					                                         REPLIES TO THE QUERIES RAISED BY M/S FLOWMORE PVT., LTD., HYD FOR PRE-BID MEETING HELD
                                                                              ON 23.10.2007.
                                                                         UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                                     TENDER NOTICE NUMBER : 3SE/2007-08, DT; 29.08.2007
           NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.70 TMC of water from + 214.000m to +300.000m,
         from fore shore of Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahmanavellemula (village), Narkatpally (Mandal), Nalgonda
                                                                               (District).
          Sl.    Volume / Page No. Clause                    Query                                                    Replies
           No       Part     / ItemNo.   No.

             1                                                    The Pump efficiency should be           The Pump efficiency should be greater than 94% and Motor efficiency should be greater
                                                                  atleast 88% & Motor Efficiency          than 97% and the combined efficiency should be greater than 91%.
                                                                  atleast 95%



             2                                                    Instead of two pumps for a total flow   This proposal of bidder is not acceptable.
                                                                  of 920 cusecs, the specifications
                                                                  may be amended to three pumps at
                                                                  each pump capacity of 306.60
                                                                  cusecs.
             3                                                    Bidder or Joint venture partneror sub- Refer Notice Inviting Tender Sl.No.27 (Eligibility criteria), B. Technical Requirements
                                                                  vendor should have design office for Clause 7.
                                                                  pumps.                                   7. Bidder should have capacity for design office backup and field backup having
                                                                                                         experience on structural and hydraulic design for pumps, pump houses and pipe line and
                                                                                                         transient analysis, structural and hydraulic design for Spillway, Earth dam, canal net work
                                                                                                         and CM/CD Structures or should have MOU with such firm of experience.

             4                                                    Please also confirm whether             Refer Notice Inviting Tender Sl.No.27 (Eligibility criteria), A. General Requirement
                                                                  local manufacturer can have             Clause 2.
                                                                  consortium with overseas
                                                                  manufacturer and then enter into        2. In case of joint venture, the lead partner should have a valid registration with the
                                                                                                          Government of Andhra Pradesh in terms of Government Orders cited There in and the
                                                                  JV with two other partners in
                                                                                                          total members in the joint venture should not be more than three i.e., 1 + 2. As far as JVs
                                                                  India.                                  are concerned, all the partners must be registered with the Government of A.P or should
                                                                                                          have applied for registration in terms of the GOs mentioned There in as on the date of
                                                                                                          submission of bids. Evidence of their making application with the Government will be
                                                                                                          sufficient to make them eligible for participation.




                                                                                                                                            Chief Engineer
                                                                                                                                        NSRSS Project, Hyderabad.



D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                           1
                        REPLIES TO THE QUERIES RAISED BY M/S PATEL ENGINEERING LTD., HYD FOR PRE-BID MEETING HELD ON 23.10.2007.

                                                                               UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                                           TENDER NOTICE NUMBER : 3SE/2007-08, DT; 29.08.2007
           NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.70 TMC of water from + 214.000m to +300.000m, from fore
             shore of Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahmanavellemula (village), Narkatpally (Mandal), Nalgonda (District).


        Sl_No Volume /                 Page No.           Clause                  Query                                                                Replies
                Part                   / ItemNo.            No.


            1           VOL.I                              11 & 16 Please note that taxes and           Clause No.11.3 & 11.6 of Instructions to Bidders of Volume.I, Clause No.45 of General
                                                                   duties one week before the date      conditions of Contract of Volme.I hold good.
                                                                   of submission of the bid shall be    11.3: The rates and prices quoted by the Bidder are not subject to adjustment during the
                                                                   included in the price. Any           performance of the Contract for taxes, duties and any other levies.
                                                                   change in tax rate or inclusion to   11.6 : All duties, taxes, and other levies payable by the contractor as per State / Central Government
                                                                   any new tax/duty after this date     rules, shall be included in the contract value quoted by the bidder.
                                                                   shall be to purchaser's account.     45. Taxes included in the bid
                                                                                                        45.1: The Bid price quoted by the contractor shall be deemed to be inclusive of the sales tax and
                                                                                                        other taxes on all materials that the contractor will have to purchase for performance of this contract.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                              2
        Sl_No Volume /                 Page No.           Clause                 Query                                                             Replies
                Part                   / ItemNo.            No.

            2                                                       Payment terms for E & M package      (1) Payment terms of Electro-mechanical equipment and 220KV line and 220KV Sub-
                                                                   are not specified. Same may please    station equipment and works shall be as follows :
                                                                   included in line with payment terms   A) For Supply :
                                                                          agreed for Kalwakurthy
                                                                                                         i) 70% of the quoted price for supply of goods (FOR Price including all taxes and duties)
                                                                        LIS St.-I&II and Nettempad
                                                                                 St.-I and II.
                                                                                                         shall be paid on receipt of goods at site based on certificate prepared by Stores authorities
                                                                                                         and supplier’s representative, on the basis of various items received in accordance with
                                                                                                         the Contract Agreement.
                                                                                                         ii) 20% of quoted price shall be paid on erection of equipment on pro-rata contract value
                                                                                                         of the work completed as per the agreed construction schedule and on certification by the
                                                                                                         Engineer-in-charge and the supplier’s representative.
                                                                                                         iii ) 5% of the quoted price shall be paid on successful testing and commissioning of
                                                                                                         each equipment as progressive payment against interim payment certificate
                                                                                                         prepared on the basis of various items supplied, erected, tested and commissioned in
                                                                                                         accordance with the Contract Agreement.
                                                                                                         iv) Final 5% of the quoted price for supply of material shall be paid on expiry of
                                                                                                         guarantee period.

                                                                                                         B) For erection , testing and commissioning
                                                                                                         i) 50% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                         completion of erection of equipment based on certificate prepared by Engineer-in-charge
                                                                                                         and supplier’s representative, on the basis of various items erected in accordance with the
                                                                                                         Contract Agreement.
                                                                                                         ii) 40% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                         completion of testing and commissioning of equipment based on certificate prepared by
                                                                                                         Engineer-in-charge and supplier’s representative, on the basis of various items erected in
                                                                                                         accordance with the Contract Agreement.
                                                                                                          iii) 5% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                         completion of testing and commissioning of each unit based on certificate prepared by
                                                                                                         Engineer-in-charge and supplier’s representative, in accordance with the Contract
                                                                                                         Agreement.
                                                                                                          iv) Final 5% of the quoted price for erection, testing and commissioning shall be paid on
                                                                                                         expiry of guarantee period.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                               3
        Sl_No Volume /                 Page No.           Clause                    Query                                                                   Replies
                Part                   / ItemNo.            No.

                                                                      Payment terms for E & M package       (2) Payment terms of Hydro-mechanical equipment for Pipe work covered in Clause 42 of
                                                                      are not specified. Same may please    Volume.I is modified as follows. Please see amendments issued.
                                                                      included in line with payment terms   Payment schedule for Pipe work :
                                                                      agreed for Kalwakurthy
                                                                                                            a) For Manufacture of Pipes in all aspects 70% of the Running Meter (RMT) will be paid.
                                                                      LIS St.-I&II and Nettempad
                                                                      St.-I and II.
                                                                                                            b) 20% will be paid after pipes are laid in the trenches and coating, jointing and joint
                                                                                                            testing is carried out.
                                                                                                            c) 5% will be paid after successful functioning of total unit.
                                                                                                            d) Balance 5% will be paid after expiry of guarantee period.
            3                                                           Similarly the prices of material    As per Clause 46 of Volume-I of Tender Schedules for EPC of the subject work hold good.
                                                                          like iron & steel, Copper,        46. Price Adjustment :
                                                                        Aluminum shall be subject to        46.1. No Price adjustment on wages will be paid. The Bidder has to quote the bid taking into
                                                                                                            account of any variation in rates and wages during the period of execution i.e., from the date of
                                                                          price variation as per the
                                                                                                            quoting the rates to the end of completion of work in all respects.
                                                                       formulae to be submitted in the      46.2 However, in respect of cement and steel price adjustment will be made for the actual quantity
                                                                                       bid.                 used in the work if the prices increase/decrease by more than 5% over prevailing market rates of
                                                                                                            Rs.4300 per M.T for cement. and Rs.30,850 per M.T for Steel reinforcement respectively. For the
                                                                                                            purpose of assessing the increase / decrease in prices, the actual market price of cement and steel,
                                                                                                            communicated by the Engineer-in-Chief, Admn.Wing, I&CAD Dept., will be adopted.


                                                                                                            46.3 Price Adjustment in respect of fuel the rates prevailing in the nearest fuel station / stations to
                                                                                                            work spot on the last day of filing the bids will be adopted as base rates and any increase/decrease
                                                                                                            of more than 5% over prevailing base rates will be in accordance with the following formula.

                                                                                                            VF= 0.85 X PF /100 X RI X (FI-FO)/FO         Where
                                                                                                            RI = Value of work done during the quarter
                                                                                                              VF = Increase or decrease in the cost of work during the quarter under consideration due to
                                                                                                            change in rates for fuels and lubricants.
                                                                                                            PF = % of fuel and lubricants of the work
                                                                                                             (The component of PF will be assessed and decided by a committee constituted by the
                                                                                                            Government),
                                                                                                            FO = Average official retail price of HSD at the existing consumer’s pumps of IOC/IBP/HP/Reliance
                                                                                                            nearest to the work spot on the last day of filling bids.
                                                                                                            FI = Average official retails price of HSD at the existing consumer’s pumps of IOC/IBP/HP/Reliance
                                                                                                            nearest to the work spot on the 15th day of middle calendar month of the quarter under
                                                                                                            consideration.


            4       GENERAL                  …                    …   As the submission time is very short, Accepted
                                                                      we request you to kindly extend the
                                                                      date of submission for at least one
                                                                      month i.e., up to 12.12.2007.



                                                                                                                                                    Chief Engineer
                                                                                                                                                NSRSS Project, Hyderabad.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                  4
                                REPLIES TO THE QUERIES RAISED BY M/S MAYTAS INFRA LTD., HYDERABAD FOR PRE-BID MEETING HELD
                                                                       ON 23.10.2007.
                                                                                      UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                                                    TENDER NOTICE NUMBER : 3SE/2007-08, DT; 29.08.2007
          NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.70 TMC of water from + 214.000m to +300.000m,
            from fore shore of Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahmanavellemula (village), Narkatpally (Mandal),
                                                                        Nalgonda (District).

         Sl_No               Volume / Part                         Page No. /        Clause                         Query                                                Replies
                                                                    ItemNo.            No.

              1              Vol-II of Part.II                    14 / 16.80 VIII    1.1.2.13 In the Bid document it is recommended that v/vo     Follow the I.S Codes Specifications of
                                 Canals                                                       value for Lined canals shall be between 0.90 to     IS : 10430-2000. (Reaffirmed 2004) Edition 2.1
                                                                                              1.10. No such thing is recommended in IS 10430-     (2005-08)
                                                                                              2000. It is requested that this clause may be           As per clause 8.8.4, the critical velocity ratio
                                                                                              modified as "Design of Lined canal sections shall   should be aimed at higher than unity or by any
                                                                                              be as per relevant I.S code".                       other method, it should be ensured that silting
                                                                                                                                                  will not take place in the lined canal.

              2                                                                               Similarly, Canal losses for lined sections shall be 1.85cumes/million sq.meters or as per the
                                                                                              10% and for unlined sections it shall be 25%. It is permeability observed on different classifications
                                                                                              requested that this may be modified as "Losses of soils along the reach whichever is higher.
                                                                                              for lined and unlined sections can be adopted as
                                                                                              per relevant I.S codes or equivalent thereto".




                                                                                                                                                                 Chief Engineer
                                                                                                                                                             NSRSS Project, Hyderabad.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                    5
                                                 REPLIES TO THE QUERIES RAISED BY M/S KIRLOSKER BROTHERS LTD., PUNE FOR PRE-BID MEETING HELD
                                                                                          ON 23.10.2007.
                                                                                       UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                 REPLIES TO THE QUERIES RAISED BY M/S KIRLOSKER BROTHERS LTD., PUNE FOR PRE-BID MEETING HELD
                                                                                          ON 23.10.2007.
                                                                                       UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                                                    TENDER NOTICE NUMBER : 3SE/2007-08, DT; 29.08.2007
            NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.70 TMC of water from + 214.000m to +300.000m, from fore shore of
                     Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahmanavellemula (village), Narkatpally (Mandal), Nalgonda (District).

Sl.              Volume / Part                         Page No. /      Clause                       Query                                                                Replies
 No                                                     ItemNo.          No.
 1                 Part-I                               Section -1      1.3     We recommend the Pump to be Metallic             The Pump shall be of Vertical Shaft Single stage Francis Turbine Pump suitable for
               E&M Equipment                            Page No.4               Volute Pump which is having more                 direct coupling to Motor of 12 MW with 10% overload Rating.
                                                                                advantages that Francis Turbine Pump.            (As per Section-I Clause 1.3 of Page 4 of Volume-II Part.I E&M equipment).
                                                                                Separate note with covering letter on Metallic
                                                                                Volute Pumps are enclosed.
 2                      VOL-I                              87/233        42     Payment terms for Electro-mechanical &
                        GCC                                                     Hydro-Mechanical have not been given.
                                                                                Please provide.
                                                                                Further we propose the following terms of
                                                                                payment :
                                                                                   1) 80% of the quoted price shall be paid
                                                                                against proofof dispatch documents and issue The proposal of the Bidder is not acceptable.
                                                                                of Material Dispatch Clearance Certificate
                                                                                (MDCC).
                                                                                   2) 10% of the quoted price shall be paid on
                                                                                receipt of material at site and certification from
                                                                                Site Engineer.
                                                                                   3) 5% of quoted price shall be paid on
                                                                                erection of equipment.
                                                                                   4) 5% of quoted price shall be paid on
                                                                                successful testing and commissioning of each (1) Payment terms of Electro-mechanical equipment and 220KV line and 220KV Sub-
                                                                                equipment.                                         station equipment and works shall be as follows :
                                                                                                                                   A) For Supply :
                                                                                                                                   i) 70% of the quoted price for supply of goods (FOR Price including all taxes and
                                                                                                                                   duties) shall be paid on receipt of goods at site based on certificate prepared by
                                                                                                                                   Stores authorities and supplier’s representative, on the basis of various items
                                                                                                                                   received in accordance with the Contract Agreement.
                                                                                                                                   ii)    20% of quoted price shall be paid on erection of equipment on pro-rata contract
                                                                                                                                   value of the work completed as per the agreed construction schedule and on
                                                                                                                                   certification by the Engineer-in-charge and the supplier’s representative.




     D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                     6
Sl.           Volume / Part                         Page No. /      Clause                        Query                                                                   Replies
 No                                                  ItemNo.          No.
                                                                                                                                  iii ) 5% of the quoted price shall be paid on successful testing and commissioning
                                                                                                                                  of each equipment as progressive payment against interim payment
                                                                                                                                  certificate prepared on the basis of various items supplied, erected, tested and
                                                                                                                                  commissioned in accordance with the Contract Agreement.
                                                                                                                                  iv) Final 5% of the quoted price for supply of material
                                                                                                                                  shall be paid on expiry of guarantee period.



                                                                                Payment terms for Electro-mechanical &            B) For erection , testing and commissioning
                                                                                Hydro-Mechanical have not been given.             i) 50% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                             Please provide.                      completion of erection of equipment based on certificate prepared by Engineer-in-
                                                                               Further we propose the following terms of          charge and supplier’s representative, on the basis of various items erected in
                                                                                                 payment :                        accordance with the Contract Agreement.
                                                                                 1) 80% of the quoted price shall be paid         ii) 40% of the quoted price for erection, testing and commissioning shall be paid after
                                                                             against proofof dispatch documents and issue         completion of testing and commissioning of equipment based on certificate prepared
                                                                               of Material Dispatch Clearance Certificate         by Engineer-in-charge and supplier’s representative, on the basis of various items
                                                                                                 (MDCC).                          erected in accordance with the Contract Agreement.
                                                                                2) 10% of the quoted price shall be paid on        iii) 5% of the quoted price for erection, testing and commissioning shall be paid after
                                                                             receipt of material at site and certification from   completion of testing and commissioning of each unit based on certificate prepared
                                                                                              Site Engineer.                      by Engineer-in-charge and supplier’s representative, in accordance with the Contract
                                                                                   3) 5% of quoted price shall be paid on         Agreement.
                                                                                         erection of equipment.                    iv) Final 5% of the quoted price for erection, testing and commissioning shall be paid
                                                                                   4) 5% of quoted price shall be paid on         on expiry of guarantee period.
                                                                             successful testing and commissioning of each
                                                                                                equipment.                        (2) Payment terms of Hydro-mechanical equipment for Pipe work covered in Clause
                                                                                                                                  42 of Volume.I is modified as follows. Please see amendments issued.
                                                                                                                                  Payment schedule for Pipe work :
                                                                                                                                  a) For Manufacture of Pipes in all aspects 70% of the Running Meter (RMT) will be
                                                                                                                                  paid.
                                                                                                                                  b) 20% will be paid after pipes are laid in the trenches and coating, jointing and joint
                                                                                                                                  testing is carried out.
                                                                                                                                  c) 5% will be paid after successful functioning of total unit.
                                                                                                                                  d) Balance 5% will be paid after expiry of guarantee period.




  D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                       7
Sl.              Volume / Part                         Page No. /      Clause                        Query                                                                   Replies
 No                                                     ItemNo.          No.
 3                      VOL-I                              91/233            46 Please provide price variation clause based      As per Clause 46 of Volume-I of Tender Schedules for EPC of the subject work hold good.
                        GCC                                                     on IPMA, IEEMA and Foreign currency
                                                                                variation indices for electromechanical items.   46. Price Adjustment
                                                                                                                                 46.1. No Price adjustment on wages will be paid. The Bidder has to quote the bid taking into
                                                                                                                                 account of any variation in rates and wages during the period of execution i.e., from the date of
                                                                                                                                 quoting the rates to the end of completion of work in all respects.
                                                                                                                                 46.2 However, in respect of cement and steel price adjustment will be made for the actual
                                                                                                                                 quantity used in the work if the prices increase/decrease by more than 5% over prevailing
                                                                                                                                 market rates of Rs.4300 per MT for cement. and Rs.30,850 per MT for Steel reinforcement
                                                                                                                                 respectively. For the purpose of assessing the increase / decrease in prices, the actual market
                                                                                                                                 price of cement and steel, communicated by the Engineer-in-Chief, Admn.Wing, I&CAD Dept.,
                                                                                                                                 will be adopted.


 4                    General                                  …         …      As per the Government G.O, Customs duty is       Necessary certificates will be issued to avail the concessions as per prevailing rules.
                                                                                exempted for these projects. The Department
                                                                                shall provide certificate during the execution
                                                                                period.
 5                      VOL-I                              73/233        9      It is not possible to pay Insurance premium in The Clause 9.2 of Volume.I in Page No.73 hold good.
                        GCC                                                     one stroke and we propose to allow the bidder
                                                                                to pay the Insurance premium in installments. The insurance policy shall be obtained by paying the premiums at one time only for
                                                                                                                               the total period of contract and defects liability period of two years or two Khariff
                                                                                                                               seasons whichever is later after completion of work and submitted to the Employer at
                                                                                                                               the time of concluding agreement which shall form part of agreement.

 6                    General                                  …         …      Please provide Ground level and all the water The Data available with the Department may be seen. The bidder can not claim any
                                                                                level details so as to prepare Pump house GA. responsibility of employer for inaccuracy of Data. He must make his own
                                                                                                                              arrangements for getting exact data.

 7                    General                                  …         …      Please provide the L-Section for the piping of   The Data available with the Department may be seen. The bidder can not claim any
                                                                                1.2 Km                                           responsibility of employer for inaccuracy of Data. He must make his own
                                                                                                                                 arrangements for getting exact data.
 8                    General                                  …         …      Bid submission date : 12.11.07, Please extend Accepted.
                                                                                the submission by 1 month i.e., up to 12.12.07.

 9                    General                                  …         …      We request you to extend the bid submission Bid submission closing date is postponed for 1 month i.e., from 12.11.2007 upto
                                                                                closing date for the period of one month from 5.00PM to 12.12.2007 upto 5.00PM
                                                                                12.11.2007 to 12.12.2007 to prepare our most
                                                                                competitive techno commercial bid fully
                                                                                complying with technical specification of
                                                                                tender and also due to Diwali most of the
                                                                                companies are closed and we are not getting
                                                                                any quotations from the vendors.



                                                                                                                                                                     Chief Engineer
                                                                                                                                                                 NSRSS Project, Hyderabad.


     D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                     8
                           REPLIES TO THE QUERIES RAISED BY M/S MEGHA ENGINEERING & INFRA LTD., HYD FOR PRE-BID MEETING HELD
                                                                     ON 23.10.2007.
                                                                        UDAYASAMUDRAM LIFT IRRIGATION SCHEME
                                                                    TENDER NOTICE NUMBER : 3SE/2007-08, DT; 29.08.2007
           NAME OF WORK :- Investigation, Design, Execution & Maintenance of the following components to lift 6.70 TMC of water from + 214.000m to +300.000m,
         from fore shore of Udayasamudram Balancing Reservoir to proposed Balancing Reservoir near Brahmanavellemula (village), Narkatpally (Mandal), Nalgonda
                                                                               (District).
         Sl_No Volume / Page No. Clause                      Query                                                    Replies
                    Part      / ItemNo.  No.

              1                                                   Electrical and Mechanical works    (1) Payment terms of Electro-mechanical equipment and 220KV line and 220KV Sub-
                                                                  payment terms are not mentioned.   station equipment and works shall be as follows :
                                                                                                     A) For Supply :
                                                                                                     i) 70% of the quoted price for supply of goods (FOR Price including all taxes and duties)
                                                                                                     shall be paid on receipt of goods at site based on certificate prepared by Stores authorities
                                                                                                     and supplier’s representative, on the basis of various items received in accordance with the
                                                                                                     Contract Agreement.
                                                                                                     ii)   20% of quoted price shall be paid on erection of equipment on pro-rata contract value
                                                                                                     of the work completed as per the agreed construction schedule and on certification by the
                                                                                                     Engineer-in-charge and the supplier’s representative.
                                                                                                     iii ) 5% of the quoted price shall be paid on successful testing and commissioning of
                                                                                                     each equipment as progressive payment against interim payment certificate prepared on
                                                                                                     the basis of various items supplied, erected, tested and commissioned in accordance
                                                                                                     with the Contract Agreement.
                                                                                                     iv) Final 5% of the quoted price for supply of material shall be paid on expiry of
                                                                                                     guarantee period.

                                                                  Electrical and Mechanical works    B) For erection , testing and commissioning
                                                                  payment terms are not mentioned.   i) 50% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                     completion of erection of equipment based on certificate prepared by Engineer-in-charge
                                                                                                     and supplier’s representative, on the basis of various items erected in accordance with the
                                                                                                     Contract Agreement.
                                                                                                     ii) 40% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                     completion of testing and commissioning of equipment based on certificate prepared by
                                                                                                     Engineer-in-charge and supplier’s representative, on the basis of various items erected in
                                                                                                     accordance with the Contract Agreement.
                                                                                                      iii) 5% of the quoted price for erection, testing and commissioning shall be paid after
                                                                                                     completion of testing and commissioning of each unit based on certificate prepared by
                                                                                                     Engineer-in-charge and supplier’s representative, in accordance with the Contract
                                                                                                     Agreement.
                                                                                                      iv) Final 5% of the quoted price for erection, testing and commissioning shall be paid on
                                                                                                     expiry of guarantee period.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                      9
         Sl_No Volume /                        Page No.           Clause                  Query                                                           Replies
                 Part                          / ItemNo.            No.

              2                                                            Exercise duty exemption clarification Clause No.11.6 of Instructions to Bidders of Volume.I, Clause No.45 of General conditions
                                                                                                                 of Contract of Volme.I hold good.
                                                                                                                 Clause 11.6 : All duties, taxes, and other levies payable by the contractor as per State /
                                                                                                                 Central Government rules, shall be included in the contract value quoted by the bidder.
                                                                                                                 Clause 45 : Taxes included in the bid. :
                                                                                                                 Clause 45.1 : The Bid price quoted by the contractor shall be deemed to be inclusive of the
                                                                                                                 sales tax and other taxes on all materials that the contractor will have to purchase for
                                                                                                                 performance of this contract.



              3           General                      …            …      Providing M S Pressure main           This proposal of the Bidder is not acceptable.
                                                                           instead of Tunnel.




                                                                                                                                                   Chief Engineer
                                                                                                                                               NSRSS Project, Hyderabad.




D:\Docstoc\Working\pdf\8d623ecf-03c4-449a-a6b7-52617148fbde.xls                                                 10

				
DOCUMENT INFO
Description: Consortium Joint Venture Agreement document sample