Docstoc

001-Position wanted-ENGR

Document Sample
001-Position wanted-ENGR Powered By Docstoc
					      Hafiz Muhammad Rashid Minhas
      A-196, Block 13-C, Gulshan-e-Iqbal,
      Karachi, Pakistan
      : + 92 321 944 7769, +92 300 838 1313
      hminhas@live.com , hminhas@engineer.com,



Position wanted :                           Project Manager / Sr. Project Engineer

Job category :                                 Construction
                                               Consultancy
                                               Engineering
                                               Management/Managerial
                                               Quality Control
                                               Quantity Surveying
                                               Document Controls
                                               Maintenance
                                               Real Estate/Property

Objective and Resume Summary:
Objective:

A mature professional with a strong commitment to Civil Engineering career and experience and
exposure brings the knowledge, attain professional growth and show progress in performance by
developing and executing the ability to satisfy the needs to skills effectiveness that leads
to successful job delivery.


Work Experience: + 11 Years in the field of Construction & Engineering

UAE Driving License Holder

Qualification Summary:

Manage the Teams of Constructions (QA/QC Engineers, QS, Procurement) Conversant in Quality
Management System (Iso 9001-2000), EPC Project delivery up to turn over of Quality Documents,
Site monitoring & Inspection implementation according to Plans & Specifications, Construction
Management & Control of Non-conformances.


Skills:                                     Lead / Manager
                                               AUTO CAD (Ver. 12 & 2007)              From               Pakistan
                                                    Engineering Congress.
                                                 Primavera Project Planner (P3.5)
                                                 Prolog Manager 07
                                                 Microsoft Project             2007
                                                 LISCAD     Version , 5 & 6.1
                                                 Prolink For DATA Processing
                                                 Diploma in Computer Applications.
                                                            Microsoft Office complete
                                                      3D HOME

Known languages (and levels):                English
                                             Arabic- little
                                             Others: Urdu,

Type of Employment wanted:                   Full Time

Minimum Yearly Salary :                     Unspecified
Current Location:                           Karachi, Pakistan.


                                                                                              Page # 1 of 10
       Hafiz Muhammad Rashid Minhas
       A-196, Block 13-C, Gulshan-e-Iqbal,
       Karachi, Pakistan
       : + 92 321 944 7769, +92 300 838 1313
       hminhas@live.com , hminhas@engineer.com,


Education & Experience
Education History, Qualifications & other additional information:
Level of Education:                          Bachelor
College Education

      2000-2002 B Tech. Honors in CIVIL, Al Khair University, AJK, Pakistan.
       Scored 82% Marks
      1999-2000 B Tech. Pass in CIVIL, Al Khair University, AJK, Pakistan.
       Scored 80% Marks
      1994–1997 D.A.E. in CIVIL, Govt. College of Technology 2nd Campus Lahore,
       Pakistan. Scored 57% Marks
      1994 Matriculation (Science Group):Govt. Central Model School Samanabad
       Lahore.    Scored 69% Marks.


Work History & Experience:
Years of Work Experience:                    +11 Years
October, 2007 – Present
B.L Harbert International, L.L.C.
1030 London Drive, Suite 400
Birmingham, Alabama 35211.
United States of America.

Project :
Construction of NCC (New Consulate Compound) Building Karachi, Pakistan. (US $ 85
Millions)
(EPC Project)
(Buildings,   Substation,   Outstation,     Reclamation,  Under  Ground  Utilities
(Mechanical, Storm Water, Sanitary Sewer, Domestic Water, Fire Water, Fire Hydrant
Water, Natural Gas, Fuel Oil Gas Supply Return & Sanitary Sewer Forced Drain),
Electrical Duct Banks, Signal, & Communication) , Roads & Yards, Shore Protection,
Advance Wetland treatment Plant System, Irrigation System, Prefabricated Building,
Suction Drums & Pumps, Pedestals & Transformer Foundation, Piling by CFA &
Temporary Casing, Corrosion-Cathodic Protection & Others)
Position Hold: Project Engineer

August, 2006 – September, 2007.
EXCEL Constructions (Pvt.) Ltd.
19, Bird Wood Road,
Lahore, Pakistan.

Projects : (Total Values Rs. 250 Millions)
    Construction & Interior Works of wateen Telecom offices at Auriga Centre
      Gulberg, Lahore Value Rs.15Milions
    Construction & Interior Works of wateen Telecom offices at DHA Phase V,
      Lahore Value Rs.15Milions, 0a basement + G5
    Interior Works of Wateen Office at Dawood Center near Karachi PC Hotel.
    Interior Works of Wateen Office at Centrum Building in Karachi
    Construction & Interior Works of Warid Office at Spencer Building near
      Raildiway Headquarter, Lahore
    Construction of 15 BTS Sites of Wateen Telecom with complete infrastructure
      in different stations.


                                                                    Page # 2 of 10
       Hafiz Muhammad Rashid Minhas
       A-196, Block 13-C, Gulshan-e-Iqbal,
       Karachi, Pakistan
       : + 92 321 944 7769, +92 300 838 1313
       hminhas@live.com , hminhas@engineer.com,



      Construction       &   Interior       works   of   Wateen   telecom   offices   in    05    different
       stations

(Buildings with Raft Foundation, Under Ground Utilities, Approach Roads Shore
Protection, Transformer Foundation, and Electromechanical Works complete HVAC work.
Raised Floor Installation, Furniture Making to installation, Electrical complete
work, etc
Position: Project Manager

July, 2005 – July, 2006.
Noor Durrani & Associates
Consultant Engineer & Project Managers
52 D-1, Gulberg III,
Lahore, Pakistan.

Projects :
    Construction of PACE Barka Properties -5B to + G22
    Foundation Works for Ali Tower, MM Allam Road Lahore

Deep Excavation, 475 Piles with double anchoring & 75 Piles with Anchor
Position: Assistant Resident Engineer


December, 2002 – July, 2005.
DARWISH Engineering Emirates L.L.C.
PO Box 673,
Ajman, UAE

Projects :
    Construction of American University at Sharjah Dhaid Road, Sharjah
    Construction of Inter Change at National Paint.
    Construction of 04 Nos of Interchanges at Alternative Route of Sharjah to
      Ras-ul-Kahimah.
    Interior Works of ENZO Studio in Hyatt Tower.
    Interior Works of Ammico Company at Dubai Medical City in front of Grand
      Hyatt. Dubai

Pilling Works, Mass Concrete works, with fair face finish, Underground Utilities
for future Storm Water, Sanitary Sewer, Domestic Water, Electrical Ducts, Roads,
Shore Protection, Pre Stressing for Post Tension Structure.

Position: Site Engineer


January, 2000 – November, 2002.
H.A. Constructions (Pvt.) Ltd.
1, Barry Court,
Lahore, Pakistan

Projects :
    Construction & Interior Works Shahdin Manzil Lahore,
    Interior Works for following Bank Alfah Limited                          Branches      with   complete
      Electromechanical Works
      1.    Circular Road Branch
      2.    Card Center at New Garden Town Lahore


                                                                                       Page # 3 of 10
       Hafiz Muhammad Rashid Minhas
       A-196, Block 13-C, Gulshan-e-Iqbal,
       Karachi, Pakistan
       : + 92 321 944 7769, +92 300 838 1313
       hminhas@live.com , hminhas@engineer.com,



       3.    Bank Islamic Bank Branch Main Boulevard Gulberg, Lahore
       4.    Extension of Gulberg Branch, Lahore
      Construction of Emirates Medical College at Wah Cantt.

Concrete Works as Exterior finished, Complete Electromechanical works, HVAC Works.
Joinery Works Complete, Glass Work, Elevation Works.

Position: Project Engineer


December, 1998 – December, 1999.
Habib Rafique (Pvt.) Ltd
35, Gulberg,
Lahore, Pakistan

Projects :
    Construction        of   PARCO Oil Refinery at Qasbah Gujrat, Multan. D.G. Khan
    Construction        of   D Parking Plaza, Lahore
    Construction        of   Faisalabad Sargodha Road
    Construction        of   Faisabad Jhang Road.

Concrete Works as Exterior finished, Complete Electromechanical works, HVAC Works.
Brick Masonry

Position: Planning & Contract Engineer


November, 1997 – December, 1998.
ENGINEER NLC (Pak Army)
Pakistan

Projects :
    Construction of Multan Roads Rehabilitation Project
    Construction of Lahore Roads Rehabilitation Project
    Construction of Faisalabad Roads Rehabilitation Project


Concrete Works for Drains, WBM, Sub Base, Asphaltic Work, Roundabout designing.
Brick Masonry

Position: Site Engineer


May, 1997 – October, 1997.
Pak PWD Punjab
Wahdat Road, II Sub Division.
Lahore, Pakistan

Project :
    Construction of Over Head Water Tanks 25’000gln
    Construction of Mosque 15000 Sft


Concrete Works for Water Supply Lines, Brick Masonry



                                                                           Page # 4 of 10
     Hafiz Muhammad Rashid Minhas
     A-196, Block 13-C, Gulshan-e-Iqbal,
     Karachi, Pakistan
     : + 92 321 944 7769, +92 300 838 1313
     hminhas@live.com , hminhas@engineer.com,



Position: Junior Engineer


Expertise:
Duties and Responsibilities

 Construction of New United States of America’s Consulate Compound in Karachi,
Pakistan having one 05 different types of Building at Site. Whole buildings having
frame structure buildings with fair-faced concrete as exterior finish. Utilizing
modern techniques and equipments to upgrade the quality of work and to reduce the
cost, to do the interior works keeping in view the budget and client requirement,
Provide guidance and supervise the site staff, Sub Contractor regarding project.
Also Engineer In charge of GSX Building (Pre Fabricated Building from Mammut UAE).

Major duties were to Documents control (Bulletin distribution, Check Contractor’s
Monthly Bill, Raised Material demand from HO & Local Purchase, Prepare Submittals
to client before the concern activity started.

Workflow   management,  vendor   negotiations,  quality  control,  and   logistical
coordination. Produce execution plan for design/construction management.
Proposed decision making protocol on Site construction.

Responsible for both the construction engineering and subcontract craft labor of
all construction for the Al Falah Community Project.

Responsible for the planning and executing the work to meet the project schedule
and making corrections when and if necessary.

Responsible for executing the work in accordance the quality standards and
requirements in the quality assurance manual. Responsible for playing an active
role in the development of BLHI safety culture.

Formalizes the project         code    structure   and   prepares   the   work   Breakdown/Network
Activity Structure.

Manage project engineering and related personnel functions and activities. Develop,
implement and administer project engineering procedures and other work controlling
documents. Interpret design/drawings for crafts installing material. Research and
resolve drawing interpretation problems, conflicts, interferences and errors.

Issues project code of accounts and provide regular updates of Master data
required. Prepares, issues, and maintains project cost and work-hour reports.
Analyzes, evaluates, and forecasts project costs and variance.

Establishes non billable budget and tracks, reports and analyzes actual cost versus
the budget. Investigates causes of variances between the estimated, committed and
actual amounts and recommends solutions or recovery plans.

Measures progress and reviews invoices of contractors to provide independent
judgment for progress reporting and payment. Reviews purchase order and subcontract
commitments and expenditures in the Projects Control systems.

Maintains the project cost saving program. Assists in the development, if value
awareness/value engineering initiatives.



                                                                                 Page # 5 of 10
     Hafiz Muhammad Rashid Minhas
     A-196, Block 13-C, Gulshan-e-Iqbal,
     Karachi, Pakistan
     : + 92 321 944 7769, +92 300 838 1313
     hminhas@live.com , hminhas@engineer.com,



Performs cost sampling and analyzes the results to validate or modify the cost
forecast.

Administer   the      incentive       program   and   makes   recommendations        for   improved
profitability.

Performs initial and ongoing Risk and Contingency Management activities. Assists
the proposal team with the development of business strategy, business plans,
financial rates, commercial terms, cost estimates and operating procedures for
prospective projects. Prepares the Project Business Plan for the Project Management
approval and determines financial reporting requirements.

Performs Project Management reporting and assists in project reviews
As Project Engineer I will be responsible for cost control/status, generating &
managing field level IV schedules and maintaining status of field progress.

I am responsible for the internal financial status of the project. I am
establishing and maintaining cost accounting and cost reporting systems (at the WBS
level) down to four schedules and detailed earned value progress measurement.

Gains   familiarity   with   applicable   codes   and            standards      on     a   project
Receives and distributes project design documents.

Understands the objectives of the site survey and provides horizontal and vertical
control.

Assists craftsmen and foreman with regard to construction-related issues identified
on drawings. Performs assignments designed to develop professional work knowledge
and ability. Receives instruction as to required tasks and results expected.
Receives close supervision as work is checked and reviewed for accuracy and
completion

Develop work breakdown and project coding structures for controls and integrity of
work defined by the contract. Develop totally integrated EPC schedules / cost
controls programs.

Recommend solutions or recovery plans to schedules / cost impact or delays.
Develops and analyzes the project income statement and prepare the sensitivity
analysis for management.

Analyzes variances in cost and schedules performance against the plan, and
communicates the reasons for the issuance of variance and proposed mitigation plans
to project management.

Provides status of reserves and contingencies. Coordinate the review of project
profile / risk analysis with management and provides status reporting. Performs
work in conformance with plans, specifications, schedules, and cost control
estimates.

Possesses practical experience in the use of the automated cost management systems.
Serves as Control Team Leader on Project and provides direct supervision to a small
team of project controls personnel if necessary. Provide meaningful, accurate
historical data.

Correspond verbally and in writing with project owners, i.E. UDOT. Prepare Hazard
Analysis and coordinate utility locating prior to construction. Maintain safety
compliance  and   environmental regulations.  Allocate  all   job  related  costs

                                                                             Page # 6 of 10
     Hafiz Muhammad Rashid Minhas
     A-196, Block 13-C, Gulshan-e-Iqbal,
     Karachi, Pakistan
     : + 92 321 944 7769, +92 300 838 1313
     hminhas@live.com , hminhas@engineer.com,



accordingly, including employee and equipment time, supplies, and subcontract
payments. Prepare field design change requisitions and “as built” drawings, as
required. Order, track and coordinate delivery of all project material and supplies.

Coordinates the work activities of all involved crafts within a discipline during
the entire construction effort, if required. Coordinates the activities of
contractors performing work within a discipline, if required.
 Ensures that subordinates are trained and knowledgeable of specifications and work
procedures that this material is being utilized to ensure optimum efficiency, and
that work is being performed in conformance with specified quality requirements.
Maintains effective schedule and cost control within assigned field functions of
the project and ensures adherence to these practices.
Plans required work activities to ensure that design drawings, tools, equipment,
and materials are available. Manages and coordinates the activities of contractors
within an area of assigned discipline in conjunction with contracts administration
group. Monitors the activities of assigned contractors and ensures compliance with
project quality, safety, and security requirements.

Supervises all construction-related work activities and assigned field functions
and/or crafts involved within a discipline on the project. Plays an active role in
the development of the safety culture on the project, making safety a natural part
of all work performed.
Controls change/scope creep, ensuring that all scope changes are quickly and
properly documented, and that change orders are approved prior to the performance
of work

       Construction of American University A frame structure building with
fair-faced concrete as exterior finish. Construction of 04 Nos Interchanges
IC 03, National Paint, H103, IC 04, also having Fair face RCC & Post Tension
structure Having all sorts of modern facilities and utilities involving
massive and precise concrete pours work with modern Construction techniques
and equipments. To provide all concern data to field Surveyors for execute
the work. Calculation of Structural Levels & Setting out data for stack out
Purpose. To supervise the lay out of Future Ducts across Road & Bridge .To
Prepare all Construction Drawings. Prepare X- Section for Billing Purpose
with Liscad. Preparation of Proposal of Additional Work. Verification of
Contractor’s monthly bills on behalf of the company.
Pilling, RCC Work, for Columns, for Column footing, RCC Abutment Walls, RCC
Slabs, and Pre Stress Girders. Fixing of 100M long Span MS Girders at (IC-3)
over Sharjah Dhaid road Intersection. Post Tension Pre Stressing Work for
Building Foundation & Also Anchorages for Retaining Wall footing for Soil
Protection.

Line & Grade in Survey Activities. Supervise/Inspect with the Consultants for the
Layouts for Line & Grades. Layout/Inspection of Excavation/Backfill & Compaction
requirement. Supervise/Inspect Apron/Revetment/Armor rocks & Stone layers in Civil
Construction   as   part    of   Survey   Design   &   requirements.   Perform   all
Documentations/Reports,   submittals    &  turn-over  documents.   Analyze   Pre-bid
Construction schedule; coordinate with client in the proposed Project for ocular
site inspection, site condition and evaluation. Conduct routine site inspection
works to ensure safety on site, work quality, approved drawings and contract scope
of work and project schedules are properly maintained and implemented.

          Construction of Wateen Telecom offices Buildings (MSC 02, BSC 01, SADM
07, REGEN 07 & BTS 30) Sites are frame structure buildings with fair- faced Brick

                                                                   Page # 7 of 10
     Hafiz Muhammad Rashid Minhas
     A-196, Block 13-C, Gulshan-e-Iqbal,
     Karachi, Pakistan
     : + 92 321 944 7769, +92 300 838 1313
     hminhas@live.com , hminhas@engineer.com,



work as exterior finish. In addition to Contract Administration, Construction
Supervision, coordination with the project consultant Contractors and Client,
utilize modern techniques and equipments to upgrade the quality of work and to
reduce the cost, to do the interior works keeping in view the budget and client
requirement, Supervision of furniture manufacturing & installation as per the
client desire for the project, Provide guidance and Supervise the site staff, Sub
Contractor regarding project. Major duties were to check layout, record entry,
supervision for installation of formwork for RCC work, preparation of shop drawings
and other miscellaneous activities. Monitoring of progress, Preparation of daily
and monthly Progress reports, keeping record of man power, certification of
monthly/final payments of Sub contractor and contract correspondence, preparation
of Bill are also included in my duties. Site Acquisition, RWO & Power Connection
Services. Shop Drawing’s Civil, Plumbing & Electrical on AUTOCAD for client
approval. Calculation and checking of whole Project Materials for Procurement & MAR
purpose. Put up Claim (Extra Work) to Client.

     Construction of PACE Barka, work at Ali Tower are frame structure buildings
with fair- faced concrete as exterior finish. All are having Deep Piles for as
retaining of existing Soil. Having all sorts of modern facilities and utilities
involving massive and precise concrete pours work modern Construction techniques
and   equipments.   In   addition   to   Construction   Supervision   and   Contract
Administration, coordination with the Client, to provide guidance to the
Contractors & site Staff regarding planning and execution of works, Monitoring of
progress, keeping record of man power, certification of monthly/final payments of
Contractor and contract correspondence, to verify the Bill are also included in my
duties. Major duties were, to check layout, record entry, supervision of
installation of formwork, Concreting, Equipments (Concrete Pump, Batching Plant) &
Electrical works. Give Approval of shop drawings and other miscellaneous activities
submitted by the contractor. Monitor & Assure the Quality of Piling Concrete.
Monitor Re Bar Testing. Performed Cube Testing. Correspondence with Client &
Contractor. Approvals of Shop Drawing’s Civil, Plumbing & Electrical on AUTOCAD for
Execution submitted by the Contractor & forward to client with remarks. Check of
Bar Bending Schedule for Cutting of Steel & submit to Client for Approval

Coordinate with Quality Manager for the timely submission of all Quality.
Documentations/Deliverables. Lead the creation of an empowered and challenging team
culture that delivers outstanding performance in quality and contract compliance.
Prepare Project Quality Plan PQP), Project Specific Procedures (PSP), Method.
Statements (MS), Quality Control Procedure (QCP), Inspection & Test Plans and Check
sheets and approval from the Client. Review & verify Approved Contract drawings &
Shop drawings. Ensure Project Quality Plan is correctly implemented and meets all
requirements of work undertaken, updating and amending when necessary. Coordinate
with project staff in the creation preparation and control of quality documentation
such as Inspection and Test plans, Process Procedures, Work Method Statements,
Welding Procedure Specifications, Inspection Checklists, etc…

Ensure all mechanical related Tests are done and inspected (Layouts, NDT, MPT,
Holiday, Leak Test, DFT, WFT etc…). Ensure all inspections for incoming materials
as per the specifications. Ensure proper interaction and coordination with Client,
Site Laboratory and Site Team. Ensure site staff/key workforce members and sub-
contractors understand the Project’s quality objectives and detect response
requirements as set down with the contract and provide trainings in the Quality
Systems and necessary skill functions. Review work practices and assist in the
development of techniques to deliver improvements and efficiency to the management
of   work    processes.  Monitoring   Non-conformance’s   and   closing   out   by
corrective/preventive actions. Prepare Statistical data’s which will show quality


                                                                   Page # 8 of 10
     Hafiz Muhammad Rashid Minhas
     A-196, Block 13-C, Gulshan-e-Iqbal,
     Karachi, Pakistan
     : + 92 321 944 7769, +92 300 838 1313
     hminhas@live.com , hminhas@engineer.com,



trends. Implementation of Objectives set during Management review. Quality records
filling for references and reporting Quality performance and documentations to Head
Office-Quality Manager. Ensure preparations of Final Documentations and submissions
of Quality related documents. Carry out Internal Audit as per QMS and ensure that
the quality audit cycle conforms to the project audit schedule and relevant
procedures.           Task           Risk          Assessment           preparation


Preparation of Quotations for Bidding, make proposals, layouts/details of plans
subject for revision, additional plans as per suggestions and discussions for
approval of the client. Procurement of Sub-contractors & awarding of sub-contracts
Prepares civil and structural detail for fabrication. Supervise and assist testing
for adequacy prior installation/erection. Prepares manpower requirement, equipment
utilization schedule, materials take-off for procurement and delivery schedules
Assist for the preparation of shop drawings form AutoCAD from time to time. Project
Monitoring, Supervision and Quality Inspections. Mechanical Piping, Vessels & Tanks
(Confined Spaces). Pedestals/Foundation for Pipe Racks/Transformer Foundations.
Substation/Operators Cabin/Underground Piping/Cable Trenches. Civil/Earth Works
(Residential & Land Development). Maintenance work for Desalination Evaporators,
Vessels,                    Demisters                   &                    other.


Project feasibility study/Site ocular inspections and investigations for the first
acquired   Property,  preparations   of  Consolidated  Survey   Plan/  Subdivision.
Plan/Project Development Plans/Designs/ /Bill of Materials as part of Project
Development formalities with the Local Government Sector. Planning and preparations
of Project and Construction Methodology, Procedures and Policies. Preparations of
Site workforce/Offices/Sourcing out and pre-qualification of Suppliers and
Contractors prior of awarding of Sub-Contracts. Review of Pre-bid documents/Project
Design Packages (Drawing and Scope of Work) prior to final approval for contract
bidding and implementation. Prepare and conduct kick-off meeting with the Proponent
and the winning Contractor for necessary site information, required preparations,
construction technicalities, safety on site and quality. Review and approve
material submittals of Contractors if all in accordance with Project Scope, Plans
and Specifications, technical requirements and for construction approved drawings.
Prepare necessary documents for Project close-out, evaluations of Job Performance
Appraisal for Contractor based on their overall contract compliance, performance,
manpower, cooperation, safety and quality. Prepare, call and conduct In-House
Counsel Meeting if project status is in non-compliance with project schedule, low
quality and safety violations on site.

Day to day project administration, reporting and successful execution of project.
Ensure that all contractual / Contractor and local authority requirements for
Quality, Health Safety & Environment (HSE) requirements are complied with
Manage the Site Team / Contractors / Sub-contractors for the successful Project
delivery. Ensure project budgets are available and updated on a regular basis.
Ensuring effective planning and responsible for implementing corrective actions to
arrest slippages. In charge of execution of the project in accordance with contract
requirements, implementation of the Quality and HSE systems on site within
allocated time, budget (cost), and quality and safety objectives. Site Construction
Management
Land Development (Earthworks and Preliminaries).Roads, Drainage and Waterline
Systems. Housing and Commercial Buildings. Move-in/Snagging/Finishing units for
turn                                over                               Warehousing.




                                                                   Page # 9 of 10
Hafiz Muhammad Rashid Minhas
A-196, Block 13-C, Gulshan-e-Iqbal,
Karachi, Pakistan
: + 92 321 944 7769, +92 300 838 1313
hminhas@live.com , hminhas@engineer.com,



                       PERSONAL INFORMATION
Father's Name                         :    SHABBIR AHMAD MINHAS
Date of Birth                         :    23rd MARCH, 1979
NIC #                                 :    35201-4262311-9
Marital Status                        :    Married
Passport #                            :    KE978175
Religion                              :    Islam
Nationality                           :    Pakistani
Driving License                       :    UAE Driving License
Permanent Address                     :    A-196,      Block   13-C,    Gulshan-e-Iqbal,
                                           Karachi City, Sindh, Pakistan.




                                                                       Page # 10 of 10

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:108
posted:12/29/2010
language:Malay
pages:10