X

Click to download
Reviews
Shared by: 44aff241486ce297
Stats
views:
9
rating:
not rated
reviews:
0
posted:
6/5/2009
language:
pages:
0
1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 1 CODE 2 5. PROJECT NO. (If applicable) 6. ISSUED BY See Block 16C BV NASA Lyndon B. Johnson Space Center Attention: BV/Billy Perry 2101 NASA Parkway Houston, TX 77058 CODE Mod 11 See Block 12 7. ADMINISTERED BY (If other than Item 6) 8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) 9A. AMENDMENT OF SOLICITATION NO. United Space Alliance 1150 Gemini Avenue, Mail Code USH-202B Houston, TX 77058 X CODE FACILITY CODE 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACT/ORDER NO. NNJ06VA01C 10B. DATED (SEE ITEM 13) 10/01/2006 is extended, is not extended. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) PR# 4200181825 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. C. D. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: OTHER Specify type of modification and authority) X FAR Clause 52.232-22 Limitation of Funds (Apr 1984) X is not, is required to sign this document and return __ copies to the issuing office. E. IMPORTANT: Contractor 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) The purpose of this modification is to incrementally fund the contract by $120,000,000. Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) BILLY PERRY Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED Original signed by Billy Perry ________________________________________________ (Signature of person authorized to sign) NSN 7540-01-152-8070 PREVIOUS EDITION UNUSABLE 30-105 Computer Generated (Signature of person authorized to sign) 12/12/2006 STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 NNJ06VA01C Modification 11 Page 2 of 2 (1) RECAPITULATION OF FUNDS Cost: Fee: Total: Previously Funded $310,433,007 $29,491,136 $339,924,143 This Action $109,589,041 $10,410,959 $120,000,000 Revised Funding $420,022,048 $39,902,095 $459,924,143 Clause B.4 entitled, CONTRACT FUNDING (1852.232-81)(JUN 1990) is deleted in its entirety and replaced with the following: “ B.4 CONTRACT FUNDING (1852.232-81) (JUN 1990) (a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $420,022,048. This allotment covers the estimated period of performance from the effective date of the contract through January 11,2007. (b) An additional amount of $39,902,095 is obligated under this contract for payment of fee.

Related docs
x
Views: 9  |  Downloads: 0
On X …
Views: 6  |  Downloads: 0
X
Views: 0  |  Downloads: 0
X
Views: 3  |  Downloads: 0
Find-x
Views: 3  |  Downloads: 0
x israel
Views: 2  |  Downloads: 0
Item-x
Views: 0  |  Downloads: 0
annex x
Views: 1  |  Downloads: 0
xxxxxxxx x
Views: 4  |  Downloads: 0
x x x x x x x x x
Views: 28  |  Downloads: 0
X X X X X X X X X
Views: 15  |  Downloads: 0
X-LITE
Views: 1  |  Downloads: 0
Agenda x x x x x x x x
Views: 5  |  Downloads: 0
X X X X X X X X XXXX
Views: 6  |  Downloads: 0
No No X X No X No X No
Views: 25  |  Downloads: 0
Other docs by 44aff241486ce2...
AP French Literature 2004 Scoring Guidelines
Views: 735  |  Downloads: 1
Lease supplement
Views: 346  |  Downloads: 3
dv140
Views: 200  |  Downloads: 0
Nobody Fills My Heart Like Jesus
Views: 176  |  Downloads: 2
English-Arabic Legal Glossary
Views: 1086  |  Downloads: 120
dv120k
Views: 154  |  Downloads: 0
Breach of Duty
Views: 909  |  Downloads: 8
Hannah v Peel
Views: 391  |  Downloads: 3
Resources for Organizational Behavior
Views: 1329  |  Downloads: 68
Healing Grace
Views: 196  |  Downloads: 1
app003
Views: 97  |  Downloads: 0
Joint check payment agreement
Views: 366  |  Downloads: 8
UNDERSTANDING REVERSE MERGERS
Views: 540  |  Downloads: 63
Physics Study Tips
Views: 672  |  Downloads: 35
Note in series issued by receiver
Views: 225  |  Downloads: 1