									                                                                                                                                                                             NOTE: "Blue Chip" products, highlighted in blue, are agreed to by Advisors as being the highest value products in


Products in Development in 2006 - Program 39: Grid Operations and Planning, Reconciliation
                                                                                                                                                                                         Revised
                                                            Portfolio    Project/                                                                                          Planned       Planned          Actual
Project                                                      Project     Lifetime                                                                                         Completion    Completion      Completion                                                     Tracking        Blue
 Set #   Project Set Title          Project Name           Sequence #   Tracking #    Manager      Product ID          Product             Product Type   In Portfolio?      Date          Date            Date    Status                       Comments               Change(s)       Chip
PS39A Making Grid            On-line Reliability Monitor    P39.001       055940   Lee, Stephen     1012478 On-line Reliability Monitor    Tech Update In Portfolio       12/31/2006                               On Schedule                                                          N
        Operation More       with Visualization and                                Ting-Yee                   with Visualization and       1-Informal
        Reliable and         Pattern Recognition                                                              Pattern Recognition          Report
        Operators More
        Effective
PS39A Making Grid            Voltage and Transient          P39.002      055944    Zhang, Pei       1012479    Voltage and Transient     Software        In Portfolio     3/31/2007                                   On Schedule                                                        N
        Operation More       Stability Region in State                                                         Stability Region in Power
        Reliable and         Space                                                                             Injection Space
        Operators More
        Effective
PS39A Making Grid            Real-Time Dynamic              P39.003      060431    Hirsch, Peter    1013276    Contingency-Constrained Technical         Post Portfolio   4/30/2006                      5/3/2006     Completed                                                          N
        Operation More       Stability Assessment                                                              Optimal Power Flow and Report
        Reliable and                                                                                           the Community Activity
        Operators More                                                                                         Room (CC-OPF and
        Effective                                                                                              CAR)

PS39A    Making Grid         Synchronized Real-Time         P39.004      062078    Hirsch, Peter    E222403    Hardware prototype          Hardware      In Portfolio     12/31/2006                                  On Schedule       Deliverables that are                            N
         Operation More      Measurements                                                                                                                                                                                               committed to be delivered
         Reliable and                                                                                                                                                                                                                   and are within the PCD.
         Operators More
         Effective
PS39A    Making Grid         Operator Training and          P39.005      052164    Hirsch, Peter    1012481    PC-Operator Training        Software      In Portfolio     12/31/2006                                  On Schedule       Deliverables that are                            N
         Operation More      Streamlined Emergency                                                             System                                                                                                                   committed to be delivered
         Reliable and        Coordination                                                                                                                                                                                               and are within the PCD.
         Operators More
         Effective
PS39A    Making Grid         Operator Training and          P39.005      052164    Hirsch, Peter    E222325    OTS User Group Meeting Conferences/ In Portfolio           12/31/2006                                  On Schedule       Deliverables that are                            N
         Operation More      Streamlined Emergency                                                             and Workshop for       Workshops                                                                                         committed to be delivered
         Reliable and        Coordination                                                                      Operator Training                                                                                                        and are within the PCD.
         Operators More
         Effective
PS39B    Enabling a More   Probabilistic Reliability        P39.006      062079    Zhang, Pei       1012484    Probabilistic Load Flow     Software      In Portfolio     12/31/2006                                  On Schedule                                                        N
         Robust            Assessment Probabilistic                                                            v4.0
         Transmission Grid Planning Tools and
                           Guidelines
PS39B    Enabling a More   Probabilistic Reliability        P39.006      062079    Zhang, Pei       1012485    Probabilistic Reliability   Software      In Portfolio     12/31/2006                                  On Schedule                                                        N
         Robust            Assessment Probabilistic                                                            Assessment v3.0
         Transmission Grid Planning Tools and
                           Guidelines
PS39B    Enabling a More   Protection Coordination          P39.007      062080    Zhang, Pei       1012486    Technical Update            Tech Update   In Portfolio     12/31/2006                                  On Schedule                                                        N
         Robust                                                                                                                            1-Informal
         Transmission Grid                                                                                                                 Report
PS39B    Enabling a More   Protection Coordination          P39.007      062080    Zhang, Pei       E222327    Workshop                    Service       In Portfolio     12/31/2006                                  On Schedule                                                        N
         Robust
         Transmission Grid
PS39B    Enabling a More   Transmission System              P39.008      060434    Hirsch, Peter    1012487    Transmission Outage         Tech Update   In Portfolio     12/31/2006                                  On Schedule       Deliverables that are                            Y
         Robust            Outage Coordination                                                                 Coordination                1-Informal                                                                                   committed to be delivered
         Transmission Grid                                                                                                                 Report                                                                                       and are within the PCD.
PS39B    Enabling a More   Transmission System              P39.008      060434    Hirsch, Peter    1013203    Transmission Outage         Software      Post Portfolio   12/31/2006                     3/31/2006    Completed (On     Deliverables that are                            Y
         Robust            Outage Coordination                                                                 Screening using Network                                                                                Time)             committed to be delivered
         Transmission Grid                                                                                     Flow Model, Version 1.0                                                                                                  and are within the PCD.

PS39B    Enabling a More   Valuation and Cost               P39.009      058536    Entriken,        1012489    Research to advance the Tech Update       In Portfolio     12/31/2006                                  On Schedule                                                        N
         Robust            Recovery of Transmission                                Robert                      art of congestion rent  1-Informal
         Transmission Grid Lines in an LMP Market                                                              forecasting             Report




           Page 1 of 6                                                                                                                                                                                                                                       Update: 12/13/2010
Products in Development in 2006 - Program 39: Grid Operations and Planning, Reconciliation
                                                                                                                                                                                     Revised
                                                         Portfolio    Project/                                                                                           Planned     Planned       Actual
Project                                                   Project     Lifetime                                                                                         Completion   Completion   Completion                                                 Tracking    Blue
 Set #   Project Set Title        Project Name          Sequence #   Tracking #    Manager     Product ID           Product            Product Type    In Portfolio?       Date        Date         Date    Status                   Comments               Change(s)   Chip
PS39B Enabling a More      Valuation and Cost            P39.009       058536   Entriken,       1012488 Software to supplement         Software     In Portfolio        3/31/2007                           On Schedule                                                  N
        Robust             Recovery of Transmission                             Robert                    forward curve prices,
        Transmission Grid Lines in an LMP Market                                                          asset valuation, and
                                                                                                          potentially transmission
                                                                                                          planning by accounting
                                                                                                          for the impact of
                                                                                                          congestion rents on
                                                                                                          these exercises
PS39C   Wide-Area          Managing Information          P39.010      060430   Lee, Stephen     1012490 CAR for Managing               Tech Update   In Portfolio      12/31/2006                           On Schedule                                                  Y
        Interconnected     Overload and Vulnerability                          Ting-Yee                   Information Overload-        1-Informal
        Systems            to Cascading Outages                                                           updates                      Report
PS39C   Wide-Area          Wide-Area Voltage             P39.011      060437   Zhang, Pei       1012491 Wide-Area Voltage              Tech Update   In Portfolio      12/31/2006                           On Schedule                                                  N
        Interconnected     Instability Load Shedding                                                      Instability Load Shedding    1-Informal
        Systems                                                                                                                        Report
PS39C   Wide-Area          Common Information Model      P39.012      062082   Becker, David    1013137    Executive Report-           Technical     Post Portfolio    7/14/2006                            On Schedule      04/06 - This is Executive                   N
        Interconnected     (CIM) Standards and                                                             CIM/GID Interoperability    Report                                                                                report of previous IOP#7
        Systems            Advanced Control Center                                                         Test #7 (2005)                                                                                                    trying to develop
                                                                                                                                                                                                                             shortened template for
                                                                                                                                                                                                                             executives.
PS39C   Wide-Area          Common Information Model      P39.012      062082   Becker, David    1013295    Interoperation Test #8 of   Technical     Post Portfolio    7/15/2006                            On Schedule                                                  N
        Interconnected     (CIM) Standards and                                                             the Generic Interface       Report
        Systems            Advanced Control Center                                                         Definition (GID)
                                                                                                           Standards and the
                                                                                                           Common Information
                                                                                                           Model (CIM)
PS39C   Wide-Area          Common Information Model      P39.012      062082   Becker, David    1012494    CIM/GID #9                  Technical     In Portfolio      1/31/2007                            On Schedule      04/06 - Planning for IOP                    N
        Interconnected     (CIM) Standards and                                                             Interoperability Test       Report                                                                                #9 starting week of
        Systems            Advanced Control Center                                                         Report                                                                                                            5/15/06

PS39C   Wide-Area          Common Information Model      P39.012      062082   Becker, David    1012492    Harmonization Draft         Tech Update   In Portfolio      3/16/2007                            On Schedule      04/06 - Currently in                        N
        Interconnected     (CIM) Standards and                                                             Architecture Report -       1-Informal                                                                            planning, anticipate to
        Systems            Advanced Control Center                                                         Report Design               Report                                                                                start by end of May.

PS39C   Wide-Area          Common Information Model      P39.012      062082   Becker, David    1012493    Advanced Control Center Tech Update       In Portfolio      3/30/2007                            Not Sufficient   Deliverable lacks sufficient                N
        Interconnected     (CIM) Standards and                                                             Concepts                1-Informal                                                               Funds (NSF)      funding to go forward. If
        Systems            Advanced Control Center                                                                                 Report                                                                                    you are interested in
                                                                                                                                                                                                                             funding this Deliverable,
                                                                                                                                                                                                                             contact your Account
                                                                                                                                                                                                                             Lead.
                                                                               Zhang, Pei       1013217    Load Model Parameter        Software      Added After       5/31/2006                            On Schedule                                                  N
                                                                                                           Derivation v1.0                           March 31st




          Page 2 of 6                                                                                                                                                                                                                             Update: 12/13/2010
                                         Customer Commitment Product Types

Description       Definition/Examples                                             Delivery Method
Assembled Package Collection or set of technical reports and/or other materials
                  such as slide presentations, graphics, etc., used to deliver
                  technical results.                                              Automatic hard copy to all funders.
Conferences/      Conferences and Workshops focus on technical issues in a Conference/workshop attendees automatically get results.
Workshops         particular field for a specific group of attendees. Use of this
                  Product Type implies that a transfer of money from the
                  customer to EPRI will take place for this activity. The cost is
                  not automatically included as part of the membership.

Hardware             Used for tangible products such as machinery prototypes or
                     computer hardware.
Peer Literature      Peer-Reviewed Literature are papers describing results of Citations catalog is delivered as a spreadsheet via the
                     EPRI-sponsored research that are submitted to peer-           web.
                     reviewed scientific and/or technical publications. There is a
                     separate Peer Literature Database for these products.

Service              Services include conferences, workshops, training courses, Various
                     training workshops, user groups, hotlines, technical
                     support, troubleshooting, evaluations, inspection issues,
                     user group meetings. Use of this product type implies that
                     the product is provided as part of the membership and that
                     no extra cost is incurred by the customer.

Software             An electronic file that includes executable code. Software Automatic distribution to all funders.
                     that becomes a web application is still considered to be
                     software.
Technical Report     A Technical Report presents the results of a project,      Automatic hard copy distribution to all funders in addition
                     technical research, case study or proceedings of           to electronic delivery via the web.
                     conferences or symposia. Consult the Technical Publishing
                     department for publishing guidelines and template
                     requirements.
Technical Update     A short, informal communication issued by the project    E-FTD notification to all funders; primary distribution is
                     manager that describes progress on a technical R&D area, electronic or via the web
                     contains an evaluation of technology, or addresses
                     regulatory issues. It is intended to address a specific
                     audience need such as Regulatory reports, notes to
                     conference attendees, etc. (Combines Technical Progress,
                     Technical Review/Technical Assessment, Regulatory
                     Analysis, Case Study, EMF or Climate Briefs, etc.)


                                                                                  Technical Update--1 Informal Report : An informal report
                                                                                  that describes continuing research, meetings, or topical
                                                                                  studies.
                                                                                  Technical Update--2 Resource Info : Precise technical
                                                                                  information and knowledge written for non-professionals. 8
                                                                                  or more pages.
                                                                                  Technical Update--3 Area Issue : Concise 2-page
                                                                                  summary of a program area issue that is important to
                                                                                  EPRI funders.
                                                                                  Technical Update--4 Tech Issue : A short 4-8 page
                                                                                  description of a technical project written for technical
                                                                                  experts to inform them of ongoing research and/or
                                                                                  developments in that field.
                                                                                  Technical Update--5 Newsletter : A collection of short
                                                                                  articles that provide updates and information to a
                                                                                  subscriber base who funded the project. Not available to
                                                                                  non-funders.




    5750764f-e3e3-484f-ac83-e549c6e0b3a4.xls                     Page 3                                                      April 2002
                                   Customer Commitment Product Types

Description      Definition/Examples                      Delivery Method
                                                          Technical Update--6 Manual : Instructional manual for
                                                          commercial end-use users that inform them how to go
                                                          about assessing or applying a technology. For
                                                          commercial, end-users only. Not intended for Nuclear
                                                          subscription or other services or for use with software.




   5750764f-e3e3-484f-ac83-e549c6e0b3a4.xls      Page 4                                              April 2002
Deliverable Status Terms/Definitions
                                                  Standard Comment
                                                  (provided for
                                                  consistency—can be
Status             Status Definition              edited)                       Used
Proposed           Initial state of a Deliverable N/A                           Pre sign-off
                   when it is entered into the
                   Sales Item Hierarchy (SIH)
                   from In Portfolio.

Not-Sufficient     Deliverable lacks sufficient   Deliverable lacks sufficient Sign-off
Funds (NSF)        funding to go forward. If      funding to go forward. If
                   you are interested in          you are interested in
                   funding this deliverable,      funding this deliverable,
                   contact your Account Lead.     contact your Account Lead.

On Schedule        Deliverables that are      N/A                               Post sign-off
                   committed to be delivered
                   and are within the planned
                   completion date (PCD)

Anticipate Possible Deliverable may not be        Deliverable may not be        Post sign-off
Delay               completed per planned         completed per planned
                    completion date (PCD).        completion date (PCD).
Delayed             Deliverable that has been     Varies                        Post sign-off
                    assigned a revised planned
                    completion date (RPCD) or
                    for which the planned
                    completion date (PCD) has
                    passed and no actual
                    completion date (ACD)
                    exists.
Deferred            Deliverable completion        Deliverable completion      Sign-off
                    date has been moved into      date has been moved into
                    a future delivery year due    a future delivery year due
                    to additional scope, and/or   to additional scope, and/or
                    advisory prioritization.      advisory prioritization.

Combined           Deliverable that will not be   Deliverable will not be       Sign-off; Post sign-
                   delivered because it has       delivered because it has      off
                   been combined with             been combined with
                   another committed              another committed
                   deliverable.                   deliverable.
Superceded         Due to Program dynamics        Due to Program dynamics       Sign-off; Post sign-
                   following release of In        following release of In       off
                   Portfolio, originally          Portfolio, originally
                   specified Deliverable in In    specified Deliverable in In
                   Portfolio has been             Portfolio has been
                   superceded by another          superceded by another
                   deliverable.                   deliverable.
No Longer        Due to Program dynamics         Due to Program dynamics Sign-off
Applicable       following release of In         following release of In
                 Portfolio, originally           Portfolio, originally
                 specified Deliverable in In     specified Deliverable in In
                 Portfolio is no longer          Portfolio is no longer
                 viable.                         viable.
Cancelled        Deliverable that will no        Varies                      Post sign-off
                 longer be delivered.
Completed (On-   Deliverable that is available   N/A                         Post sign-off*
Time)            to customers on or before
                 the planned completion
                 date (PCD).
Completed        Deliverable that is available   N/A                         Post sign-off
                 to customers and for which
                 an actual completion date
                 (ACD) exists, but was
                 completed after the initial
                 Planned completion Date
                 (PCD).

								
To top