Arranging a Meeting Template - Excel

Description

Arranging a Meeting Template document sample

Shared by: xws11804
Categories
Tags
-
Stats
views:
50
posted:
12/20/2010
language:
English
pages:
4
Document Sample
scope of work template
							Timesheet for Birkbeck College EC Framework 7 Projects

Project Title
EC Project Ref
Birkbeck Research Grant Code

Researcher name
Percentage hours worked (FTE)

Month
Year



Type of activity & WP                   Description of work (see example form)     Week 1           Week 2         Week 3         Week 4         Week 5             TOTAL
Date w/c                                                                           02/02/09         09/02/09       16/02/09       23/02/09         -
Research & Technological Development (RTD) - # of hours
Work package 1                                                                                                                                                              0
Work package 2                                                                                                                                                              0
Work package 3                                                                                                                                                              0
Work package 4                                                                                                                                                              0
Work package 5                                                                                                                                                              0
Work package 6                                                                                                                                                              0
Management- please record # of hours
Work package 1                                                                                                                                                              0
Work package 2                                                                                                                                                              0
Work package 3                                                                                                                                                              0
Work package 4                                                                                                                                                              0
Demonstration- please record # of hours
Work package 1                                                                                                                                                              0
Work package 2                                                                                                                                                              0
Work package 3                                                                                                                                                              0
Other - please record # of hours
Work package 1                                                                                                                                                              0
Work package 2                                                                                                                                                              0
Work package 3                                                                                                                                                              0
Work package 4                                                                                                                                                              0

Total hours to be charged to this project                                                     0                0              0              0             0                0



Time spent on other projects
Project title                                                                                                                                                               0
Project title                                                                                                                                                               0
Project title                                                                                                                                                               0
Project title                                                                                                                                                               0


Total hours worked                                                                            0                0              0              0             0                0
                                                                                 Overall total productive hours should average 137.5 hours a month for a full-time person




Signature of Researcher                                                                           Signature of Supervisor




Date                                                                                              Date
  Notes

1 Timesheets are mandatory in Framework 7. They should provide supporting evidence for the staff costs charged to the
  grant. This timesheet must be completed for all staff, including staff working 100% on the project. For such staff at
  least 1650 hours a year should be recorded
2 For staff working on this project for only part of their time this timesheet must record how the rest of their time is
  spent in order to "enable a reconciliation of total hours worked" as per EC requirements . Please use the section entitled
  'Time spent on other projects'.
3 EC definitions of activities.:
         Research & Technological Development (RTD) = "activities directly aimed at creating new knowledge, new
         technology, and products, including scientific coordination."
         Management = co-ordinator's role, reporting to EC and liaising with partners plus general "legal, ethical,
         financical and administrative management of the project".
         Other = other costs including networking, coordination, dissemination (e.g. establishing a website, presenting the
         project at a conference or workshop, drafting a publication), studies on the socio-economic impact. Providing
         training can also be recorded
          Demonstration = This section only applies to Coordination or Support Actions (CSA). EC definition = "activities
          designed to prove the viability of new technologies that offer a potential economic advantage".
4 For certain grants there is a requirement to report the number of hours worked on a specific work package. Therefore
  this timesheet enables you to record time spent on different work packages so that this can be more easily reported.

5 The 'Further information/Description of work' field should be used to enter a brief description of the type of work done,
  e.g. lab research, research analysis, staff management, attending meetings/conferences.
6 The form must be signed by the person recording their time and then checked and authorised by their superior (UKRO
  have confirmed that PI time sheets must also be signed by a superior).
7 Please see sheet 3 for an example of a completed spreadsheet. Fields completed by the end user are shown in red.
e for the staff costs charged to the
 n the project. For such staff at

cord how the rest of their time is
 ts . Please use the section entitled



t creating new knowledge, new

 us general "legal, ethical,

ablishing a website, presenting the
o-economic impact. Providing

 (CSA). EC definition = "activities
mic advantage".
 pecific work package. Therefore
 is can be more easily reported.

cription of the type of work done,
ces.
 thorised by their superior (UKRO

 the end user are shown in red.
Timesheet for Birkbeck College EC Framework 7 Projects

Project Title                               EU Strep
EC Project Ref                              Xxxxxx
Birkbeck Research Grant Code                AARA1

Researcher name                             Dr E.U. Aaré
Percentage hours worked (FTE)               100% (50% charged to this project)

Month                                                        February
Year                                                          2009



Type of activity & WP                   Description of work (see example form)           Week 1            Week 2          Week 3          Week 4          Week 5        TOTAL
Date w/c                                                                                 02/02/09          09/02/09        16/02/09        23/02/09          -
Research & Technological Development (RTD) - # of hours
Work package 1                          e.g. Questionnaire design and administration               15              7.5                                                      22.5
Work package 2                          e.g. Interviews                                           7.5                                 5                                     12.5
Work package 3                          e.g. Analysis                                                                                 7           7.5                       14.5
Work package 4                          e.g. Testing                                                                                  7                                        7
Work package 5                                                                                                                                                                 0
Work package 6                                                                                                                                                                 0
Management- please record # of hours
Work package 1                          e.g. Arranging consortium meeting                          2                                  2                                        4
Work package 2                          e.g. Preparing interim report                           1.25                                                                        1.25
Work package 3                          e.g. Atteding consortium meeting                                                              7                                        7
Work package 4                                                                                                                                                                 0
Demonstration- please record # of hours
Work package 1                                                                                                                                                                    0
Work package 2                                                                                                                                                                    0
Work package 3                                                                                                                                                                    0
Other - please record # of hours
Work package 1                                                                                                                                                                    0
Work package 2                                                                                                                                                                    0
Work package 3                                                                                                                                                                    0
Work package 4                                                                                                                                                                    0

Total hours to be charged to this project                                                      25.75               7.5                28          7.5               0      68.75



Time spent on other projects
Project title                               AHRC grant                                              12                30         8.25            18.5                      68.75
Project title                                                                                                                                                                     0
Project title                                                                                                                                                                     0
Project title                                                                                                                                                                     0


Total hours worked                                                                             37.75             37.5           36.25                 26            0      137.5
                                                                                       Overall total productive hours should average 137.5 hours a month for a full-time person




Signature of Researcher                                                                                  Signature of Supervisor




Date                                                                                                     Date

						
Related docs
Other docs by xws11804