									HARRIS                   COUNTY
Public Infrastructure Department                                                                   1001 Preston, 7th Floor
Architecture & Engineering Division                                                                Houston, Texas 77002
                                                                                                           (713) 755-5370
Consultant Bi-Weekly Status Report (Version 1.0):
                                                                                                         Project Name
                                                                                                                     APIN:

Reporting Dates:                     to January 6, 2011

Study Report/PER NTP Date:                   Duration:                Projected Completion Date:
Study Report Accepted:

Final Design NTP Date:                       Duration:                Projected Completion Date:

Project Bid Date:                                                     Est. Const. Cost:
                                                                      Date of Cost Est.:
Schedule of Deliverables:
   1.
   2.

Outstanding Issues Requiring HC Input or Direction:
   1.
   2.

Project Control Update (Schedule Impacts, Anticipated Budget Adjustments, etc):
    1.
    2.

Overall Design Progress and Summary of Issues Resolved Since Last Report:
   1.
   2.

Drainage:
    A. Impact Analysis (Date of HCFCD Acceptance:                      )
          a.
    B. CLOMR (Date of HCFCD Acceptance:                           )
          a.
    C. Remaining Issues to be resolved
          a.

ROW:
  A. Survey
         a.
  B. ROW Maps w/ Metes & Bounds(Date of HCPID Acceptance:                                  )
         a.
  C. Temporary Construction Easements (Date of HCPID Acceptance:                               )
         a.

Geotechnical Investigations:
   A. Roadway(Date of HCPID Acceptance:                           )
          a.
d:\docstoc\working\pdf\a1d261f5-7eac-48b1-9ed7-329036c28870.doc
                                                                                                         1/6/2011
                                                                                                       Page 2 of 2

    B. Detention (Date of HCFCD Acceptance:                       )
           a.
    C. Bridge (Date of HCFCD Acceptance:                          )
           a.

Environmental Issues:
    A. Environmental Site Assessments (Date of HCPID Acceptance:               )
           a.
    B. Cultural Resources (Date of HCPID Acceptance:         ) (Date of THC Approval:              )
           a.
    C. Threaten Endangered Species (Date of HCPID Acceptance:                )(TxDFW Approval:             )
           a.
    D. Wetlands and Water US (Date of HCPID Acceptance:               ) (Date of CORPS Approval:           )
           a.
    E. Storm Water Quality Management Plan (Date of HCPID Acceptance:                 )
           a.

Utility Coordination:
     A. Issues
            a.
     B. Agreements Required:
            a.

Traffic:
    A. Traffic Studies (Date of HCPID Acceptance:                     )
           a.
    B. Visibility Triangles (Date of HCPID Acceptance:                )
           a.
    C. Traffic Control Plan (TCP Meeting Held:                    )
           a.

Approvals/Permit Requirements:
   A. HC Permits/HCFCD
           a.
   B. TxDOT
           a.
   C. Rail Road (Date Interagency Agreement Executed                      )
           a.
   D. City (Date Interagency Agreement Executed                       )
           a.
   E. Others
           a.




d:\docstoc\working\pdf\a1d261f5-7eac-48b1-9ed7-329036c28870.doc

								