Certificate Fake Marriage License
W
Description
Certificate Fake Marriage License document sample
Document Sample


Reports under 14-A of K.C.S (CC&A) Rules sent to Disciplinary Authority as on 28/04/2006
PAGE : 1
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
Proved
-------
1 |LOK/ARE4 | Sri.M.S.Umeshchandra(DGO) KAS, |Arbitrarily granted permission|PRINCIPAL SECY |
|Enq-7/ | former Asst. Commissioner |in favour of Sri Ian Faria to |DPAR |
|1999-2000| Bangalore North Sub-Dn. B'lore |acquire agricultural land. |06/07/2002 |
| | | | |
-----------------------------------------------------------------------------------------------
2 |LOK/DRE2 | Sri.Hanumantharaya Kanakatta |Demanded and accepted bribe of|SECY |
|Enq-11/ | (DGO) Village Accountant, |Rs.2000/- from the complainant|REVENUE DEPT. |
|1999-2000| Ambalaga Village, Aland Taluk, |for effecting change of katha.|06/07/2002 |
| | Gulbarga District. | | |
-----------------------------------------------------------------------------------------------
3 |LOK/ARE4 | Sri.J.S.Lamani (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-17/ | Block Education Officer, |Rs.1050/- from three TCH stud-|EDN (PRIM-SEC) |
|1999-2000| Holalkere, |ents to award higher marks. |06/07/2002 |
| | Chitradurga District. | | |
-----------------------------------------------------------------------------------------------
4 |LOK/ARE3 | 1.Sri.H.Pundalika (DGO-1) |Made excess payment to the |SECY |
|Enq-1/ | Assistant Ex.Engineer, |contractors by recording |RD&PR |
|1998-1999| Z.P. Engneering Sub-Division, |higher measurements in |06/07/2002 |
| | Basavakalyana, Bidar District. |Measurement Book. | |
| | 2.Sri Ashok Patil (DGO-2), | | |
| | Asst.Engineer, | | |
| | Z.P.Engineering Sub-Division, | | |
| | Basavakalyana, Bidar District. | | |
| | | | |
| | 3.Sri Jagannath Majjige (DGO-3) | | |
| | Junior Engineer, | | |
| | Z.P. Engineering Sub-Division, | | |
| | Basavaklyana, Bidar District. | | |
-----------------------------------------------------------------------------------------------
5 |LOK/ARE4 | Sri.M.S.Umeshchandra(DGO) KAS, |Arbitrarily granted permission|PRINCIPAL SECY |
|Enq-7/ | former Asst. Commissioner |in favour of Sri Ian Faria to |DPAR |
|1999-2000| Bangalore North Sub-Dn. B'lore |acquire agricultural land. |06/07/2002 |
| | | | |
-----------------------------------------------------------------------------------------------
6 |LOK/DRE4 | Sri.B.D.Rajendra (DGO), |On the basis of unregistered |SECY |
|Enq-5/ | Secretary, Village Panchayath |sale deed, DGO changed the |RD&PR |
|1999-2000| Belagola, Srirangapatna Taluk |kaktha in favour of |10/07/2002 |
| | Mandya District. |Sri Venkatesh. | |
-----------------------------------------------------------------------------------------------
7 |LOK/DRE4 | Sri.R.R.Kulkarni (DGO), |DGO created false mutation and|SECY |
|Enq-27/ | Village Accountant, Hunchal |record of rights and issued |REVENUE DEPT. |
|1999-2000| (P.Y.) Gokak Taluk, Belgaum |certified copies thereof. |10/07/2002 |
| | District. | | |
-----------------------------------------------------------------------------------------------
8 |LOK/DRE2 | Sri.F.G.Devappa (DGO), |Demanded and accepted bribe of|SECY |
|Enq-8/ | Village Accountant, Bagali |Rs.300/- from complainant for |REVENUE DEPT. |
|1998-1999| Village, Harapanahalli Taluk, |issue of RTC extract. |10/07/2002 |
| | Bellary District. | | |
-----------------------------------------------------------------------------------------------
9 |LOK/DRE5 | 1.Sri.D.H.Muralidhara Rao(DGO-1)|Executed the work of digging |SECY |
|Enq-8/ | Asst. Executive Engineer, |of 52 open wells departmental-|RD&PR |
|1999-2000| Z.P. Engineering Sub-Division, |ly without inviting tenders |10/07/2002 |
| | Sorab. |and failed to maintain Nominal| |
| | 2.Sri M.S.Shankara Murthy(DGO-2)|Muster Rolls. | |
| | Junior Engineer, | | |
| | Z.P.Engineering Sub-Division, | | |
| | Sorab. | | |
| | | | |
PAGE : 2
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri Pandurangappa(DGO-3) | | |
| | Junior Engineer, | | |
| | Z.P.Engineering Sub-Division, | | |
| | Sorab. | | |
-----------------------------------------------------------------------------------------------
10 |LOK/ARE5 | Dr.Y.Krishnappa,(DGO) former |Made payment without materials|PRINCIPAL SECY |
|Enq-33/ | Asst.Project Officer,Spl.Live |supplied and caused loss to |AH & F DEPT. |
|1997-1998| Stock Breeding Prog.O/o Deputy |Govt. |10/07/2002 |
| | Director, A.H.&V.S., Bidar. | | |
| | | | |
-----------------------------------------------------------------------------------------------
11 |LOK/DRE4 | Dr.Narasimha Prasad (DGO), |Illegally granted license in |PRIN SECY. |
|Enq-8/ | the then Health Officer, |favour of Shivappa for running|H&FW DEPT |
|2000-2001| Mysore City Corproation, |a Tea Stall. |11/07/2002 |
| | Mysore. | | |
-----------------------------------------------------------------------------------------------
12 |LOK/DRE5 | Sri.Thimmachari (DGO), |Created two records for one |SECY |
|Enq-9/ | Village Accountant, |site and giving two different |REVENUE DEPT. |
|1999-2000| Belagola, Srirangapatna Taluk |numbers in Demand Register. |11/07/2002 |
| | Mandya District. | | |
-----------------------------------------------------------------------------------------------
13 |LOK/ARE2 | Dr.G.G.Betageri (DGO), |Demanded and accepted bribe of|PRIN SECY. |
|Enq-52/ | Asst. Surgeon, |Rs.300/- from complainant for |H&FW DEPT |
|2000-2001| Government Hospital, |conducting the surgery. |11/07/2002 |
| | Bhadravati. | | |
-----------------------------------------------------------------------------------------------
14 |LOK/DRE4 | Sri.C.K.Mallesh (DGO), |Demanded & accepted bribe of |SECY |
|Enq-18/ | First Division Assistant, |Rs.500/- from complainant for |REVENUE DEPT. |
|1999-2000| Taluk Office, Alur, Hassan |regularisation of his unautho-|11/07/2002 |
| | District. |rised cultivation. | |
-----------------------------------------------------------------------------------------------
15 |LOK/DRE2 | 1.Sri.Srinivasa (DGO-1) |Demanded and accepted bribe of|SECY |
|Enq-26/ | Senior Labour Inspector, |Rs.250/- from complainant for |LABOUR DEPT |
|1996-1997| O/o.Labour Commissioner,VISL |issue of registration certifi-|11/07/2002 |
| | Building, Bangalore |cate of the firm. | |
| | 2.Sri R.Nagaraju (DGO-2), | | |
| | (Abated), Literate Assistant, | | |
| | O/o the Labour Commissioner, | | |
| | VISL Building, Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
16 |LOK/ARE3 | Smt.Hilda D'Souza (DGO), |Demanded & accpeted bribe of |SECY |
|Enq-12/ | Sub-Registrar, |Rs.200/- from complainant for |REVENUE DEPT. |
|1997-1998| Kundapur, D.K.District. |registration of sale deed. |12/07/2002 |
-----------------------------------------------------------------------------------------------
17 |LOK/ARE4 | 1.Sri S.B.Surpur (DGO-1), |Acquired movable and immovable|PRIN SECY. |
|Enq-14/ | First Division Assistant, |properties in contravention of|H&FW DEPT |
|2000-2001| District Hospital, Bijapur. |KCS(Conduct) Rules, 1966. |12/07/2002 |
| | | | |
| | 2.Smt.Kasturi S.Surpur (DGO-2), | | |
| | Senior Health Assistant, | | |
| | District Hospital, Bijapur. | | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE : 3
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
18 |LOK/DRE4 | Sri.Suryasekhara C. |Demanded and accepted bribe of|SECY |
|Enq-6/ | Krishnamurthy (DGO) Village |Rs.600/- from complainant for |REVENUE DEPT. |
|2001-2002| Accountant, Tumaraguddi, |change of katha. |12/07/2002 |
| | YelburgaTaluk,Raichur District | | |
-----------------------------------------------------------------------------------------------
19 |LOK/DRE3 | Smt.Rajeswari (DGO), |Married a person who has a |PRINCIPAL SECY |
|Enq-3/ | Assistant Karnataka Bureau of |wife living, without obtaining|DPAR |
|1999-2000| Public Enterprises, K.G.S., |permission of the Government. |12/07/2002 |
| | Bangalore. | | |
-----------------------------------------------------------------------------------------------
20 |LOK/DRE5 | Sri A.V.Naik (DGO), |failed to take effective steps|SECY |
|Enq-7/ | Block Development Officer, |for recovery of rent arrears |RD&PR |
|1999-2000| Mudhol, |and committed procedural |12/07/2002 |
| | Bijapur District. |irregularities in repair works| |
| | |of Venkatapura School. | |
| | | | |
| | | | |
-----------------------------------------------------------------------------------------------
21 |LOK/ARE5 | 1.Sri.E.Govindaiah (DGO-1) |DGO 2 without conducting legi-|SECY. |
|Enq-18/ | (Abated)Municipal Commissioner |timate enquiry & recommended |UD |
|2000-2001| T.M.C. Doddaballapura Town, |for change of katha in favour |15/07/2002 |
| | Bangalore Rural District. |of Sadashiva Vylaya. | |
| | 2.Sri Muthurayappa (DGO-2), | | |
| | Revenue Inspector, | | |
| | T.M.C. Doddaballapura Town, | | |
| | Bangalore Rural District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
22 |LOK/DRE2 | Sri.Manappa H.Badiger (DGO) |Demanded & accepted bribe of |SECY |
|Enq-1/ | Village Accountant, Gunjanoor |Rs.500/- from complaint for |REVENUE DEPT. |
|2000-2001| Village, Yadagir Taluk, |effecting mutation in the |15/07/2002 |
| | Gulbarga District. |name of his brother. | |
-----------------------------------------------------------------------------------------------
23 |LOK/DRE5 | Sri.P.R.Sathyanarayana (DGO), |Demanded and accepted bribe of|SECY |
|Enq-2/ | Mandal Panchayath Secretary, |Rs.1000/- from complainant for|RD&PR |
|1994-1995| Udbhoor Mandal Panchayath, |change of katha. |15/07/2002 |
| | Mysore Taluk | | |
-----------------------------------------------------------------------------------------------
24 |LOK/DRE5 | Sri.S.L.Ravikumar (DBE), |DemandedRs.5000/- and accepted|CHAIRMAN |
|Enq-9/ | Asst. Engineer (Electrical), |Rs.1000/-bribe as firstinstal-|KPTCL |
|1996-1997| Section Officer, O & M Unit-19 |ment from complainant to issue|15/07/2002 |
| | KEB Nayandanahalli, Bangalore. |feasibility certificate. | |
-----------------------------------------------------------------------------------------------
25 |LOK/DRE3 | Sri.Vishwanath (DGO), |Without execution of work |SECY |
|Enq-5/ | Junior Engineer, |raised bogus bills and |RD&PR |
|1999-2000| Taluka Panchayath, Sindanoor, |misappropriated the amount |15/07/2002 |
| | Raichur District. |and caused loss to Government.| |
-----------------------------------------------------------------------------------------------
26 |LOK/ARE3 | Sri K Prasad (DGO) (Retired), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-19/ | District Treasury Officer, |Rs.200/- from complainant to |FINANCE |
|2001-2002| Madikeri. |pass the bill. |16/07/2002 |
-----------------------------------------------------------------------------------------------
27 |LOK/ARE3 | Sri.Ashok B.Naik (DGO) K.A.S. |Reconveyed the land & issued |PRINCIPAL SECY |
|Enq-3/ | Former Deputy Commissioner, |possession certificate & sale |DPAR |
|2000-2001| B.D.A., Bangalore. |deed without approval. |16/07/2002 |
-----------------------------------------------------------------------------------------------
PAGE : 4
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
28 |LOK/ARE4 | Sri.E.Manchegowda (DGO), |Sold the house without obtain-|PRIN SECY. |
|Enq-15/ | First Division Assistant, O/0 |ing prior permission from the |H&FW DEPT |
|2001-2002| Directorate of Health & Family |Government. |16/07/2002 |
| | Welfare Services, Bangalore. | | |
-----------------------------------------------------------------------------------------------
29 |LOK/ARE5 | Sri.Parashuram Bhairu Belgoji |Demanded Rs.1500/- and |SECY |
|Enq-7/ | (DGO),Secretary, Mandal |accepted Rs.1000/-bribe as |RD&PR |
|1999-2000| Panchayath, Muchandi, Belgaum |first instalment from the |16/07/2002 |
| | District. |complalinant for effecting | |
| | |khatha. | |
-----------------------------------------------------------------------------------------------
30 |LOK/DRE2 | Sri.Sannaswamygowda (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-6/ | Jr.Engineer(Elecl),MT Divisoin |Rs.2500/-from complainant to |KPTCL |
|2001-2002| KEB, Ananda Rao Circle, |rectify the electric meter. |16/07/2002 |
| | Bangalore. | | |
-----------------------------------------------------------------------------------------------
31 |LOK/DRE2 | Sri.V.Papanna (DGO), |Demanded and accepted bribe |SECY |
|Enq-5/ | Revenue Inspector, |of Rs.350/- from complainant |REVENUE DEPT. |
|2000-2001| Kasaba Hobli, Honnali Taluk, |to issue caste and income |16/07/2002 |
| | Davanagere District. |certificate. | |
-----------------------------------------------------------------------------------------------
32 |LOK/DRE3 | Sri N. Lakshmi Narasimha (DGO) |Acquired site and built house |SECY |
|Enq-10/ | Village Accountant, |in his wife's name in contra- |REVENUE DEPT. |
|1999-2000| Varana Hobli and Village |vention of KCS(Conduct) Rules.|16/07/2002 |
| | Mysore Taluk. | | |
-----------------------------------------------------------------------------------------------
33 |LOK/ARE4 | Sri.Siddaramaiah (DGO). |Received Rs.2500/- promising |PRINCIPAL SECY |
|Enq-27/ | Teacher, Govt. Higher Primary |to get transfer of |EDN (PRIM-SEC) |
|2001-2002| School,Mallathahalli,Bangalore |complainant's wife. |16/07/2002 |
| | South Taluk, Bangalore. | | |
-----------------------------------------------------------------------------------------------
34 |LOK/DRE4 | 1.Sri.Jogappa,(DGO-1), |Demand and accepted bribe |PRINCIPAL SECY |
|Enq-13/ | Asst. Educational Officer and |of Rs.500/-Rs.200/- & Rs.200/-|EDN (PRIM-SEC) |
|1999-2000| I/c.Block Educational Officer, |respectively from the |16/07/2002 |
| | Jagalur. |complainant to sanction | |
| | 2.Sri D.Mahalingappa (DGO-2), |complainant's arrears of | |
| | First Division Assistant, |stagnation increment. | |
| | O/o the B.E.O., Jagalur. | | |
| | | | |
| | 3.Sri H.Shivarudrappa (DGO-3), | | |
| | First Division Assistant, | | |
| | O/o the B.E.O., Jagalur. | | |
-----------------------------------------------------------------------------------------------
35 |LOK/DRE5 | Sri Shankara Rao Tagare (DGO), |Demanded and accepted bribe of|SECY |
|Enq-5/ | Second Division Assistant, |Rs.150/- from complainant to |REVENUE DEPT. |
|1999-2000| Tahsildar Officer, Auradh (B) |forward the application of the|16/07/2002 |
| | Taluk, Bidar District. |complainant's sister to the | |
| | |office of the Asst.Director | |
| | |of Land Records. | |
-----------------------------------------------------------------------------------------------
36 |LOK/DRE3 | Sri.Marinayaka (DGO), |Illegally effected katha in |SECY |
|Enq-11/ | Secretary, Town Panchayath, |favour of Lakshmamma ignoring |RD&PR |
|2001-2002| Melukote, Pandavapur Taluk |lawful claim of the |17/07/2002 |
| | Mandya District. |complainant. | |
-----------------------------------------------------------------------------------------------
PAGE : 5
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
37 |LOK/DRE3 | Sri.V.Chandrashekar (DGO)) |Given inconsistent statement |SECY |
|Enq-9/ | Second Division Assistant, O/o |in a trap case and committed |REVENUE DEPT. |
|1999-2000| the Deputy Commissioner, |misconduct. |17/07/2002 |
| | Bangalore Urban District. | | |
-----------------------------------------------------------------------------------------------
38 |LOK/DRE4 | 1.Sri.Jagadishchandra Nadagowda |Issued building license |SECY. |
|Enq-9/ | (DGO-1) former Municipal |causing encroachment of |UD |
|1999-2000| Commissioner, City Municipal |City Municipal Council land. |17/07/2002 |
| | Council, Nippani. | | |
| | 2.Sri P.J.Shendure (DGO-2), | | |
| | Junior Engineer, | | |
| | City Municpal Council, | | |
| | Nippani. | | |
| | | | |
| | 3.Sri M.G.Yendigeri (DGO-3), | | |
| | Assistant Engineer (Retired), | | |
| | City Municipal Council, | | |
| | Nippani. | | |
-----------------------------------------------------------------------------------------------
39 |LOK/ARE4 | 1.Sri B.Rangaswamy (DBE-1) |For using jungle wood to con- |CHAIRMAN |
|Enq-24/ | Asst. Executive Engineer |struct office building and |KPTCL |
|2001-2002| (Expired), O & M, K.P.T.C.L., |servants' quarters. |17/07/2002 |
| | Munirabad. | | |
| | 2.Sri Nagendra (DBE-2), | | |
| | Assistant Engineer, | | |
| | O & M, K.P.T.C.L., | | |
| | Munirabad. | | |
| | | | |
| | 3.Sri Shekar (DBE-3), | | |
| | Assistant Engineer, | | |
| | O & M, K.P.T.C.L., | | |
| | Munirabad. | | |
-----------------------------------------------------------------------------------------------
40 |LOK/DRE2 | Sri.I.T.Kunjappa(DGO)(Retired) |Created fake certificate of |SECY |
|Enq-7/ | Block Development Officer, |departmental exam.& got promo-|RD&PR |
|1997-1998| Madikeri. |tion & financial benefits. |17/07/2002 |
-----------------------------------------------------------------------------------------------
41 |LOK/ARE5 | Sri.D.Basavaraj (DGO), |Sent a false report regarding |PRINCIPAL SECY |
|Enq-29/ | Tahsildar, Sakaleshpura, |Bank guarantee by the parties.|DPAR |
|2000-2001| Hassan District. | |17/07/2002 |
-----------------------------------------------------------------------------------------------
42 |LOK/ARE5 | Sri J.Parameshwarappa (DGO), |Misused materials and recorded|SECY |
|Enq-6/ | Junior Engineer, |excess measurements and caused|RD&PR |
|1999-2000| ZP(E) Sub-Division, Gangavathi |loss of Rs.27,329=45 to |17/07/2002 |
| | Raichur District. |Government. | |
| | | | |
| | | | |
-----------------------------------------------------------------------------------------------
43 |LOK/DRE5 | Sri P.Ramachandra Rao (DGO), |Amasing wealth and acquisition|SECY. |
|Enq-8/ | Electrical Superintendent |of properties without prior |UD |
|1991-1992| (Retired), Mangalore City |permission of Competent |17/07/2002 |
| | Corporation, Mangalore. |Authority. | |
-----------------------------------------------------------------------------------------------
PAGE : 6
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
44 |LOK/DRE5 | Sri.Rajashekara Devalgudda |Demanded & accepted bribe of |SECY |
|Enq-9/ | (DGO), Second Division Assis- |Rs.100/- from complainant for |REVENUE DEPT. |
|2000-2001| tant, Tahsildar's Office, |enhancement of compensation |17/07/2002 |
| | Aland Taluk, Gulbarga Dist. |with regard to fire mishap. | |
-----------------------------------------------------------------------------------------------
45 |LOK/DRE5 | Sri.Puttananjappa (DBE) |Demanded Rs.3000/-, accepted |CHAIRMAN |
|Enq-4/ | Junior Engineer (Electrical), |Rs.1200/- bribe from complain-|KPTCL |
|1999-2000| K.E.B., Halaguru. |ant to change the transformer.|17/07/2002 |
-----------------------------------------------------------------------------------------------
46 |LOK/DRE4 | 1.Sri.B.K.Chandrashekarappa |Having executed substandard |SECY |
|Enq-12/ | (DGO-1), Asst.Ex.Engineer, |work,recording higher measure-|RD&PR |
|1999-2000| Zilla Panchyath Sub-Division, |ments in Measurement Book and |18/07/2002 |
| | Kadur, Chikkamagalur District. |and excess payment to the | |
| | 2.Sri K.Sekharegowda (DGO-2), |contractors. | |
| | Assistant Ex.Engineer, | | |
| | Zilla Panchayath Sub-Division, | | |
| | Kadur, Chikmgalur District. | | |
| | | | |
| | 3.Sri B.S.Ramachandra (DGO-3), | | |
| | Asst.Ex.Engineer, | | |
| | Zilla Panchayath Sub-Division, | | |
| | Kadur, Chicmgalur District. | | |
| | 4.Sri K.B.Rajashekhara (DGO-4), | | |
| | Assistant Engineer, | | |
| | Zilla Panchayath Sub-Division, | | |
| | Kadur, Chicmgalur District. | | |
-----------------------------------------------------------------------------------------------
47 |LOK/DRE4 | 1.Sri.B.B.Patil (DGO-1), |DGO-1 purhcased name plates |SECY |
|Enq-3/ | Secretary |without quotations and follow-|RD&PR |
|2000-2001| Kodikal Mandal Panchayath, |ing procedure and made payment|18/07/2002 |
| | Surpura, Gulbarga District. |ofRs.3600/-towards rent though| |
| | 2.Sri Huliyappa (DGO-2), |the premises has not been | |
| | Secretary (expired), |taken on lease. | |
| | Kodikal Mandal Panchayath, | | |
| | Surpura, Gulbarga District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
48 |LOK/ARE3 | 1.Smt.K.A.Ponnamma (DGO-1), |Irregularities in maintaining |PRINCIPAL SECY |
|Enq-40/ | former Superintendent(Retired) |accounts & misappropriated |SOCIAL WELFARE |
|1992-1993| Reception Centre, |amount. |18/07/2002 |
| | Shimoga. | | |
| | 2.Sri J.Ruzario (DGO-2) (abated)| | |
| | the then Superintendent, | | |
| | Remand Home, | | |
| | Shimoga. | | |
| | | | |
| | 3.Sri S.B.Javalagi (DGO-3), | | |
| | former Probation Officer | | |
| | (Retired),Remand Home, | | |
| | Shimoga. | | |
-----------------------------------------------------------------------------------------------
49 |LOK/ARE3 | 1.Sri.G.Thippeswamy (DGO-1) |Execution of substandard impro|PRINCIPAL SECY |
|Enq-11/ | Executive Engineer,who imple- |vement work ofRaichur-Ganegara|PWD |
|1996-1997| mented development of roadwork |and made excess payment to the|18/07/2002 |
| | Hyderabad-Karnataka Dev.Progr. |contractors, recorded excess | |
| | 2.Sri Siddaramappa (DGO-2) |measurements in M.B. andcaused| |
| | Executive Engineer (Retd.)who |pecuniary lossofRs.26,17,323/-| |
| | implemented develop.road works | | |
| | Hyderabad-Karnataka Devlp.Prog | | |
| | | | |
PAGE : 7
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri B.N.Venkatesh (DGO-3), | | |
| | Assistant Engineer, who imple- | | |
| | mented develp.road works -Hyde | | |
| | rabad-Karnataka Develop.Prog. | | |
| | 4.Sri Prasanna Kumar (DGO-4), | | |
| | Assistant Engineer, who imple- | | |
| | mented develp.road works -Hyde | | |
| | rabad-Karnataka Develop.Prog. | | |
| | 5.Sri Siddegowda (DGO-5), | | |
| | Assistant Engineer, who imple- | | |
| | mented develp.road works -Hyde | | |
| | rabad-Karnataka Develop.Prog. | | |
-----------------------------------------------------------------------------------------------
50 |LOK/DRE3 | Sri.J.Venkatesh (DGO), |Made illegal entries in the |SECY |
|Enq-10/ | Village Accountant, |revenue records in favour of |REVENUE DEPT. |
|2001-2002| Gangasandra,Kasaba Hobli, |Sri.G.S.Rangaswamy by deleting|18/07/2002 |
| | Kunigal Taluk, Tumkur Dist. |the flawful entry pertaining | |
| | |to the complainant. | |
-----------------------------------------------------------------------------------------------
51 |LOK/ARE4 | 1.Sri.Pattabhiramulu (DGO-1), |Failed to check measure the |SECY |
|Enq-19/ | Execuitive Engineer(Retired), |work and invoke penalty clause|RD&PR |
|1999-2000| Zilla Parishath Engineering |against contractor and execu- |18/07/2002 |
| | Division & Sub-Divn Raichur. |ted sub-standard work causing | |
| | 2.Sri Thippaiah (DGO-2), |loss of Rs.4,57,856=25 to | |
| | Assistant Ex.Engineer, |Government. | |
| | Zilla Parishat Engineering | | |
| | Divn.& Sub-Division, Raichur. | | |
| | | | |
| | 3.Sri Balaji (DGO-3), | | |
| | Assistant Engineer, | | |
| | Zilla Parishat Engineering | | |
| | Divn. & Sub-Division, Raichur. | | |
| | 4.Sri Mallanna (DGO-4), | | |
| | Accounts Superindent, | | |
| | Zilla Parishat Engineering | | |
| | Divn. & Sub-Division, Raichur. | | |
-----------------------------------------------------------------------------------------------
52 |LOK/DRE2 | Sri.H.S.Diwakarachar (DGO), |Demanded and accepted bribe of|SECY |
|Enq-13/ | Taluk Surveyor,Kadur Taluk, |Rs.1000/- from complainant to |REVENUE DEPT. |
|2000-2001| Chikkamagalur District. |measure land & fix boundaries.|18/07/2002 |
-----------------------------------------------------------------------------------------------
53 |LOK/DRE5 | Sri.Dakshinamurthy (DGO). |DemandedRs.100/-and accepted |PRIN SECY. |
|Enq-12/ | First Division Assistant, |Rs.50/-bribe as first instal- |H&FW DEPT |
|2000-2001| Bangalore Medical College, |ment to grant Festival Advance|18/07/2002 |
| | Bangalore. |and increment. | |
-----------------------------------------------------------------------------------------------
54 |LOK/ARE5 | K.B.Chalawadi (DGO). |Demanded and accepted bribe of|SECY. |
|Enq-15/ | Head Draughtsman, O/o. Joint |Rs.5000/- from complainant to |UD |
|1999-2000| Director of Tonw Planning, |issue N.O.C. to convert land. |18/07/2002 |
| | Dharwad. | | |
-----------------------------------------------------------------------------------------------
55 |LOK/ARE5 | Sri.S.N.Gangadharagouda (DGO) |Amassing of wealth. |SECY |
|Enq-11/ | Range Forest Officer, | |FOREST & E & E |
|1999-2000| Chickmagalur. | |18/07/2002 |
-----------------------------------------------------------------------------------------------
PAGE : 8
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
56 |LOK/DRE3 | Sri.B.N.Muralidhar (DGO), |Raised loan of Rs.4000/- with-|SECY |
|Enq-7/ | First Division Assistant, |out obtaining permission from |REVENUE DEPT. |
|1999-2000| Taluk Office,Bhadravathi, |the Competent Authority. |19/07/2002 |
| | Shimoga District. | | |
-----------------------------------------------------------------------------------------------
57 |LOK/DRE2 | Sri.N.K.Dikshit (DGO). |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-25/ | Commercial Tax Inspector(Retd) |Rs.1500/- from complainant not|FINANCE |
|1996-1997| II Circle,Bagalkot, |to assess tax for business. |19/07/2002 |
| | Bijapur District. | | |
-----------------------------------------------------------------------------------------------
58 |LOK/ARE5 | 1.Sri. Anna Rao S. Mutthatthi |Recorded false measurementsin |PRINCIPAL SECY |
|Enq-25/ | (DGO-1) Asst.Ex.Engineer(Retd) |M.B. and made excess payment |PWD |
|2000 | No.2 Hungund Sub-Division, |of Rs.53,93,980-40 to the con-|19/07/2002 |
| | KUWS&DB, Bijapur District. |tractor and caused delay in | |
| | 2.Sri M.S.Chandrashekar (DGO-2),|execution of water supply | |
| | Assistant Ex.Engineer, |work. | |
| | No.2, Hungund Sub-Division, | | |
| | KUWS&DB, Bijapur District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
59 |LOK/ARE4 | Sri.Naganna (DGO), |Illegally and unlawfully |SECY |
|Enq-29/ | Village Accountant, |entered the names of certain |REVENUE DEPT. |
|2001-2002| Chitaguppa, Humnabad Taluk, |persons in record of rights. |19/07/2002 |
| | Bidar District. | | |
-----------------------------------------------------------------------------------------------
60 |LOK/ARE5 | Dr.N.P.Manohar (DGO), |Not staying at Head Quarters. |PRIN SECY. |
|Enq-52/ | Health Officer, | |H&FW DEPT |
|2001-2002| Yogi Malalli, PHC,Thirthahalli | |19/07/2002 |
| | Taluk, Shimoga District. | | |
-----------------------------------------------------------------------------------------------
61 |LOK/ARE3 | 1.Sri.Thippaiah (DGO-1), |Recorded higher measurements |SECY |
|Enq-27/ | Assistant Ex.Engineer, |in Measurement Book and made |RD&PR |
|2001-2002| Z.P. Engineering Sub-Division, |excess payment. |02/09/2002 |
| | Manvi, Raichur District. | | |
| | 2.Sri Marappa (DGO-2), | | |
| | Assistant Ex.Engineer, | | |
| | Z.P.Engineering Sub-Division, | | |
| | Manvi, Raichur District. | | |
| | | | |
| | 3.Sri Kariappa (DGO-3), | | |
| | Junior Engineer, | | |
| | Z.P.Engineering Sub-Division, | | |
| | Manvi, Raichur District. | | |
-----------------------------------------------------------------------------------------------
62 |LOK/ARE4 | Smt. H.C Padmavathi (DGO), |Attended delivery of wife of |PRIN SECY. |
|Enq-14/ | Junior Lady Health Assistant, |complaniant in the absence of |H&FW DEPT |
|2001-2002| PHC, Holehonnuru,Bhadravathi |Medical Officer and in process|02/09/2002 |
| | Taluk, Shimoga district. |mother and child died,tampered| |
| | |entries in the Register and | |
| | |failed to maintain case sheet.| |
-----------------------------------------------------------------------------------------------
63 |LOK/ARE4 | 1.Sri.Dharma Naik (DGO-1), |Recorded false measurements in|SECY. |
|Enq-21/ | the then Commissioner(Retired) |M.B.Book, raised bogus bills |UD |
|2001-2002| City Municipal Council, |and vouchers for some works |02/09/2002 |
| | Harihara |without their execution and | |
| | 2.Sri Manjunath (DGO-2), |responsible for misappropria- | |
| | Junior Engineer, |tion of Government funds. | |
| | City Municipal Council, | | |
| | Harihara. | | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE : 9
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
64 |LOK/ARE3 | Smt.N.R.Jayanthi (DGO), |Demanded and accepted bribe of|SECY |
|Enq-23/ | Asst. Director of Sericulture |Rs.2000/-from complainant for |C&I DEPT |
|2001-2002| Doddaballapur. |granting leave. |02/09/2002 |
-----------------------------------------------------------------------------------------------
65 |LOK/ARE3 | 1.Sri.H.Rudrappa (DGO-1), |Recorded false measurements in|PRINCIPAL SECY |
|Enq-19/ | Assistant Ex.Engineer(Retired) |Measurement Book, made excess |PWD |
|2002-2003| A.P.M.C., |payment of Rs.65,115/- and |02/09/2002 |
| | Mysore. |caused loss to Government. | |
| | 2.Sri K.N.Satish (DGO-2), | | |
| | Assistant Engineer, | | |
| | A.P.M.C., | | |
| | Mysore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
66 |LOK/ARE4 | 1.Sri.Y.B.Olekar (DGO-1), |Having caused bogus and wrong |SECY |
|Enq-12/ | Co-op ExtensionOfficer(abated) |entries in M.B.books, manipu- |RD&PR |
|1999-2000| B.D.O's Office, Muddebihal-cum |lated bogus bills and mis - |02/09/2002 |
| | Secretary, M.P. Tangadagi. |appropriated Rs.24,000/- and | |
| | 2.Sri N.M.Managuli (DGO-2), |without recording in M.B. | |
| | Assistant Engineer, |made payaments of Rs.74,827/-.| |
| | Z.P. Engineering Sub-Division. | | |
| | Muddebhihal. | | |
| | | | |
-----------------------------------------------------------------------------------------------
67 |LOK/ARE4 | 1.Sri.S.R.Vijayakumar (DBE-1), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-15/ | Junior Engineer (Electrical), |Rs.1000/- each from the |KPTCL |
|2002-2003| K.E.B., Chamarajpet, |complainant. |02/09/2002 |
| | Bangalore. | | |
| | 2.Sri Venkatesh (DBE-2), | | |
| | Junior Assistant (Retired), | | |
| | K.E.B., Chamarajpet, | | |
| | Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
68 |LOK/ARE3 | Sri.Narasimha Kamble (DGO) |Acquired immovable properties |SECY |
|Enq-27/ | Typist, |without obtainig prior permis-|REVENUE DEPT. |
|2002-2003| Taluk Office, Yadagir, |sion from Competent Authority.|03/09/2002 |
| | Gulbarga District. | | |
-----------------------------------------------------------------------------------------------
69 |LOK/ARE4 | 1.Sri.Gangadharappa (DGO-1), |DGO-1 tampered the employment |SECY |
|Enq-28/ | Second Division Assistant, |registration card of DGO-2 con|LABOUR DEPT |
|2001-2002| District Employment Exchange, |ferring fake seniority of 10 |03/09/2002 |
| | Hassan. |years and enabled DGO-2 to get| |
| | 2.Sri S.N.Karibasappa (DGO-2), |Group "D" post in Government. | |
| | Group "D" Official, Office of | | |
| | the Commercial Tax Office, | | |
| | Davanagere. | | |
| | | | |
-----------------------------------------------------------------------------------------------
70 |LOK/ARE4 | 1.Sri.N.G.Gaikwad (DGO-1), |Execution of substandard road |PRINCIPAL SECY |
|Enq-3/ | Assistant Ex.Engineer(Retired) |work and caused financial loss|PWD |
|1999-2000| (Procedings Dropped) P.W.D. |of Rs.36,84,639/- to the |03/09/2002 |
| | Bhalki, Bidar District. |Government. | |
| | 2.Sri Bheemanna Shirageri(DGO-2)| | |
| | Junior Engineer, | | |
| | P.W.D., Bhalki, | | |
| | Bidar District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE :10
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
71 |LOK/ARE3 | Sri.H.G.Ramesh (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-13/ | Assistant Engineer, K.E.B., |Rs.500/- from complainant for |KPTCL |
|2002-2003| Marathhalli, Bangalore. |issuing feasibility report and|30/09/2002 |
| | |preparation of the estimate. | |
-----------------------------------------------------------------------------------------------
72 |LOK/ARE3 | Sri.Shivanna Gowda (DGO), |Purchased articles worth |SECY. |
|Enq-1/ | Commissioner, Town Municipal |Rs.2,69,368/- for water supply|UD |
|2000-2001| Council, Ramanagaram, |scheme without sanction of the|30/09/2002 |
| | Bangalore Rural District |Municipal Council, without | |
| | |calling tenders and thus made | |
| | |loss to Muncipal Council. | |
-----------------------------------------------------------------------------------------------
73 |LOK/ARE3 | Sri.Chandramouleshwar (DGO), |Demanded and accepted bribe of|SECY |
|Enq-6/ | Village Accountant, |Rs.200/- from the complainant |REVENUE DEPT. |
|2002-2003| Bommanahalli Circle, Arasikere |to issue extracts of R.T.C. |30/09/2002 |
| | Taluk, Hassan District. |and mutation. | |
-----------------------------------------------------------------------------------------------
74 |LOK/ARE3 | Sri.R.Y.Malligawad (DGO), |Demanded and accepted bribe of|SECY |
|Enq-16/ | Second Division Asst.(Retired) |Rs.500/- from complainant for |REVENUE DEPT. |
|2002-2003| Office of Tahsildar, |issuing legal heir |30/09/2002 |
| | Navalagund, Dharwad District. |certificate. | |
-----------------------------------------------------------------------------------------------
75 |LOK/ARE4 | Sri.K.B.Rajashekar (DGO), |Executed substandard work in |SECY |
|Enq-19/ | Assistant Engineer, |respect of water tank and lay-|RD&PR |
|2001-2002| Z.P. Engineering Sub-Division |ing pipeline, recorded higher |30/09/2002 |
| | Kadur, Chikkamagalur District. |measurements in M.B. and made | |
| | |excess payment of Rs.26,076/- | |
| | |and caused loss to Government.| |
-----------------------------------------------------------------------------------------------
76 |LOK/ARE4 | Sri.Iqbal Ahmed Khan (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-16/ | Principal (Retired), |Rs.1000/- from the complainant|EDN.(HIGHER) |
|2001-2002| B.M.Shetty Government College, |for forwarding service |30/09/2002 |
| | Konanur, Hassan District. |register and confidential | |
| | |report along with his recom- | |
| | |mendation. | |
-----------------------------------------------------------------------------------------------
77 |LOK/ARE4 | Smt.S.Indumathi (DGO), |Having undertaken unauthori- |PRINCIPAL SECY |
|Enq-26/ | Under Secretary, Karnataka |sedly formation of lay-out |DPAR |
|2001-2002| Government Secretariat, |without obtaining permission |30/09/2002 |
| | Vidhana Soudha, Bangalore |from the Competent Authority. | |
-----------------------------------------------------------------------------------------------
78 |LOK/ARE1 | Sri Rangegowda (DGO) |Raised loan of Rs.50000/- from|PRIN SECY. |
|Enq-73/ | FirstDivison Asst.,Directorate |his friend without prior |H&FW DEPT |
|2002-2003| of Health & Family WelfareSer- |permission of Competent |30/09/2002 |
| | vices,Anada Rao Circle,B'lore. |Authority. | |
-----------------------------------------------------------------------------------------------
79 |LOK/ARE1 | Sri.M.M. Ammakkanavar (DGO), |Demanded and accepted bribe of|SECY |
|Enq-74/ | Village Accountant, |Rs.600/- from complainant for |REVENUE DEPT. |
|2002-2003| Hirekamble Village, Savadatti |rectifying the extent of land |18/10/2002 |
| | Taluk, Belgaum District. |and issuing the extracts of | |
| | |records of rights of the said | |
| | |land. | |
-----------------------------------------------------------------------------------------------
PAGE :11
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
80 |LOK/ARE1 | Sri.Hemanth Kumar (DGO), |Demanded and accepted bribe of|SECY |
|Enq-28/ | First Division Assistant, |Rs.250/-from complainant for |REVENUE DEPT. |
|2002-2003| Talulk Office, Arasikere, |giving a certificate that no |18/10/2002 |
| | Hassan District. |member of his family was in | |
| | |Government service. | |
-----------------------------------------------------------------------------------------------
81 |LOK/ARE1 | Sri.S.Lokanath (DGO), |Demanded and accepted bribe of|SECY |
|Enq-25/ | Village Accountant, Doddasuli- |Rs.400/- from complainant to |REVENUE DEPT. |
|2002-2003| kere, Ramanagara Taluk, |effect katha and issue pahani |18/10/2002 |
| | Bangalore Rural District. |of land bearing Sy.No.157 of | |
| | |Doddasoolikere village. | |
-----------------------------------------------------------------------------------------------
82 |LOK/ARE1 | Sri.S.D.Badami Banashankari |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-112/ | (DGO), Head Master, |Rs.200/- from complainant for |EDN (PRIM-SEC) |
|2002-2003| Govt. Higher Primary School |getting sanction of scholar- |18/10/2002 |
| | Sandur, Bellary District. |ship amount. | |
-----------------------------------------------------------------------------------------------
83 |LOK/ARE3 | Sri Fayaz Ahmed, (DGO), |Received Rs.10000/- bribe from|SECY |
|Enq-31/ | Asst.EmployementOfficer(Retd.) |complainant,promising to renew|LABOUR DEPT |
|2002-2003| O/o. Dy. Regional Employment |his employment registration |18/10/2002 |
| | Exchnage Centre, Bangalore. |card and issued duplicate fra-| |
| | |dulent one and destroyed origi| |
| | |nal Register Book. | |
-----------------------------------------------------------------------------------------------
84 |LOK/ARE1 | Dr.B.Rajanna (DGO), |Failed to maintain proper |PRIN SECY. |
|Enq-118/ | Medical Officer, P.H.C., |accounts as provided under |H&FW DEPT |
|2002-2003| Jadigenahalli, Hoskote Taluk, |Karanataka Financial Code and |18/10/2002 |
| | Bangalore Rural District. |not maintained the Cash Book | |
| | |properly. | |
-----------------------------------------------------------------------------------------------
85 |LOK/ARE4 | Sri.A.Rudrappa (DGO), |Demanded and accepted bribe of|SECY |
|Enq-1/ | Village Accountant, |Rs.800/- from complainant for |REVENUE DEPT. |
|2002-2003| Rampura Village, Kudligi |change of katha of the sister |30/12/2002 |
| | Taluk, Bellary District. |of the complainant. | |
-----------------------------------------------------------------------------------------------
86 |LOK/ARE3 | Sri.M.K.Channegowda (DGO), |Demanded and accepted bribe of|SECY |
|Enq-24/ | Village Accountant, |Rs.400/-from complainant for |REVENUE DEPT. |
|2002-2003| Koushika Circle, |changing the katha. |30/12/2002 |
| | Hassan Taluk & District. | | |
-----------------------------------------------------------------------------------------------
87 |LOK/ARE3 | Sri.M.Puttappa Naik (DGO), |Demanded and accepted bribe of|SECY TO GOVT. |
|Enq-29/ | Executive Engineer, |Rs.1000/- from complainant who|WATER RESOURCE |
|2001-2002| R & R U.K.P. Sub-Division |was working as a Peon in the |30/12/2002 |
| | No.4, Bilagi Camp, Gaddankeri. |office of the DGO to sanction | |
| | |his leave. | |
-----------------------------------------------------------------------------------------------
88 |LOK/ARE4 | 1.Sri.H.N Gopalaiah (DGO-1), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-30/ | First Division Clerk, |Rs.50/- from complainant to |FINANCE |
|2002-2003| State Huzur Treasury, |issue cheque. |30/12/2002 |
| | Bangalore. | | |
| | 2.Sri N.Srinivasan (DGO-2), | | |
| | First Division Clerk, | | |
| | State Huzur Treasury, | | |
| | Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE :12
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
89 |LOK/ARE4 | Sri.Chowdegowda (DGO), |Demanded and accepted bribe of|SECY. |
|Enq-8/ | Assistant Director of Town |Rs.4000/- from complainant for|UD |
|2002-2003| Planning, Hassan. |showing an official favour. |30/12/2002 |
-----------------------------------------------------------------------------------------------
90 |LOK/ARE1 | Sri.S.M.Horaginamath (DGO) |Demanded and accepted bribe of|SECY |
|Enq-43/ | Extension Officer (Retired), |Rs.1000/-from complainant for |RD&PR |
|2002-2003| Taluk Panchayath, Muddebihal |issuing allotment order of |30/12/2002 |
| | Bijapur District. |shop. | |
-----------------------------------------------------------------------------------------------
91 |LOK/ARE3 | 1.Sri.M.K.Nashi (DGO-1), |Irregularity in calling quota-|SECY TO GOVT. |
|Enq-51/ | Executive Engineer(Retired) , |tions and purchasing rolling |WATER RESOURCE |
|2002-2003| Krishna Bhagya Jala Nigam,Kem- |shutters at higher prices and |01/01/2003 |
| | bavi, IBC Circle No.2, Rampur. |caused loss of Rs.75,463/- | |
| | 2.Sri M.K.Hongal (DGO-2), |which was recovered later from| |
| | Store Keeper, Krishna Bhagya |the concerned firm. | |
| | Jala Nigam, Kembavi, I.B.C. | | |
| | Circle No.2, Rampur. | | |
| | | | |
| | 3.Sri Malleshappa Biradar(DGO-3)| | |
| | First Division Assistant, | | |
| | I.B.C. Circle No.2, Rampur. | | |
| | 4.Sri Hiremath (DGO-4), | | |
| | Manager, | | |
| | I.B.C. Circle No.2, | | |
| | Rampur. | | |
| | 5.Sri Betageri (DGO-5), | | |
| | Registrar, | | |
| | I.B.C. Circle No.2, | | |
| | Rampur. | | |
-----------------------------------------------------------------------------------------------
92 |LOK/ARE1 | 1.Sri T.V.Shankaraiah (DGO-1), |Executed substandard work in |SECY TO GOVT. |
|Enq-114/ | Assistant Engineer, |the Ayacut Road from 2.40 K.M.|WATER RESOURCE |
|2002-2003| No.5, Nala Division |to 6.00 K.M. of Gunjahalli |01/01/2003 |
| | Yermarus Camp, Raichur. |village to Edappanur village, | |
| | 2.Sri V.T.Patwari (DGO-2), |the total loss of which was | |
| | Assistant Ex.Engineer, |estimated to Rs.5,47,545/-. | |
| | R.D.S. Sub-Division, Gillesgur | | |
| | Camp, Raichur. | | |
| | | | |
| | 3.Sri D.V.Jegarkal (DGO-3), | | |
| | Executive Engineer, | | |
| | No.5 Nala Division, Yermarus | | |
| | Camp, Raichur. | | |
-----------------------------------------------------------------------------------------------
93 |LOK/ARE3 | 1.Sri.B.Ganesh (DGO-1), |Failed to perform their duties|SECY |
|Enq-10/ | Warder, |resulting escape of five under|HOME DEPT. |
|2001-2002| Mangalore District Jail, |trial prisoners from the Dis- |01/01/2003 |
| | Mangalore. |trict Jail, Mangalore. | |
| | 2.Sri Rajaram (DGO-2), | | |
| | Warder, | | |
| | Mangalore District Jail, | | |
| | Mangalore. | | |
| | | | |
PAGE :13
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri K.Janardhan (DGO-3), | | |
| | Head Warder, | | |
| | Mangalore District Jail, | | |
| | Mangalore. | | |
| | 4.Sri P.Ramesh (DGO-4), | | |
| | Head Warder, | | |
| | Mangalore District Jail, | | |
| | Mangalore. | | |
| | 5.Sri Ganesh Shettigar (DGO-5), | | |
| | Warder, | | |
| | Mangalore District Jail, | | |
| | Mangalore. | | |
-----------------------------------------------------------------------------------------------
94 |LOK/ARE3 | 1.Sri.A.Mahadev (DGO-1), |Placed orders for printing and|PRINCIPAL SECY |
|Enq-26/ | the then Asst.Secretary(Retd). |supplying Registers and Forms |DPAR |
|2001-2002| Srirampura Mandal Panchayath |to Printers without approach- |01/01/2003 |
| | Chitradurga District. |ing Government Press and thus | |
| | 2.Sri A.N.Ramareddy (DGO-2), |caused loss of Rs.13,17,085/- | |
| | Office Manager, |to Government. | |
| | Sriramapura Mandal Panchayath, | | |
| | Chitradurga District. | | |
| | | | |
| | 3.Sri Sadyojatappa (DGO-3), | | |
| | Case Worker, | | |
| | Zilla Parishath, | | |
| | Chitradurga. | | |
| | 4.Sri Vijayaraju (DGO-4), | | |
| | Secretary, | | |
| | Sriramapura Mandal Panchayath, | | |
| | Chitradurga District. | | |
-----------------------------------------------------------------------------------------------
95 |LOK/ARE3 | Sri.R.Nagaraj (DBE) |Irregularities in purchasing |CHAIRMAN |
|Enq-8/ | I/c.Store Keeper,ZP(E)Division |sub-mersible pump sets without|KPTCL |
|2001-2002| Chikkaballapur Sub-Dn.No.3 |verification of stock and |01/01/2003 |
| | (South),KPTCL.,HAL, Bangalore. |requirements and ignored appro| |
| | |ved firms and purchased with- | |
| | |out administrative approval. | |
-----------------------------------------------------------------------------------------------
96 |LOK/ARE3 | 1.Sri S.D. Nagaraj (DGO-1), |Made irregular payments of in-|PRIN SECY. |
|Enq-2/ | Medical Officer (Retd.) |centives to beneficiaries and |H&FW DEPT |
|1995-1996| PHC Pandavapura, |double payments of incentives |01/01/2003 |
| | Mandya District. |in 24 cases of receptors who | |
| | 2.Sri Parashivamurthy (DGO-2), |under went family planning | |
| | Junior Health Assistant, |operations. | |
| | P.H.C., K.R.Pet, | | |
| | Mandya District. | | |
| | | | |
| | 3.Sri.Dattathreya (DGO-3), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Chinakurali, | | |
| | Mandya District. | | |
| | 4.Sri K.V.Srinivasamurthy(DGO-4)| | |
| | Jr.Health Assistant, | | |
| | P.H.C., Haradanahalli, | | |
| | Mandya District. | | |
PAGE :14
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 5.Sri B.R.Leela Narasimha(DGO-5)| | |
| | Junior Health Assistant, | | |
| | P.H.C., K.Shettalli, | | |
| | Mandya District. | | |
| | 6.Sri K.S.Vijayaraju (DGO-6), | | |
| | Junior Health Assistant, | | |
| | O/o District H. & F.W., | | |
| | Mysore. | | |
| | 7.Sri B.Javarayya (DGO-7), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Basagarahalli. | | |
| | 8.Sri Visveshwara Aradhya(DGO-8)| | |
| | Junior Health Assistant, | | |
| | O/o District H. & F.W. | | |
| | Tumkur. | | |
| | 9.Sri M.B.Krishnappa (DGO-9), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Chinakurali, | | |
| | Mandya District. | | |
| |10.Smt.B.C.Pushpa (DGO-10), | | |
| | Junior Health Assistant, | | |
| | O/o District H. & F.W. | | |
| | Mysore. | | |
| |11.Sri Palangappa (DGO-11), | | |
| | Junior Health Assistant, | | |
| | General Hospital,Srirangapatna | | |
| | Mandya District. | | |
| |12.Sri.Srikantegowda (DGO-12), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Melukote, | | |
| | Mandya District. | | |
| |13.Sri Gurusiddaiah (DGO-13), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Melukote, | | |
| | Mandya District. | | |
| |14.Smt.Fathima (DGO-14), | | |
| | Junior Health Assistant, | | |
| | P.H.C., K.M.Doddi, | | |
| | Mandya District. | | |
| |15.Sri.Muddegowda (DGO-15), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Doddarasinakere, | | |
| | Mandya District. | | |
| |16.Sri R.Ranganna (DGO-16), | | |
| | Junior Health Assistant, | | |
| | P.H.C. Cheenya, | | |
| | Mandya District. | | |
| |17.Sri Channaiah (DGO-17), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Mahadevapura. | | |
| |18.Sri Puttaraju (DGO-18), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Mahadevapura. | | |
PAGE :15
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| |19.Sri.M.N.Nanjundaswamy (DGO-19)| | |
| | Junior Health Assistant(Retd.) | | |
| | P.H.C., Hittanahalli Koppalu, | | |
| | Mandya District. | | |
| |20.Sri P.Ramegowda (DGO-20), | | |
| | Junior Health Assistant, | | |
| | City Municipal Council, | | |
| | Mandya District. | | |
| |21.Smt.Sulochana (DGO-21), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Anegola, | | |
| | Mandya District. | | |
| |22.Sri V.S.Naik (DGO-22), | | |
| | Junior Health Assistant, | | |
| | O/o District H. & F.W. | | |
| | Karwar. | | |
| |23.Smt.Sannamma (DGO-23), | | |
| | Junior Health Assistant, | | |
| | General Hospital, Pandavapura. | | |
| |24.Smt.S.N.Indiramma (DGO-24), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Kyathanahalli, | | |
| | Mandya District. | | |
| |25.Smt.K.B.Saroja (DGO-25), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Pandavapura, | | |
| | Mandya District. | | |
| |26.Sri Srinivasaiah (DGO-26), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Haradanahalli, | | |
| | Mandya District. | | |
| |27.Sri P.Ganganna (DGO-27), | | |
| | Junior Health Assistant, | | |
| | O/o District H. & F.W., | | |
| | Mysore. | | |
| |28.Sri B.Y.Parameshwara (DGO-28),| | |
| | Junior Health Assistant, | | |
| | City Municipal Council, Udupi, | | |
| | Dakshina Kannada District. | | |
| |29.Smt.Papamma (DGO-29), | | |
| | Junior Health Assistant, | | |
| | P.H.C., Chinakurali, | | |
| | Manyda District. | | |
| |30.Sri Padmanabhaih (DGO-30), | | |
| | Junior Health Assistant(Retd.) | | |
| | City Municipal Council, | | |
| | Mysore | | |
| |31.Smt.N.Sunandamma (DGO-31), | | |
| | Junior Health Assistant(Retd.) | | |
| | O/o District H. & F.W., | | |
| | Mysore. | | |
-----------------------------------------------------------------------------------------------
97 |LOK/ARE2 | Sri M.V.Waddin (DGO), |Purchased lands during 1985 |SECY |
|Enq-5/ | Assistant Conservator of |in the name of his wife for |FOREST & E & E |
|1990-1991| Forests (Retired), Dharwad. |Rs.40,000/- without taking |03/01/2003 |
| | |permission from Competent | |
| | |Authority. | |
-----------------------------------------------------------------------------------------------
PAGE :16
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
98 |LOK/ARE1 | Sri P. Muniraju (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-39/ | Meter Reader, |Rs.1500/- from complainant to |KPTCL |
|2002-2003| K.P.T.C.L., T.Dasarahalli, |issue electricity bill redu- |31/01/2003 |
| | Bangalore. |cing the amount towards con- | |
| | |sumption of electricity. | |
-----------------------------------------------------------------------------------------------
99 |LOK/ARE1 | Sri H. Parameshwarappa (DBE) |Demanded and accepted bribe of|CHAIRMAN |
|Enq-107/ | Meter ReaderI/cSection Officer |Rs.500/- from complainant to |KPTCL |
|2002-2003| KPTCL, Hampasagara, Hagari- |show an official favour. |31/01/2003 |
| | bommanahalli Tq. Bellary Dist. | | |
-----------------------------------------------------------------------------------------------
100|LOK/ARE1 | Sri M.C. Mariyappa (DGO), |Demanded and accepted bribe of|SECY |
|Enq-80/ | Revenue Inspector, |Rs.500/- from complainant to |REVENUE DEPT. |
|2002-2003| Chikkarasinakere Circle,Maddur |enter his name in RTC and |31/01/2003 |
| | Taluk, Mandya Dsitrict. |other records. | |
-----------------------------------------------------------------------------------------------
101|LOK/ARE1 | Sri H. Anjanappa (DGO), |Accepted gifts during his |PRINCIPAL SECY |
|Enq-117/ | Assistant Commissioner of |marriage, borrowed huge amount|FINANCE |
|2002-2003| Commercial Taxes, 31st circle, |of loans and constructed a |31/01/2003 |
| | Bangalore. |house without obtaining prior | |
| | |sanction from Competent | |
| | |Authority. | |
-----------------------------------------------------------------------------------------------
102|LOK/ARE1 | Sri H.K. Honnappa (DGO), |Demanded and accepted bribe of|SECY. |
|Enq-29/ | First Division Assistant, |Rs.500/- from complainant to |UD |
|2002-2003| Office of the City Municipal |forward the relevant records |31/01/2003 |
| | Council, Shimoga. |to the office of the Sub- | |
| | |Registrar for registration of | |
| | |the site. | |
-----------------------------------------------------------------------------------------------
103|LOK/ARE4 | Sri Ningappa (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-43/ | First Division Assistant(Retd) |Rs.1000/- from complainant to |EDN (PRIM-SEC) |
|2002-2003| Office of the Asst.Education |put up the concerned file to |04/03/2003 |
| | Officer, Chitradurga. |his higher officer. | |
-----------------------------------------------------------------------------------------------
104|LOK/ARE4 | Sri Honningappa (DGO), |Demanded and accepted bribe of|PRIN SECY. |
|Enq-54/ | First Division Assistant, |Rs.450/- from complainant to |H&FW DEPT |
|2002-2003| P.H.C. Tarikere Taluk, |show an official fvaour. |04/03/2003 |
| | Chickmagalur District. | | |
-----------------------------------------------------------------------------------------------
105|LOK/ARE3 | Sri R.B.Mykari (DGO), |Prepared fake bills & forged |PRINCIPAL SECY |
|Enq-49/ | Assistant Master, |the signature of the Drawing |EDN (PRIM-SEC) |
|2002-2003| Government Kannada Girls |Officer and caused misappro- |04/03/2003 |
| | School, Raibagh. |priation of Rs.2,59,977=20. | |
-----------------------------------------------------------------------------------------------
106|LOK/ARE3 | Sri Shankarappa (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-50/ | Second Division Assistant, |Rs.600/- from Complainant to |FINANCE |
|2002-2003| District Treasury Office, |process the subsidy bill of |04/03/2003 |
| | Kolar. |Rs.6000/- in connection with | |
| | |Gober Gas Plant. | |
-----------------------------------------------------------------------------------------------
107|LOK/ARE4 | SriPrakash Baburao Osekar(DBE) |Demanded and accepted bribe of|CHAIRMAN |
|Enq-21/ | Junior Engineer (Electrical), |Rs.4000/- from complainant to |KPTCL |
|2002-2003| Itagi, Belgaum District. |give power connection to the |04/03/2003 |
| | |bore-well dug. | |
-----------------------------------------------------------------------------------------------
PAGE :17
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
108|LOK/ARE3 | Sri S.B.Javalagi (DGO), | |SECY |
|Enq-42/ | former Probation Officer(Retd) | |WOMEN & CHILD |
|1992 | Remand Home, Shimoga. | |04/03/2003 |
-----------------------------------------------------------------------------------------------
109|LOK/ARE5 | 1.Dr. B.D. Malejan (DGO-1) | |SECY. |
|Enq-302/ | Health Officer-cum-incharge | |UD |
|1996 | Commissioner, City Municipal | |04/03/2003 |
| | Council, Bijapur. | | |
| | 2.Sri Chennabasappa (DGO-2), | | |
| | Record Keeper (Retired), | | |
| | City Municipal Council, | | |
| | Bijapur. | | |
| | | | |
-----------------------------------------------------------------------------------------------
110|LOK/DRE4 | Sri K.H. Shankar (DGO), |Having issued false completion|PRINCIPAL SECY |
|Enq-11/ | Junior Engineer, |certificate of constrcution of|PWD |
|1999-2000| Block Development Office, |ten Janata Houses without |13/03/2003 |
| | Harapanahalli. |making local inspection. | |
-----------------------------------------------------------------------------------------------
111|LOK/ARE4 | Sri B. Mallappa (DGO), |Acquired agricultural lands |PRINCIPAL SECY |
|Enq-37/ | Agricultural Assistant, |in the name of his mother and |AGRI & HORT DEP|
|2002-2003| CADA, Hunsur. |second wife without obtaining |13/03/2003 |
| | |prior permission from the | |
| | |Competent Authority. | |
-----------------------------------------------------------------------------------------------
112|LOK/ARE3 | 1.Sri R.A.Pujar (DGO-1)(abated),|Committed grave and serious |SECY. |
|Enq-26/ | then Municipal Commissioner, |irregularities in allotment of|UD |
|2002-2003| City Municipal Council, |sites, execution of sale deeds|13/03/2003 |
| | Shimoga. |deleting non-alienation clause| |
| | 2.Sri M.K.Gad (DGO-2), |and transfer of kathas. | |
| | former Municipal Commissioner, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| | | | |
| | 3.SriM.Lingoji Rao Mohare(DGO-3)| | |
| | Revenue Officer, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| | 4.Sri K.M.Dharmappa (DGO-4), | | |
| | former Chief Officer, | | |
| | Town Municpal Council, | | |
| | Bhadravathi. | | |
| | 5.Sri K.S.Gudagappa (DGO-5), | | |
| | former Revenue Officer, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| | 6.Sri G.Chandrappa (DGO-6), | | |
| | former Manager, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| | 7.Sri K.Mruthyunjayappa (DGO-7),| | |
| | Clerk (Revenue Department), | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
PAGE :18
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 8.Sri T.Shivanna (DGO-8), | | |
| | First Division Assisltant, | | |
| | N.A.C., | | |
| | Bhadravathi. | | |
| | 9.Sri Chandrashekar (DGO-9), | | |
| | Clerk (Revenue Inspector), | | |
| | Town Municipal Council, | | |
| | Ambikanagar. | | |
| |10.Sri Mallikarjunaswamy (DGO-10)| | |
| | Clerk, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| |11.Sri K.Krishnamurthy (DGO-11), | | |
| | Clerk, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
| |12.Sri Raju (DGO-12), | | |
| | Clerk, | | |
| | Town Municipal Council, | | |
| | Bhadravathi. | | |
| |13.Sri Syed Ataulla (DGO-13), | | |
| | Cashier, | | |
| | City Municipal Council, | | |
| | Shimoga. | | |
-----------------------------------------------------------------------------------------------
113|LOK/ARE4 | 1.Sri Shambappa (DGO-1), |Caused temporary misappropria-|SECY |
|Enq-45/ | Cashier, |tion of Rs.16875/- kept unau- |RD&PR |
|2002-2003| O/o.the Taluk Panchayath, |thorisedly out of Rs.41875/- |13/03/2003 |
| | Arakalgud, Hassan District. |withdrawn towards repairs of | |
| | 2.Sri B.C.Shankar Shetty(DGO-2),|jeep falsely certifying that | |
| | Credit Officer, |the repairs are completed. | |
| | O/o the Taluk Panchayath, | | |
| | Arakalgud, Hassan District. | | |
| | | | |
| | 3.Sri Puttaswamy (DGO-3), | | |
| | Block Development Officer, | | |
| | O/o the Taluk Panchayath, | | |
| | Arakagud, Hassan District. | | |
| | 4.Sri Dasabhovi (DGO-4), | | |
| | Manager, | | |
| | O/o the Taluk Panchayath, | | |
| | Arakalgud, Hassan District. | | |
-----------------------------------------------------------------------------------------------
114|LOK/ARE1 | 1.Dr.G.Rangaswamy (DGO-1), |Incurring excess expenditure |PRIN SECY. |
|Enq-86/ | District Health & F.W. Officer |of Rs.38,37,433/- towards |H&FW DEPT |
|2002-2003| Tumkur. |purchase of drugs and dressing|13/03/2003 |
| | |and linen items without | |
| | 2.Sri P.Sreenivasaiah (DGO-2), |administrative approval of the| |
| | Gazetted Assistant, |Competent Authority. | |
| | O/o the District.Health & | | |
| | Family Welfare Officer, Tumkur | | |
| | | | |
| | 3.Sri A.Felix Franklin (DGO-3), | | |
| | Office Superintendent, | | |
| | O/o the District Health & | | |
| | Family Welare Officer,Tumkur. | | |
PAGE :19
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 4.Sri Abdul Rehaman (DGO-4), | | |
| | First Division Assistant, | | |
| | O/o the District Health & | | |
| | Family Welare Officer,Tumkur. | | |
| | 5.Sri Arjun (DGO-5), | | |
| | Pharmacist & Store Keeper, | | |
| | O/o the District Health & | | |
| | Family Welare Officer,Tumkur. | | |
-----------------------------------------------------------------------------------------------
115|LOK/ARE3 | 1.Sri D. Anjaneyalu (DGO-1), |Demanded and accepted bribe of|SECY |
|Enq-10/ | Sheristedar, |Rs.2000/- from complainant for|REVENUE DEPT. |
|2002-2003| Taluk Office, Sandur, |release of five persons detain|17/03/2003 |
| | Bellary District. |ed under Section 109 of Crimi-| |
| | 2.Sri B.Swamy (DGO-2), |nal Procedure Code by Gadiga- | |
| | Second Division Assistant, |nur Police. | |
| | Taluk Office, Sandur, | | |
| | Bellary District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
116|LOK/ARE4 | 1.Sri K.R. Renuka Prasad (DGO-1)|Allowed 5 persons as mediators|SECY |
|Enq-16/ | Sub-Registrar, |for corrupt activities, and |REVENUE DEPT. |
|1999-2000| Mysore North, |allowed to keep their belong- |17/03/2003 |
| | Mysore. |ings in the office and kept 16| |
| | 2.Sri K.S.Pandurangaiah Shetty |applications pending and vio- | |
| | (DGO-2), Addl.Sub-Registrar, |lated Government Circular. | |
| | O/o the Sub-Registrar, Mysore | | |
| | North, Mysore. | | |
| | | | |
| | 3.Sri R.H.Chandrashekar (DGO-3),| | |
| | Second Division Assistant, | | |
| | O/o the Sub-Registrar, Mysore | | |
| | North, Mysore. | | |
| | 4.Sri S.Sadashivamurthy (DGO-4),| | |
| | Attender, | | |
| | O/o the Sub-Registrar, Mysore | | |
| | North, Mysore. | | |
-----------------------------------------------------------------------------------------------
117|LOK/ARE3 | Sri R.S. Lamani (DGO), |Demanded and accepted bribe of|SECY |
|Enq-33/ | Warder, |Rs.150/- from complainant to |HOME DEPT. |
|2002-2003| Sub-Jail, Bagalkot. |release his son-in-law in pur-|17/03/2003 |
| | |suance of bail order granted | |
| | |by the Court. | |
-----------------------------------------------------------------------------------------------
118|LOK/ARE1 | 1.Sri N. Vijayakumar (DGO-1), |Allowed the owners of building|SECY. |
|Enq-103/ | Assistant Engineer, |to construct the buildings in |UD |
|2002-2003| Bangalore City Corporation, |contravention of sanctioned |17/03/2003 |
| | Basavanagudi Sub-Dn.,Bangalore |plan and building bye-laws. | |
| | 2.Sri B.Karibasappa (DGO-2), | | |
| | Assistant Ex.Engineer, | | |
| | Bangalore City Corporation, | | |
| | Basavanagudi Sub-Dn.,Bangalore | | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE :20
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
119|LOK/ARE1 | 1.Sri Rangaswamy (DGO-1) |Violated Government order and |PRINCIPAL SECY |
|Enq-87/ | Superintending Engineee(Retd.) |PWD Codal Rules in construc- |PWD |
|2002-2003| P.W.D., Ananda Rao Circle, |tion of bridge work and P.H.C.|17/03/2003 |
| | Bangalore. |building and caused loss of | |
| | 2.Sri H.Munikempanna (DGO-2), |Rs.93,155/- to Government. | |
| | Executive Engineer (Retired), | | |
| | Zilla Parishath Engg.Division, | | |
| | Ramanagaram. | | |
| | | | |
-----------------------------------------------------------------------------------------------
120|LOK/ARE4 | 1.Sri M.D. Shivakumar (DGO-1), |Failed to distribute R.D.commi|PRINCIPAL SECY |
|Enq-15/ | Block Education Officer, |ssion of Rs.72,486/-to staff |EDN (PRIM-SEC) |
|1999-2000| Channapatna. |members & failed to maintain |21/03/2003 |
| | |Stock Register & failed to | |
| | 2.SriK.N.YoganandaIyengar(DGO-2)|furnish accounts of cash | |
| | Manager, |transactions. | |
| | O/othe Block Education Officer | | |
| | Channapatna. | | |
| | | | |
| | 3.Sri Chandraiah (DGO-3), | | |
| | Clerk, | | |
| | O/othe Block Education Officer | | |
| | Channapatna. | | |
-----------------------------------------------------------------------------------------------
121|LOK/ARE3 | Smt.B.S. Renuka (DGO), |Guilty of bigamous marriage |PRINCIPAL SECY |
|Enq-22/ | Junior Assistant, |and after re-marriage drawn |DPAR |
|2002-2003| D.P.A.R. Vidhana Soudha, |family pension of her first |21/03/2003 |
| | Bangalore. |husband of Rs.33,225/-. | |
| | | | |
| | | | |
-----------------------------------------------------------------------------------------------
122|LOK/ARE4 | 1.Sri Rajashekharamurthy (DGO-1)|Execution of substandard road |PRINCIPAL SECY |
|Enq-5/ | Assistant Ex.Engineer, |work causing loss of |PWD |
|1999-2000| PWD, Arakalgud Sub-Division, |Rs.7,42,051/- to Government. |21/03/2003 |
| | Hassan District. | | |
| | 2.Sri K.N.Siddegowda (DGO-2), | | |
| | Junior Engineer, | | |
| | P.W.D., Arakalgud Sub-Division | | |
| | Hassan District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
123|LOK/ARE1 | 1.Smt.Server Merchant (DGO-1), |Having booked the expenditure |SECY |
|Enq-90/ | Executive Officer, |of 7 buildings without effect-|RD&PR |
|2002-2003| Taluk Panchyath, Tumkur. |ing repair works, claimed |27/03/2003 |
| | |false and bogus bills and mis-| |
| | 2.Sri G.C.Bramhadev (DGO-2), |appropriated Rs.60349/-. | |
| | then Junior Engineer, | | |
| | Taluk Panchayath, Tumkur. | | |
| | | | |
-----------------------------------------------------------------------------------------------
124|LOK/ARE1 | Sri M. Balaji (DGO), |Demanded and accepted bribe of|SECY |
|Enq-63/ | Village Accountant, |Rs.2000/- from complainant for|REVENUE DEPT. |
|2002-2003| Yettikodi Circle, Malur Taluk, |change of katha ofagricultural|27/03/2003 |
| | Kolar District. |lands. | |
-----------------------------------------------------------------------------------------------
PAGE :21
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
125|LOK/ARE1 | 1.Sri T.V. Narayana (DGO-1), |showed fictitious lead for |SECY TO GOVT. |
|Enq-110/ | Junior Engineer, |transportation of materials |WATER RESOURCE |
|2002-2003| No.2, Kabini Canal Division, |resulting imaginary and |27/03/2003 |
| | Kolloegal. |escalated estimate, causing | |
| | 2.Sri J.Annaiah (DGO-2), |loss to Government and failed| |
| | Junior Engineer, |to show gravel borrow pits. | |
| | No.2 Kabini Canal Division, | | |
| | Kollegal. | | |
| | | | |
| | 3.SriJames Vincent Texera(DGO-3)| | |
| | Assistant Ex.Engineer, | | |
| | Uduthorehalla Reservoir | | |
| | Project Sub-Division,Ajjipura. | | |
| | 4.Sri B.V.Siddaramappa (DGO-4), | | |
| | Executive Engineer, | | |
| | No.2 Kabini Canal Division, | | |
| | Kollegal. | | |
-----------------------------------------------------------------------------------------------
126|LOK/ARE4 | 1.Sri Pattabhiramulu (DGO-1) |Allowed water supply work with|SECY |
|Enq-8/ | formerExecutiveEngineer(Retd.) |outadministrative approval and|RD&PR |
|1999-2000| Zilla Panchayath Engineering |technical sanction and PWD |19/05/2003 |
| | Division, Raichur. |Codal Rules. Incurred expendi-| |
| | 2.Sri Shivakumar (DGO-2), |ture of Rs.3,47,389=60 as | |
| | Assistant Ex.Engineer (Retd.), |against Rs.1,64,122.53. | |
| | Zilla Panchayath Engineering | | |
| | Division, Raichur. | | |
| | | | |
| | 3.Sri.Thippaiah (DGO-3), | | |
| | Assistant Ex.Engineer, | | |
| | Zilla Panchayath Engineering | | |
| | Division, Raichur. | | |
| | 4.Sri B.M.Mallanna (DGO-4), | | |
| | Assistant Engineer, | | |
| | Zilla Panchayath Engineering | | |
| | Division, Raichur. | | |
| | 5.Sri Mallanna (DGO-5), | | |
| | Accounts Superintendent, | | |
| | Zilla Panchayath Engineering | | |
| | Division, Raichur, | | |
| | 6.Sri Zahurul Hussain (DGO-6), | | |
| | First DivisionAssistant(Retd.) | | |
| | Zilla Panchayath Engineering | | |
| | Division, Raichur. | | |
-----------------------------------------------------------------------------------------------
127|LOK/ARE3 | Sri Vasanth K.Gudodagi (DGO), |Purchased sub-standard sports |SECY |
|Enq-5/ | Joint Director, |materials at exorbitant rates |ITY DEPT. |
|2000-2001| Youth Services Department, |and causing loss ofRs.1,43,625|19/05/2003 |
| | Bangalore. |to Government without calling | |
| | |tenders or through S.P.D. | |
| | |approved firms. | |
-----------------------------------------------------------------------------------------------
128|LOK/ARE1 | 1.Sri Somashekar (DGO-1), |Failed to ensure the beneficia|SECY. |
|Enq-91/ | Ex-Chief Officer, |ries fully utilisedRs.1,30,000|UD |
|2002-2003| Town Panchayath, Pandavapura, |disbursed to them for construc|19/05/2003 |
| | Mandya District. |tion of houses, beneficiaires | |
| | 2.Sri B.Nagaraj (DGO-2), |utilised only Rs.34,136/-caus-| |
| | Junior Engineer, |ing loss to Govt.Rs.95,864/-. | |
| | Town Panchayath, Pandavapura, | | |
| | Mandya District. | | |
| | | | |
PAGE :22
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri H.B.Nagarajaiah (DGO-3), | | |
| | Revenue Inspector, | | |
| | Town Panchayath, Pandavapura, | | |
| | Mandya District. | | |
| | 4.Sri Bhimsen Vaidya (DGO-4), | | |
| | Tahsildar (Retired), | | |
| | Town Panchayath, Pandavapura, | | |
| | Mandya District. | | |
-----------------------------------------------------------------------------------------------
129|LOK/ARE3 | Sri M.G.Ramalingaiah (DGO), |Demanded and accepted bribe of|SECY |
|Enq-36/ | Village Accountant, |Rs.400/-on 10.6.98and Rs.500/-|REVENUE DEPT. |
|2001-2002| Honakere Hobli,Mannahalli Cir. |on 19.6.98 from complainant to|19/05/2003 |
| | Nagamangala Tq.,Mandya Dist. |change katha in her name. | |
-----------------------------------------------------------------------------------------------
130|LOK/ARE3 | 1.Sri A.M. Chittargi (DGO-1), |Demanded and accepted bribe of|SECY. |
|Enq-36/ | Chief Officer, |Rs.750/- from complainant to |UD |
|2002-2003| Town Panchayath Office, |issue N.O.C., fitness certifi-|19/05/2003 |
| | Kustagi, Koppal District. |cate, katha extract and permis| |
| | 2.Sri Vaijanath (DGO-2), |sion to instal 3 H.P.power | |
| | Pump Operator, |connection. | |
| | Town Panchayath Office, | | |
| | Kustagi, Koppal District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
131|LOK/ARE4 | Sri S.G.Veeranagowdar (DGO), |Raised huge loan without |SECY |
|Enq-32/ | Range Forest Officer, |obtaining permission from |FOREST & E & E |
|2001-2002| Dharwad. |the Competent Authority. |19/05/2003 |
-----------------------------------------------------------------------------------------------
132|LOK/ARE3 | Sri K.C.Venkateshaiah (DGO), |Demanded and accepted bribe of|SECY. |
|Enq-37/ | Chief Officer, |Rs.500/- from complainant to |UD |
|2002-2003| Town Municipal Council, |issue license for construction|19/05/2003 |
| | Madhugiri. |of the house. | |
-----------------------------------------------------------------------------------------------
133|LOK/ARE1 | Sri N.Seetharam (DGO), |Demanded and accepted bribe of|SECY |
|Enq-55/ | Village Accountant, |Rs.1000/- from complainant for|REVENUE DEPT. |
|2002-2003| Vemgal Village, |effecting change of katha. |19/05/2003 |
| | Kolar District. | | |
-----------------------------------------------------------------------------------------------
134|LOK/ARE1 | 1.Smt.K.K.Kuttamma (DGO-1), |causedfinancial loss to Govern|SECY |
|Enq-61/ | former B.D.O (Retired), |ment of Rs.47,362=75 towards |RD&PR |
|2002-2003| Taluk Panchayath Offfice, |the construction of Indira |19/05/2003 |
| | Mysore. |Awaz Yojana and Jawahar Rozgar| |
| | 2.Sri Somasundar (DGO-2), |Yojana. | |
| | Junior Engineer, | | |
| | Taluk Panchayath Office, | | |
| | Mysore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
135|LOK/ARE1 | Sri H.V.Prabhakar Reddy (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-15/ | Assistant Engineer, |Rs.3000/- from complainant to |BWSSB |
|2002-2003| B.W.S.S.B.East-II Sub-Division |issue work order to fix up the|24/05/2003 |
| | Bangalore. |water meter. | |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE :23
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
136|LOK/ARE1 | Sri M.K.Jamadar (DGO), |Demanded and accepted bribe of|SECY |
|Enq-77/ | Food Inspector, |Rs.1000/- from complainant for|FOOD & CS DEPT |
|2002-2003| Office of the Tahsildar, |making a report favouring the |24/05/2003 |
| | Kundagol Tq. Dharwar District. |complainant in criminal case | |
| | |of Kundagol Police Station. | |
-----------------------------------------------------------------------------------------------
137|LOK/ARE3 | Sri K.Jayappa (DGO), |Demanded and accepted bribe of|SECY |
|Enq-28/ | Village Accountant, |Rs.600/- from complainant to |REVENUE DEPT. |
|2002-2003| C. Village, Sandur, |effect change of katha. |24/05/2003 |
| | Bellary District. | | |
-----------------------------------------------------------------------------------------------
138|LOK/ARE1 | 1.Sri B.T.Venkataram (DGO-1), |Allowed Brokers to collect |SECY |
|Enq-119/ | Senior Sub-Registrar, |Rs.26,600/- from parties for |REVENUE DEPT. |
|2002-2003| Shivajinagar, |registration of documents and |24/05/2003 |
| | Bangalore. |indulged in collecting bribe | |
| | 2.Sri B.S.Varadarajan (DGO-2), |and Rs.4,800/- was seized from| |
| | Senior Sub-Registrar, |underneath the wash basin. | |
| | Shivajinagar, | | |
| | Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
139|LOK/ARE4 | Sri T.R.Ranganath (DGO), |Demanded and accepted bribe of|SECY. |
|Enq-51/ | Second Division Assistant, |Rs.200/- from complainant for |UD |
|2002-2003| Town Municipal Council, |effecting change of katha in |27/05/2003 |
| | Bhadravathi, Shimoga District. |favour of mother of the | |
| | |complainant. | |
-----------------------------------------------------------------------------------------------
140|LOK/ARE4 | Sri M.Narayanaswamy (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-33/ | Assistant Engineer (Electl.), |Rs.500/- from complainant to |KPTCL |
|2001-2002| K.P.T.C.L., Nandagudi Sub-Dn., |provide power supply to the |27/05/2003 |
| | Hoskote Taluk, Bangalore Dist. |lathe machine of the customer | |
| | |of the complainant. | |
-----------------------------------------------------------------------------------------------
141|LOK/ARE3 | Sri Bhojaraj Poovani (DGO), |Demanded and accepted bribe of|SECY. |
|Enq-48/ | Chief Officer (Retired), |Rs.500/- from complainant to |UD |
|2002-2003| Town Municipal Council,Buntwal |restore water tap connection |27/05/2003 |
| | Dakshina Kannada District. |disconnected earlier to the | |
| | |house of the complainant. | |
-----------------------------------------------------------------------------------------------
142|LOK/ARE3 | Sri V.Raju (DGO), |Demanded and accepted bribe of|SECY |
|Enq-76/ | Village Accountant, |Rs.1000/- from complainant to |REVENUE DEPT. |
|2002-2003| Antharavalli Circle, Malavalli |enter the name of his wife in |29/05/2003 |
| | Taluk, Mandya District. |the revenue records. | |
| | | | |
-----------------------------------------------------------------------------------------------
143|LOK/ARE4 | Dr.A.Mohd.Iqbal (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-17/ | Asst. Director of Key Village |Rs.300/- from complainant's |AH & F DEPT. |
|2001-2002| Scheme, A.H.& V.S.(Retd.), |son for forwarding |02/06/2003 |
| | Harapanahalli,Davanagere Dist, |complainant's tour programme. | |
-----------------------------------------------------------------------------------------------
144|LOK/ARE4 | Sri Y Nagappa (DGO), |Committed financial irregula- |SECY |
|Enq-16/ | former Secretary, |rities causing loss of |RD&PR |
|2002-2003| MandalPanchayath, Sriramnagar, |Rs.56,890/- and misappropria- |10/06/2003 |
| | Gangavathi Taluk, Raichur Dist |tion of Rs.65,734=80. | |
-----------------------------------------------------------------------------------------------
PAGE :24
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
145|LOK/ARE4 | Sri Nadurmath (DGO), |Found indulged in corruption |SECY |
|Enq-64/ | Additional District Registrar, |with assistance of Sri Sandip |REVENUE DEPT. |
|2002-2003| B.D.A.Office Complex, |and collected Rs.8331/- as |21/06/2003 |
| | Bangalore. |bribe and abused his position | |
| | |and failed maitain Cash Decla-| |
| | |ration Register. | |
-----------------------------------------------------------------------------------------------
146|LOK/ARE3 | 1.Sri A.B.Shastri (DGO-1), |Misappropriation of Government|SECY |
|Enq-86/ | BlockDevelopmentOfficer(Retd.) |funds in execution of various |RD&PR |
|2002-2003| Koppal. |works and created bogus recei-|21/06/2003 |
| | |pts drawn the amount falsely | |
| | 2.Sri Abdul Razaak (DGO-2), |and not pointing out thelapses| |
| | Junior Engineer (Retired), |while working as Audit staff. | |
| | O/o the B.D.O., | | |
| | Koppal. | | |
| | | | |
| | 3.Sri M.K.Puttu Rao (DGO-3), | | |
| | Junior Engineer (Expired), | | |
| | O/o the B.D.O., | | |
| | Koppal. | | |
| | 4.Sri Ramadas Munga (DGO-4), | | |
| | Junior Engineer, | | |
| | O/o of the B.D.O., | | |
| | Koppal. | | |
| | 5.Sri Ranga Rao (DGO-5), | | |
| | Manager (Expired), | | |
| | O/o the B.D.O., | | |
| | Koppal. | | |
| | 6.Sri Sarvothamchar (DGO-6), | | |
| | Manager (Retired), | | |
| | O/o of the B.D.O., | | |
| | Koppal. | | |
| | 7.Sri Kadeeruddin (DGO-7), | | |
| | Manager, | | |
| | O/o of the B.D.O., | | |
| | Koppal. | | |
| | 8.Sri Shamasunder (DGO-8), | | |
| | Clerk, | | |
| | O/o the B.D.O., | | |
| | Koppal. | | |
| | 9.Sri T.Devendra (DGO-9), | | |
| | Clerk (Retired), | | |
| | O/o the B.D.O., | | |
| | Koppal. | | |
-----------------------------------------------------------------------------------------------
147|LOK/ARE4 | Sri M.Veeraiah (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-60/ | Second Division Assistant, |Rs.100/- from complainant for |FINANCE |
|2002-2003| District Treasury Office, |pursuing his resanctioned |21/06/2003 |
| | Bellary. |pension papers. | |
-----------------------------------------------------------------------------------------------
148|LOK/ARE1 | Sri Basappa (DGO), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-93/ | Sub-Inspector of Excise(Retd.) |Rs.500/- from complainant as |FINANCE |
|2002-2003| Sub-Range, Chintamani, |monthly mamool for the month |03/07/2003 |
| | Kolar District. |of July 1999 and to dispense | |
| | |with booking of cases. | |
-----------------------------------------------------------------------------------------------
PAGE :25
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
149|LOK/ARE1 | 1.Sri S.B.Madiwala (DGO-1), |Demanded and accepted bribe of|SECY |
|Enq-58/ | City Survey Supervisor, |Rs.3500/- from complainant |REVENUE DEPT. |
|2002-2003| O/o the Asst.Director of |for effecting change of katha |03/07/2003 |
| | Land Records, Bellary. |in the name of complainant. | |
| | 2.Sri B.Kuberappa (DGO-2), | | |
| | Peon, | | |
| | O/o the Asst.Director of | | |
| | Land Records, Bellary. | | |
| | | | |
-----------------------------------------------------------------------------------------------
150|LOK/ARE3 | Sri S.Gangadharaiah (DBE), |Demanded and accepted bribe of|CHAIRMAN |
|Enq-79/ | Section Officer (Jr.Engineer), |Rs.200/- from complainant for |KPTCL |
|2002-2003| K.E.B., Huliyurdurga, |reconnection of power supply |03/09/2003 |
| | Kunigal Sub-Dvision. |to his house. | |
-----------------------------------------------------------------------------------------------
151|LOK/ARE3 | Sri Ahamed Khaleel (DGO), |Demanded and accepted bribe of|SECY |
|Enq-84/ | Village Panchayath Secretary, |Rs.1500/- from complainant for|RD&PR |
|2002-2003| Nisrani Grama Panchayath, |change of katha in favour of |03/09/2003 |
| | Sorab Taluk, Shimoga District. |his father. | |
-----------------------------------------------------------------------------------------------
152|LOK/ARE1 | Sri T.N.Lakshman (DGO), |Demanded and accepted bribe of|SECY |
|Enq-36/ | Revenue Inspector (Retired), |Rs.5000/- from complainant for|REVENUE DEPT. |
|2002-2003| Virajpet Hobli and Taluk, |making spot inspection of the |03/09/2003 |
| | Madikeri District. |land and sending the report | |
| | |found in the occupation of | |
| | |her daughter. | |
-----------------------------------------------------------------------------------------------
153|LOK/ARE4 | 1.Sri S.Dinesh Kumar (DGO-1), |Demanded and accepted bribe of|PRINCIPAL SECY |
|Enq-28/ | Commercial Tax Inspector, |Rs.1000/- from complainant to |FINANCE |
|2002-2003| O/o Commercial Tax Officer |remove the seal and lock put |03/09/2003 |
| | (Recovery), Mysore. |to the factory premises in | |
| | 2.Sri N.A.Balachandra (DGO-2), |pursuance of the High Court | |
| | Driver, |order. | |
| | O/o the Commercial Tax Officer | | |
| | (Recovery), Mysore | | |
| | | | |
-----------------------------------------------------------------------------------------------
154|LOK/ARE4 | Sri M.S.Ranjan (DGO), |Demanded and accepted bribe of|SECY |
|Enq-17/ | First Division Assistant, |Rs.500/- from complainant to |REVENUE DEPT. |
|2002-2003| Bangalore North Taluk, |deliver the cheque towards the|03/09/2003 |
| | Yelahanka. |first instalment sanctioned by| |
| | |the Government for development| |
| | |of the temple. | |
-----------------------------------------------------------------------------------------------
155|LOK/ARE1 | Sri T.Venkategowda (DGO), |Accepted illegal gratification|SECY |
|Enq-48/ | Literate Attender, |of Rs.300/-onbehalfof Senior |LABOUR DEPT |
|2002-2003| O/o the Senior LabourInspector |Labour Inspector and Rs.200/- |17/10/2003 |
| | Labour Dept.,II Circle,Mysore. |for himself to show official | |
| | |favour of issuing renewed | |
| | |license to the complainant. | |
-----------------------------------------------------------------------------------------------
156|LOK/ARE1 | Sri H.S.Shankaranarayana (DBE) |Demanded and accepted an ille-|CHAIRMAN |
|Enq-96/ | Executive Engineer (Retired), |gal gratification of Rs.1000/-|KPTCL |
|2002-2003| 220 KV Station,K.P.T.C.L., |from the complainant to show |17/10/2003 |
| | Kolar. |an official favour of issuing | |
| | |tender form towards execution | |
| | |of small works. | |
-----------------------------------------------------------------------------------------------
PAGE :26
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
157|LOK/ARE4 | 1.Sri V.N.Revankar (DGO-1), |Having committedadministrative|SECY |
|Enq-12/ | Tahsildar (Retired), |serious lapses and irregulari-|REVENUE DEPT. |
|2002-2003| Channapatna Taluk Office. |ties in building up and main- |17/10/2003 |
| | |taining records of regularisa-| |
| | 2.Sri Venkatamuthaiah (DGO-2), |tion of unauthorised occupa- | |
| | Dharkash Clerk, |tion of lands. | |
| | Channapatna Taluk Office. | | |
| | | | |
-----------------------------------------------------------------------------------------------
158|LOK/ARE1 | Sri K.S.Prakash (DGO), |Demanded and accepted a bribe |SECY |
|Enq-33/ | Child Development Project |of Rs.500/- from the complain-|WOMEN & CHILD |
|2002-2003| Officer, Madikeri. |ant to show him an official |17/10/2003 |
| | |favour viz., for handing over | |
| | |the Demand Draft of Rs.4224/-.| |
-----------------------------------------------------------------------------------------------
159|LOK/ARE3 | Sri K.Narasimhaiah (DGO), |Demanded and accepted a bribe |SECY |
|Enq-83/ | Village Accountant, |of Rs.2500/- from the com- |REVENUE DEPT. |
|2002-2003| Kikkeri Hobli, K.R.Pet Taluk, |plainant for showing an |17/10/2003 |
| | Mandya District. |favour for effecting change of| |
| | |khatha into complainant's | |
| | |name. | |
-----------------------------------------------------------------------------------------------
160|LOK/ARE4 | 1.Sri H.R.Naikar (DGO-1), |DGO-1 and DGO-2 demanded and |PRINCIPAL SECY |
|Enq-50/ | Second Division Assistant, |acceped a bribe of Rs.100/- |PWD |
|2002-2003| P.W.D. Sub-Division, |and 50/-respectively from the |17/10/2003 |
| | Byadagi. |complainant for forwarding the| |
| | 2.Sri M.S.Kadakol (DGO-2), |Service Register ofcomplainant| |
| | Second Division Assistant, |to the AEE's office. | |
| | P.W.D. Sub-Division, | | |
| | Byadagi. | | |
| | | | |
-----------------------------------------------------------------------------------------------
161|LOK/ARE4 | 1.Sri Marigowda (DGO-1), |DGO-1 and DGO-2 demanded and |SECY TO GOVT. |
|Enq-4/ | Asst.Ex. Engineer(Retired), |accepted a bribe ofRs.10,000/-|WATER RESOURCE |
|2000-2001| No.1 Varuna Canal Project |from complainant to show an |17/10/2003 |
| | Sub-Division, Mysore. |official favour ofrecommending| |
| | 2.Sri K.S.Venkatesh (DGO-2), |to sanction the outstanding | |
| | Assitant Engineer, |bill amount of Rs.1,61,000/-. | |
| | No.1 Varuna Canal Project | | |
| | Sub-Division, Mysore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
162|LOK/ARE1 | Sri Gopala Rao (DGO), |Drawn an amount of Rs.2,62,556|SECY |
|Enq-105/ | Secretary (Retired), |and paid to Pradhan for execu-|RD&PR |
|2002-2003| Santhapur Mandal Panchayath, |ting the works without check |17/10/2003 |
| | Aurad Taluk, Bidar District. |measurement ofthe works andnot| |
| | |takenaction toget theobjection| |
| | |waivedoff forpurchasematerials| |
-----------------------------------------------------------------------------------------------
163|LOK/ARE1 | 1.Sri R.Dharma Naik (DGO-1), |Caused corrections/over writ- |SECY. |
|Enq-82/ | Municipal Commissioner, |ings in the quotations that |UD |
|2002-2003| City Municipal Council, |resulted extra payment of |17/10/2003 |
| | Harihar. |Rs.2000/- to the firm by name | |
| | 2.Sri Manjunath (DGO-2), |Venkateshwara Enterprises. | |
| | Junior Engineer, | | |
| | City Municipal Council, | | |
| | Harihar. | | |
| | | | |
PAGE :27
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri Maheshwarappa (DGO-3), | | |
| | Fitter, | | |
| | City Municipal Council, | | |
| | Harihar. | | |
-----------------------------------------------------------------------------------------------
164|LOK/ARE4 | 1.Sri Chikkarajaiah (DBE-1), |DBE-1 & DBE-2 demanded and |CHAIRMAN |
|Enq-13/ | Junior Engineer (Retired), |accepted a bribe of Rs.2,500/-|KPTCL |
|2000-2001| O&M Unit-4,K.P.T.C.L.,1st Main |from thecomplainant to provide|03/11/2003 |
| | Road, Vijayanagar, Bangalore. |electricity and new meter to | |
| | 2.Sri G.Mahendrappa (DBE-2), |complainant's newly construc- | |
| | Assistant Lineman, |ted house. | |
| | O&M Unit-4,K.P.T.C.L.,1st Main | | |
| | Raod, Vijayanagar, Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
165|LOK/ARE3 | Sri G.A.Manjunath (DGO), |Demanded and accepted a bribe |PRINCIPAL SECY |
|Enq-73/ | Second Division Assistant, |of Rs.500/- from the complain-|SOCIAL WELFARE |
|2002-2003| Office of District Backward |ant for grant of loan under |03/11/2003 |
| | Classes & Minorities,Bellary. |"Swavalambana Scheme" and | |
| | |forward the same to superior | |
| | |officers. | |
-----------------------------------------------------------------------------------------------
166|LOK/ARE1 | Sri M.S.Gururaj (DGO), |Demanded and accepted a bribe |SECY |
|Enq-30/ | Secretary, Village Panchayath, |of Rs.400/- from the compalai-|RD&PR |
|2002-2003| Dhanaganahalli Village |nant for issuing revenue |03/11/2003 |
| | Panchayath, Mysore District. |receipt, demand register | |
| | |extract and builidng licence | |
| | |for construction of house. | |
-----------------------------------------------------------------------------------------------
167|LOK/ARE3 | 1.Sri H.S.Banakar (DGO-1), |DGO-1 and DGO-2 demanded |PRINCIPAL SECY |
|Enq-20/ | First Division Assistant, |Rs.3000/- as gratification |EDN (PRIM-SEC) |
|2002-2003| Office of the Block Education |and accepted Rs.1000/- as part|03/11/2003 |
| | Officer, Badami. |payment from the complainant | |
| | 2.Sri M.A.Tankasali (DGO-2), |for crediting arears of salary| |
| | Peon, |of his wife to her Bank A/c. | |
| | Office of the Block Education | | |
| | Officer, Badami. | | |
| | | | |
-----------------------------------------------------------------------------------------------
168|LOK/ARE3 | Sri C.Thippeswamy (DGO), |Demanded Rs.50,000/-as illegal|SECY |
|Enq-10/ | Tahsildar (Retired), |gratification and accepted |REVENUE DEPT. |
|2000-2001| Periyapatna Taluk, |Rs.10,000/- from the complain-|03/11/2003 |
| | Mysore District. |ant for change of katha and | |
| | |insisted to pay balance after | |
| | |his work was attended. | |
-----------------------------------------------------------------------------------------------
169|LOK/ARE4 | Sri Hanumashetty (DGO), |Demanded and accepted a bribe |SECY. |
|Enq-55/ | Tax Assessment Officer, |of Rs.500/- from the complai- |UD |
|2002-2003| City Municipal Council, |nant for not enhancing the |03/11/2003 |
| | Bidar. |house tax. | |
-----------------------------------------------------------------------------------------------
170|LOK/ARE3 | Sri C.T.Krishnegwoda (DGO), |Demanded Rs.1,500/- as illegal|PRINCIPAL SECY |
|Enq-92/ | Second Division Assistant, |gratificaction and accepted |FINANCE |
|2002-2003| Sub-Treasury, K.R.Nagar, |Rs.7 00/- at the first instanc|03/11/2003 |
| | Mysore District. |for attending and passing the | |
| | |pension bills of the complain-| |
| | |ant and for issuing a cheque. | |
-----------------------------------------------------------------------------------------------
PAGE :28
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
171|LOK/ARE1 | Sri T.Muniyappa (DGO), |Demanded Rs.10,000/- from the |PRINCIPAL SECY |
|Enq-42/ | (former Revenue Assessor), |complainant and accepted |DPAR |
|2002-2003| Presently working as A.R.O., |Rs.5,000/-as a bribe from him |03/11/2003 |
| | Bangalore Mahanagar Palike. |for change of katha of the | |
| | |house property. | |
-----------------------------------------------------------------------------------------------
172|LOK/ARE4 | 1.Sri Venkateshwara (DGO-1), |Responsible for shortage of |PRINCIPAL SECY |
|Enq-24/ | Asst.Executive Engineer, |300 metric tons of asphalt and|PWD |
|2002-2003| P.W.D. Sub-Division, Holalkere |10 barrels of packed asphalt |30/12/2003 |
| | Chitradurga District. |causing loss of Rs.14.86 lakhs| |
| | 2.Sri Kottura Basappa (DGO-2), |to the Government. | |
| | Store Keeper, | | |
| | P.W.D. Sub-Division, Holakere, | | |
| | Chitradurga District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
173|LOK/ARE3 | Sri Ramanna Dakhya Naik (DGO), |Demanded and accepted a bribe |PRINCIPAL SECY |
|Enq-70/ | Second Division Assistant, |of Rs.500/- from the complain-|FINANCE |
|2002-2003| District Insurance Office, |ant to process application and|30/12/2003 |
| | Haveri. |settle claim on K.G.I.D.Policy| |
| | |relating to deceased Suresh D.| |
| | |Andhori, P.C., DAR, Belgaum. | |
-----------------------------------------------------------------------------------------------
174|LOK/ARE4 | Sri A.Shankar (DGO), |Demanded and accepted a bribe |SECY |
|Enq-31/ | Assistant Registrar of Co- |of Rs.10,000/-from complainant|COOPERATION |
|2001-2002| operative Societies (Retired), |to deliver the judgment in |30/12/2003 |
| | Mangalore. |favour of his wife. | |
-----------------------------------------------------------------------------------------------
175|LOK/ARE4 | Sri Tasneemulla Khan (DGO), |Demanded and aceepted a bribe |SECY |
|Enq-77/ | Auditor, |of Rs.1000/- from complainant |COOPERATION |
|2002-2003| O/o Sr.Auditor of Co-operative |to rectify the audit |30/12/2003 |
| | Societies,Kunigal,Tumkur Dist. |objections of Milk Producers' | |
| | |Co-op.Society. | |
-----------------------------------------------------------------------------------------------
176|LOK/ARE1 | Sri Beera Krishnegowda (DGO), |Demanded and accepted a bribe |SECY |
|Enq-13/ | Section Forester, |of Rs.1000/- from complainant |FOREST & E & E |
|2002-2003| Janmane Range Forest Office, |for imposing lesser penalty |30/12/2003 |
| | Sirsi. |for unauthorised cutting of | |
| | |tree & stocking wooden logs in| |
| | |the cattle shed. | |
-----------------------------------------------------------------------------------------------
177|LOK/ARE1 | 1.Sri S.N.Ninne (DGO-1), |Purchased medicines without |PRIN SECY. |
|Enq-38/ | Office Supdt.& I/C.Gazetted |approval ofCompetent Authority|H&FW DEPT |
|2002-2003| Asst (Retired), O/oDist.Health |& without indents and in |03/01/2004 |
| | &Famly.WelfareOfficer,Bijapur. |violation of Purchase Rules & | |
| | 2.Sri H.C.Ambigere (DGO-2), |misappropriatedGovernmentmoney| |
| | First Division Assistant, |to the extent of Rs.11,486/-. | |
| | O/o District Health and Family | | |
| | Welfare Officer, Bijapur. | | |
| | | | |
-----------------------------------------------------------------------------------------------
178|LOK/ARE4 | Sri D.Sridhar (DGO), |Demanded and accepted a bribe |CHIEF EX.OFF. |
|Enq-58/ | Section Superintendent, |of Rs.2000/- from complainant |KAR KHADI BOARD|
|2002-2003| O/o the Karnataka Khadhi & |for releasing second instal- |03/01/2004 |
| | Gramodyog Board, Bangalore. |ment of loan amount sanctioned| |
| | |to the brother of complainant.| |
| | | | |
-----------------------------------------------------------------------------------------------
PAGE :29
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
179|LOK/ARE3 | Sri A.R.Chavan (DGO), |Demanded and accepted a bribe |SECY |
|Enq-9/ | Forester, |of Rs.2000/- from complainant |FOREST & E & E |
|2003-2004| O/o the Range Forest Officer, |to issue permit for trnaspor- |03/01/2004 |
| | Sandur, Bellary District. |tation of bamboo sticks. | |
-----------------------------------------------------------------------------------------------
180|LOK/ARE4 | Smt.H.Nagamma (DGO), |Stealthily taken away the |PRIN SECY. |
|Enq-73/ | Senior Lady Health Visitor, |medicines worth Rs.1,00,000/- |H&FW DEPT |
|2002-2003| Government Hospital, |supplied to GovernmentHospital|03/01/2004 |
| | Chitradurga. |& stored in her residence for | |
| | |sale causing wrongful loss to | |
| | |Govt.& worngulgain to herself.| |
-----------------------------------------------------------------------------------------------
181|LOK/ARE3 | Sri V.Thimappa (DGO), |Bigamy (2nd time married) |PRINCIPAL SECY |
|Enq-41/ | First Division Assistant, | |FINANCE |
|2003-2004| Excise Department, | |02/03/2005 |
| | Yeshwanathpur, Bangalore. | | |
-----------------------------------------------------------------------------------------------
182|LOK/ARE1 | 1.Sri S.D.Salagar (DGO-1), |DGOs have colluded andcollect-|SECY |
|Enq-3/ | Asst.Commandant, |ed money by giving false pro- |HOME DEPT. |
|2002-2003| 8th Battalion, K.S.R.P., |mises to secure Government |04/04/2005 |
| | Shimoga. |jobs. | |
| | 2.Sri Bashir Ahmed Lal Khan, | | |
| | Police Constable No.185, | | |
| | 8th Battallion, K.S.R.P., | | |
| | Shimoga. | | |
| | | | |
-----------------------------------------------------------------------------------------------
183|LOK/ARE3 | 1.Smt.Elizabeth Joseph (DGO-1), |Demanded and accepted illegal |PRINCIPAL SECY |
|Enq-22/ | Deputy Director, |gratification of Rs.2400/- |EDN.(HIGHER) |
|2001-2002| Vocational Education, |from the complainant. |19/04/2005 |
| | Raichur. | | |
| | 2.Sri Seenappa (DGO-2), | | |
| | First Division Assistant, | | |
| | O/o the Divisional Dy.Directo | | |
| | Vocational Education,Raichur. | | |
| | | | |
-----------------------------------------------------------------------------------------------
184|LOK/ARE1 | 1.Sri Khaza Hussasin (DGO-1), |DGOs have acquired houses and |PRINCIPAL SECY |
|Enq-56/ | Junior Engineer, |sites without prior permission|PWD |
|2002-2003| PWD No.1 Sub-Division, |of the prescribed authority. |20/04/2005 |
| | Bellary. | | |
| | 2.Sri G.Hemadri (DGO-2), | | |
| | Junior Engineer, | | |
| | PWD Sub-Division, Bellary. | | |
| | | | |
| | 3.Sri B.N.Onkarappa (DGO-3), | | |
| | Asst.Ex.Engineer, | | |
| | Yagalkere Irrigation Sub-Dn., | | |
| | Bellalry | | |
| | 4.Sri H.Sheikshavalli (DGO-4), | | |
| | Junior Engineer, | | |
| | Zilla Parishat Sub-division, | | |
| | Bellary. | | |
-----------------------------------------------------------------------------------------------
PAGE :30
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
185|LOK/ARE3 | 1.Sri R.V.Pawar (DGO-1), |DGOs committed the irregulari-|PRINCIPAL SECY |
|Enq-53/ | Asst.Executive Engineer, |ties in digging of bore-wells.|PWD |
|2002-2003| P.H.E.Mechanical Sub-Division | |23/04/2005 |
| | Raichur. | | |
| | 2.Sri Nazeer Ahmed (DGO-2), | | |
| | Junior Engineer, | | |
| | P.H.E.Mechanical Sub-Division | | |
| | Raichur. | | |
| | | | |
| | 3.Sri D.Devendrappa (DGO-3), | | |
| | Junior Engineer, | | |
| | P.H.E.Mechanical Sub-Division | | |
| | Raichur. | | |
| | 4.Sri Shivannagouda (DGO-4), | | |
| | Junior Engineer, | | |
| | P.H.E.Mechanical Sub-Division, | | |
| | Raichur. | | |
| | 5.Sri Lakshminarayana (DGO-5), | | |
| | Assistant Engineer, | | |
| | P.H.E.Mechanical Sub-Division, | | |
| | Raichur. | | |
| | 6.Sri Ashok Kumar Budage (DGO-6)| | |
| | Junior Engineer, | | |
| | P.H.E.Mechanical Sub-Division, | | |
| | Raichur. | | |
-----------------------------------------------------------------------------------------------
186|LOK/ARE4 | 1.Sri Nisar Ahmed (DGO-1), |DGOs misappropriated public |SECY |
|Enq-34/ | Ex.Wakf Officer, |funds. |REVENUE DEPT. |
|2002-2003| District Wakf Committee, | |26/04/2005 |
| | Kolar. | | |
| | 2.Sri Syed Habibulla (DGO-2), | | |
| | Ex.Inspector-cum-Auditor, | | |
| | District Wakf Committee, | | |
| | Kolar. | | |
| | | | |
-----------------------------------------------------------------------------------------------
187|LOK/ARE1 | Sri Shivappa (DGO), |DGO demanded Rs.500/- from the|SECY |
|Enq-126/ | Revenue Inspector, |complainant in respect of |REVENUE DEPT. |
|2002-2003| Nadakacheri, Hethur Village, |mutation of katha. |28/04/2005 |
| | Sakaleshpur, Hassan District. | | |
-----------------------------------------------------------------------------------------------
188|LOK/ARE4 | 1.Sri P.Ramakrishna (DGO-1), |DGO-1 and 2 demanded &accepted|SECY |
|Enq-30/ | Village Accountant, |an illegal gratification of |REVENUE DEPT. |
|2001-2002| Koppal. |Rs.1000/- from the complainant|27/06/2005 |
| | |for change of katha. | |
| | 2.Sri Mahanthappa N.Patil(DGO-2)| | |
| | Revenue Inspector, | | |
| | Koppal. | | |
| | | | |
-----------------------------------------------------------------------------------------------
189|LOK/ARE1 | 1.Sri.S.Hanumanthappa (DGO-1), |Failed to take action and |SECY. |
|Enq-9/ | former Commissiaoner, |place the annual budget and |UD |
|2002-2003| C.M.C., Kolar. |misappropriation of funds. |22/07/2005 |
| | 2.Sri S.Sannapopa (DGO-2), | | |
| | the then Commissioner(Retd.), | | |
| | C.M.C., Kolar. | | |
| | | | |
PAGE :31
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 3.Sri Srinivasa Shetty (DGO-3), | | |
| | Revenue Inspector, | | |
| | C.M.C., Kolar. | | |
| | 4.Sri H.Krishna Murthy (DGO-4), | | |
| | former Revenue Inspector, | | |
| | C.M.C., Kolar(Now working as | | |
| | FDA,T.M.C.,Bangarpet). | | |
| | 5.Sri.Sriramareddy (DGO-5), | | |
| | First Division Assistant, | | |
| | C.M.C.Kolar (Now working atCMC | | |
| | Robertsonpet, K.G.F. | | |
| | 6.Sri Balakumar (DGO-6), | | |
| | First Division Assistant, | | |
| | C.M.C. Kolar (now working at | | |
| | TMC, Bangarpet, Kolar Dist. | | |
| | 7.Sri Srinivasa Reddy (DGO-7), | | |
| | Jr.Health Assistant, | | |
| | C.M.C. Kolar (now working at | | |
| | Dist.Malaria Office,Kolar). | | |
-----------------------------------------------------------------------------------------------
190|LOK/ARE1 | 1.Sri S.M.Bevoor (DGO-1), |Misused the government money |PRIN SECY. |
|Enq-109/ | Assistant Secretary, |for purchasing equipments and |H&FW DEPT |
|2002-2003| Zilla Parishath, Bidar. |medicines. |26/07/2005 |
| | 2.Sri Gundappa (DGO-2), | | |
| | Chief Accounts Officer, | | |
| | Zilla Parishath, Bidar. | | |
| | | | |
| | 3.Smt.P.Vasundaradevi(DGO-3), | | |
| | Addl.District Health Officer, | | |
| | Bidar. | | |
| | 4.Sri Kaleel Ahmed (DGO-4), | | |
| | Superintendent, | | |
| | District Health Office, | | |
| | Bidar. | | |
| | 5.Sri Dundappa (DGO-5), | | |
| | Service Engineer, | | |
| | District Health Office, | | |
| | Bidar. | | |
| | 6.Sri Manik Rao Kate (DGO-6), | | |
| | First Division Assistant, | | |
| | District Health Office, | | |
| | Bidar. | | |
| | 7.SriBasavarajBharashetty(DGO-7)| | |
| | First Division Assistant, | | |
| | District Health Office, | | |
| | Bidar. | | |
| | 8.Sri Raghunatha Rao (DGO-8), | | |
| | First Division Assistant, | | |
| | District Health Office, | | |
| | Bidar. | | |
| | 9.Sri Janardhan (DGO-9), | | |
| | First Division Assistant, | | |
| | District Health Office, | | |
| | Bidar. | | |
-----------------------------------------------------------------------------------------------
PAGE :32
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
191|LOK/ARE3 | 1.Sri C.K.Kittur (DGO-1), |Illegally registered the names|SECY |
|Enq-60/ | Deputy Director (Employment), |of candidates in the Sub- |LABOUR DEPT |
|2002-2003| Directorate of Employment and |Regional Employ.Exchange. |03/08/2005 |
| | Training, Bangalore. | | |
| | 2.Smt.Khuteja Feroz (DGO-2), | | |
| | Employment Officer (VG), | | |
| | Ditrectorate of Employment | | |
| | and Training, Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
192|LOK/ARE3 | Sri V.M.Suryavamshi (DGO), |Demanded and acceptedRs.2000/-|PRINCIPAL SECY |
|Enq-106/ | Asst.Director of Fisheries |for grant of fundsto construct|AH & F DEPT. |
|2002-2003| (Grade-II), Bijapur. |houses under Welfare Scheme to|08/08/2005 |
| | |the Fisheries Office. | |
-----------------------------------------------------------------------------------------------
193|LOK/ARE4 | 1.Sri R.B.Kudri (DGO-1), |DGOs caused financial loss of |PRINCIPAL SECY |
|Enq-28/ | Asst.Executive Engineer, |Rs.63,637/- to Govt. by record|PWD |
|2003-2004| PWD,APMC No.1 Sub-Dn.Gulbarga- |ing excess measurements. |10/08/2005 |
| | Bidar Sub-Division, Gulbarga. | | |
| | 2.Sri Murugeppa (DGO-2), | | |
| | Asst.Executive Engineer, | | |
| | PWD,APMC No.1 Sub-Dn.Gulbarga- | | |
| | Bidar Sub-Division, Gulbarga. | | |
| | | | |
| | 3.Sri A.F.Mulla (DGO-3), | | |
| | Assistant Engineer, | | |
| | Bidar Sub-Division, Gulbarga. | | |
| | Bidar Sub-Division, Gulbarga. | | |
-----------------------------------------------------------------------------------------------
194|LOK/ARE3 | 1.Sri Mruthyunjaya (DGO-1), |Placed bulk orders for |SECY |
|Enq-5/ | First Division Assistant, |purchase of absorbent cotton. |LABOUR DEPT |
|2002-2003| Directorate of E.S.I.(M), | |12/08/2005 |
| | Services, Bangalore. | | |
| | 2.Sri K.S.Srivathsa (DGO-2), | | |
| | Deputy Chief Manager, | | |
| | Directorate of E.S.I.(M), | | |
| | Services, Bangalore. | | |
| | | | |
-----------------------------------------------------------------------------------------------
195|LOK/ARE3 | 1.Sri Mohd.Shirajuddin (DGO-1), |DGOs violating the norms laid |SECY |
|Enq-1/ | Z.P.E.Sub-Division, Chittapur, |down under Jawahar Rojgar |RD&PR |
|2001-2002| Asst.Executive Engineer, |YojanaProgramme and conditions|24/08/2005 |
| | Gulbarga District. |specified by the SPD. | |
| | 2.Sri Hanumantharata (DGO-2), | | |
| | Z.P.E.Sub-Division, Chittapur, | | |
| | Asst.Executive Engineer, | | |
| | Gulbarga District. | | |
| | | | |
| | 3.Sri B.S.Inapur (DGO-3), | | |
| | Z.P.E. Sub-Division, | | |
| | Junior Engineer, | | |
| | Chittapur, Gulbarga District. | | |
| | 4.Sri M.Veerabhadraiah (DGO-4), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Asst.Executive Engineer, | | |
| | Gulbarga District. | | |
PAGE :33
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
| | 5.Sri Annarao Bhoorjane (DGO-5),| | |
| | ZPE Sub-Division, Chittapur, | | |
| | Asst.Executive Engineer, | | |
| | Gulbarga District. | | |
| | 6.Sri C.V.Math (DGO-6), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Asst.Executive Engineer, | | |
| | Gulbarga District. | | |
| | 7.Sri Mohinuddin Hasan (DGO-7), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Asst.Executive Engineer, | | |
| | Gulbarga District. | | |
| | 8.Sri S.G.Rudrawadi (DGO-8), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Assistant Enineer, | | |
| | Gulbarga District. | | |
| | 9.Sri Ramakrishna (DGO-9), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Junior Engineer, | | |
| | Gulbarga District. | | |
| |10.Sri G.Puranik (DGO-10), | | |
| | ZPE Division, Gulbarga. | | |
| | Executive Engineer, | | |
| |11.Sri B.Mallikarjun (DGO-11), | | |
| | ZPE Division, Gulbarga. | | |
| | Executive Engineer, | | |
| |12.Sri Shivanna (DGO-12), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Accounts Superintendent, | | |
| | Gulbarga District. | | |
| |13.Sri Hiremath (DGO-13), | | |
| | ZPE Sub-Division, Chittapur, | | |
| | Store Superintendent, | | |
| | Gulbarga District. | | |
| |14.Sri Basavaraj K.Thakkalkki | | |
| | ZPE Sub-Division, Chittapur, | | |
| | (DGO-14) Junior Engineer, | | |
| | Gulbarga District. | | |
-----------------------------------------------------------------------------------------------
196|LOK/ARE3 | Sri S.V.Akki (DGO), |DGO demanded and accepted |SECY. |
|Enq-59/ | Firist Division Assistant, |Rs.100/-bribe from complainant|UD |
|2002-2003| O/o the Town Munipal Council, |for sending L.P.C. |30/08/2005 |
| | Bagalkot. | | |
-----------------------------------------------------------------------------------------------
197|LOK/ARE4 | Sri K.Thimmegowda (DGO), |DGO demanded and accepted |SECY. |
|Enq-76/ | Chief Officer, |Rs.500/- bribe from com- |UD |
|2002-2003| Town Municpality, Sakaleshpur, |plainant for releasing the |31/08/2005 |
| | Hassan District. |loan amount. | |
-----------------------------------------------------------------------------------------------
198|LOK/ARE1 | Sri V.S.Alabala (DGO), |DGO demanded and accepted |SECY |
|Enq-134/ | Village Accountant, |Rs.750/-bribe from complainant|REVENUE DEPT. |
|2002-2003| Inam Hanchinala Village, |to issue khatha. |01/09/2005 |
| | Beelagi Tq.,Bagalkot District. | | |
-----------------------------------------------------------------------------------------------
PAGE :34
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
199|LOK/ARE3 | Sri K.Anajaneya Reddy (DGO), |DGO demanded and accepted |PRINCIPAL SECY |
|Enq-2/ | Development Officer, |Rs.500/-from complainant for |FINANCE |
|2003-2004| Small Savings Department, |issuing a cheque. |02/09/2005 |
| | Kolar. | | |
-----------------------------------------------------------------------------------------------
200|LOK/ARE3 | Sri Y.K.Appannavar (DGO), |DGO demanded and accepted |SECY |
|Enq-20/ | Village Accountant, |Rs.1500/- from complainant |REVENUE DEPT. |
|2003-2004| Bidapudi, Ramadurga Taluk, |for preparing diary to the |05/09/2005 |
| | Belgaum District. |newly purchased land. | |
-----------------------------------------------------------------------------------------------
201|LOK/ARE3 | Dr.Mathivannan (DGO), |DGO demanded and accepted |PRIN SECY. |
|Enq-38/ | Casualty Medical Officer, |Rs.200/- bribe for issuing |H&FW DEPT |
|2003-2004| Victoria Hospital, |physical fitness certificate. |08/09/2005 |
| | Bangalore. | | |
-----------------------------------------------------------------------------------------------
202|LOK/ARE4 | Sri Shivakumar (DGO), |DGO demanded and accepted a |SECY |
|Enq-2/ | Secretary, |bribe of Rs.1000/-from com- |RD&PR |
|2003-2004| Melagodu Grama Panchayath, |plainant for issuing khatha. |09/09/2005 |
| | Hassan District. | | |
-----------------------------------------------------------------------------------------------
203|LOK/ARE1 | Dr.T.Kempaiah (DGO-1), |Repaired the Government Jeep |PRINCIPAL SECY |
|Enq-102/ | Husbandry & VeterinaryServices |without obtaining proper |AH & F DEPT. |
|2002-2003| Asst.Director of Animal |sanction. |13/09/2005 |
| | Belur, Hassan District. | | |
-----------------------------------------------------------------------------------------------
204|LOK/ARE4 | Sri S.S.Badiger (DGO), |DGO demanded and accepted |SECY |
|Enq-100/ | Second Division Assistant, |Rs.500/-bribe from complainant|REVENUE DEPT. |
|2002-2003| Tahsil Office, Bailhongal, |to enter his name in the |28/09/2005 |
| | Belgaum. |records. | |
-----------------------------------------------------------------------------------------------
205|LOK/ARE1 | Sri A.M.George (DGO), |DGO demande and accepted |SECY |
|Enq-2/ | Second Division Surveyor, |Rs.100/- bribe from com- |REVENUE DEPT. |
|2002-2003| O/o the Asst.Director of Land |plainant to issue suevey |29/09/2005 |
| | Records, Virajpet. |map. | |
-----------------------------------------------------------------------------------------------
206|LOK/ARE1 | Sri Abdul Khalik (DGO), |DGO demanded and accepted |PRINCIPAL SECY |
|Enq-130/ | Typist, |Rs.1000/- from complainant |AGRI & HORT DEP|
|2002-2003| O/o the Asst.Director of Agri. |to settle his pensionary |04/10/2005 |
| | Sira Taluk, Tumkur District. |benefits. | |
-----------------------------------------------------------------------------------------------
207|LOK/ARE3 | Sri Venkatachala (DGO), |DGO demanded and accepted |SECY |
|Enq-77/ | Village Accountant, |Rs.1000/- bribe from complain-|REVENUE DEPT. |
|2002-2003| K.R.Nagar, |ant to show an official. |05/10/2005 |
| | Mysore District. | | |
-----------------------------------------------------------------------------------------------
208|LOK/ARE4 | Sri K.Bellaiah (DGO), |DGO demanded and accepted |SECY TO GOVT. |
|Enq-1/ | Asst.Ex.Engineer, |Rs.5000/- bribe from complain-|WATER RESOURCE |
|2001-2002| No.1 Sub-Division, |ant to show an official |06/10/2005 |
| | Harangi. |favour. | |
-----------------------------------------------------------------------------------------------
209|LOK/ARE3 | Sri Narasing (DGO), |DGO demanded and accepted |37 |
|Enq-69/ | First Division Assistant, |Rs.400/- from complainant | |
|2002-2003| Karnataka S.C. & S.T. Devlop. |as bribe to show an official |07/10/2005 |
| | Corp. Ltd., Gulbarga. |favour. | |
-----------------------------------------------------------------------------------------------
PAGE :35
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
210|LOK/ARE3 | Sri S.R.Prasad (DGO), |DGO demanded and accepted |PRINCIPAL SECY |
|Enq-103/ | Assistant Engineer, |Rs.10,000/- bribe from |PWD |
|2002-2003| Palace Building Sub-Division, |complainant to show an |10/10/2005 |
| | P.W.D., Mysore. |official favour. | |
-----------------------------------------------------------------------------------------------
211|LOK/ARE4 | 1.Sri Chikkahonnappa (DGO-1), |DGOs failed to evict the |SECY |
|Enq-19/ | Tahsildar, |encroachment of land reserved |REVENUE DEPT. |
|2003-2004| Taluk Office, Virajpet Taluk, |for grazing cattel. |17/10/2005 |
| | Kodagu District. | | |
| | 2.Sri A.K.Nanaiah (DGO-2), | | |
| | Deputy Tahsildar, | | |
| | Taluk Office, Virajpet Taluk, | | |
| | Kodagu District. | | |
| | | | |
| | 3.Sri Ramaiah (DGO-3), | | |
| | Revenue Inspector, | | |
| | Taluk Office, Virajpet Taluk, | | |
| | Kodagu District. | | |
-----------------------------------------------------------------------------------------------
212|LOK/ARE3 | Sri B.N.Hanchinamani (DGO), |DGO demanded and accepted a |SECY |
|Enq-15/ | Village Accountant, |bribe of Rs.3,800/- from the |REVENUE DEPT. |
|2003-2004| Khanapur, Belgaum district. |complainant to show official |21/10/2005 |
| | |favour. | |
-----------------------------------------------------------------------------------------------
213|LOK/ARE4 | 1.Sri H.N.Hanumanthaiah (DGO-1),|DGOs wrongly changed the muta-|PRINCIPAL SECY |
|Enq-79/ | KAS (Jr.Scale) Officer, |tion entries in the revenue |DPAR |
|2002-2003| Tahsildar, Karwar Taluk. |records. |03/11/2005 |
| | 2.Sri A.G.Patrekar (DGO-2), | | |
| | Village Accountant, | | |
| | Kesarolli, Halyal, | | |
| | Uttara Kannada District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
214|LOK/ARE4 | Sri N.G.Basavanagouda (DGO), |DGO acquired land and Sites in|PRINCIPAL SECY |
|Enq-102/ | Assistant Master, |his name without prior permis-|EDN.(HIGHER) |
|2002-2003| Govt.HigherPrim.BoysSchool,Ka- |sion of theCompetentAuthority.|15/11/2005 |
| | riganur,Channagiri,ShimogaDist | | |
-----------------------------------------------------------------------------------------------
215|LOK/ARE4 | 1.Sri S.Shivananda Sharma(DGO-1)|DGOs created bogus documents |PRINCIPAL SECY |
|Enq-8/ | KAS, Special Land Acq.Officer, |and paid compensation |DPAR |
|2001-2002| B.D.A., Bangalore. |amounting to Rs.8,67,535. |19/11/2005 |
| | 2.Sri Jayaramu (DGO-2), | | |
| | Assistant Engineer, | | |
| | B.D.A., Bangalore. | | |
| | | | |
| | 3.Sri Rahamathulla (DGO-3), | | |
| | Revenue Inspector, | | |
| | B.D.A., Bangalore. | | |
| | 4.Sri Jayaraj (DGO-4), | | |
| | Village Accountant, | | |
| | Madivala Village Panchayath, | | |
| | Bangalore. | | |
-----------------------------------------------------------------------------------------------
PAGE :36
-----------------------------------------------------------------------------------------------
SL| ENQUIRY | NAME & DESIGNATION OF | NATURE OF CHARGE |DISCIPLINARY |
NO| NUMBER | THE DGOs | |AUTHORITY TO |
| | | |WHOM ENQUIRY |
| | | |REPORT & RECOM-|
| | | |MENDATION ARE |
| | | |SENT AND DATE |
-----------------------------------------------------------------------------------------------
216|LOK/ARE1 | Sri Gopal (DGO), | |PRINCIPAL SECY |
|Enq-88/ | Senior Asst.Director of | |AH & F DEPT. |
|2002-2003| Fisheries (Admn), Fisheries | |22/02/2006 |
| | Department, Bangalore. | | |
-----------------------------------------------------------------------------------------------
217|LOK/ARE3 | Sri S.Narayan (DBE), |DBE demanded and accepted a |CHAIRMAN |
|Enq-90/ | Junior Engineer (Electrical), |bribe of Rs.500/- from |KPTCL |
|2002-2003| KPTCL, North Zone, Rajajinagar |complainant to instal the |06/03/2006 |
| | Bangalore. |electric meter. | |
-----------------------------------------------------------------------------------------------
218|LOK/ARE1 | 1.Sri M.Onkaramurthy (DGO-1), |DGOs allowed to construc build|PRINCIPAL SECY |
|Enq-71/ | K.A.S.,(Junior Scale), |ing on panchayath properties |DPAR |
|2002-2003| Executive Officer,Taluk Pancha |by Hanuman Club. |07/03/2006 |
| | yath, Arasikere,Hassan Dist. | | |
| | 2.Sri Bheemappa (DGO-2), | | |
| | Secretary, | | |
| | Village Panchayath, | | |
| | Banavara, Hassan District. | | |
| | | | |
-----------------------------------------------------------------------------------------------
219|LOK/ARE1 | Sri R.Chamappa (DGO), |DGO demanded and accepted a |SECY. |
|Enq-60/ | Second Division Assistant, |bribe of Rs.200/- from |UD |
|2002-2003| Health Department, Hubli- |complainant to issue death |13/03/2006 |
| | Dharwad Municipal Corp. Hubli. |certificate. | |
-----------------------------------------------------------------------------------------------
220|LOK/ARE1 | Sri C.Nagaraju (DGO), |DGO demanded and accepted a |CHAIRMAN |
|Enq-69/ | Junior Engineer (Electrical), |bribe of Rs.750/- from |KPTCL |
|2002-2003| VV-1 Unit,K.P.T.C.L., |complainant to give electrical|14/03/2006 |
| | Vidyaranyapuram Mysore. |power supply. | |
-----------------------------------------------------------------------------------------------
221|LOK/ARE4 | 1.Sri Mohad.Abbas (DGO-1), |DGOs did not check measure the|SECY. |
|Enq-7/ | Commissioner, |asphalt work pertaining to 7 |UD |
|2000-2001| C.M.C., Chitradurga. |works and caused loss to the |21/03/2006 |
| | |government. | |
| | 2.Sri Noor Ahmed (DGO-2), | | |
| | Junior Engineer, | | |
| | C.M.C., Chitradurga. | | |
| | | | |
| | 3.Sri Shyamasundara Reddy(DGO-3)| | |
| | Accounts Superintendent, | | |
| | C.M.C., Chitradurga. | | |
| | 4.Sri Hanumantha Reddy (DGO-4), | | |
| | Asst.Ex.Engineer, | | |
| | No.1 Sub-Division, PWD, | | |
| | Chitradurga. | | |
-----------------------------------------------------------------------------------------------
nary Authority as on 28/04/2006
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
y granted permission|PRINCIPAL SECY |Proved |DGO's one increment withheld |
of Sri Ian Faria to |DPAR | |with cumulative effect - |
ricultural land. |06/07/2002 | |G.O.No.134 SEN 98 dated |
| | |16.12.2002. |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired - |
from the complainant|REVENUE DEPT. | |G.O.No.RD 114 BDP 99 dated |
ing change of katha.|06/07/2002 | |31.5.2003. |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO dismissed from service - |
from three TCH stud-|EDN (PRIM-SEC) | |G.O.No.ED 17 DGD 98 dated |
ard higher marks. |06/07/2002 | |19.12.2002. |
| | | |
----------------------------------------------------------------------------
s payment to the |SECY |Proved |DGO-1 to DGO-3's one increment|
s by recording |RD&PR | |withheld with cumulative |
surements in |06/07/2002 | |effect and loss of |
t Book. | | |Rs.1,12,190=60 recovered - |
| |Proved |G.O.No.RDPR 203 ENQ 96 dated |
| | |26.3.2003. |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
y granted permission|PRINCIPAL SECY |Proved |DGO's one increment withheld |
of Sri Ian Faria to |DPAR | |with cumulative effect - |
ricultural land. |06/07/2002 | |G.O.No.134 SEN 98 dated |
| | |16.12.2002. |
----------------------------------------------------------------------------
is of unregistered |SECY |Proved |DGO's two increments withheld |
DGO changed the |RD&PR | |with cumulative effect- G.O.No|
favour of |10/07/2002 | |RDPR 175 KSS 2002 dated |
esh. | | |10.12.2002. |
----------------------------------------------------------------------------
d false mutation and|SECY |Proved |DGO's three increments with- |
rights and issued |REVENUE DEPT. | |held with cumulative effect - |
copies thereof. |10/07/2002 | |G.O.No.RD 113 BDP 99 dated |
| | |13.12.2002. |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
rom complainant for |REVENUE DEPT. | |service - G.O.No.RD 69 BDP 98 |
TC extract. |10/07/2002 | |dated 20.10.2003. |
| | | |
----------------------------------------------------------------------------
he work of digging |SECY |Proved |DGO-1 & DGO-3's one increment |
wells departmental-|RD&PR | |withheld with cumulative |
inviting tenders |10/07/2002 | |effect. DGO-2 exonerated - |
to maintain Nominal| | |G.O.No.PWD 17 SDE 2003 dated |
ls. | |Not |22.4.2003. |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nt without materials|PRINCIPAL SECY |Proved |DGO compulsorily retired from |
nd caused loss to |AH & F DEPT. | |service and Rs.1,31,680/- loss|
|10/07/2002 | |caused to the Government |
| | |recovered -G.O.No.AHF 84 VAD |
| | |95 dated 9.1.2004. |
----------------------------------------------------------------------------
granted license in |PRIN SECY. |Proved |DGO's 20% of pension withheld |
Shivappa for running|H&FW DEPT | |for one year - G.O.No.HFW 183 |
l. |11/07/2002 | |MSA 98 dated 26.4.2003. |
| | | |
----------------------------------------------------------------------------
o records for one |SECY |Proved |Final Orders awaited from |
iving two different |REVENUE DEPT. | |Disciplinary Authority |
Demand Register. |11/07/2002 | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRIN SECY. |Proved |DGO Compulsorily retired from |
rom complainant for |H&FW DEPT | |service - G.O.No.HFW 49 MSA 95|
the surgery. |11/07/2002 | |Dated 19.3.2003 |
| | | |
----------------------------------------------------------------------------
accepted bribe of |SECY |Proved |DGO compulsorily retired from |
rom complainant for |REVENUE DEPT. | |Service - G.O.No.RD 21 BDP 99 |
tion of his unautho-|11/07/2002 | |dated 31.5.2003. |
ivation. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
rom complainant for |LABOUR DEPT | |Disciplinary Authority |
egistration certifi-|11/07/2002 | | |
e firm. | | | |
| |Abated | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
accpeted bribe of |SECY |Proved |DGO compulsorily retired from |
rom complainant for |REVENUE DEPT. | |service - G.O.No.RD 151 Mu No |
on of sale deed. |12/07/2002 | |Se(3) 97 dated 6.2.2003. |
----------------------------------------------------------------------------
ovable and immovable|PRIN SECY. |Proved |DGO-1 and DGO-2's one incre- |
in contravention of|H&FW DEPT | |ment withheld with cumulative |
t) Rules, 1966. |12/07/2002 | |effect - G.O.No. HFW 15 HSM |
| | |2000 dated 20.1.2003. |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
rom complainant for |REVENUE DEPT. | |Disciplinary Authority |
katha. |12/07/2002 | | |
| | | |
----------------------------------------------------------------------------
person who has a |PRINCIPAL SECY |Proved |DGO compulsorily retired from |
g, without obtaining|DPAR | |service - G.O.No.DPAR 101 AGS |
of the Government. |12/07/2002 | |90 dated 17.10.2002. |
| | | |
----------------------------------------------------------------------------
take effective steps|SECY |Proved |DGO's one increment withheld |
ry of rent arrears |RD&PR | |with cumulative effect G.O.No.|
ted procedural |12/07/2002 | |RDPR 82 VESEBI 99 dt.18.1.2003|
ties in repair works| | |is modified under same G.O.No.|
pura School. | | |dated 11.6.2004 and DGO is |
| | |imposed Rs.100/-p.m.bededucted|
| | |from hispension for two years.|
----------------------------------------------------------------------------
out conducting legi-|SECY. |Abated |DGO-1 since dead enquiry |
uiry & recommended |UD | |dropped. DGO-2's two incre- |
of katha in favour |15/07/2002 | |ments withheld with cumulative|
va Vylaya. | | |effect - G.O. No.UDD 49 DMK |
| |Proved |99 dated 30.4.2003. |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
accepted bribe of |SECY |Proved |DGO removed from service - |
rom complaint for |REVENUE DEPT. | |G.O.No.RD 112 BDP 99 dated |
mutation in the |15/07/2002 | |31.5.2003. |
s brother. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
from complainant for|RD&PR | |Disciplinary Authority |
katha. |15/07/2002 | | |
| | | |
----------------------------------------------------------------------------
.5000/- and accepted|CHAIRMAN |Proved |Final Orders awaited from |
ribe as firstinstal-|KPTCL | |Disciplinary Authority |
complainant to issue|15/07/2002 | | |
y certificate. | | | |
----------------------------------------------------------------------------
ecution of work |SECY |Proved |Final Orders awaited from |
us bills and |RD&PR | |Disciplinary Authority |
iated the amount |15/07/2002 | | |
loss to Government.| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |Final Orders awaited from |
rom complainant to |FINANCE | |Disciplinary Authority |
ill. |16/07/2002 | | |
----------------------------------------------------------------------------
the land & issued |PRINCIPAL SECY |Proved |Since the DGO dead - proceed- |
certificate & sale |DPAR | |ings dropped - G.O.No.DPAR 33 |
ut approval. |16/07/2002 | |SEN 99 dated 26.5.2003. |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
ouse without obtain-|PRIN SECY. |Proved |DGO's one increment withheld |
permission from the |H&FW DEPT | |with cumulative effect-G.O.No.|
. |16/07/2002 | |HFW 479 HSM 97 dated |
| | |29.12.2002. |
----------------------------------------------------------------------------
s.1500/- and |SECY |Proved |Final Orders awaited from |
s.1000/-bribe as |RD&PR | |Disciplinary Authority |
alment from the |16/07/2002 | | |
nt for effecting | | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
rom complainant to |KPTCL | |Disciplinary Authority |
e electric meter. |16/07/2002 | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe |SECY |Proved |Final Orders awaited from |
- from complainant |REVENUE DEPT. | |Disciplinary Authority |
aste and income |16/07/2002 | | |
e. | | | |
----------------------------------------------------------------------------
ite and built house |SECY |Proved |DGO's one increment withheld |
e's name in contra- |REVENUE DEPT. | |with cumulative effect- G.O.No|
KCS(Conduct) Rules.|16/07/2002 | |RD 111 BDP 99 dated 30.5.2003 |
| | | |
----------------------------------------------------------------------------
s.2500/- promising |PRINCIPAL SECY |Proved |DGO's three increments with- |
nsfer of |EDN (PRIM-SEC) | |held with cumulative effect |
t's wife. |16/07/2002 | |G.O.No.ED 91 PBS 2000 dated |
| | |19.2.2003. |
----------------------------------------------------------------------------
accepted bribe |PRINCIPAL SECY |Proved |DGO-1, DGO-2 & DGO-3 have been|
-Rs.200/- & Rs.200/-|EDN (PRIM-SEC) | |compulsorily retired from |
ly from the |16/07/2002 | |service - G.O.No.ED 71(A) DGD |
t to sanction | | |97 dated 4.8.2003. |
t's arrears of | |Proved | |
increment. | | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Govt. in their letter No. RD |
rom complainant to |REVENUE DEPT. | |87 MVS 99 dated 26.12.2003 |
e application of the|16/07/2002 | |intimated that since the DGO |
t's sister to the | | |expired on 15.2.2002punishment|
the Asst.Director | | |cannot be imposed on DGO. |
cords. | | | |
----------------------------------------------------------------------------
effected katha in |SECY |Proved |DGO's two increments withheld |
Lakshmamma ignoring |RD&PR | |with cumulative effect- G.O.NO|
im of the |17/07/2002 | |RDP 184 KSS 02 dated 27.12.02.|
t. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nsistent statement |SECY |Proved |DGO's two increments withheld |
case and committed |REVENUE DEPT. | |with cumulative effect - G.O. |
. |17/07/2002 | |No.RD 218 MVS 99 dated |
| | |22.5.2003. |
----------------------------------------------------------------------------
lding license |SECY. |Dropped|DGO-1 dropped. DGO-2's one |
croachment of |UD | |increment withheld with cumu- |
ipal Council land. |17/07/2002 | |lative effect and DGO-3's 10% |
| | |of pension withheld for one |
| |Proved |year - G.O.No.UDD 63 DMK 98 |
| | |dated 17.5.2003. |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
jungle wood to con- |CHAIRMAN |Abated |DBE-2 and DBE-3 two increments|
ice building and |KPTCL | |withheld withcumulative effect|
quarters. |17/07/2002 | |and loss ofRs.44,394/-recover-|
| | |ed.DBE-1 expired charges with-|
| |Proved |drawn - Order No.KPTCL/B21/ |
| | |3034/2001-02 dated 27.6.2003. |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ke certificate of |SECY |Proved |Final Orders awaited from |
al exam.& got promo-|RD&PR | |Disciplinary Authority |
ancial benefits. |17/07/2002 | | |
----------------------------------------------------------------------------
se report regarding |PRINCIPAL SECY |Proved |Final Orders awaited from |
ntee by the parties.|DPAR | |Disciplinary Authority |
|17/07/2002 | | |
----------------------------------------------------------------------------
terials and recorded|SECY |Proved |DGO compulsorily retired from |
surements and caused|RD&PR | |service and loss of |
.27,329=45 to |17/07/2002 | |Rs.27,329=45 recovered from |
. | | |his pensionery benefits - G.O.|
| | |No.PWD 216 SDE 2002 dated |
| | |1.8.2003. |
----------------------------------------------------------------------------
alth and acquisition|SECY. |Proved |DGO's 30% of pension withheld |
ies without prior |UD | |for 3 years - G.O.No.UDD 64 |
of Competent |17/07/2002 | |MMC 98 dated 9.5.2003. |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
accepted bribe of |SECY |Proved |DGO compulsorily retired from |
rom complainant for |REVENUE DEPT. | |service -G.O.No.RD 155 MVS |
t of compensation |17/07/2002 | |2000 dated 23.5.2003. |
d to fire mishap. | | | |
----------------------------------------------------------------------------
s.3000/-, accepted |CHAIRMAN |Proved |Final Orders awaited from |
bribe from complain-|KPTCL | |Disciplinary Authority |
nge the transformer.|17/07/2002 | | |
----------------------------------------------------------------------------
cuted substandard |SECY |Proved |Final Orders awaited from |
ding higher measure-|RD&PR | |Disciplinary Authority |
easurement Book and |18/07/2002 | | |
payment to the | | | |
s. | |Proved | |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
cased name plates |SECY |Proved |Final Orders awaited from |
otations and follow-|RD&PR | |Disciplinary Authority |
ure and made payment|18/07/2002 | | |
-towards rent though| | | |
es has not been | |Abated | |
ease. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ties in maintaining |PRINCIPAL SECY |Proved |Final Orders awaited from |
misappropriated |SOCIAL WELFARE | |Disciplinary Authority |
|18/07/2002 | | |
| | | |
| |Abated | |
| | | |
| | | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
of substandard impro|PRINCIPAL SECY |Proved |DGO-2's pension withheld perma|
k ofRaichur-Ganegara|PWD | |nently-G.O. No.DPAR 105 SEN 02|
xcess payment to the|18/07/2002 | |dated 23.7.03. Against DGO-1, |
s, recorded excess | | |DGO-3, DGO-4 and DGO-5 Govern-|
ts in M.B. andcaused| |Proved |ment Order is awaited. |
lossofRs.26,17,323/-| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
al entries in the |SECY |Proved |DGO's two increments withheld |
cords in favour of |REVENUE DEPT. | |with cumulative effect-G.O.No.|
ngaswamy by deleting|18/07/2002 | |RD 88 BDP 98 dated 23.6.2003. |
l entry pertaining | | | |
plainant. | | | |
----------------------------------------------------------------------------
check measure the |SECY |Proved |Final Orders awaited from |
nvoke penalty clause|RD&PR | |Disciplinary Authority |
ntractor and execu- |18/07/2002 | | |
andard work causing | | | |
.4,57,856=25 to | |Proved | |
. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
from complainant to |REVENUE DEPT. | |service -G.O.No.RD 154 LRS (3)|
nd & fix boundaries.|18/07/2002 | |99 dated 18.8.2003. |
----------------------------------------------------------------------------
.100/-and accepted |PRIN SECY. |Proved |DGO compulsorily retired from |
be as first instal- |H&FW DEPT | |service - G.O.No.HFW 238 HSM |
ant Festival Advance|18/07/2002 | |99 dated 17.2.2003. |
ent. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |Final Orders awaited from |
from complainant to |UD | |Disciplinary Authority |
C. to convert land. |18/07/2002 | | |
| | | |
----------------------------------------------------------------------------
f wealth. |SECY |Proved |DGO's one increment withheld |
|FOREST & E & E | |with cumulative effect-G.O.No.|
|18/07/2002 | |FEE 51 FDE 99 dated 10.7.2003.|
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
n of Rs.4000/- with-|SECY |Proved |DGO censured - G.O.No.RD 64 |
ing permission from |REVENUE DEPT. | |BDP 2002 dated 19.12.2002 |
ent Authority. |19/07/2002 | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO's 40% pension withheld |
from complainant not|FINANCE | |permanently - G.O.No.FD 49 |
tax for business. |19/07/2002 | |Va Te Ta 94 dated 10.10.2003. |
| | | |
----------------------------------------------------------------------------
alse measurementsin |PRINCIPAL SECY |Proved |Final Orders awaited from |
ade excess payment |PWD | |Disciplinary Authority |
3,980-40 to the con-|19/07/2002 | | |
d caused delay in | | | |
of water supply | |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
and unlawfully |SECY |Proved |DGO's two increments withheld |
he names of certain |REVENUE DEPT. | |with cumulative effect- G.O.No|
record of rights. |19/07/2002 | |RD 107 BDP 2000 dated |
| | |27.1.2003. |
----------------------------------------------------------------------------
g at Head Quarters. |PRIN SECY. |Proved |DGO's one increment withheld |
|H&FW DEPT | |with cumulative effect -G.O.No|
|19/07/2002 | |HFW 62 MSA 2000 dated |
| | |26.11.2002. |
----------------------------------------------------------------------------
igher measurements |SECY |Proved |Final Orders awaited from |
ment Book and made |RD&PR | |Disciplinary Authority |
ment. |02/09/2002 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
elivery of wife of |PRIN SECY. |Proved |Final Orders awaited from |
t in the absence of |H&FW DEPT | |Disciplinary Authority |
ficer and in process|02/09/2002 | | |
child died,tampered| | | |
the Register and | | | |
maintain case sheet.| | | |
----------------------------------------------------------------------------
alse measurements in|SECY. |Proved |DGO-1's 50%of pension withheld|
raised bogus bills |UD | |permanently and DGO-2 compul- |
rs for some works |02/09/2002 | |sorily retired from service - |
eir execution and | | |G.O.No.UDD 37 DMK 2000 dated |
e for misappropria- | |Proved |13.5.2003. |
vernment funds. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
rom complainant for |C&I DEPT | |service - G.O.No.C&I 226 Re Se|
eave. |02/09/2002 | |Ve 97 dated 3.6.2003. |
----------------------------------------------------------------------------
alse measurements in|PRINCIPAL SECY |Proved |DGO-1's 25%of pension withheld|
t Book, made excess |PWD | |permanently.DGO-2'sthree incre|
Rs.65,115/- and |02/09/2002 | |ments withheld with cumulative|
s to Government. | | |effect and loss ofRs.65115-00 |
| |Proved |recovered from him- G.O.No.PWD|
| | |281 SDE 2000 dated 23.9.2003. |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
sed bogus and wrong |SECY |Abated |Final Orders awaited from |
M.B.books, manipu- |RD&PR | |Disciplinary Authority |
s bills and mis - |02/09/2002 | | |
ed Rs.24,000/- and | | | |
cording in M.B. | |Proved | |
ents of Rs.74,827/-.| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
each from the |KPTCL | |Disciplinary Authority |
t. |02/09/2002 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
mmovable properties |SECY |Proved |DGO's one increment withheld |
tainig prior permis-|REVENUE DEPT. | |with cumulative effect-G.O.No.|
Competent Authority.|03/09/2002 | |RD 57 BDP 99 dated 25.1.2003. |
| | | |
----------------------------------------------------------------------------
ered the employment |SECY |Proved |Final Orders awaited from |
on card of DGO-2 con|LABOUR DEPT | |Disciplinary Authority |
ke seniority of 10 |03/09/2002 | | |
enabled DGO-2 to get| | | |
post in Government. | |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
of substandard road |PRINCIPAL SECY |Dropped|DGO-1since retired proceedings|
aused financial loss|PWD | |dropped and filed a case in |
4,639/- to the |03/09/2002 | |Court for recovery of loss. |
. | | |DGO-2 dismissed from service -|
| |Proved |G.O. No.PWD 297 SDE 97 dated |
| | |27.6.2003. |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
rom complainant for |KPTCL | |Disciplinary Authority |
asibility report and|30/09/2002 | | |
n of the estimate. | | | |
----------------------------------------------------------------------------
articles worth |SECY. |Proved |Final Orders awaited from |
8/- for water supply|UD | |Disciplinary Authority |
hout sanction of the|30/09/2002 | | |
Council, without | | | |
nders and thus made | | | |
ncipal Council. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
rom the complainant |REVENUE DEPT. | |Disciplinary Authority |
xtracts of R.T.C. |30/09/2002 | | |
on. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO's 50% of pension withdrawn|
rom complainant for |REVENUE DEPT. | |permanently - G.O.No.RD 59 BDP|
gal heir |30/09/2002 | |2000 dated 31.5.2003. |
e. | | | |
----------------------------------------------------------------------------
ubstandard work in |SECY |Proved |DGO's 3 increment withheld |
water tank and lay-|RD&PR | |with cumulative effect and |
ne, recorded higher |30/09/2002 | |loss of Rs.26,076/- recovered |
ts in M.B. and made | | |-G.O.No.RDPR 75 ENQ 2000 |
ment of Rs.26,076/- | | |dated 29.5.2003. |
loss to Government.| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |Final Orders awaited from |
from the complainant|EDN.(HIGHER) | |Disciplinary Authority |
ding service |30/09/2002 | | |
nd confidential | | | |
ng with his recom- | | | |
| | | |
----------------------------------------------------------------------------
ertaken unauthori- |PRINCIPAL SECY |Proved |DGO's one increment withheld |
ation of lay-out |DPAR | |with cumulative effect-G.O.No.|
taining permission |30/09/2002 | |DPAR 98 SEN 97 dated 12.8.2003|
ompetent Authority. | | | |
----------------------------------------------------------------------------
n of Rs.50000/- from|PRIN SECY. |Proved |DGO's one increment withheld |
without prior |H&FW DEPT | |permanently - G.O. NO.HFW 4 |
of Competent |30/09/2002 | |HSM 99 dated 22-1-2003. |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO removed from service - |
rom complainant for |REVENUE DEPT. | |G.O.No. RD 41 BDP 2000 |
the extent of land |18/10/2002 | |dated 24.6.2003. |
g the extracts of | | | |
rights of the said | | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO removed from service - |
om complainant for |REVENUE DEPT. | |G.O.No.RD 6 BDP 2000 dated |
ertificate that no |18/10/2002 | |31.5.2003. |
his family was in | | | |
service. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
rom complainant to |REVENUE DEPT. | |Disciplinary Authority |
ha and issue pahani |18/10/2002 | | |
aring Sy.No.157 of | | | |
kere village. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO compulsorily retired from |
rom complainant for |EDN (PRIM-SEC) | |service - G.O.No.ED 51 PBS |
nction of scholar- |18/10/2002 | |2000 dated 29.4.2003. |
t. | | | |
----------------------------------------------------------------------------
s.10000/- bribe from|SECY |Proved |DGO's 50% pension withheld |
t,promising to renew|LABOUR DEPT | |permanently -G.O.No.LD 16 |
ment registration |18/10/2002 | |ETX 2001 dated 27.11.2003. |
ssued duplicate fra-| | | |
and destroyed origi| | | |
er Book. | | | |
----------------------------------------------------------------------------
maintain proper |PRIN SECY. |Proved |Final Orders awaited from |
s provided under |H&FW DEPT | |Disciplinary Authority |
Financial Code and |18/10/2002 | | |
ined the Cash Book | | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
rom complainant for |REVENUE DEPT. | |Disciplinary Authority |
katha of the sister |30/12/2002 | | |
plainant. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
om complainant for |REVENUE DEPT. | |service - G.O.No.RD 117 BDP |
he katha. |30/12/2002 | |2001 dated 23.6.2003. |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY TO GOVT. |Proved |Final Orders awaited from |
from complainant who|WATER RESOURCE | |Disciplinary Authority |
g as a Peon in the |30/12/2002 | | |
the DGO to sanction | | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Not |DGO-1 exonerated - G.O. No.FD|
om complainant to |FINANCE |Proved |230 ATE 99 dated 28.3.2003. |
ue. |30/12/2002 | |DGO-2 compulsorily retired |
| | |from service - G.O. No.FD |
| |Proved |230 ATE 99 dated 27.9.2003. |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |Final Orders awaited from |
from complainant for|UD | |Disciplinary Authority |
official favour. |30/12/2002 | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO's 50% of pension withheld |
rom complainant for |RD&PR | |permanently -G.O.No.RDPR 310 |
lotment order of |30/12/2002 | |KSS 2000 dated 18.7.2003. |
| | | |
----------------------------------------------------------------------------
ty in calling quota-|SECY TO GOVT. |Proved |Final Orders awaited from |
purchasing rolling |WATER RESOURCE | |Disciplinary Authority |
t higher prices and |01/01/2003 | | |
s of Rs.75,463/- | | | |
recovered later from| |Proved | |
ned firm. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ubstandard work in |SECY TO GOVT. |Proved |Final Orders awaited from |
Road from 2.40 K.M.|WATER RESOURCE | |Disciplinary Authority |
M. of Gunjahalli |01/01/2003 | | |
Edappanur village, | | | |
loss of which was | |Proved | |
to Rs.5,47,545/-. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
perform their duties|SECY |Proved |Final Orders awaited from |
escape of five under|HOME DEPT. | |Disciplinary Authority |
oners from the Dis- |01/01/2003 | | |
, Mangalore. | | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ers for printing and|PRINCIPAL SECY |Proved |Final Orders awaited from |
Registers and Forms |DPAR | |Disciplinary Authority |
s without approach- |01/01/2003 | | |
ment Press and thus | | | |
s of Rs.13,17,085/- | |Proved | |
ent. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ties in purchasing |CHAIRMAN |Proved |Final Orders awaited from |
le pump sets without|KPTCL | |Disciplinary Authority |
on of stock and |01/01/2003 | | |
ts and ignored appro| | | |
and purchased with- | | | |
strative approval. | | | |
----------------------------------------------------------------------------
ular payments of in-|PRIN SECY. |Proved |DGO-1 50%pensionwithheld permt|
o beneficiaries and |H&FW DEPT | |&Rs.90584/-recovd.DGOs.19,30 &|
ments of incentives |01/01/2003 | |31 50%pension& DGOs.4,7&23 30%|
s of receptors who | | |pension withheld permanently. |
family planning | |Proved |DGOs.2,5,6,10-18,20-22,24-29 |
. | | |compul.retired.DGOs8,9 dead. |
| | |G.O.No.HFW42MSA89 dt.4.12.2003|
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
lands during 1985 |SECY |Proved |DGO's 20% pension withheld for|
e of his wife for |FOREST & E & E | |one year -G.O.No.FEE 09 FDE |
- without taking |03/01/2003 | |2003 dated 19.7.2004. |
from Competent | | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
from complainant to |KPTCL | |Disciplinary Authority |
tricity bill redu- |31/01/2003 | | |
mount towards con- | | | |
f electricity. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |DGo dismissed from service |
rom complainant to |KPTCL | |with immediate effect vide |
ficial favour. |31/01/2003 | |O.No.KPTCL/B21/739/1997-1998 |
| | |dt 11/02/2005 |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO dismissed from service - |
rom complainant to |REVENUE DEPT. | |G.O.No.RD 168 BDP 2001 dated |
name in RTC and |31/01/2003 | |25.7.2003. |
rds. | | | |
----------------------------------------------------------------------------
ifts during his |PRINCIPAL SECY |Proved |Final Orders awaited from |
borrowed huge amount|FINANCE | |Disciplinary Authority |
nd constructed a |31/01/2003 | | |
out obtaining prior | | | |
rom Competent | | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |Final Orders awaited from |
rom complainant to |UD | |Disciplinary Authority |
e relevant records |31/01/2003 | | |
ice of the Sub- | | | |
for registration of | | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO's 30% of pension withdheld|
from complainant to |EDN (PRIM-SEC) | |permanently - G.O.No.ED 171 |
concerned file to |04/03/2003 | |SLB 1998 dated 12.11.2003. |
officer. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRIN SECY. |Proved |Final Orders awaited from |
rom complainant to |H&FW DEPT | |Disciplinary Authority |
ficial fvaour. |04/03/2003 | | |
| | | |
----------------------------------------------------------------------------
ake bills & forged |PRINCIPAL SECY |Proved |DGO dismissed from service - |
ure of the Drawing |EDN (PRIM-SEC) | |G.O.No.ED 67 DGD 93 dated |
d caused misappro- |04/03/2003 | |19.5.2003. |
f Rs.2,59,977=20. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO compulsorily retired from |
rom Complainant to |FINANCE | |service - G.O.No.FD 87 Aa Kha |
e subsidy bill of |04/03/2003 | |Ee 2000 dated 12.9.2003. |
in connection with | | | |
Plant. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
from complainant to |KPTCL | |Disciplinary Authority |
connection to the |04/03/2003 | | |
dug. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
|SECY |Proved |Final Orders awaited from |
|WOMEN & CHILD | |Disciplinary Authority |
|04/03/2003 | | |
----------------------------------------------------------------------------
|SECY. |Not |Final Orders awaited from |
|UD |Proved |Disciplinary Authority |
|04/03/2003 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ued false completion|PRINCIPAL SECY |Proved |DGO's two increment withheld |
e of constrcution of|PWD | |with cumulative effect-G.O.No.|
Houses without |13/03/2003 | |PWD 91 SDE 99 dated 23.7.2003.|
al inspection. | | | |
----------------------------------------------------------------------------
gricultural lands |PRINCIPAL SECY |Proved |Final Orders awaited from |
e of his mother and |AGRI & HORT DEP| |Disciplinary Authority |
e without obtaining |13/03/2003 | | |
ission from the | | | |
Authority. | | | |
----------------------------------------------------------------------------
grave and serious |SECY. |Abated |Final Orders awaited from |
ties in allotment of|UD | |Disciplinary Authority |
cution of sale deeds|13/03/2003 | | |
on-alienation clause| | | |
er of kathas. | |Dis- | |
| |contd. | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
porary misappropria-|SECY |Not |Final Orders awaited from |
.16875/- kept unau- |RD&PR |Proved |Disciplinary Authority |
out of Rs.41875/- |13/03/2003 | | |
towards repairs of | | | |
ly certifying that | |Dis- | |
s are completed. | |contd. | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
excess expenditure |PRIN SECY. |Proved |DGO-1,DGO-4 & DGO-5 were |
7,433/- towards |H&FW DEPT | |dimissed from service - G.O.No|
f drugs and dressing|13/03/2003 | |HFW 78 MSA 91 dated 23.5.2003.|
items without | | |Since DGO-2 retired, separate |
tive approval of the| |Proved |order is going to be issued. |
Authority. | | |DGO-3 enquiry dropped. |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO-1 dismissed from service. |
from complainant for|REVENUE DEPT. | |DGO-2 has obtained stay order |
five persons detain|17/03/2003 | |from K.A.T. hence orders |
ection 109 of Crimi-| | |against him are pending - G.O.|
ure Code by Gadiga- | |Proved |No.RD 134 BMM 2003 dated |
. | | |22.9.2003. |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
persons as mediators|SECY |Proved |Final Orders awaited from |
t activities, and |REVENUE DEPT. | |Disciplinary Authority |
keep their belong- |17/03/2003 | | |
e office and kept 16| | | |
ns pending and vio- | |Proved | |
rnment Circular. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Since DGO expired on 8.4.2004 |
rom complainant to |HOME DEPT. | |the charges have been dis- |
s son-in-law in pur-|17/03/2003 | |continued - vide G.O.No.HTD 57|
bail order granted | | |PRE 99 dated 8.4.2005. |
rt. | | | |
----------------------------------------------------------------------------
e owners of building|SECY. |Proved |Final Orders awaited from |
ct the buildings in |UD | |Disciplinary Authority |
ion of sanctioned |17/03/2003 | | |
uilding bye-laws. | | | |
| |Dropped| |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
overnment order and |PRINCIPAL SECY |Not |DGO-1 exonarated. DGO-2 loss |
Rules in construc- |PWD |Proved |of Rs.93,155/- recovered from |
idge work and P.H.C.|17/03/2003 | |his pensionary benefit - G.O. |
nd caused loss of | | |No.PWD 142 SDE 2001 dated |
- to Government. | |Proved |28.1.2004. |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
distribute R.D.commi|PRINCIPAL SECY |Proved |Final Orders awaited from |
s.72,486/-to staff |EDN (PRIM-SEC) | |Disciplinary Authority |
failed to maintain |21/03/2003 | | |
ster & failed to | | | |
counts of cash | |Proved | |
ns. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
bigamous marriage |PRINCIPAL SECY |Proved |DGO compulsorily retired from |
re-marriage drawn |DPAR | |service and recovered |
sion of her first |21/03/2003 | |Rs.33,225/- family pension |
Rs.33,225/-. | | |drawn after her remarriage - |
| | |G.O.No. DPAR 11 Aa Ki Se 97 |
| | |dated 23.8.2003. |
----------------------------------------------------------------------------
of substandard road |PRINCIPAL SECY |Dropped|DGO-1since retired proceedings|
ng loss of |PWD | |dropped and filed a civil suit|
1/- to Government. |21/03/2003 | |in Court for recovery of loss.|
| | |DGO-2 dismissed from service -|
| |Proved |G.O.No.PWD 255 SDE 98 dated |
| | |16.7.2003. |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ked the expenditure |SECY |Proved |Final Orders awaited from |
ings without effect-|RD&PR | |Disciplinary Authority |
works, claimed |27/03/2003 | | |
bogus bills and mis-| | | |
ed Rs.60349/-. | |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
from complainant for|REVENUE DEPT. | |Disciplinary Authority |
katha ofagricultural|27/03/2003 | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
titious lead for |SECY TO GOVT. |Dropped|DGO-2 and DGO-3 are compul- |
tion of materials |WATER RESOURCE | |sorily retired from service - |
imaginary and |27/03/2003 | |G.O.No.WRD 43 SDE 2000 dated |
estimate, causing | | |5.7.2004. |
vernment and failed| |Proved | |
avel borrow pits. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ter supply work with|SECY |Proved |Final Orders awaited from |
trative approval and|RD&PR | |Disciplinary Authority |
sanction and PWD |19/05/2003 | | |
s. Incurred expendi-| | | |
.3,47,389=60 as | |Dropped| |
.1,64,122.53. | | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
sub-standard sports |SECY |Proved |Final Orders awaited from |
at exorbitant rates |ITY DEPT. | |Disciplinary Authority |
g loss ofRs.1,43,625|19/05/2003 | | |
ent without calling | | | |
through S.P.D. | | | |
irms. | | | |
----------------------------------------------------------------------------
ensure the beneficia|SECY. |Proved |Final Orders awaited from |
utilisedRs.1,30,000|UD | |Disciplinary Authority |
to them for construc|19/05/2003 | | |
uses, beneficiaires | | | |
nly Rs.34,136/-caus-| |Proved | |
o Govt.Rs.95,864/-. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
10.6.98and Rs.500/-|REVENUE DEPT. | |Disciplinary Authority |
from complainant to|19/05/2003 | | |
ha in her name. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |Final Orders awaited from |
rom complainant to |UD | |Disciplinary Authority |
C., fitness certifi-|19/05/2003 | | |
a extract and permis| | | |
stal 3 H.P.power | |Not | |
. | |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
e loan without |SECY |Proved |Final Orders awaited from |
permission from |FOREST & E & E | |Disciplinary Authority |
ent Authority. |19/05/2003 | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |Final Orders awaited from |
rom complainant to |UD | |Disciplinary Authority |
nse for construction|19/05/2003 | | |
se. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
from complainant for|REVENUE DEPT. | |service - G.O.No.RD 146 BDP |
change of katha. |19/05/2003 | |2003 dated 20.l2.2003. |
| | | |
----------------------------------------------------------------------------
ncial loss to Govern|SECY |Proved |DGO-2's two incrementswithheld|
.47,362=75 towards |RD&PR | |with cumulative effect&loss of|
uction of Indira |19/05/2003 | |Rs.47,362/-recovered-G.O.No. |
a and Jawahar Rozgar| | |RDP 137 Ve Se Be 2001 dated |
| |Proved |25.10.03.DGO-1's30% of pension|
| | |withhled permanently-G.O.No. |
| | |RDP137Ve Se Be 2001dt.29.12.03|
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |DGO dismissed from service - |
from complainant to |BWSSB | |O.M.No.BWB/70/02/9/4444/2003- |
order to fix up the|24/05/2003 | |04 dated 22.03.2004 of |
r. | | |Bangalore Water Supply & |
| | |Sewerage Board, Bangalore. |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO dismissed from service - |
from complainant for|FOOD & CS DEPT | |G.O.No.RD 83 BDP 2003 dated |
eport favouring the |24/05/2003 | |14.10.2003. |
t in criminal case | | | |
l Police Station. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO dismissed from service - |
rom complainant to |REVENUE DEPT. | |G.O.No.RD 80 BDP 99 dated |
nge of katha. |24/05/2003 | |19.12.2003. |
| | | |
----------------------------------------------------------------------------
okers to collect |SECY |Proved |Final Orders awaited from |
- from parties for |REVENUE DEPT. | |Disciplinary Authority |
on of documents and |24/05/2003 | | |
n collecting bribe | | | |
00/- was seized from| |Proved | |
the wash basin. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |DGO compulsorily retired from |
rom complainant for |UD | |service - G.O.No.UDD 278 BMS |
change of katha in |27/05/2003 | |2001 dated 17.3.2004. |
mother of the | | | |
t. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
rom complainant to |KPTCL | |Disciplinary Authority |
wer supply to the |27/05/2003 | | |
ine of the customer | | | |
plainant. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY. |Proved |DGO's 50% of pension withheld |
rom complainant to |UD | |permanently - G.O.No.UDD 26 |
ter tap connection |27/05/2003 | |DMK 93 dated 1.9.2003. |
ed earlier to the | | | |
he complainant. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO compulsorily retired from |
from complainant to |REVENUE DEPT. | |service G.O.No.RD 60 BDP 2002 |
name of his wife in |29/05/2003 | |dated 20.12.2003 and corrigen-|
e records. | | |dum No.RD 60 BDP 2002 dated |
| | |3.1.2004. |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO's 50% pension withheld |
rom complainant's |AH & F DEPT. | |permanently - G.O.No.AHF 10 |
rwarding |02/06/2003 | |VDE 98 dated 09.01.2004. |
t's tour programme. | | | |
----------------------------------------------------------------------------
financial irregula- |SECY |Proved |Final Orders awaited from |
sing loss of |RD&PR | |Disciplinary Authority |
- and misappropria- |10/06/2003 | | |
.65,734=80. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
lged in corruption |SECY |Proved |Final Orders awaited from |
tance of Sri Sandip |REVENUE DEPT. | |Disciplinary Authority |
ted Rs.8331/- as |21/06/2003 | | |
abused his position | | | |
maitain Cash Decla-| | | |
ister. | | | |
----------------------------------------------------------------------------
iation of Government|SECY |Proved |Final Orders awaited from |
xecution of various |RD&PR | |Disciplinary Authority |
created bogus recei-|21/06/2003 | | |
the amount falsely | | | |
inting out thelapses| |Proved | |
ing as Audit staff. | | | |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dis- | |
| |contd. | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO compulsorily retired from |
rom complainant for |FINANCE | |service - G.O.No.FD 261 |
is resanctioned |21/06/2003 | |Aa Kha Ee 2001 dated 5.1.2004.|
pers. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |DGO's pension withheld perma- |
rom complainant as |FINANCE | |nently - G.O. No.FD 137 EPS |
mool for the month |03/07/2003 | |2001 dated 20.2.2004. |
99 and to dispense | | | |
ng of cases. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO-1 and DGO-2 dismissed from|
from complainant |REVENUE DEPT. | |service - G.O.No.RD 198 LRS(3)|
ing change of katha |03/07/2003 | |2001 dated 26.6.2004. |
e of complainant. | | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|CHAIRMAN |Proved |Final Orders awaited from |
rom complainant for |KPTCL | |Disciplinary Authority |
on of power supply |03/09/2003 | | |
se. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO dismissed from service |
from complainant for|RD&PR | |G.O.No.RDP 201 KSS 2003 dated |
katha in favour of |03/09/2003 | |5.12.2003. |
. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |Final Orders awaited from |
from complainant for|REVENUE DEPT. | |Disciplinary Authority |
t inspection of the |03/09/2003 | | |
ending the report | | | |
he occupation of | | | |
er. | | | |
----------------------------------------------------------------------------
nd accepted bribe of|PRINCIPAL SECY |Proved |Final Orders awaited from |
from complainant to |FINANCE | |Disciplinary Authority |
seal and lock put |03/09/2003 | | |
tory premises in | | | |
of the High Court | |Not | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted bribe of|SECY |Proved |DGO dismissed from service - |
rom complainant to |REVENUE DEPT. | |G.O.No.RD 32 BDP 99 dated |
e cheque towards the|03/09/2003 | |19.12.2003 |
alment sanctioned by| | | |
ment for development| | | |
ple. | | | |
----------------------------------------------------------------------------
llegal gratification|SECY |Proved |Final Orders awaited from |
-onbehalfof Senior |LABOUR DEPT | |Disciplinary Authority |
pector and Rs.200/- |17/10/2003 | | |
f to show official | | | |
issuing renewed | | | |
the complainant. | | | |
----------------------------------------------------------------------------
nd accepted an ille-|CHAIRMAN |Proved |DGO's 50 % of his pension |
ication of Rs.1000/-|KPTCL | |withheld permanently vide |
omplainant to show |17/10/2003 | |O.No.KPTCL/B21/4221/1999-2000 |
l favour of issuing | | |Dt 11/02/2005 |
m towards execution | | | |
orks. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
mittedadministrative|SECY |Proved |DGO'S 25% of pension stopped |
pses and irregulari-|REVENUE DEPT. | |permanently-Go-no.RD/59/ADE/ |
ilding up and main- |17/10/2003 | |2001 dt 27.01.2005 |
cords of regularisa-| | | |
authorised occupa- | |Proved | |
nds. | | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |Final Orders awaited from |
- from the complain-|WOMEN & CHILD | |Disciplinary Authority |
w him an official |17/10/2003 | | |
., for handing over | | | |
Draft of Rs.4224/-.| | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |DGO compulsorily retired from |
/- from the com- |REVENUE DEPT. | |servic - G.O.No.RD 71 BDP 2002|
or showing an |17/10/2003 | |dated 9.2.2004. |
effecting change of| | | |
o complainant's | | | |
| | | |
----------------------------------------------------------------------------
DGO-2 demanded and |PRINCIPAL SECY |Proved |Dgo-1 & Dgo-2 retired from ser|
bribe of Rs.100/- |PWD | |vice compulsorily- Go-PWD-231 |
spectively from the |17/10/2003 | |-SDE-2001 dt 07/09/2004 |
t for forwarding the| | | |
gister ofcomplainant| |Proved | |
's office. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
DGO-2 demanded and |SECY TO GOVT. |Proved |Final Orders awaited from |
bribe ofRs.10,000/-|WATER RESOURCE | |Disciplinary Authority |
ainant to show an |17/10/2003 | | |
avour ofrecommending| | | |
n the outstanding | |Proved | |
t of Rs.1,61,000/-. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
mount of Rs.2,62,556|SECY |Proved |Final Orders awaited from |
o Pradhan for execu-|RD&PR | |Disciplinary Authority |
orks without check |17/10/2003 | | |
t ofthe works andnot| | | |
n toget theobjection| | | |
forpurchasematerials| | | |
----------------------------------------------------------------------------
rections/over writ- |SECY. |Dis- |DGO-2-STOPPAGE OF 2 INCREMENTS|
e quotations that |UD |contd. |WITH CUMULATIVE EFFECT. |
xtra payment of |17/10/2003 | |DGO-3-RECOVERED THE LOSS OF RS|
to the firm by name | | |2000 FROM HIS PENSION BENIFITS|
ara Enterprises. | |Proved |VIDE GO.NO HUD/116/DMK/2000 |
| | |DT 04/02/2005 |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
E-2 demanded and |CHAIRMAN |Proved |Final Orders awaited from |
bribe of Rs.2,500/-|KPTCL | |Disciplinary Authority |
mplainant to provide|03/11/2003 | | |
y and new meter to | | | |
t's newly construc- | |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted a bribe |PRINCIPAL SECY |Proved |Final Orders awaited from |
- from the complain-|SOCIAL WELFARE | |Disciplinary Authority |
ant of loan under |03/11/2003 | | |
ana Scheme" and | | | |
e same to superior | | | |
| | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |DGO dismissed from service - |
- from the compalai-|RD&PR | |G.O.No.RD 112 BDP 2003 dated |
ssuing revenue |03/11/2003 | |27.2.2004. |
emand register | | | |
d builidng licence | | | |
uction of house. | | | |
----------------------------------------------------------------------------
DGO-2 demanded |PRINCIPAL SECY |Proved |DGO-1 compulsorily retired |
as gratification |EDN (PRIM-SEC) | |from service and DGO-2 |
ed Rs.1000/- as part|03/11/2003 | |exonerated - G.O.No.ED 61 SLB |
om the complainant | | |2000 dated 25.1.2005. |
ing arears of salary| |Not | |
e to her Bank A/c. | |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
s.50,000/-as illegal|SECY |Proved |Final Orders awaited from |
ion and accepted |REVENUE DEPT. | |Disciplinary Authority |
- from the complain-|03/11/2003 | | |
ange of katha and | | | |
o pay balance after | | | |
as attended. | | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY. |Proved |Final Orders awaited from |
- from the complai- |UD | |Disciplinary Authority |
ot enhancing the |03/11/2003 | | |
| | | |
----------------------------------------------------------------------------
s.1,500/- as illegal|PRINCIPAL SECY |Proved |Final Orders awaited from |
tion and accepted |FINANCE | |Disciplinary Authority |
at the first instanc|03/11/2003 | | |
ing and passing the | | | |
lls of the complain-| | | |
r issuing a cheque. | | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
s.10,000/- from the |PRINCIPAL SECY |Proved |Final Orders awaited from |
t and accepted |DPAR | |Disciplinary Authority |
as a bribe from him |03/11/2003 | | |
of katha of the | | | |
erty. | | | |
----------------------------------------------------------------------------
e for shortage of |PRINCIPAL SECY |Proved |Final Orders awaited from |
tons of asphalt and|PWD | |Disciplinary Authority |
of packed asphalt |30/12/2003 | | |
ss of Rs.14.86 lakhs| | | |
ernment. | |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted a bribe |PRINCIPAL SECY |Proved |Final Orders awaited from |
- from the complain-|FINANCE | |Disciplinary Authority |
cess application and|30/12/2003 | | |
im on K.G.I.D.Policy| | | |
o deceased Suresh D.| | | |
.C., DAR, Belgaum. | | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |Final Orders awaited from |
00/-from complainant|COOPERATION | |Disciplinary Authority |
the judgment in |30/12/2003 | | |
his wife. | | | |
----------------------------------------------------------------------------
nd aceepted a bribe |SECY |Proved |Final Orders awaited from |
/- from complainant |COOPERATION | |Disciplinary Authority |
the audit |30/12/2003 | | |
of Milk Producers' | | | |
ety. | | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |Final Orders awaited from |
/- from complainant |FOREST & E & E | |Disciplinary Authority |
ng lesser penalty |30/12/2003 | | |
orised cutting of | | | |
cking wooden logs in| | | |
shed. | | | |
----------------------------------------------------------------------------
medicines without |PRIN SECY. |Proved |Final Orders awaited from |
fCompetent Authority|H&FW DEPT | |Disciplinary Authority |
indents and in |03/01/2004 | | |
of Purchase Rules & | | | |
iatedGovernmentmoney| |Proved | |
ent of Rs.11,486/-. | | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted a bribe |CHIEF EX.OFF. |Proved |DGO compulsorily retired from |
/- from complainant |KAR KHADI BOARD| |service -Order No.Numbaram/CV/|
ing second instal- |03/01/2004 | |Enquiry/254/2003-04 dated |
an amount sanctioned| | |31.1.2004 of Karntaka State |
ther of complainant.| | |Khadhi & Gramodyog Board, |
| | |Bangalore. |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
nd accepted a bribe |SECY |Proved |Final Orders awaited from |
/- from complainant |FOREST & E & E | |Disciplinary Authority |
ermit for trnaspor- |03/01/2004 | | |
bamboo sticks. | | | |
----------------------------------------------------------------------------
taken away the |PRIN SECY. |Proved |DGO compulsorily retired from |
worth Rs.1,00,000/- |H&FW DEPT | |service - G.O.No.HFW 202 SPE |
o GovernmentHospital|03/01/2004 | |2002 dated 2.4.2004. |
n her residence for | | | |
ng wrongful loss to | | | |
ngulgain to herself.| | | |
----------------------------------------------------------------------------
d time married) |PRINCIPAL SECY |Proved |Final Orders awaited from |
|FINANCE | |Disciplinary Authority |
|02/03/2005 | | |
| | | |
----------------------------------------------------------------------------
colluded andcollect-|SECY |Proved |DGO-1 and DGO-2 dismissed |
y giving false pro- |HOME DEPT. | |from service - G.O.No.HD 446 |
ecure Government |04/04/2005 | |98 dated 2.9.2005. |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd accepted illegal |PRINCIPAL SECY |Not |DGO-1 exonerated and DGO-2 |
ion of Rs.2400/- |EDN.(HIGHER) |Proved |Censured vide G.O.No.ED 31 |
omplainant. |19/04/2005 | |DGD 2000 dated 2.8.2005. |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
acquired houses and |PRINCIPAL SECY |Proved |Final Orders awaited from |
out prior permission|PWD | |Disciplinary Authority |
scribed authority. |20/04/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
tted the irregulari-|PRINCIPAL SECY |Proved |Final Orders awaited from |
gging of bore-wells.|PWD | |Disciplinary Authority |
|23/04/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
propriated public |SECY |Proved |Final Orders awaited from |
|REVENUE DEPT. | |Disciplinary Authority |
|26/04/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ed Rs.500/- from the|SECY |Proved |Final Orders awaited from |
t in respect of |REVENUE DEPT. | |Disciplinary Authority |
f katha. |28/04/2005 | | |
| | | |
----------------------------------------------------------------------------
2 demanded &accepted|SECY |Not |Final Orders awaited from |
gratification of |REVENUE DEPT. |Proved |Disciplinary Authority |
from the complainant|27/06/2005 | | |
of katha. | | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
take action and |SECY. |Proved |Final Orders awaited from |
annual budget and |UD | |Disciplinary Authority |
iation of funds. |22/07/2005 | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
e government money |PRIN SECY. |Proved |Final Orders awaited from |
sing equipments and |H&FW DEPT | |Disciplinary Authority |
|26/07/2005 | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
registered the names|SECY |Proved |Final Orders awaited from |
tes in the Sub- |LABOUR DEPT | |Disciplinary Authority |
mploy.Exchange. |03/08/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
nd acceptedRs.2000/-|PRINCIPAL SECY |Proved |Final Orders awaited from |
of fundsto construct|AH & F DEPT. | |Disciplinary Authority |
er Welfare Scheme to|08/08/2005 | | |
ies Office. | | | |
----------------------------------------------------------------------------
d financial loss of |PRINCIPAL SECY |Proved |Final Orders awaited from |
- to Govt. by record|PWD | |Disciplinary Authority |
measurements. |10/08/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
k orders for |SECY |Proved |Final Orders awaited from |
f absorbent cotton. |LABOUR DEPT | |Disciplinary Authority |
|12/08/2005 | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ting the norms laid |SECY |Dropped|Final Orders awaited from |
Jawahar Rojgar |RD&PR | |Disciplinary Authority |
ramme and conditions|24/08/2005 | | |
by the SPD. | | | |
| |Dropped| |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| |Dropped| |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY. |Proved |Final Orders awaited from |
ibe from complainant|UD | |Disciplinary Authority |
g L.P.C. |30/08/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY. |Proved |Final Orders awaited from |
bribe from com- |UD | |Disciplinary Authority |
or releasing the |31/08/2005 | | |
t. | | | |
----------------------------------------------------------------------------
ed and accepted |SECY |Proved |Final Orders awaited from |
ibe from complainant|REVENUE DEPT. | |Disciplinary Authority |
hatha. |01/09/2005 | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
ed and accepted |PRINCIPAL SECY |Proved |DGO dismissed from service - |
om complainant for |FINANCE | |vide G.O.No.FD 251 Savula 2002|
cheque. |02/09/2005 | |dated 20.1.2006. |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY |Proved |Final Orders awaited from |
from complainant |REVENUE DEPT. | |Disciplinary Authority |
ing diary to the |05/09/2005 | | |
hased land. | | | |
----------------------------------------------------------------------------
ed and accepted |PRIN SECY. |Proved |Final Orders awaited from |
ribe for issuing |H&FW DEPT | |Disciplinary Authority |
itness certificate. |08/09/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted a |SECY |Proved |Final Orders awaited from |
s.1000/-from com- |RD&PR | |Disciplinary Authority |
or issuing khatha. |09/09/2005 | | |
| | | |
----------------------------------------------------------------------------
he Government Jeep |PRINCIPAL SECY |Proved |Final Orders awaited from |
taining proper |AH & F DEPT. | |Disciplinary Authority |
|13/09/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY |Proved |Final Orders awaited from |
ibe from complainant|REVENUE DEPT. | |Disciplinary Authority |
is name in the |28/09/2005 | | |
| | | |
----------------------------------------------------------------------------
e and accepted |SECY |Proved |Final Orders awaited from |
ribe from com- |REVENUE DEPT. | |Disciplinary Authority |
o issue suevey |29/09/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |PRINCIPAL SECY |Proved |Final Orders awaited from |
from complainant |AGRI & HORT DEP| |Disciplinary Authority |
his pensionary |04/10/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY |Proved |Final Orders awaited from |
bribe from complain-|REVENUE DEPT. | |Disciplinary Authority |
w an official. |05/10/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |SECY TO GOVT. |Proved |Final Orders awaited from |
bribe from complain-|WATER RESOURCE | |Disciplinary Authority |
w an official |06/10/2005 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted |37 |Proved |Final Orders awaited from |
rom complainant | | |Disciplinary Authority |
o show an official |07/10/2005 | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
ed and accepted |PRINCIPAL SECY |Proved |Final Orders awaited from |
- bribe from |PWD | |Disciplinary Authority |
t to show an |10/10/2005 | | |
avour. | | | |
----------------------------------------------------------------------------
d to evict the |SECY |Proved |Final Orders awaited from |
nt of land reserved |REVENUE DEPT. | |Disciplinary Authority |
g cattel. |17/10/2005 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ed and accepted a |SECY |Proved |Final Orders awaited from |
s.3,800/- from the |REVENUE DEPT. | |Disciplinary Authority |
t to show official |21/10/2005 | | |
| | | |
----------------------------------------------------------------------------
ly changed the muta-|PRINCIPAL SECY |Not |Final Orders awaited from |
es in the revenue |DPAR |Proved |Disciplinary Authority |
|03/11/2005 | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ed land and Sites in|PRINCIPAL SECY |Proved |Final Orders awaited from |
ithout prior permis-|EDN.(HIGHER) | |Disciplinary Authority |
eCompetentAuthority.|15/11/2005 | | |
| | | |
----------------------------------------------------------------------------
ed bogus documents |PRINCIPAL SECY |Proved |Final Orders awaited from |
ompensation |DPAR | |Disciplinary Authority |
to Rs.8,67,535. |19/11/2005 | | |
| |Not | |
| |Proved | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
----------------------------------------------------------------------------
F CHARGE |DISCIPLINARY |CHARGES| FINAL ORDERS OF |
|AUTHORITY TO |PROVED | DISCIPLINARY |
|WHOM ENQUIRY |OR NOT | AUTHORITY |
|REPORT & RECOM-|PROVED | |
|MENDATION ARE | | |
|SENT AND DATE | | |
----------------------------------------------------------------------------
|PRINCIPAL SECY |Proved |Final Orders awaited from |
|AH & F DEPT. | |Disciplinary Authority |
|22/02/2006 | | |
| | | |
----------------------------------------------------------------------------
ed and accepted a |CHAIRMAN |Proved |Final Orders awaited from |
s.500/- from |KPTCL | |Disciplinary Authority |
t to instal the |06/03/2006 | | |
eter. | | | |
----------------------------------------------------------------------------
ed to construc build|PRINCIPAL SECY |Not |Final Orders awaited from |
chayath properties |DPAR |Proved |Disciplinary Authority |
Club. |07/03/2006 | | |
| | | |
| |Proved | |
| | | |
| | | |
| | | |
| | | |
----------------------------------------------------------------------------
ed and accepted a |SECY. |Proved |Final Orders awaited from |
s.200/- from |UD | |Disciplinary Authority |
t to issue death |13/03/2006 | | |
e. | | | |
----------------------------------------------------------------------------
ed and accepted a |CHAIRMAN |Proved |Final Orders awaited from |
s.750/- from |KPTCL | |Disciplinary Authority |
t to give electrical|14/03/2006 | | |
ly. | | | |
----------------------------------------------------------------------------
ot check measure the|SECY. |Proved |Final Orders awaited from |
rk pertaining to 7 |UD | |Disciplinary Authority |
caused loss to the |21/03/2006 | | |
. | | | |
| |Proved | |
| | | |
| | | |
| | | |
| |Proved | |
| | | |
| | | |
| |Not | |
| |Proved | |
| | | |
| | | |
----------------------------------------------------------------------------
Related docs
Get documents about "