Cnc Business Profits

Description

Cnc Business Profits document sample

Shared by: vts57849
Categories
Tags
-
Stats
views:
15
posted:
1/4/2011
language:
English
pages:
57
Document Sample
scope of work template
							Rating Values
          Range of 1- 5 (No decimal points allowed)
          Rating assigned to each section must meet all of the criteria of that rating to be assigned that score.
                       eg. To assign a "4", the site must clearly have tools, skills, actions in place to meet the proficiency leve
          Must consider effectiveness across all shifts
                                           Setup is done once or twice per                                         People are aware of the
                                           month. Little to no awareness of                                        need and value in lowering
                                           need for frequent setups. Setup                                         setup times. Improvement
                                           may take half a day or more. No                                         activities are selective, not
                                           consistent measurement of Set-                                          formally built into the system.
                                           up time. Material availability is                                       Setup times are fairly high
                                           ignored.                                                                (hours).

                         Changeover/Setu
                               p




Data Entry Points
          First time the report is used, you must add your site name to the top of the Lean Skills and Sustain Radar Chart (tab
                        Go to Chart, Options, Title, Type in your site name where it says (your site)
          First time the report is used, you must enter your site's 1% revenue target in Cell B 29 of the Current month Sust
          Data entry (1,2,3,4,or 5) is required in columns L thru T Only (to the right of the RED Line) on the Current Month
                        Do Not Enter Data anywhere else in this section these sheets. All calculations are automatic.
          Manually transfer the Site Lean Average and Site Sustain scores to the Trend Graph data columns on Tab 6 (Trend
          At the bottom of the Sustain Survey, see the % savings calculator. Enter your monthly savings in the proper month i
                        Do Not Enter Data anywhere else in this section. All calculations are automatic.
Report Format

           There are (2) Surveys to be completed monthly by the 28th of each month. These will be reviewed as part of the MO
                                                                                                 ( Y o ur sit e) Sit e W C M Sco r e
                          Site Lean Average Score
                                                                              3.3                                                            Elimination of Process Delay                            3.1
                                                                                                       Cont inuous Flow
                                                                                                              5
                          Problem Solving         3.5                           Response Syst ems
                                                                                                        4.5
                                                                                                                            Layout
                                                                                                                                                                                         Threshold         Site Average
                                                                         Problem Solving                                               Load Smoot hing
                                                                                                              4
                                                                                                        3.5
                                                          Visual Management                                                                    Takt Time
                                                                                                              3
                                                                                                        2.5                                                                              Site Low
                                                                                                              2
                                           Workplace Organizat ion "5S"                                                                               Changeover/ Set up
                                                                                                            1. 5
                                                                                                              1

                                                             Qualit y                                   0.5                                              Value Added Work
                                                                                                              0
                          Quality   3.5
                                                                                                                                                                            Operational Costs              3.0
                                                       Error Proof ing                                                                                   Mult i-Skilled Operat ors




                                                 Cont inuous Improvement                                                                           Perf ormance Measurement s



                                                              Perf ormance Focus                                                           Invent ory / WIP


                                                           St andard Operat ing Procedures                                        Prevent at ive Maint enance
                                                                                       Mat erial Cont rol              Pull Syst ems



                                                                                                      Predictable Output
                                                                                                                   3.5

           The Red Section is the threshold of Lean and is set at 3.5 for all sites, processes, operating models.
           The Yellow Line is the lowest score that appears for any of the processes reviewed. (See below)
                                              Perf ormance Focus                                                 Invent ory / WIP


                                            St andard Operat ing Procedures                             Prevent at ive Maint enance
                                                                     Mat erial Cont rol      Pull Syst ems



                                                                                    Predictable Output
                                                                                                 3.5




The Green Section is the Site Average performance for the all processes reviewed.
           Must consider effectiveness across all shifts
 Objective                                                                       Level of Implementation & Performance

                       1                                2                                                       3
               Change Leaders      Human objectives for a project                         Human objectives and either
               do not consider     are identified, but are often not                      project success measures
               the human side      achieved or measured. In these                         are established at the onset
               of the change       cases site leaders do not take                         of a project. These are
               project. Project    ownership for poor                                     communicated to all
               objectives do not   implementation of sustained                            impacted and are monitored
               include "human      results. The project teams                             and measured throughout
Accountability
               objectives",        appear to have sole ownership                          the project. Role maps are
                                   for success or failure.                                created that identify
                                                                                          ownership and accountability
                                                                                          for the change across the
                                                                                          organization.




Site Average Score is posted top left corner of the Radar chart
Section Average scores are posted to the right of each section title.
 rating to be assigned that score.
kills, actions in place to meet the proficiency level described.

                                  Setup reduction teams                  Setup on machines is 30+/-    All Setups are done within
                                  exist on key machines and              minutes, repeatability of     a very short time (<10
                                  times are improving, but               the process is very           minutes), one small
                                  progress still needs to be             noticeable. Material          enough to allow extremely
                                  made. Set-up time has                  availability is improved to   frequent changeovers.
                                  been reduced by 75% as                 re-supply complete within     Times are low enough to
                                  defined by “Last good piece            30+/- minutes. Setup times    make setup an almost
                                  with old tools to first good           in assembly areas are         irrelevant issue for
                                  piece with new tools                   short, predictable, and       scheduling and utilization.
                                  (includes 1st piece                    repeatable.On-going           Material supply is not a
                                  approval)”. Some beginning             improvements are visible.     problem. Methods are
                                  focus on the material                                                migrated to all Value
                                  supply processes.                                                    streams. Setup is equal to
                                                                                                       TAKT time. Change
                                                                                                       notification is visible.




p of the Lean Skills and Sustain Radar Chart (tabs 2, 4)
ere it says (your site)
  target in Cell B 29 of the Current month Sustain Survey.
he right of the RED Line) on the Current Month Lean Survey and the Current Month Sustain Sheets
 ese sheets. All calculations are automatic.
  the Trend Graph data columns on Tab 6 (Trend Data). The YTD trend will graph automatically.
Enter your monthly savings in the proper month in Column B (shaded purple section)
 ll calculations are automatic.


 month. These will be reviewed as part of the MOR.


     Elimination of Process Delay                            3.1

                                                 Threshold         Site Average
 d Smoot hing


      Takt Time

                                                 Site Low

            Changeover/ Set up




                Value Added Work


                                   Operational Costs               3.0
                Mult i-Skilled Operat ors




         Perf ormance Measurement s



  Invent ory / WIP


at ive Maint enance




ut

es, processes, operating models.
cesses reviewed. (See below)
 Invent ory / WIP


at ive Maint enance




ut




cesses reviewed.

                                                                                                 Site
ntation & Performance                                                            Site Target   Average   Site Low   Process A
                                  4                            5                   Score        Score     Score      Score
                      Leaders of change efforts   Business leaders are
                      are measured on the level   measured on the
                      of disruption caused by     sustainability of the change
                      their change projects.      projects in their areas.
                      These results indicate      These results indicate a
                      minimal disruption to the   positive return on change
                      business and the            efforts.
                      organization. Post-
                      implementation monitoring
                      of progress and problems
                      is done.


                                                                                    3.5          2.8        1          2
Process B   Process C Process D
 Score       Score      Score     Score   Score   Score   Score   Score   Score




   3           5          1
                                                            Raleigh WCM Score
Site Lean Average Score            3.5                                                          Elimination of Process Delay           3.7
                                                             Continuous Flow
Problem Solving 3.1                   Response Systems           5              Layout

                               Problem Solving                 4.5                        Load Smoothing                          Threshold
                                                                 4
                                                               3.5                                                                Site Average
                 Visual Management                                                                Takt Time
                                                                 3                                                                Site Low
                                                               2.5
   Workplace Organization "5S"                                                                             Changeover/Setup
                                                                 2
                                                               1.5
                                                                 1
                     Quality                                                                                 Value Added Work
                                                               0.5
Quality 3.8                                                      0                                                  Operational Costs 4.0

              Error Proofing                                                                                 Multi-Skilled Operators




      Continuous Improvement                                                                               Performance Measurements



                  Performance Focus                                                               Inventory Storage

                           Standard Operating
                                                                                          WIP
                               Procedures
                           Material Control/Supply Chain
                                                                                Preventative Maintenance
                                    Management
                                                              Pull Systems
                                                           Predictable Output       3.1
                Objective                                       Level of Implementation & Performance (M

                                                 1

                                Products move through the
                                production line in large batches,
                                often taking several days or more.
                                Batch sizes on average are
                                equivalent to daily demand.
                                Overall WIP inventory is large and
Elimination                     material gets out of sequence.
of Process    Continuous Flow
   Delay




                                Equipment and sequential
                                processes are placed far apart
                                from each other, leading to batch
                                processing and a lot of
                                transportation delay. Products
                                change direction multiple times
                  Layout
                                during the process. Typical flow
                                diagram looks like “Spagehtti” and
                                cannot be easily followed. High
                                number of shared resources
                                causes “traffic jams”

                                Production of major products
                                takes place at least twice a month
                                and is scheduled. Production pace
                                differs by process and is controlled
                                heavily by manufacturing
                                problems. Schedule is constantly
                                reprioritized by a planner.
              Load Smoothing
                                 Production pace is not planned but
                                 assumed to be a fixed function of
                                 current equipment. Production
                                 area operates and adds/cuts
                                 hours or inventory to match
                                 demand.
                 Takt Time




                                 Setup is done once or twice per
                                 month. Little to no awareness of
                                 need for frequent setups. Setup
                                 may take half a day or more. No
                                 consistent measurement of Set-up
                                 time. Material availability is
              Changeover/Setup   ignored.




                                 A great deal of time spent waiting
                                 on machines, parts, people.
                                 Significant amount of time is spent
                                 walking, inspecting, resolving work
                                 stoppages, changeover, moving
Operational
              Value Added Work   material, repair. VA-NVA ratio is
  Costs                          <5%




                                 Operators have narrow and rigid
                                 job classifications or expectations -
                                 “this and only this is my job”.
                Multi-Skilled
                 Operators
                                  Measurements are primarily
                                  efficiency based and used as a
                                  negative motivator. Employees do
                                  not see a connection between
                                  their job and the organization
                                  making money. Customer
                                  satisfaction is not important. Large
                Performance       number of measures in place
               Measurements       causing conflict.




                                  Storage is disorganized and has
                                  no clear visual controls on location
                                  or volume. Items often located in
                                  unmarked locations. Work
                                  stations are frequently waiting for
                                  material to be delivered from a
              Inventory Storage   central location.




                                  Material, WIP, and equipment
                                  storage is disorganized and has
                                  no clear controls on location or
                                  volume. Items often located far
                                  away from point of need in
                                  unmarked locations. Work
                    WIP           stations are frequently waiting for
                                  material to be delivered from a
                                  central location.




                                  Frequent machine failure with
                                  large buffer stock kept to cover.
                                  PM’s are regularly behind
                                  schedule or non-existent. No
Predictable      Preventative
                                  tracking of downtime or utilization
  Output         Maintenance
                                  analysis.
                       Production flow is completely MRP
                       based with no in-line control on
                       operations or production pace.
                       Material enters and is pushed
                       downstream on forecast only.



   Pull Systems




                       Parts and materials spend a lot of
                       time in transit. System counts do
                       not match available parts. Large
                       equipment and process downtime
                       due to missing parts. Several
                       parts areas with no visible
                       customer separation.




      Material
Control/Supply Chain
   Management
                               Work procedure charts exist in
                               basic form but are not rigidly
                               followed. No consideration given
                               to areas such as WIP levels,
                               machine time, or critical
                               quality/safety items.
          Standard Operating
              Procedures




                               Only real concern is the paycheck.
                               No interest in general business
                               operation, improvements, or belief
                               in change. Very little/no contact or
                               interest with the customer.
Quality   Performance Focus




                               Steady continuous improvement
                               does not occur at any significant
                               level. Upper management and
                               engineering may be involved in
                               large scale innovation.
             Continuous
            Improvement




                               Not used at all. No effort made to
                               error-proof process. Background
                               level of production errors is
                               accepted.

            Error Proofing
                              No preventative quality tools are
                              used. Significant amount of
                              inspection is used. Process
                              quality is not repeatable nor
                              reliable.




              Quality




                              Plant is a mess, but those in
                              charge generally understand
                              location and quantity of items.
                              Some control exists over the
                              location of fixtures, machines,
                              WIP, and tools. No Celestica
Problem      Workplace        Standard signage in place.
Solving   Organization "5S"




                              No visual displays showing
                              performance, goals, or current
                              status exist. Visual tools are not
                              used for communication process.
          Visual Management
                   Problems are only noticed by
                   operators and repaired by
                   maint/eng. Superficial fixes lead
                   to recurring problems.



 Problem Solving




                   Operators have no authority to
                   stop production or alert
                   supervisors. Stop authority may
                   rest as high as plant manager.
                   Employees may be actively
Response Systems   discouraged from disrupting
                   production flow.




Acronyms:
                   Acronym:
                   WIP
                   WCM
                   MOQ
                   NVA
                   VA
                   IE
                   SCM
                   PM
                   TPM
                   MRP
                   FIFO
                   CTO
                   CI
                   SPC
                   FMEA
Level of Implementation & Performance (Must Consider effectiveness across all shifts)

                   2                                   3                                     4

   Batching is used heavily, but       Parts of the line(s) are run on       Production basically runs in a
   batch sizes are moderate and        continuous flow basis but batch       continuous flow, but small
   material moves through the          processing still occurs in some       inventory buffers exist between
   system in the proper sequence.      areas. WIP levels are                 processes to insulate each
   Batch sizes have been reduced to    moderately low.                       individual process from
   half of daily demand.                                                     variability in others and/or high
                                                                             changeover times.




   Limited dedication of resources.    Most processes are placed in          Transportation delay is very
   Processes are placed apart,         close proximity, but long-            minimal, and operators are
   leading to sporadic batch           distance transportation delay still   close enough together to share
   processing and a moderate           occurs. A few problems occur          some jobs. Cell concept is
   amount of transportation delay.     when products with different          present. Increased amount of
                                       processing needs are produced         resource dedication based on
                                       on the same line. Some use of         product families (similar
                                       cells are found.                      processing needs).




   Production of major products        Production of major products          Production of major products
   takes place at least once a week.   takes place at least once a week      takes place daily.Production is
   Production pace differs by          and is fairly well synchronized       synchronized among processes
   process and is controlled heavily   among processes. Fair amount          and is based on Takt Time with
   by manufacturing problems.          of visibility to demand mix.          little disruption to the process.
                                       Schedule is fairly stable. System     Some build-up inventory due to
                                       has only one setting based on         changing mix. Playbook exists to
                                       average customer demand.              adjust system Takt Time based
                                                                             on Customer orders.
Customer demand is used to            Demand quantities are used to        Pace of production is controlled
determine optimal cycle time but      determine optimal cycle time         directly by optimal TAKT time.
may not be closely followed.          and efforts are made to balance      Time is calculated from live
Some over/under production            work allocation to match.            customer demand and used to
occurs. No work allocation            Inefficiency still exists in the     balance work between
changes are used to balance           form of overproduction and/or        operators. Each person/station
operators to demand.                  low utilization. Takt Time is        operates close to optimal TAKT
                                      calculated from live customer        time. Deviation to TAKT time is
                                      demand but is not used               visible and addressed.
                                      exclusively to drive the process.




People are aware of the need and      Setup reduction teams exist on       Setup on machines is 30+/-
value in lowering setup times.        key machines and times are           minutes, repeatability of the
Improvement activities are            improving, but progress still        process is very noticeable.
selective, not formally built into    needs to be made. Set-up time        Material availability is improved
the system. Setup times are fairly    has been reduced by 75% as           to re-supply complete within
high (hours).                         defined by “Last good piece with     30+/- minutes. Setup times in
                                      old tools to first good piece with   assembly areas are short,
                                      new tools (includes 1st piece        predictable, and repeatable.On-
                                      approval)”. Some beginning           going improvements are visible.
                                      focus on the material supply
                                      processes.



Non-value-added activity              A moderate amount of work that       Waiting time is minimal, and
consumes the majority of time,        does not add value is found in       most work is value-added.
but efforts are made (primarily by    redundant activity such as           Cross-functional improvement
IE) to make work more efficient       multiple inspections, and            teams work regularly to increase
and eliminate steps. Operator         changeover. Operators are            the productivity of the work
involvement is limited.               more involved in developing new      areas.
                                      work methods. VA-NVA ratio is
                                      > 10%




Some cross-training is present,       Cross-training is present.           Cross training is well established
but it is not very well developed.    Workers regularly assist or run      and well documented. Workers
No large barriers to cross training   neighboring stations based on        have the skill and do regularly
exist.                                flow rates. Team concept is in       work various combinations of
                                      place.                               jobs/parts of jobs on cells/lines
                                                                           based on necessary flow rate.
Still a large number of measures       The measures are related to the     Partial attempt at a Balanced
tracked but a few get the most         type of business and product        Scorecard is made with some
attention. Some awareness of           produced. Customer Sat. has         vertical link to business
Customer Satisfaction and the          sizeable influence over             measures. Employees are
profitability of the business.         performance decisions. Some         exposed to various
                                       visibility of the measures is       measurements and see the link
                                       gained through weekly/monthly       between their job and profits.
                                       measures but adherence to a         Priorities become a little clearer.
                                       “hot” few is common.




Storage areas have begun               Storage areas are specifically      Supply Chain Management has
utilizing visual controls and are      designated and may be               performed an 80/20 analysis on
beginning to establish a               relatively close to the point of    those parts and suppliers that
replenishment system for line side     use, and employees generally        are causing or could cause
stocking with the involvment of        comply with procedures. Some        significant variations in the
Supply Chain Management.               FIFO mechanisms exist. Line         production process and has a
                                       side stocking replenishment         plan in place to reduce lead-
                                       system is being utilized.           times, quality issues, or lot size
                                                                           issues. Storage continues to be
                                                                           moved to line side stocking
                                                                           where applicable.

Designated incoming and                Storage areas are specifically      Materials, WIP and equipment
outgoing storage zones may exist       designated and may be               have designated storage areas
but are unlabelled and poorly          relatively close to the point of    which are close to the point of
controlled. Many employees             use, and employees generally        need. Minor compliance
disregard, leading to unauthorized     comply with procedures. Some        slippage still occurs. FIFO
pile-ups. In between process           FIFO mechanisms exist.              occurs. Production and in
WIP levels are still not controlled.   Incoming and outgoing areas         process WIP are controlled by
                                       are clearly marked and are          Kanban (pull system criteria
                                       being utilized properly.            below).
                                       Excessive Material entering the
                                       cell is sent back to the previous
                                       process.

Maintenance crew is fairly well        Maint. crew is cross-trained and    Goals for maint. dept. are set
trained, but slow to respond. Only     responsibility is well organized.   and measured regularly.
maintenance does maintenance.          Operators do simple                 Machine failure rarely impacts
Major PM’s conducted yearly.           maintenance and are doing daily     production schedule. Root
Little awareness of PM/TPM.            walk-around checks. PM              cause analysis used for major
Recurring downtime problems are        schedules are posted but major      failures. Pilot TPM team is
the norm.                              PM is done only annually.           running.
Production output at individual      Partial Kanban (or similar)            Kanban (or similar) systems are
stations may be somewhat limited     system is in place either in very     in place either in multiple areas
by backup of WIP downstream. A       limited area of line or in            to support specifc Value or
“cap-limit” or maximum WIP level     materials replenishment at work       product streams. Replenishment
is in place. Communication           stations but relies on high buffer    to the lines, Pull between
between stations is poor.            sizes to prevent line disruptions.    separated work areas, Pull from
                                     Management is aware of value          supermarkets for CTO are
                                     of pull control. Discipline in pull   readily identifiable and evident.
                                     control may be slightly               Minimal reliance on buffers to
                                     imperfect.                            prevent line disruptions.
                                                                           Discipline in pull control by
                                                                           operators is good. Some
                                                                           supplier pull systems are in
                                                                           place for key materials.



Parts supply strategy not clearly    Parts supply strategy defined but     Majority of parts supply is
defined to support current           implemented to support current        consistent with current
Operating Model needs (Line-side     Operating Model needs (Line-          Operating Model needs (Line-
stock vs replenishment).Multiple     side stock vs replenishment).         side stock vs replenishment).
part drop areas, large amount of     Limited correct packaging             Majority of correct packaging
parts are centralized in one area.   methods/media are in place.           methods/media are in place.
Data integrity still poor. Large     Supply Chain Management has           Minimal material returned to the
amounts of material is returned to   performed an 80/20 analysis on        stockroom. Incoming inspection
stockroom.                           those parts and suppliers that        ensures good parts are available
                                     are causing or could cause            to the cell. Material handlers are
                                     significant variations in the         measured on cell uptime.Some
                                     production process and has a          suppliers check stock at the line
                                     plan in place to reduce lead-         in house. Operators reconcile
                                     times, quality issues, or lot size    parts taken/used/scrapped.
                                     issues. Incoming inspection           Supply Chain has resolved 50%
                                     reviews quality prior to put away     of Major issues identified in the
                                     in stores. Most part storage          80/20 recovery plan.
                                     areas are organized. Some
                                     parts are Point Of Use. Some
                                     downtime due to unpredicted
                                     parts issues. Still double
                                     counting and multiple parts
                                     areas.
Basic aspects of Standardized        Fairly complete Standard Work        Majority of stations are covered
Work Procedures are developed        Sheets are developed and             in integrated Standard Work
but not always updated well.         basically followed, and located      Sheets. Sheets are updated
Taken only as a “general             at line side. However these are      regularly, and are used regularly
guideline” for the stations to       not frequently used as baselines     as baselines for continuous
follow. Concepts good, but slips     for continuous improvement           improvement of processes and
occur in application. Some           activities.                          procedures. Operators
operator input into the methods.                                          create/maintain Standard work
                                                                          methods and documents.
                                                                          Operators adhere to standards
                                                                          on all shifts.


Passive suggestion system is in      Employees are interested in          Most employees understand and
place, but no real training or       improving and are given limited      participate in ongoing
motivation supplied to employees.    feedback and training.               improvement and have
Little feedback or communication     However, involvement is low key      knowledge of customer
to employees on their involvement    and not well organized. Some         demands. Focus on
in                                   customer awareness is present.       performance still needs to be
                                                                          built into training/compensation.




Upper management and                 Suggestion system to support CI      A fair amount of CI occurs
engineering advocate CI type         program exists, but is not based     through dedicated CI teams.
progress, but no systems exists to   on team efforts or well              Suggestion system is used by
facilitate. Suggestion system is     supported by management.             workers. Management clearly
non-existent or weak.                Feedback to workers on               understands CI versus
                                     progress is limited. Six Sigma       “innovation”.
                                     personnel are involved when
                                     major or reoccuring problems
                                     are identified.



Production managers aware of         Error-proofing devices built into    Error-proofing devices are
problems and use SPC or other        a number of machines but their       present on majority of machines
monitoring to signal when            further application is not part of   and processes. Error proofing is
problems develop.                    continuous improvement               used in fixing root problems.
                                     process. Design is largely           Most people understand value
                                     limited to engineers.                and use of error-proofing.
Managers and Operators are                Routine use of SPC (Statistical     Routine use of FMEA (Failure
aware of problems and use SPC             Process Control). Some              Mode Effects Analysis),
sparingly to collect defect data          Corrective Actions are              Corrective Actions are
periodically or other monitoring          generated whenever a problem        generated for all problems
tools to signal when problems             arises, Defects are repaired at     including supplier related
develop. Operators are                    the source and do not pass          problems. Continuing
empowered to stop the line when           downstream. FMEA ( Failure          Improvement as well as periodic
problems arise.                           Mode Effects Analysis) are          audits of actions on Machine,
                                          developed for some products.        Operator/Method assignable
                                                                              causes. Value Streams are
                                                                              operating at a 4 sigma level.




Work areas and walking areas              Names of                            All can easily tell the designated
are separated. Goods and                  materials/tools/machines are        location and quantity of tools,
machines are placed in a                  displayed according to Celestica    materials and machines.
standardized order. Work areas            standard. Machines/floors are       Cleaning and orderliness is very
are still messy. Some Celestica           regularly cleaned. Visitors see a   good with a well maintained
standard signage is in place but          “clean plant”. Plant is generally   system in place to keep it this
inconsistent                              orderly, including most work        way. Enforcement of clean and
                                          areas. Celestica Standard           orderly workstations is done by
                                          signage is in place                 shop employees themselves.
                                                                              Celestica Standard signage is in
                                                                              place



A few visual communication tools          Visual communication tools and      All Employees are able to
are used. It is still very difficult to   displays are used, but the          understand performance, goals,
see performance, goals, and               information is not very complete    and status of the process from
current status.                           or as up to date as it could be.    the posted information.
                                          Performance and status are          Information is thoughtfully
                                          fairly clear to most people.        tailored to individual areas.
Very limited use of structured       Some Managers, Directors,            Most Managers, Directors,
problem solving analysis on          Supervisors may use structured       Supervisors, Lead people apply
special occasions (e.g.              problem solving type analysis,       structured problem solving to
engineering, management); often      but normally after several           problems frequently (although
large, repetitive problems.          repeats and for more severe          some Band-Aid’s still occur).
                                     problems.                            Problem solving methods are
                                                                          standardized, and operators are
                                                                          trained on their use.




High level stop authority but no     Work cell or team leader has         Work cell or team leader may
system is present to react quickly   authority to stop line for serious   stop line for general or
when a defect or other problem       quality problems and safety          developing quality problems
occurs. Long wait (>24 hrs)          issues. Criteria for stoppage is     before these become serious.
occurs before identified problems    posted at workstations.              Effective system to alert those
are fixed.                           Response time of support is          who can help is in place with
                                     predictable but not fast.            fairly rapid response speed.




Expanded Definition:                 Other Comments:
Work in Process                      in process inventories
World Class Manufacturing            refers to the lean philosophy
Monthly Order Quantity
Non Value Added
Value Added
Industrial Engineering
Supply Chain Management
Preventitive Maintenance
Total Productive Mainenance
Material Requirement Plan
First in First Out
Configure to Order
Continuous Improvement
Statistical Process Control
Failure Mode Effects Analysis
                                                                      Value
ss all shifts)                                     Site      Site    Stream
                                                  Target   Average     Low    Line 1   Line 2   Line 3

                            5                     Score     Score    Score    Score    Score    Score

           True single piece flow (lot size=1)
           occurs in virtually all areas of the
           line(s). Employees understand
           the value of this and constantly
           work to improve efficiency of
           setups/changeovers and reduce
           variability. Production system is
           defined by linked cells supporting
           a product stream. Deviations to
           single piece flow are understood
           and standardized. Setup time is
           equal to TAKT time.



                                                   3.5       2.8       2        2        2        2
           Equipment and processes are
           close enough together for hand
           transport and job sharing.
           Equipment/processes are
           arranged in small, product
           specific, flexible cells. Work
           “loops” are easily re-balanced.
           Facilities are flexible to change,
           operator workflow are
           uninterrupted. Equipment and
           tools are not shared.
                                                   3.5       4.3       4        4        4        4
           Production of major products as
           well as “spot” demand occurs
           daily. High degree of visibility to
           customer demand. Production is
           synchronized among processes
           and based on TAKT time
           analysis. System rules for
           flexibility and order processing
           are defined and managed by the
           line. Orders are managed to
           adhere to lead time. TAKT time is
           adjusted to customer demand.
           MOQ =1


                                                   3.5       3.5       3        3        3        3
Pace of production is controlled
directly by optimal TAKT time.
Time is calculated from live
customer demand and used to
balance work between operators.
All people/stations operate
exactly to optimal TAKT time.
Littel to no deviation to TAKT time
occurs.




                                      3.5   3.5   3   3   3   3
All Setups are done within a very
short time (<10 minutes), one
small enough to allow extremely
frequent changeovers. Times are
low enough to make setup an
almost irrelevant issue for
scheduling and utilization.
Material supply is not a problem.
Methods are migrated to all Value
streams. Setup is equal to TAKT
time. Change notification is
visible.
                                      3.5   4.3   4   4   4   4
Percent of value-added work is
very high. Work is streamlined
down to a hand motion level.
Improvement teams work
extensively to improve
productivity and make jobs better
and easier. VA-NVA ratio is >
20%. Elimination of Non-value
added time is a priority.

                                      3.5   4.3   4   4   4   4
Machines/operations are in work
cells. Employees can and do run
all/several machines as
necessary. Work
balance/allocation strategy is
used to match flow rates to
customer demand. Cross-training
is part of the culture.
                                      3.5   4.3   4   4   4   4
Selected measures vertically
integrated. All measures are
displayed for all employees to see
and reviewed for understanding
at frequent intervals. Customer
Satisfaction is the driving
measure. The measures package
is constantly reviewed and
updated to ensure a Balanced
Scorecard is in effect. Priorities
are clear to all. Trends are
positive. Leadership regularly
reviews data with operators.

                                      3.5   4.0   4   4   4   4
All materials, WIP, and
equipment have designated, well
labeled storage close to point of
use. Quantity figures are always
accurate. All employees
understand and follow
procedures. Parts arrive when
needed for production. Supply
Chain Management has reached
80 percent of original plans goals.

                                      3.5   3.5   3   3   3   3
All materials, WIP, and
equipment have designated, well
labeled storage close to point of
use. Quantity figures are always
accurate. All employees
understand and follow
procedures. Parts arrive when
needed for production.




                                      3.5   3.5   3   3   3   3
Machine fails never impact
schedule. PM is conducted
routinely by everyone. Consists
of: 1) Total employee
involvement, 2) Routine machine
cleaning/checking, 3) On-going
PM and continuous improvement.
TPM in use.
                                      3.5   3.3   3   3   3   3
Production is driven completely
by pull control. Daily output
demands are given to final
assembly only + drawn back up
the line using Kanban cards or
similar device. WIP levels are
low + strictly limited, system is
highly disciplined. All material flow
(raw and WIP) through the
production system is driven by
consumption and is independent
of forecast. Materials are ordered
and linked via a Pull system
directly to suppliers.

                                        3.5   2.8   2   2   2   2
Material supply strategy is
consistent with current Operating
Model needs (Line-side stock vs
replenishment). Appropriate
packaging methods/media are in
place. Minimal material returned
to the stockroom. Suppliers
ensure good parts are available
at the cell. Parts are clearly
labeled and part counts match
system numbers. Material
handlers are measured on cell
uptime. Material is delivered
ready for use. Material status is
visible at all times (on order,
when due, what is late, lead time
problem parts). Supply Chain
has resolved 80% of Major issues
identified in the recovery plan. A
process is in place to identify and
address supply issues on an on-
going basis.




                                        3.5   3.5   3   4   3   3
All work areas are covered in
integrated Standard Work
Sheets. Sheets are updated
regularly, and are thr driver for
continuous improvement of
processes and procedures by the
Operators. Operators
create/maintain Standard work
methods and documents.
Operators adhere to standards
and audit for compliance on all
shifts.
                                     3.5   3.0   3   3   3   3
Employees are clearly aware of
the need to meet changing
customer demands and improve
to succeed. Improvement activity
is regular and vigorous. Needs
and feedback are communicated
well. Operators understand and
present performance to the
leadership team.


                                     3.5   4.0   4   4   4   4
Employees are given major
responsibility (expectation) for
generating and implementing CI.
Time is dedicated for teams to
identify and solve problems with
skill. CI is a “way of life”.
Workplace ergonomics are
continuously improved.
Workteams regularly redesign
cells and upgrade standards.
                                     3.5   3.5   3   3   3   3
Error-proofing devices are
present on all applicable
machines/processes. All
understand value and use of error-
proofing. Operator assignable
causes are minimal. Operation
can be performed flawlessly
without paying attention by any
operator.

                                     3.5   3.5   3   3   3   3
Process variation due to machine,
operator/method, and material
causes are routinely investigated
and eliminated. Operators follow
standard work methods and
consistently performs tasks
correctly. Tools such as FMEA,
SPC, defect data are widely used.
Supplier quality programs are in
place and managed. Error
proofing methods are used at the
source to drive zero defects.
Deviation to standard is identified
and managed. Value Streams
are operating at a 5+ sigma level.


                                      3.5   4.0   4   4   4   4
Clear standardization is visible
across all Value Streams in the
entire plant(signage, color
markings, labels) All materials,
tools, fixtures, and machines
have designated, controlled and
justifed locations. Regular audits
are conducted by Shop floor
people and posted in the work
areas. Celestica Standard
signage is in place.


                                      3.5   2.0   2   2   2   2
All can visually check status and
performance in all Value Streams
of the plant. Problems are quickly
noted and corrective actions are
taken immediately. Information is
maintained by employees.
System status is visible and
obvious to all shifts.

                                      3.5   3.3   3   3   3   3
All problems are investigated
using a team, structured problem
solving approach. Root cause is
identified and permanently fixed.
All employees
understand/participate in problem
solving analyses. Periodic audits
show adherence to corrections.
Corrective actions are sustained.




                                    3.5       3.3     3     3   3   3
Each operator has full authority
and means to stop the entire line
because of developing quality
problems - before these become
serious. Efficient response
system reacts quickly to all
problems (within Takt time).
Escalation process is defined and
followed.

                                     3.5       4.0     4    4   4   4
                                    22.0      77.8   71.0
                                      110.0    3.5    3.2

Eliminate Delay                               18.3   3.7
Operational costs                             16.0   4.0
Predictable output                            12.5   3.1
Quality                                       15.0   3.8
Problem Solving                               12.5   3.1
Drives

Score    Score   Score   Score   Score   Score   Score




  5




  5




  5
5




5




5




5
4




5




5




4
5




4
3




4




5




5
4




2




4
4




4
                                                                   Raleigh WCM Score
Site Sustain Average Score              3.3                                                                                   Threshold

                                                                       Commitment                                             Site Average
                                                                         5
                             Ability to deliver 12 core training                       Education and understanding
                                                                       4.5                                                    Site Low

                                                                         4
              % of line mgmt trained- 12 core                                                      Planning for Change
                                                                       3.5
                                                                         3
                                                                       2.5
            % people totally- 12 core                                    2                                  Accountability
                                                                       1.5
 Training       2.9                                                      1                                      Leadership/Change         3.3
                                                                       0.5
       % people partial-12 core                                          0                                      Resilience




            Leadership team-12 core                                                                         Non-manufacturing support




                        % Saved of the monthly
                                                                                                   Leadership
                              obligation


                                     Monthly saving identified                         Communication

1% Revenue        4.3                                               Improvement plan
                                                              Level of Implementation & Performance
                 Objective
                                                 1
                               Long-term sustained results can
                               not be demonstrated. Business
                               changes , initiatives and projects
                               focus only on the technical
                               requirements and aspects and do
                               not consider the human aspects
                               of the change.


               Commitment




Leadership &
Change
Management
                               Site does not have a Lean
                               awareness or education plan
                               designed or in place. . Change is
                               perceived to be a weak
                               management ability to control the
                               site.




               Education and
               understanding
                 Compliance with business
                 changes is expected. Resistance
                 and other key risks to the change
                 are underestimated or ignored.
                 Fear of change is prevalent
                 among site personnel. The
                 culture is deep rooted and
                 entrenched and resists change.
Planning for
  Change




                 Change Leaders do not consider
                 the human side of the change
                 project. Project objectives do not
                 include "human objectives",

Accountability




                 The organization is overwhelmed
                 by the volume, rate and
                 complexity of changes required.
                 Priorities are not clear and work
                 items are often late or
                 incomplete. People in the
                 organization demonstrate signs of
                 stress and dysfunction.

 Resilience
                                    Lean is viewed as a
                                    Manufacturing focus and
                                    applicable to anything else. There
                                    is little to no awareness of Lean
                                    principles in non-manufacturing
       Non-
                                    areas. Department goals and
  manufacturing                     objectives do not include the
support functions                   identification and elimination of
    (Finance,                       waste. "Us" vs "Them" is the
                       Non-         prevailing culture.
Marketing, Sales,
                    manufacturing
    Customer
                      support
 service, Human
   Resources,
Engineering, NPI,
       etc.)




                                    Actions by site management do
                                    not reflect commitment.
                                    Knowledge of Lean principles by
                                    site personnel is limited. Site
                                    does not see the need for
                                    change. No plan exists to
                                    incorporate Lean plans into the
                     Leadership
                                    Strategic plans.




                                    GM and leadership team are not
                                    reviewing WCM projects, WCM is
                                    rarely mentioned in all-employee
                                    meetings or written
                                    communications.
                    Communication
                                   2004 WCM deployment plan does
                                   not exist. No formal organization
                                   (eg Lean Transformation team)
                                   exists.

             Improvement plan


1% revenue
  status
                                   Site has not determined any
                                   savings resulting from WCM
                                   projects during the current month.

              Monthly saving
                identified




                                              0% to .25%
              % Saved of the
             monthly obligation
                                   Percent of the GM's staff who can
             Leadership team-      teach (and have taught) some of
 Training                          the 12 core modules.      0% to
                 12 core
                                   20%
                                   Percent of employees at the site
                                   who have been partially trained in
             % people partial-     the 12 core modules.       0% to
                 12 core           20%

                                   Percent of employees at the site
             % people totally-     completely trained in the 12 core
                                   modules.       0% to 20%
                 12 core

                                   Percent of line management at
               % of line mgmt the site completely trained in the
              trained- 12 core 12 core modules.       0% to 20%

                                   No one at the site can deliver the
                                   12 core module training.
              Ability to deliver
              12 core training
                 Your site 1% Goal   YTD savings
Goal per Year       $1,700,000
Goal per Month       $141,667

    Month              Actual
      1              $90,000           $90,000
      2               $50,000         $140,000
      3               $50,000         $190,000
      4               $35,000         $225,000
      5              $120,000         $345,000
      6              $250,000         $595,000
      7                               $595,000
      8                               $595,000
      9                               $595,000
     10                               $595,000
     11                               $595,000
     12                               $595,000
Level of Implementation & Performance (Must consider effectiveness across all shifts)

                  2                                  3                                   4
  Changes are implemented, but      Stakeholders are identified and     In addition to basic actions to
  they are surrounded in turmoil,   the need for their commitment is    build people's commitment to a
  stress and disruptions to the     understood. Commitment levels       change, specific risk areas are
  business. Actions by site         are diagnosed and basic actions     assessed proactively to identify
  management do not reflect         are done to build commitment for    potential areas for action to
  commitment.                       the change. (I.e, clarify &         minimize or mitigate risks
                                    communicate)                        associated with the change.
                                                                        (I.e., sponsorship, capacity,
                                                                        culture, synergy, resistance,
                                                                        change agent skills)




  Knowledge of Lean principles by   About 50% of the site personnel     Most of the site leadership
  site personnel is limited.        participate in some type of Lean    "walks the talk" and exhibits a
  Sponsors, Advocates and           training (voluntary or not). Lean   good understanding of Lean
  Change Agents do not have         principles and concepts are         concepts. Change Management
  clearly defined or understood     understood and are incorporated     methodology is understood and
  roles and responsibilities for    into business projects. There is    how to apply it and appropriate
  managing the change to a Lean     an acceptance of change but not     tools for handing resistance and
  environment.                      widespread support. Some            other risks. Change Sponsors,
                                    managers are seen as Change         Agents and Participants are
                                    Agents and attempt to make          educated in these areas.
                                    improvements. All employees are
                                    educated on the change process
                                    and their roles within it.
Leaders of change make efforts        Change plans are integrated into      The culture is open to change
to enable the organization to         the Project Plan and address the      and is aware that it will be met
prepare, build acceptance and         needs of people to prepare, build     with some understandable
implement the change, but these       acceptance and implement the          resistance. Leaders are
efforts are inconsistent and          change. These plans are formal        equipped to recognize and
informal. They rely on the            and utilize project or staff forums   effectively address resistance.
personalities of the change           for review, but the site may          Diagnoses are conducted to
leaders and are often done as a       underestimate the impact of           identify any human risks to the
response to resistance rather         people's resistance to change.        project. Project plans are
than in anticipation of resistance.   Change management activities          updated to include the risk
There is covert resistance to         are centered on impacted              management activities. These
change that is not recognized or      employee groups. These                are monitored and updated
addressed. Often this work is         activities are cascaded throughout    throughout the project and
done in the isolation of the          the organization by change            beyond implementation.
project team and sustaining           agents and managers of impacted
sponsors are not engaged until        employees.
the project is near
implementation.

Human objectives for a project    Human objectives and either               Leaders of change efforts are
are identified, but are often not project success measures are              measured on the level of
achieved or measured. In these    established at the onset of a             disruption caused by their
cases site leaders do not take    project. These are                        change projects. These results
ownership for poor                communicated to all impacted              indicate minimal disruption to the
implementation of sustained       and are monitored and measured            business and the organization.
results. The project teams        throughout the project. Role              Post-implementation monitoring
appear to have sole ownership     maps are created that identify            of progress and problems is
for success or failure.           ownership and accountability for          done.
                                  the change across the
                                  organization.
 Site does not see the need for   Changes project are prioritized.          Organizational capacity for
change. No plan exists to         People have a clear                       change is assessed. This
incorporate Change                understanding of these priorities,        assessment is a factor in setting
Management plans into the         but it is still somewhat of a             organizational priorities. A formal
Strategic plans. Change projects struggle to make progress on               change management process is
are started but see many          changes in the face of day to day         followed. People in the
disruptions and deprioritizations responsibilities and                      organization adapt to the
in the face of "emergencies".     "emergencies". Sustainability of          changes and are ready for more.
                                  the changes is a common issue.
A few of the support                Some of the support                    Some alignment of non-
organizations show interest in      organizations willingly get involved   manufacturing functions
applying Lean concepts. There is    in applying Lean concepts. There       (administrative) to support the
awareness of the potential          is awareness of the potential          manufacturing function. There is
benefits but not a concerted        benefits but the regular               continuous elimination of waste
effort to get started. Some         application of Lean tools is not in    in many of the functional units of
dialogue between manufacturing      evidence. Some high-level              the organization. Many high-level
and the support areas to work       department goals and some PDP          department goals and PDP goals
together. Lean terminology starts   goals include waste elimination        include waste elimination actions
to appear in communications and     actions such as need to reduce         such as need to reduce
discussions.                        transactional cycle time, improve      transactional cycle time, improve
                                    responsiveness, and NPI lead           responsiveness, and NPI lead
                                    time. There is increased dialogue      time. Continuous improvement is
                                    between manufacturing and the          a major focus for many
                                    support areas to resolve daily         managers.
                                    production problems.




Site management makes a token       Site Leadership periodically           Most leadership promotes and
effort towards commitment to        demonstrates a commitment to           implements world-class practices
Lean. Knowledge of Lean             making the site a Lean                 in all business cycles. There is a
principles is limited a few key     environment. The site leadership       high level of personal
change agents. Site                 will separate the daily needs of       commitment and involvement to
management provides little          the business from Lean principles      drive Lean practices by most of
vision of how Lean will benefit     in times of business pressures         the organization's managers. A
the business.                       (eg. end of month, increased           plan for establishing and
                                    demand).                               deploying the Lean principle is in
                                                                           place, reviewed and supported
                                                                           by most site leadership.



WCM is mentioned in some       WCM status is consistently                  GM and leadership team hold
employee communications but it communicated to employees and               monthly detailed reviews of
is not consistent or frequent. some management review of                   WCM projects and consistent
                               WCM projects occurs.                        communication of WCM status
                                                                           to all employees occurs.
Deployment plan is in draft form       Deployment plan exists and is         Deployment plan is reviewed at
but has not been reveiwed by the       reviewed periodically. Site           least quarterly on a formal basis
site Leadership team. Some             management is aware of the plan       by the Site Leadership team.
actions are taken that conicide        but it is not a priority for all      Most Site Management is
with the plan but it is not            managers. Resources are               engaged in the support and
reconciled for updates or validity.    assigned 75% of the time, but         deployment of the plan. A mix of
                                       may be pulled into other tasks by     full-time and part-time resources
                                       management.                           are assigned to execute the plan.



Site has a plan for                    A general project breakdown on        A detailed project breakdown on
monthlysavings desired by using        how the savings will be delivered     how the savings will be delivered
1/2th of 1% revenue. Savings are       is complete. Savings are identified   is created but not yet firm.
estimated by the people who            monthly but not discussed in any      Savings are identified monthly
have completed the projects.           detail. Savings are calculated but    but not always reviewed on a
                                       not always approved or audited by     monthly basis. Savings are
                                       site Finance.                         calculated and approved by site
                                                                             Finance.



           .26% to .5%                           .51% to .75%                           .76% to .1%



Percent of the GM's staff who          Percent of the GM's staff who can     Percent of the GM's staff who
can teach (and have taught)            teach (and have taught) some of       can teach (and have taught)
some of the 12 core modules.           the 12 core modules.      40% to      some of the 12 core modules.
20% to 40%                             60%                                   60% to 80%
Percent of employees at the site       Percent of employees at the site      Percent of employees at the site
who have been partially trained        who have been partially trained in    who have been partially trained
in the 12 core modules.                the 12 core modules.       40% to     in the 12 core modules.
20% to 40%                             60%                                   60% to 80%

Percent of employees at the site Percent of employees at the site            Percent of employees at the site
completely trained in the 12 core completely trained in the 12 core          completely trained in the 12 core
modules.       20% to 40%         modules.       40% to 60%                  modules.       60% to 80%


Percent of line management at          Percent of line management at         Percent of line management at
the site completely trained in the     the site completely trained in the    the site completely trained in the
12 core modules.         20% to        12 core modules.        40% to        12 core modules.        60% to
40%                                    60%                                   80%
There is at least one resource         All members of the site WCM           All members of the site WCM
within the site that can deliver all   Core Team can deliver the 12          Core Team and some members
12 modules.                            modules.                              of another functional group can
                                                                             deliver the 12 modules.
Cumulative Savings Goal     Percentage of $ YTD   Score achieved YTD




                 $141,667              0.64                  3
                 $283,333              0.49                  2
                 $425,000              0.45                  2
                 $566,667              0.40                  2
                 $708,333              0.49                  2
                 $850,000              0.70                  3
                 $991,667              0.60                  3
               $1,133,333              0.53                  3
               $1,275,000              0.47                  2
               $1,416,667              0.42                  2
               $1,558,333              0.38                  2
               $1,700,000              0.35                  2
                                                                    Value
ss all shifts)                                   Site      Site    Stream
                                                Target   Average     Low    Line 1   Line 2
                             5                  Score     Score    Score    Score    Score
            Gaining people's commitment for
            a change is an important
            component of any key business
            project. Leaders of change are
            equipped to manage the change
            process and employees are
            equipped to work through the
            change process. Actions
            demonstrate a focus on the
            human side of change.
            Sustainability and Disruption
            Levels are measured and
            monitored. These results
            indicate high commitment and
            return on change efforts.


                                                 3.5       4.0       4        4        4
            All site personnel receive 40+
            hours of Lean training per year.
            Employees regularly participate
            in events that alter the current
            status-quo. Change is part of the
            culture and is expected by all
            personnel. Senior and middle
            management are capable of
            teaching Lean and regularly
            teach multiple modules of the
            Lean /Concepts. In addition to a
            formal methodology for change,
            all project leaders and team
            members understand how to
            recognize and address
            resistance, ineffective
            sponsorship, and other key risk
            factors.


                                                 3.5       3.0       3        3        3
Resistance is anticipated and
drawn out early on in a change.
Effective strategies for
addressing resistance are in
place. Lessons learned are
captured, shared and leveraged.
Change plans extend beyond the
project implementation date and
include actions to continue to
build commitment and sustain
the change. These activities are
primarily owned by site
management and supported by
key members of the project
team.



                                      3.5   3.0   3   3   3
Business leaders are measured
on the sustainability of the
change projects in their areas.
These results indicate a positive
return on change efforts.




                                      3.5   3.0   3   3   3
Change projects are
implemented on time with
minimal disruption to the
business. The organization is
able to manage more change
initiatives than the prior year and
is increasing its capacity to
handle an increasing volume,
complexity and rate of change.
The organization expects
ongoing change and views it as
the "norm". Site leaders are
measured on the sustainability of
the change projects in their
areas. These results indicate a
positive return on change efforts.



                                      3.5   3.0   3   3   3
Complete alignment of non-
manufacturing functions
(administrative) to support the
manufacturing function. There is
continuous elimination of waste
in all functional units of the
organization. Continuous
improvement is incorporated into
the mission/vision for the site.
Proactive dialogue to eliminate
problems before they occur is
the norm.




                                   3.5   2.3   2   2   2
Organization uses leadership to
promote and implement world-
class practices. There is
sustained personal commitment
and involvement to drive Lean
practices by all of the
organization's managers. A plan
for establishing and deploying
the Lean principles is in place
and executed.



                                   3.5   4.0   4   4   4
GM and leadership team hold
monthly detailed reviews of
WCM projects, team members
do the presentations, WCM
status covered in every all-
employee meeting, WCM article
included in every periodical or
written communication.

                                   3.5   4.0   4   4   4
WCM plan is complete with
planned dollars of benefit per
month. Site management is
actively engaged in the support
and deployment of the plan.
Adequate resources have been
assigned to deliver the planned
results. Deployment plan is
reviewed monthly for corrective
actions.
                                     3.5       4.0     4     4   4
Detailed project breakdown on
how the savings will be delivered
is complete. Site Finance
representative drives the
calculation and validation of the
dollars saved. Results are
submitted for MOR visibility. Site
GM, Director Operations, and
WCM Site Leader
                                     3.5       4.0     4     4   4
              >1.0%

                                     3.5       5.0     5     5   5
Percent of the GM's staff who
can teach (and have taught)
some of the 12 core modules.
80% to 100%
                                     3.5       2.0     2     2   2
Percent of employees at the site
who have been partially trained
in the 12 core modules.
80% to 100%
                                     3.5       3.0     3     3   3
Percent of employees at the site
completely trained in the 12 core
modules.       80% to 100%

                                     3.5       2.3     2     2   2
Percent of line management at
the site completely trained in the
12 core modules.        80% to
100%                                 3.5       3.0     3     3   3
The site WCM Core Team,
leadership team and line
management can all deliver the
12 core module training.
                                      3.5       4.0     4    4   4
                                     16.0      53.5   53.0
                                        80.0    3.3    3.3

Leadership/Change                              26.3   3.3
1% Revenue   13.0   4.3
Training     14.3   2.9
Line 3   Drives
Score    Score    Score   Score   Score   Score   Score   Score




  4        4




  3        3
3   3




3   3




3   3
2   3




4   4




4   4
4   4




4   4



5   5




2   2




3   3




2   3



3   3




4   4
  Site Lean Avg. Score
  January         3.5            Site Lean Avg. Score
  February
  March                     4
                          3.5
  April                     3
  May                     2.5
                            2
  June                    1.5
                            1
  July                    0.5
  August                    0
  September
  October
  November
  December


Site Sustain Avg. Score
                                Site Sustain Avg. Score
  January          3.3
  February
                          3.5
  March                     3
  April                   2.5
  May                       2
                          1.5
  June                      1
  July                    0.5
  August                    0
  September
  October
  November
  December
             Avg. Score




Avg. Score




             Avg. Score

						
Related docs
Other docs by vts57849
Co Op Wind Farm Agreement - PDF
Views: 6  |  Downloads: 0
Cmt Certified Market Technician
Views: 220  |  Downloads: 0
Coca Cola Competition Strategy
Views: 261  |  Downloads: 0
Co Tenancy Use Agreement
Views: 12  |  Downloads: 0
Co Brokers Agreement
Views: 9  |  Downloads: 0
Cnt Incorporated Gels ECE5320
Views: 85  |  Downloads: 0
Coaching Certificate
Views: 25  |  Downloads: 0
Coach Contract - Excel
Views: 157  |  Downloads: 0
Cobol Teradata Application Programming
Views: 52  |  Downloads: 0