					Lunar Surface Systems
   Chris Culbert
   Manager, Lunar Surface Systems Project, NASA JSC

   Tuesday, February 26, 2008




                 CONSTELLATION
                      Background on NASA Studies


     !Exploration Systems Analysis Study (ESAS) defined
      only a limited framework for Lunar surface activities
     !To prepare for early transportation milestones, it was
      necessary to assess impacts of eventual surface
         activities on Altair and Ares V
     !Lunar Architecture Team Phase 1 (LAT1) in the fall of
      2006 attempted to put more structure to surface
      activities and refine concepts
     !Lunar Architecture Team Phase 2 (LAT2) in
      spring/summer of 2007 examined a number of additional
      approaches
Printed: 2/27/08                                               Page 2
                          Background on NASA Studies (cont’d)


     !The Constellation Lunar Architecture Team (CxAT
      Lunar) started in fall 2007 and is currently preparing for
      a June 2008 review
            • Emphasis is on the transportation architecture and understanding
                   performance trades
            • Examining key driving requirements from the surface systems that
                   impact transportation elements




Printed: 2/27/08                                                                 Page 3
                                   Basic Components


        !Habitation, eventually for long duration stays
               • Must provide both life support and safe haven

        !Mobility to enable expanded exploration, for both
         humans and payloads
        !Power infrastructure for both day and night operations
        !Communications, both to Earth and within the lunar
         community
        !Science support, labs and infrastructure




Printed: 2/27/08                                                 Page 4
              Conceptual Lunar Outpost Surface Systems
                                                                             10 kW Array (net)

                   2 kW Array (net)



                                 Logistics

                                                                Habitation
                                                                Elements
                                                                                          Small Pressurized
                                                                                            Rover (SPR)




                                             Common Airlock
                                               With Lander
    ATHLETE                                               ISRU Oxygen
Mobility System (2)                                      Production Plant
                                                                                     Unpressurized Rover
Printed: 2/27/08                                                                                      Page 5
                                                                         Sample Campaign Analysis
                             2500
                                                                    Lab-1 &            Hab-1 &
                                                                    ICP                ICP                                                                      #     - Crew Size

                                                                                                                                                                #      - Mission Duration

                             2000
                                                                                                                Hab-2/PLM
                                                                                      ICP                       & ICP
Cumulative Days on Surface




                                                                                                                                                                      PLM &
                                                                                                                                                                      ICP
                                                                                       OTSE
                             1500                          ICP
                                                                                       Excavation
                                                                                       Tools                                                                                         4
                                            CT                                                                                                    PLM &                             180
                                    CCK                                   CT
                                                                                                                                                  ICP
                                                                                                                      PLM &                                              0
                                                                                            OPS
                                                           OTSE                                                       ICP           PLM &                                0
                                                                                            ISRU
                                                                                                                                    ICP                                           4
                             1000   MCT                                                                                                                          4
                                                                                                                                                                                 180
                                                                                                                                                                180
                                                                                      SPR               Hab-2/PLM
                                                          SPR                                           & ICP
                                                                                                                                                    0      4
                                                                                                                                                    0     180
                                                                                                                                                                        1442 total
                                                 Lab-1
                                                 & ICP                                 Tri-
                                                                                                                                      0      4
                                                                                                                                            180
                                                                                                                                                                       surface days
                                    Solar                                                                                             0
                                                          Tri-                         ATHLETE
                             500    Array
                                                          ATHLETE              Hab-1 & x2                               0      4
                                       MC                 x2                   ICP                                      0     180

                                                                                                          0      4
                                                  Solar                                                         180
                                                                                            0       4     0                          Notes:
                                                  Array
                                      0     0         4         0   4
                                                                          0      4          0      95                                • Unpressurized, Liquid, & Gas carriers not shown
                                      0     0        14         0   28
                                                                          0      45
                                                                                                                                     • Each Crewed Lander & Flight 1 has 500 kg of Science
                               0



         Printed: 2/27/08                                                                                                                                                                 Page 6