									                                                REPUBLIC OF SOUTH AFRICA
                                         DEPARTMENT OF WATER AFFAIRS & FORESTRY




     REGIONAL WATER SECTOR OPERATIONAL & QUARTERLY REPORTING TOOL
                                                        2008/2009




Submitted to:                                                                 Submitted by:
Deputy Director General: Regions                                              Department of Water Affairs & Forestry
Department of Water Affairs & Forestry                                        Water Services Support Directorate
Private Bag X313                                                              Monitoring & Evaluation Unit
PRETORIA
0001
                    NOTES FOR THE SUPPORT TEAM FOR REGIONAL OPERATIONAL PLANS

1 INTRODUCTION
   These notes serve to provide guidance to the Team that will be supporting regions in compiling their Operational Plans for
   the 2008/09 Financial Year.
   There are General issues that should be considered when assistance is provided to regions and Regional Specific issues to
   be addressed in each region. Section 3 below captures the former, while Section 4 deals with the latter.



2 PURPOSE OF THE SUPPORT

   The support to be provided to the Regions is to be focused on:
   1. Assistance to Regions in developing their Operational Plans
   2. Assistance to Regions in developing their Business Plans



3 GENERAL ISSUES

     Local Government Support – Top Management has issued a directive that our support to local government should
    create an enabling environment for DWAF to Regulate and should be guided by the Priorities reflected in the Draft Water
    Services Regulatory Strategy. The support to local governments, as captured in Municipal Support Plans should
    demonstrate how the regions intends to provide support to municipalities in the areas as reflected in the Work Plan under
    the Local Government Support sub-Programme. If the existing MSP / Business Plan does not talk to these, it will have to be
    revised accordingly, in consultation with municipalities;

     Non-quantifiable Service Delivery Targets - In the light of the fact that DWAF is not responsible for provision of basic
    services, it is not expected that there will be quantifiable targets for these in the regional work plans. In this case, it is only
    possible to support local municipalities to achieve their targets based on the MIG allocations they have. Therefore,
    measurable outputs can be anything but quantifiable targets which are the responsibilities of municipalities. However
    regions may indicate, if they so wish to, the targets that the municipalities will be aiming to achieve if these are known;

     Quantifiable Service Delivery Targets – the Department has funding for and is therefore responsible for Bucket
    Eradication; Schools; Clinics and Regional Bulk. Thus for these programmes there should be quantifiable targets per region;

     Compliance Monitoring and Enforcement Units - Establishment of a unit in each region, with adequate capacity

     Transfers – a range of deliverables per region is included in section 3 of this report and should be adhered to;
     Drinking Water Quality Support – all regions should ensure they have adequate capacity to support local government
    in drinking water quality management issues
     Water Security Plan – development of Reconciliation Strategies for demarcation regions
     Water Use and Regulation Units – the following roles are amongst those that regions should undertake and should be
    noted as follows:
        o        Participation in the development of the Strategy and Model

        o        Coordination of Compliance Monitoring and Enforcement intervention programmes in their respective regions

        o        Identification of support requirements by local government to be able to comply with regulatory requirements

        o         Development of support plans, in consultation with Water Sector Support Units and ensure that same
              is included in the 2009/10 Municipal Support Plans

     National Targets – the following National Targets are expressed clearly in the Consolidated Departmental Business
    Plan – regions are therefore expected to indicate their contribution (targets) to the attainment of same:
        o        Municipal Support Plans – Development and Implementation of MSPs
        o        Resource-Poor Farmers – 100% of the allocated budget should be utilised

        o       Resource-Poor Farmers – at least one (1) Resource-Poor Farmers Project should be implemented in each
              Region

        o        Schools Water Services Programme – at least 1376 schools should be served

        o        2020 Vision Programme – all (100%) schools should be participating by March 2009
        o        Regional Bulk – 32 Projects Implemented and 49 Feasibility Studies conducted
4 REGION SPECIFIC ISSUES

     Eastern Cape – the following should be addressed:
        o      Together with KZN, this Eastern Cape Region should demonstrate how they would contribute to reaching the
             National Target of 10 000 ha of Water Use Licensing for Afforestation
        o       Monitor Compliance with Transfer Agreements and Dora

        o       Water Security Plan – development of a Reconciliation Strategy for Nelson Mandela – confirm what your role is
             with Planning

     Free State – the following should be addressed:
      o       Facilitate the finalization of the Operations and Maintenance Agreements for Van der Kloof Water User
            Association
      o       Conduct a learning journey for the Oranje Riet Water User Association

     Gauteng – the following should be addressed:
      o      Facilitate the conclusion of the Transfer Agreements for Water Services Schemes
        o       Ensure that Refurbishment Plans for transferred schemes are in place

        o      Water Security Plan – development of a Reconciliation Strategies for Johannesburg and Tswhane – confirm
             what your role is with Planning

        o       National Water-Wise Campaign – rolled out
        o       Establishment of the Governing Board for Upper Vaal

     Kwa-Zulu Natal– the following should be addressed:
        o       Facilitate the conclusion of the Transfer Agreements for Water Services Schemes for Sisonke DM

        o       Together with the EC, the KwaZulu Natal Region should demonstrate how they would contribute to reaching
              the National Target of 10 000 ha of Water Use Licensing for Afforestation

        o       Monitor Compliance with Transfer Agreements and Dora
        o       Water Security Plan – development of a Reconciliation Strategy for Durban – confirm what your role is with
             Planning

     Limpopo – the following should be addressed:
      o      Conduct a learning journey for the Nzhelele Water User Association
      o      Ensure that Refurbishment Plans for transferred schemes are in place
      o      Monitor Compliance with Transfer Agreements and Dora

     Mpumalanga – the following should be addressed:
      o     Sign HR Transfer Agreements for Thembisile; Dr JS Moroka and Bushbuckridge
      o     Ensure that Refurbishment Plans for transferred schemes are in place
      o     Monitor Compliance with Transfer Agreements and Dora
      o     National Water-Wise Campaign – launched and rolled out
      o     Establishment of the Governing Board for Upper Olifants

     North-West– the following should be addressed:
      o      Facilitate the conclusion of the Transfer Agreements for Water Services Schemes

     Northern Cape – the following should be addressed:
      o       Facilitate the conclusion of the Transfer Agreements for Water Services Schemes
      o       Facilitate the transfer of staff for Boegoeberg and Kakamas WUAs
      o       National Water-Wise Campaign – launched and rolled out

     Western Cape – the following should be addressed:
      o      Facilitate the conclusion of the Transfer Agreements for Water Services Schemes
      o      Establishment of the Governing Board for Berg
     WATER SECTOR WORKPLAN TOOL 2008/09

     PROGRAMME: WATER SERVICES & WATER RESOURCES

     REGION: MPUMALANGA

                                                                                                          OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                     2nd QUARTER WORKPLAN REPORT


                                                                                                                                      MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                              SUPPORT
            KEY FOCUS AREA OF                                                                                                                                                                                                                         PROJECT MANAGER/                                                          REQUIRED
                                            REGIONAL TARGET 2008/09                                                                                                                                                                                                               KEY ACTIVITIES (WHAT IS PLANNED)                                           ACHIEVED                                      NOT ACHIEVED
               DIRECTORATE                                                                                                                                                                                                                                CHAMPION                                                             FROM HEAD
                                                                                                 Q1                                        Q2                                   Q3                                          Q4                                                                                                   OFFICE


     PRIORITY PROGRAMME: WATER SECTOR SUPPORT

     SUB-PROGRAMME: LOCAL GOVERNMENT SUPPORT


                                                                                                                         Facilitate meetings with                                                                                                                                                                                          Driekoppies: strategy is 60% completed -
                                         WfGD: Incorporation of the national     Consultation of the strategy to the
1a   Planning - WfGD                                                                                                     stakeholders at Injaka dam and        Draft strategy                        Rollout of the draft strategy                        R Maphothoma           1. Facilitate meetings with Municipalities.               information is still being gathered in
                                         strategy to regional strategy           stakeholders
                                                                                                                         Driekoppies Dam                                                                                                                                                                                                   conjunction with Gauteng

                                                                                                                                                                                                                                                                                                                                           Assesment of WSDP completed in six
                                                                                                                                                                                                                                                                                                                                           municipalities (Bushbuckridge, Delmas, Dr JS
                                                                                                                                                                                                                                                                                                                                           Moroka, Emakhazeni, Steve Tshwete, and
                                                                                                                         Working session held in 4 WSAs to                                                                                                                                                                                 Thembisile)
                                                                                                                         update their WSDPs (Albert                                                                                                                                                                                        Mbombela invited bids for the evaluation of
1b   Planning - WSDP                     WSDP: All 18 WSAs supported.            4 WSAs                                                                        6 WSAs                                4 WSAs                                                Ernest Kubayi         1. Facilitate meetings with Municipalities.
                                                                                                                         Luthuli; Govan Mbeki;                                                                                                                                                                                             WSDP
                                                                                                                         Bushbuckridge; DR JS Moroka)                                                                                                                                                                                      Thaba Cheuw WSDP approved by council
                                                                                                                                                                                                                                                                                                                                           PSP appointed by Gert Sibande to assist 5
                                                                                                                                                                                                                                                                                                                                           Municipalities with their WSDPs (Dipaleseng,
                                                                                                                                                                                                                                                                                                                                           Lekwa, Mkhondo, Msukaligwa & Pixley ka
                                         S 78/3: Albert Luthuli,                                                                                                                                                                                                                                                                           Four local municipalities undertaking item 78/3
1c   Planning - Section 78/3             Bushbuckridge, Dr JS Moroka,            0 WSAs                                  2 WSAs (Bushbuckridge & XXX)          2 WSAs                                1 WSA                                                 Ernest Kubayi         1. Facilitate meetings with Municipalities.               Thembisile & Dr JS Moroka - still stuck on S78
                                         Nkomazi, Thembisile                                                                                                                                                                                                                                                                               item no 2 - Council did not take any resolution

                                                                                                                         Upgrading of pipes in                                                                                                                                   Appoint permanent person to champion                      BP compiled for implementation of WCDM for
                                                                                                                         Bushbuckridge                                                                                                                                           WCDM                                                      Bushbuckridge, Dr JS Moroka, Nkomazi &
     Water Conservation & Demand         Bushbuckridge, Dr JS Moroka,                                                    Retain plans for Nkomazi and
2                                                                                0                                                                             2                                     2                                                    Richard Mbambo         Implementation programme at Albert                        Thembisile. Albert Luthuli LM has submitted       WCDM Programme not implemented
     Management                          Nkomazi, Thembisile & Albert Luthuli                                            Western Highveld                                                                                                                                        Luthuli                                                   their project implementation plan - was sent
                                                                                                                         Launch rain water harvesting                                                                                                                            Awareness at Nkomazi                                      to HO for comments.
                                                                                                                         project                                                                                                                                                                                                           Accurate figures obtained from BPs:
                                                                                                                                                                                                                                                                                                                                           Target population = 13 604
                                         Backlog strategies have developed,      Simplifying the booklet to be user                                                                                                                                                                                                                        Target stands = 2 690
                                                                                                                         Ensure incorporation of the                                                 Verification from Municipalities that backlog
     Meeting Water targets               Ensure BP deal with the target          friendly                                                                      Improved backlog eradication by                                                                                                                                             Capital project amounts approved = 222 6053
3                                                                                                                        backlog study into IDP                                                      study figures are correct - ensure targets are         Johan Jooste
     (households)                        Beef up the capacity                    Consultants appointed                                                         20%
                                                                                                                         No. of BP approved                                                          being met on the ground
                                         Identify available resources            Attach the resources                                                                                                                                                                                                                                      Study done on backlogs - was taken to DPLG
                                                                                                                                                                                                                                                                                                                                           who in turn contacted the Municipalities to
                                                                                                                                                                                                                                                                                                                                           verify the figures
                                                                                                                                                                                                                                                                                                                                           Accurate figures obtained from BPs:
                                                                                                                                                                                                                                                                                                                                           Target population = 1 200
                                         Backlog strategies have developed,      Simplifying the booklet to be user      Ensure incorporation of the
                                                                                                                                                                                                     Verification from Municipalities that backlog                                                                                         Target stands = 240
     Meeting Sanitation targets          Ensure BP deal with the target          friendly                                backlog study into IDP                Improved backlog eradication by
4                                                                                                                                                                                                    study figures are correct - ensure targets are         Johan Jooste                                                                   Capital project amounts approved = 776 500
     (households)                        Beef up the capacity                    Consultants appointed                   No. of BP approved                    20%
                                                                                                                                                                                                     being met on the ground                                                                                                               Study done on backlogs - was taken to DPLG
                                         Identify available resources            Attach the resources
                                                                                                                                                                                                                                                                                                                                           who in turn contacted the Municipalities to
                                                                                                                                                                                                                                                                                                                                           verify the figures

                                      Finalise the Provincial support plan
                                      and adopt for the 18 LMs.                  Revise the draft.
     Development of Municipal Support                                                                                    Get stakeholders input on revised     Finalise the plan.                                                                                                                                                          12 of the 18 draft MSPs have been submitted
5                                     Produce a working document for                       Revise the draft                                                                                          Present to Chief Director.             Monitor    3 District coordinators
     Plans                                                                                                               draft. Implement priorities                        Monitor                                                                                                                                                        to the LMs
                                      Bushbuckridge and see that all             document
                                      priorities are implemented

                                                                                                                                                                                                                                                                                                                                           Training manuals developed - manuals from
                                                                                 Assessment of skills and                Training to be done in 3              Training to be done in 2
     Capacity Building / Skills          Capacitated operators in all the                                                                                                                            Training to be done in 2 Municipalities (Thaba                                                                                        University of the North were outdated. PSP's
6                                                                                development of the modules for          Municipalities (Bushbuckridge,        Municipalities (Dr JS Moroka &                                                            Hasani Makhubela                                                                                                                    No Training
     Development                         Municipalities                                                                                                                                              Chweu & Mbombela)                                                                                                                     used to develop draft training manuals for
                                                                                 training                                Albert Luthuli & Nkomazi)             Thembisile)
                                                                                                                                                                                                                                                                                                                                           DWAF

                                                                                                                                                                                                                                                                                                                                           Letter sent to DBSA (copied Jenny Evans at
                                         Technical experts deployed to                                                                                                                                                                                                                                                                     HO) requesting 2 engineers. Vini Naidoo did
                                                                                 Assess the expertise according to       Deployment of technical people in
7    Deployment of Technical Experts     Regional Office to support needy                                                                                      Monitoring the impact                 Monitor the impact                                   Meadow Maseko                                                                    needs assessment for MP to ensure correct
                                                                                 the needs of the municipalities         the needy municipalities
                                         municipalities                                                                                                                                                                                                                                                                                    engineers are deployed. Technical expert
                                                                                                                                                                                                                                                                                                                                           currently in MP was re-called

                                                                                                                                                                                                     Monitor implementation of refurbishment
                                         Ensure Refurbishment of schemes         Ensure contractors have been            Ensure contractors have been          Ensure contractors have been                                                                                                                                                2 Contractors appointed in Albert Luthuli LM
8    Refurbishment of Schemes                                                                                                                                                                        project plans & ensure all contractors have          Richard Mbambo                                                                                                                     5 WSAs did not appoint contractors
                                         takes place in all 18 WSAs              appointed                               appointed                             appointed                                                                                                                                                                   to implement Refurbishment Plans
                                                                                                                                                                                                     been appointed

                                         Refurbishment of WTW (Brugspruit)                                                                                                                                                                                                       Operational Plan in Place and funding
9                                                                                Refurbishment of scheme (plant)         Refurbishment of scheme (plant)       Ensuring operational of plant         Fully operational plant (80% capacity on HR)            P Ntabeni                                                                     Funding for Brugspruit obtained
                                         scheme                                                                                                                                                                                                                                  obtained
     MP: ensure that Refurbishment
     Plans for transferred schemes are                                                                                                                         Develop project plans based on
     in place                                                                    Assist municipalities to develop                                                                                    Develop project plans based on refurbished
                                         7 municipalities Master Plans to be                                             Develop refurbishment master          refurbished master plans (Albert                                                                                                                                            Project Plans signed off by Dr JS Moroka,         Nkomazi, Bushbuckridge, Thaba Chweu
10                                                                               refurbishment master plans                                                                                          master plans (Thembisile, Dr JS Moroka,              Richard Mbambo
                                         completed                                                                       plans for the municipalities          Luthuli, Nkomazi, Mbombela,                                                                                                                                                 Mbombela, Nkomazi and Albert Luthuli LM           & Thembisile
                                                                                 4 Draft documents to be done                                                                                        Ehlanzeni)
                                                                                                                                                               Bushbuckridge, Thaba Chweu)

                                                                                                                                                                                                                                                                                                                                           Refurbishment and Water for All coordinated
                                                                                                                                                                                                                                                                                                                                           at Nkomazi to provide more coordinated
                                         Give support to 7 LMs by identifying                                                                                                                                                                                                                                                              support to Nkomazi
                                                                                                                         Finalization of all logistical                                                                                                                                                                                                                                      Western Highveld and Bushbuckridge
11   Operation and Maintenance           people in municipalities for training   2                                                                             2 LMs                                 1 LM                                                 Richard Mbambo                                                                   Assist Albert Luthuli LM during diarrhea
                                                                                                                         arrangements                                                                                                                                                                                                                                                        not yet finalised
                                         on O&M                                                                                                                                                                                                                                                                                            outbreak with the identification of leaks and
                                                                                                                                                                                                                                                                                                                                           materials to repair the leaks
                                                                                                                                                                                                                                                                                                                                           Training of 11 operators in Albert Luthuli LM

                                         Studies on augmentation of the raw                                                                                                                                                                           Regional Director (J Van
12                                                                               Studies on augmentation                 Obtain funding                        Implementation planning               Implementation of augmentation
                                         water supply to Amsterdam                                                                                                                                                                                    Aswegen) / Pat Ntabeni

     Drought Relief
                                                                                                                                                                                                                                                                                 1. Co-ordinate meetings with Municipalities
                                         4 Municipalities to be assisted with                                            To identify municipalities that are   Implement what is stated in the                                                                                                                                                                                               Nothing achieved - could not assist
13                                                                               Develop Business Plan                                                                                               Monitor the impact                                   Richard Mbambo         for assessment and gathering of
                                         Drought Relief                                                                  to be assisted with Drought Relief    Business Plan                                                                                                                                                                                                                 Nkomazi due to budget constraints
                                                                                                                                                                                                                                                                                 information to compile a Business Plan


14   National Transfers

                                                                                 Consolidation of the draft HR                                                 Facilitate the signing of HR
                                          Sign HR Agreements for Thembisile,     Transfer Agreements                     Facilitate the signing of HR          Transfer Agreements by council
     MP: Sign HR Agreements for          Dr JS Moroka and Bushbuckridge,                                            d.   Transfer Agreements by council                                  ..          HR Transfer Agreements Finalised.                                                                                                     All HR Transfer agreements signed for Thaba
15   Thembisile, Dr JS Moroka and        Albert Luthuli, Thaba Chweu.                                                    Ensure staff are transferred                                                                                                     Richard Mbambo                                                                                                                     Albert Luthuli and Bushbuckridge
                                                                                                                                                                                                     Review the transfer process                                                                                                           Chweu, Dr JS Moroka, and Thembisile
     Bushbuckridge                       Transfer of staff                                            g                         Facilitate after-care and                  Ensure staff are
                                         After-care and wellness                                                         wellness of transferred staff         transferred              Facilitate
                                                                                                                                                               after-care and wellness of


                                                                                 Conduct training workshops on
     MP: Monitor compliance with         Monitor compliance with Transfer                                                Capacity building on DORA             Monitor compliance on improved                                                                                                                                              Appointed permanent post to ensure
16                                                                               Transfer agreements conditions on                                                                                   All LMs reporting on DORA compliance                 Richard Mbambo
     Transfer Agreements and DoRA        Agreements and DoRA                                                             reporting template on 7 LMs           reporting                                                                                                                                                                   Municipality compliance of DoRA
                                                                                 7 LMs




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                                  Page 4 of 20                                                                                                                                                                                               1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                               EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                  BUDGET
                                                                                                                                                   RE




                                                                                Challenge: Lack of information & budget
                                                                                constraints - no budget for PSPs


                                                                                Challenge: Contract of PSP has expired - no one to
                                                                                help municipalities
                                                                                Solution: Gert Sibande appointed own PSP to assist
                                                                                5 LMs

                                                                                Challenge: Nkangala DM experiencing financial
                                                                                constraints in funding the WSDP review.
                                                                                Solution: DWAF to consider assistance under
                                                                                masibambane. Nkangala DM to provide financial
                                                                                information during Sector Collaboration forum.
                                                                                Challenge: Engagement of Councilors
                                                                                Solution: Run workshops with all current councilors
                                                                                for them to understand the impact.


                                                                                Challenge: No funding for Q3
                                                                                Solution: Funding now secured for Q4 -
                                                                                implementation to take place in Q4




                                                                                Challenge: Regional offices awaiting budget
                                                                                approval from National Treasury




                                                                                Challenge: Unavailability of technical director




                                                                                Challenge: No consultation of stakeholders from
                                                                                DPLG




                                                                                Challenge: Nehawu did not sign




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                     Page 5 of 20                           1/7/2011
                                                                                                             OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                          2nd QUARTER WORKPLAN REPORT


                                                                                                                                       MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                               SUPPORT
             KEY FOCUS AREA OF                                                                                                                                                                                                                           PROJECT MANAGER/                                                         REQUIRED
                                             REGIONAL TARGET 2008/09                                                                                                                                                                                                              KEY ACTIVITIES (WHAT IS PLANNED)                                                   ACHIEVED                                        NOT ACHIEVED
                DIRECTORATE                                                                                                                                                                                                                                  CHAMPION                                                            FROM HEAD
                                                                                                     Q1                                     Q2                                     Q3                                         Q4                                                                                                   OFFICE


                                                                                    Mbombela: Assist with the
                                          Support the Mbombela Municipality         funding for design & specification                                                                                                                                                                                                                             Attended Mbombela planning meeting -              Implementation of project not yet
      2010 FIFA World Cup support to                                                                                       Awaiting funding from National         Assist with the implementation of
17                                        Facilitate the development of Water       Assess the status quo in terms of                                                                                  Monitor the assessment                              Richard Mbambo                                                                          everything going according to plan - water        started due to budget still to be
      Host Municipalities                                                                                                  Treasury                               the project
                                          Safety and Security Plan                  water supply in Mbombela and                                                                                                                                                                                                                                   budget still to be approved                       approved
                                                                                    Hazy View


                                          4 Municipalities identified for Special
                                          Intervention Programme (Dr JS                                                    Lobbying and obtaining Council                                                                                                                        Assist municipalities to identify needs for
18    Free Basic Water                                                              Identify municipal support needs                                              Implementation                       Implementation                                      Hasani Makhubela                                                                        Policy approved by council for Bushbuckridge.     No implementation of FBW
                                          Moroka, Mbombela, Nkomazi and                                                    Resolutions                                                                                                                                           implementing FBW
                                          Bushbuckridge)

                                                                                                                                                                                                                                                                                                                                                   Tracking system to improve flow of technical
                                                                                                                                                                  Development of a Coordination                                                                                                                                                    reports developed.
                                                                                    appoint a coordinator for DWAF                                                                                                                                                               1. Co-Coordinate meetings with Water for
      MIG & Accelerated infrastructure                                                                                     sourcing of funding for the            strategy for MIG and                                                                   Johan Jooste & Ernest                                                                     2 meetings held between DWAF and Water for
19                                        Support the water for all project         within the Water for All                                                                                           Implementation                                                            all PMU, DDG, DLG. 2. Present to Provincial                                                                         Development of Coordination Strategy
      development                                                                                                          programme                              Infrastructure or any other water                                                              Kubayi                                                                            All (flagship programme in MP) - agreed that
                                                                                    Programme Management Unit                                                                                                                                                                     Executive Committee
                                                                                                                                                                  project                                                                                                                                                                          Sector Forums to be used as platform for
                                                                                                                                                                                                                                                                                                                                                   collaboration.




                                                                                    Review the Provincial Plan on
      Municipal Izimbizo's and Water      Coordinate Izimbizo and Summits                                                  Reviewing of the action plans on       Reviewing of the action plans on     Reviewing of the action plans on the Izimbizo's    3 Regional Project                                                                       Financial and planning support was given to
20                                                                                  Izimbizo and Summits and
      Sector Summits                      and ensure that IGR is promoted                                                  the Izimbizo's that were held          the Izimbizo's that were held        that were held                                        Coordinators                                                                          Ehlanzeni for their summit in Oct
                                                                                    Izindaba;




                                                                                    Assessment of the results and          Assessment of the results and          Assessment of the results and        Assessment of the results and make                 3 Regional Project                                                                       Problems identified have been incorporated
21    WSA Checklist                       Review the previous checklist                                                                                                                                                                                                          Being done with MSPs
                                                                                    make recommendations                   make recommendations                   make recommendations                 recommendations                                       Coordinators                                                                          into the MSP

      Siyenza Manje (Water Sector
                                          Deploy technical experts in need          Assess the expertise according to      Deployment of technical people in
22    Support Coordinating Unit) - see                                                                                                                            Monitoring the impact                Monitor the impact                                   Meadow Maseko
                                          municipalities                            the needs of the municipalities        the needy municipalities
      item no 7 too
      Mobilisation of Support from
                                                                                                                                                                  Planning to launch Provincial                                                                                                                                                                                                      Could not launch Prov Liaison
      Provincial and Local Politicians    Strengthening of the IGR through          Strengthening of the IGR               Strengthening of the IGR                                                    Planning to launch Provincial Liaison                                                                                                       Attend Muni MEC, Muni MAN, PCF for
23                                                                                                                                                                Liaison Committee on Water                                                                Meadow Maseko                                                                                                                            Committee due to dates not being
      through relevant structures such    sector forums                             through sector forums                  through sector forums                                                       Committee on Water Sector Support                                                                                                           strengthening Local Govt participation
                                                                                                                                                                  Sector Support                                                                                                                                                                                                                     suitable for other stakeholders
      Minmec; Mayoral Committee; etc.

      Monitoring and Evaluation and       Establishment of the M&E&R Unit in        Drafting of the terms of reference                                                                                 Orientation of the Unit to its functions in                               1. Draft ToR. 2. Compile, Adjudicate Tender                                                                         No Coordinator appointed yet due to
24                                                                                                                        Appointment of a Coordinator            Appointment of a Coordinator                                                              Meadow Maseko
      Reporting                           the office of the Regional Head;          (specific to the region) for the Unit                                                                              liaison with Head Office                                                  Document                                                                                                            time constraints & resources

                                                                                                                                                                  Identify non-complying Local
                                          Identify non-complying Local              Identify non-complying Local           Identify non-complying Local
                                                                                                                                                                  Municipalities.
                                          Municipalities.                           Municipalities.                        Municipalities.                                                             Identify non-complying Local Municipalities.
                                                                                                                                                                               Issue letters of non-
                                                   Issue letters of non-                       Issue letters of non-                  Issue letters of non-                                                                         Issue letters of
                                                                                                                                                                  compliance to relevant LMs.                                                                                                                                                      Letters issued in terms of non-compliance to
      Compliance, Monitoring and          compliance to relevant LMs.               compliance to relevant LMs.            compliance to relevant LMs.                                                 non-compliance to relevant LMs.
25                                                                                                                                                                                                                                                          Meadow Maseko        Monitor compliance                                                Bushbuckridge, Mbombela, Thaba Chweu and
      Enforcement                                               Engage in                                   Engage in                              Engage in                                                                        Engage in
                                                                                                                                                                         Engage in meetings where                                                                                                                                                  Umjindi
                                          meetings where necessary.                 meetings where necessary.              meetings where necessary.                                                   meetings where necessary.             If no
                                                                                                                                                                  necessary.           If no
                                           If no improvement enforce                   If no improvement enforce              If no improvement enforce                                                improvement enforce compliance directives
                                                                                                                                                                  improvement enforce compliance
                                          compliance directives                     compliance directives                  compliance directives
                                                                                                                                                                  directives



                                          Ensure that all WSAs have access to       Re-training WSAs on the eWQMS - Re-training WSAs on the eWQMS - Re-training WSAs on the eWQMS -                                                                                                                                                                PSPs ensuring implementation of SANS 241 in
                                                                                                                                                                                    Re-training WSAs on the eWQMS - 5 WSAs;                                                      Blue Green Drop                                                                                                     No training on eWQMS - municipalities
26    Drinking Water Quality (DWQ)        and understand SANS 241                   4 WSAs; ensure implementation of 4 WSAs; ensure implementation of 5 WSAs; ensure implementation                                                                        Richard Mbambo                                                                          3 Districts (Gert Sibande, Nkangala &
                                                                                                                                                                                    ensure implementation of SANS 241                                                            Training of Operators                                                                                               did not respond
                                          imperatives                               SANS 241                         SANS 241                         of SANS 241                                                                                                                                                                                  Ehlanzeni)




                                                                                                                                                                                                                                                                                                                                                   A comprehensive report for the following
                                                                                                                                                                  Make recommendations to                                                                                                                                                                                                            Letters of recommendation for the
                                                                                                                                                                                                                                                                                                                                                   sewage treatment works has been compiled ,
      Waste Water Treatment Works         Assess compliance of WWTW in the          Determine the number of WWTW           Assess which WWTW are                  municipalities on refurbishment                                                         Deputy Director (B                                                                                                                         sewage treatment works assessed for
27                                                                                                                                                                                                     Enforce compliance                                                                                                                          Waterval Boven, White River, Barberton and
      (WWTW) - discharge standards        region                                    in the region                          complying with standards;              and maintenance issues required                                                            Mahlangu)                                                                                                                               compliance to effluent discharge
                                                                                                                                                                                                                                                                                                                                                   Malelane. The report must still be forwarded
                                                                                                                                                                  for compliance                                                                                                                                                                                                                     standards must still be compiled
                                                                                                                                                                                                                                                                                                                                                   to the municipality

                                                                                                                                                                                                                                                                                                                                                   Meetings held between Bushbuckridge LM and
                                          Facilitate signing of the WSP
                                                                                                                           Engage in discussions for water        Facilitate discussion between WSP                                                                                                                                                Bushbuckridge Water Board, Mbombela LM
28    WSA / WSP Contracts                 agreement for Bushbuckridge and           Identify capacity of Institutions                                                                                  Signing of agreements                                Meadow Maseko
                                                                                                                           provision options                      and LM                                                                                                                                                                           and Bushbuckridge Water Board - DWAF gave
                                          Mbombela
                                                                                                                                                                                                                                                                                                                                                   them WSP contracts. Awaiting their comments

29    Tariff Regulation                   Not Applicable


30    Waste Discharge Standards (WQ)      Not Applicable

                                                                                                                           Complaint / queries referred to
                                                                                                                                                                  Complaint / queries referred to                                                                                                                              Training of newly
                                          All received enquiries and complaints                                            relevant institution or directorate.
                                                                                    Complaint / queries referred to                                               relevant institution or directorate.                                                                                                                         appointed           Two Response cordinators appointed and
                                          attended to and resolved. Have the                                               Complaints and queries follow-up.                                           Complaint / queries referred to relevant                                  Beef up complaints-line unit                                                                                        Operationalisation of the knowledge
                                                                                    relevant institution or directorate.                                          Complaints and queries follow-up.                                                                                                                            Costumer            trained on Customer Reations Management.
31    OSS / RIC                           OSS operating efficiently and                                                    Resolved complains closed Ensure                                            institution or directorate. Complaints and             Sello Kheva        Receive complaints & allocate to persons                                                                            base centre not yet achieved. 54
                                                                                    Complaints and queries follow-up.                                             Resolved complains closed. Ensure                                                                                                                            Relations           Two GIS posts advertised. 6 Queries resolved
                                          effectively.                                                                     GIS Centre operational.                                                     queries follow-up. Resolved complains closed.                             responsible                                                                                                         querries still to be resolved.
                                                                                    Resolved complains closed.                                                    Knowledge Based Centre                                                                                                                                       Management          and closed.
                                             Appointment of staff                                                          Appointment of customer relation
                                                                                                                                                                  operational. Appointed GIS Officer                                                                                                                           Officers.
                                                                                                                           management officers.
      SUB-PROGRAMME: SANITATION


                                          Programme is complete - eradication
32    Bucket Eradication                                                                                                                                                                                                                                     Ernest Kubayi
                                          no longer applicable


      No of Clinics provided with basic   To provide toilets in 5 clinics        Finalization of the tendering             Implementation and completion of                                                                                                                                                                                        4 clinics handed over - 2 in Ehlanzeni DM and
33                                                                                                                                                                Hand -over                           Monitoring                                            Ernest Kubayi       Finalise tender documents
      water and sanitation services       (backlog from previous financial year) process                                   toilets in 5 clinics                                                                                                                                                                                                    2 in Gert Sibande DM


                                                                                                                                                                                                                                                                                                                                                   2 schools provided with water
                                                                                                                                                                  18 Schools in Gert Sibande
      No of Schools provided with basic   Provide 51 Priority 1 schools with                                                                                                                                                                                                     Appoint of IA                                                     Gert Sibande implementing on their own - did      Schools in Gert Sibande district not provided because
34a                                                                                 15                                     7 schools provided with Water          3 schools in Nkgangala               10                                                    Ernest Kubayi
      water services                      water                                                                                                                                                                                                                                  Formulate provincial steering committee                           project design and appointment of consulting      of landownership / access agreements.
                                                                                                                                                                  4 schools in Ehlanzeni
                                                                                                                                                                                                                                                                                                                                                   engineers

                                                                                                                                                                                                                                                                                                                                                   Projects in Ehlanzeni District are at 81 - 99 %
                                                                                                                                                                                                                                                                                                                                                   completion
                                                                                                                                                                  7 Schools in Ehlanzeni
    No of Schools provided with basic     Provide 51 Priority 1 schools with                                                                                                                                                                                                     Appoint of IA                                                     Projects in Nkangala District are at 61 - 80 %    Schools in Gert Sibande district not provided because
34b                                                                                 Designs completed for 15 schools       Tenders                                3 schools in Ekangala                10                                                 Arnold and Meadow
    sanitation services                   sanitation                                                                                                                                                                                                                             Formulate provincial steering committee                           completion                                        of landownership / access agreements.
                                                                                                                                                                  6 schools in Gert Sibande
                                                                                                                                                                                                                                                                                                                                                   Projects in Gert Sibande District are at tender
                                                                                                                                                                                                                                                                                                                                                   phase
                                                                                                                                                                                                                                                                                                                                                   Cholera outbreak in Carolina - awareness
                                                                                                                                                                                                                                                                                                                                                   campaign done there
                                                                                    Preparation of the ToRs to be                                                                                                                                                                                                                                  Global hand washing day - 2 schools were
                                          All the MIG projects in the 18 LMs                                                                                                                                                                                                                                                                                                                         PSP not appointed & no rollout of the
35    People Reached by H&H                                                         submitted to RBC (regional bid         Appointment of the PSPs                Rollout the programme                Implementation                                        Andries Zulu                                                                          targeted (Bushbuckridge LM & Nkomazi LM)
                                          to be reached with H &H                                                                                                                                                                                                                                                                                                                                    program
                                                                                    committee)                                                                                                                                                                                                                                                     World Toilet Day - community awareness
                                                                                                                                                                                                                                                                                                                                                   (Mbombela LM) & public awareness (Nelspruit
                                                                                                                                                                                                                                                                                                                                                   City Centre)




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                                     Page 6 of 20                                                                                                                                                                                                                1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                    EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                    BUDGET
                                                                                                                                                        RE




                                                                                Challenge: Infrastructure development in
                                                                                Municipalities; Capacity in terms of institutional
                                                                                arrangements; Cost recovery
                                                                                Solutions: Utilisation of MIG funds in Municipalities
                                                                                (will include bylaws to address above challenges)
                                                                                Ring-fencing of funds

                                                                                Challenge: No information sharing between DWAF
                                                                                and Water for All
                                                                                Solution: Information sharing at Sector Forums




                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




                                                                                Toll freeline backlog not sufficiently reduced.
                                                                                Scarcity of GIS skills.Slow response time from line
                                                                                functions in resolving queries. Solutions: Line
                                                                                function managers to give high priority to queries
                                                                                lodged trhough the tollfree line.




                                                                                Challenge: Land ownership problems
                                                                                Solution: Transfer R5 000 000 from Gert Sibande
                                                                                                                                        5,000,000     2,580,322
                                                                                DM to Nkangala and Ehlanzeni DMs due to land
                                                                                ownership agreements


                                                                                Challenge: Land ownership problems
                                                                                Solution: Transfer R5 000 000 from Gert Sibande
                                                                                                                                        7,000,000     4,145,109
                                                                                DM to Nkangala and Ehlanzeni DMs due to land
                                                                                ownership agreements




                                                                                Challenge: No funding for this financial year




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                     Page 7 of 20                                  1/7/2011
                                                                                                        OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                                            2nd QUARTER WORKPLAN REPORT


                                                                                                                                  MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                                    SUPPORT
            KEY FOCUS AREA OF                                                                                                                                                                                                                       PROJECT MANAGER/                                                              REQUIRED
                                           REGIONAL TARGET 2008/09                                                                                                                                                                                                              KEY ACTIVITIES (WHAT IS PLANNED)                                                            ACHIEVED                                                 NOT ACHIEVED
               DIRECTORATE                                                                                                                                                                                                                              CHAMPION                                                                 FROM HEAD
                                                                                                Q1                                     Q2                                    Q3                                           Q4                                                                                                       OFFICE



                                                                                                                                                                                                                                                                                                                                                                                                                    No implementation of WASH
                                                                               Finalization of the tendering          Finalization of the tendering                                               Implementation and monitoring of the
36    WASH Programme                    Taking the programme to 18 LMs                                                                                      Implementation of the programme                                                              Andries Zulu                                                                                                                                               Programme - PSP assisting in above
                                                                               process                                process                                                                     programme
                                                                                                                                                                                                                                                                                                                                                                                                                    events - implementation to start in Q4


      SUB-PROGRAMME: SUPPORT TO WATER MANAGEMENT INSTITUTIONS (WMIs)

                                                                                                                                                                                                                                                       Deputy Director:
                                        Olifants CMA Advisory Committee        Report proposal done and               Consultation process and amend        Finalise approval of advisory                                                                                     Provide support to the formation of CMA-                                                                                              Not yet Achieved - depending on
37                                                                                                                                                                                                Appoint advisory committee                              Institutional
                                        Established                            submitted to HO                        proposal if required                  committee                                                                                                         Olifants                                                                                                                              National Institutional realignment
                                                                                                                                                                                                                                                   Establishment (P. Ntabeni)



                                                                                                                                                                                                                                                                                                                                                   Ilanga WUAs Election were on the 16th
                                                                                                                                                                                                                                                                               Ilanga WUA: Election of the Management
38a                                                                                                                                                                                                                                                                                                                                                October 2008. First MANCO established on
                                                                                                                                                                                                                                                                               Committee
                                                                                                                                                                                                                                                                                                                                                   the 19th November 2008.




                                                                                                                                                                                                                                                                                                                                                   Meeting held with the steering Committee to
38b                                                                                                                                                                                                                                                                            Mogaba WUA: Submit proposals to HO                                  discuss boundaries Greater Sikhukhuni and
                                                                                                                                                                                                                                                                                                                                                   Irrigation Board




                                                                                                                                                                                                                                                        Acting Director:      Lower Lepelle WUA: Submit proposals to                               Meeting held on 13th October 2008 to discuss
38c                                                                            Four additional WUAs established       Setting up committees for each        Per each WUAs steering
                                                                                                                                                                                                  Submit four proposals to the HO for approval            Institutional       HO                                                                   dratfed Constitution.
                                                                               in the Olifants catchment              four WUAs                             committees established
                                                                                                                                                                                                                                                   Establishment (P. Ntabeni)
      Establishment and regulation of   Four additional WUAs established in
      institutions                      the Olifants catchment
                                                                                                                                                                                                                                                                               Tubatse WUA: Interim Management                                     Meetings held and elections prepared for WUA
38d
                                                                                                                                                                                                                                                                               Committee (IMC) Meeting                                             management



                                                                                                                                                                                                                                                                               Sekhukhune Interim Management                                       Meetings held and elections prepared for WUA
38e
                                                                                                                                                                                                                                                                               Committee (IMC) Meeting                                             management


                                                                                                                                                                                                                                                                                                                                                   Meeting with all the stakeholders to finalise
                                                                                                                                                                                                                                                                               Loskop WUA: Public Participation,
                                                                                                                                                                                                                                                                                                                                                   the boundaries. Submission of the information
38f                                                                                                                                                                                                                                                                            Establishment of the Interim Management
                                                                                                                                                                                                                                                                                                                                                   on Irrigation Boards assets and liabilities by
                                                                                                                                                                                                                                                                               Committee (IMC)
                                                                                                                                                                                                                                                                                                                                                   the Loskop IMC to DWAF to Head Office
                                                                                                                                                            Elections of Management                                                                Acting Regional Director;
                                                                                                                                                                                                                                                          Institutional                                                                            Meeting held with Fetakgomo Local
                                                                               Finalise the 4 gazetting process       Setting up committees & elections     Committee for the 3 WUA.                                                                                                                                           Capacity Building
38g                                                                                                                                                                                               Capacity Building for the appointed Manco           Establishment: P.H.      Elections of WUAs                                                   Municipality on 12th November 2008 to
                                                                               with the Associations                  for each four WUAs                    Drafting of the constitution for 1                                                                                                                                 of WUAs
                                                                                                                                                                                                                                                     Ntabeni and Assistant                                                                         discuss Tubatse WUA boundaries.
                                                                                                                                                            WUA
                                                                                                                                                                                                                                                       Director: Zandile
                                        Inkomati CMA (WUAs) - Support                                                                                                                                                                              Acting Regional Director;   Reinforce the relationship between DWAF,
                                                                                                                                                                                                                                                          Institutional                                                                          Meeting with Mr, Khorommbi from DWAF HO
                                        ICMA in the establishment of two                                                                                    Establish the Status quo of the       Appointment of Interim Management                                            ICMA and WUA’s                                  Delegation of
38h                                                                                                                                                                                                                                                   Establishment: P.H.                                                                        to discuss issue of Irrigation Boards with
                                        WUAs- Sand river WUA and Sabie                                                                                      two water user association            Committee                                                                    Working together with ICMA in the               Functions to ICMA
                                                                                                                                                                                                                                                     Ntabeni and Assistant                                                                       assets and liabilities.
                                        WUA                                                                                                                                                                                                                                    establishing of WUAs
                                                                                                                                                                                                                                                   Director: Kenneth Masindi
                                                                                                                                                                                                                                                                                                                                                 Meeting with ICMA held in terms of the MoU
                                                                                                                                                                                                                                                    Regional Director (J Van
                                                                              Setting up meetings with HO and                                               Implement MoU between DWAF            Monitor and evaluate MoU between DWAF and                                   Setting up meetings with HO and ICMA for                           and DWAF to discuss issue of Irrigation
      Technical and Capacity Building   Inkomati CMA implementation and                                               Liaise with ICMA to finalise the                                                                                               Aswegen) and Deputy                                                       Delegation of
39                                                                            ICMA to get approval for the                                                  and ICMA in terms of WUAs             ICMA in terms of WUAs formation in the                                      the setting of functions (roles, etc)                              Boards with assets and liabilities. Draft Billing
      Support                           delegations to be transferred to ICMA                                         process                                                                                                                        Director: Institutional                                                   Functions to ICMA
                                                                              delegations of functions                                                      formation in the Inkomati             Inkomati                                                                    Approval of BP of ICMA                                             system available pending Legal section
                                                                                                                                                                                                                                                   Establishment (P. Ntabeni)
                                                                                                                                                                                                                                                                                                                                                 approval

      SUB-PROGRAMME: REGIONAL BULK INFRASTRUCTURE



                                                                                                                                                                                                                                                                                                                                                   Coordination with municipalities for progress and cashflows
                                                                                                                                                                                                                                                                                                                                                   continued.
                                                                               Establish coordination within                                                                                                                                                                   Establish coordination meetings with                                Delmas appointed contractor and had R4 million transferd         Hoxani to provide invoices to effect transfer of funds as
                                        3 projects and 2 feasibility studies   identified municipalities. To write    Ensure 50 % spending of allocated     Ensure 75% spending of allocated                                                                                   municipalities. Write letters to                                    towards completion of project. Project at 0 - 40 % completion.   per submitted project expenditure plan.
40    Bulk Water Infrastructure                                                                                                                                                                   Ensure 100% spending of allocated money                Ernest Kubayi
                                        completed                              letters to municipalities to ask for   money                                 money                                                                                                              Municipalities for cash flow. Site visits bi-                       R2 million transferred to Mbombela. Project at tender stage.     PSP for the Lowveld feasibility study not appointed.
                                                                               cash flow information                                                                                                                                                                           weekly. Biweekly site visit report meetings                         R1 million transfered to Nkomazi. Project at 81 - 99 %           Project is at pre-tender phase.
                                                                                                                                                                                                                                                                                                                                                   completion.
                                                                                                                                                                                                                                                                                                                                                   PSP for the Western Highveld feasibility study appointed



      PRIORITY PROGRAMME: WATER ALLOCATION REFORM (WAR)

      SUB-PROGRAMME: WATER ALLOCATION REFORM (as per BBBEE Strategy)

                                        Draft licenses shall be finalised on   Draft licenses shall be finalised      Draft licenses shall be finalised     Draft licenses shall be finalised     Draft licenses shall be finalised during this    Acting Regional Director
41                                                                                                                                                                                                                                                                                                                                                 About Six Licences have been achieved
                                        the backlog                            during this quarter                    during this quarter                   during this quarter                   quarter                                                  P.Ntabeni
                                                                                                                                                                                                                                                                                                                                                   10 priority license applications identified and
                                                                                                                                                                                                                                                      PSP (PN Odendaal)        Application assessed ,RoR and License                               action plan developed. 1 backlog licence to
42a                                     44 licenses on backlog eradicated      12 license backlogs submitted          12 license backlogs eradicated        10 license backlogs eradicated
                                                                                                                                                                                                                                                       Thandi Mthembu          compiled and uploaded on to WULATS                                  Acting Regional Director for signature. 1 draft
      Eradicating water use license                                                                                                                                                                                                                                                                                                                with AD
      backlogs


                                                                                                                                                                                                                                                   P.H Ntabeni/T Mthembu/S Application assessed ,RoR and License
42b                                     60 licenses on backlog eradicated      16 license backlogs eradicated         16 license backlogs eradicated        13 license backlogs eradicated        15 license backlogs eradicated                                                                                                                   7 Licences recommended
                                                                                                                                                                                                                                                           Macevele        compiled and uploaded on to WULATS




                                                                                                                                                                                                                                                                             WQM: Authorisations of water use
                                                                                                                                                                                                                                                   Acting Deputy Director (S applications evaluated, processed within a                            All licence applications captured on WULATS.
      Recommendation of new water       WQM : 8 Draft Water Use
43                                                                             2 Draft licenses shall be finalized    2 draft licenses shall be finalised   2 draft licences shall be finalised   2 draft licences shall be finalised                  Macevele)/ Thandi     reasonable time (in cooperation with other                            1 draft licence and Record of Recommendation
      use licenses to Head Office       licenses shall be finalized
                                                                                                                                                                                                                                                   Mthembu/Tolmay Hopkins departments where necessary) and                                         sent to Head Office. 2 Licenses recommended
                                                                                                                                                                                                                                                                             authorised where approved or Delegated



                                                                                                                                                                                                                                                   Acting Deputy Director (S
                                        133 Water Use Licenses captured on                                            8 Licenses captured on the            120 Licenses captured on the                                                                                                                                                           All licence applications (new and backlog)
44    Water Use License tracking                                               0 Licenses captured on WULATS                                                                                      5 Licenses captured on WULATS                        Macevele)/ Thandi     133 Water Use licenses to be captured
                                        WULATS                                                                        WULATS system                         WULATS system                                                                                                                                                                          captured on WULATS.
                                                                                                                                                                                                                                                   Mthembu/Tolmay Hopkins


                                        Inspect & verify unlawful water        Inspect & verify unlawful water        Inspect & verify unlawful water       Inspect & verify unlawful water
      Unlawful Water Use (Abstraction                                                                                                                                                             Inspect & verify unlawful water usage within a                                                                                                   About Six Licences have been issued and
45                                      usage within a response time of 2      usage within a response time of 2      usage within a response time of 2     usage within a response time of 2                                                          Thandi Mthembu
      control)                                                                                                                                                                                    response time of 2 weeks, as reported,                                                                                                           Licencing Committee established
                                        weeks, as reported,                    weeks, as reported,                    weeks, as reported,                   weeks, as reported,


46    Verification of Water Users       Verification of 4000 Water Users       verification process in progress       verification process in progress      verification of 1 000 water users     verification process of 1000 water users              Patrick Ntabeni        Verification of 1000 water users                                    verification of 1 000 water users




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                                Page 8 of 20                                                                                                                                                                                                                                      1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                   EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                  BUDGET
                                                                                                                                                       RE




                                                                                Pending the National Institutional Realignment
                                                                                interms of CMAs formation




                                                                                MANCO capacity building




                                                                                Boundreis discussion are still to be finalised.




                                                                                Constitution was circulated for final comments.




                                                                                Loskop WUA IMC has not submitted the Irrigation
                                                                                Boards assets and liabilities to the Dept.



                                                                                Boundreis discussion are still to be finalised.




                                                                                                                                      26,000,000    20,000,000




                                                                                Challenge: Require assistance from PSP on
                                                                                S21(c)&(i) licenses. Appoint and train new
                                                                                personnel.




                                                                                Require assistance from PSP on S21(c)&(i) licenses.
                                                                                Appoint and train new personnel. Reserve
                                                                                determination, Applicants not responding timeosly
                                                                                to requests. Support from legal services. Staff
                                                                                turnover




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                      Page 9 of 20                                1/7/2011
                                                                                                           OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                          2nd QUARTER WORKPLAN REPORT


                                                                                                                                      MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                                 SUPPORT
             KEY FOCUS AREA OF                                                                                                                                                                                                                           PROJECT MANAGER/                                                          REQUIRED
                                             REGIONAL TARGET 2008/09                                                                                                                                                                                                                 KEY ACTIVITIES (WHAT IS PLANNED)                                              ACHIEVED                                  NOT ACHIEVED
                DIRECTORATE                                                                                                                                                                                                                                  CHAMPION                                                             FROM HEAD
                                                                                                   Q1                                     Q2                                   Q3                                          Q4                                                                                                       OFFICE


                                                                                   Receive and evaluate application.
                                          Tracking system up and running           Request reserve determination.
                                          licenses loaded onto WULATS.             Draft water use license. Check
                                          Authorisations of water use              with information systems, water
      Reduction in turnaround time for                                                                                    Support CMA to take up function     Support CMA to take up function
                                          applications evaluated, processed        balance, data, resource impacts,                                                                                 Support CMA to take up function in Inkomati,
47    the process of licensing - to                                                                                       in Inkomati, Olifants, DWAF         in Inkomati, Olifants, DWAF                                                                   Mamogala Kadiaka
                                          within a reasonable time (in             NWRS beneficial use, poverty,                                                                                    Olifants, DWAF continues with functions
      average 12 months                                                                                                   continues with functions            continues with functions
                                          cooperation with other departments       sustainability assessment and
                                          where necessary) and authorised          recommendation. Prepare
                                          where approved or Delegated              submission to CD: WU & C.
                                                                                   Approve licenses where delegated.
                                                                                   Receive and evaluate application.
                                                                                   Request reserve determination.
                                          Authorisations of water use              Draft water use license. Check
                                          applications evaluated, processed        with information systems, water
                                                                                                                          Support CMA to take up function     Support CMA to take up function
                                          within a reasonable time (in             balance, data, resource impacts,                                                                                 Support CMA to take up function in Inkomati,                                                                                                  1st meeting held between JCMA and DWAF to
48a                                                                                                                       in Inkomati, Olifants, DWAF         in Inkomati, Olifants, DWAF                                                                      Pat Ndabeni
                                          cooperation with other departments       NWRS beneficial use, poverty,                                                                                    Olifants, DWAF continues with functions                                                                                                       discuss operational matters.
                                                                                                                          continues with functions            continues with functions
                                          where necessary) and authorised          sustainability assessment and
      Issuing of water use licenses /
                                          where approved or Delegated              recommendation. Prepare
      afforestation
                                                                                   submission to CD: WU & C.
                                                                                   Approve licenses where delegated.
                                          SFRA LAAC: Coordinate, organise,
                                                                                                                          Coordinate, organise, chair and     Coordinate, organise, chair and       Coordinate, organise, chair and arrange.                                                                                    Attendance.       2 SFRA LAAC meetings held. Two matters
                                          chair, arrange all SFRA license          Coordinate, organise, chair and                                                                                                                                        Assistant Director:
48b                                                                                                                       arrange. Investigation of           arrange. Investigation of             Investigation of applications transferred to                                    2 x SFRA LAAC MEETINGS                      License           resolved. Two new genus and/or area
                                          applications through the bi-monthly      arrange                                                                                                                                                               SFRA/SEA (T. Hopkins)
                                                                                                                          applications transferred to ICMA    applications transferred to ICMA      ICMA                                                                                                                        administration    exchange applications received.
                                          SFRA: LAAC.


                                                                                                                                                                                                                                                                                                                                                  Draft Billing system available pending Legal
49    Revenue management                  Billing of 6 000 customers                                                                                                                                                                                        Nombuso Khuluse
                                                                                                                                                                                                                                                                                                                                                  section approval for 3 irrigation boards

                                                                                   Appointment of PSPs for the
                                                                                                                          Letters sent to stakeholders.
      Initiate Compulsory licensing in    Initiated compulsory licensing in        verification of water use in                                               Verification certificates issued                                                                                                                                                    Finalisation of Inkomati Catchement
50                                                                                                                        Finalise implementation plan. ToR                                         Issue call for Compulsory Licensing                     Mamogala Kadiaka
      Inkomati                            Inkomati                                 Inkomati. Consult users on the                                             (dependent on S/H responses).                                                                                                                                                       Verification at its final stage
                                                                                                                          for compulsory licensing agreed
                                                                                   draft water allocation framework

      Proposed allocation schedules for
51
      Mhlathuze & Jan Dissels

    MP: Establishment of the
51a Governing Board for Upper
    Olifants
                                                                                                                                                                                                                                                                                                                                                  Meeting with Sekhukhune WUA stakeholders
                                                                                                                                                                                                                                                                                                                                                  held on 06th October 2008 to inform them
                                                                                                                                                                                                                                                          Pat Ntabeni / Kenneth                                                                   about water rights. Submitted the WAR Roll
                                                                                                                                                              WAR projects plan and budget
52    WAR roll-out plans                  Included in Inkomati                                                                                                                                                                                              Masindi / Zandile                                                   Policy approval   out budget plan fot 2009/10 on the 30th
                                                                                                                                                              compiled and submitted to HO
                                                                                                                                                                                                                                                               Maqwazima                                                                          November 2008.Water allocation meeting held
                                                                                                                                                                                                                                                                                                                                                  at Setlaboswane irrigation scheme on the 08
                                                                                                                                                                                                                                                                                                                                                  December 08
                                                                                                                                                                                                                                                                                                                                                  Rainwater Harvesting Handover meeting was
                                                                                                                                                                                                                                                        Acting Regional Director;                                                                 held on the 14/12/08 to introduce the IDT
                                          Collaborate with Independent                                                                                                                                                                                                                                                                            and RIENG(Rural Intragrated Engeering
                                                                                                                                                              Monitoring the implementation                                                                   Institutional
                                          Development Trust (IDT) to                                                                                                                                Monitoring the implementation and the                                           Collaboration with independent                                Consultan Impementor).Meeting with
                                                                                                                                                              and the progress of the project to                                                          Establishment: P.H.                                                   Funding and
53a                                       implement the project in the Olifants                                                                                                                     progress of the project to ensure that is in line                               Development Trust (IDT) to implement rain                     DoA(ARC), IDT and RIENG on the 09th
                                                                                                                                                              ensure that is in line with the                                                            Ntabeni and Assistant                                                  expertise
                                          in the Dr. J.S. Moroka LM , Moretele                                                                                                                      with the requirement of DWAF                                                    water project in the Inkomati                                 December 2008 to discuss the implementation
                                                                                                                                                              requirement of DWAF                                                                           Director: Zandile
                                          area                                                                                                                                                                                                                                                                                                    of Rain Water Harvet project in the Moretele
                                                                                                                                                                                                                                                               Maqwazima
      Rainwater Harvesting                                                                                                                                                                                                                                                                                                                        area. Site visit conducted on the 17th
                                                                                                                                                                                                                                                                                                                                                  December 208 to assess tanks built by ARC
                                                                                                                                                                                                                                                        Acting Regional Director;
                                          Collaboration with Independent                                                                                      Monitoring the implementation
                                                                                                                                                                                                    Monitoring the implementation and the                      Institutional      Collaboration with independent
                                          Development Trust (IDT) to                                                                                          and the progress of the project to
53b                                                                                                                                                                                                 progress of the project to ensure that is in line      Establishment: P.H.    Development Trust (IDT) to implement rain
                                          implement rain water project in the                                                                                 ensure that is in line with the
                                                                                                                                                                                                    with the requirement of DWAF                          Ntabeni and Assistant   water project in the Inkomati
                                          Inkomati KaMsogwaba and Barberton                                                                                   requirement of DWAF
                                                                                                                                                                                                                                                        Director: Kenneth Masindi

                                                                                                                                                              Received two applications for the                                                                                                                                                   Received two applications for the Tswelopele
                                                                                                                                                              Tswelopele and Moganyaka                                                                  Acting Regional Director;                                                                 and Moganyaka Irrigation schemes.Site visit
                                                                                                                                                              Farmers.                                                                                        Institutional                                                                       done for Monganyaka on the 13 November
                                          Support Resource Poor Farmers by                                                                                    Meetings with the RPF to identify                                                           Establishment: P.H.                                                                     2008
54a                                                                                                                                                                                               Support the farmers
                                          mobilising the farmers in the Olifants                                                                              their needs. Verify their Water use Meetings with the RPF to identify their needs.         Ntabeni and Assistant                                                                    Meetings with the RPF to identify their needs
                                                                                                                                                              License                                                                                       Director: Zandile                                                                     and verify their Water use Licence.
                                                                                                                                                              Site visits                                                                                      Maqwazima                                                                          Site visit for Tswelopele on 18th November
                                                                                                                                                                                                                                                                                                                                                  2008.
      Support to Resource Poor                                                                                                                                                                                                                                                      Mobilise RPF Programme.
      Farmers (RPFs)                                                                                                                                                                                                                                                                Blyde: assist the MCPA with the
                                                                                                                                                                                                                                                        Acting Regional Director;   application of Water Use License
                                                                                                                                                              Blyde: Implementation of the                                                                                          Mfufane: assist the farmers to access the                     Mfufane funding received pending DALA
                                                                                                                                                                                                    Blyde: Implementation of the project                       Institutional                                                    Selwanendlala:
                                          Support Resource Poor Farmers in                                                                                    project                                                                                                               other 50% from the DALA as DWAF                               respons for implementing the
54b                                                                                                                                                                                                 Mfufane: Implementation of the project                 Establishment: P.H.                                                  Approve finance
                                          the Inkomati                                                                                                        Mfufane: Implementation of the                                                                                        approved 50% funding of the project                           project.Selwanendla application received and
                                                                                                                                                                                                    Selwanendlala: Recommendation of the                  Ntabeni and Assistant                                                 application
                                                                                                                                                              project Selwanendlala: Processing                                                                                     Selwanendlala Processing the application                      ready to be submited to Mpumalanga CCAW.
                                                                                                                                                                                                    application for financing to HO.                    Director: Kenneth Masindi
                                                                                                                                                              of the application for financing.                                                                                     for finance
                                                                                                                                                                                                                                                                                    Recommend for the approval of funding to
                                                                                                                                                                                                                                                                                    HO
      PRIORITY PROGRAMME: WORKING FOR WATER

55    No of Hectares initial Cleared      9 278                                    921                                    3 583                               2 577                                 2 980                                                 DD: Ronald Nenungwi                                                                     2577 hactares cleared


56    No of Hectares Followed up          29 218                                   10 289                                 16 689                              9 850                                 4 108                                                 DD: Ronald Nenungwi       ASSISTANCE FROM Working on Fire                               9850 follow up hactares done

      PRIORITY PROGRAMME: WATER QUALITY MANAGEMENT

      SUB-PROGRAMME: DRINKING WATER QUALITY (DWQ)


      Establishment of Capacity to deal
57
      with DWQ issues


      SUB-PROGRAMME: WATER RESOURCE QUALITY


                                                                                                                                                                                                                                                         Regional Director (Ms.
                                                                                                                                                                                                                                                                                                                                                                                                  Working Committee as planned for
                                                                                                                                                                                                                                                         Mamogala Kadiaka and                                                   Funding and
58a                                       Initiate the 'Adopt-a-River' project     Initiated from HO                      Establish working committee         Finalise the Plan of Action           Implementation                                                                                                                                Not achieved                                    second quarter not achieved, therefore
                                                                                                                                                                                                                                                         Deputy Director: Water                                                 expertise
                                                                                                                                                                                                                                                                                                                                                                                                  action plan not developed.
                                                                                                                                                                                                                                                           Quality T. Hopkins)

                                                                                                                                                              Obtain comment from
                                          WQM : To ensure full                     Training of the 27 WQM personnel       Identification of the 4 priority
                                                                                                                                                              participating partners on
                                          implementation of the River Health       and other capacity building            areas and establishment of the                                            Finalise business plan and budget. Commence                                                                                                                                                   No progress. Still awaiting feedback
58b River Health Programme                                                                                                                                    Memorandum of Agreement                                                                   Assistant Director: SEA     Obtain comment from MTPA, DALA, ICMA
                                          Programme within the Inkomati and        initiative for the implementation of   monitoring sites in the Olifants                                          with implementation                                                                                                                                                                           from MTPA on MoA.
                                                                                                                                                              (including roles & responsibilities
                                          Olifants WMA .                           the River Health Programme             and the Inkomati catchment.
                                                                                                                                                              and budget

                                                                                                                                                              Monthly continuous monitoring of
                                          WQM : To ensure full                     Training of the 27 WQM personnel       Identification of the 4 priority                                                                                                                                                                      Re-vitalise
                                                                                                                                                              the sites, review of the monitoring                                                                                   Training, continuous monitoring, report
                                          implementation of the River Health       and other capacity building            areas and establishment of the                                          Continuous monitoring of the established sites,                                                                               Mpumalanga
58c                                                                                                                                                           programme where necessary and                                                                 Stanford Macevele       writing, purchasing of the relevant field
                                          Programme within the Inkomati and        initiative for the implementation of   monitoring sites in the Olifants                                        data assessment and evaluation. Annual report.                                                                                River Health
                                                                                                                                                              data collection and interpretation.                                                                                   equipments,
                                          Olifants WMA .                           the River Health Programme             and the Inkomati catchment.                                                                                                                                                                           Programme
                                                                                                                                                              Quarterly reporting.



OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                                 Page 10 of 20                                                                                                                                                                                                    1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                                        EXPENDITU
                                                                                       CHALLENGES & POSSIBLE SOLUTIONS                                     BUDGET
                                                                                                                                                                            RE




                                                                                Active and consistent participation by co-operative governance partners.
                                                                                Liaise with Heads of Department to ensure involvement




                                                                                                                                                           48 118 000     8 534 147




                                                                                Lack of capacity that should be alleviated through
                                                                                appointment of personnel in 4th quarter. Include in                         R300 000
                                                                                discussions with partners in River Health Programme


                                                                                Challenge: resignation of Dr Johan Engelbrecht
                                                                                from MTPA who was driving the process on their
                                                                                side.
                                                                                Solution: identify new contact person and establish
                                                                                working relationship.




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                 Page 11 of 20                                         1/7/2011
                                                                                                           OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                                2nd QUARTER WORKPLAN REPORT


                                                                                                                                     MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                                      SUPPORT
             KEY FOCUS AREA OF                                                                                                                                                                                                                            PROJECT MANAGER/                                                             REQUIRED
                                             REGIONAL TARGET 2008/09                                                                                                                                                                                                                  KEY ACTIVITIES (WHAT IS PLANNED)                                                  ACHIEVED                                     NOT ACHIEVED
                DIRECTORATE                                                                                                                                                                                                                                   CHAMPION                                                                FROM HEAD
                                                                                                      Q1                                     Q2                                    Q3                                          Q4                                                                                                       OFFICE


                                                                                                                                                                                                                                                                                                                                    Technical
                                          Compile State of Rivers report form                                                                                   Finalise proposal to achieve                                                                                                                                        assistance.                                                           No progress. Need to get feedback
                                                                                                                                                                                                       Assistance to MTPA to do required field work to                               Monitor progress with regard to monitoring
59    State of Rivers Report              Inkomati WMA across international                                                                                     publication. Commence with                                                                Assistant Director: SEA                                                   Funding for                                                           from MTPA on additional fieldwork that
                                                                                                                                                                                                       obtain sufficient data.                                                       by MTPA.
                                          boundaries ("source-to-sea" report)                                                                                   activities to fill information gaps                                                                                                                                 publication of                                                        had to be carried out.
                                                                                                                                                                                                                                                                                                                                    report
                                                                                                                                                                                                                                                                                     WQM: Authorisations of water use
                                                                                  Two water use licenses issued for      Two water use licenses for the         Two water use licenses for the         Two licenses for the other sectors that are                                   applications evaluated, processed within a
      To ensure equitable allocation and WQM : 8 licenses shall be assessed                                                                                                                                                                               Acting Deputy Director                                                                     WQM 2 licenses authorised and water use
60                                                                                the mining industry shall be           Local Government shall be audited      industry sector shall be audited       issued with water use licenses shall be audited                               reasonable time (in cooperation with other
      authorization of water use         for compliance                                                                                                                                                                                                     (Stanford Macevele                                                                       evaluated
                                                                                  audited for compliance.                for compliance.                        for compliance.                        for compliance.                                                               departments where necessary) and
                                                                                                                                                                                                                                                                                     authorised where approved or Delegated


                                                                                                                                                                                                                                                                                     WQM: Authorisations of water use
      Eradicating water use licensing                                                                                                                                                                                                                                                applications evaluated, processed within a
                                          WQM : 15 Draft Licenses shall be        4 draft licenses shall be finalized    4 draft licenses shall be finalized    3 draft licenses shall be finalized                                                       Acting Deputy Director
61    backlog( Licenses older than 12                                                                                                                                                                  5 draft licenses shall be finalized.                                          reasonable time (in cooperation with other                      3 applications evaluated
                                          finilised on the backlog                during this quarter.                   during this quarter.                   at the Regional Office.                                                                     (Stanford Macevele
      months)                                                                                                                                                                                                                                                                        departments where necessary) and
                                                                                                                                                                                                                                                                                     authorised where approved or Delegated


                                                                                                                                                                                                                                                                                     WQM: Authorisations of water use
                                                                                                                                                                                                                                                                                     applications evaluated, processed within a
      Recommendation of new water         WQM : 8 Draft Water Use licenses                                                                                                                                                                                Acting Deputy Director
62                                                                                2 Draft licenses shall be finalized    2 draft licenses shall be finalised    2 draft licenses shall be finalised    2 draft licenses shall be finalised                                           reasonable time (in cooperation with other                      2 draft licenses finalised
      use licenses to Head Office         shall be finalized                                                                                                                                                                                               (Stanford Macevele)
                                                                                                                                                                                                                                                                                     departments where necessary) and
                                                                                                                                                                                                                                                                                     authorised where approved or Delegated

                                                                                                                                                                                                                                                                                      Authorisations of water use applications
                                          WQM : 8 Draft Water Use licenses                                                                                                                                                                                                           evaluated, processed within a reasonable
                                                                                  2 Draft licenses shall be finalized.   2 draft licenses shall be finalised.   3 draft licenses shall be finalised.   4 draft licenses shall be finalised. SEA/SFRA 2    Acting Deputy Director                                                    Reserve          SEA:SFRA: 1 draft licence completed and              SEA:SFRA: 1 draft licence not
63    Issuing of new water use licenses   shall be finalized. SEA/SFRA 8 Draft                                                                                                                                                                                                       time (in cooperation with other
                                                                                  SEA/SFRA 2 Draft licenses              SEA/SFRA 2 Draft licenses              SEA/SFRA 2 Draft licenses              Draft licenses                                      (Stanford Macevele)                                                      Determination    submitted to Head Office                             completed
                                          licenses.                                                                                                                                                                                                                                  departments where necessary) and
                                                                                                                                                                                                                                                                                     authorised where approved or Delegated

                                                                                                                         Monitoring. Resolve non-
                                          Audit compliance to authorisation                                                                                                                                                                                                          Audit compliance to authorisation and
                                                                               monitoring, conduct inspections.          compliance and non response of
      Compliance monitoring and           and Legislation for WQM. Monitor the                                                                                  Monitoring. . Initiate actions         Monitoring. initiate actions where                 Acting Deputy Director     Legislation for WQM. Monitor the quality of
64                                                                             Transfer function to CMA in               Municipalities on their sewerage                                                                                                                                                                                            Monitoring of water quality in the catchments
      enforcement                         quality of rivers and discharge                                                                                       where transgressions identified        transgressions identified                           (Stanford Macevele)       rivers and discharge qualities through
                                                                               Inkomati                                  works. Support CMA to fulfill
                                          qualities through sampling.                                                                                                                                                                                                                sampling.
                                                                                                                         functions in Inkomati


      To ensure minimization of impacts Evaluation of EMPRs, EIAs, WSDP's,        Evaluate and recommend EMPRs,          Evaluate and recommend EMPRs,          Evaluate and recommend EMPRs,          Evaluate and recommend EMPRs, EIAs etc as                                     Evaluation of EMPRs, EIAs, WSDP's, IDP's,
                                                                                                                                                                                                                                                         Acting Deputy Director (S                                                                   77 EIA's and 107 EMPR's evaluated and
65    of waste and land based activities IDP's, solid waste applications          EIAs etc as and when requested.        EIAs etc as and when requested.        EIAs etc as and when requested.        and when requested. Transfer function in the                                  solid waste applications through
                                                                                                                                                                                                                                                                 Macevele)                                                                           recommended
      on water resources                 through cooperative authorisation        Transfer function in the Inkomati      Transfer function in the Inkomati      Transfer function in the Inkomati      Inkomati                                                                      cooperative authorisation

                                                                                                                                                                                                                                                                                                                                                     nine pollution incidents attended to and
                                                                                                                                                                                                                                                                                                                                                     rectified. Sewage spill into the Witbank Dam
                                          Attend to all pollution incidents
                                                                                  Attend to all reported incidents       Attend to all reported incidents       Attend to all reported incidents                                                                                     Attend to all pollution incidents reported.                     was attended to and rectified attended ( a
      To ensure water related disaster    reported. Impacted areas                                                                                                                                     Attend to all reported incidents and submit
66                                                                                and submit reports. Transfer           and submit reports. Transfer           and submit reports. Transfer                                                                Stanford Macevele        Impacted areas rehabilitated to the                             predirective has been issued to Emalahleni
      preparedness and safety of dams     rehabilitated to the satisfaction of                                                                                                                         reports. Transfer function in the inkomati
                                                                                  function in the inkomati               function in the inkomati               function in the inkomati                                                                                             satisfaction of the department                                  with regard to the spillage and the
                                          the department
                                                                                                                                                                                                                                                                                                                                                     enforcement protocol is going to be instituted
                                                                                                                                                                                                                                                                                                                                                     in the municipality, the process has already
                                                                                To register 300 monitoring points
                                                                                data collected during the previous                                                                                     Monitoring of the compliance status of the                                    Training of the WPCO"s, monthly water
                                          To maintain and upgrade the current
                                                                                financial year into the WMS              Monthly Water Quality Monitoring   To initiate the setting of the             different water users within the catchment to                                 quality sampling, bi-monthly water quality
      To ensure effective and efficient   water quality monitoring programme                                                                                                                                                                                                                                                                         Monthy water monitoring status compiled.42
67                                                                              through the Winterm connected            Status report compiled. Purchasing interim RQO's for the Olifants and         the objectives set and also to generate an           Stanford Macevele        report for the different management units,                                                                           WMS server not purhased
      use of water                        in both the Olifants and the Inkomati                                                                                                                                                                                                                                                                      monitoring points registerd
                                                                                through RQS. To maintain the             of the WMS software package.       the Inkomati catchment.                    annual report on the state of the rivers with                                 establish Forums, setting the RQO's and
                                          WMA.
                                                                                bimonthly reporting on the water                                                                                       regard to water quality.                                                      water use licensing.
                                                                                quality status in both WMA.
                                          To ensure that the WDCS is                                                     Capturing of the water quality data
                                          implemented within the Upper          To register all the discharge            through the WMS. Continuous                                                                                                                                 Training of the WPCO's on data collection,
                                                                                                                                                                Determination of the interim
                                          Olifants sub-catchment. To ensure     related water use activities (in         communication with the water                                                                                                                                management and use. Setting of the
                                                                                                                                                                RQO's. Collection and collation of     Inputs and finalisation of the WDCS charge        Acting Deputy Director (S                                                                   13 sets of waste dicharge charge forms sent
68    WDCS implementation                 that all the discharge related water  terms of section 21 e,f,g,h of the       users on the implications of the                                                                                                                            RQO's. Maintenance of the water quality
                                                                                                                                                                WDCS data. Progress on the WMS         rate. Progress on the WMS system.                         Macevele)                                                                           to users
                                          use activities are registered and     NWA). Progress on the WMS                WDCS in the Upper Olifants                                                                                                                                  monitoring network. Progress on the WMS
                                                                                                                                                                system.
                                          charges are set and the users start   system.                                  catchment. Progress on the WMS                                                                                                                              system.
                                          paying. Progress on the WMS system                                             system.
                                          To ensure that all the sewage works
                                          in the Olifants and Inkomati WMA    Registering of 14 water quality            Registering of 14 water quality                                                                                                                             Compliance status reports will be
                                          are authorized and to ensure that                                                                                     14 water quality discharge data        14 water quality discharge data captured into     Acting Deputy Director (S
69    Waste discharge standards                                               discharge monitoring programme             discharge monitoring programme                                                                                                                              generated. Recommended actions will be                          442 dicharge quality data captured on WMS
                                          the monthly water quality                                                                                             captured into the WMS                  the WMS                                                   Macevele)
                                                                              for both WMA                               for both WMA                                                                                                                                                forwarded to the Municipalities.
                                          monitoring data from the
                                          dischargers are captured onto the
                                                                                                                                                                                                                                                                                                                                                     A comprehensive report for the following
                                                                                                                                                                Make recommendations to                                                                                                                                                                                                                   Letters of recommendation for the
                                                                                                                                                                                                                                                                                                                                                     sewage treatment works has been compiled ,
      Waste Discharge Charge System       Assess compliance of WWTW in the        Determine the number of WWTW           Assess which WWTW are                  municiplaities on refurbishment                                                             Deputy Director (B       Conduct site inspections, assess which                                                                               sewage treatment works assessed for
70                                                                                                                                                                                                     Enforce compliance                                                                                                                            Waterval Boven, White River, Barberton and
      implementation - three pilot CMAs   region                                  in the region                          complying with standards;              and maintanance issues required                                                                Mahlangu)             WWTW are complying with std                                                                                          compliance to effluent discharge
                                                                                                                                                                                                                                                                                                                                                     Malelane. The report must still be forwarded
                                                                                                                                                                for compliance                                                                                                                                                                                                                            standards must still be compiled
                                                                                                                                                                                                                                                                                                                                                     to the municipality

      PRIORITY PROGRAMME: WATER SECTOR REGULATION

                                                                                                                                                                                                                                                                                                                                                     2 Control Industrial Technician Post and 1
                                                                                                                                                                                                                                                                                                                                                     Assistant Director Post , were advertised and
                                                                                                                                                                                                                                                                                                                                                     the closing date was on the 28 November              2 Economist post are still vacant and
                                                                                                                                                                                                                                                                                                                                                     2008, shortlisting was conducted on the 4            has bot been advertised because there
                                                                                                                                                                                                                                                                                     Compile Job Description, Request for JoB                        December 2008 and Interviews on the 12               is no JE certicate. 1 Legal
                                                                                                                                                                                                                                                                                     Evaluation for Post without JE Certificates,                    December 2008. Appointable candidate were            Administrator post is still vacant and
                                                                                                                                                                                                                                                            Deputy Director (B       Prepare submission for request to advertise                     recommended and HR must prepare a                    has not been advertised because I was
71a                                       Establishment of new unit               Establish unit .                       Establish unit .                       Establish unit .                       Establish unit .
                                                                                                                                                                                                                                                               Mahlangu)             vacant post, conduct shortlisting for                           submission for the Chief Director signature. 2       unable to get a copy of aJE certificate
                                                                                                                                                                                                                                                                                     advertised post, conduct interview and                          Senior Administration Clerk post were also           because there is still some clarity
                                                                                                                                                                                                                                                                                     recommend for appointments                                      advertised and the closing date was the 12           requeired with regards to the reporting
                                                                                                                                                                                                                                                                                                                                                     December 2008, shortlisting and interviews           lines for Legal Administrator still
                                                                                                                                                                                                                                                                                                                                                     will be conducted early January 2009. A Job          waiting for feed back from WOrk Study.
                                                                                                                                                                                                                                                                                                                                                     Description for the 2 Economist Post has been
                                                                                                                                                                                                                                                                                                                                                     compiled and signed by the Senior Manager
                                                                                                                                                                                                                                                                                     Appoint a service provider to assist with
                                                                                                                                                                                                                                                                                     the development of a system to audit                            ToR were finalised and forwarded to PSP for          Review the comments and factor the
                                          Develop a system to Audit                                                                                             Review the comments and factor
                                                                                                                         Consultation process and amend                                                                                                     Deputy Director (B       compliance. Manage the pap to ensure that                       proposals. 1 proposal was received and there         comments into the framework for the
71b                                       compliance of issued water use          Draft a framework for the system                                              the comments into the framework        Final draft for implementation
                                                                                                                         the framework for the system                                                                                                          Mahlangu)             the deliverables are received on time as                        other proposal will be received early in             system. PSP to assist the section has
                                          (abstraction & discharge) licenses                                                                                    for the system
                                                                                                                                                                                                                                                                                     per the project plan. Manage the cash flow                      January 2009.                                        not been appointed.
                                                                                                                                                                                                                                                                                     and expenditure
                                                                                                                                                                                                                                                                                     Audit licenses in terms of of conditions set
                                                                                                                                                                                                                                                                                     in Water Use licenses previously issued.
                                                                                                                                                                                                                                                                                     Compile audit findings report with                              ToR were finalised and forwarded to PSP for
                                          Audit compliance of issued water use                                                                                                                                                                              Deputy Director (B       recommendation and time frames. Where                           proposals. 1 proposal was received and there         No licenses were audited. PSP to assist
71c                                                                            10 licenses audited                       10 licenses audited                    10 licenses audited                    10 licenses audited                                                           there is no positive response on the
                                          (abstraction & discharge) licenses                                                                                                                                                                                   Mahlangu)                                                                             other proposal will be received early in             the section has not been appointed.
                                                                                                                                                                                                                                                                                     recommendation and adherence to the time                        January 2009.
                                                                                                                                                                                                                                                                                     frames, implement section 53 of NWA by
      Compliance, Monitoring and                                                                                                                                                                                                                                                     issuing a directive for non compliance to
      Enforcement                                                                                                                                                                                                                                                                    license conditions and 54investigation for
                                                                                                                                                                                                                                                                                     Schedule inspection and NWAby                                   2 new cases of illegal river diversion were
                                                                                                                                                                                                                                                                                     illegal water use. Compile                                      initiated in the Crocodile River and directives
                                                                                                                                                                                                                                                                                     inspection/investigation report with                            to stop the activities were issued. 1 new case
                                          Initiate actions where transgressions                                                                                                                                                                             Deputy Director (B       recommendations with time frames. Take                          of illegal crosising of a wetland was initiated in
71d                                                                               4 cases initiated                      4 cases initiated                      4 cases initiated                      4 cases initiated
                                          are identified                                                                                                                                                                                                       Mahlangu)             enforcement action where recommendation                         Bronkhrstspruit and a notice of intent to issue
                                                                                                                                                                                                                                                                                     and time frames not adhered to through                          a directive has been issued. A notice of intent
                                                                                                                                                                                                                                                                                     issuing of directives and criminal                              to issue a direction was issued to
                                                                                                                                                                                                                                                                                     prosecution to enforce compliance                               Bushbuckridge Water Board for illegal




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                                    Page 12 of 20                                                                                                                                                                                                          1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                 EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                    BUDGET
                                                                                                                                                     RE



                                                                                Challenge: resignation of Dr Johan Engelbrecht
                                                                                from MTPA who was driving the process on their
                                                                                side.
                                                                                Solution: identify new contact person and establish
                                                                                working relationship




                                                                                Lack of capacity that should be alleviated through
                                                                                appointment of personnel in 4th quarter and
                                                                                through TAC




                                                                                Challenge: Funds




                                                                                Challenge: Funds, physical infrastructure and
                                                                                human resource




                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




                                                                                Challenge: New section which is not funded. Only
                                                                                one person in the structure appointed and 9 vacant
                                                                                posts.
                                                                                Solution: Appoint a PSP through the TAC contact to
                                                                                assist with some of the task whilst fast tracking the
                                                                                recuitment process. Speed up the recruitment
                                                                                process and fill all the vacant post

                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post



                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                    Page 13 of 20                             1/7/2011
      Compliance, Monitoring and
      Enforcement                                                                                       OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                              2nd QUARTER WORKPLAN REPORT


                                                                                                                                MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                                    SUPPORT
             KEY FOCUS AREA OF                                                                                                                                                                                                                    PROJECT MANAGER/                                                              REQUIRED
                                           REGIONAL TARGET 2008/09                                                                                                                                                                                                            KEY ACTIVITIES (WHAT IS PLANNED)                                                      ACHIEVED                                   NOT ACHIEVED
                DIRECTORATE                                                                                                                                                                                                                           CHAMPION                                                                 FROM HEAD
                                                                                                Q1                                   Q2                                    Q3                                         Q4                                                                                                         OFFICE


                                                                                                                                                                                                                                                                             Read through the MoU between DWAF and
                                                                                                                                                                                                                                                                             ESKOM. Arrange for meeting with ESKOM                                ToR were finalised and forwarded to PSP for
                                                                               Develop an audit process with                                                                                                                                                                                                                                                                                        Develop an audit process with ESKOM
                                        Initiate 4 joint audits with ESKOM                                           Develop an audit process with         Develop an audit process with       Develop an audit process with ESKOM for              Deputy Director (B       to plan for the joint audits with ESKOM.                             proposals. 1 proposal was received and there
71e                                                                            ESKOM for mining and industry.                                                                                                                                                                                                                                                                                       for mining and industry. PSP to assist
                                        for the mining and industry sectors                                          ESKOM for mining and industry         ESKOM for mining and industry       mining and industry                                     Mahlangu)             Schedule site visits. Conduct site visits and                        other proposal will be received early in
                                                                               Conduct 1                                                                                                                                                                                                                                                                                                            the section has not been appointed.
                                                                                                                                                                                                                                                                             audits. Write audit report with findings and                         January 2009.
                                                                                                                                                                                                                                                                             recommendations with time frames
                                                                                                                                                                                                                                                                             Prepare PEP document for PSP appointment
                                                                                                                                                                                                                                                                              to assist with setting of a monitoring
                                                                               Set a monitoring framework for        Set a monitoring framework for        Set a monitoring framework for                                                                                    framework for the enforcement of                                     ToR were finalised and forwarded to PSP for
                                        Set a Monitoring framework for                                                                                                                        Set a monitoring framework for the enforce of                                                                                                                                                         Set a monitoring framework for the
                                                                               the enforce of compliance with the    the enforce of compliance with the    the enforce of compliance with the                                                       Deputy Director (B       compliance with the JWC, TPTC,                                       proposals. 1 proposal was received and there
71f                                     compliance with International                                                                                                                         compliance with the JWC, TPTC, IncoMaputo                                                                                                                                                             eenforce of compliance with the JWC,
                                                                               JWC, TPTC, IncoMaputo                 JWC, TPTC, IncoMaputo                 JWC, TPTC, IncoMaputo                                                                       Mahlangu)             IncoMaputo agreements. Attendance and                                other proposal will be received early in
                                        Agreements                                                                                                                                            agreements                                                                                                                                                                                            TPTC, IncoMaputo agreements
                                                                               agreements                            agreements                            agreements                                                                                                        reporting of JWC (joined water commission)                           January 2009.
                                                                                                                                                                                                                                                                             meetings between MP and Swaziland,
                                                                                                                                                                                                                                                                             continuation of support for Driekoppies
                                                                                                                                                                                                                                                                             Conduct site inspection and investigation.
                                                                                                                                                                                                                                                                                                                                                  ToR were finalised and forwarded to PSP for
                                                                                                                                                                                                                                                                             Compile a report on the findings of the
                                        Conduct survey of unlawful use in                                                                                                                                                                           Deputy Director (B                                                                            proposals. 1 proposal was received and there
71g                                                                            unlawful water uses identified        unlawful water uses identified        unlawful water uses identified      unlawful water uses identified                                                investigation,. Prepare enforcement action
                                        the Region                                                                                                                                                                                                     Mahlangu)                                                                                  other proposal will be received early in
                                                                                                                                                                                                                                                                             through directive and criminal prosecution
                                                                                                                                                                                                                                                                                                                                                  January 2009.
                                                                                                                                                                                                                                                                             to stop unlawful water use


      Drinking Water Quality (DWQ) -
72
      SEE ITEM 26


                                                                                                                                                           Make recommendations to
      Waste Water Treatment Works       Assess compliance of WWTW in the       Determine the number of WWTW          Assess which WWTW are                 municipalities on refurbishment                                                                                   Conduct site inspections, assess which
73                                                                                                                                                                                             Enforce compliance                                     Meadow Maseko
      (WWTW) - discharge standards      region                                 in the region                         complying with standards;             and maintenance issues required                                                                                   WWTW are complying with std
                                                                                                                                                           for compliance

      WSA / WSP Contracts - SEE ITEM
74
      28


                                                                                                                                                                                               Function transfer to ICMA for Inkomati WMA,
                                        Transfer of revenue collection
                                                                               Initiate transfer of functions to     Function transfer to CMA, regional                                        DWAF and ICMA to have meeting on this                                                                                                              Invoicing, revenue collection being done on
75a                                     function to ICMA, WRM tariffs                                                                                      Invoicing, revenue collection                                                                Pat Ntabeni          Meetings held between DWAF and ICMA
                                                                               ICMA                                  consultation start                                                        matter for possible interim support to Olifants                                                                                                    continuous basis
                                        determined
                                                                                                                                                                                               from ICMA

      Tariff Regulation                                                                                                                                                                                                                                                                                                                           Follow up on the Loskop Noord case of illegal
                                                                                                                                                                                                                                                                             Establish list of all using water illegally.                         constraction of dam was conducted and notice
                                        All reported cases investigated and                                                                                                                                                                         Deputy Director (B       Follow up on existing cases through                                  to issue a directive was issued. . Follow up on
75b                                                                            Follow-up on existing cases           Follow up on existing cases           Follow-up on existing cases         Addressing new cases
                                        attended to                                                                                                                                                                                                    Mahlangu)             inspections.                                                         the illegal water use and dam construction in
                                                                                                                                                                                                                                                                             Issue follow-up directives                                           the Sterkspuit has been conducted, assistance
                                                                                                                                                                                                                                                                                                                                                  from Legal Services is required for this case

                                                                                                                                                                                                                                                                             Establish list of all using water illegally.
                                        All reported cases investigated and                                                                                                                                                                         Deputy Director (B       Follow up on existing cases through
76    Illegal Water Use                                                        Follow-up on existing cases           Follow up on existing cases           Follow-up on existing cases         Addressing new cases
                                        attended to                                                                                                                                                                                                    Mahlangu)             inspections.
                                                                                                                                                                                                                                                                             Issue follow-up directives

                                        To ensure that all the sewage works                                          2 bi-monthly water quality status     3 bi-monthly water quality status
                                        in the Olifants and Inkomati WMA                                                                                                                       4 bi-monthly water quality status reports shall                                                                                                    3 bi-monthly water quality status reports shall
                                                                                                                     reports shall be compiled.            reports shall be compiled.
                                        are authorised and to ensure that                                                                                                                      be compiled. Continuous capturing of the                                                                                                           be compiled. Continuous capturing of the
                                                                               2 bi-monthly water quality status     Continuous capturing of the water     Continuous capturing of the water                                                     Deputy Director (Stanford
77    Waste Discharge Standards (WQ)    the monthly water quality                                                                                                                              water quality monitoring data onto the WMS                                                                                                         water quality monitoring data onto the WMS
                                                                               reports shall be compiled             quality monitoring data onto the      quality monitoring data onto the                                                             Macevele)
                                        monitoring reports from the                                                                                                                            and compliance monitoring of the water use                                                                                                         and compliance monitoring of the water use
                                                                                                                     WMS and compliance monitoring         WMS and compliance monitoring
                                        discharge are captured onto the                                                                                                                        activities                                                                                                                                         activities
                                                                                                                     of the water use activities           of the water use activities
                                        WMS.
      Finalise Strategy and Model for
78
      Water Sector Regulation

      PRIORITY PROGRAMME: WATER SECURITY

      SUB-PROGRAMME: WATER AVAILABILITY

79    Reconciliation Strategies

                                        Support Current WCDM Project for
                                                                                                                                                                                                                                                 Acting Regional Director(
80    Water Use Efficiency (WC/WDM)     Inkomati and Olifants budgeted by      Support project from HO               Support project from HO               Support project from HO             Support project from HO                                                                                                                            Support project from HO
                                                                                                                                                                                                                                                        Pat Ntabeni)
                                        Water Use Efficiency

                                                                                                                     Collection and capturing of ground    Maintain existing monitoring                                                                                                                                                           Groundwater awareness carried out at two
                                                                                                                     water data from 39 monitoring         stations                                                                                                                                                                               Municipal District Sector Collaboration
                                                                                                                                                                                               Maintain existing monitoring stations
                                                                                                                     stations                              Do a profile assessment of the                                                                                                                                                         metings. Groundwater monitoring data
      Promotion of Sustainable          Maintain and extend monitoring         Maintain and extend monitoring                                                                                  Do a profile assessment of the Komati
                                                                                                                     Extension of ground water             Komati                                                                                                                                                                                 collected and captured on hydstra.
81    management and use of             network and introduce further          network and introduce further                                                                                   Quarterly ground water Monitoring report.                Silo Kheva           Visiting 3-Sector Collaboration forums.
                                                                                                                     monitoring network                    Quarterly ground water                                                                                                                                                                 Maintenance carried out on 58 monitoring
      Groundwater                       qualitative aspects                    qualitative aspects                                                                                             Implementation of Dolomite Management
                                                                                                                     Compilation of the quarterly          monitoring report. Undertake                                                                                                                                                           stations. Three montly monitoring reports
                                                                                                                                                                                               Intervention Plan for Sudwala.
                                                                                                                     Groundwater Monitoring report.        groundwater awareness at Sector                                                                                                                                                        compiles. Technician staff trained on Hydstra.
                                                                                                                     Undertake groundwater awareness       Collaboration Forum i.e..                                                                                                                                                              Seven (7) technical posts advertised. Two (2)
                                                                                                                     at Sector Collaboration Forum i.e..   Nkangala, Ehlanzeni. Gert                                                                                                                                                              staff apointments recommended.
      SUB-PROGRAMME: WATER INFORMATION MANAGEMENT

      Consolidate State of Water        Report on compliance monitoring                                                                                                                                                                          Acting Regional Director
82                                                                             Quarterly reports (ad hoc)            Quarterly reports (ad hoc)            Quarterly reports (ad hoc)          Quarterly reports (ad hoc)                                                                                                                         Quarterly reports (ad hoc)
      Resources and Services Report     and pollution incidents                                                                                                                                                                                        (Pat Ntabeni)

                                                                                                                                                                                                                                                                                                                                                  98% of all data collected due to access
                                                                                                                                                                                                                                                                                                                             Technical            problems and Instrumentation failures. 94%        2% of data not collected due to
                                        100% of gauging stations in relevant
                                                                               100% of data to be collected,         100% of data to be collected,         100% of data to be collected,                                                                                                                                     assistance.                                                            Equipments failure. Construction at
                                        WMAs to be served adequately.                                                                                                                          100% of data to be collected, processed and                                   Collect, process & archive data (Surface                             success in Real Time data acquisition due to
      Improved Information                                                     processed and archived, calibrate     processed and archived, calibrate     processed and archived, calibrate                                                                                                                                 Funding for          equipment failure. Maintenance target (70%        Balule weir abandoned due to flood
                                        Lack of funds will prevent target of                                                                                                                   archived, calibrate 30% of weirs, 100% of           Assistant Director:       water data)
83    Management and Expansion of                                              20% of weirs, start construction of   30% of weirs, 50% completion of       30% of weirs, complete                                                                                                                                            Equipment and        of Stations serviced) has been reached and in     damage. Only 2 calibrations and
                                        expanding network with 5% and                                                                                                                          sites to be maintained, expand Real Time           Hydrology (D. Joubert)     Maintenance of gauging station
      Monitoring Network                                                       Balule weir and expand Real Time      construction of Balule weir and       construction of Balule weir and                                                                                                                                   new gauging          general the Hydrological network is a healthy     surveys completed due to personnel
                                        even the Real Time network will not                                                                                                                    network by 20%                                                                Construction of Balule weir
                                                                               network by 10%                        expand Real Time network by 15%       expand Real Time network by 20%                                                                                                                                   weirs (Olifants at                                                     shortage. Real Time Network not
                                        expand due to resource problems                                                                                                                                                                                                                                                                           state. 72% of data processed within 1-month
                                                                                                                                                                                                                                                                                                                             Liverpool)           after collection but 96% processed and            expanded due to lack of funds.
                                                                                                                                                                                                                                                                                                                                                  archived within 3-months (international
      Establish National Information
84                                      refer to OSS/RIC
      Centre for Water and Forestry

      PRIORITY PROGRAMME: AFRICA INITIATIVE AND PARTICIPATION


                                                                                                                                                                                                                                                                                                                                                  Komati Joint Operations Forum meeting hed
                                                                                                                                                                                                                                                                                                                                                  on 2008/12/18 - Planning for next 2 months'
                                                                              Attendance and reporting of JWC
                                        Regional participation in activities                                                                                                                                                                                                 Attend JWC meeting on 19/03/2008                                     allocation done and to be forwarded to JWC
                                                                              (joined water commission)              Attendance and reporting of JWC       Attendance and reporting of JWC     Attendance and reporting of JWC meetings,         Acting Regional Director
                                        involving Easter Boundary States i.e.                                                                                                                                                                                                Investigate lack of abstraction measures                             for approval                                      No JWC and / or TPTC meetings held
85                                                                            meetings between MP and                meetings, continuation of support     meetings, continuation of support   continuation of support for Driekoppies Dam         (Pat Ntabeni and Mr
                                        Mozambique and Swaziland e.g. JWC                                                                                                                                                                                                    between Tonga and Malanga in Lower                                                                                     due to unavailability of members
                                                                              Swaziland, continuation of             for Driekoppies Dam RAP               for Driekoppies Dam RAP             RAP                                                 Johan van Aswegen)
                                        and TPTC.                                                                                                                                                                                                                            Komati                                                               RAP II Management Committee meeting held
                                                                              support for Driekoppies Dam RAP
                                                                                                                                                                                                                                                                                                                                                  on 2008/10/29 - assisting the re-allocated
                                                                                                                                                                                                                                                                                                                                                  people to become self sustained

      SADC




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                            Page 14 of 20                                                                                                                                                                                                           1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                   BUDGET
                                                                                                                                                    RE



                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post

                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post

                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




                                                                                New section which is not funded. Only one person
                                                                                in the structure appointed and 9 vacant posts. As
                                                                                part of solutions is to appoit a PSP through the TAC
                                                                                contact to assist with some of the task whilst fast
                                                                                tracking the recuitment process. Speed up the
                                                                                recruitment process and fill all the vacant post




                                                                                Difficult to retain geotechnical skills. Inadequate
                                                                                funds.




                                                                                Challenge: Filling of vacant posts to improve on
                                                                                none-compliance and support better service in
                                                                                calibration and Real Time Data.
                                                                                Solution: Additional funds to be obtained to expand
                                                                                real Time Network and Construction of Liverpool
                                                                                weir.




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                     Page 15 of 20                           1/7/2011
                                                                                                       OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                                                                     2nd QUARTER WORKPLAN REPORT


                                                                                                                                 MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                                                         SUPPORT
             KEY FOCUS AREA OF                                                                                                                                                                                                           PROJECT MANAGER/                                                             REQUIRED
                                           REGIONAL TARGET 2008/09                                                                                                                                                                                                   KEY ACTIVITIES (WHAT IS PLANNED)                                                     ACHIEVED                                   NOT ACHIEVED
                DIRECTORATE                                                                                                                                                                                                                  CHAMPION                                                                FROM HEAD
                                                                                               Q1                                    Q2                                 Q3                                        Q4                                                                                                   OFFICE

      SADC
                                                                                                                                                                                                                                                                                                                                        Two (2) Water Restrictions and Low River Flow
                                                                                                                                                                                                                                                                                                                                        Management Committee (WR LRF MC)
                                                                                                                                                                                                                                                                                                                                        meetings held on 2008/11/05 and
                                                                                                                                                                                                                                                                                                                                        2008/12/09. The purpose of these meetings
                                        Ensuring that cross border flow                                                                                                                                                                  Acting Regional Director                                                                       is to effectively manage the available water
86                                      requirements are met through joint      Continuous                          Continuous                         Continuous                         Continuous                                       (Pat Ntabeni and Mr                                                                          and to ensure its fairly distributed
                                        water forums                                                                                                                                                                                       Johan van Aswegen)
                                                                                                                                                                                                                                                                                                                                        Crocodile River Forum meeting held on
                                                                                                                                                                                                                                                                                                                                        2008/11/21 - the purpose of this meeting is
                                                                                                                                                                                                                                                                                                                                        to ensure fair distribution of water both
                                                                                                                                                                                                                                                                                                                                        Nationally and Internationally is taking place
      PRIORITY PROGRAMME: WATER SECTOR ADVOCACY PROGRAMMES

                                                                                Three Municipalities:
87    Water Week                        3 Municipalities                                                            n/a                                n/a                                n/a                                               Hasani Makhubela                                                                            n/a
                                                                                Bushbuckridge, Mkhondo, Delmas


                                                                                Three municipalities: Albert
88    Sanitation Week                   3 Municipalities                                                            n/a                                n/a                                n/a                                                   Onednico                                                                                n/a
                                                                                Luthuli, Nkomazi, Dr J S Moroka


89    Arbor Week                        N/A Forestry                                                                                                                                                                                           n/a Forestry                                                                             n/a


                                                                                                                                                                                                                                                                                                                                        Engaged a team of 8 learners to represent the
                                                                                                                                                       Attend National workshops in                                                                                                                                                     Region in the National Workshop - learners
90    World Water Monitoring Day                                                                                    Plan                                                                                                                    Hasani Makhubela
                                                                                                                                                       October                                                                                                                                                                          taken to various municipalities to learn about
                                                                                                                                                                                                                                                                                                                                        infrastructure and maintenance thereof

                                        Create awareness on Invasive Alien
                                        Plans in Mpumalanga Region. Target
                                        audience are schools, Private                                               from the 6-9 October mobilizing
                                        Landowners, Local communities,                                              the event at toll gates, border
                                                                                planning meeting for weedbuster
                                        Municipalities, Border Gates -                                              gates, schools and the public
                                                                                week with relevant stakeholders,                                      Respond to request from different                                                                             co-ordination of weedbuster planner
                                        Swaziland (Oeshoek, Matsamo,                                                areas. The main event was held on                                                                                                                                                              Resource
91    Weed Buster Week                                                          e.g MTPA and conduct workshops                                        schools that requested material     Continuous awareness                              Ronald Nenungwi         meeting, Briefing sections on the control of
                                        Mananga) and Mozambique and also                                            10th October and it was well                                                                                                                                                                   materials
                                                                                to Municipalities. Planning for                                       during weed buster week                                                                                       IAP legislation (CARA)
                                        target Toll Gates( Middleburg                                               attended by Bushbuckridge local
                                                                                media coverage
                                        ,Mashado, Malelane). The main                                               communities and schools and
                                        function will be at Bushbuckridge                                           other stakeholder.
                                        Municipality. The week will be
                                        celebrated on 6-12 October 2008.
                                        DWAF provides presentation to DALA Presentation updated, completed                                                                                                                                Assistant Director:
92    Environmental Week                                                                                            Complete                           Complete                           Complete                                                                                                                                      completed in 1st quarter
                                        during celebrations                and presented                                                                                                                                                 SFRA/SEA (T. Hopkins)

                                                                                                                                                                                                                                                                                                                                        5 schools mentored prior to the competition;
      20/20 Vision for water and        Work with all 3 DMs
93                                                                              152 schools                         129 schools                        516 Schools                        516 Schools                                       Hasani Makhubela        Mentorship of 5 schools to go to National                           5 schools participated in the Nationals - MP
      sanitation education programme:   500 Primary schools targeted
                                                                                                                                                                                                                                                                                                                                        won in one of the 5 categories


                                                                                                                                                       134 Entry Forms received from                                                                                School mobilization and participation in       Strategic issues     updating of database according to 134 entry
93a Baswa le Meetse                     129 Primary Schools                                                                                                                                                                                 Hasani Makhubela
                                                                                                                                                       schools                                                                                                      competitions                                   and guidance         forms received from the schools


                                                                                                                                                                                                                                                                    School mobilization and participation in       Strategic issues
93b South African Youth Water Prize     129 Primary Schools                                                                                            No of entry forms received                                                           Hasani Makhubela                                                                            No entry forms received from schools
                                                                                                                                                                                                                                                                    competitions                                   and guidance

                                        Conduct 4 career promotion
                                                                                                                                                                                                                                                                    Conducting Career exhibition in all the 3      Strategic issues     1 career exhibition held in Gert Sibande DM      Career exhibition not done in
93c Water Sector Career Promotion       exhibitions in 3 DMs plus                                                   1 in EDM                           2 Career Promotions                1 Career Promotion                                Hasani Makhubela
                                                                                                                                                                                                                                                                    districts                                      and guidance         (Nelspruit)                                      Bushbuckridge - will be doing in Q4
                                        Bushbuckridge LM
                                                                                                                                                                                                                                                                                                                                        Implementation of intervention projects
                                                                                                                                                       134 Entry Forms received from                                                                                Identifying and implementing intervention      Strategic issues     (rainwater harvesting) in Delmas,
93d Curriculum Support                  129 Primary Schools                                                                                                                                                                                 Hasani Makhubela
                                                                                                                                                       schools                                                                                                      projects in 10 schools                         and guidance         Bushbuckridge and Mkhondo - total of 134
                                                                                                                                                                                                                                                                                                                                        entry forms from schools
      Celebration of special                                                                                                                           National Wetlands Indaba 2008                                                                                                                                                    NWI2008 organised. Attended by 216
93e                                     129 Primary Schools                                                                                                                               World Wetland day: February 2009                       AD: SEA
      environment days                                                                                                                                 (28-31 October 2008)                                                                                                                                                             delegates.

      PRIORITY PROGRAMME: INSTITUTIONAL DEVELOPMENT AND PERFORMANCE

      Sector collaboration and
94                                                                                                                                                                                                                                                 RPC
      Intergovernmental Relations


95    Sustainability pillars:



95a Gender Mainstreaming                Roll out Provincial Strategy to 18 LMs 0 (Awaiting Budget)                  5 LMs                              7 LMS                              6 LMs                                           Vuyelwa/Andries Zulu


                                        Implementation of VIP Toilets.
                                                                                                                                                                                                                                                                                                                                        Application of Appropriate Technology
95b Appropriate Technology              Promoting Rain water harvesting.                                                                                                                                                                       Johan Jooste
                                                                                                                                                                                                                                                                                                                                        examined in 10 BPs for Sanitation
                                        Preventing ground water pollution

                                                                                1. Social Mobilization,
                                        Establishment of CBO's at Nkomazi &
                                                                                Communication, Data Collection &
                                        Bushbuckridge Municipalities to                                             1. Training of CBO's. 2.                                                                                                                        1. Development of an Implementation Plan.                           Nkomazi LM: 5 PSPs appointed for Civil
                                                                                Cleansing.3. Establishment of CBO                                      Ongoing Facilitation, monitoring
95c Civil Society                       improve water supply and to enable                                          Institutionalization of CBO's.                                        Ongoing Facilitation, Monitoring and Support         Andries Zulu         2. Identify & Appoint CBO's. 3. Liaison with                        Society for data collection, establishment of
                                                                                2. Establish linkages with the                                         and Support
                                        the Municipalities to play their part                                       Operations and Maintenance.                                                                                                                     Water for All PMU. 2.Establish CBO's.                               steering committees, etc.
                                                                                Provincial Water for All Flagship
                                        in WC/ WDM
                                                                                Projects.


                                                                                                                                                                                                                                                                                                                                                                                         Pilot not done in 2 LMs (Albert Luthuli
95d HIV Aids                            Pilot to 5 LMs                          0                                   Pilot to 2 LMs                     Pilot to 2 LMs                     Pilot to 1 LM                                        Andries Zulu
                                                                                                                                                                                                                                                                                                                                                                                         and Dr JS Moroka)

                                        Hosting of National Wetlands Indaba
                                                                                                                                                                                                                                                                                                                                        NWI2008 organised. Attended by 216
95e Environmental Management            2008 through Mpumalanga Wetland         Plan for National Wetland Indaba    Plan for National Wetland Indaba   National Wetland Indaba            Complete
                                                                                                                                                                                                                                                                                                                                        delegates.
                                        Forum.

      PRIORITY PROGRAMME: JOB CREATION AND SKILLS DEVELOPMENT

                                        Create as many jobs as possible
96    Water (No of Jobs Created)        where water is being provided to        24                                  36                                 48                                 15                                                  Ernest Kubayi                                                                             17 jobs created in Hoxani Bulk Project
                                        schools

97    Through Refurbishment Program     Create as many jobs as possible         n/a                                 100                                100                                100                                                Richard Mbambo

                                        Create jobs where sanitation is being                                                                                                                                                                                                                                                           108 Jobs created through school sanitation
98    Sanitation (No of Jobs Created)                                         28                                    32                                 56                                 20                                                  Ernest Kubayi
                                        provided at schools                                                                                                                                                                                                                                                                             program


99    Working for Water


                                                                                                                                                                                                                                                                                                                   legal intervention
                                                                                                                                                                                                                                         Deputy Director-Ronald
100 No of Person Days                   68 697                                  43 567                              59 585                             48 738                                                                                                                                                      of the court order   48 738 persond days achieved
                                                                                                                                                                                                                                               Nenungwi
                                                                                                                                                                                                                                                                                                                   with WFW




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                                        Page 16 of 20                                                                                                                                                                                                     1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                                EXPENDITU
                                                                                     CHALLENGES & POSSIBLE SOLUTIONS                 BUDGET
                                                                                                                                                    RE




                                                                                                                                      R60 000




                                                                                Challenge: Low response from schools due to
                                                                                various depts running many programmes
                                                                                Solution: Promotional materials




                                                                                Challenge: Insufficient human resource capacity in
                                                                                the region.
                                                                                Solution: Post advertised and candidates short
                                                                                listed

                                                                                Challenge: Insufficient funding




                                                                                Challenge: Budget for PSPs too limited to cover
                                                                                scope of work
                                                                                Solution: Still to be sorted out



                                                                                Challenge: No budget at all
                                                                                Solution: Get involved in Municipalities where HIV
                                                                                is being promoted




                                                                                                                                        R 48M




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                   Page 17 of 20                             1/7/2011
                                                                                                   OPERATIONAL PLAN 2nd Quarter Report 30 09 2008                                                                                                                                                                         2nd QUARTER WORKPLAN REPORT


                                                                                                                       MEASURABLE REGIONAL TARGET OR OUTPUT 2008/09                                                                                                         SUPPORT
           KEY FOCUS AREA OF                                                                                                                                                                     PROJECT MANAGER/                                                           REQUIRED
                                        REGIONAL TARGET 2008/09                                                                                                                                                            KEY ACTIVITIES (WHAT IS PLANNED)                                                    ACHIEVED                     NOT ACHIEVED
              DIRECTORATE                                                                                                                                                                            CHAMPION                                                              FROM HEAD
                                                                                              Q1                              Q2                           Q3                               Q4                                                                               OFFICE


                                                                                                                                                                                                                                                                         legal intervention
                                                                                                                                                                                                 Deputy Director-Ronald
101 No of Jobs Created               1 300                                  1 300                           1 300                        1 300                                                                                                                           of the court order   1 300 Created
                                                                                                                                                                                                       Nenungwi
                                                                                                                                                                                                                                                                         with WFW
                                                                                                                                                                                                                                                                         Negotiation of
                                                                                                                                                                                                                          To train all new beneficiaries on how to
                                                                                                                                                                                                                                                                         funds with
                                                                                                                                                                                                 Deputy Director-Ronald   eradicate Alien Invasive Species. Training
102 No of People Trained             6993                                   952                             1768                         2596                         194                                                                                                Department of        2596 Trained
                                                                                                                                                                                                       Nenungwi           to be done are wfw induction, herbicide,
                                                                                                                                                                                                                                                                         Labour, Training
                                                                                                                                                                                                                          Health and Safety and First Aid
                                                                                                                                                                                                                                                                         done on
                                     8 Aerial sprays of Crocodile River
                                                                                                                                                                                                 Deputy Director-Ronald   1 Aerial spray of Crocodile River (East) and
103 Aquatic Weeds Project            (East) from Nelspruit to Komatipoort   2 Aerial sprays                 1 Aerial sprays              3 Aerial sprays              4 Aerial sprays                                                                                    None                 3 Aerial sprays done
                                                                                                                                                                                                       Nenungwi           Engelhard dam (KNP)
                                     and Engelhard dam (KNP)




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                                                                                                  Page 18 of 20                                                                                                                                                             1/7/2011
                                                  2nd QUARTER WORKPLAN REPORT




                                                                                                                                 EXPENDITU
                                                                                CHALLENGES & POSSIBLE SOLUTIONS      BUDGET
                                                                                                                                     RE




                                                                                                                     R 721,611




OPERATIONAL WORKPLAN REPORTING TOOL 2008/09 v02                                                      Page 19 of 20                           1/7/2011
                                     REGION: MPUMALANGA
                                                   EMPLOYMENT EQUITY
                                  SET TARGET             ACHIEVED NOT
                                                                               CHALLENGES
Occupational Categories           (EE PLAN)               TARGETS ACHIEVED
                                                                               Interveiws not finalised. 3 candidates
                                  African Male
Director Water Services Support                                                have to attend the interveiw. Date to
                                  African female
                                                                               be scheduled
Director Water Services sector    African Male /                               Interveiws finalised, competency
regulations & use                 African female                               assessment to be finalised
                                  African Male
DD planning (2 posts)                                             Not achieved No suitable candidates, headhunting
                                  African female
                                  African Male
DD: RPL                                                                        Shortlisting not yet done
                                  African female
DD : WOM                                                                       To be advertised
DD: Financial Management                                                       To be advertised

								