Agreement to Hire an Inmate Letter - Excel

W
Description

Agreement to Hire an Inmate Letter document sample

Shared by: gjz44318
Categories
Tags
-
Stats
views:
15
posted:
12/8/2010
language:
English
pages:
39
Document Sample
scope of work template
							                                                                           WASHOE COUNTY SHERIFF’S OFFICE STRATEGIC PLAN and BUDGET FY 2007/2008

                               STRATEGIC PORTION (WHY, WHAT AND OUTCOME)                                                                                                         TACTICAL PORTION (HOW, WHEN AND WHO)

   SO Strategic          Long-Term Goals         Divn Supporting Goals       Performance Measure         1ST QTR    2ND QTR     Strategy Budget   Priority                     Action Plans                      Action Plan Target              Status     Division Lead
    Priorities           (3 to 5-year Goal           FY 2007/2008                   Target               FY 07/08    FY 07/08   Req ($)     FY                                                                    Completion Date                           Responsibility
                                                     (1-year Goal)                                       % Comp      % Comp          08/09

1. Improve           1.1 Maintain adequate   1.1.1 Evaluate projected      Maintain inmate population      20%        45%                                    Statistical analysis of the inmate population           Ongoing                                Capt Hodges
Detention            bed space based on the growth as it relates to jail   within historical growth of                                                                                                                                                      Carla Fells
Operations and       needs of the community. overcrowding and              5% annually. FY 07-08                                                             Obtain space utilization study results                 12/31/2007        Complete
Services [1, 2, 5,                           expansion.                    goal of less than 1229                                     C                      Begin planning of next expansion based on               3/31/2008        Deferred
6)                                                                         ADP.                                                       O                      results of study
                                               1.1.2 Reduce the            FY 06-07 was 16.88.             25%        50%             N                      Analysis and communication to courts, user          Ongoing - monthly                          Wendy Keller,
                                               average number of           Reduce average length of                                   F                      agencies and court services on impact to facility      meetings                                Carla Fells,
                                               “length of stay” days.      stay days by .5 (or 1/2                                                           through CJAC.                                                                                  Linda Justus,
                                                                                                                                      I
                                                                           day).                                                                                                                                                                            Sgt Barboza
                                               1.1.3 Evaluate court        Conduct quarterly               20%        50%
                                                                                                                                      D                      Statistical analysis of current Own-                    Quarterly        In Progress           Carla Fells
                                               standards for own-          meetings with Court                                        E                      Recognizance releases                                                                          Linda Justus
                                               recognizance releases.      Services.                                                  N                      Coordinate through Court Services to have               Quarterly        In Progress           C. Hinxman
                                                                                                                                      T                      their courts review their requirements and
                                                                                                                                      I                      communicate with courts to increase OR
                                                                                                                                                             releases.
                                                                                                                                      A
                                               1.1.4 Research              Increase number of bed          15%        50%                                    Research “best practices” throughout the                3/31/2008        In Progress           Carla Fells
                                                                                                                                      L
                                               alternatives for inmate     days saved in IAP and                                                             country                                                                                        Wendy Keller
                                               housing.                    SCWP by 5%. (1,541                                         l                      Obtain information on new and alternative               3/31/2008        In Progress
                                                                           days, for a savings of                                                            concepts
                                                                           approx. $128,000) -                                        I                      Communicate with the community in order to              Ongoing
                                                                           savings for 07-08 currently                                N                      bring in new ideas through re-entry meetings.
                                                                           at $200,340 (22%
                                                                                                                                      F
                                                                           increase) for SCWP YTD.                                                           Implement “test” programs and evaluate                  Ongoing
                                                                           Have already met goal for                                  O
                                                                                                                                                             success and results
                                                                           the FY.                                                    R
                                                                                                                                      M
                                               1.1.5 Implement off-site    See Action Plans.               10%        25%             A                      Complete off-site station at Mills Lane Justice         6/30/2008        In Progress - condo   Carla Fells
                                               Book-Print and Release                                                                 T                      Center                                                                   agreement signed      Wendy Keller
                                               Program.                                                                               I                      Number of inmate bookings completed at off-             FY 08/09         Deferred
                                                                                                                                                             site location.
                                                                                                                                      O
                                                                                                                                                             Review uses for site to provide benefits to             FY 08/09         Deferred
                                                                                                                                      N                      community and reduce population in facility
                     1.2 Provide for a safe    1.2.1 Anticipate staffing   See Action Plans.               25%        50%                                    Statistical analysis of the inmate population to        Ongoing                                Capt Hodges,
                     and secure Detention      needs to ensure safety,                                                                                       anticipate staffing                                                                            Carla Fells
                     Facility                  security and support                                                                                          Analyze and plan for staffing to support needs          Ongoing
                                               functions.
                                                                                                                                                             Present reports and recommendations in a                Ongoing
                                                                                                                                                             timely and effective manner
                                                                                                                                                             Anticipate need for future positions                    Ongoing
                                               1.2.2 Utilize current staff See Action Plans.               25%        50%                                    Review current staffing practices                       Ongoing          In Progress           Capt Hodges
                                               in the most efficient                                                                                                                                                                                        Carla Fells
                                               manner possible while                                                                                                                                                                                        Lt Howe
                                               maintaining safety                                                                                                                                                                                           Lt
                                               standards.                                                                                                                                                                                                   Vorderbruggen
                     1.2 Provide for a safe
                     and secure Detention
                     Facility

   SO Strategic          Long-Term Goals       Divn Supporting Goals             Performance Measure         1ST QTR    2ND QTR     Strategy Budget   Priority                     Action Plans                       Action Plan Target            Status        Division Lead
    Priorities           (3 to 5-year Goal          FY 2007/2008                        Target               FY 07/08    FY 07/08   Req ($)     FY                                                                     Completion Date                            Responsibility
                                                    (1-year Goal)                                            % Comp      % Comp          08/09
                                             1.2.2 Utilize current staff       See Action Plans.               25%                                                                                                                                                Capt Hodges
1. Improve           1.1 Maintain adequate   in the most efficient
                                             1.1.1 Evaluate projected          Maintain inmate population      20%                                               Research alternative methods of staffing for             Ongoing          In Progress/ AC4       Carla Fells
                                                                                                                                                                                                                                                                  Capt Hodges
Detention                                    manner possible while
                     bed space based on the growth as it relates to jail       within historical growth of                                                       safety and efficiency                                                     podular remote in      Lt Howe
                                                                                                                                                                                                                                                                  Carla Fells
Operations and                               maintaining safety
                     needs of the community. overcrowding and                  5% annually. FY 07-08                                                                                                                                       progress               Lt
Services [1, 2, 5,                           standards.
                                             expansion.                        goal of less than 1229                                                            If alternative methods are indicated, plan for           Ongoing          In Progress/ County    Vorderbruggen
6)                                                                             ADP.                                                                              infrastructure to implement plans                                         working on bid for
                                                                                                                                                                                                                                           podular remote
                                                                                                                                                                                                                                           conversion
                                                 1.2.3 Ensure that all staff   Provide 8 hours of training    20%        100%                                    Ensure all commissioned staff meet and                   6/30/2008        In Progress            Capt Hodges
                                                 are sufficiently trained to   in addition to the 24                                                             maintain P.O.S.T. standards                                                                      Carla Fells
                                                 ensure personal and           mandatory hours required                                                          Ensure all staff meet standards as delineated in         6/30/2008        In Progress            Admin Support
                                                 community safety and          by P.O.S.T.(as of 12-12-                                                          G.O. and S.O.P.’s                                                                                Unit
                                                 security.                     07, of the 230                                                                    Reduce incidents of risk management claims               Ongoing                                 Line
                                                                               commissioned staff, not                                                           and on-the-job injuries                                                                          Supervisors
                                                                               including NNLEA grads.,
                                                                               each employee has                                                                 Anticipate future safety and security risks,             Ongoing
                                                                               averaged 56 hours of                                                              providing up-to-date training on current issues.
                                                                               training.)
                                                 1.2.4 Provide all staff       See Action Plans.               20%        45%                                    Review and anticipate future needs of                    Ongoing                                 Lt. Hodges
                                                 with the equipment                                                                                              equipment, whether replacement or newly                                                          Carla Fells
                                                 necessary to effectively                                                                                        needed items                                                                                     Mike Cavalli
                                                 and efficiently complete                                                                                        Pre-plan needs for equipment based on current            Ongoing                                 Tami Gaston
                                                 their jobs in a fiscally                                                                                        and future positions
                                                 responsible manner.                                                                                             Evaluate all areas of the department to ensure           Ongoing
                                                                                                                                                                 consistency and most cost effective methods of
                                                                                                                                                                 ordering equipment.
                                                                                                                                                                 Coordinate with R & D for evaluation of new              Ongoing
                                                                                                                                                                 equipment.
                                                 1.2.5 Constantly evaluate     Conduct quarterly Safety &      25%        50%                                    Conduct regular safety and security meetings             Quarterly                               Capt Hodges
                                                 the detention facility to     Security meetings.                                                                and implement necessary changes                                                                  Lt Howe
                                                 anticipate security needs     Complete monthly safety                                                                                                                                                            Admin Support
                                                 and ensure the complex        inspections as delineated                                                         Conduct regular facility inspections and                  Monthly                                Unit
                                                 is maintained in order to     by SOP 725.182.                                                                   document security issues.
                                                 accomplish these needs.                                                                                         Conduct regular Facilities Management                     Monthly
                                                                                                                                                                 meetings
                                                                                                                                                                 Create permanent Projects Coordinator position           FY 08/09         Deferred - adding to
                                                                                                                                                                                                                                           ACES footprint
                     1.3 Provide for a safe and 1.3.1 Provide a bailiff in     Maintain current number of      25%        50%                                    Collect accurate statistics of all district court    6/30/08 - Ongoing    In Progress            Capt Hodges
                     secure Courts complex      every district court           16 bailiffs with 1 rover.                                                         hearings in where a bailiff is required.                                                         Lt Keller
                                                hearing.                                                                                                         Determine if current staffing levels are                 6/30/2008        In Progress            Carla Fells
                                                                                                                                                                 adequate and request additional staffing if
                                                                                                                                                                 needed.
                                                                                                                                                                 Anticipate future needs of the court (new                Ongoing
                                                                                                                                                                 construction, functions of the courts, anticipated
                                                                                                                                                                 growth)
                                                                                                                                                                 Provide equipment and supplies for added                 6/30/2008        In Progress
                                                                                                                                                                 positions
   SO Strategic          Long-Term Goals        Divn Supporting Goals           Performance Measure         1ST QTR    2ND QTR     Strategy Budget   Priority                    Action Plans                     Action Plan Target              Status      Division Lead
    Priorities           (3 to 5-year Goal          FY 2007/2008                       Target               FY 07/08    FY 07/08   Req ($)     FY                                                                  Completion Date                            Responsibility
                                                    (1-year Goal)                                           % Comp      % Comp          08/09

1. Improve           1.1 Maintain adequate     1.1.1 Evaluate projected
                                               1.3.2 Ensure all persons       Maintain inmate population
                                                                              Projected 4% of                 20%
                                                                                                              25%        50%                                    Complete Court Security audit and implement           6/30/2008        In Progress - audit    Capt Hodges
Detention            bed space based on the    growth as it relates to jail
                                               entering courts facilities     within historical growth of
                                                                              confiscated items                                                                 recommendations on a priority basis.                                   complete, MOU signed   Carla Fells
                                                                                                                                                                                                                                                              Lt Keller
Operations and       needs of the community.   overcrowding and
                                               are properly screened for      comparative FY of visitors
                                                                              5% annually. to # 07-08                                                                                                                                                         Carla Fells
Services [1, 2, 5,                             expansion.
                                               potential threats.             goal of less than 1229
                                                                              screened. Maintain 4%                                                             Request additional funds to implement security        FY 08/09         Deferred               Kevin Costa
6)                                                                            ADP.
                                                                              average, with continued                                                           recommendations as determined by audit                                                        John Lewis
                                                                              increase in persons                                                               results.                                                                                      Sgt O'Connor
                                                                              screened.                                                                         Determine staffing needs and increase as              Ongoing                                 Sgt Hopkins
                                                                                                                                                                demands change.
                                                                                                                                                                Utilize current staff in the most efficient and       Ongoing
                                                                                                                                                                effective manner.
                                                                                                                                                                Ensure proper equipment is obtained or                Ongoing
                                                                                                                                                                provided.
                                                                                                                                                                Provide proper training.                               Ongoing
                                               1.3.3 Ensure proper          Conduct quarterly security        10%        50%                                    Complete Court Security audit and implement           6/30/2008        In Progress - audit    Lt Keller
                                               security levels at all court inspections of bailiffs and                                                         recommendations on a priority basis. Request                           complete, MOU signed   Kevin Costa
                                               hearing locations.           CSO's in all court                                                                  funds as needed.                                                                              John Lewis
                                                                            locations.                                                                          Evaluate current and future staffing needs            Ongoing                                 Sgt O'Connor
                                                                                                                                                                Utilize current staff in the most efficient and       Ongoing          Formal inspection      Sgt Adams
                                                                                                                                                                effective manner.                                                      program initiated
                                                                                                                                                                Provide proper training                               Ongoing
                                                                                                                                                                Provide required equipment                            Ongoing
                                               1.3.4 Improve efficiency       See Action Plans.               15%        40%                                    Determine future needs and priorities of              FY 08/09         Deferred               Carla Fells
                                               of video arraignments                                                                                            establishing new video courts.                                                                Lt Keller
                                                                                                                                                                Ensure quality and effectiveness of current           3/31/2008        In Progress            Sgt Robinson
                                                                                                                                                                video courts systems.
                                                                                                                                                                Effectively communicate with courts to            6/30/08 - Ongoing    In Progress
                                                                                                                                                                determine “best practices”
                                               1.3.5 Implement uniform        Complete master MOU             25%        50%                                    Complete current Court Security audit                 6/30/2008        In Progress            Capt Hodges
                                               standards for responding       with stakeholders of the                                                          Develop MOU's with building users to ensure           3/31/2008        In Progress/ MOU       Lt Keller
                                               and reacting to potential      courts complexes.                                                                 understanding and enhance safety during                                signed                 Lt Howe
                                               emergency situations.          Conduct bi-annual training                                                        emergency situations.                                                                         Sgt O'Connor
                                                                              exercises.                                                                        Ensure distribution and training of staff on          6/30/2008        In Progress            Sgt Hopkins
                                                                                                                                                                standards.                                                                                    Kevin Costa
                                                                                                                                                                Conduct drills to ensure procedures,                  Ongoing                                 Admin Support
                                                                                                                                                                understanding and knowledge                                                                   Unit
                     1.4 Enhance and improve 1.4.1 Improve radio              Obtain and maintain             25%        50%                                    Ensure 800mz radio system is installed and            6/30/2008        In Progress            Capt Hodges
                     communication and       communications                   minimum of 199,                                                                   functioning                                                                                   Carla Fells
                     cooperation.            systems.                         800 mhz radios for                                                                Provide sufficient number of radios for staff        12/31/2007        Complete               Jim Algeo
                                                                              Detention.                                                                        Plan for maintenance and replacement for              Ongoing                                 Admin Support
                                                                                                                                                                radios                                                                                        Unit
                                               1.4.2 Improve and              New video visiting system       25%        35%                                    Complete current test period for new video             9/31/07         Complete               Capt Hodges
                                               increase video                 functioning by June 2008.                                                         system                                                                                        Lt Keller
                                               arraignment and visiting                                                                                         Select vendor for video visiting                     12/31/2007        In Progress - bid      Carla Fells
                                               to allow for improved                                                                                                                                                                   delayed by County
                                               security.                                                                                                        Expand video arraignment to all courts,               FY 08/09         Deferred
                                                                                                                                                                reducing need for transportation and improving
                                                                                                                                                                court security.
   SO Strategic          Long-Term Goals        Divn Supporting Goals           Performance Measure         1ST QTR    2ND QTR     Strategy Budget   Priority                     Action Plans                     Action Plan Target            Status        Division Lead
    Priorities           (3 to 5-year Goal          FY 2007/2008                       Target               FY 07/08    FY 07/08   Req ($)     FY                                                                   Completion Date                            Responsibility
                                                    (1-year Goal)                                           % Comp      % Comp          08/09

1. Improve           1.1 Maintain adequate     1.1.1 Evaluate projected
                                               1.4.3 Continue to              Maintain 12 CJAC and 2
                                                                              Conduct inmate population       20%
                                                                                                              25%        50%                                    Conduct regular meetings with courts and user          Ongoing                                 Capt Hodges
Detention            bed space based on the    growth as it relates to jail
                                               improve communications         within historical growth of
                                                                              Jail User meetings.                                                               agencies.                                                                                      Carla Fells
                                                                                                                                                                                                                                                               Lt Keller
Operations and       needs of the community.   overcrowding andcourts
                                               with all agencies,             5% annually. FY 07-08                                                             Evaluate use of multi-media methods to                 6/30/2008        In Progress            Carla Fells
Services [1, 2, 5,                             expansion.
                                               and jail users.                goal of less than 1229                                                            improve communication
6)                                                                            ADP.                                                                              Coordinate with Public Information Officer on          6/30/2008        In Progress
                                                                                                                                                                efficient methods of communication
                                               1.4.4 Research new      See Action Plans.                      15%        30%                                    Meet regularly with R & D to bring new ideas to    6/30/08 - Ongoing    In Progress/ setting   Capt Hodges
                                               technologies to improve                                                                                          the table and discuss priorities and challenges.                        quarterly meetings     Carla Fells
                                               communication, security                                                                                                                                                                  between Detn. Admin.   Admin Support
                                               and ensure fiscal                                                                                                                                                                        and R & D              Unit
                                               responsibility.

                                               1.4.5 Provide the              Accommodate and provide         25%        50%                                    Provide information to the WCSO website to              Monthly                                Capt Hodges
                                               community with                 100% of all tours                                                                 distribute accurate information to the public.                                                 Lt Howe
                                               information and                requested.                                                                                                                                                                       Admin Support
                                               education related to the                                                                                         Coordinate and provide tours for the public             Ongoing                                Unit
                                               functions of the Sheriff’s                                                                                       Determine and anticipate the fiscal impact of          6/30/2008        In Progress
                                               Office. (tours, website)                                                                                         providing tours and information to the
                                                                                                                                                                community
                     1.5 Promote and expand 1.5.1 Provide support to          Offer assistance to 25% of      15%        25%                                    Create a discharge/transitional release program        6/30/2008        In Progress            Capt Hodges
                     jail programs, both    individuals transitioning         released inmates, and                                                             for inmates returning to the community.                                                        Carla Fells
                     internal and external. from custody.                     75% of inmates with "None                                                                                                                                                        Wendy Keller
                                                                              Fixed" addresses.                                                                 Implement more in-house programs to prepare            3/31/2008        In Progress            Perry Leach
                                                                                                                                                                inmates for release                                                                            AIU
                                                                                                                                                                Coordinate outside resources and services to           3/31/2008        In Progress            Sgt Miranda
                                                                                                                                                                provide support to increased programming.                                                      Mike Sherak

                                               1.5.2 Anticipate the           Evaluate 20 programs.           20%        40%                                    Evaluate the issues that cause recidivism               9/31/07         Complete               Carla Fells
                                               program needs of the           Reduce recidivism by 5%.                                                          Create test-programs and evaluate                      Ongoing                                 Wendy Keller
                                               inmate population in an                                                                                          effectiveness and response of programs
                                               attempt to reduce crime                                                                                          Locate providers through meetings,                     Ongoing
                                               and recidivism.                                                                                                  presentations and working groups.
                                               1.5.3 Provide assistance       Increase number of bed          25%        50%                                    Ensure proper coordination with community in           Ongoing                                 Wendy Keller
                                               to the community to            days saved in IAP and                                                             providing services                                                                             Carla Fells
                                               improve the quality of the     SCWP by 5%. (1,541                                                                Coordinate with various agencies to not only           Ongoing                                 Sgt Miranda
                                               region and reduce the          days, for a savings of                                                            correct the crime, but provide detailed                                                        Lt Howe
                                               appearance of crime            approx. $128,000)                                                                 information in order to stop the crimes                                                        Mike Sherak
                                               (graffiti and SCWP                                                                                               (identifying taggers, mapping locations and                                                    Benny Imbert
                                               programs).                                                                                                       types of crime, etc….)
                                                                                                                                                                Continually review implementation of services          Ongoing

                                                                                                                                                                Ensure proper equipment and supplies are               Ongoing
                                                                                                                                                                available to provide services
                                                                                                                                                                Research and obtain grant funding if available         Ongoing
   SO Strategic           Long-Term Goals           Divn Supporting Goals           Performance Measure         1ST QTR    2ND QTR     Strategy Budget   Priority                    Action Plans                     Action Plan Target            Status            Division Lead
    Priorities            (3 to 5-year Goal             FY 2007/2008                       Target               FY 07/08    FY 07/08   Req ($)     FY                                                                  Completion Date                                Responsibility
                                                        (1-year Goal)                                           % Comp      % Comp          08/09

1. Improve           1.1 Maintain adequate
                     1.6 Ensure compliance         1.1.1 Evaluate projected
                                                   1.6.1            and           Maintain inmate population
                                                                                  Evaluate services provided      20%        40%                                    Review past expenditures and implement “best      6/30/08 - Ongoing    In Progress             Capt Hodges
                                                                                                                                                                                                                                                                   Lt Howe, Mike
Detention            bed space based on the
                     with Constitutional rights,   growth as it relates to jail
                                                   improve inmate services        within historical growth of
                                                                                  by 5 agencies of similar                                                          practices”                                                                                     Carla Fells
                                                                                                                                                                                                                                                                   Cavalli, Dave
Operations and       needs of the community.
                     laws and court decisions.     overcrowding fiscally
                                                   in order to be and             5% annually. FY 07-08
                                                                                  size and scope by June                                                            Look for alternatives in how we provide               Ongoing          In Progress/            Cunningham,
Services [1, 2, 5,                                 expansion. while
                                                   responsible                    goal of less than 1229
                                                                                  2008                                                                              services                                                               implemented changes in Perry Leach,
6)                                                 ensuring civil rights (food    ADP.                                                                                                                                                     inmate clothing choices Gail Singletary,
                                                   service, laundry, medical,                                                                                                                                                              (socks, pants, shoes)   Sgt Barboza
                                                   religious programs).
                                                                                                                                                                    Review all applicable NRS, NAC, case laws and Quarterly - Ongoing
                                                                                                                                                                    policies regarding inmate services

                                                                                                                                                                    Eliminate any services no longer required             Ongoing
                                                                                                                                                                    Explore alternative procurement sources or            FY 08/09         In Progress
                                                                                                                                                                    methods
                                                                                                                                                                    Determine total services budget for FY 07-      3/31/2008      In Progress
                                                                                                                                                                    08. If greater than authorized amount,
                                                                                                                                                                    submit with justification for above base
                                                                                                                                                                    funding
                                                                                                                                                                    Determine inmate dietary requirements      Quarterly - Ongoing                                   Mike Cavalli,
                                                                                                                                                                    and needs following all applicable laws                                                          Dave
                                                                                                                                                                    regarding food services                                                                          Cunningham
                                                                                                                                                                    Determine cost per meal and projected      3/31/2008 - Ongoing In Progress
                                                                                                                                                                    increase in cost due to anticapted inmate
                                                                                                                                                                    ADP
                                                                                                                                                                    Submit above base funding request with          3/31/2008      In Progress
                                                                                                                                                                    justification FY 08/09
                                                   1.6.2 Research and             Review all law changes          25%        50%                                    Maintain logs of current case law                     Ongoing                                    Sgt Barboza
                                                   evaluate changes in laws       and court decisions issues                                                        Share and receive information with Admin.             Ongoing                                    IMU staff
                                                   and court decisions in         during FY 07/08 affecting                                                         Bureau and DA’s Office                                                                           Capt Hodges
                                                   order to implement             Detention Bureau.                                                                 Distribute pertinent information to staff             Ongoing                                    Lt Howe
                                                   changes while reducing                                                                                           Present potential effects of case law to              Ongoing                                    Lt Keller
                                                   the fiscal impact of those                                                                                       management with poss. solutions                                                                  Admin support
                                                   changes.
                                                   1.6.3 Constantly evaluate      Review all risk                 20%        50%                                    Track and evaluate risk management cases               Weekly          In Progress/ reduction of Unit Mills
                                                                                                                                                                                                                                                                     Dep
                                                   the safety and security of     management cases                                                                                                                                         30% from FY 06/07 -       Kate Aubuchon
                                                   the facility to reduce         impacting Detention                                                                                                                                      replacing downed cells Tami Gaston
                                                   fiscal impact due to risk      Bureau. Reduce # of                                                                                                                                      with new bunk system      Lt Howe
                                                   management issues.             completed inmate suicides                                                                                                                                                          Line Staff
                                                                                  to zero.                                                                          Reduce risks and threats connected with           6/30/08 - Ongoing    In Progress/ new vent
                                                                                                                                                                    suicidal inmates                                                       system installed in
                                                                                                                                                                                                                                           expansion
                                                                                                                                                                    Identify patterns and propose solutions to        6/30/08 - Ongoing    In Progress/ using
                                                                                                                                                                    problems                                                               different socks
                                                                                                                                                                    Conduct regular safety and security meetings          Quarterly

                                                                                                                                                                    Conduct regular safety and security inspections        Monthly

                                                                                                                                                                    Create a safety and security link on WCSO In-         6/30/2008        In Progress/ setting up
                                                                                                                                                                    site                                                                   link
                                                                                   WASHOE COUNTY SHERIFF’S OFFICE STRATEGIC PLAN and BUDGET FY 2007/2008

                                        STRATEGIC PORTION (WHY, WHAT AND OUTCOME)                                                                                                                     TACTICAL (HOW, WHEN AND WHO)

   SO Strategic           Long-Term Goals                 Divn Supporting Goals              Performance Measure        1ST QTR       2ND QTR       Strategy Budget   Priority                 Action Plans                 Action Plan         Status
    Priorities            (3 to 5-year Goal)                  FY 2007/2008                          Target              FY 07/08      FY 07/08      Req ($)     FY                                                            Target
                                                              (1-year Goal)                                             % Comp        % Comp             08/09                                                              Completion
                                                                                                                                                                                                                               Date
2. Improve the                                     2.1.1 De-centralize and expand the      See action plan. Track            50%           25%                                   Determine steps to develop & implement      9/30/07      Complete
quality of life for                                hours of operation of the               permits for last 3 yrs by
the citizens of                                    permits/registrations unit within the   zip code for trends.                                                                  Crystal Report for spread sheet             9/30/07      Complete
Washoe County                                      Records Section                         Letters/survey out by                                                                 Draft survey letter/cards/questions         12/31/07
[1, 2]                                                                                     09/30/07. Compile                                                                                                                              Complete
                                                                                           results by 02/08.                                                                     Produce / Interpret Spread Sheet            12/31/07     Complete
                                                                                                                                                           C                     Mail cards/questions/letters                12/31/07
                                                                                                                                                           O
                                                                                                                                                                                                                                          Complete
                                                                                                                                                                                 Interpret cards/questions/letters           6/30/08
                                                                                                                                                           N                     Identify budget                             3/31/08
                                                                                                                                                           F                     Prepare & Implement                         6/30/08
                                              2.1.2 Identify site, equipment,              Identify resource                 5%                            I                     Establish focus groups involving stake      9/30/07
                                              vehicle, vehicle equipment and               requirements by 1/1/08                                          D                     holders for construction, equipment and
                                              personnel needs.                                                                                             E                     Personnel needs
                                              2.1.3. Conduct market survey and             Results of survey by              15%                           N                     CAB meetings, ACES AND Volunteer            6/30/08
                                              identify community needs                     6/30/08                                                                               Survey Group
                                                                                                                                                           T
                      2.2 Establish General   2.2.1 Obtain appropriate                     Aquire appropriate               100%          100%                                   Interface with FUSION Center and            9/30/07
                      Investigation Unit to   surveillance and electronic                  surveilance equipment by
                                                                                                                                                           I                     Criminal Intelligence personnel. Take
                      provide additional      intelligence equipment. Identify             6/1/08                                                          A                     inventory of current equipment.
                      services and coverage 7 grant funding source.                                                                                        L
                      days a week.            2.2.2 Obtain appropriate digital             Obtain digital recording          75%           90%             l                     Equipment currently being installed by      12/31/07
                                              recording equipment for use in               equipment by 7/1/08                                                                   "Consiliant Technologies" 100%
                                              investigations.                                                                                              I                     completion expeteced by mid Dec.
                                              2.2.3 Research and identify grant            Have the grant fund              Delete
                                                                                                                                                           N
                                              funding sources for above                    identified by 1/31/08                                                                                                                               Delete
                                              equipment                                                                                                    F
                                              2.2.4 Enhance/increase personnel             Add additional personnel        Deferred      Deferred          O                     Submit budget request in January 08         12/31/07     Deferred
                                              by 1 Sgt and 3 Detective positions           1 Sgt and 3 Dets by                                             R
                                                                                           7/1/08                                                          M
                      2.3 Enhance budget to        2.3.1 Research and identify grant       Conduct needs                     10%                           A                     Establish focus group to include            6/30/08
                      purchase and fund the        funding sources for above               assessment to determine                                                               Comptroller and Financial personnel in
                                                                                                                                                           T
                      RAVEN Program                equipment                               requests for service by                                                               the County
                                                                                           3/31/08                                                         I
                      2.4 Build or upgrade the     2.4.1 Review tentative building         Have an accepted                  50%                           O                     Review current plans and reassess           12/31/07     Reviewing
                      current Incline Substation   plans and revise if necessary to        construction plan in place                                      N                     needs projected for construction year of                 existing plans.
                      to a modern police           meet needs of the Incline Village       by 6/08                                                                               2011 or 2012
                      facility.                    Patrol
                      2.5 Address staffing         2.5.1 Justify and request additional Have board approval for              50%                                                 Prepare budget requests and provide         12/31/07
                      shortfalls that brings the   staffing in FY 08/09 Budget          a Lieutenant for Incline to                                                              supporting documentation
                      agency into Western                                               begin FY 08/09 by 6/08.                                                                  Write budget request with supporting        12/31/07     In progress
                      States standards                                                                                                                                           documents for addtional deputies and a
                                                                                                                                                                                 lieutenant for Incline
   SO Strategic           Long-Term Goals               Divn Supporting Goals              Performance Measure       1ST QTR       2ND QTR      Strategy Budget   Priority                 Action Plans                  Action Plan        Status
    Priorities            (3 to 5-year Goal)                FY 2007/2008                          Target             FY 07/08      FY 07/08     Req ($)     FY                                                             Target
                                                            (1-year Goal)                                            % Comp        % Comp            08/09                                                               Completion
                                                                                                                                                                                                                            Date
2. Improve the        2.6 Address Regional       2.1.1 De-centralize and expand the
                                                 2.6.1 Reassess effectiveness of         See action plan. Track
                                                                                         Regionalize all dispatch         50%
                                                                                                                          45%                                                Identify problems with current system        12/31/07     Complete
quality of life for   Dispatch issues            hours of operation of the
                                                 current service                         permits for last 3 yrs by
                                                                                         services in one Center
the citizens of                                  permits/registrations unit within the   zip code for trends. Blvd
                                                                                         located on Spectrum                                                                 Establish focus group involving all stake    6/30/07      Complete
Washoe County                                    Records Section                         Letters/survey out by
                                                                                         by 6/30/08                                                                          holders within the region and develop a
[1, 2]                                                                                   09/30/07. Compile                                                                   regional authority.
                                                                                         results by 02/08.                                                                   Identify solutions and infrastructure        3/31/08      In progress
                                                                                                                                                                             changes needed to improve system and
                                                                                                                                                                             create a regional center by 2/08
                                                                                                                                                                             Conduct cost analysis                        3/31/08      In progress
                                                                                                                                                                             Determine logistics of move                  3/31/08      In progress


                      2.7 Enhance the ability    2.7.1 Conduct needs                     Complete needs                   35%          50%                                   Create reports: number of crimes in           1/1/08
                      of the Detective           assessment to determine                 assesment by 1/1/08                                                                 each area, location of crimes, This
                      Division to timely         additional Commissioned                                                                                                     report will also include hours
                      investigate crimes         personnel needed to increase                                                                                                expended on detective investigated
                      involving gangs,           education and prevention                                                                                                    cases.
                      drugs, computer            efforts re: violent crimes and
                      crimes, violent juvenile   identify theft. Determine
                      crimes and domestic        additional support staffing,
                      violence.                  equipment, training, logistical
                                                 requirements and cost.
                                                 2.7.2 Evaluate funding options          Obtain additional              Deferred     Deferred                                Discuss grant funding with Grant's           11/1/07      Deferred
                                                 and seek funding to                     funding by 7/1/08 to                                                                Coordinator. Submit budget request
                                                 permanently assign 1 detective          fund ATF position                                                                   with required documentation
                                                 position to ATF task force.
                                                 2.7.3 Evaluate funding options          Identify and obtain            Deferred     Deferred                                Discuss grant funding with Grant's           11/1/07      Deferred
                                                 and seek funding to                     funding source for                                                                  Coordinator. Submit budget request
                                                 permanently assign 1 detective          ICAC Detective by                                                                   with required documentation
                                                 position to Internet Crimes             7/1/08
                                                 Against Children (ICAC)
                                                 2.7.4 Evaluate funding options          Identify and obtain            Deferred     Deferred                                Discuss grant funding with Grant's           11/1/07      Deferred
                                                 and seek funding to                     funding source for                                                                  Coordinator. Submit budget request
                                                 permanently assign 1 detective          Cyber Crimes                                                                        with required documentation
                                                 position to Cyber crimes.               Detective by 7/1/08

                                                 2.7.5 Evaluate funding options          Identify and obtain            Deferred     Deferred                                Discuss grant funding with Grant's           11/1/07      Deferred
                                                 and seek funding to                     funding for a felony                                                                Coordinator. Submit budget request
                                                 permanently assign 1 detective          property and violent                                                                with required documentation
                                                 position to felony property             juvenile crimes
                                                 crimes and juvenile violent             detective by 7/1/08
                                                 crimes.
   SO Strategic       Long-Term Goals            Divn Supporting Goals             Performance Measure       1ST QTR       2ND QTR      Strategy Budget   Priority               Action Plans             Action Plan        Status
    Priorities        (3 to 5-year Goal)             FY 2007/2008                         Target             FY 07/08      FY 07/08     Req ($)     FY                                                      Target
                                                     (1-year Goal)                                           % Comp        % Comp            08/09                                                        Completion
                                                                                                                                                                                                             Date
2. Improve the                             2.1.1 De-centralize and expand the
                                           2.7.6 Evaluate funding options        See action plan. Track
                                                                                 Identify and obtain              50%
                                                                                                                Deferred     Deferred                                Discuss grant funding with Grant's    11/1/07      Deferred
quality of life for                        hours of operation of the
                                           and seek funding to                   funding source yrs
                                                                                 permits for last 3 for by                                                           Coordinator. Submit budget request
the citizens of                            permanently assign 1 within the
                                           permits/registrations unitdetective   zip code for trends.
                                                                                 domestc violence                                                                    with required documentation
Washoe County                              Records Section                       Letters/survey out by
                                           position to domestic violence         detective by 7/1/08
[1, 2]                                                                           09/30/07. Compile
                                           crimes                                results by 02/08.
   SO Strategic          Long-Term Goals               Divn Supporting Goals              Performance Measure       1ST QTR       2ND QTR    Strategy Budget   Priority                  Action Plans                   Action Plan          Status
    Priorities           (3 to 5-year Goal)                FY 2007/2008                          Target             FY 07/08      FY 07/08   Req ($)     FY                                                               Target
                                                           (1-year Goal)                                            % Comp        % Comp          08/09                                                                 Completion
                                                                                                                                                                                                                           Date
2. Improve the        2.8 Establish Special     2.1.1 De-centralize and expand the
                                                2.8.1 Obtain appropriate                Complete plan. Track
                                                                                        See actionassessment by          50%
                                                                                                                          5%                                              Determine needs of Community Liaison           12/31/2007 Compling
quality of life for   Enforcement Team in       hours of operation of the
                                                surveillance and electronic             permits for last 3 yrs by
                                                                                        12/31/07                                                                          Deputies, Detectives and Criminal                            inventory list
the citizens of       the Patrol Division to    permits/registrations unitIdentifythe
                                                intelligence equipment. within          zip code for trends.                                                              Intelligence personnel.
Washoe County                                   Recordsor alternative funding.
                                                funding Section                         Letters/survey out by                                                             Explore funding options                            1/31/08
                      combat crimes, gangs,
[1, 2]                                                                                  09/30/07. Compile
                      drugs, violent juvenile                                           results by 02/08.
                      crimes and domestic
                                                                                                                                                                          Submit list of equipment with justification        1/31/08
                      violence
                                                                                                                                                                          for above base FY 08/09 funding

                                                2.8.2 Enhance/increase personnel Complete assessment by                  5%                                               Based upon the assessment results,             12/31/2007 Compling crime
                                                by 1 Sgt and 6 Deputy positions  12/31/07                                                                                 determine additional staffing                                statistics to
                                                                                                                                                                          requirements to support SET                                  conduct
                                                                                                                                                                                                                                       assessment.
                                                                                                                                                                          Submit request for additional staffing and         1/31/08 Waiting for
                                                                                                                                                                          justification for above base budget FY                       assessment to
                                                                                                                                                                          08/09                                                        be completed.
                      2.9 Enhance the ability   2.9.1 Conduct needs                     Complete assessment by           25%                                              Based upon assessment results,                     1/31/08 Completed initial
                      of the Patrol Division    assessment to determine                 12/31/07                                                                          determine additional staffing                                data collection;
                      to decrease response      additional Commissioned                                                                                                   required.                                                    validating
                      times to crimes           staffing needed to reduce                                                                                                                                                              current statistics
                      associated with gangs,    burglaries, increase drug (meth)
                      drugs, violent juvenile   arrests and increase
                      crimes, domestic          educational efforts for illegal                                                                                           Submit request for additional staffing             1/31/08
                      violence, graffiti, and   dumping. Determine additional                                                                                             and justification for above base
                      illegal dumping.          support staffing, equipment,                                                                                              budget FY 08/09
                                                training, logistical requirements
                                                and cost.
                                                2.9.2 Evaluate funding options          Complete assessment by         Deferred                                           Based upon assessment results,                    12/31/07 Deferred
                                                and seek funding to                     12/31/07                                                                          determine additional staffing                                pending budget
                                                permanently assign 1 office                                                                                               required.
                                                support clerical position to                                                                                              Submit findings of assessment and                  1/1/08 Deferred
                                                Patrol Administration Staff.                                                                                              justification for above base budget                       pending budget
                                                                                                                                                                          FY 08/09
                                                2.9.3 Complete assessment of            Complete assessment              25%                                              Create tracking reports: actual               12/31/07       Reviewing
                                                clerical support staff to               12/31/07                                                                          number of subpoenas, court time                              existing tracking
                                                establish a court liaison within                                                                                          accrued (OT/Regular), actual                                 forms.
                                                the Patrol Division.                                                                                                      needed appearance vs. standby
                                                                                                                                                                          Submit findings of assessment and                  1/1/08 Pending
                                                                                                                                                                          justification for above base budget                       outcome of
                                                                                                                                                                          FY 08/09                                                  statistics
                                                                                                                                                                                                                                    collected.
                                                2.9.4 Increase the efficiency           Complete building                50%                                              Review building design, interior                  12/31/07   Complete
                                                and effectiveness of Gerlach            renovation assessment                                                             condition and furniture needs
                                                Deputies                                by 12/31/07.
   SO Strategic          Long-Term Goals               Divn Supporting Goals              Performance Measure       1ST QTR   2ND QTR    Strategy Budget   Priority                 Action Plans              Action Plan          Status
    Priorities           (3 to 5-year Goal)     2.9.4 Increase the efficiency
                                                           FY 2007/2008                 Complete building
                                                                                                 Target            50%
                                                                                                              FY 07/08        FY 07/08   Req ($)     FY                                                         Target
                                                           (1-year Goal)
                                                and effectiveness of Gerlach            renovation assessment % Comp          % Comp          08/09                                                           Completion
                                                Deputies                                by 12/31/07.                                                                                                             Date
2. Improve the                                  2.1.1 De-centralize and expand the      See action plan. Track          50%                                           Conduct cost analysis to support                       Identifying items
quality of life for                             hours of operation of the               permits for last 3 yrs by                                                     needed renovations                                     that need to be
the citizens of                                 permits/registrations unit within the   zip code for trends.                                                                                                                 purchased from
Washoe County                                   Records Section                         Letters/survey out by
                                                                                                                                                                                                                             assessment.
[1, 2]                                                                                  09/30/07. Compile
                                                                                        results by 02/08.
                                                                                                                                                                      Submit findings of assessment and            1/31/08
                                                                                                                                                                      justification for above base budget
                                                                                                                                                                      FY 08/09
                                                2.9.5 Replace the current               Complete assessment             15%                                           Based upon assessment results               12/31/07 Continuing to
                                                permanent Gerlach Deputy                by 12/31/07                                                                   prepare building design                              review and
                                                residence                                                                                                                                                                  identifying
                                                                                                                                                                                                                           federal grants
                                                                                                                                                                      Develop list of required furniture          12/31/07 Pending
                                                                                                                                                                                                                           outcome of
                                                                                                                                                                                                                           research
                                                                                                                                                                      Conduct cost analysis to support            12/31/07
                                                                                                                                                                      building requirements
                                                                                                                                                                      Explore funding options                      1/31/08

                                                                                                                                                                      Submit findings of assessment and            1/31/08
                                                                                                                                                                      justification for above base budget
                                                                                                                                                                      FY 08/09
                      2.10 Enhance the          2.10.1 Obtain appropriate               Complete assessment             50%                                           Based upon assessment results,              12/31/07 Researching
                      efficiency and            equipment for Special                   by 12/31/07                                                                   develop list of equipment required to                federal/state
                      effectiveness of the      Weapons and Tactics Team                                                                                              support SWAT                                         grants and other
                      Special Weapons and                                                                                                                                                                                  alternative
                      Tactics Team in                                                                                                                                                                                      funding.
                      responding to crimes                                                                                                                            Determine equipment deficiencies            12/31/07 Pending
                      associated with gangs,                                                                                                                          and associated costs.                                outcome of
                      drugs, violent juvenile                                                                                                                                                                              research
                      crimes, domestic                                                                                                                                Explore funding options                     12/31/07
                      violence, graffiti,                                                                                                                             Submit request and justification for         1/31/08
                      property crimes, and                                                                                                                            above base budget FY 08/09
                      sexual assaults.          2.10.2 Conduct needs                    Complete assessment             50%                                           Based upon assessment results,             12/31/07 Researching
                                                assessment to determine                 by 12/31/07                                                                   determine mandated training                            federal/state
                                                Special Weapons and Tactics                                                                                           courses, duration and associated                       grants and other
                                                mandated training and cost .                                                                                          costs.                                                 alternative
                                                                                                                                                                                                                             funding.
                                                                                                                                                                      Explore funding options                     12/31/07
                                                                                                                                                                      Submit findings of assessment and            1/1/08 Pending
                                                                                                                                                                      justification for above base budget                 outcome of
                                                                                                                                                                      FY 08/09                                            research
   SO Strategic          Long-Term Goals                 Divn Supporting Goals            Performance Measure       1ST QTR    2ND QTR    Strategy Budget   Priority                Action Plans                Action Plan          Status
    Priorities           (3 to 5-year Goal)                  FY 2007/2008                        Target             FY 07/08   FY 07/08   Req ($)     FY                                                          Target
                                                             (1-year Goal)                                          % Comp     % Comp          08/09                                                            Completion
                                                                                                                                                                                                                   Date
2. Improve the        2.11 Decrease             2.11.1 Complete and expand of
                                                2.1.1 De-centralize assessmentthe       See action plan. Track
                                                                                        Complete assessment              50%
                                                                                                                         25%                                           Based upon assessment results,              12/31/07
quality of life for   accidents through         staffing operation of the
                                                hours of to support proactive           permits for last 3 yrs by
                                                                                        by 12/31/07                                                                    determine additional staffing required                  Developing
the citizens of       increased driver safety   permits/registrations unit within the
                                                enforcement and educational             zip code for trends.                                                                                                                   lesson plan
Washoe County                                   Records Section                         Letters/survey out by
                      awareness and             effort                                                                                                                 Explore funding options                       1/31/08   Researching
[1, 2]                                                                                  09/30/07. Compile
                      poractive enforcement                                             results by 02/08.                                                                                                                      federal/state
                      of vehicle code                                                                                                                                                                                          grants and other
                      violations                                                                                                                                                                                               alternative
                                                                                                                                                                                                                               funding.
                                                                                                                                                                       Submit findings of assessment and             1/1/08    Pending
                                                                                                                                                                       justification for above base budget                     outcome of
                                                                                                                                                                       FY 08/09                                                research
                                                2.11.2 Conduct needs                    Complete assessment              60%                                           Submit findings of assessment and             1/1/08    Pending
                                                assessment for driver safety            by 12/31/07                                                                    justification for above base budget                     outcome of
                                                awareness programs                                                                                                     FY 08/09                                                research
                                                2.11.3 Obtain appropriate               Complete assessment              25%                                           Based upon assessment results,                1/31/08   Reviewing
                                                equipment for Motor Unit                by 12/31/07                                                                    determine equipment needs                               Drivers
                                                                                                                                                                                                                               Education
                                                                                                                                                                                                                               program
                                                                                                                                                                       Determine equipment deficiencies              1/31/08
                                                                                                                                                                       and associated costs
                                                                                                                                                                       Submit request and justification for          1/31/08
                                                                                                                                                                       above base budget FY 08/09
                      2.12 Enhance the          2.12.1 Complete assessment of Complete assessment                        25%                                           Based upon assessment results               12/31/07 Reviewing
                      ability of the K-9 Unit   K-9 staffing and canines to   by 12/31/07                                                                              determine additional staffing and                       current statistics
                      to respond to crimes      support increase crime                                                                                                 canines required                                        for requests for
                      associated with gangs,    response time                                                                                                                                                                  K-9
                      drugs, violent                                                                                                                                   Submit request and justification for          1/31/08
                      juveniles, sexual                                                                                                                                above base budget FY 08/09
                      assaults, property        2.12.2 Obtain appropriate     Complete assessment                        25%                                           Based upon assessment results,                1/31/08   Complete
                      crimes, graffiti and      equipment needed for K-9 Unit by 12/31/07                                                                              develop list of equipment required to
                      domestic violence                                                                                                                                support K-9 Unit.
                                                                                                                                                                       Determine equipment deficiencies              1/31/08 Reviewing
                                                                                                                                                                       and associated costs                                    identified
                                                                                                                                                                                                                               equipment
                                                                                                                                                                                                                               needed.
                                                                                                                                                                       Submit findings of assessment and             1/31/08
                                                                                                                                                                       justification for above base budget
                                                                                                                                                                       FY 08/09
                                                2.12.3 Conduct needs                    Complete assessment              25%                                           Based upon assessment results,              12/31/07 Researching
                                                assessment of mandated                  by 12/31/07                                                                    determine mandated training                             federal/state
                                                training for K-9 Unit.                                                                                                 courses, duration and associated                        grants and other
                                                                                                                                                                       costs                                                   alternative
                                                                                                                                                                                                                               funding.
                                              2.12.3 Conduct needs                    Complete assessment        25%
   SO Strategic          Long-Term Goals      assessment of mandated
                                                     Divn Supporting Goals               12/31/07
                                                                                      byPerformance Measure 1ST QTR          2ND QTR    Strategy Budget   Priority                Action Plans               Action Plan          Status
    Priorities           (3 to 5-year Goal)   training for K-9 Unit.
                                                         FY 2007/2008                           Target            FY 07/08   FY 07/08   Req ($)     FY                                                         Target
                                                         (1-year Goal)                                            % Comp     % Comp          08/09                                                           Completion
                                                                                                                                                                                                                Date
2. Improve the                                2.1.1 De-centralize and expand the      See action plan. Track           50%                                           Explore funding options                    12/31/07 Pending
quality of life for                           hours of operation of the               permits for last 3 yrs by                                                                                                             identification of
the citizens of                               permits/registrations unit within the   zip code for trends.                                                                                                                  alternative
Washoe County                                 Records Section                         Letters/survey out by
                                                                                                                                                                                                                            funding.
[1, 2]                                                                                09/30/07. Compile
                                                                                                                                                                     Submit findings of assessment and            1/31/08
                                                                                      results by 02/08.
                                                                                                                                                                     justification for above base budget
                                                                                                                                                                     FY 08/09
                      2.13 Enhance the        2.13.1 Conduct assessment to            Complete assessment                                                            Based upon assessment results,              12/31/07
                      efficiency and          determine appropriate                   by 12/31/07                                                                    develop list of equipment required to
                      effectiveness of the    equipment for Hostage                                                                                                  support SWAT
                      Hostage Negotiation     Negotiation Team.                                                                                                      Determine equipment deficiencies            12/31/07
                      Team.                                                                                                                                          and associated costs.
                                                                                                                                                                     Explore funding options                     12/31/07

                                                                                                                                                                     Submit request and justification for         1/31/08
                                                                                                                                                                     above base budget FY 08/09
                                              2.13.2 Conduct needs                    Complete assessment                                                            Based upon assessment results,             12/31/07
                                              assessment to determine                 by 12/31/07                                                                    determine mandated training
                                              Hostage Negotiation Team                                                                                               courses, duration and associated
                                              mandated training and cost .                                                                                           costs.
                                                                                                                                                                     Explore funding options                     12/31/07
                                                                                                                                                                     Submit findings of assessment and            1/31/08
                                                                                                                                                                     justification for above base budget
                                                                                                                                                                     FY 08/09
WHO)

       Division Lead
       Responsibility


   P Kelly / C Palian

   P Kelly / C Palian
   P Kelly / C Palian
   P Kelly / C Palian
   P Kelly / C Palian
   P Kelly / C Palian
   P Kelly / C Palian
   P Kelly / C Palian
   Capt Blue
   Capt Emerson
   Capt Kelly
   P Kelly

   Capt Emerson




   Capt Emerson




   Capt Emerson


   Sgt Pedersen




   Capt Kelly




   Clay Griffen

   Capt Kelly
    Division Lead
    Responsibility



Divisional
Commanders
US Vinger


US Vinger


Finance
Capt Kelly
Carla Fells
Clay Griffin
Capt Emerson
Lt Yarbrough
Sgt Redmond
Sgt Herrera




Capt Emerson
Lt Yarbrough
Sgt Herrera

Capt Emerson
Lt Yarbrough
Sgt Redmond



Capt Emerson
Lt Yarbrough
Sgt Herrera


Capt Emerson
Lt Yarbrough
Sgt Macaluso
  Division Lead
  Responsibility



Capt Emerson
Lt Yarbrough
Sgt Macaluso
   Division Lead
   Responsibility



Capt Blue


Capt Blue
Lt. Balaam
Lt Spurr
Capt Blue
Lt Perry

Capt Blue
Lt. Balaam



Capt Blue      Lt
Balaam


Capt Blue            Lt
Spurr          Lt.
Hebb
Sgt Rice




Cpt. Blue
Lt. Perry

Cpt. Blue
Lt. Perry

Capt Blue
Cindy Stewart
(County Interns)

Capt Blue
Cindy Stewart
(County Interns)

Capt. Blue
Lt. Perry       Sgt.
Condon
   Division Lead
   Responsibility



Capt. Blue
Lt. Perry       Sgt.
Condon


Capt. Blue
Lt. Perry       Sgt.
Condon
Lt. Perry
Sgt. Condon


Lt. Perry
Sgt. Condon

Lt. Perry
Sgt. Condon
Lt. Perry
Sgt. Condon
Lt. Perry
Sgt. Condon

Capt. Blue
Lt. Balaam Sgt.
Baldridge


Capt. Blue
Lt. Balaam
Sgt. Wright



Cpt. Blue       Lt.
Balaam        Sgt.
Lee



Cpt. Blue       Lt.
Balaam        Sgt.
Lee
   Division Lead
   Responsibility



Cpt. Blue
Lt. Spurr
Sgt. Gross
Cpt. Blue
Lt. Spurr
Sgt. Gross


Cpt. Blue
Lt. Spurr
Sgt. Gross
Cpt. Blue
Lt. Spurr
Sgt. Gross
Cpt. Blue
Lt. Spurr
Sgt. Gross




Cpt. Blue
Lt. Balaam
Sgt. Wright



Cpt. Blue
Lt. Balaam
Sgt. Wright
Cpt. Blue
Lt. Balaam
Sgt. Wright




Cpt. Blue
Lt. Balaam
Sgt. Wright
   Division Lead
   Responsibility



Cpt. Blue
Lt. Balaam
Sgt. Wright




Capt. Blue
Sgt. Rice
Lt. Nikoley
Lt. Nikoley
Sgt. Rice
Lt. Nikoley
Sgt. Rice
Lt. Nikoley
Sgt. Rice
Lt Nikoley



Lt Nikoley
Lt Nikoley
                                                                       WASHOE COUNTY SHERIFF’S OFFICE STRATEGIC PLAN and BUDGET FY 2007/2008

                                    STRATEGIC PORTION (WHY, WHAT AND OUTCOME)                                                                                                     TACTICAL PORTION (HOW, WHEN AND WHO)

                                                                                                                                                                                                                     Action Plan
                                                        Divn Supporting Goals                                 1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                        Performance Measure                                                                                                                Target
                                                            FY 2007/2008                                       FY07/08    FY07/08    Req ($)   FY     Priority                     Action Plans                                       Current Status
    Priorities              (3 to 5- year Goal)                                            Target                                                                                                                    Completion
                                                            (1-year Goal)                                     % Comp      % Comp         08/09
                                                                                                                                                                                                                        Date
3. Improve              3.1 Integrate Research     3.1.1 Research and identify     Identify appropriate        100%                                              Identify existing databases and mapping              3/31/08      Complete
operational             and Development            software program                software by 3/30/08                                                           software in use by County and WCSO
effectiveness and       concepts, methods and                                                                                                                    Research and identify a software program for         3/31/08      Complete
efficiency              tools into the management                                                                                                                use by the crime analyst based
regarding               structure of the Sheriff's
                                                                                                                                            C                    Determine cost of purchasing new software            3/31/08
customer service,       Office                                                                                                                                                                                                     Complete
fiscal responsibility                                                                                                                       O                    and/or hardware
and professional                                                                                                                            N                    Provide software/hardware requirements and           3/31/08      Complete
standards effecting                                                                                                                         F                    pricing to Administration
agency readiness                                                                                                                            I                    Find funding source                                  6/30/08      Complete
and
                                                     3.1.2 Hire a crime analyst    Crime Analyst hired by      100%                         D                    Meet with Margaret Brindzak to discuss               12/31/07     Complete
responsiveness
[5,6,7]
                                                     and integrate physically into 1/14/08                                                  E                    recruiting venues and test options. Establish
                                                     R&D                                                                                    N                    timeline for recruiting, testing and interviewing
                                                                                                                                            T
                                                                                                                                                                 Request copy of County Class Spec from HR            12/31/07     Complete
                                                                                                                                            I
                                                                                                                                            A                    Establish functional job description and             9/30/07      Complete
                                                                                                                                            L                    responsibilities
                                                                                                                                            l                    Determine physical location                                       Complete
                                                                                                                                                                 Develop interview questions and panel                12/31/07     Complete
                                                                                                                                            I                    members
                        3.2 Develop new recruiting   3.2.1 Research and identify   Identify recruiting          50%                         N                    Contact 4 agencies with Recruiting Officers.         12/31/07     Complete
                        program maximizing the       appropriate recruiting        sources by 12/30/07                                      F                    Coordinate with HR online web recruitment,
                        effective use of             websites, venues and                                                                                        and TMCC, rural community colleges,
                        technology, venues and       information for recruiting
                                                                                                                                            O                    WorkReno.com and job connect.
                        websites.                    purposes.                                                                              R
                                                                                                                                                                 Contact Transition Officers (4): Army, Navy,         12/31/07     Complete
                                                                                                                                            M                    Marines & Air Force. Coordinate with HR on
                                                                                                                                            A                    Dept of Defense - America of Job Bank
                                                                                                                                            T
                                                                                                                                            I
                                                                                                                                                                 Coordinate quarterly "career in law                  3/31/08      Haven't started.
                                                                                                                                            O                    enforcement" orientation program. Provide
                                                                                                                                            N                    jail tours, demo of PAT, academy orientation,
                                                                                                                                                                 special assignment/program review.

                                                     3.2.2 Develop recruiting      Develop recruiting tools     75%                                              Receipt of literature folder, Deputy pamphlet.       9/30/07      Complete
                                                     tools including agency        by 3/30/08
                                                     brochure, handouts and                                                                                      Develop venue backdrop/purchase and                  12/31/07     Purchase order
                                                     venue backdrop                                                                                              requisition                                                       has been
                                                                                                                                                                                                                                   submitted.
                                                                                                                                                                                                                    Action Plan
                                                        Divn Supporting Goals                                  1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                          Performance Measure                                                                                                             Target
                                                            FY 2007/2008                                        FY07/08    FY07/08    Req ($)   FY     Priority                    Action Plans                                      Current Status
    Priorities              (3 to 5- year Goal)                                              Target                                                                                                                 Completion
                                                            (1-year Goal)                                      % Comp      % Comp         08/09
                                                                                                                                                                                                                       Date
3. Improve              3.1 Integrate Research       3.1.1 Research and identify
                                                     3.2.3 Established rapport       Identify appropriate
                                                                                     Establish resources        100%
                                                                                                                 50%                                              Meet and/or correspond with UNR & TMCC           Fall and Spring 1 professor
operational             and Development              software program
                                                     with educational institutions   software by 3/30/08
                                                                                     with educational                                                             Professors and rural colleges requesting           semesters response. UNR
effectiveness and       concepts, methods and        for career in law               institutions by 3/30/08                                                      class time for presentation for law                             Mr. Manny Barth
efficiency              tools into the management    enforcement.                                                                                                 enforcement careers.
regarding               structure of the Sheriff's                                                                                                                                                                   12/31/07     Debi D. is going to
customer service,       Office
                                                                                                                                                                                                                                  contact Mr. Barth
fiscal responsibility
                                                                                                                                                                                                                                  about linking UNR
and professional
standards effecting                                                                                                                                                                                                               CRJ dept. with
agency readiness                                                                                                                                                  Develop link for UNR students (CRJ website)                     W.C.S.O
and                                                  3.2.4 Meet with leaders in   Establish contact with       Deferred                                           Meet with Estella Lavario-Gutierrez re:                         Project on hold due
responsiveness                                       the Hispanic community and Hispanic community by                                                             training day                                                    to lack of funding.
[5,6,7]                                              explore effective recruiting 10/30/07
                                                     methods for this segment of
                                                     the community.
                        3.3 Develop and              3.3.1 Link ESD data base    Complete link by               100%                                              Access crystal reports -populated from the          3/31/08     Complete
                        Implement a long-term                                    3/30/08                                                                          Maximus database
                        equipment service plan.      3.3.2 Improve the inventory On-going audits for             25%                                              Replacement cycles and rotation audits,             3/31/08     In process
                                                     program for the fleet       replacement/ rotation                                                            departmental accountability
                                                                                 cycles
                        3.4 Develop a                3.4.1 Revise and update the CET program revised             75%                                              Increase efficiency on yearly CET through          12/31/07     In process
                        professional training        Continuing Education        by 11/15/07                                                                      Use of Force Simulator, smoke tower training
                        program                      Training Program                                                                                             and misc. training i.e. (Soc Srvc and TMWA)

                                                                                     Agency in compliance                                                         Determine status of required training for each      3/1/08
                                                                                     with NAC (POST)                                                              commissioned staff member
                                                                                     training requirements                                                        Schedule commissioned staff members for             7/1/08
                                                                                     by 12/1/08                                                                   required training as indicated by the report

                                                                                                                                                                  Document training and transmit certificate of
                                                                                                                                                                  training to POST
                                                     3.4.2 Encourage continuous      See action plans            50%                                              Increase Train the Trainers in WD / CPR             9/30/07     CPR complete;
                                                     learning and continue to        Track the number of                                                                                                                          WD is targeted for
                                                     development highly qualified    attendees. Track the                                                                                                                         completion 1/08
                                                     employees                       number of problem          100%                                              Develop topics and curriculum for the               9/30/07     Complete
                                                                                     timecards on Payroll                                                         Beginner and intermediate ESS/Timecard
                                                                                     Monday                                                                       encoding and trouble shooting classes
                                                                                                                50%                                               Schedule and complete ESS/SAP training              6/30/08     1st training session
                                                                                                                                                                  classes by Division twice a year.                               completed for 1st
                                                                                                                                                                                                                                  half of year. 2nd
                                                                                                                                                                                                                                  training sesssion
                                                                                                                                                                                                                                  will be start in
                                                                                                                                                                                                                                  February 2008.

                                                     3.4.3 Obtain the most up-to- Equipment obtained by                                                           Submitted JAG grant to fund Simunitions             9/30/07
                                                     date and realistic police    3/30/08                                                                         June 2007
                                                     shooting scenario equipment                                                                                  Get BCC Approval of grant award                     6/30/08
                                                     (Simunitions)                                                                                                Encumberment of equipment                           6/30/08
                                                                                                                                                                                                             Action Plan
                                                        Divn Supporting Goals                               1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                         Performance Measure                                                                                                       Target
                                                            FY 2007/2008                                     FY07/08    FY07/08    Req ($)   FY     Priority                   Action Plans                                   Current Status
    Priorities              (3 to 5- year Goal)                                             Target                                                                                                           Completion
                                                            (1-year Goal)                                   % Comp      % Comp         08/09
                                                                                                                                                                                                                Date
3. Improve              3.1 Integrate Research       3.1.1 Research and identify
                                                     3.4.4 Develop combined         Identify appropriate
                                                                                    Combined training        100%
                                                                                                              25%                                              Develop standardized protocols for crime       12/31/07     Held table-top
operational             and Development              softwarewith the new Medical
                                                     training program               software complete and
                                                                                    program by 3/30/08                                                         scenes, autopsies, evidence storage , cross                 exercise
effectiveness and       concepts, methods and        Examiner's Office              tested by 6/2008                                                           contamination elimination and mass disaster
efficiency              tools into the management                                                                                                              preparedness.
regarding               structure of the Sheriff's                                                                                                             Conduct mass disaster exercise                 6/30/08
customer service,       Office
                                                                                                                                                                                                                           Complete
fiscal responsibility
and professional
standards effecting
agency readiness
and
responsiveness
[5,6,7]
                                                                                                                                                                                                                       Action Plan
                                                         Divn Supporting Goals                                   1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                            Performance Measure                                                                                                              Target
                                                             FY 2007/2008                                         FY07/08    FY07/08    Req ($)   FY     Priority                     Action Plans                                      Current Status
    Priorities              (3 to 5- year Goal)                                                Target                                                                                                                  Completion
                                                             (1-year Goal)                                       % Comp      % Comp         08/09
                                                                                                                                                                                                                          Date
3. Improve              3.1 Integrate Research
                        3.5 Assess all operational    3.1.1 Research and identify
                                                      3.5.1 Create a                   Identify appropriate
                                                                                       Communication link         100%
                                                                                                                   5%                                               Coordinate with P.O.S.T. IT department and           6/30/08     In process
operational             and Development
                        functions for opportunities   software program between
                                                      communication link               software byby 6/1/08
                                                                                       completed 3/30/08                                                            Technology Services
effectiveness and       concepts, methods and
                        to increase efficiency and    Skills Manager and NV                                                                                         Establish a needs assessment task force              3/31/08
efficiency              improve the management
                        tools intocustomer service    POST
regarding               structure of the Sheriff's    3.5.2 Centralize the Civil       Civil added to Courts      100%                                              Determine feasibility of centralizing the Civil      3/31/08
customer service,       Office
                                                                                                                                                                                                                                     Complete
                                                      Section                          Master Plan.                                                                 Section in a downtown Courts building
fiscal responsibility
and professional                                                                                                                                                    Prepare workload statistical report: all             9/30/07
standards effecting                                                                                                                                                                                                                  Complete
                                                                                                                                                                    services provided 1999 to present
agency readiness
                                                                                                                                                                    Attend meetings re: the Courts Master Plan &         3/31/08     On-going
and
                                                                                                                                                                    participate in the space utilization study
responsiveness
[5,6,7]
                                                      3.5.3 Update CivilServe          Software upgrade due       100%                                              Determine desired enhancements                       9/30/07     Complete
                                                      software                         from vendor 2nd or 3rd                                                       Notify vendor of enhancements desired.              12/31/07     Deferred.
                                                                                       quarter.                                                                     Determine software modules not purchased
                                                                                                                                                                    in original procurement and determine if they
                                                                                                                                                                    provide desired enhancements.

                                                                                                                                                                    Identify desired enhancements not included in        2/8/07      Deferred.
                                                                                                                                                                    next release of upgrades or through purchase
                                                                                                                                                                    of additional modules
                                                      3.5.4 Regionalize the Sex        Sex Offender                25%        5%                                    Meet w RPD/SPD                                       9/30/07     Complete
                                                      Offender Notification Unit for   Notification Unit                                                            Identify/Budget                                     12/31/07     PENDING
                                                      compliance with Adam             regionalized by
                                                                                                                                                                    Implement process                                    6/30/08
                                                      Walsh Law                        7/1/2008

                                                      3.5.5 Research feasibility of    Case form interactive      100%                                              Research Case Form                                   9/30/07     Complete
                                                      putting the permit process       since 06/26/07. All                                                          Develop Case Form                                    9/30/07
                                                      on-line                          applicable permit forms
                                                                                                                                                                                                                                     Complete
                                                                                                                                                                    Review Permit sites                                 12/31/07     Complete
                                                                                       on site for user to
                                                                                       download. Dropping                                                           Forms Interactive                                   12/31/07     Dropped
                                                      3.5.6 Streamline the             Streamline actions by       10%                                              Review process steps, reports generated &           12/31/07     In progress
                                                      backgrounds investigation        12/10/07. Procedures                                                         forms
                                                      process                          manual completed by                                                          Create procedures manual                          Draft 12/15/07 In progress
                                                                                       3/15/08                                                                                                                        Final 3/15/08
                                                      3.5.7 Implement an agency-       Deferred to FY 08/09      Deferred                                           Deferred to FY 08/09                                Deferred     Deferred
                                                      wide Quarter Master
                                                      program
                                                      3.5.8 Develop a Computer         Computer Forensic           10%                                              Train 1 additional person in computer               12/31/07     In progress
                                                      Forensic Section in the          Section design                                                               forensics
                                                      Laboratory                       completed by 6/2008                                                          Continued training in advance computer               6/30/08     In progress
                                                                                                                                                                    forensics
                                                                                                                                                                    Develop protocols for compliance with               12/31/07     In progress
                                                                                                                                                                    accreditation standards
                                                                                                                                                                    Coordinate with No. NV Taskforce for high           Ongoing      In progress
                                                                                                                                                                    technology crimes
                                                                                                                                                                                                               Action Plan
                                                      Divn Supporting Goals                                 1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                       Performance Measure                                                                                                           Target
                                                          FY 2007/2008                                       FY07/08    FY07/08    Req ($)   FY     Priority                    Action Plans                                    Current Status
    Priorities              (3 to 5- year Goal)                                           Target                                                                                                               Completion
                                                          (1-year Goal)                                     % Comp      % Comp         08/09
                                                                                                                                                                                                                  Date
3. Improve              3.1 Integrate Research     3.1.1 Research and identify
                                                   3.5.9 Repair the HVAC          Identify appropriate by
                                                                                  Repairs completed          100%
                                                                                                              95%                                              Consult with installing vendor for review of     9/30/07      Complete
operational             and Development            software program
                                                   system in the Lab              software by 3/30/08
                                                                                  11/2007                                                                      system operation
effectiveness and       concepts, methods and                                                                                                                  Develop plan to fix system to eliminate          12/31/07     Complete
efficiency              tools into the management                                                                                                              patches, venting by-pass and exhaust
regarding               structure of the Sheriff's                                                                                                             problems
customer service,       Office                                                                                                                                 Identify funding Sources                         12/31/07
fiscal responsibility
                                                                                                                                                                                                                             Complete
                                                                                                                                                               Develop MOU with Metro to handle                 3/31/08      NA
and professional
                                                                                                                                                               emergency work.
standards effecting
agency readiness                                                                                                                                               Complete installation                             1/15/08     In progress
and                                                3.5.10 Obtain grant funding    New technology in           25%      Deferred                                Identify grant or funding resources              12/31/07     Deferred
responsiveness                                     for technological              place by 12/31/07
[5,6,7]                                            improvement in Crime                                                                                        Select Vendor                                    11/30/07     Deferred
                                                   Scene Investigation
                                                   3.5.11 Obtain rolling          Shelving installed by       25%        75%                                   Identify grant or funding resources              12/15/07     Complete
                                                   shelving system for evidence   12/31/07
                                                                                                                                                               Get competititve bids                                         In progress
                                                                                                                                                               Purchase shelving system                         2/28/08      In progress

                                                                                                                                                               Install system                                   5/31/07      Pending receipt
                                                   3.5.12 Request                 Complete                    0%         25%                                   Write justification, PDQ and Essential Job        1/1/08      In progress
                                                   reclassification of 2          reclassification                                                             Functions
                                                   Evidence Clerks to Forensic    documentation by                                                             Submit request and justification with budget      1/1/08      In progress
                                                   Tech                           1/2008                                                                       package
                                                   3.5.13 Employ OPI software Have electronic                 5%                                               Determine appropriate software                   6/30/08      In progress
                                                   to improve efficiency of OPI reports in place by                                                            Identify funding Sources                                      In progress
                                                   reports                      10/1/09                                                                        Train command staff on the report software.                   Not started

                                                   3.5.14 Respond to customer Develop a process               0%                                               Update the General Order                         6/30/08      Not started
                                                   complaints in a uniform and and procedure to
                                                   timely manner               handle customer
                                                                                  complaints by
                                                                                  10/1/09
                                                   3.5.15 Move OPI to an off-     Move by 8/1/08              1%                                               Discuss concept and reasoning with               10/1/07      Complete
                                                   site location                                                                                               Command Staff. If they concur, proceed
                                                                                                                                                               other steps. If they do not concur, consider
                                                                                                                                                               other options.
                                                                                                                                                               Evaluate positive and negative impacts to the    12/1/07      Not started
                                                                                                                                                               Agency
                                                                                                                                                               Coordinate with Facilities Management on         12/1/07      Not started
                                                                                                                                                               ascertain office space options and costs

                                                                                                                                                               Develop report and present to Command            12/15/07     Not started
                                                                                                                                                               Staff
                                                                                                                                                               Based on decision from Command Staff,             1/1/08      Not started
                                                                                                                                                               submit above base budget request FY 08/09
                                                                                                                                                                                                                   Action Plan
                                                        Divn Supporting Goals                                  1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                          Performance Measure                                                                                                            Target
                                                            FY 2007/2008                                        FY07/08    FY07/08    Req ($)   FY     Priority                    Action Plans                                   Current Status
    Priorities              (3 to 5- year Goal)                                              Target                                                                                                                Completion
                                                            (1-year Goal)                                      % Comp      % Comp         08/09
                                                                                                                                                                                                                      Date
3. Improve              3.1 Integrate Research       3.1.1 Research and identify
                                                     3.5. 16. Increase staffing in   Identify appropriate of
                                                                                     Conduct assessment         100%                                              Determine number of cases and/or                  12/31/2007
operational             and Development              software programreduce the
                                                     the Crime Lab to                software by 3/30/08
                                                                                     cases, submissions,                                                          submissions by evidence categories (i.e.
effectiveness and       concepts, methods and        backlog of cases and            backlogs and                                                                 latent prints, DNA, Toxicology, etc.) received
efficiency              tools into the management    submissions awaiting            processing time.                                                             and processed on an annual basis.
regarding               structure of the Sheriff's   investigations                  Complete assessment
customer service,       Office                                                       by 12/31/07.                                                                 Determine backlog of cases and/or                 12/31/2007
fiscal responsibility                                                                                                                                             submissions waiting to be processed and the
and professional                                                                                                                                                  age of backlog.
standards effecting                                                                                                                                               Determine staffing required to reduce backlog     12/31/2007
agency readiness                                                                                                                                                  over 90 days by 50%, 75% or 100%
and
responsiveness
                                                                                                                                                                  Submit findings of assessment and                   1/15/2008
[5,6,7]
                                                                                                                                                                  justification for above base budget FY 08/09
                                                                                                                                                                                                               Action Plan
                                                         Divn Supporting Goals                             1ST QTR    2ND QTR    Strategy Budget
   SO Strategic              Long-Term Goals                                         Performance Measure                                                                                                         Target
                                                             FY 2007/2008                                   FY07/08    FY07/08    Req ($)   FY     Priority                    Action Plans                                     Current Status
    Priorities              (3 to 5- year Goal)                                             Target                                                                                                             Completion
                                                             (1-year Goal)                                 % Comp      % Comp         08/09
                                                                                                                                                                                                                  Date
3. Improve              3.1 Integrate Research
                        3.6 Obtain ISO/ASCLD          3.1.1 Research and identify
                                                      3.6.1Assess staffing          Identify appropriate
                                                                                    Complete assessment     100%
                                                                                                             0%         50%                                   Determine additional staffing required as          9/30/07     In progress
operational             and Development
                        International Accreditation   software program
                                                      requirements to meet          software by 3/30/08
                                                                                    by 12/2007                                                                indicated by the assessment
effectiveness and       concepts, methods and
                        for the Laboratory            accreditation requirements                                                                              Write justification, PDQ and Essential Job         9/30/07     In progress
efficiency              tools into the management                                                                                                             Functions for requested positions
regarding               structure of the Sheriff's                                                                                                            Submit justification with above base budget        1/1/08      In progress
customer service,       Office                                                                                                                                FY 08/09 funding
fiscal responsibility
                                                      3.6.2 Develop additional     Complete by 4/2008        0%        100%                                   Review all protocols and determine where           11/1/07     Complete
and professional
                                                      protocols and revise current                                                                            revision is required
standards effecting
                                                      protocols                                                                                               Revise protocols as applicable                     3/31/08     Complete
agency readiness
and                                                                                                                                                           Advise all users of changes to protocols          12/10/07     Complete
responsiveness          3.7 . Provide superior        3.7.1 Increase staff to be    Complete needs          25%         5%                                    Stream Line IRB                                   12/31/07     Pending
[5,6,7]                 customer service by           able to increase the office   assessment of                                                             DA Opinion                                        12/31/07     Complete
                        increasing accessibility      hours to early mornings,      staffing by 12/31/07                                                      Contact BCC                                       12/31/07     Pending
                        and assistance to             nights, and possibly                                                                                    Comply w/method                                    3/31/08
                        customers, internal and       weekends
                                                                                                           Deferred                                           Justify additional Payroll/Personnel position      3/31/08     Deferred pending
                        external.
                                                                                                                                                              (s) and submit in the budget FY 08/09                          budget

                                                                                                            100%                                              Justify at least 1 computer work station for       3/31/08     Complete
                                                                                                                                                              employees to use for help with their timecards
                                                                                                                                                              and other payroll actions.
                                                      3.7.2 Increase staffing in    Complete needs           5%                                               Conduct needs assessment to determine              12/1/07     In progress
                                                      OPI in order to handle        assessment of                                                             staffing based on caseload including OPI
                                                      cases and investigations      staffing by 12/31/07                                                      cases and Risk Management cases.
                                                      in a timely manner
                                                                                                                                                              Based on outcome of assessment submit              1/31/08     Not started
                                                                                                                                                              request for above base budget FY 08/09

                        3.8 Lease equipment       3.8.1 Replace current             Assessment              50%         50%                                   Conduct an assessment including cost                NA         Complete
                        allowing the Agency to    equipment with leased             completed by                                                              benefit, industry trends and market
                        stay current with changes equipment.                        12/31/07                                                                  availability.
                        in technology and                                                                                                                     Complete inventory of all equipment                 NA
                        scientific applications.
                                                                                                                                                                                                                             Complete
                                                                                                                                                              used by the Lab, current status of each
                                                                                                                                                              piece, ability to upgrade technology and
                                                                                                                                                              life expectency.
                                                                                                                                                              Meet with Comptroller and Purchasing to          12/31/2007 In progress
                                                                                                                                                              discuss concept and findings.
                                                                                                                                                              Draft proposal for BCC                           12/31/2007 In progress
                        3.9 Create a secondary 3.9.1 Create an Assistant            Positions approved      75%                                               Conduct staffing analysis                            NA     Complete
                        level of management in Lab Director position and            by 7/1/08                                                                 Prepare justification and submit in the FY           NA     Complete
                        the Crime Lab.             a Lieutenant's position in                                                                                 08/09 budget.
                                                   the Crime Lab
                        3.10 Achieve pay parity 3.10.1 Increase the pay             Request for re-         25%                                               Conduct market study to determine                   NA         Complete
                        for Certified Latent Print for Certified Latent Print       evaluation of pay by                                                      comparable pay scale.
                        Examiner with industry. Examiner in order to                12/31/07                                                                  Review job spec and determine if                 11/30/2007 In progress
                                                   recruit qualified                                                                                          revision required.
                                                   candidates                                                                                                 Submit position description questionnaire        12/31/2007 In progress
                                                                                                                                                              and justification to HR
AND WHO)


        Division Lead
        Responsibility


     Sgt Pam Keller

     Sgt Pam Keller


     Sgt Pam Keller

     Sgt Pam Keller

     Sgt Pam Keller
     Sgt Pam Keller




     Sgt Pam Keller

     Sgt Pam Keller

     Sgt Pam Keller
     Sgt Pam Keller

     Deputy Shigeta
     Deputy Webb



     Deputy Shigeta
     Deputy Webb



     Deputy Shigeta
     Deputy Webb




     Deputy Shigeta
     Deputy Webb
     Deputy Shigeta
     Deputy Webb
   Division Lead
   Responsibility


Deputy Shigeta
Deputy Webb


Deputy Shigeta
Deputy Webb




Valerie Moser
Mercy Bustos




Sgt Pam Keller

Capt Bennett


Sgt Beltron




Sgt Beltron



Adele Lea



Adele Lea




Valerie Moser
Lt. Brown
Lt Brown
Lt Brown
   Division Lead
   Responsibility


Capt Means




Capt Means
    Division Lead
    Responsibility



Loren Chantler
Sgt Beltron
Sgt Keller
Debi Campbell


Debi Campbell
Shirley Cosmos
Debi Campbell



Debi Campbell
Debi Campbell




Debi Campbell


D.Campbell P Kelly
D Campbell P Kelly
D Campbell P Kelly


P Kelly / M Callis
P Kelly / M Callis
P Kelly / C Palian
P Kelly / C Palian
Backgrounds staff

Backgrounds staff

Mike Cavalli


Capt Means

Capt Means

Capt Means

Capt Means
   Division Lead
   Responsibility


Capt Means

Capt Means


Capt Means
Capt Means

Capt Means
Valerie Moser
Capt Means
Capt Means
Valerie Moser
Capt Means

Capt Means

Vendor
Capt Means

Capt Means

Lt Nikoley
Lt Nikoley
Lt Nikoley

Lt Nikoley




Lt Nikoley
   Division Lead
   Responsibility


Capt Means




Capt Means


Capt Means


Capt Means
   Division Lead
   Responsibility


Capt Means

Capt Means

Capt Means

Capt Means

Capt Means


P Kelly / C Palian
P Kelly / C Palian
P Kelly / C Palian
P Kelly / C Palian
Adele Lea


Adele Lea


Lt Nikoley




Lt Nikoley


Capt Means


Capt Means



Capt Means

Capt Means
Capt Means
Capt Means


Capt Means

Capt Means

Capt Means
                                                                   WASHOE COUNTY SHERIFF’S OFFICE STRATEGIC PLAN and BUDGET FY 2007/2008

                                         STRATEGIC PORTION (WHY, WHAT AND OUTCOME)                                                                                                           TACTICAL PORTION (HOW, WHEN AND WHO)

  SO Strategic             Long-Term Goals                     Divn Supporting Goals                Performance Measure        1ST QTR     2ND QTR FY Strategy Budget   Priority              Action Plans                Action Plan    Current Status
   Priorities              (3 to 5-year Goal)          FY 2007/2008                          (1-           Target              FY 07/08      07/08 %   Req ($) FY                                                           Target
                                                                     year Goal)                                                % Comp         Comp         08/09                                                          Completion
                                                                                                                                                                                                                             Date
4. Plan for future 4.1 Find space and funding for the 4.1.1 Find space and funding for the         This goal was cancelled     Cancelled                     NA           NA       Meet w SPD/ RPD & etc                   9/30/07      Complete
growth [1, 4, 6, 7] development of a regional criminal development of a regional criminal          9/18/07; neither RPD or                                                         Identify budget                         12/31/07
                    justice computer training lab.     justice computer training lab.              SPD interested in a
                                                                                                                                                                                                                                        Cancelled
                                                                                                                                                                                   Process prepare implement                            Cancelled
                                                                                                   regional criminal justice
                                                                                                   training lab.

                                                                                                                                                              C
                  4.2 Cooperate in the design and      4.2.1 To provide the most realistic law Deferred until FY 08/09         Deferred                       O                    Attend master plan subcommittee         FY 08/09     Deferred
                  funding of the "Mock City", also     enforcement training possible, and do                                                                  N                    meetings as scheduled
                  known as a "City Grid" and a 1/4     so in an area or structures that are not                                                               F
                  mile athletic track.                 dependent on the availability of
                                                       donations.
                                                                                                                                                              I
                  4.3 Explore regionalizing in-service 4.3.1 Gauge current comprehensive        Deferred until FY 08/09        Deferred
                                                                                                                                                              D                    Calculate actual monetary cost of       FY 08/09     Deferred
                  training to include RPD, SPD and cost of in-service training, including the                                                                 E                    in-service training
                  WCSO                                 cost to backfill positions. Compare the                                                                N
                                                       cost to projected shared costs                                                                         T
                  4.4 Develop a new combined           associated a combined Medical
                                                       4.4.1 Build with regional training.      Identify adequate facility       30%                          I                    Conduct needs assessment                12/31/07     Complete
                  Crime Lab/Evidence                   Examiner and Crime Office/Evidence by 6/2008                                                           A                    Develop overall plan defining           6/30/09      In Progress
                  Building/Coroner's Office            storage facility                                                                                                            design, operation, equipment,
                                                                                                                                                              L
                                                                                                                                                                                   parameters, economy of shared
                                                                                                                                                              l
                                                                                                                                                                                   facilities
                                                                                                                                                                                   Submit project to Public Works and
                                                                                                                                                              I                    Assistant County Manager
                                                                                                                                                              N                    Submit CIP Request                      6/30/09      Not Started
                  4.5 Replace equipment in             4.5.1 Install new equipment.                Equipment operational         75%                          F                    Upgrade software for current            12/31/07     Pending funding
                  Toxicology                                                                       by 6/2008                                                  O                    equipment to provide service until
                                                                                                                                                              R                    new equipment in place
                  4.6 Have sufficient personnel and 4.6.1 Increase staffing in DNA section Complete assessment                  100%                                               Conduct anslysis of existing &          12/31/07     Complete
                                                                                                                                                              M
                  supplies in the DNA section to    as determined by needs assessment      by 12/2007                                                                              projected caseload, waiting time for
                  meet the changes in law and                                                                                                                 A                    processing, requests turned down,
                  criminal activity.                                                                                                                          T                    etc.
                                                                                                                                                              I                    Determine additional staffing and       3/30/08      Pending funding
                                                                                                                                                              O                    submit with justification for FY
                                                                                                                                                              N                    08/09 above base funding.
                                                       4.6.2 Increase supplies budget to           Complete assessment           50%                                               Analyze existing supplies budget        12/31/07     Complete
                                                       support current case load.                  of required supplies by                                                         versus case load requirements.
                                                                                                   12/2007
4.6.2 Increase supplies budget to   Complete assessment       50%
support current case load.          of required supplies by
                                    12/2007
                                                                    Determine additional supplies cost     3/30/08   In Progress
                                                                    and submit with justification for FY
                                                                    08/09 above base funding
4.7 Have sufficient funding and   4.7.1 Increase staffing in CODIS as   Complete assessment   100%         Conduct anslysis of CODIS              12/31/07   Complete
personnel in Codis program        determined by program needs           by12/2007                          program to include existing and
                                  assessment                                                               projected caseload, waiting time for
                                                                                                           processing, requests turned down,
                                                                                                           etc.
                                                                                                           Determine additional staffing and      3/30/08    Pending funding
                                                                                                           submit with justification for FY
                                                                                                           08/09 above base funding
                                  4.7.2 Assess supplies budget to       Complete assessment   50%    50%   Identify impact of NRS changes to      12/31/07   In Progress
                                  ensure compliance with new Nevada     by 12/01/2008                      existing supplies budget
                                  Revised Statute                                                          Determine additional supplies cost     3/30/08    In Progress
                                                                                                           and submit with justification for FY
                                                                                                           08/09 above base funding
ND WHO)

    Division Lead
    Responsibility


D Campbell / P Kelly
D Campbell / P Kelly
D Campbell / P Kelly




Lt Brown




Lt Brown




Capt Means
Capt Means




Capt Means
Capt Means


Capt Means




Capt Means



Capt Means
Capt Means
Capt Means




Capt Means


Capt Means

Capt Means

						
Related docs