ST. LUCIA OECS EDUCATION DEVELOPMENT PROJECT

PROCUREMENT PLAN - CONSULTING SERVICES (REVISED SEPTEMBER 27, 2004)

January 2004 - June 2005

ICB-International Competitive Bidding; NCB-National Competitive Bidding [NCB 2 is without prior review]; IS-International Shopping for Goods or Shopping for small works [<150,000US$]; NS-National Shopping; LIB-Limited International Bidding;

IC-Individual Consulting; DC-Direct Contracting; QCBS-Quality Cost Based Selection (N= National, I= International); QBS-Quality Based Selection; LCS-Least Cost Selection

* Retroactive financing will be used as the FTAL is not expected to be effective until November 2003.



TABLE 3: Consultant Services -- Time Table of Procurement Activities

Description Bid Number Method of Estimated Vs. Amount in US$ Request for Advertise date Request for Prior/ Post No Object. to Closing date for No Object. No Object. No Objection to Contract Contract End Contract Consultant

Selection Actual GPN in in UNDB proposals ready Review RFP proposals Technical Final Contract Signature (Delivery) Duration Name

Elapsed weeks UNDB Evaluation Evaluation







QCBS I 10 30 15 Prior 45 30 15 20 15 10

QCBS N 0 30 15 Prior 30 30 15 20 15 10

IC 0 10 0 Post 15 0 0 0 20 3

DC 0 10 0 Prior 15 0 0 0 20 3

CQ 0 10 0 None 20 0 0 0 30 10

LCS 0 10 0 None 20 0 0 0 40 10

FBS 0 10 0 20 0 0 0 40 10

QBS 10 30 15 45 30 15 20 15 10





Description Bid Number Method of Estimated Vs. Amount in US$ Request for Advertise date Request for Prior/ Post No Objection to Closing date for No Object. No Object. No Objection to Contract Contract End Contract Consultant

Selection Actual EOI in UNDB in UNDB proposals ready Review RFP proposals Technical Final Contract Signature (Delivery) Duration Name

Elapsed weeks Evaluation Evaluation







TA for Architectural Design and Supervision of SL/WB-CON- QCBS I Estimated 556,811.07 1-Nov-03 11-Nov-2003 11-Dec-2003 PRIOR 26-Dec-2003 9-Feb-2004 10-Mar-2004 25-Mar-2004 14-Apr-2004 29-Apr-2004 29-Jul-2007 1176 Lee Young

Construction of New Schools W-401/03 Actual 556,811.07 16-Mar-2003 9-Feb-2004 4-Mar-2004 8-Apr-2004 25-May-2004 11-Jun-2004 24-Sep-2007 & Partners







TA for Architectural Design and Supervision of SL/WB-CON- QCBS I Estimated 426,588.93 1-Nov-03 11-Nov-2003 11-Dec-2003 PRIOR 26-Dec-2003 9-Feb-2004 10-Mar-2004 25-Mar-2004 14-Apr-2004 29-Apr-2004 29-Jul-2007 1176

Construction for Rehabilitation of 11 Existing Secondary W-402/03 Actual 16-Mar-2003 9-Feb-2004 4-Mar-2004 6-Jul-2004

Schools and 2 Education Offices





TA for the Conduct of Needs Assessment for SL/WB-CON- QCBS I Estimated 100,000.00 18-Oct-03 28-Oct-2003 27-Nov-2003 PRIOR 12-Dec-2003 26-Jan-2004 25-Feb-2004 11-Mar-2004 31-Mar-2004 15-Apr-2004 16-Aug-2004 113 Tropical

Rehabilitation of 11 Existing Schools and 2 Education W-501/03 Actual 43,954.51 26-Jan-2004 4-Mar-2004 8-Apr-2004 6-May-2004 10-May-2004 Architecture

Offices Group



TA for Design of New Curriculum and Materials and SL/WB-CON- DC Estimated 62,000.00 1-Sep-05 1-Sep-2005 11-Sep-2005 PRIOR 11-Sep-2005 26-Sep-2005 26-Sep-2005 26-Sep-2005 26-Sep-2005 16-Oct-2005 18-Dec-2005 60

TA for Production of New Curriculum and Materials F-404/04 and Actual

with CXC input SL/WB-CON-

F-601/04





TA for Development of a National Secondary School SL/WB-CON- IC Estimated 30,000.00 1-Mar-05 1-Mar-2005 11-Mar-2005 NONE 11-Mar-2005 26-Mar-2005 26-Mar-2005 26-Mar-2005 26-Mar-2005 15-Apr-2005 17-Jul-2005 90

Certificate F-509/05 Actual DTB Opening

TA for Operations of the Book Loan Scheme SL/WB-CON- IC Estimated 10,000.00 6-Feb-05 6-Feb-2005 16-Feb-2005 NONE 16-Feb-2005 3-Mar-2005 3-Mar-2005 3-Mar-2005 3-Mar-2005 23-Mar-2005 2-Apr-2005 7

F-603/05





Actual DTB Opening





Consultancy for Electronic/Hardcopy Document SL/WB-CON- IC Estimated 15,000.00 10-Jan-05 10-Jan-2005 20-Jan-2005 NONE 20-Jan-2005 4-Feb-2005 4-Feb-2005 4-Feb-2005 4-Feb-2005 24-Feb-2005 27-Feb-2005

Management for PMU and General Administration F-508/04





Actual







TOTAL COMPONENTS 1,200,400.00

ST. LUCIA OECS EDUCATION DEVELOPMENT PROJECT

PROCUREMENT PLAN - WORKS (REVISED SEPTEMBER 27, 2004)

January 2004 - June 2005

ICB-International Competitive Bidding; NCB-National Competitive Bidding [NCB 2 is without prior review]; IS-International Shopping for Goods or Shopping for small works [<150,000US$];

NS-National Shopping; LIB-Limited International Bidding; IC-Individual Consulting; DC-Direct Contracting; QCBS-Quality Cost Based Selection (N= National, I= International); QBS-Quality Based Selection;

LCS-Least Cost Selection



TABLE 5: WORKS -- Time Table of Procurement Activities

Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding Prior/ Post No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or

Method Actual Documents Review Bid Docs Contract Award Signature (Delivery) Duration Contractor

Name

Elapsed weeks



ICB 10 Prior 10 45 90 15 15

NCB 10 Prior 10 30 60 15 15

NCB2 0 Post 0 30 30 0 15

LIB 10 Prior 10 45 60 15 15

IS 0 Post 0 20 20 10 3

NS 0 Post 0 20 20 0 3

DC 10 Prior 10 30 30 10 3





Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding Prior/ Post No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or

Method Actual Documents Review Bid Docs Contract Award Signature (Delivery) Duration Contractor

Name



Rehabilitation of the Entrepot Secondary SL/WB-NCB- NS Estimated 55,209.98 20-Jan-05 POST 20-Jan-2005 20-Jan-2005 9-Feb-2005 1-Mar-2005 1-Mar-2005 6-May-2005 63

School W-106/04 Actual CTB Opening





Rehabilitation of the Vide Bouteille SL/WB-NCB- NS Estimated 128,823.29 17-Feb-05 POST 17-Feb-2005 17-Feb-2005 9-Mar-2005 29-Mar-2005 29-Mar-2005 28-Jun-2005 88

Secondary School W-103/04 Actual CTB Opening





Rehabilitation of the St. Mary's College SL/WB-NCB- NCB Estimated 736,133.09 22-Feb-05 PRIOR 4-Mar-2005 14-Mar-2005 13-Apr-2005 12-Jun-2005 27-Jun-2005 15-Nov-2005 126

W-104/04 Actual CTB Opening





Rehabilitation of the Clendon Mason SL/WB-ICB- NCB Estimated 2-May-05 PRIOR 12-May-2005 22-May-2005 21-Jun-2005 20-Aug-2005 4-Sep-2005 17-Jan-2006 120

Memorial Secondary School W-02/04 Actual CTB Opening









Rehabilitation of the Choiseul Secondary SL/WB-NCB- NCB2 Estimated 11-Jul-05 POST 11-Jul-2005 11-Jul-2005 10-Aug-2005 9-Sep-2005 9-Sep-2005 22-Jan-2006 120

School W-107/04

Rehabilitation of the Choiseul Secondary SL/WB-NCB- NCB2

School W-107/04 Actual CTB Opening





Rehabilitation of the Micoud Secondary SL/WB-NCB- NCB2 Estimated 11-Jul-05 POST 11-Jul-2005 11-Jul-2005 10-Aug-2005 9-Sep-2005 9-Sep-2005 22-Jan-2006 120

School W-109/04 Actual CTB Opening





Major Rehabilitation and Upgrading of SL/WB-ICB- ICB Estimated 2-May-05 PRIOR 12-May-2005 22-May-2005 6-Jul-2005 4-Oct-2005 19-Oct-2005 3-Mar-2006 120

the Grande Riviere Senior Primary School W-03/04 Actual CTB Opening

(Dennery)





Rehabilitation of the Corinth Secondary SL/WB-NCB- NS Estimated 19-Apr-05 PRIOR 19-Apr-2005 19-Apr-2005 9-May-2005 29-May-2005 29-May-2005 29-Sep-2005 120

School W-102/04 Actual CTB Opening





Rehabilitation of the Castries SL/WB-NCB- NCB Estimated 0.00 N/A #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 120

Comprehensive Secondary School W-101/04 Actual CTB Opening





Rehabilitation of the Bocage Secondary SL/WB-NCB- NCB2 Estimated 0.00 N/A #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 120

School W-105/04 Actual CTB Opening





Rehabilitation of the Vieux-Fort SL/WB-NCB- NCB2 Estimated 0.00 N/A #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 120

Comprehensive Secondary School-Campus W-108/04 Actual CTB Opening

B



Relocation and Construction of the Micoud SL/WB-SHP- IS Estimated 185,000.00 26-Mar-05 POST 26-Mar-2005 26-Mar-2005 15-Apr-2005 5-May-2005 15-May-2005 15-Sep-2005 120

District Office W-01/04 Actual CTB Opening





Construction of a New Secondary School at SL/WB-ICB- ICB Estimated 2,009,858.50 7-Mar-05 PRIOR 17-Mar-2005 27-Mar-2005 11-May-2005 9-Aug-2005 24-Aug-2005 29-Sep-2006 386

Gros Islet W-01/04(a) Actual CTB Opening





Construction of a New Secondary School at SL/WB-ICB- ICB Estimated 2,009,858.50 7-Mar-05 PRIOR 17-Mar-2005 27-Mar-2005 11-May-2005 9-Aug-2005 24-Aug-2005 29-Sep-2006 386

Marigot W-01/04(b) Actual CTB Opening









TOTAL COMPONENTS $ 4,204,717.00

ST. LUCIA OECS EDUCATION DEVELOPMENT PROJECT

PROCUREMENT PLAN - TRAINING (REVISED SEPTEMBER 27, 2004)

January 2004 - June 2005

ICB-International Competitive Bidding; NCB-National Competitive Bidding [NCB 2 is without prior review]; IS-International Shopping for Goods or Shopping for small works [<150,000US$];

NS-National Shopping; LIB-Limited International Bidding; IC-Individual Consulting; DC-Direct Contracting; QCBS-Quality Cost Based Selection (N= National, I= International); QBS-Quality Based Selection;



TABLE 6: TRAINING -- Time Table of Procurement Activities

Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or

Method Actual Documents Bid Docs Contract Award Signature (Delivery) Duration Contractor

Name

Elapsed weeks



IS 0 0 20 20 15 3

NS 0 0 20 20 0 3

DC 10 10 30 30 10 3

Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or 31-Dec-04 Percentage Amount

Method Actual Documents Bid Docs Contract Award Signature (Delivery) Duration Contractor executed in disbursed in

Name 2004 2004



Local Training in Implementation of SL/WB-CON- DC Estimated 81,000.00 6-Jan-05 16-Jan-2005 26-Jan-2005 25-Feb-2005 27-Mar-2005 6-Apr-2005 16-Apr-2005 7

Compensatory Programme F-602/04 Actual





Local Training in School Social IS Estimated 301,000.00 6-Jan-05

Work/Guidance Counseling Actual





New Teacher Training Programs, and IS Estimated 70,000.00 6-Jan-05

Training in Instructional Supervision Actual







Local Workshops and Consultations on QCBS I Estimated 125,000.00 6-Jan-05

New Assessment Methods Actual



Literacy and Numeracy Workshops at SL/WB-CON- Estimated 8,000.00 6-Jan-05

School Level F-404/03 Actual







Training for Lab. Technicians and Bursars Estimated 22,000.00 6-Jan-05

Actual





Training and Study Tours for Project Estimated 65,000.00 18-Oct-04

Management Staff Actual

Training and Supplies for School Estimated 375,000.00 31-Oct-04

Improvement Projects Actual









TOTAL COMPONENTS $1,047,000.00

ST. LUCIA OECS EDUCATION DEVELOPMENT PROJECT

PROCUREMENT PLAN - GOODS (REVISED SEPTEMBER 27, 2004)

January 2004 - August 2005

ICB-International Competitive Bidding; NCB-National Competitive Bidding [NCB 2 is without prior review]; IS-International Shopping for Goods or Shopping for small works [<150,000US$];

NS-National Shopping; LIB-Limited International Bidding; IC-Individual Consulting; DC-Direct Contracting; QCBS-Quality Cost Based Selection (N= National, I= International);

QBS-Quality Based Selection; LCS-Least Cost Selection



TABLE 2: GOODS -- Time Table of Procurement Activities

Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding Prior/ Post No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or

Method Actual Documents Review Bid Docs Contract Award Signature (Delivery) Duration Contractor

Name

Elapsed weeks



ICB 10 Prior 10 45 90 15 15

NCB 10 Prior 10 30 60 15 15

NCB2 0 Post 0 30 60 0 15

LIB 10 Prior 10 45 60 15 15

IS 0 None 0 20 20 15 3

NS 0 None 0 20 20 0 3





DC 10 Prior 10 30 30 10 3





Description Bid Number Procurement Estimated Vs. Amount in US$ Bidding Prior/ Post No Objection Call for Bids Bid Opening No Objection to Contract Contract End Contract Supplier or

Method Actual Documents Review Bid Docs Contract Award Signature (Delivery) Duration Contractor

Name





Non-Computer Equipment and Office SL/WB-NS- NS Estimated 9,100 1-Mar-04 POST 1-Mar-2004 1-Mar-2004 21-Mar-2004 10-Apr-2004 10-Apr-2004 13-May-2004 30

Supplies for PMU

Various

COMPLETED G-115/04 Actual 1-Mar-04 23-Mar-2004 30-Apr-2004





General Equipment for 8 District Offices and SL/WB-NCB- NCB Estimated 72,000 20-Apr-04 PRIOR 30-Apr-2004 10-May-2004 9-Jun-2004 8-Aug-2004 23-Aug-2004 6-Nov-2004 60

Examinations Unit



(subsumed SL/WB-SHP-G-204/03) G-112/04 Actual 10-May-2004 CTB Opening 4-Aug-2004 30-Aug-2004 30-Nov-2004







EMIS Software Packages & Related Services SL/WB-NCB- LIB Estimated 162,300 5-Jul-04 PRIOR 15-Jul-2004 25-Jul-2004 8-Sep-2004 7-Nov-2004 22-Nov-2004 5-Feb-2005 60

for 22 Existing Schools



& 2 New Schools(training included) G-205/04 Actual 14-Jul-04 23-Jul-2004 23-Jul-2004 15-Sep-2004

Non-Computer Equipment and Office SL/WB-NS- NS Estimated 10,900 27-Aug-04 POST 27-Aug-2004 27-Aug-2004 16-Sep-2004 6-Oct-2004 6-Oct-2004 8-Nov-2004 30

Supplies for PMU



G-119/04 Actual





(1) Furniture for Student Support SL/WB-NS- NS Estimated 20,000 21-Oct-04 POST 21-Oct-2004 21-Oct-2004 10-Nov-2004 30-Nov-2004 30-Nov-2004 1-Feb-2005 60

Services/Educational Administration G-117/04



(modular ensemble & accessories) Actual DTB Meeting





School Furniture for 11 Rehab. (tech. & SL/WB-ICB- ICB Estimated 390,000 4-Oct-04 PRIOR 14-Oct-2004 24-Oct-2004 8-Dec-2004 8-Mar-2005 23-Mar-2005 6-Jul-2005 90

admin.-Science & LRC) + :



2 New Schools G-03/04 New Schools 4-Oct-04 1-Jul-2006



PHASED DELIVERY Actual CTB Opening





General Equipment and Misc. Supplies for 11 SL/WB-NCB- NCB Estimated 118,000 21-Sep-04 PRIOR 1-Oct-2004 11-Oct-2004 10-Nov-2004 9-Jan-2005 24-Jan-2005 9-Apr-2005 60

Rehab. Schools



(technical & admin. areas) G-113/04 Actual CTB Opening





Electronic Document Management and SL/WB-NCB- LIB Estimated 96,000 15-Nov-04 PRIOR 25-Nov-2004 5-Dec-2004 19-Jan-2005 20-Mar-2005 4-Apr-2005 18-Jun-2005 60

Sharing Software Package



G-115/04 Actual CTB Opening





Computers and Software for Rehab. Schools SL/WB-ICB- ICB Estimated 204,000 15-Nov-04 PRIOR 25-Nov-2004 5-Dec-2004 19-Jan-2005 19-Apr-2005 4-May-2005 18-Jul-2005 60





and District Offices(tech. & admin) G-05/04 Actual CTB Opening





Science Equipment for 20 Existing + SL/WB-ICB- ICB Estimated 357,000 15-Nov-04 PRIOR 25-Nov-2004 5-Dec-2004 19-Jan-2005 19-Apr-2005 4-May-2005 17-Aug-2005 90





2 New Schools: G-04/04 New Schools 1-Jul-2006



PHASED DELIVERY Actual CTB Opening





Education Technology Equipment for 11 SL/WB-ICB- ICB Estimated 300,000 15-Nov-04 PRIOR 25-Nov-2004 5-Dec-2004 19-Jan-2005 19-Apr-2005 4-May-2005 17-Aug-2005 90

Rehab.



+ 2 New Schools G-07/04 New Schools 1-Jul-2006



PHASED DELIVERY Actual CTB Opening

Lot 1:Textbooks for Book Rental Scheme (20 SL/WB-ICB- ICB Estimated 900,000 3-Jan-05 PRIOR 13-Jan-2005 23-Jan-2005 9-Mar-2005 7-Jun-2005 22-Jun-2005 4-Nov-2005 120

Exist. + 2 New Schools)



Lot 2: Reference Books for LRC (20 Exist. + 2 G-06/04 Actual CTB Opening

New Schools)







Educational Materials to Support New SL/WB-NCB- NCB2 Estimated 43,000 8-Nov-04 POST 8-Nov-2004 8-Nov-2004 8-Dec-2004 6-Feb-2005 6-Feb-2005 22-May-2005 90

Curriculm



G-116/04 Actual CTB Opening





Non-Computer Equipment and Office SL/WB-NS- NS Estimated 18,000 6-Jan-05 POST 6-Jan-2005 6-Jan-2005 26-Jan-2005 15-Feb-2005 15-Feb-2005 20-Mar-2005 30

Supplies for PMU



G-118/05 Actual DTB Meeting





Computers, Software, Printers & Peripherals SL/WB-ICB- ICB Estimated 270,000 8-Aug-05 PRIOR 18-Aug-2005 28-Aug-2005 12-Oct-2005 10-Jan-2006 25-Jan-2006 9-Jun-2006 120

for New Schools and G-08/05





(2) High End Scanner for Examinations Actual Unconfirmed

(70,000 from unallocated funds)









General Equipment and Misc. SL/WB-NCB- NCB2 Estimated 118,000 10-Sep-05 POST 10-Sep-2005 10-Sep-2005 10-Oct-2005 9-Dec-2005 9-Dec-2005 24-Mar-2006 90





Supplies for New Schools G-114/05 Actual Unconfirmed





Computers, Accessories for PMU SL/WB-NS- NS Estimated 25,000 POST

G-201/03



COMPLETED Actual





Sports Equipment for 2 New Schools SL/WB-NCB- NCB2 Estimated 74,000 10-Sep-05 POST 10-Sep-2005 10-Sep-2005 10-Oct-2005 9-Dec-2005 9-Dec-2005 12-Jul-2006 200

G-202/05



PHASED DELIVERY Actual Unconfirmed









TOTAL COMPONENTS $ 3,187,300.00


Share This Document


Related docs
Other docs by 87b802bace5062...
Integrated Safeguards Data Sheet
Views: 14  |  Downloads: 0
A Multioutput Cost Function for Port Terminals
Views: 36  |  Downloads: 2
ENVIRONMENTAL MANAGEMENT PLAN FORMAT
Views: 282  |  Downloads: 1
Consulting
Views: 389  |  Downloads: 10
Protokolu
Views: 54  |  Downloads: 0
CUMMULATIVE
Views: 20  |  Downloads: 0
I. BIENES-PREVIO
Views: 19  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!