FY07-F09 DEPOT LEVEL MAINTENANCE PROGRAM (DLMP) CONFERENCE - ACTION ITEMS
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
Will be converted to SAC 2 and will have no TAM assigned. What is projected
1 A0004 Accessory Maintenance Kit MK-1823(V)TT 12 date this will take place? MCSC (PG-12) 28-Jul-06
Airborne Mobile Direct Air Copy of Phase Out Plan provided. PCN: 163 067 431 00
2 A0010 Support AN/UYQ-3A(V)2 12 Has been phased out and replaced by A0020. What is PCN? MCSC (PG-12) 28-Jul-06 SI 06743-0D/1
Central Office Telephone,
3 A0248 Automatic AN/TTC-42(V) 12 No requirements in FY08 or FY09. Reduce to zero. MCLC (SCMC/SCPD) 28-Jul-06
4 A0498 Message System, Digital AN/PSC2A 12 Phased out. Was phase-out plan written? Where it is posted? MCSC (PG-12) 28-Jul-06
5 A0966 MEWSS AN/MLQ-36 LAV MEWSS: Per Craig Harper, will become an E TAM. What will TAM be? MCSC (LAV) 28-Jul-06
Can this item be reconfigured to MC variant? MCSC: How many on EDL for
6 A1078 Multiplexer TD1234 12 OIF? MCSC (PG-12) 28-Jul-06
Phased out. Was phase-out plan written? Where it is posted? What is
7 A1221 Monitor, Portable AN/PSQ22 12 replacement TAM? A0003? MCSC (PG-12) 28-Jul-06
Being replaced by DAGRS. What is IOC/FOC? What is fielding plan? Where
8 A1260 PLGR AN/PSN-11 12 is it posted? MCSC (PG-12) 28-Jul-06
Phased out. Was phase-out plan written? Where it is posted? What is
9 A1275 Entry Device, Program MU848A/PSC2 12 replacement TAM? MCSC (PG-12) 28-Jul-06
GRC-193: fielding replacement in FY07. What is replacement TAM? Was
10 A1795 Radio Set AN/GRC193B(V) 12 phase-out/phase-in plan written? Where is it posted? MCSC (PG-12) 28-Jul-06
11 A2065 Radio Set AN/PRC104B(V) 12 Phased out; only RT being repaired. Where is phase-out plan? MCSC (PG-12) 28-Jul-06
12 A2069 Radio Set AN/PRC113(V)3 12 Repaired by component. Do not schedule on MWS. MCLC (SCMC/SCPD) 28-Jul-06
13 A2164 Radio Set, Vehicular AN/VRC83(V)2 12 Repaired by component. Do not schedule on MWS. MCLC (SCMC/SCPD) 28-Jul-06
What is plan to reset the force once items rotate back in country from in
theater? What are future plans for replacement of items? Next DLMP
Conference, would like to see representation from MCLC and MCSC on MCLC (SCMC/MD2)/
14 A2335 Shelter, 10 Ft, EMI 16 shelters. MCSC (PG-16) 28-Jul-06
What is plan to reset the force once items rotate back in country from in
theater? What are future plans for replacement of items? Next DLMP
Conference, would like to see representation from MCLC and MCSC on MCLC (SCMC/MD2)/
15 A2336 Shelter, 20 Ft, EMI 16 shelters. MCSC (PG-16) 28-Jul-06
What is plan to reset the force once items rotate back in country from in
theater? What are future plans for replacement of items? Next DLMP
Conference, would like to see representation from MCLC and MCSC on MCLC (SCMC/MD2)/
16 A2337 Shelter, 20 Ft, Rigid 16 shelters. MCSC (PG-16) 28-Jul-06
What is plan to reset the force once items rotate back in country from in
theater? What are future plans for replacement of items? Next DLMP
Conference, would like to see representation from MCLC and MCSC on MCLC (SCMC/MD2)/
17 A2338 Shelter, 10 Ft, Rigid 16 shelters. MCSC (PG-16) 28-Jul-06
SB-3614: There is an issue with the NSN. The Air Force and Marine Corps use
the same one and are stored in the same location. Are they the same
configuration? TSM will replace. When? Phase-in/Phase-out Plan written?
18 A2505 Switchboard, Telephone SB3614 12 Where is it posted? MCSC (PG-12) 28-Jul-06
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
TSM will replace. When? Phase-in/Phase-out Plan written? Where is it
19 A2508 Switching Unit, Phone SB3865 12 posted? MCSC (PG-12) 28-Jul-06
Based on cost to repair vs cost to buy, stakeholders from DLMP Conference
20 A2635 Telephone Set TA838A/TT 12 recommend SYSCOM buy 1058s vice repairing 838s. MCSC (PG-12) 28-Jul-06
21 A2740 Test Set, Field Cable AN/GTM3 12 Requirement to be validated. MCSC (PG-12) 28-Jul-06
22 A2805 Test Set AN/GRM115 12 Phased out. Where is plan? MCSC (PG-12) 28-Jul-06
Was phased out with Avenger. Was phase-out plan written? Where it is
23 A3224 Training, Captive Flight M67 11 posted? MCSC (PG-11) 28-Jul-06
24 A7060 Oscilloscope 54825A 16 Replacement on purchase through the Navy. What is IOC/FOC? MCSC (PG-16) 28-Jul-06
Being replaced. What is replacement TAM? Is Phase-in/Phase-out plan
25 A7061 Oscilloscope FLK199C 16 written? Where is it posted? MCSC (PG-16) 28-Jul-06
Being replaced. What is replacement TAM? Is Phase-in/Phase-out plan
26 A7062 16 written? Where is it posted? MCSC (PG-16) 28-Jul-06
27 A7075 Test Set, Radar AN/UPM155 16 Phased out. Where is plan? MCSC (PG-16) 28-Jul-06
Being replaced. What is replacement TAM? Is Phase-in/Phase-out plan
28 A7080 Test Set, Radio VHF TS429/U 16 written? Where is it posted? MCSC (PG-16) 28-Jul-06
Test Set, Being replaced. What is replacement TAM? Is Phase-in/Phase-out plan
29 A7081 Telecommunication System FB6000-NVY-P2 16 written? Where is it posted? MCSC (PG-16) 28-Jul-06
30 A7090 Reflectometer, Time Domain ME562/P 16 Obsolete. Where is phase-out plan? MCSC (PG-16) 28-Jul-06
31 A7500 Test Set, MCATES, Hybrid 16 Obsolete. Where is phase-out plan? MCSC (PG-16) 28-Jul-06
32 A8072 Remote Rekey Equipment KOK13A 12 How many KOK-13A are out in the Marine Corps and how many in Iraq? MCSC (PG-12) E-Mail provided by Victor Lugo on 22 June 06
Currently the Phase-in/out plan is in awaiting signature and
will be posted to the Albany Publications Web site.
Being replaced by B0003; has phase-in/phase-out plan been written? Where is Tentative vertical fielding to the fleet will begin 1st Qtr FY-
33 B0001 Air Conditioner ECUHC326 15 it posted? MCSC (PG-15) 28-Jul-06 07
Currently the Phase-in/out plan is in awaiting signature and
will be posted to the Albany Publications Web site.
Being replaced by B0003; has phase-in/phase-out plan been written? Where is Tentative vertical fielding to the fleet will begin 1st Qtr FY-
34 B0002 Air Conditioner F18H35B 15 it posted? MCSC (PG-15) 28-Jul-06 07.
The phase-in/phase-out plan is spelled out in the Fielding
Replacing B0001/B0002. Has phase-in/phase-out plan been written? Where is Plan which is posted on the Albany Publications web site.
35 B0003 Environmental Control Unit 18K BTU 15 it posted? Has this gone through DLSOR process? MCSC (PG-15) 28-Jul-06 Still waiting on response to DLSOR question.
Being replaced by B0014; has phase-in/phase-out plan been written? Where is The phase-in/phase-out plan is spelled out in the Fielding
36 B0004 Environmental Control Unit MHP204-08 15 it posted? MCSC (PG-15) 28-Jul-06 Plan which is posted on the Albany Publications web site.
Being replaced by B0014; has phase-in/phase-out plan been written? Where is The phase-in/phase-out plan is spelled out in the Fielding
37 B0005 Air Conditioner 817005 15 it posted? MCSC (PG-15) 28-Jul-06 Plan which is posted on the Albany Publications web site.
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
Being replaced by B0014; has phase-in/phase-out plan been written? Where is The phase-in/phase-out plan is spelled out in the Fielding
38 B0006 Air Conditioner 9387767 15 it posted? MCSC (PG-15) 28-Jul-06 Plan which is posted on the Albany Publications web site.
The B0007 is being replaced by the B0008 vice the B0014.
Being replaced by B0014; has phase-in/phase-out plan been written? Where is The phase-in/phase out plan is posted on the Albany
39 B0007 Air Conditioner F00T2HS 15 it posted? MCSC (PG-15) 28-Jul-06 Publications Web site.
There was no B0008 until just recently which replaces the
B0007 and B0011. The current Fielding pland posted on
Being replaced by B0014; has phase-in/phase-out plan been written? Where is the Albany Publications Web site spells out the pahse-
40 B0008 Environmental Control Unit 15 it posted? MCSC (PG-15) 28-Jul-06 in/phase-out procedures.
Subject TAMCN has been coded obsolete without
41 B0009 Air Conditioner F9000T32 15 Which system replaced? MCSC (PG-15) 28-Jul-06 replacement.
The B0011 was replaced by the B0008. The Fielding Plan
which is posted on the Albany Publications Web site spells
42 B0011 Air Conditioner 15 Which system replaced? MCSC (PG-15) 28-Jul-06 out the phase-in/phase-out plan for this ECU.
42a B0012 Air Conditioner 15 Which system replaced? MCSC (PG-15) 28-Jul-06
42b B0013 Air Conditioner 15 Which system replaced? MCSC (PG-15) 28-Jul-06
Hardened Engr Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
43 B0016 (HEV) 6x6 TSG COUGAR 15 and out MCSC (PG-15) 28-Jul-06
Hardened Engr Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
44 B0018 (HEV) 4x4 TSG COUGAR 15 and out MCSC (PG-15) 28-Jul-06
Joint Engineer Rapid
Response Vehicle (JERRV), Action for next year's DLMP Conference -- determine requirements for FY11
45 B0033 6x6 15 and out MCSC (PG-15) 28-Jul-06
Joint EOD Rapid Response Action for next year's DLMP Conference -- determine requirements for FY11
46 B0034 Vehicle (JERRV), 4x4 15 and out MCSC (PG-15) 28-Jul-06
Hardened Engineer Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
47 B0035 (Buffalo) 15 and out MCSC (PG-15) 28-Jul-06
48 B0055 Bath Shower Unit MK64, MOD5 15 Add requirements to DLMP. MCLC (SCMC/SCPD) 28-Jul-06
Container Handler, Rough
49 B0391 Terrain 988B 15 Being replaced. Replacement TAM is B0392. How long will Fleet be mixed? MCSC (PG-15) 28-Jul-06
Container Handler, RT,
50 B0392 Kalmar 15 What is IOC/FOC for system? MCSC (PG-15) 28-Jul-06
Crane, High Speed, High
51 B0443 Mobility HSHMC 15 Being replaced. What is replacement TAM? MCSC (PG-15) 28-Jul-06
Detecting Set, Mine, Metallic
52 B0475 Portable AN/PSS12 15 B0476 is replacing. What is EDL? MCSC (PG-15) 28-Jul-06
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
Study needs to be conducted on Korean initiative vice working at MCA or MCB.
Is it more cost effective? Would the Repair Cycle Time be reduced? Would
TOT be reduced? Perhaps this could be studied by a Monterey student? It
would be on a select listing of TAMs (so as not to impact Albany or Barstow's
production lines) for Okinawa to be repaired at Materiel Support Command
53 B0589 Excavator, M9Ace M9 Ace 15 Korea (MSC-K), U. S. Army. MCLC (Maint Dir) 28-Jul-06
Excavator, Hydraulic Med Replaced by B2483. Was Phase-in/Phase-out plan written? Where is it
54 B0591 Wt, RT MC 1085C 15 posted? MCSC (PG-15) 28-Jul-06
Replaced by B0640. Was Phase-in/Phase-out plan written? Where is it
54a B0635 Floodlight Set 15 posted?
55 B1300 Platform, Maint, Crane 15 What is OIF EDL quantity? MCLC (SCMC/MD2) 28-Jul-06
Pump Module, Fuel
56 B1580 (SIXCON) 845010A0000 15 III MEF would like MCLC to study sending this to Korea. MCLC (Maint Dir) 28-Jul-06
57 B1710 Refridgerator, Rigid Box MRC10 15 What is replacement plan? Field Food Service System? MCSC (PG-15) 28-Jul-06
Storage Tank Module, Water Due to age of equipment, there may be a requirement to determine if foam is PM may need longer than 28 Jul 06 due to Equip Spec
58 B2086 (SIXCON) MWT166 15 still viable. What is condemnation criteria? MCSC (PG-15) 28-Jul-06 being TAD.
Purification Unit, Water, Rev
59 B2604 Osmosis 600-3 15 What is status of TWPS (B2605) fielding? MCSC (PG-15) 28-Jul-06
Shop Equipment, Contact Action
60 C7033 Maint SECM 16 How many can MCA do per month? MCLC (MCA) complete 4 if C/C D or E; 2 if C/C F
MTVR Truck Armored Cargo
61 D0003 w/o w AMK23 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Armored Cargo
62 D0004 w/ w AMK25 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Armored XLWB
63 D0005 w/o AMK27 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Armored,
64 D0006 XLWB w/Winch AMK28 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Dump,
65 D0007 Armored, 7T, w/o winch AMK29 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Tractor, 7T, w/
66 D0008 winch AMK30 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MTVR Truck Tractor, 7T,
67 D0009 w/o winch MK31 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
Hardened Enginer Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
68 D0023 (HEV), 6x6 TSG COUGAR 15 and out MCSC (PG-15) 28-Jul-06
Hardened Engineer Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
69 D0024 (HEV), 4x4 TSG COUGAR 15 and out MCSC (PG-15) 28-Jul-06
Joint EOD Rapid Response Action for next year's DLMP Conference -- determine requirements for FY11
70 D0025 Vehicle (JERRV), 4x4 15 and out MCSC (PG-15) 28-Jul-06
Hardened Engineer Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
71 D0026 (Buffalo) 15 and out MCSC (PG-15) 28-Jul-06
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
Joint Engineer Rapid
Response Vehicle (JERRV), Action for next year's DLMP Conference -- determine requirements for FY11
72 D0027 6x6 15 and out MCSC (PG-15) 28-Jul-06
Hardened Engr Vehicle Action for next year's DLMP Conference -- determine requirements for FY11
73 D0029 (HEV), 6x6 TSG COUGAR 15 and out MCSC (PG-15) 28-Jul-06
74 D0060 Small Unit Spt (SUSV) 15 Statement of Work needs to be written. MCSC (PG-15) 28-Jul-06
MTVR, Trk, Cargo, 7T,
75 D0198 w/Winch MK25 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
MARFORs would like TAMCN assigned to armor that's being applied to MK-48s
76 D0209 LVS, Power Unit MK48 15 so they can account for. MCSC (PG-15) 28-Jul-06
LVS, Trailer, Powered, 20T, MARFORS would like this TAMCN to be taken off Bul 3000 due to LVS-R
77 D0879 Cargo Dropside MK17/A1 15 fielding FY08. HQMC 28-Jul-06
MTVR, Truck, Cargo, 7T,
78 D1062 XLWB MK28 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
Trk, Firefighting, Aircraft and
79 D1064 Structure A/S32P-19A 15 Does I MEF still have a requirement for these? I MEF 28-Jul-06
80 D1073 MTVR Dump Truck MK30 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
81 D1213 MTVR Wrecker MK36 15 PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
Has never been repaired at 5th Echelon, but there is a Statement of Work in
staffing. Once SOW is staffed, repair logic will be decided. If over 65%, will
82 E0139 Borescope M3 13 more than likely procure new. When will SOW staffing be completed? MCSC (PG-13) 28-Jul-06
Per PM Tanks: To be assigned by PM GTES. PM GTES
may decide to retain E0149 and only assign a new TAMCN
83 E0149 Bridge, Scissor f/AVLB MLC70 14 To be replaced by the Enhanced Assault Bridge (EAB)? What is the TAM? MCSC (PG-15) 28-Jul-06 to replace the E0150. Has yet to be decisioned.
Armored Vehicle, Launcher,
84 E0150 Bridge M60A1 14 Will be replaced by the Joint Assault Bridge (JAB) What is the TAM? MCSC (PG-15) 28-Jul-06 Per PM Tanks: To be assigned by PM GTES.
How many new will be procured? Will they be full sets? How many on EDL for
85 E0180 Aiming Circle M2A2 14 OIF? MCSC (PG-14) 28-Jul-06
Units will not give this up unless they get one first. Depot Maintenance Float
86 E0190 Carbine, 5.56MM (CQBW) M4A1 13 Allowance needs to be computed by MCLC and procured by MCSC. MCLC (SCMC/SCPD) 28-Jul-06
Units will not give this up unless they get one first. Depot Maintenance Float
87 E0195 Carbine, 5.56MM, M4 M4 13 Allowance needs to be computed by MCLC and procured by MCSC. MCLC (SCMC/SCPD) 28-Jul-06
Rifle, Designated Marksman This item is being replaced and the replacement has not been fully fielded.
88 E0311 (DMR) M14 13 MCSC to provide requirements breakdown for DLMP. MCSC (PG-13) 28-Jul-06
Howitzer, LtWt, Towed Lightweight 155 will replace M198 Howitzer (E0665). PM wants to establish
89 E0671 155MM M777 14 rotation program similar to M198. PM needs to provide requirements for DLMP. MCSC (PG-14) 28-Jul-06
AAV-P7: This is another example of TAMs coming in as a platform. In this
90 E0846 AAV-P7 AAVP7A1 14 case, E0997 and E0999 will be married to the PEI E0846 . See Action Item #95. MCSC (PG-14) 28-Jul-06
Observation Set, Laser,
91 E0870 Infrared AN/GVSS 13 Being replaced. What is replacement TAM? MCSC (PG-13) 28-Jul-06
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
92 E0892 Launcher, Grendade, 40MM M203 13 MCSC to validate requirement and provide to MCLC. MCSC (PG-13) 28-Jul-06
93 E0935 Launcher, TOW M220EA 13 See Action Item #94. MCSC (PG-14) 28-Jul-06
Will the LAV-AT have the TOW or TOW II? Will the Fleet be split? What are
94 E0942 LAV Anti-Tank LAV-AT LAV due dates for employing TOW II with LAV-AT? MCSC (AFSS) 28-Jul-06
Should the E0942 and TOW (E0935) and/or TOW II be treated as separate
systems when it comes to 5th Echelon Repair, or should they come in as a
Platform (together) for repair? This issue needs to be studied to determine
feasibility. Examples of issues to study: Rotation criteria is different for TOW
than it is for LAV-AT; transportation costs would go up; bonded vs. non-bonded
issue; Repair Cycle Time is different for two systems. Statement of Work would
have to change. MARFORPAC would like to hold on the requirement until this
95 E0942 LAV Anti-Tank LAV-AT LAV issue is resolved. MCSC (PM-LAV) 28-Jul-06
No longer required since Avenger phased out. Was phase-out plan written?
96 E0990 Machine Gun, Cal 50 M3P 13 Where is it posted? MCSC (PG-13) (PG-12) 28-Jul-06
System was decisioned to be retained within the Tank
community, thus it will retain its current TAM. It will not be
97 E0996 Blade, Mine Clearing 14 Will be replaced by the Assault Breacher Vehicle. What will TAM be? MCSC (PG-14) 28-Jul-06 replaced by the ABV.
Machine Gun, 40MM MARFORPAC would like to see UGWS come in with AAV as a platform. See
98 E0997 (UGWS) MK19 13 Action item 95. MCSC to validate requirement and provide to MCLC. MCSC (PG-14) 28-Jul-06
What is Blount Island Command's requirement? Should it match Tank Per PM Tanks: BICmd needs to validate the requirement.
99 E0998 Machine Gun, 7.62MM M240 13 requirement? MCLC (BIC) 28-Jul-06 It requires two M240s per Tank.
Machine Gun, Cal 50 MARFORPAC would like to see UGWS come in with AAV as a platform. See
100 E0999 (UGWS) M2 13 Action item 95. MCSC to validate requirement and provide to MCLC. MCSC (PG-14) 28-Jul-06
System Group, New system coming FY08; is replacement TAM known? Has phase-in/phase-
101 E1035 Meteorological AN/TMQ49 14 out plan been done? Where is it posted? MCSC (PG-14) 28-Jul-06
PM to provide accurate inventory and teardown configuration. What is
102 E1065 Mortor, 60MM M224 13 condemnation criteria? MCSC (PG-13) 28-Jul-06
103 E1095 Mortor, 81MM M252 13 PM to provide accurate inventory and teardown configuration. MCSC (PG-13) 28-Jul-06
Is being replaced with fielding of LW155. Has phase-in/phase-out plan been
104 E1145 Muzzle Velocity System M94 14 done? Where is it posted? MCSC (PG-14) 28-Jul-06
Being replaced by A0116 (I-PADS). Has phase-in/phase-out plan been written?
105 E1210 PADS AN/USQ-70 14 Where is it posted? MCSC (PG-14) 28-Jul-06
Item not phased out. Line used to repair items washed out
Recharging Unit, Coolant, of Screening Program. Request 1 per year. No need to
106 E1356 Training GM M80 11 Was phased out. Was phase-out plan written? Where it is posted? MCSC (PG-11) 28-Jul-06 fund at this time.
Need Statement of Work and Impact Statement for FY-07 and FY-08. Once
Rocket System, Arty, High Statement of Work is done, need to determine how long it will take to repair and
107 E1500 Mob (HIMARS) XM142 14 cost to repair. MCSC (PG-14) 28-Jul-06
108 E1712 Shop Set, Equipment Arty 14 When in replacement shelter due to be fielded? MCSC (PG-14) 28-Jul-06
Shotgun, Riot Control, 12
109 E1762 Gauge Mossberg 500A2 13 MCSC to validate requirement. MCSC (PG-13) 28-Jul-06
TAMCN Nomen Model PGD Discussion Action Officer Due Date Remarks
Is being phased out. What is replacement TAM? Has phase-in/phase-out plan
110 E1846 Survey Set, Artillery 14 been done? Where is it posted? MCSC (PG-14) 28-Jul-06
Direct Support Electrical System is being repaired via a CLS contract with DRS Test
111 E1906 System AN/USM-615 14 Who is repairing? Who is paying for repair? MCSC (PG-14) 28-Jul-06 and Energy Mgmt Inc. Being paid for by PM.
112 E1912 Test Set, GM (TOW) AN/TSM-140B 13 What is upgrade (to TOW II) plan? MCSC (PG-13) 28-Jul-06
HMMWV (all
113 variants) PM Motor T to re-strategize DLMP requirements. What is rotation criteria? MCSC (PG-15) 28-Jul-06
Phase in/
Phase Out Phase-in/Phase-out plans need to be written when an item is phasing in and/or
114 plans out and posted to a central location that all can access. MCSC (ACPROD) 28-Jul-06
PM has for action to code item(s) for 5th Echelon Repair or work with MCLC on
115 Optics Screening requirements. Optics are currently repaired at IMA level. MCSC (PM Optics) 28-Jul-06
Rotation criteria for peacetime and wartime needs to be established for items
116 Rotations requiring 5th Echelon repair. All PMs 28-Jul-06
Research needs to be done on 26 Urgent UNS items that were approved for
117 UUNs programs of record for inclusion into DLMP. MCSC (Operations) 31-Aug-06