					                                                Los Angeles Community College District Proposition A/AA Bond Program
                                           BuildLACCD CONTRACTOR'S JOB BOARD - QUARTERLY LOOK AHEAD SCHEDULE
                                                                      915 Wilshire Blvd., 810 Floor, Los Angeles, CA 90017

       THIS SPREADSHEET IS ONLY A LOOK AHEAD. FOR ACTUAL PRE-BID AND BID OPENING DATES, log on to www.build-laccd.org click on
     "Contracting & Bidding Site", then " Universal Reprographics" link. This information does not supersede the project plans and specifications.

3rd Quarter
                      Type of           Approx.                  Estimated    LEED        Design
 Campus                                           Project Type                                              CPM Team                         Project/Description                     Job Walk   Bid Awarded
                      Facility          Sq. Ft.                   Budget     Certified     Team
                                                                                                                           Project consists of construction on the southwest
                                                                                                                           corner of the campus of two (2) new buildings;
                                                                                                                           Building 1A/1B is a two-story steel framed structure
                                                                                                                           approx. 45,880 ST. This building will house
                                                                                                                           administrative/management offices, a multi-purpose
                                                                                                                           room and a computer lab. Building 2 is a new one-
                                                                                                                           story steel framed structure approx. 11,510 SF. This
                                                                                                                           building will house administrative/management
                                                                                                                URS
                                                                                                                           offices. In addition two (2) exisiting buildings,
 Valley       Student Services Center   37,490        New         $18.5M       Yes       Steinberg        Rinaldo Veseliza                                                            9/23/08       No
                                                                                                                           Physics and Chemistry, will be demolished in its
                                                                                                          (818) 756-0953
                                                                                                                           entirety with protection of an existing utility tunnel
                                                                                                                           running beneath both buildings. This is a Certified
                                                                                                                           LEED Silver project. Work includes: demolition,
                                                                                                                           sitework, concrete, carpentry, roofing, doors and
                                                                                                                           windows, finishes, plumbing, HVAC, electrical wiring,
                                                                                                                           fire protection, security system, and other systems.
                                                                                                                           This site work encompasses 2.94 acres and includes
                                                                                                                           demolition, landscaping, ADA improvements,

4th Quarter
                      Type of           Approx.                  Estimated    LEED        Design
 Campus                                           Project Type                                              CPM Team                         Project/Description                     Job Walk   Bid Awarded
                      Facility          Sq. Ft.                   Budget     Certified     Team
                                                                                                               Harris &
                                                                                                             Associates
                RWGPL - Red Line
  City                                                                                                    Christopher Dunn
                Pedestrian Corridor
                                                                                                           (323) 953-4000
                                                                                                                x3089

                                                                                                               Jacobs
                                                                                                             Bob Herman Scope includes replacing the exisitng E3/E5 bldgs
  East          E3/E5 Replacement       45,000    Renovation      $7.2M        Yes       WWCOT
                                                                                                           (323) 859-2330 with a 3-story 45,000 sq. ft. classroom building
                                                                                                                x102

                                                                                                                          Bid out by the City of Monterey Park: The project
                                                                                                                          will develop a Transit Center in conjunction with the
                                                                                                                          redevelopment of the campus of ELAC which will
                                                                                                                          create an off - street terminal which will provide a hub
                                                                                                               Jacobs
                                                                                                                          for the following transit entities: MTA, City of
                                                                                                             Bob Herman
  East            Transit Center         N/A      Renovation       $1M          No         TBD                            Montebello and City of Monterey Park. The Transit
                                                                                                           (323) 859-2330
                                                                                                                          Center will be designed to provide an attractive and
                                                                                                                x102
                                                                                                                          safe environment for transit passengers. The waiting
                                                                                                                          area will be equipped with bus shelters, seating ,
                                                                                                                          trash receptacles, informational kiosks, informational
                                                                                                                          signage, lighting, landscaping, paving and security


          L:/Outreach/ConstructionLookahead_Qtrly_3rdand4th_100608                               1 of 4
                                                                                                  Pinnacle One    Scope of work includes demolition, new accessibility,
                                                                                                      Mark        grading and drainage, landscaping,
           Theater Drama Speech
Harbor                                       Renovation   $2.5 to $3M   No   Rosetti Jorgensen     Schoeppner     plumbing/irrigation, exterior lighting, exterior
                  Building
                                                                                                 (310) 835-0466   electrical, window & door installation, and painting
                                                                                                      x102        around the Music, Fine Arts, and Drama building.

                                                                                                  Pinnacle One
                                                                                                      Mark      Construction of new stage rigging, electrical, lighting,
            Theater Rigging and                             $1M to
Harbor                                       Renovation                 No   Rosetti Jorgensen     Schoeppner   audio and video in the Theater / Drama/Speech
                 Lighting                                   $1.2M
                                                                                                 (310) 835-0466 Building and Music Recital Hall
                                                                                                      x102


                                                                                                      GSE         The scope of this project is to relocate LADWP
          RWGPL -LADWP Water
Mission                              N/A      Remodel      $ 200 K      No      Psomas           Nick Quintanilla waterline which crosses the Health, Fitness, & PE
            Line Relocation
                                                                                                 (818) 367-7237 building.



          Campus Administrative                                                                       GSE         This project includes remodelling the office space &
Mission     Services Building        N/A      Remodel      $1.03 M      No   Steven Fader        Nick Quintanilla updating all the code requirements for Administrative
                Remodel                                                                          (818) 367-7237 Wing of Campus Administrative services Building



                                                                                                                  The scope of this highly specilized project includes
               Campus-Wide                                                                            GSE
                                                                                                                  installation of new equipment for Fire Safety in the
Mission     Infrastructure - Fire    N/A      Remodel       $500 K      No      Psomas           Nick Quintanilla
                                                                                                                  existing 5 campus buildings & intigrating new
           Safety Systems (FSS)                                                                  (818) 367-7236
                                                                                                                  builidings to the existing Fire Safety systems.

                                                                                                                  The proposed development includes the extension
                                                                                                                  of Eldridge Avenue from Harding Street eastward to
                                                                                                                  Maclay Street, on-site develoment for the Health and
                                                                                                      GSE         PE, Fitness Center and a surface parking lot, Maclay
           RWGPL - Extended
Mission                              N/A      Remodel        $1M        No      Psomas           Nick Quintanilla Street improvents to accomodate the Eldridge
          Campus Improvements
                                                                                                 (818) 367-7237 Avenue connection and future traffic demands,
                                                                                                                  intersetion improvements at Harding/Eldridge and
                                                                                                                  Maclay/Eldridge and new utility infrastructure to and
                                                                                                                  within the subject property.

                                                                                                                  The scope of this highly specilized project includes
               Campus-Wide                                                                            GSE
                                                                                                                  installation of new equipment for Campus security in
Mission   Infrastructure - Campus    N/A      Remodel       $500K       No      Plan Net         Nick Quintanilla
                                                                                                                  the existing 5 campus buildings & intigrating new
          Security Systems (CSS)                                                                 (818) 367-7236
                                                                                                                  builidings to the existing security systems.


                                                                                                                  Renovate 36,082 GSF including upgrades to basic
                                                                                                    Swinerton     electrical and plumbing systems, modifications to
             Fine Arts & Music,
                                                                                                     Joseph       HVAC systems, renovation of restrooms, technology
Pierce      Faculty Office, and     36,082   Renovation     $4.1M       NO   Johnson Fain
                                                                                                  Santiesteban    and communications upgrades, new floor finishes,
            Business Education
                                                                                                 (818) 710.2918   new paint interior and exterior, window treatments,
                                                                                                                  ADA upgrades as needed.


                                                                                                     Swinerton     Removal & replacement of existing parking lot along
          Administration Parking
Pierce                               N/A        New         $3.3M       NO      PSOMAS           Isabella Golovaty with selected landscape improvements, an added fire
                   Lot
                                                                                                  (818) 610-6527 lane and revised layout.


      L:/Outreach/ConstructionLookahead_Qtrly_3rdand4th_100608                          2 of 4
                                                                                                                      The project consists of landscape, hardscape,
                                                                                                                      lighting, & irrigation to the North/South Axis of the
                                                                                                      Swinerton       Pedestrian Mall & the Hill Side Zone below the
                Landscape Specific
 Pierce                                  N/A        New         $8.4M   NO       Berliner         Isabella Golovaty   Performing Arts Building. The project also
                   Master Plan
                                                                                                   (818) 610-6527     addresses site furniture, site amenities, signage and
                                                                                                                      way finding, and building identifications. Construction
                                                                                                                      of a botanical garden in an existing 2-acre site.
                                                                                                                      This project will improve areas around the campus
                                                                                                     Swinerton        noted as entrances at Winnetka, De Soto and
               FTA Bus Rapid Transit
 Pierce                                  N/A        New         $2.1M   NO       Berliner          Richard Nasr       Masson. A Gateway or improved path finding will be
                    Extension
                                                                                                  (818) 610-6588      developed to link the rapid transit bus to Pierce
                                                                                                                      College.
                                                                                                                      The renovation and modernization of the 77,300 SF
                                                                                                                      Lecture Laboratory Building includes water-proofing
                                                                                                       CCG            the roof and exterior skin of the building, a complete
                Lecture Laboratory                                            LHA a division
Southwest                               78,700   Renovation     $5.6M   Yes                        Ed Bilezikjian     upgrade to the air conditioning system, modernization
              Building- Modernization                                         of GKKWorks
                                                                                                  (323) 241-1750      of data/voice technology, and the incorporation of
                                                                                                                      state-of-the-art, smart classroom technology to the
                                                                                                                      majority of the classrooms.
                                                                                                                  The scope of work addresses re-configuration of the
                                                                                                                  facility to reflect changed curriculum needs and
                                                                                                                  modifications of some areas based on increased use.
                                                                                                       CCG
                                                                                                                  The four racquetball rooms, no longer used for
Southwest     PE Gym, Pool, Bleachers    N/A     Renovation     $1.3M   No    Cannon/KDG           Ed Bilezikjian
                                                                                                                  racquetball, will be reconfigured into a classroom and
                                                                                                  (323) 241-1750
                                                                                                                  aerobics room. Showers will be added in the
                                                                                                                  women’s locker room, and repairs will be made to
                                                                                                                  address maintenance issues.

                                                                                                                 The project consists of the consturction of outdoor
                                                                                                                 playground and hardscape for the Child Development
                                                                                                                 Center and miscellaneous building modifications and
                                                                                                       AVA
                Child Development                                                                                finish applications required for completion.
  Trade                                  N/A        New          $1M    Yes        N/A            Deba Mohapatra                                                                10/16/08   No
                 Center- Phase II                                                                                Construction of new parking lot along Grand Avenue
                                                                                                  (213) 763-7392
                                                                                                                 west of the project limit line. Work consists of
                                                                                                                 grading, compacting, and placement of previous
                                                                                                                 concrete parking surface per LEED requirements.

                                                                                                       AVA
              SC- Undergrounding of
  Trade                                                                                           Deba Mohapatra
                Overhead Utilities
                                                                                                  (213) 763-7392


                                                                                                       AVA
                LRC & Bldg C Space
  Trade                                                                                           Deba Mohapatra
                   Heating Sys
                                                                                                  (213) 763-7392



                                                                                                                   Scope of work includes installation of emergency
                                                                                                        URS
              Emergency Lighting/Fire                                                                              lighting, fire alarm and security systems i.e. lighting
 Valley                                             Other        $1M    No        Arup            Rinaldo Veseliza
               Alarm/Security System                                                                               control relay, fire alarm control panel and scurity
                                                                                                  (818) 756-0953
                                                                                                                   camera, etc. throughout the campus




          L:/Outreach/ConstructionLookahead_Qtrly_3rdand4th_100608                       3 of 4
                                                                                                               Construct a new Library / Learning Resource Center
                                                                                                               facility of approx. 89,000 SF, with reinf. concrete
                                                                                                               spread footings and grade beams, steel columns and
                                                                                                               bracing, reinforced concrete slab on grade and
                                                                                                  URS          structural steel framing. Steel framed roof with
                Library/ Resource                                            Pfeiffer
Valley                                90,350       New          $33M   Yes                  Rinaldo Veseliza   concrete filled metal deck. Lath and plaster exterior
                 Learning Center                                             Partners
                                                                                            (818) 756-0953     cladding, insulated window glazing, metal panels,
                                                                                                               alum glazed doors, sunscreens and trim. Roofing
                                                                                                               includes flat "Cool roofing." Includes four exterior
                                                                                                               concrete filled metal pan stairs and one 2-stop
                                                                                                               hydraulic elevator. Full M/E/P/Fire Protection. LEED
                                                                                                               project.
                                                                                                               Renovation of approx. 15,700 SF Art Building,
                                                                                                  URS          includes demolition, repalcement of doors and
Valley        Life Science Building   15,700    Renovation     $850K   Yes   Caldwell       Rinaldo Veseliza   windows, new walls, refurbishing floor, painting of
                                                                                            (818) 756-0953     wall/ceiling, and installation of communication and
                                                                                                               security systems.




         L:/Outreach/ConstructionLookahead_Qtrly_3rdand4th_100608                  4 of 4

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:4
posted:12/20/2010
language:English
pages:4