Architect Professional Services Proposal

W
Description

Architect Professional Services Proposal document sample

Document Sample
scope of work template
							                                                                                         STATE OF MONTANA
                                                                                  DEPARTMENT OF FISH, WILDLIFE & PARKS
                                                                                    DESIGN AND CONSTRUCTION BUREAU
                                                                              600 North Park Avenue  P.O. Box 200701  Helena, Montana 59620.0701
                                                                                             Phone: 406.841.4000  Fax: 406.841.4004



                 ARCHITECT/ENGINEER PROFESSIONAL SERVICES FEE PROPOSAL
    Project Name:         GARAGE/STORAGE BUILDING FACILITY                                          FWP #:                        123456789
    Location:             JOCKO RIVER TROUT HATCHERY, ARLEE, MT

    Architect/Engineer: ABC ENGINEERING                                                             Date:                         12/21/2010
    Address:            123 FIRST AVENUE                                                            Phone:                       406-123-4567



BASIC SERVICES (areas that do not apply are to be left blank)                                          Costs/Expenses

Schematic Design Phase (SD)
    Administration / Coordination / Meetings / Data Gathering / Quality Control
    Architecture - Design / Drafting / Cost Estimating
    Mechanical - Design / Drafting / Cost Estimating
    Electrical - Design / Drafting / Cost Estimating
    Structural - Design / Drafting / Cost Estimating
    Civil - Design / Drafting / Cost Estimating
    Reimbursables (travel, phone, mail, printing, etc.)
                                                              Schematic Design Phase (SD) Total =
Design Development Phase (DD) or Preliminary Design Phase (PD)
    Administration / Coordination / Meetings / Data Gathering / Quality Control
    Architecture - Design / Specifications / Drafting / Cost Estimating
    Mechanical - Design / Specifications / Drafting / Cost Estimating
    Electrical - Design / Specifications / Drafting / Cost Estimating
    Structural - Design / Specifications / Drafting / Cost Estimating
    Civil - Design / Specifications / Drafting / Cost Estimating
    Reimbursables (travel, phone, mail, printing, etc.)
                           Design Development Phase (DD) or Preliminary Design (PD) Total =
Construction Document Phase (CD)
    Administration / Coordination / Meetings / Data Gathering / Quality Control
    Architecture - Design / Specifications / Drafting / Cost Estimating
    Mechanical - Design / Specifications / Drafting / Cost Estimating
    Electrical - Design / Specifications / Drafting / Cost Estimating
    Structural - Design / Specifications / Drafting / Cost Estimating
    Civil - Design / Specifications / Drafting / Cost Estimating
    Reimbursables (travel, phone, mail, printing, etc.)
                                                       Construction Documents Phase (CD) Total =
Bidding Phase (BD)
    Administration / Coordination / Addenda / Responses
    Pre-Bid Meeting and Meeting Minutes

    Reimbursables (travel, phone, mail, printing, etc.) – do not include bid document reproduction
                                                                      Bidding Phase (BD) Total =
Construction Administration Phase (CA)
    Administration / Coordination / Meeting Minutes / Field Reports / Submittals
    Pre-Construction Meeting and Meeting Minutes
    Architect’s Site Visits
    Mechanical Engineer’s Site Visits
    Electrical Engineer’s Site Visits
    Structural Engineer’s Site Visits
    Civil Engineer’s Site Visits
    Substantial Completion(s) Inspection & Report
    Final Completion Inspection & Report
    Reimbursables (travel, phone, mail, printing, etc.)
                                                Construction Administration Phase (CA) Total =
                                                             BASIC SERVICES TOTAL =
ADDITIONAL SERVICES
(areas that do not apply are to be left blank, add any items not listed)                                       Costs/Expenses

Master Planning
Programming/Planning
Fund-Raising & Marketing (provide a breakdown of deliverables – models, renderings, etc.)
Feasibility Study
Fixtures, Furnishings & Equipment Services
Life Cycle Cost Analysis
Value Engineering Analysis
Energy Study
Asbestos / Hazardous Materials Investigation

Specialty Consultants (specialty consultants’ fees are part of Basic Services unless noted otherwise)
    Acoustical
    Audio / Visual / Communication / Information Technology
    Correctional
    Cost Estimating
    Education / Demographics
    Interior Design
    Kitchen / Food Services
    Laboratory / Research
    Landscape Architect
    LEED / Sustainability
    Security / Security Electronics


Site Survey
Geotechnical Investigation
Construction Staking
Third-Party Construction Document Review
Bid Document Reproduction (show here if provided as lump sum, leave blank if at-cost)
On-Site Construction Administration
Record Drawings
Warranty Inspection & Report


                                                     ADDITIONAL SERVICES TOTAL =
                              PROFESSIONAL SERVICES TOTAL =

              I hereby certify that this professional services fee proposal is inclusive of all labor, supervision,
    overhead, profit, reimbursable expenses (travel, per diem, lodging, materials, supplies, phone, etc.) and all other items
            directly or indirectly related to the professional services for which I am contracting with the Owner.
Submitted by:
                (Firm Name)   (Architect/Engineer Signature)   (Date)
                                                                                                                                                                                                                STATE OF MONTANA
                                                                                                                                                                                                        DEPARTMENT OF FISH, WILDLIFE & PARKS
                                                                                                                                                                                                            DESIGN AND CONSTRUCTION BUREAU
                                                                                                                                                                                               600 North Park Avenue  P.O. Box 200701  Helena, Montana 59620.0701
                                                                                                                                                                                                             Phone: 406.841.4000  Fax: 406.841.4004



INSTRUCTIONS:                       DATA ENTRY IN YELLOW AREAS ONLY.
                                    ADJUST POSITION DESCRIPTIONS AND/OR POSITION RATES AS NECEESARY.
                                    AREAS THAT DO NOT APPLY ARE TO BE LEFT BLANK.
                                    RECAPITULATION SPREADSHEET IS AUTOMATICALLY UPDATED.


                                                                                                             ARCHITECT/ENGINEER PROFESSIONAL SERVICES FEE PROPOSAL
                                                                                                                            DETAIL COST BREAKDOWN

BASIC SERVICES (areas that do not apply are to be left blank)
Schematic Design Phase (SD)                                                                                Hours/Rates   $115.00        $90.00       $90.00         $65.00          $50.00         $65.00        $35.00                                                      Extension

                  Administration                                                                                         Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Coordination
                                    Meetings
                                    Data Gathering
                                    QA/QC

                  Architecture (AR)                                                                                      Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Drafting
                                    Cost Estimates

                  Mechanical (ME)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
   DIRECT LABOR




                                    Design
                                    Drafting
                                    Cost Estimates

                  Electrical (EL)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Drafting
                                    Cost Estimates

                  Structural (ST)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Drafting
                                    Cost Estimates

                  Civil (CV)                                                                                             Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Drafting
                                    Cost Estimates

                  AR Reimbursables (travel, phone, mail, printing, etc.)
                  ME Reimbursables (travel, phone, mail, printing, etc.)
   DIRECT COSTS




                  EL Reimbursables (travel, phone, mail, printing, etc.)
                  ST Reimbursables (travel, phone, mail, printing, etc.)
                  CV Reimbursables (travel, phone, mail, printing, etc.)
                  Document Production (match contract)                                                                                                                                                                               # of sets          cost/set
                                               TOTAL Reimbursables (travel, phone, mail, printing, etc.)
                                                                                                                                                                                                                                       Schematic Design Phase (SD) Total =




                                                                                                                                                                     Sheet 5 of 9
Design Development Phase (DD) or Preliminary Design Phase (PD)                                             Hours/Rates   $115.00        $90.00       $90.00         $65.00          $50.00        $65.00          $35.00                                                      Extension

                  Administration                                                                                         Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Coordination
                                    Meetings
                                    Data Gathering
                                    QA/QC

                  Architecture (AR)                                                                                      Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Mechanical (ME)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Specifications
   DIRECT LABOR




                                    Drafting
                                    Cost Estimates

                  Electrical (EL)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Structural (ST)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Civil (CV)                                                                                             Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager     Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  AR Reimbursables (travel, phone, mail, printing, etc.)
                  ME Reimbursables (travel, phone, mail, printing, etc.)
   DIRECT COSTS




                  EL Reimbursables (travel, phone, mail, printing, etc.)
                  ST Reimbursables (travel, phone, mail, printing, etc.)
                  CV Reimbursables (travel, phone, mail, printing, etc.)
                  Document Production (match contract)                                                                                                                                                                                # of sets          cost/set
                                               TOTAL Reimbursables (travel, phone, mail, printing, etc.)
                                                                                                                                                                                                           Design Development Phase (DD) or Preliminary Design Phase (PD) =




                                                                                                                                                                     Sheet 6 of 9
Construction Document Phase (CD)                                                                           Hours/Rates   $115.00        $90.00       $90.00         $65.00          $50.00        $65.00        $35.00                                         Extension

                  Administration                                                                                         Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Coordination
                                    Meetings
                                    Data Gathering
                                    QA/QC

                  Architecture (AR)                                                                                      Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Mechanical (ME)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Design
                                    Specifications
   DIRECT LABOR




                                    Drafting
                                    Cost Estimates

                  Electrical (EL)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Structural (ST)                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  Civil (CV)                                                                                             Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                    Design
                                    Specifications
                                    Drafting
                                    Cost Estimates

                  AR Reimbursables (travel, phone, mail, printing, etc.)
                  ME Reimbursables (travel, phone, mail, printing, etc.)
   DIRECT COSTS




                  EL Reimbursables (travel, phone, mail, printing, etc.)
                  ST Reimbursables (travel, phone, mail, printing, etc.)
                  CV Reimbursables (travel, phone, mail, printing, etc.)
                  Document Production (match contract)                                                                                                                                                                   # of sets        cost/set
                                               TOTAL Reimbursables (travel, phone, mail, printing, etc.)
                                                                                                                                                                                                                          Construction Document Phase (CD) =




                                                                                                                                                                     Sheet 7 of 9
Bidding Phase (BD)                                                                                         Hours/Rates   $115.00        $90.00       $90.00         $65.00          $50.00        $65.00        $35.00                                                Extension

                   Administration                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
    DIRECT LABOR




                                     Coordination
                                     Addenda
                                     Responses

                   Pre-Bid Meeting                                                                                       Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Meeting
                                     Meeting Minutes

                   Reimbursables (travel, phone, mail, printing, etc.)
 DIRECT
 COSTS




                   Document Production (match contract)                                                                                                                                                                       # of sets          cost/set
                                               TOTAL Reimbursables (travel, phone, mail, printing, etc.)
                                                                                                                                                                                                                                              Bidding Phase (BD) =


Construction Administration Phase (CA)                                                                     Hours/Rates   $115.00        $90.00       $90.00         $65.00          $50.00        $65.00        $35.00                                                Extension

                   Administration                                                                                        Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Coordination
                                     Meeting Minutes
                                     Field Reports
                                     Submittals

                   Pre-Con Meeting                                                                                       Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Meeting
                                     Meeting Minutes

                   Architecture (AR)                                                                                     Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Site Visit(s)
    DIRECT LABOR




                   Mechanical (ME)                                                                                       Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Site Visit(s)

                   Electrical (EL)                                                                                       Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Site Visit(s)

                   Structural (ST)                                                                                       Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Site Visit(s)

                   Civil (CV)                                                                                            Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Site Visit(s)

                   Substantial Completion                                                                                Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Inspection
                                     Certification/Report

                   Final Completion                                                                                      Principal   Proj. Manager   Architect   Proj. Engineer   Technician   Const. Manager   Admin
                                     Inspection
                                     Certification/Report

                   AR Reimbursables (travel, phone, mail, printing, etc.)
    DIRECT COSTS




                   ME Reimbursables (travel, phone, mail, printing, etc.)
                   EL Reimbursables (travel, phone, mail, printing, etc.)
                   ST Reimbursables (travel, phone, mail, printing, etc.)
                   CV Reimbursables (travel, phone, mail, printing, etc.)
                                               TOTAL Reimbursables (travel, phone, mail, printing, etc.)
                                                                                                                                                                                                                           Construction Administration Phase (CA) =
                                                                                                                                                                                                                         BASIC SERVICES TOTAL =




                                                                                                                                                                     Sheet 8 of 9
ADDITIONAL SERVICES (areas that do not apply are to be left blank, add any items not listed)                                                 Expenses

Master Planning
Programming/Planning
Fund-Raising & Marketing (provide a breakdown of deliverables – models, renderings, etc.)
Feasibility Study
Fixtures, Furnishings & Equipment Services
Life Cycle Cost Analysis
Value Engineering Analysis
Energy Study
Asbestos / Hazardous Materials Investigation

Specialty Consultants (specialty consultants’ fees are part of Basic Services unless noted otherwise)
                    Acoustical
                    Audio / Visual / Communication / Information Technology
                    Correctional
                    Cost Estimating
                    Education / Demographics
                    Interior Design
                    Kitchen / Food Services
                    Laboratory / Research
                    Landscape Architect
                    LEED / Sustainability
                    Security / Security Electronics


Site Survey
Geotechnical Investigation
Construction Staking
Third-Party Construction Document Review
Bid Document Reproduction (show here if provided as lump sum, leave blank if at-cost)
On-Site Construction Administration
Record Drawings
Warranty Inspection & Report


                                                                                                               ADDITIONAL SERVICES TOTAL =

                                                                                                        PROFESSIONAL SERVICES TOTAL =




                                                                               Sheet 9 of 9

						
Related docs
Other docs by lwa19935
Arizona Employment Agreement
Views: 10  |  Downloads: 0
Area Manager Operations Format
Views: 482  |  Downloads: 1
Argumentative Research Essay - Excel
Views: 98  |  Downloads: 0
Archives Management - PDF
Views: 4  |  Downloads: 0
Arizona Eviction Templates
Views: 935  |  Downloads: 0
Arizona Nonprofit Corporations - Excel
Views: 21  |  Downloads: 0
Architectural Website Project Plan Sample
Views: 63  |  Downloads: 0
Architectural Template - DOC
Views: 21  |  Downloads: 0