Docstoc

CV

Document Sample
CV Powered By Docstoc
					                                          Planning & Execution Engineer


ASLAM HAMEED
S/o Gul Rahim               Date of Birth: November 16, 1984
Postal Address:             Vill & P.O Khurram M Zai, Teh Banda Daud Shah, Distt Karak.
Phone No:                   (+92)300-9330679, 0322-9013171
E-mail:                     aslam_hameed007@yahoo.com
CNIC No:                    14201-9728870-7

PROFESSIONAL OBJECTIVE
I seek to gain valuable real world experience through a full time, part time position leading to a career
involving Mechanical Systems, Plant Maintenance and related services. I want to join such an organization
which utilize my abilities effectively and which act as a gateway for me to enter into a challenging and
rewarding career.

PRACTICAL EXPOSURE

DESCON ENGINEERING LIMITED
Position:         Assistant Engineer

Duration:         From 1st June 2010 Till now

Department:
     Plant Services Department, deals In Turnaround / Shutdown Maintenance of Oil & Gas, Fertilizer,
      Chemical and Power Plants.

    o   Project:          BHPbilliton PETROLEUM COMPANY (ZAMZAMA GAS PLANT) DADU.
         (Erection Project and Shutdown 2010)
        Position:         Site Engineer

        Duration:         16th September 2010 to 11 November 2010                                    16th Septemb

        Responsibilities:
     Complete study of plane drawings ,P&IDs and isometric drawings.
     Complete study and erection of equipment ( Inlet Filter Coalescer).
     Complete structure erection and pipe supports.
     Piping erection to the tie in point (Spools, Valves, Control Valves, Level gauges).
     TEG Contactor Towers maintenance in shutdown October 2010 in coordination with SULZER

        international and resources management.

     Worked as a team lead during the whole activities by assuring good quality and HSEC.




                                                                                               Page 1 of 4
                                       Planning & Execution Engineer
   o Project:         FAUJI CEMENT COMPANY LTD. TAXILA (Erection Project 2007-2010)
       Position:      Area Engineer / Incharge Night Shift

       Duration:      4th June 2010 to date

       Responsibilities:
        Planning & Installation of Hydraulic Accumulator and Hydraulic Piping

        Installation of Water Injection System

        Structure related works

        Assuring good quality work in coordination with POLYSIUS AG BECHUM GERMANY.


RACHNA AUTOMOBILES (PVT) LIMITED, WAZIRABAD

Position:     Quality Control Engineer

Duration:     3 Months (11 Feb 2010 to 31 May 2010)
Responsibilities:
    Inspection Of All Parts of Motor Cycle Purchased From Vendors

    Designing of parts in 2-D AutoCAD

    Incharge of functional check department

    Attending Meetings With Government Teams And Vendors

MOL OIL AND GAS CO. BV MANZALAI, KARAK

Position:     Internee
Duration:     2 Months (1-7-2008 to 1-9-2008)
Responsibilities: (MAKORI GAS FIELD)

    Gas Generator Fan Fins Cleaning

    MRU Condenser Fan Bearing changing activity

    Installation of Centrifugal Pumps for Sprinklers

    Studying of Centrifugal Pump parts and function Pump available in workshop

    Studying P&IDS

    Loading Bowser, their safety checks

    Maintaining Log Book
                    (GURGURI GAS PLANT)
    Sprinkler Maintenance

    Loading

    Filters Replacement after Shutdown

    Chock Manifold Fitting after Shutdown

    Participated in Plant start up after Shutdown




                                                                                  Page 2 of 4
                                         Planning & Execution Engineer
OGDCL, CHANDA OIL FIELD SHAKARDARA, KOHAT

Position:        Internee

Duration:        01 Month 16-7-2008 to 16-8-2008

Responsibilities:

     Studying P&IDs

     Centrifugal Pump Coupling Replacement activity

     Mechanical Seal changing process of Hot Oil Pump

     Refrigeration Package Screw Compressor Alignment With Engine

     Assignment completion of (Equipment Data Collection)



UET PESHAWAR

Position:        Internee

Duration:        01 Month
Responsibilities:

     Four weeks Research Project on Survey of Drivers Fatigue Problems

     Manage to Deal with Time and Drivers



PROFESSIONAL SKILLS

     Pro-E
     Auto CAD
     Microsoft office, Power point, Microsoft excel


QUALIFICATION



                               Marks/
        Degree        Year                  Grade                Name of Institute / University
                                GPA
B.Sc. Mechanical      2009      2.66/4        A      UET Peshawar

F.Sc.                 2004    857/1100        A      Sir Syed Public School and College Risal Pur

Matric                2001     575/850        B      Govt. High School Khurram Muhammad Zai (Karak)




RESEARCH WORK

Final Year Project:      Designing and Fabrication of Time Base Automatic Controller for a Gas Water
                         Heater.
                         Long Technical Report on Solar Energy



                                                                                                    Page 3 of 4
                                    Planning & Execution Engineer
INTERESTS AND ACTIVITIES

   Member of Executive Committee ASME (American Society of Mechanical Engineers) (Membership
    No. 9580531)
   Playing Cricket, Football
   Hunting And Watching Movies


REFERENCE

   Will be furnished upon demand




                                                                                    Page 4 of 4