									Environmental Protection Commission
of Hillsborough County
May 19, 2005



Source Management and Rotation
  Technology Tool (SMARTT)


                                  1
  Source Management and Rotation Technology
              Tool (SMARTT)


1. Decision Process and Trade Off Analysis Tool
2. Assists with Source Rotation and Planning
3. Enables TBW to Determine What Mix of Water Sources Will
   Meet Demand

Staff Concerns:
1. Bias Towards Groundwater
2. Influences More Groundwater Production
3. Shifts Source Management and Rotation Planning Away from
   Minimizing Environmental Impacts
                                                              2
    Background
•Excessive Impacts from Past Pumpage to Lakes and Wetlands
•Partnership Agreements:
               •Developed New Environmentally Sustainable
               Water Supply
               •Reduced Groundwater Pumpage
               •Ended Litigation
               •Developed SWFWMD Financial Assistance
•Chapter 40D-80 “Recovery and Prevention Strategies”
• 158 – 121 - 90 MGD Groundwater Production Caps and
Continuing Environmental Harm
•Part 4.C “Recovery Strategy” of Partnership Agreement – Intent
of Reducing Pumpage to Lowest Achievable Level

                                                              3
4
5
6
      RECOMMENDED BOARD ACTIONS



1. Support Continued Minimization of Environmental Impacts
   by Minimizing Groundwater Withdrawals.
2. Endorse Letter to Tampa Bay Water Identifying Issues and
   Concerns with SMARTT.
3. Endorse EPC and HC WRT Continuing to Work with Tampa
   Bay Water and SWFWMD to Achieve Greater Objectivity
   and Protection of Resources in the SMARTT and
   Operations Plan (OROP).
4. Endorse Equivalent Actions on the Part of the BOCC.




                                                              7
 Preliminary Technical
 Review of SMARTT Model

                           Prepared for:
Environmental Protection Commission of Hillsborough County

                           Prepared by:
                   Shahrokh Rouhani, Ph.D., P.E.
                    NewFields Companies, LLC
                     srouhani@newfields.com
                          May 19, 2005




                                                             8
     Introduction
      SMARTT Model is a decision tool for ranking of
               pre-screened scenarios
Scenarios                                      Ranked Scenarios
                                                  Highest Rank
 Scenario 1
                                                    Scenario
  GW/SW
                                                    GW Only

 Scenario 2
 GW/Desal

 Scenario 3    Screening
  GW/SW/
                              Utility Curves
   Desal

                                                  Lowest Rank
                                                    Scenario
                                                  GW/SW/Desal
 Scenario n
  GW Only


                                                                 9
SMARTT Scenarios
 Scenarios
      GW+SW

      GW+Desal

      GW+SW+Desal

      GW+SW+R

      GW Only

 Screening
       SW Quality Standards

            “… internal standards, rather than regulatory limits”
         Source Permit/Capacity Constraints
            Consolidated groundwater wellfields, the reservoir, and the
             desalinization facility capacities
                                                                       10
SMARTT Utility Functions
 Utility Values

             1                              0
   (most preferred)                   (least preferred)


 Utility Factors
         Cost
         Source Reliability
         Environmental Stewardship

                                                      11
SMARTT Results

 Scenario utilities are 50 times more sensitive
  to Cost and Source Reliability than to
  Environmental Stewardship!

 Highest Ranked Scenario:


              GW Only
                                                   12
SMARTT
Technical
Problems
            13
                                  1. Black Box Descriptions
                                   Unexplained Utility Curves
                                                                                                      Correct and appropriate?
                                                                                                      Consistent and Equivalent?

                                                                                                                                                Utility Curve: Environmental Stewardship
                                                                                                                                                               (Alafia River)
                                                                                                                                                               January 2006
                                 Utility Curve: Operating Cost                                                          1.00
                                                                                                                                                                                                                                                 Utility Curve: Groundwater, Current Month
          1.00                                                                                                          0.90
                                                                                                                                                                                                                                          1.00

          0.90                                                                                                                                                                                                                            0.90
                                                                                                                        0.80
          0.80                                                                                                                                                                                                                            0.80
                                                                                                                        0.70
          0.70                                                                                                                                                                                                                            0.70
                                                                                                                        0.60
                                                                                                              UTILITY
UTILITY




                                                                                                                                                                                                                                UTILITY
          0.60                                                                                                                                                                                                                            0.60
                                                                                                                        0.50
          0.50                                                                                                                                                                                                                            0.50
                                                                                                                        0.40




                                                                                                                                                                                                                                                                                                                                     TBW Staff
          0.40                                                                                                                                                                                                                            0.40
                                                                                                                        0.30
          0.30                                                                                                                                                                                                                            0.30
                                                                                                                        0.20




                                                                                                                                                                                                                                                                                                                                 =
          0.20                                                                                                                                                                                                                            0.20
                                                                                                                        0.10
          0.10                                                                                                                                                                                                                            0.10
                                                                                                                        0.00
          0.00                                                                                                                 0         200            400          600          800        1000          1200          1400             0.00
                 $1.96   $1.98    $2.02   $2.04   $2.08    $2.12     $2.16   $2.20   $2.24   $2.29   $2.33                                                                                                                                       -10.0    -10.0   -5.0   -2.5   0.0    2.5    5.0    10.0   10.0   10.0   10.0
                                                                                                                                                                      FLOW (mgd)
                                                          $ / kgal                                                                                                                                                                                          Historical month minus current month withdrawals / 12




          1.00

          0.90

          0.80

          0.70
                         Utility Curve: Groundwater Levels
                                                                                                                         1.00

                                                                                                                         0.90

                                                                                                                         0.80

                                                                                                                         0.70
                                                                                                                                    Utility Curve: Reservoir Reserve Capacity
                                                                                                                                                                                                                                          1.00

                                                                                                                                                                                                                                          0.90

                                                                                                                                                                                                                                          0.80

                                                                                                                                                                                                                                          0.70
                                                                                                                                                                                                                                                             Utility Curve: GW, Permit Limit
                                                                                                                                                                                                                                                                                                                                     Preferences
UTILITY




                                                                                                              UTILITY




                                                                                                                                                                                                                                UTILITY




          0.60                                                                                                           0.60                                                                                                             0.60

          0.50                                                                                                           0.50                                                                                                             0.50

          0.40                                                                                                           0.40                                                                                                             0.40

          0.30                                                                                                           0.30                                                                                                             0.30

          0.20                                                                                                           0.20                                                                                                             0.20

          0.10                                                                                                           0.10                                                                                                             0.10

          0.00                                                                                                           0.00                                                                                                             0.00
                  0       1        5       10      50       75       100     500     1,000   5,000   10,000                        0.2    2.4     5.0         7.5   8.50   11.0    11.5   12.0      13.5   14.0   15.0                            0.0      5.0    10.0   12.5   15.0   17.5   20.0   25.0   30.0   35.0   35.0

                                                     OROP Score                                                                                                     billions of gallons                                                                  Permit limit minus (proposed) 12-month average withdrawals




                                                                                                                                                                                                                                                                                                                                              14
Example: Cost Utility Curve
              GW
              Onl
               y                    Utility Curve: Operating Cost
             1.00

             0.90

             0.80

             0.70
   UTILITY




             0.60

             0.50

             0.40

             0.30                                                                                               SW
                                                                                                                Onl
             0.20                                                                                                y
             0.10

             0.00
                    $1.96   $1.98    $2.02   $2.04   $2.08    $2.12     $2.16   $2.20   $2.24   $2.29   $2.33

                                                             $ / kgal



                                                                                                                      15
More Appropriate Cost Utility Curve
              GW
              Onl
               y                    Utility Curve: Operating Cost
                                                                                                                SW
             1.00                                                                                               Onl
                                                                                                                 y
             0.90

             0.80

             0.70
   UTILITY




             0.60

             0.50

             0.40

             0.30

             0.20

             0.10

             0.00
                    $1.96   $1.98    $2.02   $2.04   $2.08    $2.12     $2.16   $2.20   $2.24   $2.29   $2.33

                                                             $ / kgal



                                                                                                                      16
2. Uneven Screening
 Screening for Surface Water Quality
        “Internal standards” (not regulatory limits)


 But No Screening for Groundwater
  Drawdowns
        No “internal standard”
        Any GW drawdowns is acceptable
        GW drawdowns are averaged over the entire
         region
            Masking of localized cones of depressions
                                                         17
More Appropriate Screening
 Internal Standards for GW drawdowns
     Limits on both local and average drawdowns


 Correct Groundwater Source Limit
     SMARTT uses 121 mgd (Permit Max)
     Partnership Agreement  ~106 mgd




                                                   18
Conclusion
 SMARTT model in its current form suffers
  from:
   BlackBox
   Biases toward “GW Only”
   No Real GW Environmental
    Stewardship



                                             19

								