									                                  GOVERMENT OF JHARKHAND

                         OFFICE OF THE EXECUTIVE ENGINEER
                   DRINKING WATER AND SANITATION DIVISION PAKUR.


Bill of Quantity for repairing and strengthening of Pakuria Rural Water Supply
Schme.


        Name of Department            :-    Drinking Water and Sanitation Division Pakur.

                                           TECHNICAL BID


Estimated cost               :- Rs. 366751.57
Earnest money                :- Rs. 7400.00
Cost of B.O.Q.               :- Rs 750.00
Time of completion           :- Two Months
Last date Sale of B.O.Q :- 14.07.2010

Date of Tender               : - 15.07.2010

Group No                     :- PKP-1

Issued to M/S/Sri ----------------------------------------------------------------------

Vide Money Receipt No.------------------ Date-----------------------------------




                                            Seal and Stamp of Issuing Officer



                                                    1
                                GOVERNMENT OF JHARKHAND
                        DRINKING WATER & SANITATION DIVISION, PAKUR

                                     SPECIAL NOTES TO TENDERER

[To be kept in Technical bid envelope after going through from clause 1 to 30 carefully and duly signed
and stamped on each page by the tenderer]
This tender pertains to the work as per Schedule “A”. The day, time and venue for the receipt of the
tender will be as per N.I.T. which is enclosed here with as Annexure-I. The tenderer are advised to go
through the following instructions (item 1-31) carefully and participate in this tender accordingly after being
satisfied. The quoted rate must be firm and fixed.
1.    The tenders will be received in two separate envelopes as explained below failure in compliance of
following instructions, will be liable for rejection of tender.
i)      Envelope I :
                This envelope will only contain Earnest Money, attested photocopy of Registration
certificate as a contractor in the D. W. & S. D, Attested photocopy of Income Tax clearance/ Pan Card,
Sales tax clearance certificate, character certificate & labour license ending last financial year and any
other paper required for qualification of the tender etc. along with this N.I.T. Annexure-I & Annexure-II. No
other papers like forwarding letter or else should contain in this envelope. This envelope should be super
scribed on top as “Technical Bid” and on the left, address of the tenderer. All the certificates must be
attested by Gazetted officer and be signed & duly stamped by the tenderer. Nothing should be written on
those papers except as asked for.
ii)     Envelope-II.
                This envelope will only contain the schedule “A” attached duly offered rates filled in on the
space provided for it. Duly signed and stamped by the tenderer. No other papers like forwarding letter or
else should contain in this envelope and nothing except asked for should be written on the tender papers.
This envelope should be super scribed on the top as “Rate Bid” and on the left, address on the tenderer.
Each of the envelopes must be properly sealed.
1.1     Envelope II super scribed as rate Bid will only be opened after as certifying that the Paper’s
contained in envelope marked. “Technical Bid” are as per instructions given in 1(i) above and fulfill the
prerequisite qualification.

                                                         2
2.     SCOPE OF THE WORK :-
       This tender comprised of construction of “repairing and strengthening of Pakuria Rural Water

Supply Scheme. all complete as required for the completion of the work as per schedule “A”. Intending

tenderer should have adequate experience in doing civil works of similar nature. Claus es contained in the

Special notes to tenderer will form a part of the contract beside the usual contained in the printed

contract form and N.I.T.


3. SITE OF WORK :-
       Sites of work is situated in Pakur district Tenderer who desire to take work may inspec t area of
work, and ascertain accessibility and availability of labours, materials etc before quoting their rates. No
claim will be entertained due to adverse site condition, non-availability of materials & labours.
4. QUANTITIES :-
       Quantities given in schedule “A” are approximate and are for the guidance of the Tenderer for
quoting their rates. Payment for work done shall be made based on the actual measurement of the work
done. No claim will be entertained for any variation in the quantity given in the schedule “A”. No extra work
should be done without permission or authorization of the competent authorities empowered to allow such
extra works.
5. TIME :-
       The contractor will have to complete the work within four month from the date of work order, in all
respect.

6. POWER TO REJECT OR ACCEPT THE TENDER :-
       The lowest tender will not necessarily be accepted. Authority reserve the right to accept or reject
any or all the tenders received. No explanation can be asked by the tenderer for the cause of the rejec tion
of the tenders by the concerned authority. Right of distribution of work between/among the tenderer is
reserved in the hands of competent authority.
7. EARNEST MONEY AND SECURITY MONEY :-
       The tender must accompanying the earnest money as per tender notice in shape of 6 year N.S.C.
8th issue / 3 or 5 year Time deposit pass book (Post office) duly pledged in favour of Executive Engineer,
D. W. & S. Division, Pakur. No tender will be considered without sufficient earnest money.
       The successful contractor after getting work awarded will have to deposit 5% Security money
including earnest money in the shape of 6 year N.S.C. 8th issue / 3 or 5 year Time deposit pass book
(Post office) duly pledged in favour of Executive Engineer, D. W. & S. Division, Pakur and have to enter
into an agreement with concerned Executive Engineer on prescribed format. In addition to this, 5%
security deposit will be deducted from his all on A/C bills & final bills. The security deposit will be released
after six month of satisfactory completion of work. Earnest money deposited by the successful tenderer

                                                       3
may be forfeited in case the contractor declines or fails to deposit the sum of 5% (five) including the
earnest money on the agreement amount as security money and to sign the agreement within 7(seven)
days from the date of award of letter by the competent authority.
       On receipt of written application, the earnest money of the unsuccessful tenderer shall be refunded
to them by the Executive Engineer in due courses. Blank pledging form attached with the tender will not be
accepted. Pledged earnest money documents deposited as earnest and security money in other work in
this office or in other office of the Dept. will not be treated as earnest money unless they are released from
the concerned work and re -pledged afresh.
8. RATES :-
       The tendered rate should be inclusive of all taxes, royalty etc. on supply of materials. The
department shall make no extra payment for the same.

       Tenderer is requested to quote their rates in percentage both in words and figures above and
below in the blank space provided in the B.O.Q. The tenderer should note that unworkable quoted rate
(that is lesser than 10% below quoted rate) shall not be accepted and such tenders shall be outright
rejected. The tenderer having good experience in civil works of similar nature shall be given preference.

9. INCOME TAX :-
       It should be noted by the tenderer that Income tax will be deducted from each bill including final bill
as applicable as per income tax act / circular.
10. SALES TAX :-
       Sales tax will be deducted from each bill of the contractor as per sales tax act / circular. The
tendered amount should be inclusive of all taxes on supply of all materials. No extra payment will be made
by the department for the same.
11. CARRIAGE :-
       It should be noted by the tenderer that rates for different items of work mentioned in schedule “A”
are exclusive of carriage but inclusive of all taxes & royalty, cess etc. Therefore no separate payment will
be made to the contractor in respect of taxes, royalties and cess in any shape, payment of carriage of
materials used in the execution of work mentioned will be made as per schedule “A”, for additional lead no
extra payment shall be allowed.
12. SETTING OUT OF WORK :-            The engineer-in-charge of the work /his authorized representative
shall give the site / location and alignment of work. The contractor will have to take full responsibility of
doing the work on the specified alignment at the given site. Any discrepancy regarding site / alignment
which shall come to notice of the engineer-in-charge, shall be get rectified by the contractor as per
direction of E/. Any errors found on the side of contractor before expiry of six months after completion of
work should be rectified by the contractor at his own cost. Failing which the rectification cost will be
deducted from security money of the contractor. The contractor should note that he shall be entirely
responsible for the correctness of the work as per specification & direction of E/I.


                                                       4
13. MATERIALS :-
        The materials supplied by the contractor shall conform to relevant latest edition of the specification
and codes of practices of the Bureau of Indian Standards or / as specified schedule A. The contractor shall
furnish necessary certificates in support of the quality of materials as may be required by the Engineer-in-
charge on his own cost.
14. CLARIFICATION OF ANY DOUBT :-
        If the Tenderer has any doubt or any confusion about the tender, he shall have to get it clarified by
the Superintending Engineer / Executive Engineer before submitting it.
15. INSURANCE :-
        The contractor will have to ensure the labours employed for the execution of the work at his own
cost. If any accident occurs at the site of work during the execution of work, the contractor will have to pay
the compensation for the damage as admissible under relevant Act / Law.


16. SITE ORDER BOOK :-
        Site order book shall be issued to the contractor by the engineer-in-charge or his representative.
The contractor shall keep this book always at site and any special order and instruction to be issued to the
contractor shall be recorded in this book by the engineer-in-charge or his representative. The contractor
shall sign all orders and instructions as token of his knowledge about the s ame. The site order book shall
be the property of the department but will remain with the contractor during the progress of the work. The
safe custody of site order book during this period shall be the responsibility of the contractor. After
completion of the work the book shall be returned back by the contractor to the Engineer-in-charge which
will be enclosed in final bill.
17. EXTRA WORK :-
        The contractor shall not carry out extra work without order of the E/I in site order book. The
contractor will have to maintain a site order book duly page marked by the E/I in which the necessary
instruction regarding execution of work will be given to the contractor by the E/I or his authorized
representative or any other inspecting officer of the department. The contractor will have to make available
all facilities for inspection and testing of work for the inspecting officer of the department.
18. WAGES :-
        The contractor will have to ensure for the payment to the labours engaged in the execution of the
work and it should be strictly in conformation to the minimum wage act approved by the Govt.
19. MISCONDUCT :-
        If any of the contractor’s agent, subagent, consultant or employee is found guilty of misconduct or
incompetence and directed by the E/I to remove him then he shall be removed from the site of work. Any
person so removed shall not be reemployed in the work except with prior permission in writing of the
engineer-in-charge or higher competent authority.



                                                        5
20. INSPECTION AND TESTING OF WORK :-
         The contractor shall provide all facilities, instrument, materials and labours for testing / inspecting
the work and shall afford the site engineer all assistance necessary to conduct the test / inspection for
which no extra payment will be made.


21. ACCOMMODATION :-
         The contractor will provide at their own cost proper huts and drinking water & other admissible
facilities for the labours employed on the job. All other essential facilities admissible to labour force as per
labour act / laws will have to be provided by the contractor at his own cost.
22. ELECTRIC POWER :-
         The contractor will make his own arrangement for electricity and other type of power required for
light or other purpose for the execution of the work. The department however may help them by moving
the electricity department in getting electric connection if required.
23. CONSTRUCTION WATER :-
         The contractor shall arrange water of approved quality for the construction purposes at his own
cost.
24. SITE CLEARANCE :-
                The contractor will keep the site neat and clean even during the execution of the work. After
the completion of work the contractor will remove all debris etc. and hand over a neat and clean site to the
department.
25. ADDRESS :-
                The tenderer shall have to furnish their full permanent and local address in the Tender
Papers. The contractors are required to sign each page of the tender document before submitting their
tenders.
26. Specification :-
MATERIALS :-
                General :
(i)      All materials shall be best of their kind and shall confirm to the relevant latest Indian Standard.
(ii)     All materials shall be of approved quality as per samples and from origins             approved by the
Engineer - in - charge.
(iii)    A set of specimen samples of all approved materials shall be kept in bottle or otherwise
         at site, cost of which is to be borne by the contractor.
(iv)     In case of materials where Indian Standards are not available, the same shall conform
         to the specification issued by the recognized authority or D.W.&.S.D./PWD/JSEB.
(v)      All test reports in original, regarding inspection of different size of G.I. pipe and accessories shall
        have to be submitted to the Executive Engineer before use. the contractor will also stock the
        materials at the concerned divisional store;

                                                         6
(vi)   All type of G.I. pipes should be used before physical verification by S.E.
26.1 BRICKS :
                The following Indian standards shall be followed :-
                IS 3102 : 1971 (latest amendment) Classification of Burnt clay brick.
                IS 1077 : 1970 (latest amendment) Specification of common burnt clay building bricks.
                IS 3495 : 1966, Part I to IV (latest amendment) Method of sampling and testing clay
                Building bricks.
                Only 100A class kiln burnt bricks shall be used unless otherwise specified.
       They shall be of a uniform deep cherry of copper color ; thoroughly burnt, regular in shape with
sharp and square edge and they must emit a clear ringing sound on being struck.
       They must be free from cracks, chips, flaws, stones or lumps of any kind and they shall not absorb
water more than one seventh of their own weight after soaking them in water for 15 minutes.
       The bricks shall show no sign of efflorescence either dry or subsequent to soaking in water.
26.2   SPECIFICATION OF AGGREGATES :-
       Aggregates shall comply with the requirements of IS : 383-1970 (latest amendment). It should be
chemically inert, strong, hard. durable, of limited porosity, and free from adherent coatings, clay lumps,
coal and coal residues and organic or other admixture, that may cause corrosion of the reinforcement and
impair with the strength and durability of concrete.

I. Coarse aggregate :-
       The nominal maximum size of coarse aggregate shall be limited to 20mm, so that the concrete can
be placed without difficulty to surround all reinforcement thoroughly and fill the corners of the forms. For
heavily reinforced concrete members the nominal maximum size of aggregate should usually be restricted
to 5mm less than the minimum clear cover to the reinforcement which ever is smaller. A coarse aggregate
may have cubical, rounded, irregular and angular shapes with rough surface. The stone chips to be used
shall satisfy the following requirement :-

1. Flakiness Index should not be more than 25 percent, when tested as per IS : 2386 )Part-I)-1963 (latest
amendment).
2.     Impact value should not be more than 30 percent, when tested as per IS:2386 (Part-IV)-1963,
       3.Crushing value should not exceed 45% for plain cement concrete and 40% for reinforced
                concrete, when tested as per IS:2386 (Part-IV)-1963 ,
       4.Deleterious materials and organic impurities should not exceed 5% in total, as details given
       below as per IS: 383-1970 and it’s estimation should be done as per IS:2386 (Part-II)-1963.
Sl.
No.    Deleterious substances                    Maximum % by wt.
                                                 (Fine uncrushed (Coarse      crushed
                                                 Aggregates)      Aggregates)
                                                 1.00             1.00
1      Coal and lignite
                                                 1.00                 1.00
2      Clay lumps
                                                        7
                                                   -                   -
3      Soft fragments
                                                 3.00                  3.00
4      Materials finer than 75u IS sieve
                                                 1.50                      -
5      Shale
                                                 5.00                  5.00
6      Total of percentage of all deleterious
       materials
ii Fine aggregate :- The aggregate finer than 4.75mm size is called fine aggregate.Natural sand shall be
used as fine aggregate. It should be free from clay, silt, chlorides and organic impurities. Its grain should
be angular in shape and its fineness modulus should be 2.0 to 3.5. It shall be conforming to specification
given in IS:383-1970 and the sand for mortar shall conform to the grading of sand as given in IS:2116-
1965 as detailed given below :-
                                 Grading limits for fine aggregate
                                         Percentage passing by mass
               I.S.              Sieve
               designation              For R.C.C. Work       For              ordinary
                                                              masonry
               4.75 mm                  100                   100
               2.36mm                   90-100                90-11
               1.18 mm                  70-100                70-100
               600 micron               40-80                 40-100
               300 micron               5-40                  5-70
               150 micron               0-10                  0-15
               Grading limits for all in aggregate as per IS:383-1970 are appended below :-


                   I.S.          Sieve Percentage passing for all in aggregate of
                   designation         20mm nominal size 40mm nominal size


                   80 mm                0                     100
                   40 mm                100                   95-100
                   20 mm                95-100                45-75
                   4.75 mm              30-50                 25-45
                   600 micron           1-35                  8-30
                   150 micron           0-6                   0-6
26.3   SPECIFICATION OF CEMENT :-
       The cement used shall be as per CL :- 4 to IS: 456-1978, and it shall be any of the following with
the prior approval of the engineer-in-charge.
       *       Ordinary or low heat port land cement conforming to IS: 269-1976.
       *       High strength ordinary Portland cement conforming to IS: 8112-1976.

                                                        8
26.4   SPECIFICATION OF REINFORCEMENT :-
       The reinforcement steel shall be any of the following :-
       [a]     Medium tensile steel bars conforming to IS:432 [Part-1]-1966
       [b]     Hot-rolled deformed bars conforming to IS: 1139-1966.
       [c]     Cold-twisted bars conforming to IS: 1786-1979.
       [d]     Hard-drawn steel wire fabric conforming to IS: 1566-1967.
       All reinforcement shall be free from loose mill scales, loose rust and coats of paints oils mud or
other coatings which may destroy or reduce bond.
26.5   WATER :-
       The water to be used in making and curing of concrete, mortar etc. shall be free from objectionable

quantities of silts, organic matter, injurious amount of oils, acid, salts and other impurities etc. as per IS:

456-1978.


       The Engineer-in-charge or his authorized representative will determine whether or not such
qualities of impurities are objectionable.
       Such comparison will usually be made by comparison of compressive strength, water requirement,
time to setting and other properties of concrete made with distilled or clean water and concrete made with
the water proposed fodr use. The maximum permissible limit for solids when tested in accordance with I.S.
3025-1964 shall be as below.

Sl.    Particular              Maximum permissible limit for solids

1.     Organic                         200 mg / litre
2.     Inorganic               3000 mg / litre
3.     Sulphate (as SO4)       500 mg / litre
4.     Chloride (as Cl)                2000 mg / litre for P.C.C. work and 1000 mg / litre for R.C.C. Work.
5.     Suspended matter        2000 mg / litre.
If any water to be used in concert, suspected by the engineer-in-charge/ or his authorized representative
of exceeding the permissible limits of solids, samples of water will be obtained and get is tested by
Engineer-in-Charge in accordance with IS-3025-1964.
26.6   CEMENT CONCRETE :-
       The following relevant Indian Standards shall be followed for cement concrete work :-
       a) IS: 456-1964; Plain and reinforced concrete code of practice
       b) IS: 1199-1959; Sampling and analysis concrete
       c) IS: 2645-1975; Integral cement water proofing compound
                                                        9
       d) IS: 2386-1963; Specific gravity, density, voids, absorption and Bulking.
       e) IS:3384 - 1965; Bitumen primer for use in water proofing and damp proofing Industrial Bitumen.
       f) IS: 516-1959; Methods of test strength of concrete.
       g) IS:3558-1956; Code of practice for use of immersion vibrators for construction of Concrete.
       h) IS:2751- 1966; Code of practice for welding of mild steel bars used for reinforced Concrete
construction.
       i) IS:2502-1963; Code of practice for bending and fixing of bars for concrete.
       Concrete shall be composed of cement, sand and stone aggregate and water as required for
workability. Admixture may be used with the approval of the engineer-in-charge. The admixture shall
conform to I.S.:9103-1979 (latest amendment). The concrete shall be of grades as designated in approved
design and must be conforming to I.S. :456-1978, CL:-5. Test and analysis of aggregate and the resulting
concrete shall be made at proper intervals at the start of work and during the progress of work to ensure
its quality and grade. The concrete mix shall have required workability and a characteristic strength not
less than adopted design strength.
       P.C.C. & R.C.C. Work should be done strictly as per approved design and drawing in accordance
with I.S:456-1978 i.e. code of practice for plain and reinforced concrete (latest amendment). If at the time
of doing P.C.C. in foundation it is felt that some M.S. reinforcement are necessary, the same must be
provided by the contractor without any extra cost. No claim shall be allowed for all that.
26.7   SPECIFICATION OF G.I. PIPES :
                The G.I. pipe used shall be as per IS:1239/1990 and G.I. Socket used for jointing the G.I.
pipes shall be as per I.S.2062/1990.
27. STORAGE OF MATERIALS:-
       The materials to be used in the work shall be stored in such a manner as to prevent deterioration
or intrusion of foreign matter and to ensure the preservation of their quality and fitness for the work.
28. GUARANTEE :-
       The contractor shall have to give the guarantee against seepage and leakage for the water from
roof of switch room and sump walls as well as stabilizer and motor pump(2Years). In the event of any
defect / failure / seepage or appearance of any sign of failure of any component of structure or equipment
or failure to comply clause of guarantee at the time of testing/commencement, the contractor shall have to
rectify the defects and set right the structure or equipment and / or reconstruct / replace or erect afresh in
order to achieve desired efficient and fulfill the guarantee within shortest possible period to the entire
satisfaction of the department. Failing which the department may get defect or defects rectified and cost
incurred over such rectification including supervision charges and penalty as demand shall be recovered
from the contractor.

                                                      10
29. MEASUREMENT AND PAYMENT :-
       Measurement will be taken by the E/I or his authorized subordinate of the concerned D.W. & S.
Sub-Division at site jointly with the contractor’s representative. All such record shall be signed by the
contractor or his authorized representative in the measurement book as a “token of acceptance”. Every
effort will be made to make running payment as per the availability of fund but for delayed payment due to
any reason beyond the control of the department ; no interest and claim will be entertained.


30. HANDED OVER OF WORK :-
      The contractor shall furnish the following information at the time of handling over the finished work
to the department :-
i)     Name of agency :-
ii)    Location of work :-
iii)   Name of work with full details of work done :-
iv)    Date of starting of work :-
v)     Date of completion of work :-
vi)    Date of handed over :-




                                                                      Executive Engineer,
                                                             Drinking Water & Sanitation Division,
                                                                          Pakur.




                                                        11
                                     >kj[kaM ljdkj
                         is; ty ,oa LoPNrk izeaMy]ikdqM-
                       fufonk lwpuk la[;k & 04@2010&11
     1- foHkkx dk uke %& is; ty ,oa LoPNrk foHkkx] >kj[kaM] jkWphA
     2- foKkiu nkrk dk uke %& dk;Zikyd vfHk;ark] is; ty ,oa LoPNrk izeaMy] ikdqM-A
     3- ifjek.k foi= fodzh dh vafre frfFk %& fnukad& 14-07-2010 rd ¼ dk;kZy; vof/k
        esa½
     4- fufonk izkfIr dh frfFk ,oa le; %& 15-07-2010 dks 3-30 cts vijkgu~ rd A
     5- fufonk izkfIr dk LFkku %& is;ty ,oa LoPNrk izeaMy] ikdqM+ ,oa is;ty ,oa
        LoPNrk
                          nqedk vapy nqedkA
     6- fufonk Ik= [kksyus dh frfFk ]le; ,oa LFkku %& 17-07-2010 dks 01%00 cts
        vijkgu~ esa
                                           is;ty ,oa LoPNrk izeaMy] ikdqM+A

     7-ifj.kke foi= fodzh dk LFkku %&dk;Zikyd vfHk;ark] is;ty ,oa LoPNrk izeaMy]
     ikdqM- dk dk;kZy;]
      v?kh{k.k vfHk;ark] is;ty ,oa LoPNrk vapy nqedk dk dk;kZy;] nqedk A ifjek.k foi=
     dks >kj[kaM
      ljdkj dh osolkbZV www.jharkhand.gov.in ls Hkh MkmuyksM fd;k tk ldrk gS] ftldk
     eqY; cSad
      MªkIV@cSadlZ psd ds            ek/;e ls dk;Zikyd vfHk;ark is;ty ,oa LoPNrk
     izeaMy]ikdqM+ ds inuke ls ikdqM+
      esa ns; gksuk pfkg, rFkk rdfudh chM esa layXu gksuk pkfg,A

   8- dk;Z dh foLr`r fooj.kh %&
dz0 xzqi       dk;Z dk uke      izkDdfyr        vxz/ku      ifjek.k   dk;Z
la0 la0                           jkf”k           dh       foi= dk    lekIr
                                    #0           jkf”k    ewY;&#0     djus
                                                  #0                   dh
                                                                      vof/k
 1      2            3                 4           5         6          7
1      PKP- jkf"Vª; vkink dks’k
        1   ls       ikdqfM+;k
            xzkeh.k tykiwfrZ
            ;kstuk          dk
            lqn`<+hdj.k dk;Z
            vUrZxr iEi gkmLk       366751.57    7400.00    750.00     2 ekg
                                           12
            dh ejEefr] 5,pih
            eksVj      iEi    dh
            vkiwfrZ          ,oa
            vf/k’Bkiu] 2500-00
            ehVj ikbZi ykbZu
            dh lQkbZ] nks
            vnn         HksV~l]
            LVS.MiksLV ,oa
            LyqbZl         HkYo
            pSECkj            dk
            fuekZ.k         vkfn
            dk;ZA
 uksV %& fufonk dh “krsZ www.jharkhand.gov.in ,oa dk;kZy; lwpuk iV~ ij ns[kk
tk ldrk gSA



                                       ¼bZ0 uojax flag½
                                      dk;Zikyd vfHk;ark
                                is;ty ,oa LoPNrk izeaMy]ikdqM-

                                   >kj[kaM ljdkj
                       is; ty ,oa LoPNrk izeaMy]ikdqM-
                     fufonk lwpuk la[;k & 04@2010&11
fufonk dh fu;e ,oa “krsZ %&
  1 is;ty ,oa LoPNrk foHkkx] >kj[k.M ljdkj ds vUrxZr l{ke inkf/kdkjh ls leqfpr Js.kh
    esa fucaf/kr laosnd gh fufonk esa Hkkx ys ldrs gSaA
  2 fufonk esa vafdr ifjek.k ,oa y{; dh jkf”k ?kV ;k c<+ ldrh gS A
  3 VuZ dh ds vk/kkj ij lQyrkiwoZd larks"k tud <ax ls dk;Z lEiUu djus okys
    laosndksa dks izkFkfedrk nh tk;sxh A blds fy, dk;Z vuqHko izek.k i= layXu
    djuk gksxk
  4 fdlh fufonk vFkok leLr fufonk dks fcuk dkj.k crk;s jn~n ;k Lohdkj djus ;k ,d ;k ,d
    ls vf/kd fufonkrkvksa ds chp dk;Z ckWVus dk vf/kdkj v|ksgLrk{kjh dks lqjf{kr
    jgsxk A
  5 'krksaZ esa ifjorZu@la”kks/ku dk vf/kdkj v|ksgLrk{kjh dks lqjf{kr jgsxk A
  6 ifjek.k foi= dk ewY; ykSVk;k ugha tk,xk A
  7 vxz/ku dh jkf”k jk"Vªh; cpr izek.k i= ¼vkBoka fuxZe½ @ 3@5 o"khZ; lkof/k tek
    iklcqd tks >kj[k.M jkT; ds Mkd?kjksa ls fuxZr fd;k x;k gks]] tks dk;Zikyd
    vfHk;ark] is;ty ,oa LoPNrk izeaMy] ikdqM- ds inuke ls izfrfKr gksuk pkfg, A
                                         13
8 fufonk ds lkFk v|ru fodzh dj LoPNrk izek.k i=] fuca/ku izek.k Ik=] dk;Z vuqHko
  izek.k i=] pfj= izek.k i= v|ru vk;dj fjVuZ izek.k Ik= ,ao Je vuqKfIr izek.k Ik= dh
  vfHkizekf.kr izfr izLrqr djuk vfuok;Z gksxk A
9 l”krZ fufonk ekU; ugha gksxk A
10 dk;Z vkoafVr gksus ds Ik”pkr~ dk;Z ds nkSjku dk;Z dh izxfr larks"ktud ugha
   gksus ij ljdkjh dk;Zfgr esa dk;Z nwljs laosnd dks vkoafVr dj fn;k tk;sxk A
11 fufonkdkj ,d fyQkQk esa fuEufyf[kr dkxtkr Mkydj lhy can dj vius iwjs uke vkSj
   irk ds lkFk lefiZr djsaxs A bl fyQkQk ds mij Li"V :i ls Vsdfudy chM fy[kk gksxk]
   Vsdfudy ohM lgh ik;s tkus ij gh jsV ohM [kksyk tk;sxk A
        i. is;ty ,oa LoPNrk foHkkx dk fuca/ku dh vfHkizekf.kr Nk;k izfr tSlk fd
          dzekad 1 esa vafdr gS A
        ii. iSu dkMZ dh vfHkizekf.kr Nk;k izfr tSlk fd dzekad 8 esa vafdr gS A
        iii. fodzh dj LoPNrk izek.k i= dh vfHkizekf.kr Nk;k izfr A
        iv. dk;Z vuqHko izek.k dh Nk;k izfr A
        v. vxz/ku dh jkf”k tSls dzekad 7 esa vafdr gS A
        vi. pfj= izek.k i= dh Nk;k izfr tSlk fd dzekad 8 esa vafdr gSA

12 nwljk fyQkQk] ftls jsV ohM dgk tk;sxk] mlesa ifjek.k foi= esa viuk nj vafdr dj
   vius iw.kZ gLrk{kj ds lkFk Mkyuk gksxk A
13 izkDdfyr jkf”k ls 14-99 izfr”kr de ;k vf/kd nj ij fufonk ekU; ugha gksxkA
14 ifjek.k foi= dz; djus ds iwoZ fufonkdkj vFkok muds izkf/kd`r izfrfuf/k ifjek.k foi=
   ds gj i`"B dks i<+ ysaxs] blds ckn vkosnu djsaxs fd eSaus ifjek.k foi= dks i<+
   dj le> fy;k gS rFkk eq>s ifjek.k foi= fuxZr fd;k tk,] ,slk vkosnu ds mijkar gh
   ifjek.k foi= fuxZr fd;k tk;sxk A
15 fuf/k izkfIr ds i”kpkr gh Hkqxrku fd;k tk;sxkA
16 cSls lEcsnd ftUgksa us izeaMy vUrZxr fMªYm uydwi@xzsHkyiSDM uydwi
   fuekZ.k@ikbZi tykiwfrZ ;kstuk dk dk;Z fu/kkZfjr le; lhek ds vUnj iw.kZ dj fy,
   gSa mUgsa dk;Z vkoaVu esa izkFkfedrk nh tk;sxh rFkk ftu fufonkrkvksa ds ikl
   mDr dk;Z fu/kkZfjr le;&lhek chr tkus ds ckctqn Hkh yafcr gS] mUgsa dk;Z
   vkoafVr ugha djus gsrq foHkkx Lora= gksxkA
17 fo”ks"k tkudkjh ds fy, v|ksgLrk{kjh dk dk;kZy; ls lEidZ dj ;k lwpuk iV~ ;k
   www.jharkhand.gov.in dh osolkbZV ij ns[k ldrs gSaA



                                                            ¼bZ0 uojax flag ½
                                                dk;Zikyd vfHk;ark
                                      is; ty ,oa LoPNrk izeaMy]ikdqM-

                                        14
                                      Annexure-II
                   PRESCRIBED FORMAT OF CHECK LIST OF TECHNICAL BID

   1. Name of Contractor


   2.Tenderers DWSD Jharkhand Registration to be
   enclosed)
   3.Amount and Shape of Earnest money Enclosed


   4.Sales Tax clearance certificate, current up to date
   (Attested Photocopy of such certificate duly signed &
   stamped by the tenderer to enclosed)

   5. Experience certificate as per clause 1.2 nd 1.3 :

   6. Photocopy of the Balance Sheet of last three
   financial year of the Firm/Contractor duly audited by
   C.A. :

   7. Past performance of the work :

   8. Financial Soundness:

   9. Satisfactory performance certificates:

  10. Last year Income-tax return/PAN Card/Current
  Sales       tax,      Clearance       certificate/Labour
  license/Character certificate (Photo copies duly signed
  and stamped by the tenderer to be enclosed).
Note:
          (i)      Attestation must be done by Gazetted Officer/Notary.
           (ii)    No foreign paper other than this page and as aspect in special notes to tenderer should be
                   kept in Technical bid envelope.
           (iii)   Nothing extra should be written on this page as asked for.
Full Address of Tenderer with Phone/Mobile number:-



                                                                           Signature of Tenderer




                                                          15
                                  GOVERMENT OF JHARKHAND

                         OFFICE OF THE EXECUTIVE ENGINEER
                   DRINKING WATER AND SANITATION DIVISION PAKUR.


Bill of Quantity for repairing and strengthening of Pakuria Rural Water Supply
Schme.


        Name of Department           :-     Drinking Water and Sanitation Division Pakur.

                                              RATE BID


Estimated cost               :- Rs. 366751.57
Earnest money                :- Rs. 7400.00
Cost of B.O.Q.               :- Rs 750.00
Time of completion           :- Two Months
Last date Sale of B.O.Q :- 14.07.2010

Date of Tender               : - 15.07.2010

Group No                     :- PKP-1

Issued to M/S/Sri ----------------------------------------------------------------------

Vide Money Receipt No.------------------ Date-----------------------------------




                                            Seal and Stamp of Issuing Officer



                                                    16
                                          Govt. of Jharkhand.
                                Drinking Water & Sanitation Division, pakur


                                          SCHEDULE –“A”
          Bill of quantity for the work of Repairing and strengthening of Pakuria Water
          Supply Scheme.

          Estimated Cost :-Rs.366751.57

Sl. No.                   Particulars                 Quantity   Unit     Rate      Amount
                                                                                     (Rs.)
1.         Repairing of Submersible Motor Pump and 1 No.         Each 232805.80    233805.80
           Electrification work as per Sub-estimate
           no. 1.

2.         Repairing of 3.65m x 3.00m x 4.26m High 1 No.         Each 20614.81     20614.81
           Pump House. (As per sub-estimate no. 2).

3.         Construction of Brick Masonry Vat. (As per 2 Nos.     Each 38230.23     76460.46
           sub-estimate no. 3).

4.         Construction of single mouth R.C.C. Stand 2 Nos.      Each 3092.69      6185.38
           Post (As per Sub-estimate no. 4).

5.         Construction of 1.20m x 0.90m x 1.30m deep 2 Nos.     Each 6217.56      12435.12
           sluice valve/Air Relief Valve Chamber (As
           per sub-estimate no. 5)

6.         Supplying labours, equipments for scouring
           CI pipe line with water all complete as per
           direction of E/I.
           100mm dia C.I. pipe.                        2500 Mts P/M     6.90       17250.00
                                                                        Total      366751.57



                                                                           Executive Engineer
                                                                        D.W.&S. Division, Pakur.




                                                 17
                                     Sub Estimate No.-01
         Name of Work :- B.O.Q for Supplying 5 HP Submersible Pump Set, Pannel
         board and 10KVA, 3Phase Voltage Stabilizer, wiring of pump house etc for
         strengthening Pakuria Water Supply Scheme.

Sl.no.   Particulars                                        Quantity   Unit      Rate        Amount
                                                                                             (Rs.)
1        Cost towards submersible pumping set capacity
         of discharging 3000 GPH clean water against a
         total head of 65m from all corner coupled with
         suitable submersible motor workable on 3 phase
         50 c/s, 380-415 volts A.C. supplying of reputed
         make.
         5 HP capacity for stand by.                        1 No.      Each      45000.00    45000.00
2        Cost of supply fitting and fixing panel board
         with starter, main switch, kit-kat, pre-venter,
         voltmeter etc. all complete job.                   1 set      Each      30000.00    30000.00
3        Cost of 65mm dia heavy duty GI pipe for
         suction pipe (TATA make).                          54m        P/M       392.70      21205.80
4        Cost towards 4.00 mm2 x 3 core water proof
         blat type PVC insulated and PVC sheathed
         cable copper conductor cable for submersible
         motor pump set.                                    60m        P/M       160.00      9600.00
5        Cost towards 10 KVA voltage stabilizer on 3
         Phase of reputed make.with 5yrs warranty.          1 No.      Each      110000.00 110000.00
6        Cost towards 65mm dia GI bend, GI socket long
         thread .30m long ripple, fullway valve GI Tec.
         Plug, GI flange, NR valve and other fittings all
         complete.                                          One item   Each      4000.00     4000.00
7        Supplying all tools, equipments and labour for
         taking out motor, pump and GI pipe for
         repairing motor pump and installation of
         submersible motor pumping set all complete.        1 no.      Each      6000.00     6000.00
8        Cost towards light wiring of pump house
         including supplying 3/20, 7/20 PVC single core
         copper cable 100 mm holder, wooden board,
         switch, bulb and also doing earthing by SWG
         8nos. copper wire supplying 32mm dia GI pipe
         3m, G.I. bend 2 nos. sockets etc. as per JSEB
         rules.                                             One item   Each      8000.00     8000.00
                                                                                 Total       233805.80



                                                                          Executive Engineer
                                                                       D.W.&S. Division, Pakur.




                                                    18
          DRINKING WATER AND SANITATION DIVISION, PAKUR
                                 Sub Estimate No. – 2
      B.O.Q for repairing of 3.65m x 3.00m x 4.26m light pump chamber.

Sl.                         Particulars                           Quantity Unit      Rate     Amount
No.                                                                                  (Rs.)     (Rs)
  1                               2                                   3        4       5         6
1.    Dismantling plain cement concrete work including
      stocking serviceable materials in countable stacks within
      15m lead and disposal of unserviceable materials with all
      leads all complete as per building specification and
      direction of E/I.
                                                                  0.547 M3    P/M3 249.00     136.20
2.    Dismantling old plaster and pointing in cement or lime
      and raking out joints to 15mm depth, watering and
      disposal of unserviceable materials with all leads all
      complete as per specification and direction of E/I.
                                                                  28.93 m2    P/M2 5.60       162.00
3.    Taking down old door and window choukhats and
      shutters including stacking serviceable materials within
      15m lead and disposal of unserviceable materials with all
      leads all complete as per specification and direction of
      E/I.
           (i)    Taking down choukhats of door.
           (ii)   Taking down chauchats of window.                 1 No.      Each 44.45      44.45
           (iii)  Taking down old door’s and window’s 2 Nos.                  Each 33.50      67.00
                  shutters.                                        3 Nos.     Each 11.15      33.45
4.    Providing 50mm thick cement concrete flooring (1:2:4)
      with 20mm to 6mm size graded stone chips finished with
      floating coat of neat cement in panels including cost of
      wiring, finishing the surface smooth by rubbing with
      carbon including stone, taxes and royalty all complete as
      per building specification and direction of E/I
                                                                   10.95 M2   P/M2 201.35     2204.78
5.    Providing 12mm cement plaster (1:6) with clean coarse
      sand of F.M. 1.5 including cost of screening curing with
      all leads and lifts of water, scaffolding, taxes and royalty
      all complete as per building specification and direction of
      E/I.                                                         28.93 M2   P/M2 54.20      1568.00
6.    Supplying, fitting and fixing good quality well dressed
      and well seasoned sal wood work in chaukhats of door
      and windows sky lights including clamps all complete
      including application of two loots of wood preservative
      of approved quality on the surface, building walls and
      linter all complete as per specification and direction of
      E/I.
                                                                   0.104 M3   P/M3 34275.85   3564.68

                                                   19
7     Supplying fitting and fixing 32mm thick good quality
      well dressed and well seasoned sal wood work in batten
      shutters ledged and braced in doors and windows with
      oxidized iron fittings such as hinge, sliding door bolts,
      tower bolts, handles or rings, hook sand eyes, cleats, sand
      block as per schedule taxes and royalty all complete as
      per building specification and direction of E/I.
                                                                    3.606 M2   P/M2 2115.95       7630.11
8.    Providing two coats of painting with ready mixed point
      over a coat of primer of approved shade and make over
      new wooden surface including preparing the surface after
      cleaning, removing dirt, scales, smokes, grease and sand
      papering including cost of scaffolding and taxes all
      complete as per building specification and direction of
      E/I.
                                                                    7.212 M2   P/M2 51.40         370.70
9.    Providing two coats of snowcem of approved shade and
      make over old surface including washing cleaning, sand
      papering the wall, scaffolding, curing and taxes all
      complete as per building specification and direction of
      E/I.                                                    136.47
                                                              M2               P/M2 32.10         4380.68
10.   Providing 1.5mm cement punning including cost of
      screening, curing with all leads and lifts of water,
      scaffolding, taxes and royalty all complete as per
      building specification and direction of E/I.
                                                              21.82 M2         P/M2 20.75         452.76
                                                                                    Total         20614.81



                                                                          Executive Engineer
                                                                       D.W.&S. Division, Pakur.




                                                     20
                                               Sub- Estimate No.- 3
B.O.Q       for construction of Brick masonry, 800 Gallons capacity Vat with 1.50m
                 Staging including platform and drain.

Sl.                                                             Qnty.     Unit      Rate     Amount
                        Particulars
1.    Earthwork in excavation in foundation trenches
      in soft soil (Class A) and disposal of excavated
      earth as obtained to a distance up to 50 mtr.
      Including all lift, leveling, ramming the
      foundation trenches, removing roots of trees,
      shrubs all complete as per specification and
      direction E/I.                                          3.529m³    P/M³    39.65     139.92
2.    Providing designation 75A one brick flat soling joint
      filled with local sand including cost of watering taxes
      royalty all complete as per building specification and
      direction of E/I.                                       5.415m²    P/M²    95.50     517.13
3.    Providing PCC M 100 (1:3:6) in foundation and plinth
      with approved quality of stone metal grade III (20 mm
      to 6 mm size) and clean coarse sand of FM 2.5 to 3
      including screening mixing cement concrete in mixer
      and placing in position vibrating, curing, taxes and
      royalty all complete as per building specification and
      direction of E/I.                                      0.675m³     P/M³    2287.80   1544.27
4.    Providing RCC (1:2:4) in column with approved quality
      of stone chips (20 mm to 6 mm size) graded and clean
      coarse sand of FM 2.5 to 3 including screening
      centering, shuttering, mixing cement concrete in mixer
      cement and placing in position vibration, curing (but
      excluding the cost of reinforcement) taxes and royalty
      all complete as per building specification and direction
      of E/I.                                                  0.656m³   P/M³    3756.85   2464.49
5.    Providing RCC (1:2:4) M150 in beams with approved
      quality of stone chips (20 mm to 6 mm size) graded
      and clean coarse sand of FM 2.5 to 3 including
      screening centering, shuttering, mixing cement
      concrete in mixer cement and placing in position
      vibration, curing (but excluding the cost of
      reinforcement) taxes and royalty all complete as per
      building specification and direction of E/I.         0.443m³       P/M³    4841.40   2144.74




                                                         21
Sl.                                                              Qnty.      Unit        Rate     Amount
                        Particulars
6.    Providing RCC (1:2:4) M150 in slab with approved
      quality of stone chips (20 mm to 6 mm size) graded
      and clean coarse sand of including screening
      centering, shuttering, mixing cement concrete in mixer
      cement and placing in position vibration, curing (but
      excluding the cost of reinforcement) taxes and royalty
      all complete as per building specification and direction
      of E/I.                                                  0.820m³     P/M³      4163.50       3414.07
7.    Providing designation 75A Brick Work in c.m. (1:4) in
      super structure with approved quality of clean coarse
      sand of F.M. 2 to 2.5 including providing 10mm thick
      mortar joints, cost of screening, scaffolding, raking out
      joints to 15mm depth. Curing, taxes and royalty all
      complete as per build specification & direction of E/I.   3.017 M³   P/M³      2046.15   6173.23
8.    Providing PCC. M-150 (1:2:4) in foundation with
      approved quality of stone chips 20mm to 6mm size
      graded and clean coarse sand of 2.50 to 3.00
      including screening, shuttering, mixing cement
      concrete and placing in position, curing taxes all
      complete as per build specification & direction of E/I. 0.316 M3     P/ M3     3174.30   1003.07
9.    Providing 12mm C.P. (1:6) with clean coarse sand of
      F.M. 1.5 including cost of carriage, screening, curing
      with all leads & lifts and royalty all complete.       26.46 M3      P/M²      54.20     1434.13
10. Providing designation 75A B/win c.m. (1:6) in apron of
    platform and drain with approved quality of clean
    coarse sand of F.M. 2 to 2.5 all complete as per
    building specification & direction of E/I.             0.103 M3        P/ M3 .   1836.10   189.11
11. Providing 12mm C.P. (1:3) with clean coarse sand of
    F.M. 1.50 including providing 1.5mm neat cement
    punning, cost of carriage, screening curing with all
    leads and lifts of water all complete.               18.66 M2          P/ M2 .   88.60     1653.28
12. Providing for steel reinforcement of 100mm dia rod as
    per approved design and drawing, cutting, bending,
    binding, with annealed wire etc. all complete as per 228.27
    direction of E/I.                                     Kg.              P/Kg.     52.106    11894.38
13. Providing two coats of snow cem of approved shade
    and make over a coat of cement primer on new
    surface including preparing the plastered surface
    smooth with sand paper, scaffolding, curing and all
    taxes all complete
    Quantity same as item no. 9                          26.46 M2          P/ M2 .   38.50     1018.71
14. Supplying & laying G.I. pipe Tata or equivalent make
    25mm dia G.I. pipe
                                                         4.00 m            P/M2      178.98    715.92

                                                          22
Sl.                                                             Qnty.    Unit      Rate       Amount
                        Particulars
15. Supplying and fixing G.I. fitting of approved make with
    all necessary fittings all complete.
    (i) 15mm dia G.I. Nipple                                  4 Nos.    Each    26.06      104.24
    (ii) 15mm dia G.I. Socket                                 4 Nos.    Each    23.86      95.44
    (iii) 25mm dia G.I. Nipple                                2 Nos.    Each    50.00      100.00
    (iv) 25mm dia G.I. Elbow.                                 2 Nos.    Each    51.10      102.20
    (v) 25mm dia G.I. Socket.                                 2 Nos.    Each    41.20      82.40
    (vi) 25mm dia G.M. Ful way valve                          1 No.     Each    360.20     360.20
16. Supplying fitting & fixing of 155 dia Push cock as per
    direction of E/I. might not less than 400 gms.         4 Nos.       Each    95.36      381.44
17. Carriage of construction materials
    1. Cement 1.60 MT
      stand 0.088 1.688MT Lead – 15 Km.                    1.688MT      P/MT    143.45     242.14
    2. Sand 3.06 M3 .                                                   P/ M3
       Stone Chips 2.62 M3        Lead – 15 Km.            5.68 M3      %0      230.03     1306.57
    3. Bricks 1500 Nos.           Lead – 25 Km.            1500Nos.     Nos.    766.10     1149.15
                                                                                Total:-    38230.23




                                                                            Executive Engineer
                                                                         D.W.&S. Division, Pakur.




                                                        23
                           Drinking Water and Sanitation Division, Pakur
                                        Sub Estimate No. – 4.
                   B.O.Q for construction of single mouth R.C.C. (1:2:4) stand post.

 Sl.                           Particulars                              Quantity   Unit    Rate    Amount
No.                                                                                        (Rs.)      (Rs)
  1                                  2                                      3        4       5         6
1      Earth work in excavation in foundation trenches in               0.147 M3   P/M3   39.65    5.82
       ordinary soil and disposal of excavated earth ……. As per
       approved design building specification and direction of E/I.
2      Providing designation 75A one on flat soling joints filled       1.96 M2    P/M2 95.50      187.18
       with local sand including cost of watering, taxes royalty all
       complete as per building specification and direction of E/I.
3      Providing R.C.C. (1:2:4) m-150 in foundation plinth with         0.337 M3   P/M3 3177.10    1070.68
       approved quality of stone chips (20mm to 6mm) and clean
       coarse sand of F.M. 2.5 to 3 all complete (but excluding
       the cost of reinforcement)
4      Providing M.S. reinforcement of 8mm dia to 6mm dia MS            6.82 kg.   P/kg   52.10    355.32
       rod as per approved design and drawing all complete.
5.     Providing P.C.C. (1:2:4) special concrete drain 10cm wide        2.0m       P/M    196.00   392.00
       and 10cm approx over 10cm or thickness PCC (1:2:4)
       including 12mm cp (1:3) with neat cement punning all
       complete.
6.     Providing 12mm cement plaster (1:3) with neat cement             3.80 M2    P/M2 88.55      336.49
       punning with clean coarse sand of F.M. 1.5 including cost
       of curing with all leads and lifts of water, scaffolding taxes
       and royalty all complete as per building specification and
       direction of E/I.
7.     Supplying all materials and labours for laying and jointing      3.0m       P/m    98.90    296.70
       of 15mm dia G.I. pipe in trenches including cost of earth
       work in excavation and refilling the trenches after laying
       all complete as per specification and direction of E/I.

8.     Supplying G.I. fitting of approved make with lead and yarn
       etc. all complete.
            (i)    15mm dia G.I. Nipple                                 2 Nos.     Each   20.45    40.90
            (ii)   15mm dia G.I. socket.                                2 Nos.     Each   19.35    38.70
            (iii)  15mm G.I. Elbow                                      2 Nos.     Each   20.45    40.90
9.     Providing and fixing G.I. push cock of approved quality          1 No.      Each   85.35    85.35
       etc. all complete job.
10.    Supplying fitting and fixing 8mm dia G.M. ferrule                1 no.      Each 242.65     242.65
       including drilling in C.I. pipe etc. all complete as per
       direction of E/I. wt. not less than 425g.
                                                                                          Total    3092.69



                                                                      Executive Engineer
                                                                   D.W.&S. Division, Pakur.
                             Drinking Water and Sanitation Division, Pakur
                                                 24
                                      Sub Estimate No. – 5
B.O.Q for construction of 1.20mx 0.90mx1.30deep sluice valve/air relief valve Chamber

 Sl.                                                                                     Amount
                     Particulars                  Quantity       Unit        Rate         in Rs.
  1                                                                                         6
                          2                              3        4            5
 1.    Earthwork in excavation in foundation
       trenches in ordinary soil and disposal
       of excavated earth as obtained to a
       distance up to 50 mtr. Including all lift,
       leveling, ramming the foundation
       trenches, removing roots of trees,
       shrubs all complete as per approved
       design, building specification and
       direction E/I.                             4.36        P/M3        46.65         203.39
 2.    Providing coarse clean sand in filling in
       foundation trenches or in plinth
       including, ramming and watering in
       layers not exceeding 150 mm thick
       layers with all leads and lift including
       cost of materials, labours, royalty and
       taxes all complete as per building
       specification and direction of E/I.       0.43         P/M3        112.25        48.26
 3.    Providing designation 75A one brick
       flat soling joints filled with local sand
       including cost of watering etc. all
       complete as per building specification
       and direction E/I.                        2.87         P/M2        95.50         274.08
 4.    Providing PCC M 150 (1:3:6) in
       foundation with approved quality of
       stone chips 20 mm to 6 mm size and
       clean coarse of FM 2.5 to 3 including
       screening mixing cement concrete in
       mixer and placing in position vibrating,
       curing, taxes and royalty all complete
       as per building specification and
       direction E/I.                           0.43M3        P/M3        2287.80       983.75
 5.    Providing designation 75A brick work in
       CM (1:6) in foundation and plinth with
       approved quality of clean coarse sand
       of FM 2 to 2.5 including providing 10
       mm thick mortar joint up to 50 mm
       depth cost of screening, scaffolding, all
       materials as per building specification
                                                 1.690        P/M3        1836.10       3103.00
       and direction of E/W.
 6.    Providing Pre cast RCC (1:2:4) M150 0.245M3            P/M3        2971.55

                                                25
Sl.                                                                                     Amount
                    Particulars                  Quantity     Unit        Rate           in Rs.
 1                                                                                          6
                          2                           3        4            5
      slab of desired size with approved
      quality of stone Chips and clean coarse
      sand of FM 2.5 to 3 including screening
      centering, shuttering, currying the slab
      manually to site and laying in position
      all   complete     as     per     building                                    728.02
      specification and direction of E/I.
7.    Providing MS reinforcement of 8 mm
      dia to 12 mm MS bars as per approved
      design and drawing including carriage
      of MS bars to work site, cutting
      bending, and binding with annealed
      wire with cost of wire, removal of rust,
      placing the rod in position all complete
                                                 6.44 Kg.   P/Kg       52106.65     335.52
      as per specification and direction of E/I
8.   Providing 12 mm Cement plaster 1:6
     with clean coarse sand of FM 1.5
     including cost of screening, curing with
     all lead and lift of water scaffolding
     taxes and royalty all complete as per
     building specification and direction of
     E/I.                                     8.77          P/M2       61.75        541.54
Total Rs.                                                                           6217.56




                                                                Executive Engineer
                                                             D.W.&S. Division, Pakur.




                                               26
                                                    SCHEDULE „D‟
                                             TO BE FILLED BY THE TENDERER

Note: I/We hereby Tender for the work at:
   a) Equal to B.O.Q rates.

     b) ________________________________% Above the B.O.Q. (In fig. & words).


     c) ________________________________% Below the B.O.Q (In fig. & words)



                                                                 Dated Signature with Stamp of Tenderer.


TO BE FILLED IN BY THE TENDRER



1. FULL NAME OF TENDERER: ................................................................................
   (IN BLOCK LETTERS)      ................................................................................

2. FULL Permanent Address: .........................................................................................

                                        .........................................................................................

                                       .........................................................................................

                                      .........................................................................................

3. Full Local Address :                 .........................................................................................

                                        ........................................................................................

                                       .........................................................................................

                                       ..........................................................................................

4. Telephone number with code: ................................................................................

5. Mobile number :                              ..............................................................................

6. Dated Signature with Stamp of Tenderer.


                                                                                         Exeuctive Engineer
                                                                                        D.W.& S.Divsion, Pakur