Acrobat PDF

APPENDIX A LESSONS LEARNED LESSONS LEARNED The following

You must be logged in to download this document
Reviews
Shared by: NPS
Stats
views:
23
downloads:
0
rating:
not rated
reviews:
0
posted:
6/2/2008
language:
English
pages:
0
APPENDIX A LESSONS LEARNED LESSONS LEARNED The following is a partial list of items which can lead to disputes and costly construction contract modifications. Improper cross-referencing on drawings. Failure to coordinate documents prior to submittal. Failure to comply with Directors Order 10A and 10B. References to “owner” instead of “Government” References to “Architect” or “Engineer” instead of “Contracting Officer” Failure to specify products in accordance with the Buy American Act. Failure to coordinate Division 1 specifications with the park Use of "Federal Specification Numbers," these are obsolete. Use of pure hydraulic lime mortar for structural applications, such as concrete block walls—it does not have adequate strength. 10. Applying paint to weathered wood without a wood stabilizer—it does not adhere. 11. Applying exterior Alkyd paint primers and top coats—they promote the growth of mildew. 1. 2. 3. 4. 5. 6. 7. 8. 9. Page 1 10/24/2004 Appendix A.doc
Related docs
Other docs by NPS
GLBA ANN RPT FINAL - Sea Otter Project Reports??
Views: 130  |  Downloads: 1
Oil Spill Response Needs Assessment
Views: 437  |  Downloads: 1
GPS for Fire Management and ICS - Training
Views: 191  |  Downloads: 3
Trimble GeoXT Quick Start Guide
Views: 460  |  Downloads: 7
Are You Really Mapping Submeter
Views: 203  |  Downloads: 3
Document to keep track of Trimble CE
Views: 152  |  Downloads: 2
Difference between NAD and WGS G at
Views: 156  |  Downloads: 0
What GPS Receiver Do I Need
Views: 138  |  Downloads: 0