STS-116/12A.1
FD 11 Execute Package
MSG Page(s) Title 116A 117 118 119A 120 122 123 124 121 1 - 12 13 - 14 15 - 16 17 18 - 19 20 - 21 22 - 23 24 --FD11 Flight Plan Revision FD11 Mission Summary FD11 Transfer Message
(pdf)
(pdf) (pdf) (pdf) (pdf)
FD11 Water Summary Message
PMA 2 X3 Connector Photography Procedure Spacehab Inlet Duct Screen Check Middeck Stowage Updates FD10 MMT Summary
(pdf) (pdf) (pdf)
Docked Audio Hardline Voice Test
(pdf - Electronic Only)
Approved by FAO: Terry Clancy
Last Updated: Dec 19 2006 1:27PM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003
MSG 116A - FD11 FLIGHT PLAN REVISION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 MSG INDEX MSG NO. MSG 116 MSG 117 MSG 118 MSG 119 MSG 120 MSG 121 MSG 122 MSG 123 MSG 124 TITLE FD11 Flight Plan Revision FD11 Mission Summary (14-0635) FD11 Transfer Message (14-0636) FD11 Water Summary Message PMA 2 X3 Connector Photography Procedure FD10 MMT Summary (14-0637) Spacehab Inlet Duct Screen Check Middeck Stowage Updates Docked Audio Hardline Voice Test (14-0643)
1. APU HEATER RECONFIG DELTAS In the Orbit Ops, APU HEATER RECONFIG (APU/HYD) procedure on page 1-2 please delete the following step: A12 APU HTR GAS GEN/FUEL PUMP (three) - B AUTO
APU HEATER RECONFIG will be worked as part of the HEATER RECONFIG CONFIG B (EPS) procedure on page 6-5. 2. HTR RECONFIG DELTAS FOR EECOM Make the following changes to HEATER RECONFIG – CONFIG B(CONFIG A) (ORB OPS, EPS), p. 6-5, to be performed by the CDR at MET 9/23:30:00 WAS: ML86B:C cb MNA EXT ARLK HTR LINE ZN 1,2 (two) – op(cl) STRUC Z1/2/3 – op(cl) cb MNB EXT ARLK HTR LINE ZN 1,2 (two) – cl(op) STRUC Z1/2/3 – cl(op) IS: ML86B:C cb MNA EXT ARLK HTR LINE ZN 1,2 (two) – cl STRUC Z1/2/3 – op cb MNB EXT ARLK HTR LINE ZN 1,2 (two) – op STRUC Z1/2/3 – cl cb MNA EXT ARLK HTR VEST Z1/2/3 – cl √cb MNB EXT ARLK HTR VEST Z1/2/3 – op
END OF PAGE 1 OF 12, MSG 116A
MSG 116A - FD11 FLIGHT PLAN REVISION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 3. FD11 SPACEHAB VIEWPORT VIOLATIONS There are no viewport violations for FD11. 4. WORDS REGARDING SOLAR ARRAY TOOLS During the airlock cleanup activities this morning we want to make sure that the effort spent building solar array contingency tools does not need to be repeated on 13A. For the tools staying on ISS and for those returning in the middeck, the Kapton tape can be left in place. 5. MS6 E-MAIL NOTE Outlook for MS6: Post hatch closure, Thomas can access e-mail using the MS6 crew mail account. 6. REPLACE PAGES 2-38, 2-40 AND 3-116 THROUGH 3-123.
END OF PAGE 2 OF 12, MSG 116A
No TVIS Exercise
12/19/06 GMT 12/19/06 (353) MET Day 009 14 15 16 17 18 AC U/ DO I O 19 20 21 22 07:14:41 23 12/20 22
REPLANNED
23 01 010/00
12
13
14
15
16
17
18
19
20
21
S T S 1 1 6
D N E X P 1 4 U P
SEP1^ SEP2^ SEP3^ A A GP M C H RP S --+GP RW N O2 P/B D T OMS Z Y R W I A T C R L ZX POST SLEEP EXERCISE MEAL FLYAROUND I T P R V UNDOCK OPS L V BURN L V P R M B R S E E TEARDOWN O H POLANSKY BU R VV V V B D UT B * E S O P N P PS S R A FDGP P RL OMS D C D HATCH M P R W ♣ UNDOCK OPS POST SLEEP XFER EXERCISE MEAL FLYAROUND SIMO ⊕ C EE PLT/IV B S I KLPR S BURN OEFELEIN O CLOSE E U INIT * I * S YBP P B A PD S C/L /E P/TV P D D POST SLEEP TRANSFER EXERCISE P/TV03 UNDOCK OPS MEAL UNDK S I P/TV03 CAMR TA MS1/R1 B 04 M O PATRICK VC S/U INST PLBK I S/U U S 3T A A EI CT S D ODS LEAK M N EVA ENT O/ POST SLEEP EMU RCNFG & XFER UNDOCK OPS MEAL EXER P I HATCH US MS2/EV1 ND CHECK PRP CURBEAM R O CLOSE T CISE D N S L A A S D ODS LEAK EVA ENT POST SLEEP EMU RCNFG & XFER UNDOCK OPS MEAL EXERCISE P I MS3/EV2 CHECK PRP FUGLESANG R O N S XU XTXB A SD FP FAFR D SE FILTER POST SLEEP - SHAB TRANSFER EXERCISE MEAL RD EGEI I TRANSFER CLEANUP OA MS4 CLEAN A RURE O RC HIGGINBOTHAM T P F S T DR XT A PW PW D SLEEP R O DPC R O CLDBAG PACK C C F A POST SLEEP TRANSFER CLEANUP EXERCISE MEAL SN EG I FE-2 ER ER (8.5) REITER F RU O PK PK G S P AC A UV PW PW T C U/ NI SLEEP SODF O2 P/B D IWIS EXERCISE R O DPC R O ♦C POST SLEEP EXERCISE RED MIDDAY-MEAL C PMA2-DEPRESS DO I DD ISS CDR ER ER S A DEPLOY TEARDOWN O S/U CEVIS LOPEZ-ALEGRIA (8.5) I KE PK PK A O S O A MC PW PW С ТP D OH SLEEP EXERCISE СОЖ CТ C C R O DPC R O Р R TVIS L POST SLEEP ПИЛЛЕ PMC MIDDAY-MEAL T A VTR C I HATCH IMS FE-1 KТ K S ER ER 2E (8.5) VELO+RED MNT TYURIN O CLOSE O R CBL K PK PK С P S G A M BS C PW PW PMA2 D E P T IMV E SLEEP R O DPC R O POST SLEEP EMU RCNFG & XFER DPRT MIDDAY-MEAL S O VLV I HATCH T V FE-2/EV3 ER ER (8.5) WILLIAMS O CLOSE X M W INSTL I CNFG PK PK S * U S DAY/NIGHT ORBIT 151 152 153 154 155 156 157 158 W -171 E -46 TDRS Z -275 ORB ATT BIAS -XLV -ZVV -XLV +ZVV UNDK/FLY -ZLV +YVV ♦LAB WNDW CLS *I'CNCT *TERM ♣SSV ON ⊕SSV OFF *REG RCNFG *UNDOCK NOTES *CONFIG
FD11 CDR/R2
U N D O C K *
(09/20:22)
2-38
FLT PLN/116/FLIGHT
12/19/06 GMT 12/20/06 (354) MET Day 010 02 010/00 03 04 05 06 07 08 09 10
07:14:41 11 12 13
01
02
03
04
05
06
07
08
09
10
11
12
FD11 CDR/R2
-♣ Z X PRE SLEEP PMC LV A/G VV ⊕ SIMO TERM
PRE SLEEP
SLEEP
POST SLEEP S D POST SLEEP B I S D POST SLEEP B I POST SLEEP
PLT/IV S T S 1 1 6
PRE SLEEP
SLEEP
MS1/R1
EXER CISE
PRE SLEEP
SLEEP
MS2/EV1
PRE SLEEP
SLEEP
MS3/EV2
♦
PRE SLEEP
SLEEP
POST SLEEP
MS4 D N E X P 1 4 U P
PRE SLEEP - SHAB
SLEEP
POST SLEEP - SHAB
FE-2
PRE SLEEP PLI PLT RM K E MKN ® A I IWIS W A R C DEACT S C 2KT 2KM TVIS C E V I S C E V EXER CEVIS I S 159 E X D L
SLEEP
POST SLEEP
ISS CDR
PRE SLEEP
SLEEP (8.5)
FE-1
PRE SLEEP
SLEEP (8.5)
FE-2/EV3
DAY/NIGHT ORBIT W -171 E -46 TDRS Z -275 ORB ATT NOTES
PRE SLEEP
SLEEP (8.5)
160
161
162
163
164
165
166
♣PRE SLEEP ⊕PRE SLEEP *PWRDN ♦EXERCISE ®EXERCISE CEVIS
-ZLV -XVV
2-40
FLT PLN/116/FLIGHT
12/19/06
07:14:41
STS-116 FD 11
GMT Date 12/19 (353) T D R O S R W E Z B S T S A Day 009 T T ~ 12:00 MET
REPLANNED
MS1 Patrick
Notes
CDR Polansky
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~~
PLT ZAMBONI R Time
14:00
SALIVA COLL & SLEEP LOG (ORB OPS, SDBI) SALIVA COLL & SLEEP LOG (ORB OPS, SDBI) POST-SLEEP ACTIVITY POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) (ORB OPS, CREW SYS)
1 5 1 13:00 15:00
FD11 EZ ACTIVITES Check TEPC Status Hard Reboot PGSCs (Except WVS)
16:00
1 5 2
14:00
B I A S X L V Z V V
15:00 17:00 1 5 3 TRANSFER REF Transfer List EXERCISE TRANSFER REF Transfer List
EXERCISE
~
16:00
~ 3-116
~
~ FLT PLN/116/FLIGHT
12/19/06
07:14:41
STS-116 FD 11
GMT Date 12/19 (353) T D R O S R W E Z B S T S A Day 009 T T ~ 12:00 MET
REPLANNED
MS4 Higginbotham FE-2 (DN) Reiter
~ Notes
MS2 Curbeam
MS3 Fuglesang
~~
14:00
EVA CREW:TAKE 1 ASPIRIN (325mg) EVA CREW:TAKE 1 ASPIRIN (325mg) POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) POST-SLEEP ACTIVITY POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) (ORB OPS, CREW SYS) SH POST-SLEEP CONFIG (SH OPS, ON-ORBIT)
SLEEP (8.5)
1 5 1 13:00 15:00 POST SLEEP
16:00
1 5 2
14:00
B I A S X L V Z V V
PREP WORK DAILY TRANSFER LIST UPDATE REF MSG 118 DAILY PLANNING CONFERENCE PREP WORK POST EVA RECONFIG & TRANSFER (EVA, AIRLOCK CONFIG) Ref MDDK Xfer List: Item 702 REF MSG 114 POST EVA RECONFIG & TRANSFER (EVA, AIRLOCK CONFIG) Ref MDDK Xfer List: Item 702 REF MSG 114 TRANSFER REF Transfer List PODF: 2.001 12A.1 SAMPLE XFER TO DOUBLE COLDBAG REF MSG 14-0603 TROPI & IMMUNO Double Coldbag Pack Photos. (Icepac color in msg 14-0603 is for reference only & may vary) REF SH Xfer List: Item 102 & MDDK Xfer List: Item 701 9 Icepac Belts must be used when packing the Double Coldbag
15:00 17:00 1 5 3
ISS P/TV: 2.730 760 EVA CAMERA DISASSEMBLY
~
16:00
~
~ 3-117
~
~ FLT PLN/116/FLIGHT
12/19/06
07:14:41
STS-116 FD 11
GMT Date 12/19 (353) T D R O S R W E Z B S T S A Day 009 T T ~ 16:00 MET
REPLANNED
MS1 Patrick
TRANSFER ~ REF Transfer List Notes
CDR Polansky
DOCKED AUDIO HARDLINE VOICE TEST REF MSG 124
~
1 5 3
PLT ZAMBONI R Time
~
18:00
EXERCISE JNT OPS: 3.122 PRBRTHE USING STS O2 TEARDOWN
17:00 19:00 1 5 4 I'CNCT RETURN (OPS 2,3) (OPCL, RCS) B FAREWELL I A S JNT OPS: 3.110 H/O ATT CNTRL CMG TA TO ORB X L V Z V V MEAL FAREWELL JNT OPS: 4.103 DUCT REMOVAL AND HATCH CLOSE (BYPASS CONFIG) When MCC has completed steps 1-2, perform steps 3-10
P/TV04 INGRESS/EGRESS (PHOTO/TV, SCENES) Perform SETUP DRAG THROUGH QD DEACT(P/TV,BPSMU) REF MDDK TL: Items 22,23 FAREWELL P/TV03 UNDOCK (PHOTO/TV, SCENES) Perform SETUP REF MSG 120
18:00 20:00
C/L CAMR INSTALL (PHOTO/TV, C/L CAMR) Perform Step 1 Only MEAL
1 5 5 19:00 21:00
1 5 6
EXERCISE FORMALDEHYDE MONITOR KIT (ORB OPS,CREW SYS) Perform Steps 1-6 O6 S TRK PWR -Z - ON O6 S TRK PWR -Z - ON PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) PRIOR PWRUP GRP B(ORB PKT,PRIOR PWRDN) Steps 12 (Recover IMU 3) & 6 (Dual G2) Steps 12 (Recover IMU 3) & 6 (Dual G2) MNVR (TRK) -XLV +ZVV (UNDOCK) SSV PWR - ON, Outrate - 3 On MCC Go: TG=2 BV=5 P=180 Y=0 OM=0 A12/AUTO/VERN Init TRK (19:22) P/TV03 UNDOCK UNDOCKING AND SEPARATION UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L) (PHOTO/TV, SCENES) (RNDZ, UNDOCK/SEP T/L) REF MSG 113 Perform OPS REF MSG 113
~~
20:00
~
~ 3-118
~
~ FLT PLN/116/FLIGHT
12/19/06
07:14:41
STS-116 FD 11
GMT Date 12/19 (353) T D R O S R W E Z B S T S A Day 009 T T ~ 16:00 MET
REPLANNED
MS4 Higginbotham FE-2 (DN) Reiter
Notes
MS2 Curbeam
~ POST EVA RECONFIG & TRANSFER (EVA, AIRLOCK CONFIG) Ref MDDK Xfer List: Item 702 REF MSG 114
MS3 Fuglesang
~ POST EVA RECONFIG & TRANSFER (EVA, AIRLOCK CONFIG) Ref MDDK Xfer List: Item 702 REF MSG 114
~
1 5 3
~ TRANSFER REF Transfer List DAILY STS/ISS CREW TRANSFER TAGUP DAILY TRANSFER BRIEFING DAILY STS/ISS CREW TRANSFER TAGUP
18:00
17:00 19:00 1 5 4 B FAREWELL FAREWELL I A S JNT OPS: 4.103 DUCT REMOVAL AND HATCH CLOSE (BYPASS CONFIG) - When MCC has completed steps X 1-2, perform steps 3-10 L V JNT OPS: 4.104 ODS VEST/PMA - JNT OPS: 4.104 ODS VEST/PMA DPRS AND HATCH LEAK CHECK Z DPRS AND HATCH LEAK CHECK V V
FAREWELL
FAREWELL
18:00 20:00
TRANSFER CLEANUP
1 5 5 19:00 21:00
TRANSFER CLEANUP EMU INSTALLATION (EVA, AIRLOCK CONFIG)
EXERCISE 1 5 6 UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L) REF MSG 113 UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L) REF MSG 113
~~
20:00
~
~ 3-119
~ FLT PLN/116/FLIGHT
12/19/06
07:19:35
STS-116 FD 11
GMT Date 12/19 (353)
T D R O S R W E Z B S T S A Day 009 T T ~ 20:00 MET
REPLANNED
MS1 Patrick
P/TV03 UNDOCK (PHOTO/TV, SCENES) Perform OPS ~ Notes
CDR Polansky
~ UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L) REF MSG 113
~~
PLT ZAMBONI R Time
~ UNDOCKING AND SEPARATION (RNDZ, UNDOCK/SEP T/L) REF MSG 113
22:00
1 5 6
< UNDOCK 9/20:22
SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L) REF MSG 113 U N D K / F L Y SEP/FLYAROUND (RNDZ, UNDOCK/SEP T/L) REF MSG 113
UPLINK β21 + Box B1 -35