NASA IVV Metrics

Click to download
Reviews
Shared by: 44aff241486ce297
Stats
views:
5
rating:
not rated
reviews:
0
posted:
6/5/2009
language:
pages:
0
NASA IV&V Metrics Independent Verification & Validation Program IVV 12 Revision: E Effective Date: December 17, 2008 DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use. APPROVAL SIGNATURES Gregory Blaney (original signature on IMS Representative file) DATE 12/17/2008 Rev. No. Basic A B C D E REVISION HISTORY Description of Change Author Initial Release Stephanie Ferguson Changed section referenced for email Stephanie instructions in Section 6.2 Ferguson Updated the following: Section 4.0 Stephanie modify flow to include metrics reporting Ferguson at QMRs, Section 5.0 to include roles, Section 6 to provide more detail regarding analysis or metrics and QMR reporting. Modified the flow in Section 4.0 to now Stephanie include two separate flows. Ferguson Update process flow diagrams to align Stephanie with Facility Management paradigm Ferguson Changed “IV&V Facility” to “IV&V Stephanie Program” Ferguson Effective Date 03/23/2005 07/08/2005 01/17/2006 10/24/2006 08/06/2007 12/17/2008 Document Number IVV QM IVV 16 NPR 1441.1 REFERENCE DOCUMENTS Document Title IV&V Quality Manual Control of Records NASA Records Retention Schedule CHECK THE MASTER LIST at http://ims.ivv.nasa.gov VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE 1 of 5 NASA IV&V Metrics Independent Verification & Validation Program 1.0 Purpose IVV 12 Revision: E Effective Date: December 17, 2008 The purpose of this system level procedure (SLP) is to document the process and responsibilities for collecting and reporting metrics and maintaining the NASA IV&V Metrics Table (Metrics Table). Collecting metrics helps the NASA IV&V Program achieve its strategic goals and objectives, as well as continually improve products, processes, and services. NASA IV&V’s continual improvement processes depend upon regularly updating objective performance measurements contained in the Metrics Table. 2.0 Scope This SLP is applicable to all metrics generated by the NASA IV&V Management System (IMS) as well as metrics that are approved to be included in the NASA IV&V Metrics Program and captured within the Metrics Table. 3.0 Definitions and Acronyms Official NASA IV&V roles and terms are defined in the Quality Manual. Specialized definitions identified in this SLP are defined below. 3.1 Metric A metric is a specific metric listed in the Metrics Table. 3.2 Requester The Requester is anyone supporting NASA IV&V who identifies a need for a change to a metric in the Metrics Table. 3.3 Acronyms IMS MCCB MTR NPR QM QMR SLP NASA IV&V Management System Metrics Configuration and Control Board Metrics Table Reviser NASA Procedural Requirements Quality Manual Quarterly Management Review System Level Procedure CHECK THE MASTER LIST at http://ims.ivv.nasa.gov VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE 2 of 5 NASA IV&V Metrics Independent Verification & Validation Program IVV 12 Revision: E Effective Date: December 17, 2008 4.0 Process Flow Diagrams The following diagrams depict processes described in this document and the responsibilities and actions that shall be performed by process participants. 4.1 Collecting, Analyzing, Reporting, and Maintaining Metrics METRIC OWNER Collects Metrics Analyzes Metrics Performs Follow-up Actions Communicates and Reports Metrics at Quarterly Management Review (QMR) Maintains Metrics (Performs Annual Metrics Review at End of Calendar Year) CHECK THE MASTER LIST at http://ims.ivv.nasa.gov VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE 3 of 5 NASA IV&V Metrics Independent Verification & Validation Program 4.2 Modifying Metrics METRICS CONFIGURATION CONTROL BOARD (MCCB) IVV 12 Revision: E Effective Date: December 17, 2008 REQUESTER IMS REPRESENTATIVE METRICS TABLE REVISER (MTR) Submits Request for Addition, Deletion, or Revision of a Metric Coordinates MCCB Meeting NO Approves Request YES Updates Metrics Table and Change Log Notifies IMS Mailing List The Request shall be sent to the IMS Representative with the subject line "Metrics Table Update - Goal ". To request a new metric, the Request must contain all information required by the columns in the Metrics Table. To request a metric revision, the Request must contain the Metrics Table field names and updated values. To request deletion of a metric, the Request must contain a valid reason for deleting the metric. CHECK THE MASTER LIST at http://ims.ivv.nasa.gov VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE 4 of 5 NASA IV&V Metrics Independent Verification & Validation Program 5.0 Metrics IVV 12 Revision: E Effective Date: December 17, 2008 Any metrics associated with this SLP are established and tracked within the NASA IV&V Metrics Program. 6.0 Records The following records will be generated and filed in accordance with this SLP and IVV 16, Control of Records, and in reference to NASA Procedural Requirements (NPR) 1441.1, NASA Records Retention Schedules. Record Name Metrics Table Original Y Vital Y Responsible Person MTR Retention Requirement Destroy when 7 yrs old (1/26.5A) Location Shared Network Drive CHECK THE MASTER LIST at http://ims.ivv.nasa.gov VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE 5 of 5

Related docs
NASA IVV Tools Lab Request Process
Views: 0  |  Downloads: 0
Optimizing IVV in Mature Organizations
Views: 18  |  Downloads: 1
NASDA IVV ………..
Views: 4  |  Downloads: 0
Project IVV Statement of Work Template
Views: 36  |  Downloads: 9
Project IVV Statement of Work Template
Views: 14  |  Downloads: 8
Guidelines for Writing IVV TIMs Using PITS
Views: 12  |  Downloads: 3
NASA IVV Facility In-Processing Form
Views: 0  |  Downloads: 0
LA IVV Final Report (10-Dec-99)
Views: 12  |  Downloads: 0
VI IVV Final Report (11-Jan-99)
Views: 10  |  Downloads: 0
CA IVV Final Report (17-Apr-2000)
Views: 12  |  Downloads: 0
NASA
Views: 0  |  Downloads: 0
Other docs by 44aff241486ce2...
Form W-2C (PDF) Corrected Wage And Tax Statement
Views: 1925  |  Downloads: 54
Batmobile Top
Views: 644  |  Downloads: 4
Employee Monthly Time Record
Views: 337  |  Downloads: 10
CorpDocs-Board Resolution Suspending an Officer
Views: 249  |  Downloads: 5
PETTY CASH REGISTER
Views: 656  |  Downloads: 39
Drugstorecom Inc Ammendments and By laws
Views: 290  |  Downloads: 1
CorpDocs-Board Resolution Naming New Officers
Views: 213  |  Downloads: 6
Avon Products Inc Ammendments and By laws
Views: 215  |  Downloads: 1
0206 Inst W-3C (PR) (PDF) Instructions
Views: 234  |  Downloads: 3
craven-all
Views: 196  |  Downloads: 4
Customer Credit Application is Accepted Letter
Views: 314  |  Downloads: 1
Deere and Co Ammendments and By laws
Views: 246  |  Downloads: 1