/08/2005   11/08/2006   V1.8/V6.34.2.3dec04             OK
 16   GABON                         F      3m     1     03/03/2005   26/02/2006   V1.8/V6.34.2.3dec04             OK
 18   SAO TOME ET PRINCIPE          F      3m     1     11/03/2005   06/03/2006   V1.8/V6.34.2.3dec04             OK
 41   ANGOLA                        A      3m     1     05/08/2005   31/07/2006   V1.8/V6.34.2.3dec04             OK
 26   NAMIBIA                       A      3m     1     26/04/2005   21/04/2006   V1.8/V6.34.2.3dec04             OK
 44   REP,DEMO,CONGO                F      3m     1     23/08/2005   18/08/2006   V1.8/V6.34.2.3dec04             OK
 30   REP,CENTRTAFRICAINE           F      3m     1     27/05/2005   22/05/2006   V1.8/V6.34.2.3dec04             OK
 29   GUINEA-BISSAU                 F      3m     1     25/05/2005   20/05/2006   V1.8/V6.34.2.3dec04             OK
 22   COTE D'IVOIRE                 F      3m     1     18/04/2005   13/04/2006   V1.8/V6.34.2.3dec04             OK
 25   GUINEA-CONAKRY                F      3m     1     22/04/2005   17/04/2006   V1.8/V6.34.2.3dec04             OK
 27   CABO VERDE                    F     3,7 m   1     25/04/2005   20/04/2006   V1.8/V6.34.2.3dec04             OK
 31   GAMBIA                        A      3m     1     02/06/2005   28/05/2006   V1.8/V6.34.2.3dec04             OK
 36   MALAWI                        A      3m     1     13/07/2005   08/07/2006   V1.8/V6.34.2.3dec04             OK
 33   NIGERIA( Lagos)               A      3m     1     17/06/2005   12/06/2006   V1.8/V6.34.2.3dec04             OK
 32   CHAD                          F      3m     1     07/06/2005   02/06/2006   V1.8/V6.34.2.3dec04             OK
 28   SEYCHELLES                    A     3,7 m   1     20/05/2005   15/05/2006   V1.8/V6.34.2.3dec04             OK
 39   MADAGASCAR                    F     3,7 m   1     22/07/2005   17/07/2006   V1.8/V6.34.2.3dec04             OK
 37   COMORES                       F      3m     1     15/07/2005   10/07/2006   V1.8/V6.34.2.3dec04             OK
 38   ERITREA (Asmara)              A      3m     1     17/07/2005   12/07/2006   V1.8/V6.34.2.3dec04             OK
 35   NIGER BIS (Niamey)            F      3m     1     22/06/2005   17/06/2006   V1.8/V6.34.2.3dec04             OK
 42   BENIN                         F      3m     1     06/08/2005   01/08/2006   V1.8/V6.34.2.3dec04             OK
 40   TOGO                          F      3m     1     30/07/2005   25/07/2006   V1.8/V6.34.2.3dec04             OK
 47   BURKINA FASO                  F      3m     1    17/092005     12/09/2006   V1.8/V6.34.2.3dec04             OK
 34   UGANDA                        A      3m     1     24/06/2005   19/06/2006   V1.8/V6.34.2.3dec04             OK
 49   RWANDA                        F      3m     1     30/09/2006   25/09/2006   V1.8/V6.34.2.3dec04             OK
 48   BURUNDI                       F      3m     1     01/10/2006   25/09/2006   V1.8/V6.34.2.3dec04             OK
 45   SIERRA LEONE                  A      3m     1     05/09/2005   31/08/2006   V1.8/V6.34.2.3dec04             OK
 46   LIBERIA                       A      3m     1     13/09/2005   08/09/2006   V1.8/V6.34.2.3dec04             OK
      ZIMBABWE BIS EMBARGO          A      3m     1                               V1.8/V6.34.2.3dec04



                            Table 1 : Status of stations at the end of PUMA contract
2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                           Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                  Page 3 of 64
A PUMA station is a system integrating hardware, basically one satellite reception antenna and 3 PCs, and
software for data acquisition, processing and exploitation. It is operated by administrators and meteorologist
users who have been specifically trained. The main mission of the system is to derive usable products for
meteorological applications, such as weather forecasts, estimates of rainfall, …

All the PUMA stations deployed are identical. Each station is composed of the following units:

            One outdoor unit for data reception consisting of

                 o   Antenna, between 3.00m and 3.70m diameter depending on geographical location,

                 o   Feed and Low Noise Block converter (LNB) for C-Band reception,

            One indoor unit for data acquisition, processing, and exploitation, consisting of

                 o   3 PCs operating under Windows XP, their saved power supply (UPS) and some peripherals
                     (printer, network switch)

                 o   Software packages

The Annex 6 provides detailed information on the design and the configuration of the stations installed
within the framework of the PUMA project.

        1.5.      EUMETSAT role in AMESD

The proposed contract is also related to the activities of the European Organisation for the Exploitation of
Meteorological Satellites (EUMETSAT) in Africa. Indeed EUMETSAT plays a key role in the programme
through a Memorandum of Understanding signed with the African Union Commission. It encompasses:

              Continuous supply of its satellite data and products free of charge via the EUMETCast
               dissemination system;

              Providing AMESD with support in the maintenance and upgrading of receiving stations and
               equipment;

              Continuing its training programmes for African National Meteorological and Hydrological
               Services personnel, in close coordination with the AMESD training activities;

              Providing managerial support to the committee in charge of supervising the project;

              Offering, through its biennial African User Forum, an opportunity for the African user community
               to meet, discuss and exchange information and ideas about AMESD and EUMETSAT data and
               products.

The proposed contract implies close coordination with EUMETSAT, especially regarding the organisation of
training and technical support services. This is detailed further in the document.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                    Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                           Page 4 of 64
2. DESCRIPTION OF THE WORK
     2.1.    LOT 1

The purpose of this contract is to supply the AMESD Thematic stations (referred as “AMESD stations” in
the following). They include any equipment necessary to receive data broadcasted via EUMETCast Africa
(EUMETSAT satellite broadcast service of meteorological and earth observation data over Africa) and to
exploit these data within the frame of the THEMAs (AMESD Thematic Projects). They will be deployed in
·the 47 AMESD National Centres (one per beneficiary country), the 5 AMESD Regional Implementation
Centres, and the AMESD Head Office. The shipment of equipments, on-site installation and first training
session are part of the contract.

The AMESD stations (present Lot, i.e. Lot1) are part of the same logic as the PUMA stations (Lot2),
focusing this time on environmental applications. As presented in Figure 1, they have (i) A block for
EUMETCast reception similar to PUMA stations and comprising a sub-system Antenna (outdoor) and a
sub-system Acquisition (indoor), (ii) A subsystem for the processing and use of data received dedicated to
environmental monitoring applications, namely the e-Station. Each of these subsystems is made of several
components integrating both hardware and software which are specified under a tabular form further in the
document.

Beyond the specificity of the data exploitation sub-system, there are also differences in terms of operational
constraints compared with PUMA stations. Indeed, the time constant related to environmental monitoring
applications is generally higher than for meteorological applications. Typically short-term weather forecast
involves products on an hourly basis, where environmental indicators are often based on decadal or seasonal
products. The result is a weaker requirement of availability of the system implying non-redundancy of
acquisition PC.




                       Figure 1: AMESD Thematic Stations versus PUMA Stations



The contract includes the following work packages:

    1. Supply of the AMESD Thematic Stations
        This is the main part of the contract.

        The Contractor shall provide:
            47 Full AMESD Stations for the AMESD National Centers (NCs),
            5 Partial AMESD Stations for the AMESD Regional Implementation Centers (RICs),
            1 Reference Platform for the Contracting Authority.
2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                       Page 5 of 64
        Each Full AMESD Station shall include the following items:
            1 Antenna sub-system including satellite dish, mounting, feed, LNB for C-Band reception
            1 Acquisition sub-system i.e. a PC equipped with DVB-S reception card, EUMETCast Key
               Unit (EKU) and ad-hoc software for data acquisition,
            1 e-Station sub-system including 1 processing workstation and 1 server with ad-hoc
               software,
            1 set of support items (UPS, network switch).

        The Partial AMESD Stations are full AMESD Station without the antenna subsystem.

        The Reference Platform is dedicated to (i) The test of CFI on target computers before the delivery
        of these CFI (ii) Technical support on CFI after their delivery. The reference shall include the
        following items:
             1 Acquisition sub-system,
             1 e-Station,
             1 set of support items (UPS, network switch).

        Furthermore, a provision of extra computers identical to the ones purchased for the station shall be
        delivered at the end of the contract (identified as +5 in Table 2).
        The software for the e-Stations and the EKU will be provided to the contractor as Customer
        Furnished Items (CFI).
        Each main item to be delivered can be broken down into components, which are further specified in
        the document. The Table 2 synthesizes the overall quantities expected for each component.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                               Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                      Page 6 of 64
          Item
                                              Description                                        Quantity
         Number

             1                                 Antenna                                                -

            1.1                   Satellite dish, mounting and feed                                  47

            1.2                                   LNB                                                47

             2                                Acquisition                                             -

            2.1                                Computer                                             53+5

            2.2                         DVB reception device                                         53

            2.3                            Operating System                                          53

            2.4                          Application Software                                       53*

            2.5                                   EKU                                               53**

             3                                 e-Station                                              -

            3.1                                Computer                                            106+5

            3.2                            Operating System                                        106**

            3.3                          Application Software                                      106**

             4                              Support items                                             -

            4.1                                   UPS                                                53

            4.2                            Network Switch                                            53

                           Table 2: Lot 1 Deliverable Item List- Overall quantities

        * One part of this software (Tellicast) will be delivered for free by the Contracting Authority (CFI)
        **Delivered for free by the Contracting Authority (CFI)


    2. On-site installation
        The equipment will be sent to destination and installed by the contractor. This includes (i) Antenna
        mounting and pointing (ii) Putting into service of the acquisition PC. The infrastructure work
        required such as concrete pad, network, power supply, will be specified in advance by the contractor.
        These infrastructure works will be performed by the beneficiary and therefore are out of the scope of
        this contract. Nevertheless, the contractor shall certify their compliance before installing the station.
        In case of non-compliance, the contractor should request the beneficiary the upgrading of
        infrastructure.
    3. First training session
        A first training session focusing on system administration and maintenance will be performed on-site
        following installation. After this training, the station administrator will be able to perform himself
        system monitoring, system configuration, re-installation of factory configuration, and first level of
        maintenance. He will also be sensitized to security rules. A specific training (type training of


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                             Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                    Page 7 of 64
          trainers) will be delivered to the staff of AMESD RICs who will be responsible for user support in
          their region.
          The training shall break down into two (2) modules:
               o    Module A - System Administration: use and configuration (if required) of the acquisition
                    software, installation, backup, system monitoring, security rules, maintenance.
               o    Module B - Training of trainers: pedagogic aspects, take in hand of training material
          It should be noted that the training activities only concerns the antenna and the acquisition sub-
          systems. Training to the e-Stations is out of the scope of this contract.
      2.2.      LOT 2

The purpose of this contract is to sustain the operational status of the existing PUMA stations. It is justified
by the fact that there was 2 years gap in maintenance since the end of PUMA contract warranty period and
because these receiving stations are key facilities for the AMESD program. It includes the provision of
supplies to deal with equipment and software obsolescence. In particular, all the PCs have to be replaced. It
also includes the preparation of training material.

The contract objective comprises the following work packages:
     1. Delivery of new indoor units
          One major outcome is to deal with hardware and software obsolescence by replacing all the PCs
          with new state-of-the-art ones. Other expected outcomes are to reinforce security (e.g. antivirus
          upgrade), to enable remote access for maintenance, and to renew the saved power supply (e.g. new
          batteries, automatic PCs shutdown to prevent full discharge). The contractor is in charge of the
          delivery and deployment of these new indoor units for all the existing stations.
          The Contractor shall provide:
              50 new PUMA indoor units for the centres identified in Table 5
              3 sets of 12 software packages (identical to the software the PUMA stations) for the
                 computers of the training centres1

          Each new PUMA indoor unit shall include the following items:
              1 Acquisition sub-system,
              1 Processing and Exploitation sub-system,
              1 set of support items including UPS

          Furthermore, a provision of extra computers identical to the ones purchased for the station shall be
          delivered at the end of the contract (identified as +5 in Table 3).
          Each main item to be delivered can be broken down into components, which are further specified in
          the document. The Table 3 synthesizes the overall quantities expected for each component.




1
  The training centers are part of the list defined in Table 5. They have a PUMA station and a training room equipped with
computers. The delivery of these computers is out of the scope of the contract. It should be noted that the software to be delivered for
the training centers is only used for training purposes (not operational use).

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                       Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                              Page 8 of 64
          Item
                                                    Description                                             Quantity
         Number

              1                                     Acquisition                                                  -

             1.1                                     Computer                                                 50+5

             1.2                              DVB reception device                                              50

             1.3                                 Operating System                                               50

             1.4                              Application Software                                             50(1)

             1.5                                        EKU                                                    50(2)

              2                           Processing & Exploitation                                              -

             2.1                                     Computer                                                 100+5

             2.2                                 Operating System                                              100

             2.3                           Application Software Suite                                          50(3)

             2.4                             DVB reception device(4)                                            50

              3                                   Support items                                                  -

             3.1                                         UPS                                                    50

              4                          Software for training centres                                           -

             4.1                           Application Software Suite                                          36(5)

        (1) One part of this software (Tellicast) will be delivered for free by the Contracting Authority (CFI)
        (2) Delivered for free by the Contracting Authority (CFI)
        (3) The quantity mentioned does not include software instances (fail-over licenses) required to switch over a redundant
        machine upon failure
        (4) For backup
        (5) 12 PCs to be equipped in each training centre
                            Table 3: Lot 2 Deliverable Item List- Overall quantities

    2. Warranty services
        In case of failure reported in one station, the contractor is fully responsible to provide any technical
        and operational means (e.g. hotline mail, technical support team for investigation, remote
        intervention, re-installation of factory configuration, repair or replacement, test, shipment, on-site
        intervention,) to fix the issue and come back to nominal operation within the specified time limit.
        The contractor may also propose and apply a set of preventive measures to reduce the risk of failure.
        The PUMA stations shall be maintained in operational condition during the whole AMESD
        programme duration.
        The EUMETSAT User Helpdesk remains the first point of contact for all maintenance support in
        order to keep the same user interface. This Helpdesk registers and processes enquiry, provides a first
        level of intervention when possible (e.g. gives information linked with the status of the
        meteorological satellite or EUMETCast service), and forward to the contractor technical authority
        when secondary support is required.



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                   Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                          Page 9 of 64
        Particular attention must be paid to encourage and promote local self-sufficiency in terms of support;
        any contractor must favor such attitudes. The Contractor should also rely on African experts trained
        in the framework of the PUMA project.
    3. Training materials
        This aims at preparing training/tutorial materials for the operation, maintenance and repair of PUMA
        stations. It must be considered in the PUMA follow-on context and several kind of material have to
        be prepared depending on the profile and background of the trainees. Beyond the preparation of
        training support dedicated to the new aspects of the upgraded stations, the logic will be to pave the
        way towards sustainability by the preparation of self-training material/tutorial and a material for the
        training of trainers.

        It should be noted that the performance of the training session is out of the scope of this contract.
        Only the delivery of training materials is included.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                 Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                        Page 10 of 64
3. PLACES OF DELIVERY
     3.1.    LOT 1

Full AMESD Thematic Stations (antenna, acquisition, and e-Station) will be delivered to AMESD National
Centres (one per beneficiary country). The list of places of delivery is given in Table 4.

Partial AMESD Thematic Stations (acquisition and e-Station) will be delivered to the AMESD Regional
Implementation Centres, i.e.

    (1) AGRYMET Regional Centre in Niamey/Niger,

    (2) BDMS in Gaborone/Botswana,

    (3) CICOS in Kinshasa/DRC,

    (4) ICPAC in Nairobi/Kenya,

    (5) MOI in Quatre Bornes/Mauritius.

(1) and (2) have already an antenna (PUMA station)
(4) is collocated with the Kenya Meteorological Dpt. (KMD) and has access to its PUMA antenna
(3) and (5) are being equipped under other AMESD contract

The RICs will be the regional focal point for the network of AMESD stations. They will provide technical
support to the users in their region. The indoor unit they will receive will be used as support platform.

The Reference Platform will be delivered to the AMESD Head Office in Addis Ababa / Ethiopia.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                               Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                      Page 11 of 64
                 N°                 Country                      Place
                 1    Angola                           Luanda
                 2    Benin                            Cotonou
                 3    Botswana                         Gaborone
                 4    Burkina Faso                     Ouagadougou
                 5    Burundi                          Bujumbura
                 6    Cape Verde                       Praia
                 7    Cameroon                         Yaoundé
                 8    Chad                             N'Djamena
                 9    Comoros                          Moroni
                 10   Congo Brazzaville                Brazzaville
                 11   Côte d‟Ivoire                    Abidjan
                 12   Djibouti                         Djibouti
                 13   Eritrea                          Asmara
                 14   Ethiopia                         Addis Ababa
                 15   Gabon                            Libreville
                 16   Gambia                           Banjul
                 17   Ghana                            Accra
                 18   Guinea Bissau                    Bissau
                 19   Guinea Conakry                   Conakry
                 20   Equatorial Guinea                Malabo
                 21   Kenya                            Nairobi
                 22   Lesotho                          Maseru
                 23   Liberia                          Monrovia
                 24   Madagascar                       Antananarivo
                 25   Malawi                           Lilongwe
                 26   Mali                             Bamako
                 27   Mauritania                       Nouakchott
                 28   Mauritius                        Albion
                 29   Mozambique                       Maputo
                 30   Namibia                          Windhoek
                 31   Niger                            Niamey
                 32   Nigeria                          Abuja
                 33   RCA                              Bangui
                 34   RDC                              Kinshasa
                 35   Rwanda                           Kigali
                 36   Sao Tome et Principe             Soa Tome
                 37   Senegal                          Dakar
                 38   Seychelles                       Victoria
                 39   Sierra Leone                     Freetown
                 40   Somalia                          Mogadishu
                 41   Sudan                            Khartoum
                 42   Swaziland                        Mbabane
                 43   Tanzania                         Dodoma
                 44   Togo                             Lome
                 45   Uganda                           Kampala
                 46   Zambia                           Lusaka
                 47   Zimbabwe                         Harare
                            Table 4: Places of delivery (Full AMESD stations)


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                   Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)          Page 12 of 64
        3.2.   LOT 2

The PUMA stations to be maintained comprise:

         Each of the countries participating in PUMA project: installed in the National Meteorological
          Service, Department or Agency (NMS) of the concerned countries,

         Each of the 4 PUMA Regional Centres (RC): AGRYMET Centre in Niamey, DMC SADC*, ICPAC
          (formerly DMC) in Nairobi, and EAMAC (ASECNA) in Niamey,

         The one of the EUMETSAT Partner Centre (PC): ACMAD in Niamey.

*The final location of this station will be confirmed at the contract kick-off: Harare (the former DMC SADC
location, where the station is actually settled) or Gaborone, (the new DMC SADC location where the station
could be transferred). In any case, the prospective transfer of the station from Harare to Gaborone is out of
the scope of this supply contract.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                               Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                      Page 13 of 64
                     N°             Country                 Place        Initial Pgm Type
                      1   ANGOLA                 Luanda                  PUMA       NMS
                      2   BENIN                  Cotonou                 PUMA       NMS
                      3   BOTSWANA               Gabarone                PUMA       NMS
                      4   BURKINA FASO           Ouagadougou             PUMA       NMS
                      5   BURUNDI                Bujumbura               PUMA       NMS
                      6   CABO VERDE             Ilha do Sal             PUMA       NMS
                      7   CAMEROUN               Douala                  PUMA       NMS
                      8   CHAD                   N'Djamena               PUMA       NMS
                      9   COMORES                Moroni                  PUMA       NMS
                     10   CONGO BRAZZAVILLE      Brazzaville             PUMA       NMS
                     11   COTE D'IVOIRE          Abidjan                 PUMA       NMS
                     12   DJIBOUTI               Djibouti                PUMA       NMS
                     13   ERITREA                Asmara                  PUMA       NMS
                     14   ETHIOPIA               Addis Ababa             PUMA       NMS
                     15   GABON                  Libreville              PUMA       NMS
                     16   GAMBIA                 Banjul                  PUMA       NMS
                     17   GHANA                  Accra                   PUMA       NMS
                     18   GUINEA BISSAU          Bissau                  PUMA       NMS
                     19   GUINEA CONAKRY         Conakry                 PUMA       NMS
                     20   GUINEE EQUATORIALE     Malabo                  PUMA       NMS
                     21   KENYA                  ICPAC / Nairobi         PUMA       RC
                     22   KENYA                  Nairobi                 PUMA       NMS
                     23   LESOTHO                Maseru                  PUMA       NMS
                     24   LIBERIA                Harbel                  PUMA       NMS
                     25   MADAGASCAR             Antananarivo            PUMA       NMS
                     26   MALAWI                 Chileka                 PUMA       NMS
                     27   MALI                   Bamako                  PUMA       NMS
                     28   MAURITANIA             Nouakchott              PUMA       NMS
                     29   MAURITIUS              Vacoas                  PUMA       NMS
                     30   MOZAMBIQUE             Maputo                  PUMA       NMS
                     31   NAMIBIA                Windhoek                PUMA       NMS
                     32   NIGER                  AGRHYMET / Niamey PUMA             RC
                     33   NIGER                  Niamey                  PUMA       NMS
                     34   NIGER                  EAMAC / Niamey          PUMA       RC
                     35   NIGER                  ACMAD / Niamey          ACMAD      PC
                     36   NIGERIA                Lagos                   PUMA       NMS
                     37   RCA                    Bangui                  PUMA       NMS
                     38   RDC                    Kinshasa                PUMA       NMS
                     39   RWANDA                 Kigali                  PUMA       NMS
                     40   SAO TOME ET PRINCIPE   Sao Tome                PUMA       NMS
                     41   SENEGAL                Dakar                   PUMA       NMS
                     42   SEYCHELLES             International Airport   PUMA       NMS
                     43   SIERRA LEONE           Freetown                PUMA       NMS
                     44   SUDAN                  Khartoum                PUMA       NMS
                     45   SWAZILAND              Mbabane                 PUMA       NMS
                     46   TANZANIA               Dar-es-Salaam           PUMA       NMS
                     47   TOGO                   Lomé                    PUMA       NMS
                     48   UGANDA                 Kampala                 PUMA       NMS
                     49   ZAMBIA                 Lusaka                  PUMA       NMS
                     50   ZIMBABWE               DMC SADC / Harare       PUMA       RC


                          Table 5: Location of the PUMA stations to be maintained


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                               Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                      Page 14 of 64
4. ASSUMPTIONS AND RISKS
     4.1.    Assumptions underlying the project intervention

   EUMETCast broadcasting is operational

   The RECs, RICs, and/or AMESD National Centres will facilitate the customs and tax arrangements (NB:
    supplies import basis on DDU)

   The management of key for EUMETCast data encryption is insured by EUMETSAT

   EUMETSAT has established a helpdesk, available during normal office hours, to support the AMESD
    African Users (this includes the national meteorological services, responsible for the PUMA station).
    This helpdesk will comprise the following elements:

    a) First line support for User enquiries relating to EUMETCast delivered data and products;

    b) First line support for PUMA reception station trouble-shouting;

    c) Provision of a system level knowledge base for the PUMA EUMETCast reception stations.

    In this capacity EUMETSAT will:

    a) Coordinate with the contractor for the maintenance of PUMA reception stations to ensure the
       successful resolution of any trouble-shooting problems identified by the AMESD Users;

    b) Liaise with the EUMETCast data providers to maintain the integrity of information provided by
       EUMETSAT on their data and products;

    c) Provide Web based information relating to the availability of data and products for AMESD African
       Users;

    d) Provide statistics on the number of Helpdesk enquiries and trouble-shooting requests received

     4.2.    Risks

   There may be a risk to experience equipment bottlenecks due to customs clearance formalities.

    This risk can be mitigated by anticipation. It is highly recommended to communicate the lists of
    equipment to be delivered within the framework of this Supply Contract as soon as possible to the
    beneficiary institutions and the AMESD RICs, in order to facilitate customs clearance formalities and the
    necessary exemption from VAT and customs duties, in accordance with the Cotonou agreement.

   There may be a risk to experience late delivery of infrastructure work in Lot 1.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                       Page 15 of 64
5. TECHNICAL REQUIREMENTS
      5.1.    General

a) All the equipment shall be provided complete with the necessary accessories and/or parts such as to
   ensure that the unit is capable of operating to the required technical and quality specifications. All
   specifications details within each lot for each item are the minimum requirements unless otherwise
   stated. Any improvements on the specifications or additional features offered should be clearly identified
   in the Tenderer‟s offer.

b) All supplies has to be ready to operate after delivery and installation by the contractor if no other
   conditions are mentioned in the technical specification.

Hardware

c) All the electronic devices shall be compatible with the power supply features (voltage, electrical outlet)
   operative in the countries of delivery, unless otherwise specified. In addition, all the electrical devices
   which have to be interconnected shall be fully compatible.

d) All the hardware indoor units must be operable in an office environment with regards to the following
   temperature, humidity and dust conditions:
        Operating temperature: 10°C – 35°C
        Relative humidity: 20% - 80%
        Dust: 0.40 gr/m3
       (applicable for hardware indoor units, only)

e) Redundant physical hard disks shall be implemented on each PC according to the following table:

           Computer Type                Lot1       Lot2                  Minimum requirement*
      Acquisition PC                  Item 2.1   Item 1.1   2 x 250 GB (1 nominal, 1 redundant)
      e-station PC                    Item 3.1              1 x 40 GB + 2 x 500 GB (2 nominal, 1 redundant)
      PUMA processing PC                         Item 2.1   2 x 250 GB (1 nominal, 1 redundant)
     *sizes indicated are a minimum

f) Some preventive measures shall be proposed in order to cope with problems of unexpected UPS battery
   alteration; e.g. automatic equipment shutdown to prevent full discharge.

g) EUMETSAT strongly recommends setting up the EUMETCast PC (acquisition sub-system) only as a
   Reception Station with an optional FTP/File Server functionality, and not to install and run other
   application software. Peaks in disk or bus usage could interrupt the DVB data reception and thus cause
   non-recoverable data losses.

Software

h) The tenderer shall propose the necessary measures to protect against malware/viruses (e.g. antivirus,
   virus database update).

i)   The system shall allow remote access for maintenance whenever possible (i.e. reliable and fast internet
     connection). There exist for this, software allowing to instantly take control over a computer anywhere
     on the Internet, even through firewalls.

j)   In order to enable end-users with minimal system administration experience to install/re-install the
     applications there shall be:

     1. The provision of easily-installable software packages for all necessary applications;

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                   Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                          Page 16 of 64
     2. The provision of a simple installation procedure for all necessary applications.

     For instance, a system software image that contains all software components that are necessary (e.g. for
     the acquisition PC, the system image includes the Operating System, the DVB and EKU device drivers
     and the Tellicast Client application) may be prepared for each PC.

k) In order to enable end-users with minimal system administration experience to perform partial/complete
   backups/restores of the system software there should be the provision of a suitable backup/restore
   mechanism.

l)   When software upgrade is needed, the Contractor shall provide easily-installable software
     packages/upgrades including all the necessary software components. The system software
     packages/upgrades shall be distributed via EUMETCast and/or by other means, e.g. via FTP or
     CDs/DVDs.

m) In order to simplify application upgrades, the upgrades should not rely on any application licenses that
   are unique to the users.

n) The installation of upgraded software versions shall allow to preserve user own configuration.

o) In order to allow hardware maintenance/replacement, the application software licenses should not be
   linked to any specific hardware (e.g. network cards, DVB cards etc.) with the exception of a unique
   system identifier.

p) In order to enable end-users with minimal system administration experience to configure the applications
   there should be the provision of one or more graphical user interfaces for configuring all necessary
   applications"

      5.2.    Requirements specific to LOT 1

Not applicable.

      5.3.    Requirements specific to LOT 2

a) The upgraded station configuration shall offer the same level of redundancy as the initial one. In
   particular, in case of failure of one PC, it shall be possible to switch over a reduced configuration and the
   station shall remain operational.


6. ASSET REGISTER
a) In order to assist in asset registration, all equipment shall have a solidly fixed metallic type or similar
   approved label, size 75 mm x 35 mm, with the EU logo and the lettering:

         AMESD Contract No. 9548/REG
         Supply Contract No. xxxx / Lot No (…) / Item No ….. / Serial No …..

         The final acceptance shall include the signed up to date asset registration as accepted by the
         beneficiary.

         The EU logo is available on the following web site:
         http://europa.eu.int/comm/europeaid/visibility/index_en.htm

b) The contractor shall maintain a complete inventory and management of the hardware of the project
   (serial numbers, part numbers, locations, moves of hardware, repair, etc).


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                  Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                         Page 17 of 64
c) The contractor shall maintain a complete inventory of the software and COTS (version numbers, release
   numbers, updates, configuration, etc).




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                           Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                  Page 18 of 64
7. TESTS AND INSTALLATION
     7.1.    General

a) The contractor is responsible to install all the software packages prior to the delivery, including the
   software packages provided by the Contracting Authority.

b) The remote access, when it is possible, shall be set up and tested as part of the station deployment.

     7.2.    Specific requirements to LOT 1

a) The contractor shall specify infrastructure work required such as concrete pad, network, and power
   supply. These specifications shall be submitted to the Contracting Authority for the Kick-Off Meeting
   and sent to the beneficiary immediately after approval.

b) The infrastructure works are out of the scope of this contract. Nevertheless, the contractor will be
   responsible for verifying their performance prior to installation.

c) The contractor shall perform a Factory Acceptance Test (FAT) on the first model of stations, for each
   kind of antenna (2,4m and 3,7m diameter). The successful FAT will result in the authorization to
   proceed to the deployment.

d) The on-site installation to be performed by the Contractor shall include (i) Antenna assembly and fixing,
   (ii) Antenna alignment, (iii) Putting into service of the station.

e) The deployment shall be performed according to the following two steps:

        Step 1: The Contractor shall produce 5 complete stations and deploy them in the 5 national centres
        located in Gaborone, Kinshasa, Nairobi, Nyamey, and Quatre Bornes. Good functioning under
        normal operation shall be verified during 1 month by the beneficiary.

        Step 2: After successful tests of the first 5 station models, the Contractor is authorized to deploy the
        rest of the system.

     7.3.    Specific requirements to LOT 2

a) The contractor shall perform a Factory Acceptance Test (FAT) aiming at validating the upgraded
   hardware and software in operational conditions. The successful FAT will result in the authorization to
   proceed to the deployment.

b) Two options are possible for the installation:

        Option a) Installation by the contractor,

        Option b) Prior training of the users by the contractor, then installation by the users under the
                  contractor responsibility.

        The tenderer shall identify in his proposal which of the two options he has selected.

c) Especially if option b) is selected, the tenderer has to make sure that installation is easy to do by the
   station staff: installation guide clear and user friendly (movie, picture, …), training with practical work
   to learn the installation procedure, …

d) In any case, the tenderer shall make a provision of a bulk for travel for 20 sites in case of problems
   during installation.

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                   Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                          Page 19 of 64
e) At least 20 stations shall be deployed during the first 7 months. The list of priority will be provided by
   the contracting authority at the kick-off meeting.

f) It shall be possible, during a transient period, to keep the old configuration running together with the
   upgraded one (e.g. by adding a splitter between the antenna and the reception PCs

Comment: If during the transient period a failure occurs on the former PCs, then it is not required to fix it.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                   Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                          Page 20 of 64
8. MANAGEMENT
     8.1.       Key people

The tenderer shall include in its proposal the CV of the Team Leader. It shall comply with the following
profile:

        Qualifications and skills

        University degree or equivalent

        Team leadership, excellent communication skills, fluent in English. A good working knowledge of
        French is an asset.

        Knowledge of satellite telecommunication (DVB), and especially the EUMETCast system,
        knowledge of meteorological/EO data handling.

        Professional experience

        At least 5 and preferably 10 years experience in managing IT projects involving:

                 Hardware and software deployment,

                 Maintenance activities,

                 Training.

        Experience in international projects.

        Experience in logistics.

Any change regarding the Team Leader shall be the object of a notification letter to the Contracting
Authority. The CV of the new Team Leader, compliant with the required profile, shall be annexed to the
notification letter.

     8.2.       Project management structure

                8.2.1.   Responsible body

The African Union Commission (Direction REA) will be responsible for managing the contract.

                8.2.2.   Management structure

The overall structure of the AMESD program is illustrated in the figure below.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                              Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                     Page 21 of 64
                                                   AMESD Programme Structure
                                                   AMESD Programme Structure




                                                                      DRAO/Programme Director      EC Delegation
                                                                               AUC                 (Addis Ababa)

               Programme Steering Committee                                                         DG ENTR
    A
                                                                    Programme Co-ordination Team
    C
                       EC, EUMETSAT
    P                                                                                                  JRC
            Regional Economic Communities - RECs                       Programme Co-ordinator
                                                                               AUC
    CEMAC       ECOWAS        IGAD     IOC       SADC
                                                                                                    EUMETSAT
                                                                         Technical Assistance




                     RIC                 RIC                RIC            RIC             RIC
                   (CEMAC)            (ECOWAS)            (IGAD)          (IOC)          (SADC)



                  Regional           Regional           Regional       Regional        Regional
                   networks           networks           networks       networks        networks




                                Figure 2: AMESD Program management structure

The African Union (AU) acts as the Delegated Regional Authorizing Officer (DRAO) for the entire
programme, jointly designated by ACP Secretariat, CEMAC, ECOWAS, IGAD, IOC, SADC. The DRAO is
responsible for the overall programme implementation and meeting its objectives. The RECs are closely
associated to the programme‟s planning and implementation through their participation in the Steering
Committee, regular reporting and ad hoc meetings. In the implementation of the programme the DRAO is
assisted by the Programme Co-ordination Team (PCT), consisting of
       The Programme Co-ordinator, an officer of the African Union, responsible for the “day-to-day”
        technical, administrative and financial management of the programme.

       The Technical Assistance, to assist and advise the Programme Co-ordinator in his/her tasks. It consists
        of a team of experts providing long term (including administrative/accounting expertise) and short-term
        services, both at the central level (in the AUC offices: TL – TDMO-AFO) and in the regional centres (5
        thematic experts in the RICs).

The PCT has the power to consult the stakeholders on programme issues.

The Programme Steering Committee (PSC) is responsible for the overall guidance and technical
orientation and coherence of the programme. This Committee meets at least on an annual basis and is
convened by the PSC Chairperson (see below). However, especially at the start of the program two
meetings per year might be required. The PSC is mandated, amongst others, to discuss, amend and approve
the programme annual action plan. It comprises the following members: 1) the Representatives of the five
Regional Economic Communities (one being elected as PSC chairperson) 2) a representative of the ACP
Secretariat, and 3) the DRAO as representative of the AU. Observers, contributing to the workings of the
PSC will include 1) the EC Delegation responsible for the monitoring of AMESD, 2) other EC
representatives (HQs, JRC, DG ENTR, other), 3) the representatives of EUMETSAT (ensuring the
Secretariat of the PSC), and 4) the representative of the World Meteorological Organisation. The meetings

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                      Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                             Page 22 of 64
are also attended by the Programme Co-ordination Team and the responsible of the regional implementation
centres with their TAs. Specific resource persons could also be convened to the PSC, as and when needed.

The EU Delegation in Ethiopia is the “chef de file” for the administrative and financial monitoring of the
entire program. For technical issues, it is supported by AIDCO, as well as by representatives of DG ENTR
and of the JRC.

Each Regional Economic Community (REC) has nominated a member of staff as their lead person and
official REC counterpart in AMESD and the primary contact point for the Programme Coordination Team.
Each REC leader needs to keep in close contact with progress made in their RIC, and with their national
counterparts.

The Regional Implementation Centres (RICs) have each been designated by one of the RECs. The RICs
have designated a senior representative as AMESD counterpart and Manager in charge of implementing the
regional thematic action, as well as local staff involved in the programme. As part of the local staff, the RIC
have to designate an accountant, to ensure correct financial implementation of the Regional Thematic Action
according to EDF procedures, and report to the PCT on financial issues. The accountant will be the
counterpart to the financial and administrative officer (AF-TA) of the TA. The RIC Manager reports directly
to the Programme Co-ordinator and keeps the REC fully appraised of progress. They are supported by the
TA staff, and particularly by the TA thematic experts seconded to the RICs.

A Focal Point, acting as Project Manager, will be designated within the PCT for the follow-up of the supply
contract #1. This person will be in charge of the daily management of the supply contract #1, at AMESD
PCT side and will be the focal point for any exchanges with the contractor.

For operational purposes, the contractor will also have to interface with EUMETSAT User Service,
especially with the EUMETSAT help desk for the technical support service in Lot 2.

The management structure dedicated to the supply contract #1 is depicted in Figure 3.



                                          DRAO / Program Director
                                                   AUC



                                         Program Co-ordination Team
                                                                                      EUMETSAT
                                                   (PCT)
       AMESD stations
         Network                               Supply Contract #1
                                                                                        User Service
                                                  Focal point




                                              Supply Contract #1

                                                  Contractor




          Management interfaces are represented in solid line, operational interfaces in dotted line

                                     Figure 3: Management structure



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                  Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                         Page 23 of 64
        8.3.   Management requirements

a) The tenderer shall include in its proposal a preliminary version of the Management plan comprising the
   following aspects:

         Team organisation and responsibilities,

         Work breakdown structure

         Control of subcontractor activities, if any

         Risk identification and mitigation plan

b) When activities are subcontracted, the responsibilities of each consortium member shall be clearly
   established.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                            Preamble
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                   Page 24 of 64
              Lot No. 1 : Supply of AMESD Thematic receiving Stations

Column 1-2 should be completed by the Contracting Authority
Column 3-4 should be completed by the tenderer
Column 5 is reserved for the evaluation committee

Annex III - the Contractor's technical offer

The tenderers are requested to complete the template on the next pages:

        Column 2 is completed by the Contracting Authority shows the required specifications (not to be
         modified by the tenderer),
        Column 3 is to be filled in by the tenderer and must detail what is offered (for example the words
         “compliant” or “yes” are not sufficient)
        Column 4 allows the tenderer to make comments on its proposed supply and to make eventual
         references to the documentation
The eventual documentation supplied should clearly indicate (highlight, mark) the models offered and the
options included, if any, so that the evaluators can see the exact configuration. Offers that do not permit to
identify precisely the models and the specifications may be rejected by the evaluation committee.

The offer must be clear enough to allow the evaluators to make an easy comparison between the requested
specifications and the offered specifications.

Reminder:

The following items are to be delivered for free by the Contracting Authority (CFI)


       Item
                                       Description                                  Quantity
      Number

          2                            Acquisition                                      -

                 EUMETCast software package (including Tellicast, e-
         A        token, DVB card driver)as part of the Application                     53
                                     Software

         B                                 EKU                                          53

          3                              e-Station                                      -

         C                      Operating System (Linux)                               106

         D                        Application Software                                 106




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 20 May 2009                                 Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                       Page 25 of 64
       1.                              2.                                                 3.                      4.                    5.

  Item                    Specifications Required                               Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                  ref to documentation   Committee’s notes

 1           ANTENNA

 1.1         Satellite dish, mounting and feed                         Specify trademark and Model

             1    Country of origin (either ACP or EU MS)

             2   The antenna sub-system shall allow to receive
                 data broadcasted on EUMETCast Africa (i.e. C-
                 Band RxOnly Fix Earth Antenna)
             3   Dish antenna diameter
             3.1  Min 2.40 m for relevant geographical areas(See
                  Annex 1)
             3.2  Min 3.70 m for relevant geographical areas (See
                  Annex 1)
             Note : The antenna diameter shall be compliant with the
             minimum diameter specified in Table 4 in Annex 1

                            Electrical specifications                                     -                       -                      -

             4    Operating frequency: C-Band 3.635-4.200 GHz

             5    Polarization: Left Hand Circular Polarization

             6    Voltage Axial Ration, (Circularly-Polarized) on
                  axis C-Band: RX < 1.26 (2 dB)

             7    G/T for antenna diameter between 2,4m and 3m:
                  17.1 dB/K

             8    G/T for antenna diameter ~3,7m: 21.2 dB/K


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                            Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                            Page 26 of 64
     1.                                2.                                          3.                      4.                    5.

  Item                    Specifications Required                        Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             9    Antenna VSWR, receive: < 1.6 : 1

             10   Side lobes: Intelsat standard H

                           Mechanical specifications                               -                       -                      -

             11   Antenna pointing: Manual

             12   Feed  flange: adapted     to   waveguide
                  WG11A/WR229/RG340 and to the LNB flange

             13   Antenna pointing range in Elevation: 15-85°

             14   Antenna pointing range in Azimuth: 360°

                         Environmental specifications                              -                       -                      -

             15   Wind loading – operational mode: 50 mph (80
                  km/h)

             16   Wind loading – survival mode: 125 mph (200
                  km/h) in any position of operation

             17   Temperature operational: -5° to +55°

             18   Rain operational: should stay operational under
                  heavy rainfall, i.e. not collect water

                              Other specifications                                 -                       -                      -

             19   Hardware kit (screws, nuts, washers …) for
                  grounding connection




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 27 of 64
       1.                             2.                                              3.                      4.                    5.

  Item                    Specifications Required                           Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                              ref to documentation   Committee’s notes

             20   Mount Ground fixings for concrete pad and/or
                  Non Penetrating Roof Mounting

 1.2         Digital Universal LNB                                Specify trade mark and Model

             1    Country of origin (either ACP or EU MS)

                           Electrical specifications                                   -                      -                      -

             2    RF Input frequency: C-Band 3.635-4.200 GHz

             3    Input VSWR: < 2:1

             4    IF Output Frequency: Compliant with the DVB
                  card typically 950 to 1750 MHz

             5    Output VSWR: < 2.5 : 1, 75 Ohms

             6    Gain: >55 dB

             7    Noise Temperature : <25K

             8    Input DC Voltage Compliant with DVB Card,
                  typically +13 to 18V

                           Mechanical specifications                                   -                      -                      -

             9    Input    interface: adapted to waveguide
                  WG11A/WR229/RG340 and to the flange of
                  antenna feed

             10   Output interface: F-Type, 75 Ohms, Waterproof

                         Environmental specifications                                  -                      -                      -

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                        Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                        Page 28 of 64
       1.                                2.                                                     3.                      4.                    5.

  Item                      Specifications Required                                   Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                        ref to documentation   Committee’s notes

             11   Temperature operational-5° to +55°

             12   Relative Humidity: up to 100% condensation
 2           ACQUISITION SUB – SYSTEM

             (0) The acquisition sub-system shall allow receiving
             the DVB-S data flow broadcasted via EUMETCast
             Africa, record data and provide interface for data
             retrieval by processing sub-system.

 2.1         Computer                                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) CPU 2.8 GHz or higher based on x86 architecture

             Note : Although CPUs with a frequency lower than 1 GHz
             work in some environments, it is recommended to use state of
             the art CPUs, in order to provide margin for system
             administration and other parallel tasks

             (3) RAM > 1 GByte

             Note: This size is mandatory, approximately 512 MB are
             needed as RAM Disk for the TelliCast file database buffer.
             The configuration of a RAM Disk is strongly recommended
             (details of this configuration are provided with the
             TELLICAST installation package). All tests performed at
             EUMETSAT at the full (12 Mbps) data rate resulted in
             significant data losses on EUMETCast Reception Stations
             not configured with a RAM Disk recommended size

             (4) 2 Internal Disks > 250 GByte each
                 (1 nominal, 1 redundant)


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                  Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                  Page 29 of 64
     1.                                   2.                                           3.                      4.                    5.

  Item                      Specifications Required                          Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                               ref to documentation   Committee’s notes

             (5) Fast and Reliable Disk Interface, e.g. SATA, SCSI

             Note: A non-blocking I/O to disk(s) is of utmost importance,
             to be ensured by use of suitable/reliable drivers

             (6) 5 Volt PCI Bus (up to PCI 2.2) or any equivalent
                 slot compliant with the DVB card proposed.

             Note : Not applicable in the case of external DVB
             reception/routing devices connected to the network interface
             or via USB

             (7) 100/10 Base Ethernet Card (or higher data rate)

             Note: This interface is needed if data must be transferred to
             other computers, or as interface if a DVB Receiver/Router is
             used

             (8) At least two USB Ports 2.0

             Note: one of these two ports is used for the EUMETCast Key
             Unit (EKU).

             (9) Benchmark score with BAPCO solution higher
                 than 160 for the scenario ratings SYSmark 2007
                 Preview Rating according to Full Disclosure
                 Reports.

                     Accessories to be provided with each PC                           -                       -                      -

             (10) One 4 Button Optical Scroll Mouse

             (11) One QUERTY or AZERTY keyboard depending
                  on the beneficiary country



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                         Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                         Page 30 of 64
       1.                               2.                                                   3.                      4.                    5.

  Item                     Specifications Required                                 Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                     ref to documentation   Committee’s notes

             (12) One 19" TFT screen, at least 1600x1400
                  resolution, <5ms Response, TCO 03, DVI

                               Other requirements                                             -                      -                      -

             (13) provision of a 2 years on-site warranty for the PC

 2.2         DVB reception device                                        Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) DVB PCI board or DVB router

             See Annex 2

 2.3         Operating system                                            Specify trade mark and Model

             (1) See Annex 3

             In case of Linux operating system, the Tenderer and
             the evaluator are invited to pay careful attention on the
             information delivered in Annex 3 based on information
             verified in EUMETSAT technical lab regarding the
             compatibility of the Linux distributions with the DVB
             reception system. However the Tenderer may propose
             an alternative and shall duly justify its compatibility.

             (2) OS maintained at least for the duration of the
                 contract

 2.4         Application software                                        Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                               Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                               Page 31 of 64
     1.                                 2.                                          3.                      4.                    5.

  Item                     Specifications Required                        Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                            ref to documentation   Committee’s notes

             (2) The application software allows to receive all
                 EUMETCast data available for African users. It
                 shall include:
                TELLICAST client software v2.4.4b or later (part
                 of the EUMETCast package),
                eToken run time environment v3.65 or later (part
                 of the EUMETCast package),
                Reception software 4.3.0a           (part    of   the
                 EUMETCast package).
             Note: EUMETCast package (including TELLICAST, eToken
             Reception software and DVB card driver for Skystar 2) will
             be provided for free by the Contracting Authority

             (3) Application software maintained at least for the
                 duration of the contract
             (4) The Acquisition sub-system shall provide as
                 external interface a FTP/File Server functionality
                 compliant with the RFC-0959 (STD-009), and a
                 SMB share directories protocol. The Acquisition
                 sub-system share the data and the processing sub-
                 system (e.g. PC2 in PUMA station, first
                 workstation of the e-Station in AMESD station)
                 has to get the file in the shared directories. The
                 data is organised on the reception station (e.g. :
                 directories for update…). It is recommended to
                 have an homogeneous data flow between different
                 stations.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                      Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                      Page 32 of 64
       1.                                  2.                                                  3.                      4.                    5.

  Item                      Specifications Required                                  Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                       ref to documentation   Committee’s notes

             (5) In order to enable end-users with minimal system
                 administration experience to configure the system
                 software there shall be the provision of one or
                 more graphical user interfaces for configuring all
                 aspects of EUMETCast reception, e.g. LNB
                 frequency/polarisation,    DVB      PIDs,    EKU
                 username/keys, Tellicast channels, etc.
             (6) If the interface mentioned above can be remotely
                 accessed (e.g. via web interface on another
                 computer connected to the station LAN) and allow
                 to perform regular system administration tasks,
                 then the supply of the monitor of the acquisition
                 computer is not mandatory. If such an option is
                 selected it shall be clearly identified and justified
                 by the Tenderer.
             (7) The tenderer shall propose the necessary measures
                 to protect against malware/viruses (e.g. antivirus,
                 virus database update).
 3           e-STATION

 3.1         Computer                                                      Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) CPU 3.0 GHz or higher based on x86 architecture

             Note: This CPU frequency is recommended, in order to
             provide margin for system administration and other parallel
             processing tasks

             (3) RAM > 4 GByte

             Note: This size is mandatory, for the processing.


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                 Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                 Page 33 of 64
     1.                                   2.                                           3.                      4.                    5.

  Item                      Specifications Required                          Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                               ref to documentation   Committee’s notes

             (4) 40 GByte or higher Internal Disk
                 (nominal)

             Note: This disk is required for the operation system
             installation and additional software.

             (5) 500 Gbyte or higher Internal Disk
                 (nominal)

             Note: This disk is required to store and data processing and
             used for the processing, an appropriate cache disk is
             required.

             (6) 500 Gbyte or higher Internal Disk
                 (redundant)

             Note: This provides redundancy for both nominal disks.

             (7) Fast and Reliable Disk Interface, e.g. SATA,
                 SCSI

             Note: A non-blocking I/O to disk(s) is of utmost importance,
             to be ensured by use of suitable/reliable drivers.

             (8) 100/10 Base Ethernet Card (or higher data rate)

             Note: This interface is needed if data must be transferred to
             other computers

             (9) Benchmark score with BAPCO solution higher
                 than 170 for the scenario ratings SYSmark 2007
                 Preview Rating according to Full Disclosure
                 Reports.

                     Accessories to be provided with each PC                           -                       -                      -


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                         Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                         Page 34 of 64
       1.                               2.                                                    3.                                   4.                    5.

  Item                     Specifications Required                                Specifications Offered                     Notes, remarks,       Evaluation
 Number                                                                                                                   ref to documentation   Committee’s notes

             (10) One 4 Button Optical Scroll Mouse

             (11) One QUERTY or AZERTY keyboard depending
                  on the beneficiary country

             (12) One 19" TFT screen, at least 1600x1400
                  resolution, <5ms Response, TCO 03, DVI

                               Other requirements                                             -                                    -                      -

             (13) provision of a 2 years on-site warranty for the PC

 3.2                                                                   Linux – provided for free by the contracting                -                      -
                                                                       authority
             Operating system
                                                                       Note: The specific Linux distribution to be used
                                                                       will be notified by the Contracting Authority
                                                                       during the execution of the contract

 3.3                                                                   e-station software - provided for free by the               -                      -
             Applicative software
                                                                       contracting authority

 4           SUPPORT ITEMS

 4.1         UPS                                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                             Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                             Page 35 of 64
       1.                               2.                                                       3.                                           4.                             5.

  Item                     Specifications Required                                   Specifications Offered                           Notes, remarks,                Evaluation
 Number                                                                                                                            ref to documentation            Committee’s notes

             (2) Capable to handle the typical power disturbances
                 that might occur in the specific area where the
                 reception system is located, including:
                      power failures,
                      power sags,
                      power surges,
                      brownouts,
                      line noise,
                      high voltage spikes,
                      frequency variations,
                      switching transients,
                      harmonic distorsion.
             (3) Capable to manage the shutdown of PC
                 equipment properly

 4.2         Network Switch                                             Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) Eight auto-sensing 10/100 Mbps Ethernet ports
                 (or higher data rate) providing high performance
                 information and resource sharing.

 FIRST TRAINING SESSION

             Preliminary note: The training activities, subject of this item, only concerns the antenna and the acquisition sub-systems. Training to the e-Stations is out of the scope of
             this contract.
             This training will be delivered on-site at the same time as the installation. It will focus on system administration and maintenance. After this training, the station
             administrator will be able to perform himself system monitoring, system configuration, re-installation of factory configuration, first level of maintenance. He will also
             be sensitized to security rules. In addition, a specific training (type training of trainers) will be delivered to the staff of AMESD RICs who will be responsible for user
             support in their region.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                                                 Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                                                 Page 36 of 64
     1.                                   2.                                               3.                                       4.                           5.

  Item                      Specifications Required                             Specifications Offered                       Notes, remarks,              Evaluation
 Number                                                                                                                   ref to documentation          Committee’s notes

 TR A +B     Training Module A
             System Administration: use and configuration (if required) of the acquisition software, installation, backup, system monitoring, security rules, maintenance.

             Training Module B
             Training of trainers: pedagogic aspects, take in hand of training material

             (1) Two staff profiles shall be distinguished “system
                 administrator” and “trainer”.                                                                        Indicate reference to the ad-
                                                                                                                      hoc section of the Training
             Remark: the pre-requisite for each profile shall be defined by
                                                                                                                      Plan
             the Contractor. The corresponding staff would be determined
             by the Beneficiary.

             (2) Staff profile “System Administrator” will receive                                                    Indicate reference to the ad-
                 Modules A.                                                                                           hoc section of the Training
                                                                                                                      Plan

             (3) Staff profile “Trainer” receives Modules A and B.                                                    Indicate reference to the ad-
                                                                                                                      hoc section of the Training
                                                                                                                      Plan

             (4) The typical duration for both modules shall be                                                       Indicate reference to the ad-
                 two days.                                                                                            hoc section of the Training
                                                                                                                      Plan

             (5) The training shall be performed on each site                                                         Indicate reference to the ad-
                 during installation. The installed station will be                                                   hoc section of the Training
                 used as training platform.                                                                           Plan

             (6) The training sessions shall be performed in                                                          Indicate reference to the ad-
                 English or French depending on the language                                                          hoc section of the Training
                 used in the center.                                                                                  Plan




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                                     Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                                     Page 37 of 64
     1.                                  2.                                           3.                          4.                         5.

  Item                      Specifications Required                         Specifications Offered         Notes, remarks,             Evaluation
 Number                                                                                                 ref to documentation         Committee’s notes

             (7) The contractor shall prepare a complete training                                    Indicate reference to the ad-
                 material package for each module in English and                                     hoc section of the Training
                 French.                                                                             Plan

             (8) For Modules A and B, there shall be two kinds of
                 material according to the level of knowledge of
                 the trainees, skilled or inexperienced. For
                                                                                                     Indicate reference to the ad-
                 instance, the level of knowledge of the operating
                                                                                                     hoc section of the Training
                 system can vary a lot from one site to another,
                                                                                                     Plan
                 especially if Linux is selected. Thus a preliminary
                 tutorial to the base of the operating system is
                 necessary.

             (9) The training materials delivered to the instructors
                 shall be of use for the training of operators. They
                 are characterized as follows:
                Multimedia (e.g. Internet/CD/DVD),
                Video display,
                                                                                                     Indicate reference to the ad-
                Possibility to print a paper copy,                                                  hoc section of the Training
                Possibility for the instructors to customize for                                    Plan
                 educational purposes without having the full
                 knowledge of the training courses, except the usual
                 office software.
             Comment: the format of these materials could be for instance
             PowerPoint 2000.

             (10) In addition to the material dedicated to training                                  Indicate reference to the ad-
                  sessions, the contractor shall also prepare self-                                  hoc section of the Training
                  training/tutorial   material,    on   appropriate                                  Plan
                  electronic form (e.g. Internet/CD/DVD).
             (11) Training materials shall be consistent with the
                  operational documentation.

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                 Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                 Page 38 of 64
     1.                                 2.                                            3.                          4.                         5.

  Item                    Specifications Required                           Specifications Offered         Notes, remarks,             Evaluation
 Number                                                                                                 ref to documentation         Committee’s notes

             (12) The training modules shall include              both                               Indicate reference to the ad-
                  theoretical part and practical work.                                               hoc section of the Training
                                                                                                     Plan

             (13) The Training plan shall comprise the following                                     Indicate reference to the ad-
                  information:                                                                       hoc section of the Training
                                                                                                     Plan
                Description of the training           strategy       and
                 organizational measures,
                Scope of the training and pre-requisites (not
                 covered by the training)
                Description of training modules (purpose,
                 necessary resources, material with table of
                 contents, pre-requisites, duration).
                Description of the self-training material/tutorial




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                 Lot 1
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                 Page 39 of 64
          Lot No. 2: Supply of Puma Stations Upgrade and Maintenance

Column 1-2 should be completed by the Contracting Authority
Column 3-4 should be completed by the tenderer
Column 5 is reserved for the evaluation committee

Annex III - the Contractor's technical offer

The tenderers are requested to complete the template on the next pages:

        Column 2 is completed by the Contracting Authority shows the required specifications (not to be
         modified by the tenderer),
        Column 3 is to be filled in by the tenderer and must detail what is offered (for example the words
         “compliant” or “yes” are not sufficient)
        Column 4 allows the tenderer to make comments on its proposed supply and to make eventual
         references to the documentation
The eventual documentation supplied should clearly indicate (highlight, mark) the models offered and the
options included, if any, so that the evaluators can see the exact configuration. Offers that do not permit to
identify precisely the models and the specifications may be rejected by the evaluation committee.

The offer must be clear enough to allow the evaluators to make an easy comparison between the requested
specifications and the offered specifications.

Reminder:

The following items are to be delivered for free by the Contracting Authority
(CFI)


       Item
                                       Description                                  Quantity
      Number

          1                            Acquisition                                       -

                 EUMETCast software package (including Tellicast, e-
         A        token, DVB card driver)as part of the Application                     50
                                     Software

         B                                 EKU                                          50




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                       Page 40 of 64
       1.                                2.                                                    3.                      4.                    5.

  Item                      Specifications Required                                  Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                       ref to documentation   Committee’s notes

 1           ACQUISITION

 1.1         Computer                                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) CPU 2.8 GHz or higher based on x86 architecture
             Note: Although CPUs with a frequency lower than 1 GHz
             work in some environments, it is recommended to use state of
             the art CPUs, in order to provide margin for system
             administration and other parallel tasks

             (3) RAM > 1 GByte
             Note: This size is mandatory, approximately 512 MB are
             needed as RAM Disk for the TelliCast file database buffer.
             The configuration of a RAM Disk is strongly recommended
             (details of this configuration are provided with the
             TELLICAST installation package). All tests performed at
             EUMETSAT at the full (12 Mbps) data rate resulted in
             significant data losses on EUMETCast Reception Stations
             not configured with a RAM Disk recommended size

             (4) 2 Internal Disks > 250 Gbyte each
                 (1 nominal, 1 redundant)
             (5) Fast and Reliable Disk Interface, e.g. SATA,
                 SCSI
             Note: A non-blocking I/O to disk(s) is of utmost importance,
             to be ensured by use of suitable/reliable drivers


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                 Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                 Page 41 of 64
     1.                                   2.                                           3.                      4.                    5.

  Item                      Specifications Required                          Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                               ref to documentation   Committee’s notes

             (6) 5 Volt PCI Bus (up to PCI 2.2) or any equivalent
                 slot compliant with the DVB card proposed.
             Note: Not applicable in the case of external DVB
             reception/routing devices connected to the network interface
             or via USB

             (7) 100/10 Base Ethernet Card (or higher data rate)
             Note: This interface is needed if data must be transferred to
             other computers, or as interface if a DVB Receiver/Router is
             used

             (8) At least two USB Ports 2.0
             Note: one of these two ports is used for the
             EUMETCast Key Unit (EKU).

             (9) Benchmark score with BAPCO solution higher
                 than 160 for the scenario ratings SYSmark 2007
                 Preview Rating according to Full Disclosure
                 Reports.
                     Accessories to be provided with each PC                           -                       -                      -

             (10) One 4 Button Optical Scroll Mouse

             (11) One QUERTY or AZERTY keyboard depending
                  on the beneficiary country
             (12) One 19" TFT screen, at least 1600x1400
                  resolution, <5ms Response, TCO 03, DVI
                                Other requirements                                     -                       -                      -

             (13) provision of a 2 years on-site warranty for the PC



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                         Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                         Page 42 of 64
       1.                              2.                                                  3.                      4.                    5.

  Item                     Specifications Required                               Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                   ref to documentation   Committee’s notes

 1.2         DVB reception device                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) DVB PCI board or DVB router
             See Annex 2

             Operating system
                                                                        Specify trade mark and Model
             See Annex 3

             (1) OS maintained at least for the duration of the
                 contract
 1.4         Application software                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) The application software allows to receive all
                 EUMETCast data available for African users. It
                 shall include:
                TELLICAST client software v2.4.4b or later (part
                 of the EUMETCast package),
                eToken run time environment v3.65 or later (part
                 of the EUMETCast package),
                Reception software 4.3.0a          (part   of   the
                 EUMETCast package).
                Note:     EUMETCast         package      (including
                 TELLICAST, eToken Reception software and DVB
                 card driver for Skystar 2) will be provided for free
                 by the Contracting Authority


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                             Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                             Page 43 of 64
       1.                                2.                                                     3.                      4.                    5.

  Item                      Specifications Required                                   Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                        ref to documentation   Committee’s notes

             (3) Application software maintained at least for the
                 duration of the contract
             (4) The Acquisition sub-system shall provide as
                 external interface a FTP/File Server functionality
                 compliant with the RFC-0959 (STD-009), and a
                 SMB share directories protocol. The Acquisition
                 sub-system share the data and the processing sub-
                 system (e.g. PC2 in PUMA station, first
                 workstation of the e-Station in AMESD station)
                 has to get the file in the shared directories. The
                 data is organised on the reception station (e.g. :
                 directories for update…). It is recommended to
                 have an homogeneous data flow between
                 different stations.
 2           PROCESSING & EXPLOITATION

 2.1         Computer                                                       Specify trade mark and Model

             (1) Country of origin (either ACP or EU MS)

             (2) CPU 2.8 GHz or higher based on x86 architecture

             Note: Although CPUs with a frequency lower than 1 GHz
             work in some environments, it is recommended to use state of
             the art CPUs, in order to provide margin for system
             administration and other parallel tasks




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                  Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                  Page 44 of 64
     1.                                   2.                                           3.                      4.                    5.

  Item                      Specifications Required                          Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                               ref to documentation   Committee’s notes

             (3) RAM > 2 GByte

             Note: This size is mandatory, approximately 512 MB are
             needed as RAM Disk for the TelliCast file database buffer.
             The configuration of a RAM Disk is strongly recommended
             (details of this configuration are provided with the
             TELLICAST installation package). All tests performed at
             EUMETSAT at the full (12 Mbps) data rate resulted in
             significant data losses on EUMETCast Reception Stations
             not configured with a RAM Disk recommended size

             (4) 2 Internal Disks > 250 Gbyte each
                 (1 nominal, 1 redundant)

             (5) Fast and Reliable Disk Interface, e.g. SATA,
                 SCSI

             Note: A non-blocking I/O to disk(s) is of utmost importance,
             to be ensured by use of suitable/reliable drivers

             (6) 5 Volt PCI Bus (up to PCI 2.2) or any equivalent
                 slot compliant with the DVB card proposed.

             Note: Not applicable in the case of external DVB
             reception/routing devices connected to the network interface
             or via USB

             (7) 100/10 Base Ethernet Card (or higher data rate)

             Note: This interface is needed if data must be transferred to
             other computers, or as interface if a DVB Receiver/Router is
             used




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                         Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                         Page 45 of 64
       1.                               2.                                                   3.                      4.                    5.

  Item                     Specifications Required                                 Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                                     ref to documentation   Committee’s notes

             (8) At least two USB Ports 2.0

             Note: one of these two ports is used for the EUMETCast Key
             Unit (EKU).

             (9) Benchmark score with BAPCO solution higher
                 than 160 for the scenario ratings SYSmark 2007
                 Preview Rating according to Full Disclosure
                 Reports.

                    Accessories to be provided with each PC                                  -                       -                      -

             (10) One 4 Button Optical Scroll Mouse

             (11) One QUERTY or AZERTY keyboard depending
                  on the beneficiary country

             (12) One 19" TFT screen, at least 1600x1400
                  resolution, <5ms Response, TCO 03, DVI

                               Other requirements                                            -                       -                      -

             (13) provision of a 2 years on-site warranty for the PC

 2.2         Operating System

             Note: The current OS installed in PUMA stations is Windows
             XP. It should become obsolete by implementation of the       Specify trade mark and Model
             contract as announced by Microsoft. As a consequence a new
             solution may be proposed by the Tenderer (see guideline in
             Annex 3)

             (1) See Annex 3



2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                               Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                               Page 46 of 64
       1.                               2.                                                  3.                        4.                      5.

  Item                      Specifications Required                               Specifications Offered       Notes, remarks,          Evaluation
 Number                                                                                                     ref to documentation      Committee’s notes

             (2) OS maintained at least for the duration of the
                 contract

 2.3         Application Software Suite
                                                                         Specify trade mark and Model


             (3) The need for software evolution shall be analysed                                         Evolution analysis to be
                 by the tenderer.                                                                                 provided
                   This analyse shall be performed in regards with
                   the obsolescence status of the current software
                   suite. New version of software or new equivalent
                   software may be proposed by the tenderer

             (4) In case of software evolution (upgraded versions,
                 or new equivalent software), the new software
                 suite shall comply with the following:

             4.1     The MMI shall be user friendly and allow an
                     easy access to the various functionalities of the
                     software suite.

             4.2     The functionalities offered by the new software
                     suite shall be at least equivalent to the ones
                     offered by the current software suite.

             (5) In any case, the contractor shall be fully
                 responsible to provide the full training materials
                 required to train users to the new software suite.

                   A. New features (to be completed in all cases)                           -                         -                        -




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                  Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                  Page 47 of 64
     1.                                 2.                                         3.                      4.                    5.

  Item                     Specifications Required                       Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             (A.1) RGB full license or equivalent software to
                   compute RGB composite images,

             (A.2) VGT improved visualization tools in order to
                   display all the VGT products

             (A.3) Update of the software to display all the available
                   GRIB formats disseminated on EUMETCast
                   Africa.

             (A.4) HDF, NetCDF, BUFR

             (A.5) Preservation of the ratio line/column in image
                   transformation

                        B. Initial Software Requirements                           -                       -                      -

             This section specifies the requirements corresponding
             to the software packages presently installed in the
             PUMA stations. This set of requirements must to be
             taken as the minimum requirements the application
             software of the upgraded indoor unit has to comply
             with.    These    requirements     includes   general
             requirements and specific requirements for the two
             software packages presented in Annex 4

                            - General requirements -
              (to be completed only when new software is proposed)

             (B.1) MMI available in English and French

             (B.2) Compatible with standard interface protocols (e.g.
                   TCP/IP) and CGMS data standards (LRIT, HRIT,
                   GRIB, BUFR).


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 48 of 64
     1.                                 2.                                         3.                      4.                    5.

  Item                     Specifications Required                       Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

                          B. Initial Software Requirements                                                 -                      -
                  - Basic software for data reception/processing -                 -
              (to be completed only when new software is proposed)

             (B.3) File assembly

             (B.4) Data decryption

             (B.5) Data decompression

             (B.6) Visualisation

             (B.7) Interface to host computer for further data
                   processing

             (B.8) Compliant with the following        data   types,
                   provided via EUMETCast:

             Meteosat High Rate SEVIRI Image Data - 0° (HR-SEVIRI)
             Meteosat HRI Image Data - Indian Ocean Coverage (HRI)
             Meteosat Low Rate SEVIRI Image Data - 0° (LR-SEVIRI)
             Meteosat Meteorological Products (MSG MPEF)
             Data Collection and Retransmission (DCP)
             Meteorological Data Dissemination (MDD)
             MTSAT-1R (3-hourly) (MTSAT)
             GOES East (3-hourly) (GOES-E)
             GOES West (3-hourly) (GOES-W)
             FY2C Products (hourly) (CMA)
             Land SAF products for Africa (LSA SAF)
             Ocean Sea Ice SAF products (OSI SAF)
             Jason-1 and Jason-2 products
             Vegetation for Africa Products (VITO)
             MODIS Fire Products (NOAA/NESDIS)
             MODIS Active Fires - Southern Africa (CSIR)




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 49 of 64
     1.                                2.                                          3.                      4.                    5.

  Item                    Specifications Required                        Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             (B.9) The software package must also be able to cope
                   with data from the EUMETSAT data archive
                   (UMARF) and other offline product data formats.
                   Then, if an NMS is required to use INTERNET to
                   obtain data, it may use this data efficiently and
                   transparently.

             (B.10) The reception and processing shall be running
                  in an unattended mode.

             (B.11) Easy management of the temporary archive to
                  avoid it becoming over-full is an essential
                  requirement. There should be fully automated
                  housekeeping routines to avoid the store
                  becoming over-full, with ability to select out
                  „messages‟ and throw away oldest and/or lowest
                  priority file.

             (B.12)   Access hierarchy with password protection

                         B. Initial Software Requirements                                                  -                      -
                    - Additional toolbox for data exploitation -                   -
              (to be completed only when new software is proposed)

             (B.13)   Image Data Display:

             1. Navigation,
             2. Calibration,
             3. Remapping,
             4. Dynamic Enhancement,
             5. Filtering,
             6. Zooming,
             7. Single image or multiple images display,
             8. Image loops of original and zoomed image sectors.


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 50 of 64
       1.                               2.                                         3.                      4.                    5.

  Item                     Specifications Required                       Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             (B.14) Numerical products grid data display (based
                  on GRID data):

             1. Plotting,
             2. Contour.
             (B.15) Meteorological observation display (based on
                   GRID data):

             1. Plotting,
             2. Thermodynamic Display,
             3. Cross section,
             4. Stability index calculation and display,
             5. Objective analysis to produce grid values.
             (B.16) Overlay display:

             1. Image with grid data,
             2. Image with meteorological observations.
             (B.17) Administrative message display:

             1. Message text display,
             2. Message display in tables,
             3. Message display in graphics.
 2.4         DVB reception device (backup) Same as 1.2

 3           SUPPORT ITEMS

 3.1         UPS

             Note: The existing UPS shall be replaced.

             (1) Country of origin (either ACP or EU MS)




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 51 of 64
       1.                              2.                                          3.                      4.                    5.

  Item                    Specifications Required                        Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             (2) Capable to handle the typical power disturbances
                 that might occur in the specific area where the
                 reception system is located, including:
                     power failures,
                     power sags,
                     power surges,
                     brownouts,
                     line noise,
                     high voltage spikes,
                     frequency variations,
                     switching transients,
                     harmonic distorsion.
             (3) Capable to manage the shutdown of PC
                 equipment properly.
 4           SOFTWARE FOR TRAINING CENTRES

 4.1         Application Software Suite       Same as 2.3

 5           WARRANTY SERVICES

 5.1         Warranty services

             Preliminary note: EUMETSAT User Helpdesk is the                       -                       -                      -
             first point of contact for all maintenance support. This
             Helpdesk registers and processes enquiry, provides a
             first level of intervention when possible (e.g. gives
             information linked with the status of the meteorological
             satellite or EUMETCast service), and forward to the
             contractor technical authority when secondary support
             is required.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 52 of 64
     1.                                 2.                                         3.                         4.                      5.

  Item                     Specifications Required                       Specifications Offered         Notes, remarks,         Evaluation
 Number                                                                                              ref to documentation     Committee’s notes

             (4) In case of failure reported in one station, the                                  Indicate reference to the
                 contractor is fully responsible to provide any                                   ad-hoc section of the
                 technical and operational means (e.g. hotline                                    Warranty Services Plan
                 mail, technical support team for investigation,
                 remote intervention, re-installation of factory
                 configuration, repair or replacement, test,
                 shipment, on-site intervention) to fix the issue and
                 come back to nominal operation.
                                                                                                  Indicate reference to the
             (5) Support service hours:                                                           ad-hoc section of the
                 working day between 8:00 and 17:00                                               Warranty Services Plan

             (6) Deadline for investigation/troubleshooting from                                  Indicate reference to the
                 request:                                                                         ad-hoc section of the
                 2 working day.                                                                   Warranty Services Plan

                                                                                                  Indicate reference to the
             (7) Deadline to overcome the problem from request:                                   ad-hoc section of the
                 10 working days                                                                  Warranty Services Plan

             (8) Deadline to fully fix the problem, including repair                              Indicate reference to the
                 or replacement, from request:                                                    ad-hoc section of the
                 30 working days, transportation period of                                        Warranty Services Plan
                 equipment excluded
                                                                                                  Indicate reference to the
             (9) The tenderer shall also propose and apply a set of                               ad-hoc section of the
                 preventive measures to reduce the risk of failure.                               Warranty Services Plan

             (10) The site has several protection levels allowing a                               Indicate reference to the
                  different category of people to access different                                ad-hoc section of the
                  levels of services.                                                             Warranty Services Plan


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                          Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                          Page 53 of 64
     1.                                 2.                                          3.                         4.                      5.

  Item                     Specifications Required                        Specifications Offered         Notes, remarks,         Evaluation
 Number                                                                                               ref to documentation     Committee’s notes

             (11) The contractor shall implement tools to assess the                               Indicate reference to the
                  quality of service.                                                              ad-hoc section of the
             Note                                                                                  Warranty Services Plan
             The tenderer may propose and describe a Web site to
             be used for any warranty services activity with access
             control: support, FAQs, general information, incident
             workflow (privileged access) in link with EUMETSAT
             Tools, statistics (number of calls, number of requests at
             the hot line, response time, etc), repository of project
             documents … The web server may also be used as a
             repository of data for the PUMA administrators that
             could enter monthly some data, compiled and treated
             in order to give an overview of the health of the PUMA
             stations all over Africa.
             This web site may be located wherever it is more
             efficient (customer, African store, partner, etc) as it is
             remotely controlled and maintained. It should be
             accessible with a standard PC and Internet connection.

             This web site should allow to manage several
             protection levels in order to give access to different
             level of services depending on user profile.

                                                                                                   Indicate reference to the
             (12) Statistics will be produced monthly in a form                                    ad-hoc section of the
                  reusable for reports.                                                            Warranty Services Plan

             (13) The replacement of outdoor units is out of the                                   Indicate reference to the
                  scope of this contract. However, the tenderer shall                              ad-hoc section of the
                  propose some preventive maintenance actions like                                 Warranty Services Plan
                  on-site inspection or antenna alignment
                  verification , which can be performed during on-
                  site intervention.


2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                           Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                           Page 54 of 64
       1.                               2.                                         3.                               4.                      5.

  Item                     Specifications Required                       Specifications Offered               Notes, remarks,         Evaluation
 Number                                                                                                    ref to documentation     Committee’s notes

             (14) The contractor shall ensure the security updates                                      Indicate reference to the
                  (e.g. COTS security patches, virus database                                           ad-hoc section of the
                  update).                                                                              Warranty Services Plan

 5.2         Training material

             Preliminary note: This aims at preparing                               -                               -                        -
             training/tutorial materials for the operation,
             maintenance and repair of PUMA stations. It must be
             considered in the PUMA follow-on context and several
             kind of material have to be prepared depending on the
             profile and background of the trainees. Beyond the
             preparation of training support dedicated to the new
             aspects of the upgraded stations, the logic will be to
             pave the way towards sustainability by the preparation
             of self-training material/tutorial and a material for the
             training of trainers.

             It should be noted that the performance of the training
             session is out of the scope of this contract. Only the
             delivery of training materials is included.

 TR   A Module A - Use of PUMA station applicative software
 +B+C
        Module B - System Administration.

             Module C - Training of instructors: pedagogic aspects, take in hand of training material




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                                Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                                Page 55 of 64
     1.                                2.                                          3.                      4.                    5.

  Item                    Specifications Required                        Specifications Offered      Notes, remarks,       Evaluation
 Number                                                                                           ref to documentation   Committee’s notes

             (1) Module A shall focus on the use of PUMA station
                 applicative software. It shall address at least the
                 following:
                    use of processing & exploitation             PCs
                     (PC2/PC3) software functionalities

                    RGB processing

             (2) Module B shall focus on System Administration.
                 It shall address at least the following:
                    use of acquisition PC (PC1),

                    configuration of all PCs (PC1/PC2/PC3),

                    installation,

                    backup,

                    configuration for new products acquisition

                    preparation of delivery package for external
                     users

             (3) Module C is dedicated to the training of trainers.
                 It shall address at least the following:
                    pedagogic aspects,

                    take in hand of training material




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                                                     Lot 2
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                                                     Page 56 of 64
Annex 1: Antenna

The antenna sub-system shall allow to receive data broadcasted on EUMETCast Africa (i.e. C-Band RxOnly
Fix Earth Antenna)

EUMETCast Africa is operated in C-Band via Atlantic Bird 3 (telecommunication satellite operated by
EUTELSAT). The core coverage zone of the satellite is mainland Africa as shown in the figure below:




             Figure 4: C-Band Downlink Coverage for ATLANTIC BIRDTM 3 at 5°West

The current transponder frequencies are as follows :

       Name: Atlantic Bird™ 3

       Transponder: C02

       Down Link Frequency: 3731.7570 MHz

       Symbol Rate: 11.963 MS/s

       FEC: 2/3

       Polarisation: Circular Left Hand

2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 20 May 2009                           Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                 Page 57 of 64
The dish antenna diameter required depends upon the location within the footprint of the broadcast satellite
The antenna diameter shall be compliant with the minimum diameter specified in the following table:

                         Location                                        Antenna size

within the "core" geographical footprint , the area bounded              2.4m or larger
     by the inner contour depicted in the figure above

       within the “extended” geographical coverage                       3.7m or larger
        (e.g. Madagascar, La Reunion, Mauritius)




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                               Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                      Page 58 of 64
Annex 2: DVB Reception Device

All equipment listed below was tested and used by EUMETSAT, however the listing does not indicate a
preference nor recommendation. There might be other hardware items than the ones listed, which could
perform EUMETCast reception as good.

Samples of PCI Cards (5 volts) which EUMETSAT has used and tested:

        1. TechniSat SkyStar2

        2. Vbox Satellite Express 2030

        3. Technotrend TT budget

        4. DVB Routers (LAN connectivity): IPricot IPR-S500 or other models. If this solution is selected
           by the Tenderer, then, an additional NIC shall be provided.

Users have informed EUMETSAT about the (successful) use of cards from other manufacturers – the list
above represents thus only the selection of models used/tested by EUMETSAT.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                            Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                   Page 59 of 64
Annex 3: Guideline for operating system

The operating system should be largely transparent to the user.

The benefit of the Operating System proposed carefully argued by the tenderer. The tenderer shall consider
in this analysis some specific aspects such as security (e.g. robustness against viruses), maintenance easiness
(some small weather services may have limited technical support).

In case of Linux operating system the following configurations are recommended:

1.      Fedora Core 9 kernel: 2.6.25.6-55.fc9.i686

2.      OpenSUSE 10.3, kernel: 2.6.22.17-0.1-default

3.      Debian 4.0r3 (Etch), kernel: 2.6.18-6-686

4.      Ubuntu 8.04 LTS kernel: (2.6.24-17-generic) (Long Term Support, maintain April 2011)

All these distributions are compliant with the Skystar 2 DVB PCI board.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                 Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                        Page 60 of 64
Annex 4: PUMA Initial Software specifications

The PUMA software suite aimed at receiving, processing and displaying all EUMETCast data available for
African users.

The initial software specifications includes one compatible software package for each station consisting of:

1. A Basic software for data reception/processing

2. An Additional toolbox for data exploitation

The first package (Basic software for data reception/processing ) is used for MSG ground station operation,
message/data reception and storage. The objective is to decode and decrypt the data stream as it is received
and to store it all (in a database on the capture PC), in standard message format with all calibration,
geometric, and ancillary data intact.

The second package (Additional toolbox for data exploitation ) is used to access MSG data from the
reception/processing system and for manipulation, further processing, archiving and operational usage. It
designed as an open toolbox allowing the user to develop further tools and routines.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                 Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                        Page 61 of 64
Annex 5: Acronyms and abbreviations

       Acronym                                       Term / Description


 AB3                 Atlantic Bird 3
 ACP                 Africa, Caribbean and Pacific
 AGRHYMET            Centre Régional de Formation et d'Application en Agro-météorologie et Hydrologie
                     Opérationnelle
 AMESD               African Monitoring of Environment for Sustainable Development
 AU                  African Union
 AUC                 African Union Commission
 BAR                 Bi-annual Activity Report
 BDMS                Botswana Department of Meteorological Services
 BPM                 Biannual Progress Meeting
 BUFR                Binary Universal Form for the Representation of meteorological data
 CEMAC               Communauté Economique des Etats d'Afrique Centrale
 CFI                 Customer Furnished Item
 CICOS               Commission International du Congo, de l'Oubangui et de la Sangha
 COTS                Commercial Off-The-Shelf
 DDU                 Delivered Duty Unpaid
 DRAO                Delegated Regional Authorising Officer
 EC                  European Commission
 ECOWAS              Economic Community of West African States
 EDF                 European Development Fund
 EKU                 EUMETCast Key Unit
 EO                  Earth Observation
 EU                  European Union
 EUMETCast           EUMETSAT's Broadcast Service for Environmental Data
 EUMETSAT            European Organisation for the Exploitation of Meteorological Satellites
 FA                  Final Acceptance
 FAT                 Factory Acceptance Test
 GRIB                GRIdded Binary
 HRIT                High Rate Information Transmission
 IGAD                Intergovernmental Authority on Development
 ICPAC               IGAD Climate Prediction and Applications Centre
 IF                  Intermediate Frequency
 IOC                 Indian Ocean Commission
 ITT                 Invitation To Tender
 KOM                 Kick-Off Meeting
 LRIT                Low Rate Information Transmission
 MMI                 Man Machine Interface
 MOI                 Mauritius Oceanography Institute
 MOU                 Memorandum of Understanding
2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                                  Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                         Page 62 of 64
      Acronym                                         Term / Description
 MPR                 Monthly Progress Report
 MSG                 METEOSAT Second Generation
 MTAP                Meteorological Transition in Africa Project
 NIC                 Network Interface Card
 NMS                 National Meteorological Service
 OS                  Operating System
 OSAT                On-Site Acceptance Test
 PA                  Provisional Acceptance
 PC                  Personal Computer
 PCT                 Programme Co-ordination Team (AMESD)
 PM                  Progress Meeting
 PPA                 Partial Provisional Acceptance
 PUMA                Preparation for the Use of MSG in Africa
 RAPAC               Network of Protected Areas in Central Africa
 REC                 Regional Economic Community
 RIC                 Regional Implementation Centre (AMESD)
 RC                  Regional Centre (PUMA)
 RF                  Radio Frequency
 RMTRC               Regional Meteorological Training and Research Centre (Vacoas/Mauritius)
 SADC                Southern Africa Development Community
 SR                  System Review
 TA                  Technical Assistance
 THEMA               Regional Thematic Action (AMESD)
 ToR                 Terms of Reference
 UMARF               Unified Meteorological Archive and Retrieval Facility (EUMETSAT)
 UPS                 Uninterruptible Power Supply
 VEGETATION          European instrument on the SPOT satellite
 VGF                 Verification of Good Functioning
 VSWR                Voltage Standing Wave Ratio
 WMO                 World Meteorological Organisation




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009                           Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)                  Page 63 of 64
Annex 6: PUMA Design Document

This annex is provided as a separate document.




2008
ef5dba03-bbff-40c6-b347-b47326bb4aa4.doc Version 30 July 2009            Annex
Europeaid/128227/D/SUP/ET AMESD Project – (Thematic and PUMA stations)   Page 64 of 64

				
DOCUMENT INFO
Description: Contract Edf Tco document sample