Conditions for Contracted Work

Description

Conditions for Contracted Work document sample

Shared by: juu13022
Categories
Tags
-
Stats
views:
3
posted:
1/6/2011
language:
English
pages:
2
Document Sample
scope of work template
							                                                          NIAGARA MOHAWK POWER CORPORATION¹

                          Third Party Distribution Pole Attachment Service Work Rate Summary Sheet
                                     Service Work Rates (Other Than Make-Ready Work Services)
                                                        Distribution Engineering Services
                                                                                               Cost (direct & indirect Cost (direct & indirect
                                                                                                       costs)                    costs)
Item No.                       Application Processing                                              (Straight-Time)             (Overtime)          Effective Date
                                            Application Fee

           This rate includes Niagara Mohawk time for the processing of a pole attachment
            application only. This rate does not include any time for Survey, Pole Loading                                                            12/6/05
               Analysis or Make Ready Work or Pole Inspections. (Lump Sum Cost per
 AP-1                                        Application)                                      $                128.00   $                192.60
                                                                                                    Cost (direct &            Cost (direct &
                                        Administrator                                              indirect costs)           indirect costs)         Effective
Item No.                       (Transportation costs not included)                                 (Straight-Time)             (Overtime)              Date
                                 Administrator - In-House Labor Fee
                    For Administrator services performed by In-House NMPC Labor
                                                                                                                                                     07/15/06
  A-1                                        (Mgmt-$/hour)                                     $                 90.90   $                115.20
                                                                                                  Contractor Total         Contractor Total        NYS PSC CASE
                                                                                                 Costs, plus 10%          Costs, plus 10%            03-M-0432
  A-2                   For Administrator services performed by NM Contractor                   Administrative Fee,      Administrative Fee,          Effective
                                                                                                plus NMPC review         plus NMPC review            08/06/2004
                                                                                                       Cost                     Cost
                                                                                               Cost (direct & indirect Cost (direct & indirect
                Construction Management & Inspection                                                   costs)                    costs)
Item No.                          (Transportation cost included)                                   (Straight-Time)             (Overtime)
                   Contractor Oversight by In-House T&D Operations Labor Fee
            Construction Oversight by an In-House Line Dept. Inspector                  (PG
                                                                                                                                                     07/15/06
 CMI-1                                   19-Step 2) ($/hour)                                   $                 73.60   $                 91.60
                           Construction Management In-House Labor Fee
           For Construction Management Services (FCC) costs performed by National Grid
                                                                                                                                                     07/15/06
 CMI-2                     Construction & Maintenance Services. ($/hour)                       $                 97.20   $                121.50
                                                                                                  Contractor Total         Contractor Total        NYS PSC CASE
                                                                                                 Costs, plus 10%          Costs, plus 10%            03-M-0432
            For Contracted Construction Management (FCC) costs associated with NMPC                                                                   Effective
                                     Contracted work. ($/hour)                                  Administrative Fee,      Administrative Fee,
                                                                                                plus NMPC review         plus NMPC review            08/06/2004

 CMI-3                                                                                                 Cost                     Cost
                                                                                               Cost (direct & indirect Cost (direct & indirect
                       Distribution Design Labor Rates                                                 costs)                    costs)
Item No.                       (Transportation costs not included)                               (Straight-Time)               (Overtime)
 DD-1                        Operations Clerk C (PG 19-Step 2) ($/hour)                        $             67.30       $              85.30        07/15/06
 DD-2                         Electric Planner C (PG 20-Step 2) ($/hour)                       $                 70.00   $                 88.60     07/15/06
 DD-2A                        Electric Planner D (PG 24-Step 2) ($/hour)                       $                 83.60   $                105.90     07/15/06
                                                                                               Cost (direct & indirect Cost (direct & indirect
                           Pole Loading Analysis Fees                                                  costs)                    costs)
Item No.                       (Transportation costs not included)                                 (Straight-Time)             (Overtime)
                                In-House Pole Loading Analysis Fees

  PL-1                                                                                                                                               07/15/06
                     Pole Loading Analyses Performed By NMPC (Cost per Pole)                   $                 85.00   $                107.70
                      Fees Associated with Contracted Pole Loading Analysis
           Minimum Cost of NMPC Structural Engineer's Review of Pole Loading Analyses
  PL-2     Performed By NMPC Contractor or the Applicant's Engineer. (Lump Sum Cost for                                                              07/15/06
                                         1 to 24 Poles)                                 $                       154.20   $                195.40
             NMPC Structural Engineer Review of Pole Loading Analyses Performed By
  PL-3       NMPC Contractor or the Applicant's Engineer for 25 or more poles. (Cost per                                                             07/15/06
                                    Pole for 25 or more poles)                                 $                  9.50   $                 12.10

           For pole loading analyses contracted by Niagara Mohawk, the Applicant will be          Contractor Total         Contractor Total        NYS PSC CASE
                                                                                                 Costs, plus 10%          Costs, plus 10%            03-M-0432
           charged for the Contractor's cost to perform the analysis, plus an Administrative                                                          Effective
  PL-4                                                                                          Administrative Fee,      Administrative Fee,
           Fee of 10% of the Contractor's cost, plus NMPC's cost to review of the                                                                    08/06/2004
           Contractor's pole loading analysis.                                                  plus NMPC review         plus NMPC review
                                                                                                       Cost                     Cost




 5ec0208a-3215-4871-a4a8-4f5bf42b6681.xls
 1 - Niagara Mohawk Power Corporation, d.b.a. National Grid                     1                                                                     May 17, 2006
                                                          NIAGARA MOHAWK POWER CORPORATION¹

                          Third Party Distribution Pole Attachment Service Work Rate Summary Sheet
                                     Service Work Rates (Other Than Make-Ready Work Services)
                                                        Distribution Engineering Services
                                                                                           Cost (direct & indirect Cost (direct & indirect
                                                                                           Cost (direct & indirect Cost (direct & indirect
                            Surveys & Inspection Fees                                              costs)
                                                                                                   costs)
                                                                                                                           costs)
                                                                                                                           costs)
Item No.
Item No.
                                              Processing
                             Application costs included)
                              (Transportation                                                  (Straight-Time)
                                                                                               (Straight-Time)
                                                                                                                         (Overtime)
                                                                                                                         (Overtime)
                                                                                                                                             Effective Date
                                       Pre-Construction Survey
  S-1                 Pre-Construction Survey of 1 to 9 Poles (Lump Sum Rate)              $                144.00   $              180.50      07/15/06
  S-2                 Pre-Construction Survey of 10 to 24 Poles (Cost per Pole)            $                 18.90   $               23.80      07/15/06
  S-3                Pre-Construction Survey of 25 or More Poles (Cost per Pole)           $                 14.40   $               18.00      07/15/06
            Pre-Construction Survey Travel Time Labor Adder Rate for Travel Time to Site                                                        07/15/06
  S-T             that is Greater Than 30 Minutes ($ per hour beyond 30 minutes)           $                 76.30   $               95.00
                         Post-Construction Inspection Fee (Cost per Pole)
  S-4                     Post-Construction Inspection Fee (Cost per Pole)                 $                  8.30   $               10.30      07/15/06
                               Periodic Inspection Fee (Cost per Pole)
  S-5                           Periodic Inspection Fee (Cost per Pole)                    $                  9.40   $               11.70      07/15/06
                              Subsequent Inspection Fee (Actual Cost)
                                                                                             Actual Cost from   Actual Cost from             Current Rate
  S-6                          Subsequent Inspection Fee (Actual Cost)                     NMPC Jobbing Order NMPC Jobbing Order
                            Overlashing Inspection Fee (Cost per Pole)
  S-7                         Overlashing Inspection Fee (Cost per Pole)                   $                  9.40   $               11.70      07/15/06
                                                                                              Contractor Total         Contractor Total      NYS PSC CASE
                                                                                             Costs, plus 10%          Costs, plus 10%          03-M-0432
                           NM Contracted Survey or Inspection Work Costs                    Administrative Fee,      Administrative Fee,        Effective
                                                                                            plus NMPC review         plus NMPC review           08/06/2004
  S-8                                                                                              Cost                     Cost
                                                                                              Per National Grid Fleet Management
                                                                                           Current Fixed Vehicle and Equipment Rate
Item No.                                Vehicle Costs                                                        Table
                                       Costs for use of vehicle
                                                                                                                                             Effective Current
  V-1
              Vehicle Rates used are per the National Grid Fleet Management Standard Fixed Rate Table for Vehicles and Equipment                  Edition

           For outage activities and other special conditions not covered under this listing of Services Rates, Costs will be
NOTE:
           calculated using National Grid's Electric & Gas System Bulletin 120A.




 5ec0208a-3215-4871-a4a8-4f5bf42b6681.xls
 1 - Niagara Mohawk Power Corporation, d.b.a. National Grid                  2                                                                   May 17, 2006

						
Related docs
Other docs by juu13022
Conceptele Managementului Calitatii
Views: 1560  |  Downloads: 1
Conditional Pet Agreement
Views: 28  |  Downloads: 0
Conceptual Design of Bioinformatics Database
Views: 27  |  Downloads: 0
Concierge Employee Training
Views: 15  |  Downloads: 0
Concept Paper Template - Download as Excel
Views: 90  |  Downloads: 1
Concept of E1 Technology
Views: 26  |  Downloads: 0
Condensed Employment Law Outline
Views: 18  |  Downloads: 0
Conditional Release of Funds
Views: 11  |  Downloads: 0
Concurrent Engineering and Project Management
Views: 4  |  Downloads: 0