							State                               Madhya Pradesh


Name of Utility                     MPPKVVCL, Jabalpur


Project Area Name/Town Name         Katni Town




                  Detail Project Report - Part B



Submitted to


    POWER FINANCE CORPORATION LTD.



DPR No./Version

    Part-B 20933018/MPPKVVCL/v1


Date of Submission

               May 25, 2010
                        INPUT DATA FOR DETAILED PROJECT REPORT (DPR)

UTILITY DETAILS
Name of State                                                               Madhya Pradesh

                                                                 Madhya Pradesh Poorva Kshetra Vidyut
Name of Utility (Expanded Name)
                                                                     Vitaran Co. Limited, Jabalpur.

Name of Utility (Short Name)                                                      MPPKVVCL, Jabalpur
Date of Incorporation                                                                       31-May-02
Total Number of Utility Consumers                                                          2,942,914
Contact Details (Utility Nodal Officer)                                      A.K.Agarwal
Designation                                                      Addl. Chief Engineer (R-APDRP)
Address                                                          Block-7, 3rd Floor, Shakti bhawan
Phone Office 1                                                       0761-2702478, 2666399
Mobile No.                                                                  9425805903
Fax                                                                        0761-2660128
E-mail                                                              mpez.apdrp@gmail.com
TOWN DETAILS
Name of Project Area/Town                                                    Katni Town
District                                                                       Katni
Total Number of Consumers                                       No.                                  40053
Total Population (as per 2001 census)                           No.                                 187029
Total Area of Coverage                                          Sq Km                                   65
Point of Contact (Town Incharge)                                           A.K. Kulshrestha
Designation                                                                 SE ( O & M )
Address                                                                    Shanti nagar , katni

Phone Office 1
Mobile No.                                                                   9425805950
E-mail                                                          seoandmkatni_2007@yahoo.co.in

Likely Date for Establishment of Baseline Data                                             Established &
(Clause 17 of Guideline Part-B)                                                            to be verified


Reference for Part A
Loan No. for IT Project under Part-A                                                              20933009
Date of Sanction of IT Project under Part-A                                                       27-Feb-09

                                                                                              Data for
Data for AT&C Losses Computation for Project Area
                                                                          Unit              Previous FY
(Available data for Previous FY Before Project Sanction)
                                                                                            2008 - 2009
                                                                FY                           2008 - 2009
Energy Input                                                    M Units                           121.70
Energy Sales                                                    M Units                            70.08
Total Revenue Billed                                            Rs. Crs                            34.11
Total Revenue Collected (including arrears)                     Rs. Crs                            33.26
Arrears    {Actual or Total Revenue collected-Revenue billed}   Rs. Crs                                0
Billing Efficiency                                              %                                 57.6%
Collection Efficiency                                           %                                 97.5%
AT&C Losses        {Assessed for Base Year-0}                   %                                 43.8%

Loss Reduction Trajectory                                       Unit                         Projection
Year-1                                                          %                                  33.6%
Year-2                                                          %                                  19.4%
Year-3                                                          %                                  14.8%
Year-4                                                          %                                  14.8%
Year-5                                                          %                                  14.8%
Year-6                                                          %                                  14.8%
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Index



      Date of Submission of Proposal                    #Date                     May 25, 2010
      DPR No.                                           Code     Part-B 20933018/MPPKVVCL/v1
      Current Financial Year                            FY                            2009-10
      Proposed Project Start Date                       #Date                         8/1/2010
      Proposed Period of Completion                     Months                              18

      Table of Contents                                                Page Number
  I   Part I: Guidelines for Part-B                                                         1
 II   Part II
  1   Declaration                                                                           3
  2   Executive Summary                                                                     4
  3   Volume I: Introduction                                                                7
  4   Volume II: General Detail                                                             8
  5   Volume III: Project Area Details                                                     10
  6   Volume IV: SUMMARY Project Cost Estimate                                             14
  7   Volume V: Expected Project Benefit                                                   22
  8   Annexure A: Implementation Schedule                                                  24
  9   Annexure B: Asset Hirarchy                                                           25
10    Annexure C: Single Line Diagrams                                                     26
11    Annexure D: Quality Management System                                                27
12    Annexure E : Procurement Procedures/Guildelines                                      28
III   Annexure-F: Check List                                                               29
      Annexure-G: Pricing Information                                                      30
      Annexure-H: System Status                                                            44
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Part I: Guidelines for Part-B

    1 Part B of the R-APDRP covers system improvement works mentioned in the DPR Volume IV. This aims at achievement of AT&C
      losses to 15% in town areas. Any other work may be considered if utility justifies that the implementation of the same would lead to
      Loss Reduction in the project area.
    2 The utilities will be required to achieve target AT&C loss reduction at the entire utility level every year starting one year after the year
      in which first project of the Part-A is completed.
      Utilities having AT&C loss above 30%: Reduction by 3% per year
      Utilities having AT&C loss below 30%: Reduction by 1.5 % per year
    3 Utility shall submit detailed cost benefit analysis of the works planned to be implemented along with the DPR. It should include
      existing loss level, works proposed and loss level after implementation.
    4 The Part-B project shall be completed within three years from the date of its sanction.Fund to be released to the Part-B project shall
      be limited to first three years, from the date of its sanction.
    5 Utility has to appoint a Nodal Officer who shall be involved from concept to commissioning of the system and shall also be the
      contact point for Nodal Agency for any clarification, issue etc.
    6 The Utility will have to certify and sign the DPRs prepared by them stating that the DPR is in line with guidlines issued by Ministry
      of Power/ PFC for Part B, R-APDRP and is aligned completely with the Utility’s business processes before the same is forwarded to
      PFC.
    7 Utility should prepare a comprehensive plan for R-APDRP implementation. All the proposed towns under the scheme (both Part-A
      and Part-B) shall be clearly listed and DPR of each town shall be forwarded to PFC for consideration. Any standalone/ piecemeal
      scheme for any Project Area for subsequent integration is liable to be rejected.
    8 Utility has to ensure timely availability of any other infrastructure or facilities that are essential for implementation of Part-B works
      but are not in the scope of Contractor viz. land acqusition, pole location etc.
    9 Works in progress should not be included in the new schemes under R-APDRP.
   10 Utility shall provide detailed informantion regarding exisitng infrastrucuture, any bottleneck in implementation of the works and the
      works proposed in the project to the Contractor before award of contract.
   11 Utility shall sumbit separate DPR for each Project Area. For all practical purposes, boundaries of the Project Area shall be considered
      as defined in the Part-A of R-APDRP by the Utility.
   12 Utility shall submit DPRs of all Project Areas (Towns) preferably together to nodal agency (PFC) for approval of Steering
      Committee.
   13 DPR shall be annexed with digital single line diagrams (SLD)/Nodal drawings of existing and proposed distribution network of the
      Project Area. DPRs without the same would not be considered for sanction.
   14 The cost estimates should not include any departmental overhead expenses and cost of consultancy. All such expenditures should be
      borne by the utility.
   15 The Utility shall work out the AT&C loss of the project / town and facilitate with independent agency (to be appointed by MoP/
      Nodal Agency) for validation of the same including providing documents etc. The AT&C loss of the project area duly certified by
      TPIEA before start of Part-B works, will be treated at Base Line AT&C loss of the project area for all purposes.
16 Scope variation on account of increase of consumer base during the currency of contract or any other reason would be to Utility’s
    account.
17 For the project areas envisaged for implementation of SCADA, distribution system shall be made compatible so as to ensure interface
    with SCADA/DMS system. The cost of such enabling features shall be covered in present DPR.
18 Utility has to ensure Ring Fencing of the project area including establishing the Baseline AT&C losses before implementation of Part-
    B project.The following guidelines have to be adhered to while ring fencing is done for project area
 a) All input points shall be identified and metered with downloadable meters for energy inflow accounting in scheme area
b) All outgoing feeders are to be metered in sub-station with downloadable meters
 c) Scheme area should be ring fenced i.e export and import meters for energy accounting shall be ensured
d) Arrangement for measuring total energy flow in the rural load portion of project area by ringfencing if rural load feeder is not
    seggregated
19 Cost of consumer meters installed under R-APDRP should not be charged to consumer.
20 Distribution Transformers procured under R-APDRP scheme, shall have efficiency level equivalent / better than that of three star
    ratings of BEE, where ever BEE standard is applicable. For other DTs, where, BEE standard is not applicable, CEA guidelines
    shall be followed (available on CEA web site).
21 In case of new 11 KV feeders/sub-stations / DTs are installed at any point of time after sanction of Part-A, utility must make
    provision for installing AMR at appropriate points and ensure integration with IT system proposed/installed in Part-A
22 Return on investment for the project shall not be less than 10%.
23 Project shall be preferably executed on turnkey basis.
24 Planning for LT lines, DTs etc shall be done, considering load growth for three years and existing utilization of transformation
    capacity & lines.
25 Planning for 11 KV lines, Power Transformers and Primary S/S shall be done, considering load growth for five years.
26 For calculation of future Load, the growth may be on the basis of average of last five year load growth.
27 Total capacity of Distribution Transformers may be upto 200% of the Power Transformer capacity. .
28 Capacity enhancement of DTs shall not be done in isolation. Capacity enhancement of LT lines shall also be clubbed with capacity
    enhancement of DTs.
29 All categories of consumer meters can be proposed in Part-B of R-APDRP scheme for replacement from electromechanical to
    electronic meters. AMIs can be considered for deployment. The meters shall be tamper proof electronic meter, as per R-APDRP
    guidelines issued from time to time.
30 In case of any new asset created at any point of time after sanction of Part-A, utility must make provision for installing AMR at
    appropriate points and ensure integration with IT system proposed / installed in Part-A. Utility should also use GPS survey through
    GPS machine for new assets created during implementation of Part-B scheme and subsequent thereof.
31 The following items may be included by the utilities under PART B:
S. No.                                                                Nature of work                                                                      Evaluation method
      a) Replacement of existing HT & LTCT Electromechanical consumer meters with two way (AMR compatible, open protocol) tamper
                                                                                                                                                  The utility shall provide the number
         proof electronic meters. For replacement of whole current electromechanical consumer meters, the guidelines of CEA shall be
                                                                                                                                                  of such consumers.
         adopted.
      b) If existing service line is prone to tamper and pilferage the same shall be replaced with armored or XLPE cable for which minimum        The replacement of service cable for
         configuration should be :                                                                                                                maximum 25% consumers of the
         (i) Single Phase consumers: min. 4 sq.mm                                                                                                 town may be allowed. In exceptional
         (ii) Three Phase consumers: min. 6 sq.mm                                                                                                 case the quantity can be increased.
      c) Installation of new Distribution Transformers in following cases:
         (i) If the length of LT feeder is more than 300 mtr then new Distribution transformer may be proposed to improve HT: LT ratio.
         (ii) If existing peak load on DT is more than 70% of its rated capacity then new DT may be proposed.
         (iii) Even if the length of LT feeder is below 300 meter but the peak load on the feeder is more than 70% of rated thermal capacity of
         the conductor, new DT should be installed or conductor should be replaced by higher size.
     d)
         Provision of Isolator, HT fuse / horn gap & LA at each Distribution Transformer, if not provided earlier. Alternatively this isolator,
         HT fuse / horn gap fuse can be replaced with drop out fuse with On Load maintenance facility thereby reducing system interruptions.
     e) Provision of LT distribution box for control and protection of outgoing LT circuits.
      f) Each Distribution Transformer of 25 KVA & above shall be provided with minimum two LT feeders. In case of only one existing LT
         feeder, scheme for laying new LT circuit may be prepared.
     g) If the peak load on existing 11KV feeder is more than 75% of rated thermal capacity of the conductor, conductor with higher capacity      The load growth of next five years
         may be proposed or feeder bifurcation may be proposed.                                                                                   should be worked out for the purpose
     h) If peak load on existing 33/11KV S/S is more than 80% of its transformer capacity or the O/G 11KV Feeders have peak load more             of calculating the capacity. (Load
         than 75% of their thermal capacity , new 33/11KV S/S may be proposed.                                                                    growth shall be worked out on the
      i) 11 Kv feeder segregation may also be proposed for (i) reducing boundary metering points (ii) reduce complexities involved in             basis of last five year average load
         consumer indexing, GIS based asset mapping (iii) fixing greater accountability and responsibility                                        growth).
      j) Intelligent Ring main unit & sectionaliser may be proposed for such town which fulfill any of the following criterion :
         (i) Where SCADA is proposed.
         (ii) Population of Town is more than 1 lakh.
         (iii) Annual energy input is more than 100MU.
         (iv) Any other specific requirement.
     k) The Distribution Transformer may be provided with the capacitors of following ratings at LT side:                                         The Distribution Transformer may be
         (i) 100 KVA : 12 KVR                                                                                                                     provided with reactive compensation
         (ii) 63 KVA : 8 KVR                                                                                                                      controls along with appropriate
         (iii) 40 KVA : 6 KVR                                                                                                                     capacitor banks to reduce system
         (iv) 25 KVA : 4 KVR                                                                                                                      losses.
      l) Installation of ABC cables in dense, theft prone & congested areas. Both HT & LT ABC may be proposed. The capacity of ABC
         shall be 20% more than that of bare conductor, as thermal overloading capacity of ABC is less than Bare conductor.
     m) In theft prone area and to improve HT:LT ratio, HVDS may be proposed. Total capacity of HVDS shall be higher by 20% than
         conventional LT S/S.
     n) For the towns where SCADA has been proposed , the following electrical interfaces shall be included in PART B :
   (i) Battery Charger at each 33KV S/S if not available.
   (ii) Conversion of overhead 11 KV line with Underground 11 KV line with installation of Fault Passage Indicators.
   (iii) Motorized breaker for all incoming & outgoing feeders at 33 KV substations.
   (iv) Open protocol electronic relays
   (v) Ring Main Unit (SCADA Ready) / sectinaliser.
   (vi) Separate CTs for SCADA purpose may be considered.
o) 10% line length of 11 KV lines may be considered for auto re-closer (self healing) scheme.
32 Following documents shall be submitted for cost justification:
   (i) Utility shall provide approved schedule of rate of current financial year for proposed works against justification of cost.
                                                                        OR
   (ii) Utility shall provide approved stock issue rate of current financial year for justification of material cost.
33 Utility shall submit cost estimate of each and every proposed work as annexure. This will ensure the preliminary study and
   preparedness of the utility about the work. This will also help in appraising the proposed cost in DPR.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Declaration
This is to certify that:
          1 Proposed Project Area has already been covered under Part-A of the R-APDRP. The status of Part-A, R-APDRP for the
            Project Area is mentioned in the Volume III of the DPR.
          2 The X plan project in the concern project area has been completed/ short closed.
          3 The proposed DPR includes only new works and excludes other works under implementation.
          4 All works proposed in the DPR are as per DPR Formats issued by Nodal Agency. Any cost other than allowed by Nodal
            Agency in the DPR formats shall be born by the Utility.
          5 The cost estimates do not include any departmental overhead expenses.
          6 MPPKVVCL will henceforth, procure all meters as per guidelines/regulations issued by MoP/CEA (circular available on
            APDRP web portal).
          7
            MPPKVVCL shall provide basic infrastructure viz. required space, building, precision air-conditioning, fire fighting
            system, power supply etc. to the contractor/agency involve for erection of system proposed to be created under Part-B of
            R-APDRP Scheme at its own cost. It shall be ready for handing over to Contractor as per the requirement.
          8 DPR has been prepared in line with the guidelines of R-APDRP issued by Ministry of Power / PFC to strengthen the
            basic infrastructure in State owned distribution companies of the country and is aligned completely with the
            MPPKVVCL's business processes.
          9 Following items have been excluded from the scope of the DPR. MPPKVVCL shall arrange the same from their own
            resources -
            ·    Land/space in accordance with project requirements.
            ·    Fire fighting system
            ·    Any mobile equipment such as Crane, truck, Jeep, filter M/c, etc.
            ·    Any T&P, testing equipments. etc.
            ·    Communication equipments such as mobile phone, telephone etc
            ·    Manpower for managing and maintaining the network, substations, etc.
         10 The Ring Fencing of the project area has been completed and Part-A of the programme has been initiated vide Loan No
            20933009 sanctioned on date 27-02-2009 Further, baseline AT&C losses shall be established before start of work of
            Part-B for this project area.
         11 A Nodal Officer has been appointed by the MPPKVVCL, who shall be involved from concept to commissioning of the
            system and co-ordinate from the MPPKVVCL side for all issues related to implementation of the project. The detail of
            the authorised signatory & Nodal Officer are given below -
         12 On basis of model incentive scheme for MPPKVVCL staff as formulated by the MoP, incentive scheme shall be
            submitted for the approval of the Steering Committee in the MoP prior to seeking disbursements under Part-B

        13 Cost of consumer meters installed under R-APDRP will not be charged to consumer.
        14 With the implementation of works of Part-B, AT&C Loss shall be brought down to below 15% (supplemented by write-
           up in the DPR for the same).
        15 The Part-B project shall be completed within three years from the date of its sanction.


           Authorised Signatory:
           Signature:
           Name:       A.K. Kulshrestha                          Tel. No. / Mobile No. : 9425805950
           Designation:     SE                                    Email address : seo&mkatni_2007@yahoo.co.in


           Approved by:
           Signature:
           Name: A.K.Agarwal
           (MPPKVVCL Nodal Officer for Part-B)
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Executive Summary


    Project objective:-                              To bring down AT&C loss below 15%

    Quadripartite Agreement Date                                 30/Mar/09

    Brief Profile of State/Utility
    Name of State                                          Madhya Pradesh
    Name of Utility (Short Name)                         MPPKVVCL, Jabalpur
    Date of Incorporation                                    31-May-02
    Total Number of Utility Consumers                         2942914
    Previous Financial Year
    Billing Efficiency                                    %                   62.77%
    Collection Efficiency                                 %                   92.18%
    AT&C Losses                                           %                   42.14%

    Project Area Profile
    Name of Project Area/Town                                  Katni Town
    District                                                     Katni
    Total Area of Coverage                           Sq Km                         65
    Total Number of Consumers                        No.                        40053
    Total Population (as per 2001 census)            No.                       187029
    Loan No. for IT Project under Part-A                                    20933009
    Date of Sanction of IT Project under Part-A                             27-Feb-09
    Scheduled date of completion of Part-A Project                          26-Feb-12
    Location of Data Centre                                     Jabalpur
    Name of Part B Consultant (if any)                 M/s Trident Techlabs P. Ltd.
    Project Cost                                     Rs. Cr                    52.45
    Scheduled date of completion (Part-B Project)                         7/31/2012
    Energy Input                                     M Units                    121.7
    AT&C Losses        {Assessed for Base Year-0}    %                       43.85%
        Status of Pre-Conditions
        Approval of Distribution Reforms Committee                 Yes/No        No
        Constitution of SERC                                       Yes/No        Yes
        Completion/Short closure of X Plan                         Yes/No        Yes
        Schedule Date of completion of Ring Fencing                Date          Already Completed



        Project Funding

        Recommended Project Cost for Sanction                      Rs. Cr                         52.45


                               Cost Item                                               Total Cost         GoI (25%) PFC/ FIs    Utility

        Total Setup Cost                                           Rs.Cr                          52.45       13.11     39.33       0.00

                                                                                       Base Year-0         Year-1     Year-2    Year-3     Year-4    Year-5    Year-6
        Phasing of Capital Expenditure                             Rs.Cr                          7.87       18.36      26.22       -
        Civil works costs will be allowed on an extent as deemed fit by Nodal Agency. For example, work like renovation of sub-station
Note:
        building, installation of meters etc. will not funded under the programme.
        Release of funds will be restricted to 36 months from the date of sanction of project under Part-B


        Project Benefits
        Financial Benefits

                                                                                       Base Year-0         Year-1     Year-2    Year-3     Year-4    Year-5    Year-6
        AT&C Losses                                                     %               43.85%               33.60%    19.40%    14.80%     14.80%    14.80%    14.80%


        Internal Rate of Return (IRR)                                   %                13.1%

        Payaback Period                                                No.               Year-5
Note: The detailed working on cost benefit analysis is provided in Volume V.b




     Other Benefits
     Establishment of base-line data system under Part-A is an outcome in itself. Establishment of baseline data is expected to
     result the following:
     - Accurate & reliable energy accounts on sustainable basis.
     - Accurate segregation & identification of loss making pockets.
     - Better accountability at all level.- Prompt and effective solution to the consumers queries / grievances
     - Increase empowerment of consumers
     - Consumer satisfaction indices can be effectively tracked / monitored.
     - Improve the reliability and quality of the power supply.
     - Improvement in network planning based on load flow study.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume I: Introduction
1.1 Background
The Ministry of Power, Government of India initiated Power Sector reforms in the 1990s to invite private
investments for setting up additional generating capacity to bridge the wide gap between demand and supply.
Numerous investors, both Indian and foreign, came forward to set up new generating capacity but little progress
could be achieved due to serious inefficiencies and losses in the electricity distribution business in almost all
states of the country.

Government of India (GOI) initiated reforms in the distribution sector in 2000. Distribution sector provides the
last mile connectivity for power supply and deals with large number of consumers. As a part of distribution
reforms, GOI launched APDP (Accelerated Power Development Program) in 2001 which was later rechristened
as APDRP (Accelerated Power Development and Reforms Program) during the 10th Five Year Plan.

To continue the support to distribution reforms during the 11th Five Tear Plan, GOI has reintroduced R-APDRP
(Restructured APDRP) with revised terms and conditions. The R-APDRP primarily aims at reducing Aggregate
Technical and Commercial (AT&C) losses in urban areas. It is a necessary condition of the scheme that the
utilities would need to demonstrate performance improvement for availing financial benefits provided under the
scheme. This would require collection of accurate data and measurement of loss reduction performance. Data
integrity and performance measurement pose many challenges for the state power utilities. This problem can be
surmounted only by: (i) setting up reliable and “no manual touch” systems for data collection; and (ii) adoption of
Information Technology in the areas of energy accounting.

IT based systems and solutions that measure the loss levels reliably will be essential before regular distribution
strengthening projects are implemented under the next phase of R-APDRP. Once the benefits of the investments
can be measured, the investments would justify themselves.

Projects under the R-APDRP program shall be taken up in Two Parts. Part-A shall include the projects for
establishment of baseline data and IT applications for energy accounting/ auditing & IT based consumer service
centres. Part-B shall include regular distribution strengthening projects.

The R-APDRP program will cover urban areas – towns and cities with population of more than 30,000 (10,000
incase of special category states).
MOP, GOI has appointed Power Finance Corporation as the Nodal Agency for implementing this program.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume II: General Detail
45

2.1 General Utility Details
2.2.1 Basic Information
                          Particular                                    Details
      State                                                         Madhya Pradesh
                                                Madhya Pradesh Poorva Kshetra Vidyut Vitaran Co.
      Name of Utility (Expanded Name)
                                                Limited, Jabalpur.
      Name of Utility (Short Name)                                   MPPKVVCL, Jabalpur
      Date of Incorporation                                          31-May-02
      Contact Details (Utility Nodal Officer)                        A.K.Agarwal
      Designation                                                  Addl. Chief Engineer (R-APDRP)
      Address                                                    Block-7, 3rd Floor, Shakti bhawan
      Phone Office 1                                                       0761-2702478, 2666399
      Mobile No.                                                                  9,425,805,903.00
      Fax                                                                            0761-2660128
      E-mail                                                               mpez.apdrp@gmail.com
      Other Information
      Total Number of consumers                                                         2,942,914

2.2.4 Financial/ Commercial Information
                         Particulars                                       Previous FY-1             Previous FY-2   Previous FY-3
                                                                            FY2008_09                 FY2007_08       FY2006_07
      Peak Demand (Met)                         MW                              2250                     2212            1992
      Peak Demand (Unrestricted)                MW                              2550                     2451            2232
      Energy Input                              MU                            9603.73                   9816.86         9062.28
      Metered Energy Sales                      MU                            4908.28                    4614            4319
      Assessed Energy                           MU                            1119.80                    1500            1498
      Total Energy Billed                       MU                            6028.08                    6114            5817
      Revenue Billed                            Rs. Crores                     2679.2                   2540.17         2420.55
      Revenue collected                         Rs. Crores                    2469.81                   2362.99         2156.29
      Billing Efficiency                        %                             62.77%                    62.28%          64.19%
      Collection Efficiency                     %                             92.18%                    93.02%          89.08%
      AT&C Losses                               %                             42.14%                    42.06%          42.82%
2.2.7 List of the Towns in Distribution Utility
      Location of Data Center # Jabalpur
      List of the Towns selected by MPPKVVCL for implementation of Part A of R-APDRP is mentioned below
      List of all Project Areas (Towns) planned to be Population as per                               Status of Part-A, Location of Data     Status of Part-B, R-
                                                                            Status of APDRP X Plan
                  covered under R-APDRP                 2001 census                                  R-APDRP XI Plan       Center #            APDRP XI Plan


      Gadarwara                                            39194          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Balaghat                                            75,997          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Bina -Etawa                                         51,181          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Chhatarpur                                         1,09,078         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Chhindwara                                         1,53,552         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Damoh                                              1,27,967         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Dhanpuri                                            43,915          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Jabalpur                                           10,22,606        Not Covered in APDRP-I     ITIA Appointed    Jabalpur            Yet to Submit DPR
      Katni                                              1,87,029         Closed                     ITIA Appointed    Jabalpur            Covered under this DPR
      Khurai                                              41,511          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Maihar                                              34,342          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Malajkhand                                          26,296          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Mandla                                              53,894          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Narsingpur                                          56,203          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Pandhurna                                           40,931          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Panna                                               52,057          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Parasia                                             37,863          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Rewa                                               1,83,274         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Sagar                                              2,75,553         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Satna                                              2,29,307         Closed                     ITIA Appointed    Jabalpur            Yet to Submit DPR
      Seoni                                               89,801          Closed                     ITIA Appointed    Jabalpur            Yet to Submit DPR
      Shahdol                                             78,624          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Sidhi                                               45,700          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Sihora                                              37,870          Not Covered in APDRP-I     ITIA Appointed    Jabalpur            DPR Submitted
      Singrauli                                          1,85,190         Closed                     ITIA Appointed    Jabalpur            DPR Submitted
      Tikamgarh                                           68,426          Closed                     ITIA Appointed    Jabalpur            DPR Submitted
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume III: Project Area Details


3.1 Project Area
        MPPKVVCL has decided to include Katni town for funding under R-APDRP. The DPR has
        been prepared for loss reduction, enhancement of system reliability, increased quality of
        supply, improved customer satisfaction etc. along with common requirements and services
        for covering the entire APDRP Scheme coverage area i.e. Katni Town of Katni District . The
        details of the Project Area are placed below:



3.1.1     Basic Information
                             Particular                      Unit               Details
          Name of the Project Area                                      Katni Town
          District                                                        Katni
          Nearest Railway Station                                         Katni
          Nearest Functional Airport                                     Jabalpur
          Total Number of Consumers                        No.                              40053
          Total Population (as per 2001 census)            No.                             187029
          Total Area of Coverage                           Sq Km                               65
          Point of Contact (Town Incharge)                           A.K. Kulshrestha
          Designation                                                 SE ( O & M )
          Address                                                   Shanti nagar , katni
          Phone Office 1                                                  0
          Mobile No.                                                 9425805950
          E-mail                                            seoandmkatni_2007@yahoo.co.in
          Status of Part A, R-APDRP
          Loan No.                                                            20933009
          Date of Sanction of Part-A DPR                                      27-Feb-09
          Select option from drop down indicating status
                                                                       ITIA Appointed
          of the Part-A in Project Area
3.1.2   Asset Information

                                                                 Details submitted with
                           Assets**                                                       Current Position
                                                                    the Part A DPR
        Total Number of EHV Sub-stations feeding the   Numbers             2                     2

                                                       Numbers             4                     4
        Total Number of EHV Transformers
        Total Capacity of EHV Transformers             MVA                260                   260

        Total Number 33 kV Feeders                     Numbers             11                    11
        Total Length of 33 kV Feeders (Overhead)       kM                 135                   130
        Total Length of 33 kV Feeders (Under-ground)   kM                  0                     0


        Total Number of 33/11 kV Sub-stations feeding
                                                      Numbers              7                     6
        the Project Area
                                                       Numbers             11                    11
        Total Number of Power Transformers
        Total Capacity of Power Transformers           MVA                 70                    70

        Total Number 11 kV Feeders                     Numbers             21                   20
        Number of Metered 11 kV Feeders                Numbers             21                   20
        Total Length of 11 kV Feeders (Overhead)       kM                269.27                223.4
        Total Length of 11 kV Feeders (Under-ground)   kM                 0.4                   0.6

        Total Length of LT Lines (Overhead)            kM                558.8                  456
        Total Length of LT Lines (Under-ground)        kM                  0                     0
        Total Number of Distribution Transformers      Numbers            492                   522
        Total Capacity of Distribution Transformers    MVA               64.37                  74.6

        Total Number of Energy Import Points for the
                                                       Numbers            11                     0
        Project Area
        Total Number of Energy Export Points for the
                                                       Numbers            16                     8
        Project Area

        Total Annual (T-1) Energy Input                MUs               121.7                 121.7
        Peak Demand                                    MW                37.52                 37.52
        Average Demand                                 MW                31.14                 31.14

        Project area already has SCADA/DMS in place
        (Yes/No)
        **Detailed asset information is the part of
        Annexure B
3.1.3   Commercial Information

                        Particulars             Previous FY-1   Previous FY-2   Previous FY-3
                                                   2008-09         2007-08         2007-06
        Peak Demand (Met)             MW             37.52           35.62           33.84
        Peak Demand (Unrestricted)    MW             39.77            37.4           35.53
        Energy Input                  MU             121.7          125.91           119.6
        Metered Energy Sales          MU             64.21           60.35           57.33
        Assessed Energy               MU              5.87            8.08            7.67
        Total Energy Billed           MU             70.08           68.43             65
        Revenue Billed                Rs. Crs       34.117            31.3          29.735
        Revenue collected             Rs. Crs       33.261          30.356           28.52
        Billing Efficiency            %            57.58%          54.35%          54.35%
        Collection Efficiency         %            97.49%          96.98%          95.91%
        AT&C Losses                   %            43.86%          47.29%          47.87%
        DT Failure rate (Yearly)      %              10.00           11.00           11.00
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume III: Scope of Work


3.2 Scope of Work

          Twenty no of 11kV Feeders are feeding entire Katni Town and having considerable Technical Losses due to
          lengthy of HT, LT lines and its overloading because of undersized conductor .To limit the technical losses ,
          it is proposed to construct a 33/11kV New Substation having 5 MVA capacity,Biffurcation of 11kV Feeder
          and augumentation of existing conductor of 11 KV feeders by DOG CONDUCTOR , replacement of
          conductor of LT Line , relocation of distribution Transformer and augmentation of capacity of DTR .For
          reduction of commercial losses it is proposed to replace the defective meters ,replacement of worn and
          unarrmoured Service cables shifting of meters at call bell location and replacement of bare conductor of LT
          line by AB XLPE cable.

          Replacement of Distribution Boxes,cables , renual of earthing & LA is proposed to improve the DT health
          conditions and reliablity of the system.

          After examining the status of the network using the Distribution Network Anlaysis Software - CYMDIST
          proposals are made to bring the AT&C losses to 15%

3.2.1     Sub Transmission System Improvement Work
3.2.1.1   [Brief KV SS : New/Augumentation
          33/11works are of following nature:-
           The Writeup]
          At Present Supply arrangements of Katni City is being maintained by 6 Nos of 33/11kV Substation.and the
          capacity of power transformer is 70 MVA and the peak demand of RAPDRP town is 43 MVA (37.52 MW )
          whereas peak demand of Rural area feeded by above mentioned power transformers is 25 MVA and to
          eliminate over loading of existing substation and considering future load growth ,Proposal for a new
          substation having 8 MVA capacity along with Four 11 kV feeders is proposed .
          The works are of following nature:-
          - New 33/11kV power House Substation with 8 MVA
          - Capacity Augmentations of existing power transformers on 33 kV katya ghat 2 X 5 MVA to 5 + 8 MVA
           -Capacity Augmentations of existing power transformers on 33 kV Shanti nagar Substation 2 X 5 MVA to 2
          X 8 MVA
          - To maintain the N-1 redundancy on 33kV Network , new lines are proposed
          A) 33 kV paharua to 33 kV shanti nagar
          B) 33kV Silimabad to 33kV Jhinjhari
          C) 220kV paharua to 33 kv paharua
          D) 33 kV paharua to new 33 kV power house s/stn

          Augmentation of 33 kV Conductor with DOG
          - 33 kV paharua form 132 kV Shanti nagar S/stn
          - 33 kV Silimabad Feeder form 132 kV Shanti nagar S/stn
          - 33 kV Paharua from 220 kV paharua S/stn
          - 33 kV madhav nagar from 132 kV Shanti nagar s/stn




3.2.1.2   11 kV Line : New Feeder/ Feeder Bifurcation
          The works are of following nature:-
            - To eliminate overloading on City - 1 , City -3 , City-5 & city 7 Feeder . following New Jharra tikuriya ,
          Station Road , Gole Bazaar and New city-5 feeders are proposed from New 33 kV power house S/stn
           - To eliminate overloading on Madhav nagar Feeder , New Madhav nagar-2 has been proposed.
           - To eliminate overloading on Khirehni Feeder , New khirehni feeder has been proposed.
          [Brief write up]overloading on NKJ feeder , New NKJ feeder has been proposed.
           - To eliminate
           - To eliminate overloading on kanchgawan feeder , New Kanchgawan feeder has been proposed.
           - To eliminate overloading on kanwara feeder , New Kanwara feeder has been proposed.
           - To eliminate overloading on City -4 Feeder , New City - 8 feeder has been proposed from 33 kv jhinjhari
          s/tn
          - To eliminate overloading on industrail feeder , New Industrail feeder has been proposed.
3.2.1.3   Distribution Transformer: Capacity Augumentation/ New Transfomer
           New transformers are proposed wherever the LT feeder length is more and transformers loading is more
           than 70%. HT/LT ratio in existing system is .48
           and in the proposed system this is going to be .57
           The works can be of following nature:-
           - Capacity Augumentation
           - Installation of New Transformers
           - Associated Civil Works
           - HT Line Extension


3.2.1.4   LT Line : New Feeder/ Feeder Bifurcation
          LT Line augmentaion work is proposed wherer aged conductors and under sized conductors are found in the
          network.
          The works can be of following nature:-
          - Augumentation of Conductors
          [Brief write up]

3.2.1.5   Capacitor Bank
          2 Nos. 600 KVAR Capacitor bank Proposed at Substation


3.2.1.6   Aerial Bunched Cables
          In the densly populated areas where ROW is not available and in the areas where Hookings are observed
          Aerial Bunched Cables are proposed .


3.2.2     HVDS

          -Not Proposed
3.2.3   Consumer Metering
        Replacement of the meters is proposed for the Mechanical meters and Defective meters in the city area.
        While replacing it is proposed to change the service line to armoured and shifting the meters to outside the
        premises.


3.2.4   Mobile Service Centre
        This Mobile Service Center, it is propsed to have trolley mounted 200KVA transformer to attend the
        tranformer failure in quickest possible way in order to improve the reliability of the system.


3.2.5   Other
        Service lines are
        [Brief write up] proposed to be replaced with armoured cable. For the purpose of controlling the pilferage it
               write-up]
        has been proposed to shift all the consumer meters outside the premises
        LT Network renovation:
        LT Distibution boxes, elimination of conductor joints, earthing improvement and improving the system
        reliability
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume III: Project Area case study findings

          The AT&C losses of the project area Rewa is quite high due to high technical & commercial losses, the same shall be brought down by implementing following
          measures:

          i) Reason of high technical losses & Measures proposed for improvement

               1      Poor Voltage Regulation due to long 11 KV lines -

                                    New Feeder/Bifurfication/Interconnection

              S.No                        Feeder Name                           Proposed measure                                           From                                                  To                              New Cut Point                        Conductor Type           Route Length
                                                                                                                                                                                                                                                                                                              Savings
                                                                                                                        Location                   New Feeder name                Location             Feeder name   Feeder name                 Location                                           m         in MU


                                                                                                                                                                                                                                         Sky plastic Industries (
               1                 33 kV Jhinjhari - New Kanchgaon                   New Feeder                Sky plastic Industries ( DT-30 )        New kanchgaon         DT-41 , dhapai Village      Kanchgaon     Kanchgaon                                    Dog ( on Existing poles )       3653
                                                                                                                                                                                                                                                DT-30 )

                                                                             New Feeder ( connection
                                                                                                         Post Office ( DT-7 From Madhav nagar                                                                                               DT-22 , Manik
               2           33 kV Madhav Nagar - New madhav nagar - 2        Between Madhav Nagar and                                              New Madhav Nagar - 2    DT-22 , Manik Industries        City-4        City-4                                               Dog                   500
                                                                                                                        Feeder )                                                                                                              Industries
                                                                                 City-4 feeder )

                                                                                                                                                                                                                                          Lawerence Line HB
                                                                                                                                                                         Lawerence Line HB Colony (
               3                   33 kV JhinJhari - New City-8                    New Feeder                 Income Tax Office ( DT - 10 )            New City-8                                         City-4        City-4            Colony ( DT-5 From                 Dog                  1628
                                                                                                                                                                          DT-5 From City-4 Feeder )
                                                                                                                                                                                                                                            City-4 Feeder )

                                                                             New Feeder ( connection
                                                                                                                                                                                                                                         balaji Minerals ( DT-
               4               33 kV katya Ghat - New Industrail - 2       Between Industrail and Pump          Purwar dall Mill ( DT-09 )          New Industrail-2      balaji Minerals ( DT-04 )     Industrail    Industrail                                       120mm2 ABC                  500
                                                                                                                                                                                                                                                 04 )
                                                                                 House feeder )

                                                                               Inter Connection (
                                                                                                                                                                                                                                                                   185mm2 ABC ( railway
               5                      33 kV Paharua - City-5                Connection Between City-5          kailwara Phatak ( DT - 13 )               City-5             Near Nobel ( DT - 18 )     Pump House    Pump House          Near Nobel ( DT - 18 )                                    600
                                                                                                                                                                                                                                                                      Under ground )
                                                                                and Pump house )

                                                                                                                                                                                                                                          Mission Chowk-3 (
               6            New 33 kV power House - New Gole bazaar                 New feeder              Gole Bazaar ( DT -20 of City - 7 )      New Gole Bazaar      Mission Chowk-3 ( DT - 06 )      City-7        City-7                                               Dog                   300
                                                                                                                                                                                                                                              DT - 06 )
                                                                                                                                                                                                                                                                                                               0.95
                                                                             New feeder ( Connection
                                                                                                                                                                                                                                         Katra Bazaar ( DT - 29
               7          New 33 kV power House - New Jharra tikuriya       Between City-3 and City-1        MPSEB-2 ( DT - 22 of City - 3 )       New Jharra tikuriya     Katra Bazaar ( DT - 29 )       City-1        City-1                                               Dog                   400
                                                                                                                                                                                                                                                   )
                                                                           Feeder near Hanuman Mandir

                                                                              New feeder ( Connection
                                                                                                                                                                         Purwar Cold Storage ( DT -                                      Purwar Cold Storage (
               8           New 33 kV power House - New Station Road          Between City-3 and City-5       MPSEB-1 ( DT - 24 of City - 3 )        New Station Road                                      City-5        City-5                                               Dog                   650
                                                                                                                                                                                   19 )                                                       DT - 19 )
                                                                             Feeder near Ghanta Ghar )


               9              New 33 kV power House - New City -5                   New feeder           Tilak Nagar School -1 ( DT -30 )              New City-5         Chandak Dhall ( DT - 15 )       City-5        City-5         Chandak Dhall ( DT - 15 )             Dog                  2300



               10                 33 kV Paharua - New Kanwara                       New feeder                     Indian oil ( DT -12 )             New Kanwara         leather Godown ( DT - 20 )     Kanwara       Kanwara             Indian oil ( DT -12 )    Dog ( on Existing poles )      2250



                                                                                                                                                                         Katni Main Market ( DT - 03
               11                     33 kV NKJ - New NKJ                           New feeder                       Near Subsation                    New NKJ                                             NKJ           NKJ                Near Subsation         Dog ( on Existing poles )       500
                                                                                                                                                                                     )


                                                                                                                                                                                                                                          Near Jagriti Colony (
               12                   33 kV NKJ - New Khirehni                        New feeder                  Jagriti Colony ( DT - 09 )            New Khirehni        Sarju Choudary ( DT - 15 )    Khirehni      Khirehni                                     Dog ( on Existing poles )      2550
                                                                                                                                                                                                                                               DT - 09 )
       2   Overloading of following 11 KV feeder lines - Reconductoring proposed

                                                                                                                                                                                                       Savings in MU
  S.No                        Feeder Name                           Proposed measure        From                  To                  Existing Conductor      Proposed Cond.   Route Length (in Mtr)


                                                                                                        main Line ( upto DT- 41,
       1                        KachGaon                              Reconductoring      Substation                                        Rabbit                 Dog                 7162
                                                                                                           Dhapai Village )


                                                                                                        main Line ( upto DT- 44,
       2                        Industrail                            Reconductoring      Substation                                        Weasal                 Dog                 1960
                                                                                                          Dharam industries )


                                                                                                        main Line ( upto DT- 36,
       3                      Madhav nagar                            Reconductoring      Substation                                        Rabbit                 Dog                 2883
                                                                                                             yog Kendra )


                                                                                                        main Line ( upto DT- 11,
       4                       Mansarover                             Reconductoring      Substation                                       Raccoon                 Dog                 1080
                                                                                                           Anand dall mill )
                                                                                                                                                                                                           0.38
                                                                                                        main Line ( upto DT- 31,
       5                      Gayatri Nagar                           Reconductoring      Substation                                       Raccoon                 Dog                 4375
                                                                                                         Hira ganj Chouraha )


                                                                                                        main Line ( upto DT- 20,
       6                        Khirehni                              Reconductoring      Substation                                        Rabbit                 Dog                 5030
                                                                                                             raju Nishad )


                                                                                                        main Line ( upto DT- 22,
       7                         kanwara                              Reconductoring      Substation                                       Raccoon                 Dog                 3150
                                                                                                        hare Krishna Rice Mill )


                                                                                                        main Line ( upto DT- 03,
       8                          NKJ                                 Reconductoring      Substation                                        Rabbit                 Dog                 2830
                                                                                                        New Katni main market )


       4   Long length of following LT lines - New Distribution Transformer proposals

S.No                     Feeder name / Section Id                                                                                                                              HT-length required in                                    Proposed Saving
                                                                  Transformer Capacity      Action             Location            New DT Capacities in KVA   HT Connection            Mtr.             Conductor      No of Circuits       in MU
           Collectrate
           K-CC-02-COLLECTRATE_OFFICE                                    100KVA            New DT            Same location                 100KVA                 DT-2                  25                 Dog               1
           Police line
           N-PLT-2-POLICE_QTRS                                            63KVA          Augmentation        Same location                 100KVA                  NA                   NA                  NA               1
           Pump House
           R-T-18-NOBEL                                                  100KVA            Relocate               A-5                        NA                   DT-18                220                 Dog               2
           Kanchhgawan
           M-T-01-MURLI_DHABA_JHINJHARI                                   63KVA            New DT                 A-4                      200KVA                 DT-1                 100                 Dog               2
           M-T-30-SKY_PLAST_INDUSTRIES                                   100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           M-T-31-KANCHGAWAN_VILLAGE                                     100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           M-T-39-BRAMAHA_NAND_BHOROL                                     63KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           M-T-43-GAYATRA_VILLAGE-1                                      100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           M-T-50-PEER_BABA                                              100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           M-T-21-PRIMARY_SCHOOL_JHINJHARI_                              200KVA            New DT                A-34                      100KVA                 KG/84                 50                 Dog               2
           Mansarover
           C-T-19-WAHE_GURU_INDUSTRIES                                    63KVA          Augmentation        Same location                 100KVA                  NA                   NA                  NA               1
           NKJ
           J-DT-01-ROSHAN_NAGAR                                          100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               2
           J-DT-01-ROSHAN_NAGAR                                          100KVA            New DT                A-03                      200KVA                NKJ-29                 80                 Dog               2
           J-DT-03-NEW_KATNI_MAIN_MARKET                                 200KVA            New DT                A-04                      100KVA                 DT-3                  50                 Dog               2
           J-DT-04-BASANT_AATA_CHAKKI                                    100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               1
           J-DT-05-MADHU_AATA_CHAKKI                                     200KVA            New DT                B-14                      100KVA                  NA                   NA                  NA               2
           J-DT-08-VODAFONE_TOWER                                         25KVA          Augmentation        Same location                 100KVA                  NA                   NA                  NA               1
           J-DT-17-CHAPRA_VILLAGE                                        100KVA          Augmentation        Same location                 200KVA                  NA                   NA                  NA               2
           J-DT-13-DR_SHARMA                                             200KVA            New DT              NKJ-114                     100KVA                  B-16                 25                 Dog               2
           J-DT-15-BIJU_AATA_CHAKKI                                      200KVA            New DT              NKJ-131                     100KVA                  B-31                 30                 Dog               3
           J-DT-16-MANGAL_BAZAR                                          200KVA            New DT              NKJ-123                     100KVA                  A-11                 30                 Dog               2
Khirehni
I-KHNT-01-ROSHAN_NAGAR                       100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
I-KHNT-05-MAHAKAUSHAL                        200KVA          New DT                 A-10        200KVA    DT-5     170      Dog        2
I-KHNT-08-FOREST_OFFICE                      100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
I-KHNT-09-JAGRATI_COLONY                     100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
I-KHNT-10-NEAR_TILAK_COLLEGE                 100KVA          New DT                A- 09        100KVA   KHN-65    70       Dog        2
I-KHNT-27-DUBEY_COLONY                       200KVA          New DT                 B-07        100KVA   DT-27     190      Dog        2
I-KHNT-27-DUBEY_COLONY                       200KVA          New DT                 B-10        100KVA   DT-27     130      Dog        2
I-KHNT-11-KHIRANI_TALAB                      200KVA          New DT                A- 19        100KVA   DT-10     30       Dog        2
I-KHNT-12-KHIRANI-1                          100KVA          New DT                A- 09        100KVA   DT-12     150      Dog        2
Kanwara
PH9-DT-02-INDER_NAGAR                        100KVA   Relocate & Augmentation       B-07        200KVA   DT-02     80       Dog        2
PH9-DT-02-INDER_NAGAR                        100KVA          New DT                 B-06        100KVA   DT-02      0       Dog        2
PH9-DT-03-MADHUR_VIHAR_HOUSE                 100KVA          New DT                A- 11        100KVA   PK-40     350      Dog        2
PH9-DT-07-SHUMANI_DAL_MILL                   63KVA         Augmentation         Same location   100KVA     NA      NA        NA        1
PH9-DT-08-HOTEL_RAJ_PALACE                   100KVA        Augmentation         Same location   200KVA     NA      NA        NA        1
PH9-DT-18-PURANI_AB_SWITCH_WALA              200KVA          New DT                 B-11        100KVA   DT-09     380      Dog        2
PH9-DT-15-FCI                                200KVA          New DT                 B-04        100KVA   DT-09      0       Dog        2
PH9-DT-15-FCI                                200KVA          New DT                 A-22        200KVA   DT-09     90       Dog        2
PH9-DT-16-NAYA_GAON                          100KVA          New DT                PK-54        100KVA   DT-17     480      Dog        2
P-DT-21-BACK_OF_LEATHER_GODOWN-3             100KVA   Relocate & Augmentation      PK-20        200KVA   PK-162    200      Dog        2
Gayatari Nagar
H-GN-02-AIRTEL_TOWER_GAYATRI_NAGER           100KVA        Augmentation         Same location   200KVA     NA      NA        NA        1
H-GN-04-NEERAJ_TAKIJ                         100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
H-GN-05-DEEP_CHAND_KUSHWAHA                  200KVA          New DT                A - 03       100KVA     32      NA        NA        1
H-GN-13-KV_INDUSTRIES                        200KVA          New DT             Same location   100KVA     0       NA        NA        1
H-GN-14-GIRI_COLONY                          200KVA          New DT                 B-18        100KVA   DT-14     175   120 mm2 ABC   2
H-GN-17-MAAI_GHAT                            200KVA          New DT                 B-09        100KVA   DT-17     200   120 mm2 ABC   2
H-GN-20-SATYA_NARAYAN_MANDIR                 100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
H-GN-30-HIRAGANJ_NEAR_PETROL_PUMP            315KVA          New DT                 B-10        100KVA   DT-30     270   120 mm2 ABC   2
H-GN-31-HIRAGANJ_CHORAHA                     500KVA          New DT                 B-07        100KVA   DT-31     185   120 mm2 ABC   2
City - 6
T1-T-01-PAHUARA_NEAR_SUB_STATION             100KVA          New DT                 A-18        100KVA   DT-01     430      Dog        2
T1-T-02-KRISHI_UPAJ_MANDI                    100KVA          New DT                 A-21        100KVA   DT-02     90       Dog        2
T1-T-04-CENTRAL_BANK_OF_INDIA                200KVA          New DT                 A-33        200KVA   DT-03     50       Dog        2
T1-T-06-KUTHLA                               100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
T1-T-07-SETHIA_DAL_MILL_KUTHLA               200KVA          New DT                 A-05        200KVA   DT-07     130      Dog        2
T1-T-08-NEAR_DAINIK_MADHYA_PRADESH           200KVA          New DT                 A-22        100KVA   DT-05     40       Dog        2
T1-T-09-AHAMAD_NAGAR                         200KVA          New DT                 A-22        100KVA   CT-6/52   30       Dog        2
T1-T-14-RADHIKA_HOTEL                        63KVA         Augmentation         Same location   100KVA     NA      NA        NA        2
T1-T-15-ADHARKAAP_BAGICHA                    200KVA          Relocate               A-06          NA     DT-15     170      Dog        2
T1-T-18-SANT_NAGAR                           100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
T1-T-19-NEEL_KANTH_NAGAR                     63KVA         Augmentation         Same location   200KVA     NA      NA        NA        3
Madhav nagar
V-T-01-GANGA_RAM_HOUSE                       100KVA          New DT                 A-09        100KVA   DT-01     120   120 mm2 ABC   2
V-T-07-POST_OFFICE-1                         200KVA          New DT                 B-09        200KVA   DT-06     80    120 mm2 ABC   2
V-T-19-GHIRDHARI_RICE_MILL                   100KVA        Augmentation         Same location   200KVA     NA      NA        NA        1
V-T-38-MAIN_BAZAR_KAIRAN_LINE                315KVA          New DT                 B-16        200KVA   MN-78     NA        NA        2
V-T-39-TANGA_STAND                           100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
V-T-39-TANGA_STAND                           100KVA          New DT                 A-05        200KVA   DT-39     185   120 mm2 ABC   2
V-T-43-SANJAY_NAGAR_TALLIYA                  100KVA        Augmentation         Same location   200KVA     NA      NA        NA        2
G-T-34-SANJAY_NAGAR(BHATIA_WALA) of City-4
                                                             New DT                 A-03                 DT-44     310   120 mm2 ABC   2
                  Feeder                     200KVA                                             100KVA




                                                                                                                                           2.70
City - 7
O-T-07-MISHAN_CHOWK-2              315KVA     New DT           B-04        200KVA    C-7/P-90     50    120 mm2 ABC   2
O-T-08-NAGAR_NIGAM                 200KVA     New DT           B-05        200KVA     DT-08       110   120 mm2 ABC   2
O-T-09-INFRONT_OF_HEAD_POST_OFFI   315KVA     New DT           C-05        200KVA     DT-09       120   120 mm2 ABC   3
O-T-09-INFRONT_OF_HEAD_POST_OFFI   315KVA     New DT           A-05        100KVA     DT-10        0    120 mm2 ABC   2
O-T-26-GHATAR_GHAT_ROAD            200KVA     New DT           A-13        100KVA     DT-26       120   120 mm2 ABC   2
                                                                                                                          2.70
O-T-27-BATTU_LAL_WALA              315KVA     New DT       Same location   200KVA      NA         NA        NA        2
O-T-10-KACHAHRI_WALA               200KVA     New DT           A-12        100KVA     DT-22       20    120 mm2 ABC   2
O-T-22-GANDHI_DWAR                 315KVA     New DT       Same location   200KVA      NA         NA        NA        2
O-T-11-VENKAT_LIBRARY              200KVA     New DT           A-06        100KVA     DT-11       180   120 mm2 ABC   1
O-T-14-REST_HOUSE                  200KVA     New DT           A-22        100KVA     DT-21       115   120 mm2 ABC   1
O-T-18-GOL_BAZAR-1                 200KVA     New DT           B-04        100KVA     DT-18       65    120 mm2 ABC   2
O-T-17-MADHAI_MANDIR-2             200KVA     New DT           B-04        200KVA     DT-17       135   120 mm2 ABC   2
O-T-19-GOL_BAZAR-2                 200KVA     New DT           A-05        200KVA     DT-18       190   120 mm2 ABC   2
O-T-23-SUBHASH_CHOWK               200KVA     New DT           A-05        200KVA     DT-23       180   120 mm2 ABC   2
City - 5
S-DT-02-UP_SAWASHASTHYA_KENDRA     200KVA     Relocate         A-20         NA        DT-02       200   120 mm2 ABC   2
S-DT-02-UP_SAWASHASTHYA_KENDRA     200KVA     New DT           A-45        100KVA   pole no 10    20        NA        2
S-DT-07-RAIN_BASERA                200KVA     Relocate         A-04          NA       DT-07       80    120 mm2 ABC   2
S-DT-08-KRISHAN_COLD_STORE         200KVA     New DT           A-06        100KVA   pole no 57    55    120 mm2 ABC   2
S-DT-09-MARGHATYE_MORE             315KVA     New DT           A-18        100KVA   pole no 78    75    120 mm2 ABC   2
S-DT-12-SHIV_NAGAR_COLONY          100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
S-DT-12-SHIV_NAGAR_COLONY          200KVA     New DT           A-12        200KVA     DT-12       225   120 mm2 ABC   2
S-DT-13-KAILWARA_FATAK             200KVA     New DT       Same location   200KVA      NA         NA        NA        2
S-DT-35-DENA_BANK                  100KVA   Augmentation   Same location   200KVA      NA         NA        NA        1
S-DT-19-PURWAR_COLD_STORE          100KVA   Augmentation   Same location   200KVA      NA         NA        NA        1
S-DT-15-CHANDAK_DHAL               200KVA     New DT           A-17        200KVA     DT-16       160   120 mm2 ABC   2
S-DT-14-BALAJI_AGENCY              200KVA     New DT           A-24        100KVA     DT-15       110   120 mm2 ABC   2
S-DT-30-ADARAS_COLONY              200KVA     New DT           B-03        100KVA     DT-30        50   120 mm2 ABC   2
S-DT-30-ADARAS_COLONY              200KVA     New DT           A-05        100KVA     DT-30       80    120 mm2 ABC   2
S-DT-33-TILAK_NATIONAL_SCHOOL-2    100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
S-DT-20-SINDHI_SCHOOL_NEW_BASTI    100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
S-DT-38-GHANTA_GHAR-1              200KVA     New DT           A-07        200KVA     DT-38       NA        NA        2
S-DT-39-GHANTA_GHAR-2              200KVA     New DT           A-05        200KVA     DT-38       NA        NA        2
S-DT-40-GARG_CHOURAHA              200KVA     New DT           A-08        200KVA     DT-40       NA        NA        2
S-DT-22-GANDHI_GANJ_PIPAL_WALA     200KVA     New DT           B-09        200KVA     DT-22       120   120 mm2 ABC   2
S-DT-21-GANDHI_GANJ_NALA_WALA      200KVA     New DT           A-08        200KVA     DT-21       130   120 mm2 ABC   2
S-DT-28-SARARWATI_SCHOOL_MODE      200KVA     New DT           A-13        200KVA   pole no 115   40    120 mm2 ABC   2
S-DT-23-BARSIAYA_NO-1              315KVA     New DT           A-17        200KVA   pole no 99    40    120 mm2 ABC   2
S-DT-24-BARSIAYA_NO-2              200KVA     New DT           B-09        200KVA     DT-24       110   120 mm2 ABC   2
S-DT-26-BAJAJ_HOSPITAL             100KVA     New DT           A-07        100KVA     DT-26       200   120 mm2 ABC   2
S-DT-27-SANT_NAGAR                 200KVA     Relocate         A-19         NA        DT-27       125   120 mm2 ABC   2
S-DT-27-SANT_NAGAR                 200KVA     New DT           A-09        100KVA     DT-27       70    120 mm2 ABC   2
S-DT-29-GIRJA_GHAT                 200KVA     New DT           B-18        100KVA     DT-29       NA        NA        3
City - 2
E-DT-01-MPSEB_COLONY               200KVA     Relocate       CT2-13         NA        DT-01       75       Dog        2
E-DT-02-AJAY_FOODS                 200KVA     Relocate       CT2-11         NA        DT-02       270      Dog        2
E-DT-04-MOHAN_BAJAJ                200KVA     Relocate       CT2-04         NA        DT-04       110      Dog        1
E-DT-06-SHIV_HARE                  100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
E-DT-09-DUPLEX                     100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
E-DT-10-RAMA_INDUSTRIES            100KVA   Augmentation   Same location   200KVA      NA         NA        NA        2
            City - 3
            F-T-02-BRIJ_LAL_BALANI_SHANTI_NAGAR                   200KVA       New DT           A-13        200KVA    DT-02     105   120 mm2 ABC   2
            F-T-03-PANJAWANI                                      100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-04-DR_R_H_ASARNI_SHANTI_NAGAR                     100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-06-A_C_C_COMPLEX                                  100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-08-DEHRU_LINE                                     100KVA       Relocate         A-11         NA       DT-08     400   120 mm2 ABC   2
            F-T-08-DEHRU_LINE                                     100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-12-MICRO_WAVE                                     315KVA       New DT           A-08        200KVA    DT-12     300   120 mm2 ABC   2
            F-T-16-HEALTH_CENTER_LAKHERA_PAN                      315KVA       New DT           A-09        100KVA    DT-12     150   120 mm2 ABC   2
            F-T-21-RAILWAY_SUBSTATION                             100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-21-RAILWAY_SUBSTATION                             100KVA       New DT           A-10        100KVA   CT-3/104   100   120 mm2 ABC   2
            F-T-24-MPSEB_OFFICE-3                                 315KVA       Relocate         A-07          NA      DT-24     145   120 mm2 ABC   2
            F-T-24-MPSEB_OFFICE-3                                 315KVA       New DT           A-15        100KVA    DT-24      65   120 mm2 ABC   3
            F-T-32-HOTEL_PANKAJ_PALACE                            100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            F-T-29-KAMINIA_GATE_BABA_MAZAAR                       200KVA       New DT           A-06        100KVA    DT-29     100   120 mm2 ABC   2
            F-T-29-KAMINIA_GATE_BABA_MAZAAR                       200KVA       New DT           A-13        200KVA    DT-30     40    120 mm2 ABC   3
            City - 1
            D-T-12-SUBHAS_TRANSPORT                               200KVA       New DT           A-05        200KVA    DT-13     45    120 mm2 ABC   3
            D-T-14-GURU_NANAK_DHARAM_KANTA                        200KVA       New DT           A-07        100KVA   CT-1-40    500   120 mm2 ABC   2
            D-T-21-JALIL_BHATTA_KUK_ROAD                          200KVA       New DT           A-10        100KVA    DT-21     290   120 mm2 ABC   2
            D-T-25-RAJIB_JAIN                                     100KVA       New DT           A-06        200KVA    DT-24     120   120 mm2 ABC   2
            D-T-34-BIRENDER_SINGH_WALA                            200KVA       Relocate         B-07          NA     CT-1-84    NA        NA        2
            D-T-33-CHAUBE_JEE_WALA                                200KVA       Relocate         A-10         NA       DT-33     200   120 mm2 ABC   2
            D-T-36-PATHAK_JI_WALA-1                               315KVA       Relocate         A-10         NA       DT-36     160   120 mm2 ABC   2
            D-T-36-PATHAK_JI_WALA-1                               315KVA       New DT           A-36        200KVA    DT-21     240   120 mm2 ABC   2
            D-T-35-BIRENDER_SINGH_WALA-2                          200KVA       New DT           A-12        100KVA    DT-35     100   120 mm2 ABC   2
            D-T-38-LAKSHI_PAN_BHANDAR                             315KVA       New DT           B-12        100KVA    DT-38     190   120 mm2 ABC   3
            D-T-39-NURA_TELI                                      200KVA       New DT           C-07        200KVA    DT-39     190   120 mm2 ABC   2
            D-T-40-JAI_HIND_CHOWK                                 200KVA       New DT           A-07        200KVA   CT-1-113    20   120 mm2 ABC   2
            D-T-42-BAHARAT_CHOWK                                  200KVA       New DT           A-13        100KVA    DT-42     150   120 mm2 ABC   3
            City - 4
            G-T-05-LAWARANCE_LINE_H_B_COLONY                      200KVA       New DT           B-20        100KVA    DT-05     150   120 mm2 ABC   2
            G-T-17-JYOTI_DAL_MILL-1                               100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            G-T-18-JYOTI_DAL_MILL-2                               100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            G-T-28-HARIJAN_BASTI                                  100KVA     Augmentation   Same location   200KVA     NA       NA        NA        2
            G-T-22-MANIK_INDUSTRIES                               315KVA       Relocate         A-13        100KVA    DT-22     410   120 mm2 ABC   3
            G-T-27-GRAM_PANCHYAT                                  315KVA       New DT           B-10        200KVA    DT-30     260   120 mm2 ABC   2
            G-T-30-CHANDRESH_INDUSTRIES                           200KVA       New DT           A-04        100KVA    DT-30     250   120 mm2 ABC   2
            G-T-31-RORAHA_BAL_MANDIR                              200KVA       New DT       Same location   100KVA    DT-31     150   120 mm2 ABC   2



 5
                                          Mobile Service Center

S.No.                            Equipments                       Quantity

        1              Trolly Mounted Substation-200KVA              3
ii) Reason of high Commercial losses & Measures proposed for improvement



  S. No.                         Reason                           Loss location/ segment          Proposed measure

    1                      Hooking / Direct tapping from following LT lines                    Installation of ABC cable



                                                                                                                                                                                                                                                               Proposed benefit
                                                                                                                                                                                                                                      Proposed benefit in MU
   S.No                                                                                                                                                                                                                                                            in MU
                                                                                                                                                                                                                                         (Technical Loss)
                                                                                                                                                                                                                                                                (Commercial)
                               S/Stn Name                              Feeder Name         Distribution Transformer Location      Distribution Transformer         Existing Conductor        Proposed Cable   Route Length ( in m )
                                                                                                                               From                      To


                                             City-5 feeder

                            33 kV Paharua S/stn                            City - 5         S-DT-01-KRISHI_UPAJ_MANDI           DT                   All Section   Rabbit , 35 mm PVC      LTABCABLE-95MM^2          1695.6


                            33 kV Paharua S/stn                            City - 5            S-DT-04-INDIA_HOTEL-2            DT                   All Section          Weasal           LTABCABLE-95MM^2           288


                            33 kV Paharua S/stn                            City - 5             S-DT-03-INDIA_HOTEL             DT                   All Section          Weasal           LTABCABLE-95MM^2          415.2

                                                                                                                                                                    Rabbit , Weasal , 35
                            33 kV Paharua S/stn                            City - 5            S-DT-07-RAIN_BASERA              DT                   All Section                           LTABCABLE-95MM^2           732
                                                                                                                                                                        mm PVC

                            33 kV Paharua S/stn                            City - 5        S-DT-06-YATAYAT_BUS_STAND            DT                   All Section      Rabbit , Weasal      LTABCABLE-95MM^2           1020


                            33 kV Paharua S/stn                            City - 5        S-DT-08-KRISHAN_COLD_STORE           DT                   All Section     Rabbit , GI Wire      LTABCABLE-95MM^2           720


                            33 kV Paharua S/stn                            City - 5         S-DT-09-MARGHATYE_MORE              DT                   All Section     Weasal , Squirrel     LTABCABLE-95MM^2           978

                                                                                                                                                                    Rabbit , Weasal , 35
                            33 kV Paharua S/stn                            City - 5            S-DT-10-MUKTI_DHAM               DT                   All Section                           LTABCABLE-95MM^2           750
                                                                                                                                                                        mm PVC

                                                                                                                                                                     Squirrel , 35 mm2
                            33 kV Paharua S/stn                            City - 5          S-DT-13-KAILWARA_FATAK             DT                   All Section                           LTABCABLE-95MM^2           1908
                                                                                                                                                                      PVC , GI wire

                                                                                                                                                                   Weasal , Squirrel , 35
                            33 kV Paharua S/stn                            City - 5           S-DT-15-CHANDAK_DHAL              DT                   All Section                          LTABCABLE-95MM^2            960
                                                                                                                                                                   mm2 PVC , GI wire

                            33 kV Paharua S/stn                            City - 5        S-DT-19-PURWAR_COLD_STORE            DT                   All Section   35 mm2 PVC, GI Wire LTABCABLE-95MM^2               498

                                                                                                    S-DT-21-                                                       Weasal , Squirrel , 35
                            33 kV Paharua S/stn                            City - 5                                             DT                   All Section                          LTABCABLE-95MM^2            1152
                                                                                            GANDHI_GANJ_NALA_WALA                                                      mm2 PVC

                                                                                                    S-DT-22-                                                        Rabbit , Weasal , 35
                            33 kV Paharua S/stn                            City - 5                                             DT                   All Section                           LTABCABLE-95MM^2           1032
                                                                                            GANDHI_GANJ_PIPAL_WALA                                                      mm PVC

                            33 kV Paharua S/stn                            City - 5               S-DT-25-DR_DIXIT              DT                   All Section      Rabbit , Weasal      LTABCABLE-95MM^2           552

                                                                                                                                                                    Rabbit , Weasal , GI
                            33 kV Paharua S/stn                            City - 5             S-DT-27-SANT_NAGAR              DT                   All Section                           LTABCABLE-95MM^2           1236
                                                                                                                                                                            wire

                                                                                                                                                                   Weasal , Squirrel , 35
                            33 kV Paharua S/stn                            City - 5             S-DT-29-GIRJA_GHAT              DT                   All Section                          LTABCABLE-95MM^2            1380
                                                                                                                                                                       mm2 PVC

                                                                                                    S-DT-33-
                            33 kV Paharua S/stn                            City - 5                                             DT                   All Section      Rabbit , Weasal      LTABCABLE-95MM^2            84
                                                                                            TILAK_NATIONAL_SCHOOL-2

                                                                                                    S-DT-32-
                            33 kV Paharua S/stn                            City - 5                                             DT                   All Section      Rabbit , Weasal      LTABCABLE-95MM^2           438
                                                                                            TILAK_NATIONAL_SCHOOL-1

                                                                                                                                                                   Weasal , Squirrel , 35
                            33 kV Paharua S/stn                            City - 5        S-DT-34-RANGOOTA_BAGHICHA            DT                   All Section                          LTABCABLE-95MM^2            480
                                                                                                                                                                       mm2 PVC

                                                                                                                                                                   Weasal , Squirrel , GI
                            33 kV Paharua S/stn                            City - 5           S-DT-38-GHANTA_GHAR-1             DT                   All Section                          LTABCABLE-95MM^2            1368
                                                                                                                                                                           wire

                                                                                                                                                                     Rabbit , Weasal ,
                            33 kV Paharua S/stn                            City - 5           S-DT-39-GHANTA_GHAR-2             DT                   All Section                           LTABCABLE-95MM^2           636
                                                                                                                                                                     Squirrel ,GI wire

                                                                                                                                                                     Rabbit , Weasal ,
                            33 kV Paharua S/stn                            City - 5           S-DT-31-JAALPA_MADIYA             DT                   All Section                           LTABCABLE-95MM^2           1020
                                                                                                                                                                     Squirrel ,GI wire

                                                                                                     S-DT-20-
                                  City - 5                                 City - 5                                             DT                   All Section      Rabbit , Weasal      LTABCABLE-95MM^2           672
                                                                                            SINDHI_SCHOOL_NEW_BASTI
                 City-6 feeder
                                                      T1-T-01-                                 Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6                                   DT   All Section                          LTABCABLE-95MM^2   2220
                                             PAHUARA_NEAR_SUB_STATION                              mm2 PVC

                                                                                                Squirrel , 35 mm2
33 kV Paharua S/stn              City - 6     T1-T-02-KRISHI_UPAJ_MANDI     DT   All Section                        LTABCABLE-95MM^2     414
                                                                                                      PVC

                                                      T1-T-03-                                  Squirrel , 35 mm2
33 kV Paharua S/stn              City - 6                                   DT   All Section                        LTABCABLE-95MM^2     3108
                                              LAXMAN_DASS_KHANDEWAL                                   PVC

                                                                                                Rabbit , Weasal ,
33 kV Paharua S/stn              City - 6   T1-T-04-CENTRAL_BANK_OF_INDIA   DT   All Section                        LTABCABLE-95MM^2     648
                                                                                                Squirrel ,GI wire
                                                                                                Rabbit , Weasal ,
33 kV Paharua S/stn              City - 6          T1-T-06-KUTHLA           DT   All Section    Squirrel , 35 mm2   LTABCABLE-95MM^2     3018
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
                                                      T1-T-07-
33 kV Paharua S/stn              City - 6                                   DT   All Section    Squirrel , 35 mm2   LTABCABLE-95MM^2     1332
                                              SETHIA_DAL_MILL_KUTHLA
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
                                                       T1-T-08-
33 kV Paharua S/stn              City - 6                                   DT   All Section    Squirrel , 35 mm2   LTABCABLE-95MM^2     1656
                                            NEAR_DAINIK_MADHYA_PRADESH
                                                                                                      PVC
                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6      T1-T-09-AHAMAD_NAGAR         DT   All Section                          LTABCABLE-95MM^2   1482
                                                                                                   mm2 PVC

                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6       T1-T-10-SHIVAJI_NAGAR       DT   All Section                          LTABCABLE-95MM^2   548.4
                                                                                                   mm2 PVC

                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6       T1-T-11-PAHUARA_BASTI       DT   All Section                          LTABCABLE-95MM^2   876
                                                                                                   mm2 PVC

                                                      T1-T-12-                                 Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6                                   DT   All Section                          LTABCABLE-95MM^2   2256
                                             RAJESH_AGRAWAL_DAL_MILL                               mm2 PVC

                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6    T1-T-15-ADHARKAAP_BAGICHA      DT   All Section                          LTABCABLE-95MM^2   498
                                                                                                   mm2 PVC

                                                                                                Squirrel , 35 mm2
33 kV Paharua S/stn              City - 6    T1-T-16-ADHARKAAP_BAGICHA      DT   All Section                        LTABCABLE-95MM^2     696
                                                                                                      PVC

                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6     T1-T-17-SIDH_BABA_COLONY      DT   All Section                          LTABCABLE-95MM^2   828
                                                                                                   mm2 PVC

                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              City - 6     T1-T-19-NEEL_KANTH_NAGAR      DT   All Section                          LTABCABLE-95MM^2   582
                                                                                                   mm2 PVC
                                                                                                Rabbit , Weasal ,
33 kV Paharua S/stn              City - 6        T1-T-18-SANT_NAGAR         DT   All Section    Squirrel , 35 mm2   LTABCABLE-95MM^2     420
                                                                                                      PVC


                Kanwara feeder
                                                                                               Weasal , Squirrel , 35
33 kV Paharua S/stn              Kanwara       PH9-DT-01-INDER_NAGAR        DT   All Section                          LTABCABLE-95MM^2   3156
                                                                                                   mm2 PVC

33 kV Paharua S/stn              Kanwara       PH9-DT-02-INDER_NAGAR        DT   All Section         Weasal         LTABCABLE-95MM^2     415.2

                                                     PH9-DT-03-
33 kV Paharua S/stn              Kanwara                                    DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1140
                                                MADHUR_VIHAR_HOUSE

33 kV Paharua S/stn              Kanwara    PH9-DT-04-MAJAGAWAN_PHATAK      DT   All Section         Weasal         LTABCABLE-95MM^2     4926


33 kV Paharua S/stn              Kanwara     PH9-DT-07-SHUMANI_DAL_MILL     DT   All Section         Squirrel       LTABCABLE-95MM^2     1704

                                                                                                Rabbit , Weasal ,
33 kV Paharua S/stn              Kanwara        PH9-DT-16-NAYA_GAON         DT   All Section    Squirrel , 35 mm2   LTABCABLE-95MM^2     2472
                                                                                                      PVC

33 kV Paharua S/stn              Kanwara    PH9-DT-17-PURANI_KEET_NASHAK    DT   All Section         Squirrel       LTABCABLE-95MM^2     3588

                                                     PH9-DT-18-
33 kV Paharua S/stn              Kanwara                                    DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     3342
                                              PURANI_AB_SWITCH_WALA

33 kV Paharua S/stn              Kanwara            PH9-DT-15-FCI           DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1842

                                                      P-DT-19-
33 kV Paharua S/stn              Kanwara                                    DT   All Section        Squirrel        LTABCABLE-95MM^2     2250
                                             BACK_OF_LEATHER_GODOWN-1

                                                      P-DT-21-
33 kV Paharua S/stn              Kanwara                                    DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     420
                                             BACK_OF_LEATHER_GODOWN-3

                                                      P-DT-20-
33 kV Paharua S/stn              Kanwara                                    DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1836
                                             BACK_OF_LEATHER_GODOWN-2
                 City-1 feeder
                                                                                               Squirrel , 35 mm2
132 kV Shanti Nagar              City - 1        D-T-10-BSNL_OFFICE        DT   All Section                            LTABCABLE-95MM^2   1716
                                                                                                     PVC

                                                                                              Weasal , Squirrel , GI
132 kV Shanti Nagar              City - 1     D-T-12-SUBHAS_TRANSPORT      DT   All Section                          LTABCABLE-95MM^2     360
                                                                                                      wire

                                                     D-T-14-                                  Weasal , Squirrel , 35
132 kV Shanti Nagar              City - 1                                  DT   All Section                          LTABCABLE-95MM^2     1212
                                            GURU_NANAK_DHARAM_KANTA                               mm2 PVC
                                                                                               Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1   D-T-21-JALIL_BHATTA_KUK_ROAD   DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   564
                                                                                                     PVC
                                                                                               Squirrel , 35 mm2
132 kV Shanti Nagar              City - 1    D-T-23-SURESH_WELDING_OLD     DT   All Section                            LTABCABLE-95MM^2   1674
                                                                                                     PVC

                                                                                               Squirrel , 35 mm2
132 kV Shanti Nagar              City - 1        D-T-24-BADVATOLA          DT   All Section                            LTABCABLE-95MM^2   1374
                                                                                                     PVC

                                                                                              Rabbit , Weasal , 35
132 kV Shanti Nagar              City - 1       D-T-29-KATRA_BAZAAR        DT   All Section                            LTABCABLE-95MM^2   756
                                                                                                  mm2 PVC

                                                                                              Rabbit , Squirrel , 35
132 kV Shanti Nagar              City - 1    D-T-31-HERO_HONDA_AGENCY      DT   All Section                            LTABCABLE-95MM^2   2154
                                                                                                  mm2 PVC

                                                                                              Weasal , Squirrel , 35
132 kV Shanti Nagar              City - 1     D-T-33-CHAUBE_JEE_WALA       DT   All Section                          LTABCABLE-95MM^2     1200
                                                                                                  mm2 PVC

                                                                                              Rabbit , Squirrel , 35
132 kV Shanti Nagar              City - 1   D-T-35-BIRENDER_SINGH_WALA-2   DT   All Section                            LTABCABLE-95MM^2   1152
                                                                                                  mm2 PVC

                                                                                              Weasal , Squirrel , 35
132 kV Shanti Nagar              City - 1      D-T-36-PATHAK_JI_WALA-1     DT   All Section                          LTABCABLE-95MM^2     1302
                                                                                              mm2 PVC , GI wire

                                                                                              Weasal , Squirrel , 35
132 kV Shanti Nagar              City - 1      D-T-37-PATHAK_JI_WALA-2     DT   All Section                          LTABCABLE-95MM^2     1422
                                                                                                  mm2 PVC
                                                                                               Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1    D-T-38-LAKSHI_PAN_BHANDAR     DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   2484
                                                                                                     PVC
                                                                                              Weasal , Squirrel , GI
132 kV Shanti Nagar              City - 1         D-T-39-NURA_TELI         DT   All Section                          LTABCABLE-95MM^2     1686
                                                                                                       wire
                                                                                               Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1      D-T-40-JAI_HIND_CHOWK       DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   738
                                                                                                     PVC
                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1      D-T-41-BHIM_RAO_CHOWK       DT   All Section                            LTABCABLE-95MM^2   1164
                                                                                                   Squirrel

                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1      D-T-42-BAHARAT_CHOWK        DT   All Section                            LTABCABLE-95MM^2   684
                                                                                                   Squirrel

132 kV Shanti Nagar              City - 1      D-T-43-TIWARI_JEE_WALA      DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   1164

                                                     D-T-44-                                    Rabbit , Weasal ,
132 kV Shanti Nagar              City - 1                                  DT   All Section                            LTABCABLE-95MM^2   900
                                            RAGHUNATH_MANDIR(TIKURIA)                              Squirrel



                 City-2 feeder

132 kV Shanti Nagar              City - 2       E-DT-05-JAIN_MANDIR        DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   552


132 kV Shanti Nagar              City - 2        E-DT-06-SHIV_HARE         DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   1488

                                                     E-DT-07-
132 kV Shanti Nagar              City - 2                                  DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   960
                                              HOUSING_BOARD_GROUND

132 kV Shanti Nagar              City - 2          E-DT-09-DUPLEX          DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   792


132 kV Shanti Nagar              City - 2     E-DT-10-RAMA_INDUSTRIES      DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   1158


132 kV Shanti Nagar              City - 2   E-DT-03-MADHAV_NAGAR_GATE      DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   1104



                 City-3 feeder
                                                       F-T-02-                                  Rabbit , Weasal ,
132 kV Shanti Nagar              City - 3                                  DT   All Section                            LTABCABLE-95MM^2   900
                                             BRIJ_LAL_BALANI_SHANTI_NA                             Squirrel

                                                                                                Squirrel , 35 mm2
132 kV Shanti Nagar              City - 3         F-T-03-PANJAWANI         DT   All Section                            LTABCABLE-95MM^2   1116
                                                                                                      PVC
                                                        F-T-04-                                Weasal , Squirrel , 35
132 kV Shanti Nagar                City - 3                                 DT   All Section                          LTABCABLE-95MM^2    1062
                                              DR_R_H_ASARNI_SHANTI_NAGA                            mm2 PVC
                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 3      F-T-13-CHURCH_LAKHERA      DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    828
                                                                                                      PVC
                                                        F-T-16-                                Weasal , Squirrel , 35
132 kV Shanti Nagar                City - 3                                 DT   All Section                          LTABCABLE-95MM^2    1068
                                              HEALTH_CENTER_LAKHERA_PAN                            mm2 PVC
                                                                                                Rabbit , Weasal ,
                                                        F-T-17-
132 kV Shanti Nagar                City - 3                                 DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2   1758
                                               TALAB_NAYA_GAON_LAKHERA
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 3       F-T-23-MPSEB_OFFICE-2     DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    648
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
                                                        F-T-18-
132 kV Shanti Nagar                City - 3                                 DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    540
                                               TIKURIA_HANUMAN_MANDIR
                                                                                                      PVC
                                                        F-T-29-
132 kV Shanti Nagar                City - 3                                 DT   All Section    Weasal , Squirrel      LTABCABLE-95MM^2    372
                                              KAMINIA_GATE_BABA_MAZAAR

                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 3       F-T-33-M_E_S_COLONY       DT   All Section                           LTABCABLE-95MM^2    684
                                                                                                   Squirrel



                   City-4 feeder
                                                                                                Rabbit , Weasal ,
                                                       G-T-05-
132 kV Shanti Nagar                City - 4                                 DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    240
                                              LAWARANCE_LINE_H_B_COLONY
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
                                                        G-T-14-
132 kV Shanti Nagar                City - 4                                 DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    936
                                                NAGAR_NIGAM_SUB_OFFICE
                                                                                                      PVC

132 kV Shanti Nagar                City - 4     G-T-15-ANKUR_INDUSTRIES     DT   All Section    Weasal , Squirrel      LTABCABLE-95MM^2   1002


132 kV Shanti Nagar                City - 4      G-T-17-JYOTI_DAL_MILL-1    DT   All Section    Weasal , Squirrel      LTABCABLE-95MM^2    576


132 kV Shanti Nagar                City - 4      G-T-18-JYOTI_DAL_MILL-2    DT   All Section    Rabbit , Squirrel      LTABCABLE-95MM^2   1488

                                                         G-T-19-
132 kV Shanti Nagar                City - 4                                 DT   All Section    Weasal , Squirrel      LTABCABLE-95MM^2   1272
                                              BANGLA_LINE_HANUMAN_MANDR

132 kV Shanti Nagar                City - 4        G-T-20-A_C_C_CLUB        DT   All Section    Rabbit , Squirrel      LTABCABLE-95MM^2    696

                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4       G-T-21-P_M_DALL_MILL      DT   All Section                           LTABCABLE-95MM^2   1416
                                                                                                   Squirrel

                                                                                               Weasal , Squirrel ,35
132 kV Shanti Nagar                City - 4     G-T-22-MANIK_INDUSTRIES     DT   All Section                           LTABCABLE-95MM^2    744
                                                                                                   mm2 PVC

                                                                                               Rabbit , Weasal , 35
132 kV Shanti Nagar                City - 4       G-T-25-PWD_COLONY-1       DT   All Section                           LTABCABLE-95MM^2    900
                                                                                                   mm2 PVC

                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4       G-T-26-PWD_COLONY-2       DT   All Section                           LTABCABLE-95MM^2   1698
                                                                                                   Squirrel

                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4      G-T-27-GRAM_PANCHYAT       DT   All Section                           LTABCABLE-95MM^2   1596
                                                                                                   Squirrel

                                                        G-T-29-
132 kV Shanti Nagar                City - 4                                 DT   All Section    Rabbit , Squirrel      LTABCABLE-95MM^2   1082.4
                                               BACK_OF_MADHAV_HOSPITAL
                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4   G-T-30-CHANDRESH_INDUSTRIES   DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2   1293.6
                                                                                                      PVC
                                                                                                Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4    G-T-31-RORAHA_BAL_MANDIR     DT   All Section                           LTABCABLE-95MM^2   1482
                                                                                                   Squirrel

                                                        G-T-33-                                 Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4                                 DT   All Section                           LTABCABLE-95MM^2    600
                                               NEAR_SUB_POST_OFFICE_OLD                            Squirrel

                                                        G-T-34-                                 Rabbit , Weasal ,
132 kV Shanti Nagar                City - 4                                 DT   All Section                           LTABCABLE-95MM^2   1152
                                              SANJAY_NAGAR(BHATIA_WALA)                            Squirrel



                   City-7 feeder

                                   City-7       O-T-05-IN_GOVT_HOSPITAL     DT   All Section    Weasal , Squirrel      LTABCABLE-95MM^2    840
 33kV Katayaghat
                                                                                                Rabbit , Weasal ,
                                                                                                                                                   2.11   15.486
                                   City-7        O-T-07-MISHAN_CHOWK-2      DT   All Section    Squirrel , 35 mm2      LTABCABLE-95MM^2    600
 33kV Katayaghat                                                                                      PVC
                                                                                               Weasal , Squirrel , GI
                                   City-7         O-T-08-NAGAR_NIGAM        DT   All Section                          LTABCABLE-95MM^2     420
                                                                                                       wire
 33kV Katayaghat
                                                           O-T-09-
                                     City-7                                     DT   All Section    Weasal , Squirrel       LTABCABLE-95MM^2   402
                                                  INFRONT_OF_HEAD_POST_OFFI
33kV Katayaghat
                                                                                                    Rabbit , Weasal ,
                                     City-7         O-T-11-VENKAT_LIBRARY       DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   360
33kV Katayaghat                                                                                           PVC
                                                                                                    Rabbit , Weasal ,
                                     City-7           O-T-14-REST_HOUSE         DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   342
33kV Katayaghat                                                                                           PVC
                                                                                                    Rabbit , Weasal ,
                                     City-7        O-T-16-MADHAI_MANDIR-1       DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   510
33kV Katayaghat                                                                                           PVC
                                                                                                   Rabbit , Weasal , 35
                                     City-7        O-T-17-MADHAI_MANDIR-2       DT   All Section                            LTABCABLE-95MM^2   960
                                                                                                       mm2 PVC
33kV Katayaghat
                                                                                                   Rabbit , Squirrel , 35
                                     City-7           O-T-18-GOL_BAZAR-1        DT   All Section                            LTABCABLE-95MM^2   1086
                                                                                                       mm2 PVC
33kV Katayaghat
                                                                                                    Squirrel , 35 mm2
                                     City-7           O-T-19-GOL_BAZAR-2        DT   All Section                            LTABCABLE-95MM^2   798
                                                                                                          PVC
33kV Katayaghat
                                                                                                    Squirrel , 35 mm2
                                     City-7          O-T-22-GANDHI_DWAR         DT   All Section                            LTABCABLE-95MM^2   660
                                                                                                          PVC
33kV Katayaghat
                                                                                                    Rabbit , Weasal ,
                                     City-7         O-T-23-SUBHASH_CHOWK        DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   415.2
33kV Katayaghat                                                                                           PVC

                                     City-7         O-T-24-MISHAN_CHOWK-3       DT   All Section   Rabbit , 35 mm2 PVC LTABCABLE-95MM^2        1458
33kV Katayaghat
                                                                                                   Rabbit , Weasal , GI
                                     City-7            O-T-25-CHHAWRA           DT   All Section                            LTABCABLE-95MM^2   2910
                                                                                                           wire
33kV Katayaghat
                                                                                                     Rabbit , Weasal ,
                                     City-7       O-T-26-GHATAR_GHAT_ROAD       DT   All Section                            LTABCABLE-95MM^2   415.2
                                                                                                      35mm2 PVC
33kV Katayaghat

                                     City-7         O-T-27-BATTU_LAL_WALA       DT   All Section   Weasal, 35 mm2 PVC LTABCABLE-95MM^2         408
33kV Katayaghat
                                                                                                    Rabbit , Weasal ,
                                     City-7           O-T-15-PWD_OFFICE         DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   1410
33kV Katayaghat                                                                                           PVC


              Industrail feeder

                                    Industrail     P-ID-05-BHARAT_MINERALS      DT   All Section     Rabbit , Weasal        LTABCABLE-95MM^2   415.2
33kV Katayaghat

                                    Industrail      P-ID-39-JP_REFACTORIES      DT   All Section     Rabbit , Weasal        LTABCABLE-95MM^2   2154
33kV Katayaghat

                                                                                                                                               2736
             Pump House feeder
                                                                                                    Rabbit , Weasal ,
                                   Pump House        R-T-21-FITTER_HOUSE        DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   4392
33kV Katayaghat                                                                                           PVC
                                                                                                   Weasal , Squirrel , 35
                                   Pump House      R-T-22-CMO_NAGAR_NIGAM       DT   All Section                          LTABCABLE-95MM^2     420
                                                                                                       mm2 PVC
33kV Katayaghat
                                                                                                    Rabbit , Weasal ,
                                   Pump House      R-T-23-CMO_NAGAR_NIGAM       DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   780
33kV Katayaghat                                                                                           PVC

                                   Pump House          R-T-17-SHYAMLAL          DT   All Section     Rabbit , Weasal        LTABCABLE-95MM^2   560.4
33kV Katayaghat

                                   Pump House            R-T-18-NOBEL           DT   All Section     Rabbit , Weasal        LTABCABLE-95MM^2   972
33kV Katayaghat

                                                                                                                                               1068
              police line feeder
                                                                                                   Weasal , Squirrel , 35
                                   police line      N-PLT-1-BILAHARI_ROAD       DT   All Section                          LTABCABLE-95MM^2     1200
                                                                                                       mm2 PVC
 33kV Jhinjhari
                                                                                                   Weasal , Squirrel , 35
                                   police line   N-PLT-3-RAWAL_DAS_JHINJHARI    DT   All Section                          LTABCABLE-95MM^2     2640
                                                                                                       mm2 PVC
 33kV Jhinjhari

                                                                                                                                               900
             Kachhgawan feeder
                                                                                                   Rabbit , Weasal , 35
                                   Kachhgawan    M-T-01-MURLI_DHABA_JHINJHARI   DT   All Section                            LTABCABLE-95MM^2   660
                                                                                                       mm2 PVC
 33kV Jhinjhari
                                                                                                    Rabbit , Weasal ,
                                   Kachhgawan       M-T-17-IMALIYA_VILLAGE      DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   494.4
 33kV Jhinjhari                                                                                           PVC
                                                          M-T-21-                                  Weasal , Squirrel , 35
                                   Kachhgawan                                   DT   All Section                          LTABCABLE-95MM^2     840
                                                 PRIMARY_SCHOOL_JHINJHARI_                             mm2 PVC
 33kV Jhinjhari
                                                                                                    Weasal , Squirrel , 35
                                   Kachhgawan     M-T-24-SUBASH_JAIN_TRANSPORT   DT   All Section                          LTABCABLE-95MM^2   936
                                                                                                        mm2 PVC
  33kV Jhinjhari

                                   Kachhgawan     M-T-29-NEAR_PRIMARY_SCHOOL     DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     654
  33kV Jhinjhari

                                   Kachhgawan          M-T-49-NIWAR_RIVER        DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1152
  33kV Jhinjhari

                                   Kachhgawan           M-T-50-PEER_BABA         DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1020
  33kV Jhinjhari

                                   Kachhgawan          M-T-51-NIWAR_RIVER        DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     900
  33kV Jhinjhari

                                                                                                                                              696
               Mansarover feeder
                                                                                                    Weasal , Squirrel , 35
                                    Mansarover      C-T-07-IMALIYA_MARGHATA      DT   All Section                          LTABCABLE-95MM^2   816
                                                                                                        mm2 PVC
33KV Madhav Nagar

                                    Mansarover     C-T-09-IMALIYA_NAYA_GAON      DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     756
33KV Madhav Nagar

                                                                                                                                              1548
             Madhav Nagar feeder

                                   Madhav Nagar     V-T-01-GANGA_RAM_HOUSE       DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     978
33KV Madhav Nagar

                                   Madhav Nagar       V-T-02-MN_INDUSTRIES       DT   All Section        Squirrel        LTABCABLE-95MM^2     948
33KV Madhav Nagar

                                   Madhav Nagar        V-T-07-POST_OFFICE-1      DT   All Section         Weasal         LTABCABLE-95MM^2     1500
33KV Madhav Nagar

                                   Madhav Nagar   V-T-18-JAI_BHAWANI_DAL_MILL    DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1308
33KV Madhav Nagar

                                   Madhav Nagar      V-T-26-PRITAM_RICE_MILL     DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     492
33KV Madhav Nagar

                                   Madhav Nagar    V-T-27-JAI_BABA_INDUSTRIES    DT   All Section         Weasal         LTABCABLE-95MM^2     870
33KV Madhav Nagar
                                                            V-T-37-
                                   Madhav Nagar                                  DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     864
                                                    MAIN_BAZAR_KAIRAN_LINE
33KV Madhav Nagar
                                                            V-T-38-
                                   Madhav Nagar                                  DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1092
                                                    MAIN_BAZAR_KAIRAN_LINE
33KV Madhav Nagar

                                   Madhav Nagar       V-T-39-TANGA_STAND         DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     816
33KV Madhav Nagar

                                   Madhav Nagar       V-T-40-TANGA_STAND         DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     246
33KV Madhav Nagar

                                   Madhav Nagar   V-T-43-SANJAY_NAGAR_TALLIYA    DT   All Section         Weasal         LTABCABLE-95MM^2     1710
33KV Madhav Nagar
                                                            V-T-44-
                                   Madhav Nagar                                  DT   All Section         Weasal         LTABCABLE-95MM^2     1032
                                                  SANJAY_NAGAR_NEAR_KHER_MA
33KV Madhav Nagar

                                   Madhav Nagar       V-T-45-AMEER_GANJ-1        DT   All Section         Weasal         LTABCABLE-95MM^2     1200
33KV Madhav Nagar

                                   Madhav Nagar       V-T-46-AMEER_GANJ-2        DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1800
33KV Madhav Nagar

                                   Madhav Nagar     V-T-35-GOVIND_INDUSTRIES     DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1872
33KV Madhav Nagar

                                   Madhav Nagar        V-T-47-LALA_YADAV         DT   All Section         Weasal         LTABCABLE-95MM^2     1608
33KV Madhav Nagar

                                                                                                                                              150
                   NKJ feeder

                                       NKJ           J-DT-01-ROSHAN_NAGAR        DT   All Section     Rabbit , Weasal    LTABCABLE-95MM^2     160.8
    33kV NKJ

                                       NKJ          J-DT-02-PRIMARE_FACTORY      DT   All Section    Weasal , Squirrel   LTABCABLE-95MM^2     1338
    33kV NKJ
                                                           J-DT-03-
                                       NKJ                                       DT   All Section     Rabbit , Weasal    LTABCABLE-95MM^2     2748
                                                    NEW_KATNI_MAIN_MARKET
    33kV NKJ

                                       NKJ        J-DT-04-BASANT_AATA_CHAKKI     DT   All Section         Weasal         LTABCABLE-95MM^2     1290
    33kV NKJ
                                      NKJ         J-DT-05-MADHU_AATA_CHAKKI      DT   All Section          Weasal            LTABCABLE-95MM^2   828
33kV NKJ
                                                           J-DT-06-                                   Rabbit , Weasal ,
                                      NKJ                                        DT   All Section                            LTABCABLE-95MM^2   1434
                                                   NAYA_GAON(SUDKHAR_RAO)                                Squirrel
33kV NKJ

                                      NKJ              J-DT-10-POLICE_LINE       DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   1050
33kV NKJ

                                      NKJ             J-DT-12-CHAPRA_BASTI       DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   2700
33kV NKJ

                                      NKJ              J-DT-13-DR_SHARMA         DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   936
33kV NKJ

                                      NKJ              J-DT-18-BILLGAWAN         DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   930
33kV NKJ

                                      NKJ              J-DT-19-PADARWADA         DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   780
33kV NKJ

                                      NKJ              J-DT-11-MOONGA_BAI        DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   1266
33kV NKJ

                                                                                                                                                2952
             Khirehni feeder
                                                                                                    Weasal , Squirrel , 35
                                    Khirehni        I-KHNT-01-ROSHAN_NAGAR       DT   All Section                          LTABCABLE-95MM^2     708
                                                                                                        mm2 PVC
33kV NKJ

                                    Khirehni      I-KHNT-02-SAI_PURAM_COLONY     DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   3144
33kV NKJ

                                    Khirehni      I-KHNT-03-SAI_PURAM_COLONY     DT   All Section      Rabbit , Weasal       LTABCABLE-95MM^2   2052
33kV NKJ

                                    Khirehni          I-KHNT-04-CHAPRAWA         DT   All Section         Squirrel           LTABCABLE-95MM^2   2196
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni        I-KHNT-05-MAHAKAUSHAL        DT   All Section                            LTABCABLE-95MM^2   1428
                                                                                                         Squirrel
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni        I-KHNT-06-TILAK_COLLEGE      DT   All Section                            LTABCABLE-95MM^2   1482
                                                                                                         Squirrel
33kV NKJ

                                    Khirehni         I-KHNT-08-FOREST_OFFICE     DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   954
33kV NKJ
                                                                                                    Weasal , Squirrel , 35
                                    Khirehni        I-KHNT-09-JAGRATI_COLONY     DT   All Section                          LTABCABLE-95MM^2     982.8
                                                                                                        mm2 PVC
33kV NKJ
                                                                                                    Rabbit , Squirrel , 35
                                    Khirehni      I-KHNT-10-NEAR_TILAK_COLLEGE   DT   All Section                            LTABCABLE-95MM^2   504
                                                                                                        mm2 PVC
33kV NKJ
                                                                                                    Weasal , Squirrel , 35
                                    Khirehni        I-KHNT-11-KHIRANI_TALAB      DT   All Section                          LTABCABLE-95MM^2     690
                                                                                                        mm2 PVC
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni           I-KHNT-12-KHIRANI-1       DT   All Section                            LTABCABLE-95MM^2   540
                                                                                                         Squirrel
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni           I-KHNT-13-KHIRANI-2       DT   All Section                            LTABCABLE-95MM^2   1098
                                                                                                         Squirrel
33kV NKJ

                                    Khirehni       I-KHNT-15-SARJU_CHAUDHARY     DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   3540
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni      I-KHNT-17-INCOME_TAX_OFFICE    DT   All Section                            LTABCABLE-95MM^2   1170
                                                                                                         Squirrel
33kV NKJ
                                                                                                     Rabbit , Weasal ,
                                                           I-KHNT-18-
                                    Khirehni                                     DT   All Section    Squirrel , 35 mm2       LTABCABLE-95MM^2   348
                                                     BEHIND_GOVT_HOSPITAL
33kV NKJ                                                                                                   PVC

                                    Khirehni        I-KHNT-19-SHASTRI_COLONY     DT   All Section     Weasal , Squirrel      LTABCABLE-95MM^2   300
33kV NKJ

                                    Khirehni         I-KHNT-20-RAJU_NISHAD       DT   All Section          Weasal            LTABCABLE-95MM^2   912
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni        I-KHNT-27-DUBEY_COLONY       DT   All Section                            LTABCABLE-95MM^2   666
                                                                                                         Squirrel
33kV NKJ
                                                                                                      Rabbit , Weasal ,
                                    Khirehni         I-KHNT-23-PNT_COLONY        DT   All Section                            LTABCABLE-95MM^2   1020
                                                                                                         Squirrel
33kV NKJ

                                                                                                                                                1068
           Gayatri Nagar feeder
                                                                                                      Rabbit , Weasal ,
                                  Gayatri Nagar     H-GN-01-LAKHAN_KANOJIYA      DT   All Section                            LTABCABLE-95MM^2   1770
                                                                                                         Squirrel
33kV NKJ
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar              H-GN-04-NEERAJ_TAKIJ                DT        All Section                               LTABCABLE-95MM^2   540
                                                                                                                                                                  Squirrel
                         33kV NKJ

                                                                 Gayatri Nagar              H-GN-06-CHURCH_WALA                 DT        All Section          Weasal , Squirrel    LTABCABLE-95MM^2   1080
                         33kV NKJ
                                                                                                 H-GN-05-
                                                                 Gayatri Nagar                                                  DT        All Section          Weasal , Squirrel    LTABCABLE-95MM^2   996
                                                                                          DEEP_CHAND_KHUSWAHA
                         33kV NKJ

                                                                 Gayatri Nagar              H-GN-07-TIWARI_WARD                 DT        All Section          Rabbit , Weasal      LTABCABLE-95MM^2   420
                         33kV NKJ

                                                                 Gayatri Nagar        H-GN-08-NAALI_KE_BAAZU_WALA               DT        All Section          Rabbit , Weasal      LTABCABLE-95MM^2   575
                         33kV NKJ

                                                                 Gayatri Nagar             H-GN-10-SONI_BHAGICHA                DT        All Section          Rabbit , Weasal      LTABCABLE-95MM^2   450
                         33kV NKJ
                                                                                               H-GN-11-                                                      Rabbit , Weasal , 35
                                                                 Gayatri Nagar                                                  DT        All Section                               LTABCABLE-95MM^2   915
                                                                                      AMBEDKAR_WARD_GONDA_GHAT                                                   mm2 PVC
                         33kV NKJ
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar               H-GN-14-GIRI_COLONY                DT        All Section                               LTABCABLE-95MM^2   2950
                                                                                                                                                                  Squirrel
                         33kV NKJ
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar                H-GN-17-MAAI_GHAT                 DT        All Section                               LTABCABLE-95MM^2   975
                                                                                                                                                                  Squirrel
                         33kV NKJ

                                                                 Gayatri Nagar           H-GN-18-GHAUTAM_BADHWA                 DT        All Section        Weasal , 35 mm2 PVC LTABCABLE-95MM^2      290
                         33kV NKJ
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar         H-GN-21-GAUTAM_AATA_CHAKKI               DT        All Section                               LTABCABLE-95MM^2   250
                                                                                                                                                                  Squirrel
                         33kV NKJ
                                                                                                                                                             Rabbit , Weasal , 35
                                                                 Gayatri Nagar             H-GN-24-NISHAD_SCHOOL                DT        All Section                               LTABCABLE-95MM^2   760
                                                                                                                                                                 mm2 PVC
                         33kV NKJ
                                                                                                                                                             Rabbit , Weasal , 35
                                                                 Gayatri Nagar        H-GN-26-SONI_NETAJI(PUROSTAM)             DT        All Section                               LTABCABLE-95MM^2   555
                                                                                                                                                                 mm2 PVC
                         33kV NKJ
                                                                                                 H-GN-30-                                                    Rabbit , Weasal , 35
                                                                 Gayatri Nagar                                                  DT        All Section                               LTABCABLE-95MM^2   850
                                                                                        HIRAGANJ_NEAR_PETROL_PUM                                                 mm2 PVC
                         33kV NKJ

                                                                 Gayatri Nagar             H-GN-28-GUPTA_COLONY                 DT        All Section          Weasal , Squirrel    LTABCABLE-95MM^2   890
                         33kV NKJ
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar           H-GN-31-HIRAGANJ_CHORAHA               DT        All Section                               LTABCABLE-95MM^2   1475
                                                                                                                                                                  Squirrel
                         33kV NKJ

                                                                 Gayatri Nagar              H-GN-29-SUNIL_MISHRA                DT        All Section        Weasal , 35 mm2 PVC LTABCABLE-95MM^2      450
                         33kV NKJ
                                                                                                 H-GN-16-                                                      Rabbit , Weasal ,
                                                                 Gayatri Nagar                                                  DT        All Section                               LTABCABLE-95MM^2   900
                         33kV NKJ                                                         GOOYANKA_BAGICHA_SONI                                                   Squirrel
                                                                                                                                                               Rabbit , Weasal ,
                                                                 Gayatri Nagar           H-GN-27-POLICE_CHOWKI_LIC              DT        All Section                               LTABCABLE-95MM^2   830
                         33kV NKJ                                                                                                                                 Squirrel




2               Defective consumer meters / Jam meters (Category wise)                 Nos. of consumer Meter replacement
                                                                                                                                     Proposed Saving in MU
                                                                 Single Phase                         10414                                  1.92
                                                                 Three Phase                           3605                                  0.74
                                                                    Total                             14019                                  2.66

3                        Consumer Meter tampering/ bypassing                           Shifting of meters to outside premises
                                                                                                                                     Proposed Saving in MU
                                                 Total Consumer meters need to be shifted outside the premises
                                                                                                                                             9.85
                                                                                                              38050
4                                                          Network renovation                                                        Proposed Saving in MU
    LT Distibution boxes, elimination of conductor joints, earthing improvement and improving the reliability                                 1.23
                                                                                                      TOTAL SAVINGS                          35.37
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume IV: SUMMARY Project Cost Estimate


4.1 Summary of Project Cost (Bill of Quantities)
Sl.                                                                                            Project Cost from
                                              Particular
No.                                                                                                  IVb*
                                                                                                   Rs. Lac

   A   Sub Transmission System Improvement Work
 A1    33/11 kV Substation : New                                                                          106.57
 A2    33/11 kV SS : Additional Transformer                                                                  -
 A3    33/11 kV SS : Transformer capacity enhancement                                                     119.55
 A4    New 33 KV feeders/Bifurcation                                                                      261.91
 A5    33 KV feeders Reconductoring/Augmentation                                                           20.93
 A6 LILO arreangment on Substation *                                                                         -

 A7 33 kV or 66 KV Line : Installation of remote switchable breaker/switches*                                -

 A8 33 kV VCB                                                                                               3.94
A9 33 kV Line Bay Extension at EHV station                                                                 56.70
A10 11 kV Line : New Feeder/ Feeder Bifurcation                                                           161.62
A11 11 kV Line : Reconductoring/Augmentation                                                               43.56
    11 kV Line : Installation of automated RMUs alongwith aux power supply to operate
A12                                                                                                          -
    sw/breaker - *
A13 11 kV Line :- Installation of remote communicable FPIs ( O/C,E/F)*                                       -
    11 kV Line : Installation of remote switchable breakers alongwith aux power supply to
A14                                                                                                          -
    operate sw/breaker *
A15 11 KV Bay Extension                                                                                    22.50
A16 Renovation & Modernisation of 33/11 kV SS                                                              82.20
A17 Installation of Distribution Transformer                                                              264.66
A18 Capacity enhancement of LT sub-station                                                                101.35
    Installation of remote operable switches for breaker/switches operation for Distribution
A19                                                                                                          -
    Transformer alongwith aux power supply to operate sw/breaker *
A20 Augumentation & Relocation of DT                                                                        6.30
A21 LT Line : Augmentation with Rabbit                                                                       -
A22 Capacitor Bank                                                                                          8.76
    Installation of remote operable switches for breaker/switches operation for cap bank
A23                                                                                                          -
    alongwith aux power supply to operate sw/breaker *
A24 Aerial Bunched Cables                                                                               1,219.70

 B     HVDS                                                                                                  -

 C     Metering                                                                                           331.08

 D     Mobile Service Centre                                                                               30.55

 E     Others                                                                                           2,152.92
       considering the project escalation cost for the year 2010-11 @5% of SOR 09-10                      249.74
                                              Grand Total                                               5,244.54

       * For project area envisaged for SCADA/DMS scheme as per the criteria, town with
       population >=4lac & Input Energy >=350MUs & other potential towns
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Estimated Project Cost - Bill of Quantities

4.2    Works Cost Estimate/ Bill of Quantities
                                                                             Unit   Quantity   Unit Price   Total Cost      Reference
                                Item Details                                                    Rs. Lac      Rs. Lac      Annexure No.
  A    Sub Transmission System Improvement Work
 A1    33/11 kV Substation : New
       New 33 kV power House Substation ( 1 X 8 MVA )                   No                 1      106.57         106.57   Annexure - G-21
                                                                                                                    -
                                                                        Sub Total       1.00                     106.57
 A2    33/11 kV SS : Additional Transformer

                                                                                                                    -
                                                                                                                    -
                                                                        Sub Total                                   -
 A3    33/11 kV SS : Transformer capacity enhancement
       33 kV Katya Ghat S/Stn - 2 x 5 MVA to 5 + 8 MVA                  No                 1       39.85          39.85
                                                                                                                          Annexure - G-8
       33 kV Shanti Nagar S/Stn - 2 x 5 MVA to 2 X 8 MVA                No                 2       39.85          79.70

                                                                        Sub Total       3.00                     119.55
 A4    New 33 KV feeders/Bifurcation
       New 33 kV line from 220 kV paharua upto four pole structure
                                                                                           7         8.66         60.62
       Near 33 kV paharua S/stn ( 3 km away )                           Km

       New 33 kV line from 220 kV paharua to 33 kV paharua S/stn                           4         8.66         34.64   Annexure - G-22
                                                                        Km
       New 33 kV line from 33 kV paharua upto four pole structure ( 3
                                                                                           3         8.66         25.98
       km away from 33 kV paharua S/stn                                 Km

       33 kV New Double Circuit line For New 33 kV power House                            11       10.82         114.69   Annexure - G-33
       S/stn From 33 kV paharua & 220 kV paharua S/stn with Dog         Km

       132 kV Shanti Nagar S/stn To 33 kV Jhinjhari ( from Silimabad
                                                                                           3         8.66         25.98   Annexure - G-22
       Tapping to 33 kV jhinjhari S/stn )                               Km
                                                                        Sub Total      27.60                     261.91
 A5    33 KV feeders Reconductoring/Augmentation
       220 kV Paharua S/stn To 33 kV paharua S/stn With Dog             Km              4.00         1.55          6.20
       132 kV Shanti Nagar S/stn To 33 kV Jhinjhari upto Silimabad
                                                                                        3.50         1.55          5.43
       Tapping With Dog                                                 Km
       132 kV Shanti Nagar to 33 kV Madhav Nagar                        Km                 6         1.55          9.30
                                                                                    Unit   Quantity     Unit Price   Total Cost       Reference
                                  Item Details                                                           Rs. Lac      Rs. Lac        Annexure No.
                                                                              Sub Total                                    20.93
A6   LILO arreangment on Substation *

                                                                                                                             -
                                                                              Sub Total
A7   33 kV or 66 KV Line : Installation of remote switchable
     breaker/switches*

                                                                                                                             -
                                                                                                                             -
                                                                                                                             -
                                                                              Sub Total                                      -
A8   33 kV VCB

     33 kV new VCB at 33 kV Jhinjhari S/stn                                   No                  1           3.94          3.94
                                                                              Sub Total        1.00                         3.94
A9   33 kV Line Bay Extension at EHV station
     33 kV Bay at 220 kV Paharua S/stn                                                              1       27.40          27.40   Annexure - G-28
     2 no of 33 kV bay At 33 kV Paharua S/stn                                 No.                   4         5.86         23.44
     2 no 33 kV Bay at 33 kV Jhinjhari S/stn                                  No.                 1           5.86          5.86    Annexure - G-25
                                                                              Sub Total        5.00                        56.70
A10 11 kV Line : New Feeder/ Feeder Bifurcation

     New kanchgaon with Dog                                                   km             3.65             5.72         20.90
     New Madhav Nagar - 2 with dog                                            km             0.50             5.72          2.86
     New City-8 with dog                                                      km             1.63             5.72          9.31
     New Industrail-2 with dog                                                km             0.50             5.72          2.86
     New Gole Bazaar with dog                                                 km             0.30             5.72          1.72
     New Jharra tikuriya with dog                                             km             0.40             5.72          2.29    Annexure - G-2A
     New Station Road with dog                                                km             0.65             5.72          1.72
     New City-5 with Dog                                                      km             2.10             5.72          2.29
     New Kanwara with Dog                                                     km             2.25             5.72          2.29
     New NKJ with Dog                                                         km             0.50             5.72          3.72
     New Khirehni with Dog                                                    km             2.55             5.72         12.87
     Inter Connection Between City - 5 and pump House With 120 mm2 ABC from
     railway line                                                             km             1.50             8.60          4.30   Annexure - G-24
                                                         Unit   Quantity   Unit Price   Total Cost      Reference
                              Item Details                                  Rs. Lac      Rs. Lac      Annexure No.
New HT Line With Dog For Distribution transformer
K-CC-02-COLLECTRATE_OFFICE                          km            0.03           5.72          0.14
R-T-18-NOBEL                                        km            0.22           5.72          1.26
M-T-01-MURLI_DHABA_JHINJHARI                        km            0.10           5.72          0.57
M-T-21-PRIMARY_SCHOOL_JHINJHARI_                    km            0.05           5.72          0.29
J-DT-01-ROSHAN_NAGAR                                km            0.08           5.72          0.46
J-DT-03-NEW_KATNI_MAIN_MARKET                       km            0.05           5.72          0.29
J-DT-13-DR_SHARMA                                   km            0.03           5.72          0.14
J-DT-15-BIJU_AATA_CHAKKI                            km            0.03           5.72          0.17
J-DT-16-MANGAL_BAZAR                                km            0.03           5.72          0.17
I-KHNT-05-MAHAKAUSHAL                               km            0.17           5.72          0.97
I-KHNT-10-NEAR_TILAK_COLLEGE                        km            0.07           5.72          0.40
I-KHNT-27-DUBEY_COLONY                              km            0.19           5.72          1.09
I-KHNT-27-DUBEY_COLONY                              km            0.13           5.72          0.74
I-KHNT-11-KHIRANI_TALAB                             km            0.03           5.72          0.17
I-KHNT-12-KHIRANI-1                                 km            0.15           5.72          0.86
PH9-DT-02-INDER_NAGAR                               km            0.08           5.72          0.46
PH9-DT-02-INDER_NAGAR                               km            0.18           5.72          1.03   Annexure - G-2A
PH9-DT-03-MADHUR_VIHAR_HOUSE                        km            0.35           5.72          2.00
PH9-DT-18-PURANI_AB_SWITCH_WALA                     km            0.38           5.72          2.17
PH9-DT-15-FCI                                       km            0.08           5.72          0.46
PH9-DT-15-FCI                                       km            0.09           5.72          0.51
PH9-DT-16-NAYA_GAON                                 km            0.48           5.72          2.75
P-DT-21-BACK_OF_LEATHER_GODOWN-3                    km            0.20           5.72          1.14
T1-T-01-PAHUARA_NEAR_SUB_STATION                    km            0.43           5.72          2.46
T1-T-02-KRISHI_UPAJ_MANDI                           km            0.09           5.72          0.51
T1-T-04-CENTRAL_BANK_OF_INDIA                       km            0.05           5.72          0.29
T1-T-07-SETHIA_DAL_MILL_KUTHLA                      km            0.13           5.72          0.74
T1-T-08-NEAR_DAINIK_MADHYA_PRADESH                  km            0.04           5.72          0.23
T1-T-09-AHAMAD_NAGAR                                km            0.03           5.72          0.17
T1-T-15-ADHARKAAP_BAGICHA                           km            0.17           5.72          0.97
E-DT-01-MPSEB_COLONY                                km            0.08           5.72          0.43
E-DT-02-AJAY_FOODS                                  km            0.27           5.72          1.54
E-DT-04-MOHAN_BAJAJ                                 km            0.11           5.72          0.63
                                                                 Unit   Quantity   Unit Price   Total Cost      Reference
                             Item Details                                           Rs. Lac      Rs. Lac      Annexure No.
New HT Line With 120 mm2 ABC For Distribution transformer
H-GN-14-GIRI_COLONY                                         km            0.18           7.18          1.26
H-GN-17-MAAI_GHAT                                           km            0.20           7.18          1.44
H-GN-30-HIRAGANJ_NEAR_PETROL_PUMP                           km            0.27           7.18          1.94
H-GN-31-HIRAGANJ_CHORAHA                                    km            0.19           7.18          1.33
V-T-01-GANGA_RAM_HOUSE                                      km            0.12           7.18          0.86
V-T-07-POST_OFFICE-1                                        km            0.08           7.18          0.57
V-T-39-TANGA_STAND                                          km            0.19           7.18          1.33
G-T-34-SANJAY_NAGAR(BHATIA_WALA) of City-4 Feeder           km            0.31           7.18          2.23
O-T-07-MISHAN_CHOWK-2                                       km            0.05           7.18          0.36
O-T-08-NAGAR_NIGAM                                          km            0.11           7.18          0.79
O-T-09-INFRONT_OF_HEAD_POST_OFFI                            km            0.12           7.18          0.86
O-T-09-INFRONT_OF_HEAD_POST_OFFI                            km            0.00           7.18           -
O-T-26-GHATAR_GHAT_ROAD                                     km            0.12           7.18          0.86
O-T-10-KACHAHRI_WALA                                        km            0.02           7.18          0.14
O-T-11-VENKAT_LIBRARY                                       km            0.18           7.18          1.29
O-T-14-REST_HOUSE                                           km            0.12           7.18          0.83
O-T-18-GOL_BAZAR-1                                          km            0.07           7.18          0.47
O-T-17-MADHAI_MANDIR-2                                      km            0.14           7.18          0.97
O-T-19-GOL_BAZAR-2                                          km            0.19           7.18          1.36
O-T-23-SUBHASH_CHOWK                                        km            0.18           7.18          1.29
S-DT-02-UP_SAWASHASTHYA_KENDRA                              km            0.20           7.18          1.44
S-DT-07-RAIN_BASERA                                         km            0.08           7.18          0.57
S-DT-08-KRISHAN_COLD_STORE                                  km            0.06           7.18          0.39
S-DT-09-MARGHATYE_MORE                                      km            0.08           7.18          0.54
S-DT-12-SHIV_NAGAR_COLONY                                   km            0.23           7.18          1.62
S-DT-15-CHANDAK_DHAL                                        km            0.16           7.18          1.15
S-DT-14-BALAJI_AGENCY                                       km            0.11           7.18          0.79
S-DT-30-ADARAS_COLONY                                       km            0.05           7.18          0.36
S-DT-30-ADARAS_COLONY                                       km            0.08           7.18          0.57
S-DT-22-GANDHI_GANJ_PIPAL_WALA                              km            0.12           7.18          0.86
S-DT-21-GANDHI_GANJ_NALA_WALA                               km            0.13           7.18          0.93
S-DT-28-SARARWATI_SCHOOL_MODE                               km            0.04           7.18          0.29   Annexure - G-4b
S-DT-23-BARSIAYA_NO-1                                       km            0.04           7.18          0.29
S-DT-24-BARSIAYA_NO-2                                       km            0.11           7.18          0.79
S-DT-26-BAJAJ_HOSPITAL                                      km            0.20           7.18          1.44
S-DT-27-SANT_NAGAR                                          km            0.13           7.18          0.90
S-DT-27-SANT_NAGAR                                          km            0.07           7.18          0.50
F-T-02-BRIJ_LAL_BALANI_SHANTI_NAGAR                         km            0.11           7.18          0.75
F-T-08-DEHRU_LINE                                           km            0.40           7.18          2.87
F-T-12-MICRO_WAVE                                           km            0.30           7.18          2.15
F-T-16-HEALTH_CENTER_LAKHERA_PAN                            km            0.15           7.18          1.08
F-T-21-RAILWAY_SUBSTATION                                   km            0.10           7.18          0.72
F-T-24-MPSEB_OFFICE-3                                       km            0.15           7.18          1.04
                                                                                            Annexure - G-4b




                                            Unit      Quantity   Unit Price   Total Cost      Reference
                          Item Details                            Rs. Lac      Rs. Lac      Annexure No.
F-T-24-MPSEB_OFFICE-3                    km             0.07           7.18          0.47
F-T-29-KAMINIA_GATE_BABA_MAZAAR          km             0.10           7.18          0.72
F-T-29-KAMINIA_GATE_BABA_MAZAAR          km             0.04           7.18          0.29
D-T-12-SUBHAS_TRANSPORT                  km             0.05           7.18          0.32
D-T-14-GURU_NANAK_DHARAM_KANTA           km             0.50           7.18          3.59
D-T-21-JALIL_BHATTA_KUK_ROAD             km             0.29           7.18          2.08
D-T-25-RAJIB_JAIN                        km             0.12           7.18          0.86
D-T-33-CHAUBE_JEE_WALA                   km             0.20           7.18          1.44
D-T-36-PATHAK_JI_WALA-1                  km             0.16           7.18          1.15
D-T-36-PATHAK_JI_WALA-1                  km             0.24           7.18          1.72
D-T-35-BIRENDER_SINGH_WALA-2             km             0.10           7.18          0.72
D-T-38-LAKSHI_PAN_BHANDAR                km             0.19           7.18          1.36
D-T-39-NURA_TELI                         km             0.19           7.18          1.36
D-T-40-JAI_HIND_CHOWK                    km             0.02           7.18          0.14
D-T-42-BAHARAT_CHOWK                     km             0.15           7.18          1.08
G-T-05-LAWARANCE_LINE_H_B_COLONY         km             0.15           7.18          1.08
G-T-22-MANIK_INDUSTRIES                  km             0.41           7.18          2.94
G-T-27-GRAM_PANCHYAT                     km             0.26           7.18          1.87
G-T-30-CHANDRESH_INDUSTRIES              km             0.25           7.18          1.80
G-T-31-RORAHA_BAL_MANDIR                 km             0.15           7.18          1.08
                                          Sub Total    30.63                       161.62
                                                                          Unit   Quantity    Unit Price   Total Cost      Reference
                             Item Details                                                     Rs. Lac      Rs. Lac       Annexure No.
A11 11 kV Line : Reconductoring/Augmentation
    Feeder Reconductoring by Dog
    KachGaon                                                        km             7.16            1.53         10.96
    Industrail                                                      km             1.96            1.53          3.00
    Madhav nagar                                                    km             2.88            1.53          4.41
    Mansarover                                                      km             1.08            1.53          1.65
                                                                                                                        Annexure - G-2B
    Gayatri Nagar                                                   km             4.38            1.53          6.69
    Khirehni                                                        km             5.03            1.53          7.70
    kanwara                                                         km             3.15            1.53          4.82
    NKJ                                                             km             2.83            1.53          4.33
                                                                     Sub Total       28.47                      43.56
A12 11 kV Line : Installation of automated RMUs alongwith aux
    power supply to operate sw/breaker - *

                                                                                                                  -
                                                                                                                  -
                                                                                                                  -
                                                                                      Sub Total                   -
A13 11 kV Line :- Installation of remote communicable FPIs (
    O/C,E/F)*

                                                                                                                  -
                                                                                                                  -
                                                                                                                  -
                                                                                      Sub Total                   -
A14 11 kV Line : Installation of remote switchable breakers
    alongwith aux power supply to operate sw/breaker *

                                                                                                                  -
                                                                                                                  -
                                                                                                                  -
                                                                                      Sub Total                   -
A15 11 KV Bay Extension
    2 no 11 kV Bay Extension At 33 kv Jhinjhari S/stn               No               2.00          3.75          7.50
    11 kV Bay Extension At 33 kv katya Ghat S/stn                   No               1.00          3.75          3.75
                                                                                                                        Annexure - G-10
    11 kV Bay Extension At 33 kv Madhav Nagar S/stn                 No               1.00          3.75          3.75
    2 no 11 kV Bay Extension At 33 kv Nkj S/stn                     No               2.00          3.75          7.50
                                                                    Sub Total        6.00                       22.50
A16 Renovation & Modernisation of 33/11 kV SS
      4 No of 33 kV S/stn Namely Jhinjhari , Madhav nagar , Katya   No.              4.00         20.55         82.20 Annexure - G-27
                          ghat , Shanti Nagar
                                                                                      Sub Total                 82.20
                                                                         Unit   Quantity   Unit Price   Total Cost      Reference
                               Item Details                                                 Rs. Lac      Rs. Lac      Annexure No.
A17 Installation of Distribution Transformer
     K-CC-02-COLLECTRATE_OFFICE - 100 KVA                           No                 1         2.44          2.44
     M-T-21-PRIMARY_SCHOOL_JHINJHARI_- 100 KVA                      No                 1         2.44          2.44
     J-DT-03-NEW_KATNI_MAIN_MARKET- 100 KVA                         No                 1         2.44          2.44
     J-DT-05-MADHU_AATA_CHAKKI- 100 KVA                             No                 1         2.44          2.44
     J-DT-13-DR_SHARMA- 100 KVA                                     No                 1         2.44          2.44
     J-DT-15-BIJU_AATA_CHAKKI- 100 KVA                              No                 1         2.44          2.44
     J-DT-16-MANGAL_BAZAR- 100 KVA- 100 KVA                         No                 1         2.44          2.44
     I-KHNT-10-NEAR_TILAK_COLLEGE- 100 KVA                          No                 1         2.44          2.44
     I-KHNT-27-DUBEY_COLONY- 100 KVA                                No                 1         2.44          2.44
     I-KHNT-27-DUBEY_COLONY- 100 KVA                                No                 1         2.44          2.44
     I-KHNT-11-KHIRANI_TALAB- 100 KVA                               No                 1         2.44          2.44
     I-KHNT-12-KHIRANI-1- 100 KVA                                   No                 1         2.44          2.44
     PH9-DT-02-INDER_NAGAR- 100 KVA                                 No                 1         2.44          2.44
     PH9-DT-03-MADHUR_VIHAR_HOUSE- 100 KVA                          No                 1         2.44          2.44
     PH9-DT-18-PURANI_AB_SWITCH_WALA- 100 KVA                       No                 1         2.44          2.44
     PH9-DT-15-FCI- 100 KVA                                         No                 1         2.44          2.44
     PH9-DT-16-NAYA_GAON- 100 KVA                                   No                 1         2.44          2.44
     H-GN-05-DEEP_CHAND_KUSHWAHA- 100 KVA                           No                 1         2.44          2.44
     H-GN-13-KV_INDUSTRIES- 100 KVA                                 No                 1         2.44          2.44
     H-GN-14-GIRI_COLONY- 100 KVA                                   No                 1         2.44          2.44
     H-GN-17-MAAI_GHAT- 100 KVA                                     No                 1         2.44          2.44
     H-GN-30-HIRAGANJ_NEAR_PETROL_PUMP- 100 KVA                     No                 1         2.44          2.44
     H-GN-31-HIRAGANJ_CHORAHA- 100 KVA                              No                 1         2.44          2.44
     T1-T-01-PAHUARA_NEAR_SUB_STATION- 100 KVA                      No                 1         2.44          2.44
     T1-T-02-KRISHI_UPAJ_MANDI- 100 KVA                             No                 1         2.44          2.44
     T1-T-08-NEAR_DAINIK_MADHYA_PRADESH- 100 KVA                    No                 1         2.44          2.44
     T1-T-09-AHAMAD_NAGAR- 100 KVA                                  No                 1         2.44          2.44
     V-T-01-GANGA_RAM_HOUSE- 100 KVA                                No                 1         2.44          2.44
       G-T-34-SANJAY_NAGAR(BHATIA_WALA) of City-4 Feeder- 100 KVA
                                                                    No                 1         2.44          2.44
     O-T-09-INFRONT_OF_HEAD_POST_OFFI- 100 KVA                      No                 1         2.44          2.44
     O-T-26-GHATAR_GHAT_ROAD- 100 KVA                               No                 1         2.44          2.44
     O-T-10-KACHAHRI_WALA- 100 KVA                                  No                 1         2.44          2.44
     O-T-11-VENKAT_LIBRARY- 100 KVA                                 No                 1         2.44          2.44
     O-T-14-REST_HOUSE- 100 KVA                                     No                 1         2.44          2.44
     O-T-18-GOL_BAZAR-1- 100 KVA                                    No                 1         2.44          2.44
     S-DT-02-UP_SAWASHASTHYA_KENDRA- 100 KVA                        No                 1         2.44          2.44
     S-DT-08-KRISHAN_COLD_STORE- 100 KVA                            No                 1         2.44          2.44
     S-DT-09-MARGHATYE_MORE- 100 KVA                                No                 1         2.44          2.44
     S-DT-14-BALAJI_AGENCY- 100 KVA                                 No                 1         2.44          2.44
     S-DT-30-ADARAS_COLONY- 100 KVA                                 No                 1         2.44          2.44
     S-DT-30-ADARAS_COLONY- 100 KVA                                 No                 1         2.44          2.44
     S-DT-26-BAJAJ_HOSPITAL- 100 KVA                                No                 1         2.44          2.44




                                                                                                                      Annexure - G-3b
                                                     Unit   Quantity   Unit Price   Total Cost      Reference
                          Item Details                                  Rs. Lac      Rs. Lac      Annexure No.
S-DT-27-SANT_NAGAR- 100 KVA                     No                 1         2.44          2.44
S-DT-29-GIRJA_GHAT- 100 KVA                     No                 1         2.44          2.44
F-T-16-HEALTH_CENTER_LAKHERA_PAN- 100 KVA       No                 1         2.44          2.44
F-T-21-RAILWAY_SUBSTATION- 100 KVA              No                 1         2.44          2.44
F-T-24-MPSEB_OFFICE-3- 100 KVA                  No                 1         2.44          2.44   Annexure - G-3b
F-T-29-KAMINIA_GATE_BABA_MAZAAR- 100 KVA        No                 1         2.44          2.44
D-T-14-GURU_NANAK_DHARAM_KANTA- 100 KVA         No                 1         2.44          2.44
D-T-21-JALIL_BHATTA_KUK_ROAD- 100 KVA           No                 1         2.44          2.44
D-T-35-BIRENDER_SINGH_WALA-2- 100 KVA           No                 1         2.44          2.44
D-T-38-LAKSHI_PAN_BHANDAR- 100 KVA              No                 1         2.44          2.44
D-T-42-BAHARAT_CHOWK- 100 KVA                   No                 1         2.44          2.44
G-T-05-LAWARANCE_LINE_H_B_COLONY- 100 KVA       No                 1         2.44          2.44
G-T-30-CHANDRESH_INDUSTRIES- 100 KVA            No                 1         2.44          2.44
G-T-31-RORAHA_BAL_MANDIR - 100 KVA              No                 1         2.44          2.44
M-T-01-MURLI_DHABA_JHINJHARI - 200 KVA          No                 1         3.46          3.46
J-DT-01-ROSHAN_NAGAR - 200 KVA                  No                 1         3.46          3.46
I-KHNT-05-MAHAKAUSHAL - 200 KVA                 No                 1         3.46          3.46
PH9-DT-15-FCI - 200 KVA                         No                 1         3.46          3.46
T1-T-04-CENTRAL_BANK_OF_INDIA - 200 KVA         No                 1         3.46          3.46
T1-T-07-SETHIA_DAL_MILL_KUTHLA - 200 KVA        No                 1         3.46          3.46
V-T-07-POST_OFFICE-1 - 200 KVA                  No                 1         3.46          3.46
V-T-38-MAIN_BAZAR_KAIRAN_LINE - 200 KVA         No                 1         3.46          3.46
V-T-39-TANGA_STAND - 200 KVA                    No                 1         3.46          3.46
O-T-07-MISHAN_CHOWK-2 - 200 KVA                 No                 1         3.46          3.46
O-T-08-NAGAR_NIGAM - 200 KVA                    No                 1         3.46          3.46
O-T-09-INFRONT_OF_HEAD_POST_OFFI - 200 KVA      No                 1         3.46          3.46
O-T-27-BATTU_LAL_WALA - 200 KVA                 No                 1         3.46          3.46
O-T-22-GANDHI_DWAR - 200 KVA                    No                 1         3.46          3.46
O-T-17-MADHAI_MANDIR-2 - 200 KVA                No                 1         3.46          3.46
O-T-19-GOL_BAZAR-2 - 200 KVA                    No                 1         3.46          3.46
O-T-23-SUBHASH_CHOWK - 200 KVA                  No                 1         3.46          3.46
S-DT-12-SHIV_NAGAR_COLONY - 200 KVA             No                 1         3.46          3.46
S-DT-13-KAILWARA_FATAK - 200 KVA                No                 1         3.46          3.46
S-DT-15-CHANDAK_DHAL - 200 KVA                  No                 1         3.46          3.46
S-DT-38-GHANTA_GHAR-1 - 200 KVA                 No                 1         3.46          3.46
S-DT-39-GHANTA_GHAR-2 - 200 KVA                 No                 1         3.46          3.46
S-DT-40-GARG_CHOURAHA - 200 KVA                 No                 1         3.46          3.46
S-DT-22-GANDHI_GANJ_PIPAL_WALA - 200 KVA        No                 1         3.46          3.46
S-DT-21-GANDHI_GANJ_NALA_WALA - 200 KVA         No                 1         3.46          3.46
S-DT-28-SARARWATI_SCHOOL_MODE - 200 KVA         No                 1         3.46          3.46
S-DT-23-BARSIAYA_NO-1 - 200 KVA                 No                 1         3.46          3.46
S-DT-24-BARSIAYA_NO-2 - 200 KVA                 No                 1         3.46          3.46
F-T-02-BRIJ_LAL_BALANI_SHANTI_NAGAR - 200 KVA   No                 1         3.46          3.46
F-T-12-MICRO_WAVE - 200 KVA                     No                 1         3.46          3.46
                                                                    Unit   Quantity   Unit Price   Total Cost      Reference
                               Item Details                                            Rs. Lac      Rs. Lac      Annexure No.
     F-T-29-KAMINIA_GATE_BABA_MAZAAR - 200 KVA                 No                 1         3.46          3.46
     D-T-12-SUBHAS_TRANSPORT - 200 KVA                         No                 1         3.46          3.46
     D-T-25-RAJIB_JAIN - 200 KVA                               No                 1         3.46          3.46
     D-T-36-PATHAK_JI_WALA-1 - 200 KVA                         No                 1         3.46          3.46
     D-T-39-NURA_TELI - 200 KVA                                No                 1         3.46          3.46
     D-T-40-JAI_HIND_CHOWK - 200 KVA                           No                 1         3.46          3.46
     G-T-27-GRAM_PANCHYAT - 200 KVA                            No                 1         3.46          3.46
                                 Sub Total                                       93                     264.66
A18 Capacity enhancement of LT sub-station
     M-T-30-SKY_PLAST_INDUSTRIES - 100 KVA to 200 KVA          No                 1         2.46          2.46
     M-T-31-KANCHGAWAN_VILLAGE - 100 KVA to 200 KVA            No                 1         2.46          2.46
     M-T-43-GAYATRA_VILLAGE-1 - 100 KVA to 200 KVA             No                 1         2.46          2.46
     M-T-50-PEER_BABA - 100 KVA to 200 KVA                     No                 1         2.46          2.46
     J-DT-01-ROSHAN_NAGAR - 100 KVA to 200 KVA                 No                 1         2.46          2.46
     J-DT-04-BASANT_AATA_CHAKKI - 100 KVA to 200 KVA           No                 1         2.46          2.46
     J-DT-17-CHAPRA_VILLAGE - 100 KVA to 200 KVA               No                 1         2.46          2.46
     I-KHNT-01-ROSHAN_NAGAR - 100 KVA to 200 KVA               No                 1         2.46          2.46
     I-KHNT-08-FOREST_OFFICE - 100 KVA to 200 KVA              No                 1         2.46          2.46
     I-KHNT-09-JAGRATI_COLONY - 100 KVA to 200 KVA             No                 1         2.46          2.46
     PH9-DT-08-HOTEL_RAJ_PALACE - 100 KVA to 200 KVA           No                 1         2.46          2.46
     H-GN-02-AIRTEL_TOWER_GAYATRI_NAGER - 100 KVA to 200 KVA   No                 1         2.46          2.46
     H-GN-04-NEERAJ_TAKIJ - 100 KVA to 200 KVA                 No                 1         2.46          2.46
     H-GN-20-SATYA_NARAYAN_MANDIR - 100 KVA to 200 KVA         No                 1         2.46          2.46
     T1-T-06-KUTHLA - 100 KVA to 200 KVA                       No                 1         2.46          2.46
     T1-T-18-SANT_NAGAR - 100 KVA to 200 KVA                   No                 1         2.46          2.46
     V-T-19-GHIRDHARI_RICE_MILL - 100 KVA to 200 KVA           No                 1         2.46          2.46
     V-T-39-TANGA_STAND - 100 KVA to 200 KVA                   No                 1         2.46          2.46
     V-T-43-SANJAY_NAGAR_TALLIYA - 100 KVA to 200 KVA          No                 1         2.46          2.46
     S-DT-12-SHIV_NAGAR_COLONY - 100 KVA to 200 KVA            No                 1         2.46          2.46
     S-DT-35-DENA_BANK - 100 KVA to 200 KVA                    No                 1         2.46          2.46
     S-DT-19-PURWAR_COLD_STORE - 100 KVA to 200 KVA            No                 1         2.46          2.46   Annexure - G18
     S-DT-33-TILAK_NATIONAL_SCHOOL-2 - 100 KVA to 200 KVA      No                 1         2.46          2.46
     S-DT-20-SINDHI_SCHOOL_NEW_BASTI - 100 KVA to 200 KVA      No                 1         2.46          2.46
     E-DT-06-SHIV_HARE - 100 KVA to 200 KVA                    No                 1         2.46          2.46
     E-DT-09-DUPLEX - 100 KVA to 200 KVA                       No                 1         2.46          2.46
     E-DT-10-RAMA_INDUSTRIES - 100 KVA to 200 KVA              No                 1         2.46          2.46
     F-T-03-PANJAWANI - 100 KVA to 200 KVA                     No                 1         2.46          2.46
     F-T-04-DR_R_H_ASARNI_SHANTI_NAGAR - 100 KVA to 200 KVA    No                 1         2.46          2.46
     F-T-06-A_C_C_COMPLEX - 100 KVA to 200 KVA                 No                 1         2.46          2.46
     F-T-08-DEHRU_LINE - 100 KVA to 200 KVA                    No                 1         2.46          2.46
     F-T-21-RAILWAY_SUBSTATION - 100 KVA to 200 KVA            No                 1         2.46          2.46
     F-T-32-HOTEL_PANKAJ_PALACE - 100 KVA to 200 KVA           No                 1         2.46          2.46
     G-T-17-JYOTI_DAL_MILL-1 - 100 KVA to 200 KVA              No                 1         2.46          2.46
     G-T-18-JYOTI_DAL_MILL-2 - 100 KVA to 200 KVA              No                 1         2.46          2.46
                                                                           Unit   Quantity   Unit Price   Total Cost      Reference
                               Item Details                                                   Rs. Lac      Rs. Lac      Annexure No.
      G-T-28-HARIJAN_BASTI - 100 KVA to 200 KVA                       No                 1         2.46          2.46
      N-PLT-2-POLICE_QTRS - 63 KVA to 100 KVA                         No                 1         1.53          1.53
      C-T-19-WAHE_GURU_INDUSTRIES - 63 KVA to 100 KVA                 No                 1         1.53          1.53
      PH9-DT-07-SHUMANI_DAL_MILL - 63 KVA to 100 KVA                  No                 1         1.53          1.53
      T1-T-14-RADHIKA_HOTEL - 63 KVA to 100 KVA                       No                 1         1.53          1.53
      M-T-39-BRAMAHA_NAND_BHOROL - 63 KVA to 200 KVA                  No                 1         2.52          2.52
      T1-T-19-NEEL_KANTH_NAGAR- 63 KVA to 200 KVA                     No                 1         2.52          2.52
      J-DT-08-VODAFONE_TOWER - 25 KVA to 100 KVA                      No                 1         1.63          1.63
      Sub Total                                                                         43                     101.35
A19
      Installation of remote operable switches for breaker/switches
      operation for Distribution Transformer alongwith aux power
      supply to operate sw/breaker *

                                                                                                                  -
                                                                                                                  -
                                                                                                                  -
                                                                                       Sub Total                  -
A20 Augumentation & Relocation of DT
      PH9-DT-02-INDER_NAGAR                                           No                 1         3.15          3.15
      P-DT-21-BACK_OF_LEATHER_GODOWN-3                                No                 1         3.15          3.15   Annexure - G-20
                                                                                                                  -
                                                                                       Sub Total                 6.30
A21 LT Line : Augmentation with Rabbit


                                                                                       Sub Total                  -
A22 Capacitor Bank

      At 33 kV Madhav Nagar and 33 kV NKJ S/stn 600 KVAR
      Capacior bank                                                   Nos.               2         4.38          8.76   Annexure - G16
                                                                      Sub Total       2.00                       8.76
A23 Installation of remote operable switches for breaker/switches
    operation for cap bank alongwith aux power supply to operate
    sw/breaker *

                                                                                                                  -
                                                                                                                  -
                                                                                                                  -
                                                                                       Sub Total                  -
                                              Unit   Quantity   Unit Price   Total Cost     Reference
                             Item Details                        Rs. Lac      Rs. Lac      Annexure No.
A24 Aerial Bunched Cables
    3X95+1X16+1X70 XLPE/AB CABLE proposals
    S-DT-01-KRISHI_UPAJ_MANDI                Km        1.70           5.07          8.60
    S-DT-04-INDIA_HOTEL-2                    Km        0.29           5.07          1.46
    S-DT-03-INDIA_HOTEL                      Km        0.42           5.07          2.11
    S-DT-07-RAIN_BASERA                      Km        0.73           5.07          3.71
    S-DT-06-YATAYAT_BUS_STAND                Km        1.02           5.07          5.17
    S-DT-08-KRISHAN_COLD_STORE               Km        0.72           5.07          3.65
    S-DT-09-MARGHATYE_MORE                   Km        0.98           5.07          4.96
    S-DT-10-MUKTI_DHAM                       Km        0.75           5.07          3.80
    S-DT-13-KAILWARA_FATAK                   Km        1.91           5.07          9.67
    S-DT-15-CHANDAK_DHAL                     Km        0.96           5.07          4.87
    S-DT-19-PURWAR_COLD_STORE                Km        0.50           5.07          2.52
    S-DT-21-GANDHI_GANJ_NALA_WALA            Km        1.15           5.07          5.84
    S-DT-22-GANDHI_GANJ_PIPAL_WALA           Km        1.03           5.07          5.23
    S-DT-25-DR_DIXIT                         Km        0.55           5.07          2.80
    S-DT-27-SANT_NAGAR                       Km        1.24           5.07          6.27
    S-DT-29-GIRJA_GHAT                       Km        1.38           5.07          7.00
    S-DT-33-TILAK_NATIONAL_SCHOOL-2          Km        0.08           5.07          0.43
    S-DT-32-TILAK_NATIONAL_SCHOOL-1          Km        0.44           5.07          2.22
    S-DT-34-RANGOOTA_BAGHICHA                Km        0.48           5.07          2.43
    S-DT-38-GHANTA_GHAR-1                    Km        1.37           5.07          6.94
    S-DT-39-GHANTA_GHAR-2                    Km        0.64           5.07          3.22
    S-DT-31-JAALPA_MADIYA                    Km        1.02           5.07          5.17
    S-DT-20-SINDHI_SCHOOL_NEW_BASTI          Km        0.67           5.07          3.41
    T1-T-01-PAHUARA_NEAR_SUB_STATION         Km        1.15           5.07          5.81
    T1-T-02-KRISHI_UPAJ_MANDI                Km        2.22           5.07         11.26
    T1-T-03-LAXMAN_DASS_KHANDEWAL            Km        0.41           5.07          2.10
    T1-T-04-CENTRAL_BANK_OF_INDIA            Km        3.11           5.07         15.76
    T1-T-06-KUTHLA                           Km        0.65           5.07          3.29
    T1-T-07-SETHIA_DAL_MILL_KUTHLA           Km        3.02           5.07         15.30
    T1-T-08-NEAR_DAINIK_MADHYA_PRADESH       Km        1.33           5.07          6.75
    T1-T-09-AHAMAD_NAGAR                     Km        1.66           5.07          8.40
    T1-T-10-SHIVAJI_NAGAR                    Km        1.48           5.07          7.51
    T1-T-11-PAHUARA_BASTI                    Km        0.55           5.07          2.78
    T1-T-12-RAJESH_AGRAWAL_DAL_MILL          Km        0.88           5.07          4.44
    T1-T-15-ADHARKAAP_BAGICHA                Km        2.26           5.07         11.44
    T1-T-16-ADHARKAAP_BAGICHA                Km        0.50           5.07          2.52
    T1-T-17-SIDH_BABA_COLONY                 Km        0.70           5.07          3.53
    T1-T-19-NEEL_KANTH_NAGAR                 Km        0.83           5.07          4.20
    T1-T-18-SANT_NAGAR                       Km        0.58           5.07          2.95
    PH9-DT-01-INDER_NAGAR                    Km        0.42           5.07          2.13
    PH9-DT-02-INDER_NAGAR                    Km        1.22           5.07          6.21
    PH9-DT-03-MADHUR_VIHAR_HOUSE             Km        3.16           5.07         16.00
                                          Unit   Quantity   Unit Price   Total Cost     Reference
                          Item Details                       Rs. Lac      Rs. Lac      Annexure No.
PH9-DT-04-MAJAGAWAN_PHATAK               Km        0.42           5.07          2.11
PH9-DT-07-SHUMANI_DAL_MILL               Km        1.14           5.07          5.78
PH9-DT-16-NAYA_GAON                      Km        4.93           5.07         24.97
PH9-DT-17-PURANI_KEET_NASHAK             Km        1.70           5.07          8.64
PH9-DT-18-PURANI_AB_SWITCH_WALA          Km        2.47           5.07         12.53
PH9-DT-15-FCI                            Km        3.59           5.07         18.19
P-DT-19-BACK_OF_LEATHER_GODOWN-1         Km        3.34           5.07         16.94
P-DT-21-BACK_OF_LEATHER_GODOWN-3         Km        1.84           5.07          9.34
P-DT-20-BACK_OF_LEATHER_GODOWN-2         Km        2.25           5.07         11.41
D-T-10-BSNL_OFFICE                       Km        0.42           5.07          2.13
D-T-12-SUBHAS_TRANSPORT                  Km        1.84           5.07          9.31
D-T-14-GURU_NANAK_DHARAM_KANTA           Km        1.49           5.07          7.54
D-T-21-JALIL_BHATTA_KUK_ROAD             Km        1.72           5.07          8.70
D-T-23-SURESH_WELDING_OLD                Km        0.36           5.07          1.83
D-T-24-BADVATOLA                         Km        1.21           5.07          6.14
D-T-29-KATRA_BAZAAR                      Km        0.56           5.07          2.86
D-T-31-HERO_HONDA_AGENCY                 Km        1.67           5.07          8.49
D-T-33-CHAUBE_JEE_WALA                   Km        1.37           5.07          6.97
D-T-35-BIRENDER_SINGH_WALA-2             Km        0.76           5.07          3.83
D-T-36-PATHAK_JI_WALA-1                  Km        2.15           5.07         10.92
D-T-37-PATHAK_JI_WALA-2                  Km        1.20           5.07          6.08
D-T-38-LAKSHI_PAN_BHANDAR                Km        1.15           5.07          5.84
D-T-39-NURA_TELI                         Km        1.30           5.07          6.60
D-T-40-JAI_HIND_CHOWK                    Km        1.42           5.07          7.21
D-T-41-BHIM_RAO_CHOWK                    Km        2.48           5.07         12.59
D-T-42-BAHARAT_CHOWK                     Km        1.69           5.07          8.55
D-T-43-TIWARI_JEE_WALA                   Km        0.74           5.07          3.74
D-T-44-RAGHUNATH_MANDIR(TIKURIA)         Km        1.16           5.07          5.90
E-DT-05-JAIN_MANDIR                      Km        0.68           5.07          3.47
E-DT-06-SHIV_HARE                        Km        1.16           5.07          5.90
E-DT-07-HOUSING_BOARD_GROUND             Km        0.90           5.07          4.56
E-DT-09-DUPLEX                           Km        0.72           5.07          3.65
E-DT-10-RAMA_INDUSTRIES                  Km        0.55           5.07          2.80
E-DT-03-MADHAV_NAGAR_GATE                Km        1.49           5.07          7.54
F-T-02-BRIJ_LAL_BALANI_SHANTI_NA         Km        0.96           5.07          4.87
F-T-03-PANJAWANI                         Km        0.79           5.07          4.02
F-T-04-DR_R_H_ASARNI_SHANTI_NAGA         Km        1.16           5.07          5.87
F-T-13-CHURCH_LAKHERA                    Km        1.10           5.07          5.60
F-T-16-HEALTH_CENTER_LAKHERA_PAN         Km        0.62           5.07          3.16
F-T-17-TALAB_NAYA_GAON_LAKHERA           Km        0.90           5.07          4.56
F-T-23-MPSEB_OFFICE-2                    Km        1.12           5.07          5.66
F-T-18-TIKURIA_HANUMAN_MANDIR            Km        1.06           5.07          5.38
F-T-29-KAMINIA_GATE_BABA_MAZAAR          Km        0.83           5.07          4.20
F-T-33-M_E_S_COLONY                      Km        1.07           5.07          5.41
                                          Unit   Quantity   Unit Price   Total Cost      Reference
                          Item Details                       Rs. Lac      Rs. Lac      Annexure No.
G-T-05-LAWARANCE_LINE_H_B_COLONY         Km        1.76           5.07          8.91
G-T-14-NAGAR_NIGAM_SUB_OFFICE            Km        0.65           5.07          3.29
G-T-15-ANKUR_INDUSTRIES                  Km        0.54           5.07          2.74
G-T-17-JYOTI_DAL_MILL-1                  Km        0.37           5.07          1.89
G-T-18-JYOTI_DAL_MILL-2                  Km        0.68           5.07          3.47
G-T-19-BANGLA_LINE_HANUMAN_MANDR         Km        0.58           5.07          2.92
G-T-20-A_C_C_CLUB                        Km        0.24           5.07          1.22
G-T-21-P_M_DALL_MILL                     Km        0.94           5.07          4.75
G-T-22-MANIK_INDUSTRIES                  Km        1.00           5.07          5.08
G-T-25-PWD_COLONY-1                      Km        0.58           5.07          2.92
G-T-26-PWD_COLONY-2                      Km        1.49           5.07          7.54
G-T-27-GRAM_PANCHYAT                     Km        1.27           5.07          6.45
G-T-29-BACK_OF_MADHAV_HOSPITAL           Km        0.70           5.07          3.53
G-T-30-CHANDRESH_INDUSTRIES              Km        1.42           5.07          7.18
G-T-31-RORAHA_BAL_MANDIR                 Km        0.74           5.07          3.77
G-T-33-NEAR_SUB_POST_OFFICE_OLD          Km        0.90           5.07          4.56
G-T-34-SANJAY_NAGAR(BHATIA_WALA)         Km        1.70           5.07          8.61
                                                                                       Annexure - G-4c
O-T-05-IN_GOVT_HOSPITAL                  Km        1.60           5.07          8.09
O-T-07-MISHAN_CHOWK-2                    Km        1.08           5.07          5.49
O-T-08-NAGAR_NIGAM                       Km        1.29           5.07          6.56
O-T-09-INFRONT_OF_HEAD_POST_OFFI         Km        1.48           5.07          7.51
O-T-11-VENKAT_LIBRARY                    Km        0.60           5.07          3.04
O-T-14-REST_HOUSE                        Km        1.15           5.07          5.84
O-T-16-MADHAI_MANDIR-1                   Km        0.43           5.07          2.19
O-T-17-MADHAI_MANDIR-2                   Km        0.84           5.07          4.26
O-T-18-GOL_BAZAR-1                       Km        0.60           5.07          3.04
O-T-19-GOL_BAZAR-2                       Km        0.42           5.07          2.13
O-T-22-GANDHI_DWAR                       Km        0.40           5.07          2.04
O-T-23-SUBHASH_CHOWK                     Km        0.36           5.07          1.83
O-T-24-MISHAN_CHOWK-3                    Km        0.34           5.07          1.73
O-T-25-CHHAWRA                           Km        0.51           5.07          2.59
O-T-26-GHATAR_GHAT_ROAD                  Km        0.96           5.07          4.87
O-T-27-BATTU_LAL_WALA                    Km        1.09           5.07          5.51
O-T-15-PWD_OFFICE                        Km        0.80           5.07          4.05
P-ID-05-BHARAT_MINERALS                  Km        0.66           5.07          3.35
P-ID-39-JP_REFACTORIES                   Km        0.42           5.07          2.11
R-T-21-FITTER_HOUSE                      Km        1.46           5.07          7.39
R-T-22-CMO_NAGAR_NIGAM                   Km        2.91           5.07         14.75
R-T-23-CMO_NAGAR_NIGAM                   Km        0.42           5.07          2.11
R-T-17-SHYAMLAL                          Km        0.41           5.07          2.07
R-T-18-NOBEL                             Km        1.41           5.07          7.15
N-PLT-1-BILAHARI_ROAD                    Km        0.97           5.07          4.93
N-PLT-3-RAWAL_DAS_JHINJHARI              Km        0.42           5.07          2.11
M-T-01-MURLI_DHABA_JHINJHARI             Km        2.15           5.07         10.92
                                          Unit   Quantity   Unit Price   Total Cost     Reference
                          Item Details                       Rs. Lac      Rs. Lac      Annexure No.
M-T-17-IMALIYA_VILLAGE                   Km        2.74           5.07         13.87
M-T-21-PRIMARY_SCHOOL_JHINJHARI_         Km        4.39           5.07         22.27
M-T-24-SUBASH_JAIN_TRANSPORT             Km        0.42           5.07          2.13
M-T-29-NEAR_PRIMARY_SCHOOL               Km        0.78           5.07          3.95
M-T-49-NIWAR_RIVER                       Km        0.56           5.07          2.84
M-T-50-PEER_BABA                         Km        0.97           5.07          4.93
M-T-51-NIWAR_RIVER                       Km        1.07           5.07          5.41
C-T-07-IMALIYA_MARGHATA                  Km        1.20           5.07          6.08
C-T-09-IMALIYA_NAYA_GAON                 Km        2.64           5.07         13.38
V-T-01-GANGA_RAM_HOUSE                   Km        0.90           5.07          4.56
V-T-02-MN_INDUSTRIES                     Km        0.66           5.07          3.35
V-T-07-POST_OFFICE-1                     Km        0.49           5.07          2.51
V-T-18-JAI_BHAWANI_DAL_MILL              Km        0.84           5.07          4.26
V-T-26-PRITAM_RICE_MILL                  Km        0.94           5.07          4.75
V-T-27-JAI_BABA_INDUSTRIES               Km        0.65           5.07          3.32
V-T-37-MAIN_BAZAR_KAIRAN_LINE            Km        1.15           5.07          5.84
V-T-38-MAIN_BAZAR_KAIRAN_LINE            Km        1.02           5.07          5.17
V-T-39-TANGA_STAND                       Km        0.90           5.07          4.56
V-T-40-TANGA_STAND                       Km        0.70           5.07          3.53
V-T-43-SANJAY_NAGAR_TALLIYA              Km        0.82           5.07          4.14
V-T-44-SANJAY_NAGAR_NEAR_KHER_MA         Km        0.76           5.07          3.83
V-T-45-AMEER_GANJ-1                      Km        1.55           5.07          7.85
V-T-46-AMEER_GANJ-2                      Km        0.98           5.07          4.96
V-T-35-GOVIND_INDUSTRIES                 Km        0.95           5.07          4.81
V-T-47-LALA_YADAV                        Km        1.50           5.07          7.61
J-DT-01-ROSHAN_NAGAR                     Km        1.31           5.07          6.63
J-DT-02-PRIMARE_FACTORY                  Km        0.49           5.07          2.49
J-DT-03-NEW_KATNI_MAIN_MARKET            Km        0.87           5.07          4.41
J-DT-04-BASANT_AATA_CHAKKI               Km        0.86           5.07          4.38
J-DT-05-MADHU_AATA_CHAKKI                Km        1.09           5.07          5.54
J-DT-06-NAYA_GAON(SUDKHAR_RAO)           Km        0.82           5.07          4.14
J-DT-10-POLICE_LINE                      Km        0.25           5.07          1.25
J-DT-12-CHAPRA_BASTI                     Km        1.71           5.07          8.67
J-DT-13-DR_SHARMA                        Km        1.03           5.07          5.23
J-DT-18-BILLGAWAN                        Km        1.20           5.07          6.08
J-DT-19-PADARWADA                        Km        1.80           5.07          9.13
J-DT-11-MOONGA_BAI                       Km        1.87           5.07          9.49
I-KHNT-01-ROSHAN_NAGAR                   Km        1.61           5.07          8.15
I-KHNT-02-SAI_PURAM_COLONY               Km        0.15           5.07          0.76
I-KHNT-03-SAI_PURAM_COLONY               Km        0.16           5.07          0.82
I-KHNT-04-CHAPRAWA                       Km        1.34           5.07          6.78
I-KHNT-05-MAHAKAUSHAL                    Km        2.75           5.07         13.93
I-KHNT-06-TILAK_COLLEGE                  Km        1.29           5.07          6.54
I-KHNT-08-FOREST_OFFICE                  Km        0.83           5.07          4.20
                                        Unit   Quantity   Unit Price   Total Cost     Reference
                        Item Details                       Rs. Lac      Rs. Lac      Annexure No.
I-KHNT-09-JAGRATI_COLONY               Km        1.43           5.07          7.27
I-KHNT-10-NEAR_TILAK_COLLEGE           Km        1.05           5.07          5.32
I-KHNT-11-KHIRANI_TALAB                Km        2.70           5.07         13.69
I-KHNT-12-KHIRANI-1                    Km        0.94           5.07          4.75
I-KHNT-13-KHIRANI-2                    Km        0.93           5.07          4.72
I-KHNT-15-SARJU_CHAUDHARY              Km        0.78           5.07          3.95
I-KHNT-17-INCOME_TAX_OFFICE            Km        1.27           5.07          6.42
I-KHNT-18-BEHIND_GOVT_HOSPITAL         Km        2.95           5.07         14.97
I-KHNT-19-SHASTRI_COLONY               Km        0.71           5.07          3.59
I-KHNT-20-RAJU_NISHAD                  Km        3.14           5.07         15.94
I-KHNT-27-DUBEY_COLONY                 Km        2.05           5.07         10.40
I-KHNT-23-PNT_COLONY                   Km        2.20           5.07         11.13
H-GN-01-LAKHAN_KANOJIYA                Km        1.43           5.07          7.24
H-GN-04-NEERAJ_TAKIJ                   Km        1.48           5.07          7.51
H-GN-06-CHURCH_WALA                    Km        0.95           5.07          4.84
H-GN-05-DEEP_CHAND_KHUSWAHA            Km        0.98           5.07          4.98
H-GN-07-TIWARI_WARD                    Km        0.50           5.07          2.56
H-GN-08-NAALI_KE_BAAZU_WALA            Km        0.69           5.07          3.50
H-GN-10-SONI_BHAGICHA                  Km        0.54           5.07          2.74
H-GN-11-AMBEDKAR_WARD_GONDA_GHAT       Km        1.10           5.07          5.57
H-GN-14-GIRI_COLONY                    Km        3.54           5.07         17.95
H-GN-17-MAAI_GHAT                      Km        1.17           5.07          5.93
H-GN-18-GHAUTAM_BADHWA                 Km        0.35           5.07          1.76
H-GN-21-GAUTAM_AATA_CHAKKI             Km        0.30           5.07          1.52
H-GN-24-NISHAD_SCHOOL                  Km        0.91           5.07          4.62
H-GN-26-SONI_NETAJI(PUROSTAM)          Km        0.67           5.07          3.38
H-GN-30-HIRAGANJ_NEAR_PETROL_PUM       Km        1.02           5.07          5.17
H-GN-28-GUPTA_COLONY                   Km        1.07           5.07          5.41
H-GN-31-HIRAGANJ_CHORAHA               Km        1.77           5.07          8.97
H-GN-29-SUNIL_MISHRA                   Km        0.54           5.07          2.74
H-GN-16-GOOYANKA_BAGICHA_SONI          Km        1.08           5.07          5.48
H-GN-27-POLICE_CHOWKI_LIC              Km        1.00           5.07          5.05
Sub Total                                        240.57                  1,219.70
                                                                            Unit     Quantity     Unit Price   Total Cost       Reference
                              Item Details                                                         Rs. Lac      Rs. Lac        Annexure No.
B   HVDS


                                                                                                                       -
                                                                                          Sub Total                    -
C   Metering
    Replacement
    1-Ph Meter Replacement from EM To Electronic Meter                No.             8011            0.0146        116.99
                                                                                                                              Annexure - G13
    3-Ph Meter Replacement from EM To Electronic Meter                No.             2403            0.0891        214.09

                                                                      Sub Total        10,414                       331.08
D   Mobile Service Centre
    Mobile Service Centre                                             Nos                    3        10.18          30.55   Annexure - G-5
    Please provide brief details of the work.Detail Cost Estimates                                                     -
                                                                                          Sub Total                  30.55
E   Others
    Shifting of meters to outside premises with service line
    with PVC cable, solid aluminium conductor, armoured, twin core,
                                                                               Nos      22029         0.026         571.44
    4.0 sq. mm.
    With PVC cable, solid aluminium conductor, armoured, twin core,
                                                                               Nos      10013         0.043         427.07 Annexure - G14
    6.0 sq. mm.
    With PVC cable, solid aluminium conductor, armoured, four core,
                                                                               Nos        6008        0.053         316.08
    10.0 sq. mm.

    Relocation of Distribution Transformers to Load Centers

    R-T-18-NOBEL                                                               Nos            1         1.50          1.50
    T1-T-15-ADHARKAAP_BAGICHA                                                  Nos            1         1.50          1.50
    S-DT-02-UP_SAWASHASTHYA_KENDRA                                             Nos            1         1.50          1.50
    S-DT-07-RAIN_BASERA                                                        Nos            1         1.50          1.50
    S-DT-27-SANT_NAGAR                                                         Nos            1         1.50          1.50
    E-DT-01-MPSEB_COLONY                                                       Nos            1         1.50          1.50
    E-DT-02-AJAY_FOODS                                                         Nos            1         1.50          1.50
                                                                                                                              Annexure - G-12
    E-DT-04-MOHAN_BAJAJ                                                        Nos            1         1.50          1.50
    F-T-08-DEHRU_LINE                                                          Nos            1         1.50          1.50
    F-T-24-MPSEB_OFFICE-3                                                      Nos            1         1.50          1.50
    D-T-34-BIRENDER_SINGH_WALA                                                 Nos            1         1.50          1.50
    D-T-33-CHAUBE_JEE_WALA                                                     Nos            1         1.50          1.50
    D-T-36-PATHAK_JI_WALA-1                                                    Nos            1         1.50          1.50
    G-T-22-MANIK_INDUSTRIES                                                    Nos            1         1.50          1.50
                            Sub Total                                                        14
                                                                        Unit   Quantity       Unit Price    Total Cost      Reference
                         Item Details                                                          Rs. Lac       Rs. Lac      Annexure No.
11KV PCC Pole Replacement With H-beam                             Nos                860            0.30         258.00
11KV Disc insulator                                               Nos              1,435           0.002           2.70   Annexure - G-19
LT Poles Replacement(Tilted and Damaged) with RSJ                 Nos               2230            0.13         289.90

DT earthing                                                       Nos
                                                                                     495            0.03          14.85


D.O. Fuse unit                                                    Nos
                                                                                     475            0.01           4.75


Replacement of damaged LA units                                   Nos                456          0.005            2.28

L.T. Distribution box suitable for exising transformer (without
TPN switches) with MCCB on incoming and PF units on outgoing
side
25KVA                                                             Nos                 18            0.03           0.45
63KVA                                                             Nos                 44            0.14           6.06
100KVA                                                            Nos                239            0.14          32.90   Annexure - G16
200KVA                                                            Nos                192            0.28          53.76
300KVA                                                            Nos                  1            0.28           0.28
315KVA                                                            Nos                 27            0.28           7.56
500KVA                                                            Nos                     2         0.28           0.56

11 kV Cable Termination Kit                                       Set                152            0.030          4.56

Replacement of DTR Cable
LT Cable For DTR
Single core 300 Sq mm                                             Km              18.44             2.41          44.36
Single core 150 Sq mm                                             Km              55.32             1.04          57.80
Single core 70 Sq mm                                              Km               7.44             0.52           3.89

11kV AB switch                                                    No.               160           0.068           10.80
LT Changeover                                                     No.               310           0.068           21.04

33 KV Oil Immersed 3 Phase 4 wire CTPT Units ( At Silimabad )     No.                 1           0.582           0.582
                                                                                                                          Annexure - G-41
110 V.,5 A. KWH electronic meter                                  No.                 1           0.265           0.265

                                                                                    Sub Total                  2,152.92
                                                                                   Grand Total               4967.57
                                                                        Unit      Quantity    Unit Price    Total Cost        Reference
                                Item Details                                                  Rs. Lac        Rs. Lac        Annexure No.
     * For project area envisaged for SCADA/DMS scheme as per the criteria, town with population
     >=4lac & Input Energy >=350MUs & other potential towns
Note Unit price and Total Cost are inclusive of all taxes and duties
     The scheduled unit rates to be provided as basis
     Under each sub-head (A1,A2,etc.) additional rows may be added for more items
     Cost of Erection, testing, commissioning may be included
     under respective sub heads, if applicable
     Cost of Land is not eligible for funding under R-APDRP
     Civil works costs will be allowed on an extent as deemed fit by Nodal Agency. For example, work like renovation of sub-station building,
     installation of meters etc. will not be funded under the programme.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume V: Expected Project Benefit
5.1 Project Benefit (AT&C Losses)
                                                                                  Assessment of
                          For the Project Area                             Unit     Existing
                                                                                   Losses for
                                                                                   Base Year
     Energy Input                                                      M Units           121.700
     Energy Sales                                                      M Units            70.080
     Total Revenue Billed                                              Rs. Crs            34.110
     Total Revenue Collected (including arrears)                       Rs. Crs            33.261
     Arrears {Actual or Total Revenue collected-Revenue billed}        Rs. Crs             0.000

     Billing Efficiency                                                %                  57.6%
     Collection Efficiency                                             %                  97.5%
     AT&C Losses (Assessed)                                            %                  43.8%

     It is envisged that with implementation of the project the AT&C Losses shall be reduced
     progressively as shown below
     Base Year                                                              %              43.85%
     Year-1                                                                 %              33.60%
     Year-2                                                                 %              19.40%
     Year-3                                                                 %              14.80%
     Year-4                                                                 %              14.80%
     Year-5                                                                 %              14.80%
     Year-6                                                                 %              14.80%

                                                         Project IRR    13.1%
                                                      Payback Period    Year-5

Note The cost benefit analysis has been computed in Vol Vb.
 [Commercial Loss & System of the project}
 [Quality of of overall benefits
{DescriptionSupplyReduction]Reliability]
 [Other Benefits]
 [Customer Satisfection]
 [Technical Loss Reduction]
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Volume V: Expected Project Benefit


5.2 Cost Benefits Analysis
                                                                   31-Mar-11       30-Mar-12 31-Mar-13 31-Mar-14 31-Mar-15 30-Mar-16 30-Mar-17
    Particulars                            Units                  Base Year        Year-1      Year-2      Year-3     Year-4      Year-5         Year-6

    Total Project Cost (Rs.)               INR Crores                     52.45
    Project Cost (phasing)                 INR Crores                     7.87        18.36       26.22

    Total Input (Units)                    MU                           121.70       121.70      121.70      121.70     121.70          121.70     121.70

    AT&C Losses                            %                              43.8%       33.6%      19.40%       14.8%      14.8%           14.8%      14.8%

    Total Units for which revenue is
    realised                               MU                             68.34       80.81       98.09      103.69     103.69          103.69     103.69

    Average Tariff                         (INR/Unit)                      3.83        3.83        3.83        3.83        3.83           3.83       3.83

    Total Realisation                      INR Crores                     26.17       30.95       37.57       39.71      39.71           39.71      39.71

    Incremental Benefit                    INR Crores                                  4.78       11.40       13.54      13.54           13.54      13.54

    Net Cash Flow                                                         (7.87)     (13.58)     (14.83)      13.54      13.54           13.54      13.54

                                    IRR                                   13.1%
                          Payback Period                                                                                          Year-5

    Note:-
    Only cells highlighted in yellow to be filled by utility
    The Input Units shall be assumed to be constant and shall be equal to input considered for base year
    The Average Tariff shall be assumed to be constant and shall be equal to tariff considered for base year. It can be calculated by
    computing weighted average of tariff of different consumer categories and no. of consumers
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure A: Implementation Schedule

       Instructions
       Write "1" in the cell if activity is underprogress during the month otherwise leave blank



                                     Activity/ Sub Activity                                                                         Q1                  Q2                   Q3                   Q4                   Q5                   Q6                   Q1                   Q2                   Q3                   Q4                   Q5                   Q6
                                                                                                   Start Date    End Date
                                                                                                                               M1   M2    M3     M4     M5     M6     M7     M8     M9     M10    M11    M12    M13    M14    M15    M16    M17    M18    M19    M20    M21    M22    M23    M24    M25    M26    M27    M28    M29    M30    M31    M32    M33    M34    M35    M36

                                                                                                                                         Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13




  1    Issue of NIT                                                                                 01/06/2010    15/08/2010
  2    Award of Contract                                                                            15/08/2010
 3.1   Supply of Material :33/11 KV SS or 66/11 kV New
 3.2   Supply of Material :33/11 kV or 66/11 kV SS Transformer
 3.3   Supply of Material :33/11 KV or 66/11 kV SS Augmentation                                     01/11/2010    30/09/2011                      1      1      1      1      1      1      1      1      1      1      1
 3.4   Supply of Material :11 kV Feeder New                                                         01/11/2010    30/09/2011                      1      1      1      1      1      1      1      1      1      1      1
 3.5   Supply of Material :11 kV Feeder Bifurcation                                                 01/11/2010    30/04/2011                      1      1      1      1      1      1      1      1
 3.6   Supply of Material :11 kV Feeder Augumentation                                               01/11/2010    31/03/2011                      1      1      1      1      1      1      1
 3.7   Supply of Material :Distribution Transformer New                                             01/03/2011    30/04/2011                                                  1      1      1      1      1      1      1      1      1      1      1      1
 3.8   Supply of Material :Distribution Transformer Augumentation                                   01/06/2011    31/07/2011                                                  1      1      1      1      1      1
 3.9   Supply of Material :LT Line New                                                              01/03/2011    30/04/2011                      1      1      1      1      1      1      1      1      1      1
3.10   Supply of Material :LT Augumentation                                                         01/11/2010    31/01/2011                      1      1      1      1      1      1      1      1
3.11   Supply of Material :Capacitor Banks                                                                                                               1      1      1      1      1      1      1
3.12   Supply of Material : Aerial Bunched Cables                                                   01/11/2010    30/04/2011                      1      1      1      1      1      1      1      1      1      1      1
3.13   Supply of Material : HVDS
3.14   Supply of Material : Consumer Metering                                                       01/11/2010    30/04/2011                      1      1      1      1      1      1      1      1      1      1      1      1      1
3.15   Supply of Material : Mobile Service Centre                                                   01/11/2010    31/01/2011                      1      1      1
3.16   Supply of Material : Others                                                                  01/01/2011    30/06/2011                      1      1      1      1      1      1      1      1      1      1      1      1      1

 4.1   Installation and commissioning:33/11 KV SS or 66/11 kV SS New
 4.2   Installation and commissioning :33/11 KV SS or 66/11 kV SS Transformer
 4.3   Installation and commissioning: 33/11 KV SS or 66/11 kV SS KV SS Augment                     01/02/2011    30/04/2011                                                                       1      1      1      1      1      1      1      1      1      1      1
 4.4   Installation and commissioning: :11 kV Feeder New                                            01/02/2011    30/04/2011                                                                       1      1      1      1      1      1      1      1      1      1      1
 4.5   Installation and commissioning: :11 kV Feeder Bifurcation                                    01/03/2011    30/04/2011                                                                                     1      1      1      1      1      1      1      1      1      1      1
 4.6   Installation and commissioning::11 kV Feeder Augumentation                                   01/03/2011    30/04/2011                                                                                                                                             1      1      1      1      1      1      1      1      1
 4.7   Installation and commissioning: :Distribution Transformer New                                01/03/2011    31/07/2011                                                                                                                                             1      1      1      1      1      1      1      1      1      1      1      1      1      1
 4.8   Installation and commissioning: :Distribution Transformer Augumentation                      01/06/2011    31/10/2011                                                                                                                                             1      1      1      1      1      1      1      1      1      1      1      1      1      1
 4.9   Installation and commissioning: :LT Line New                                                 01/02/2011    31/05/2011                                                                                                                                             1      1      1      1      1      1      1
4.10   Installation and commissioning: :LT Augumentation                                            01/02/2011    30/04/2011                                                                                                                               1      1      1      1      1      1      1      1      1
4.11   Installation and commissioning: :Capacitor Banks                                             01/01/2010    30/06/2011                                                         1      1      1      1      1
4.12   Installation and commissioning: : Aerial Bunched Cables                                      01/12/2010    04/31/2011                             1      1      1      1      1      1      1      1      1      1      1      1      1      1      1      1
4.13   Installation and commissioning: : HVDS
4.14   Installation and commissioning: : Consumer Metering                                          01/12/2010    31/07/2011                             1      1      1      1      1      1      1      1
4.15   Installation and commissioning: : Mobile Service Centre                                      01/09/2011    31/10/2011                                                                                            1      1
4.16   Installation and commissioning: : Others                                                     01/01/2011    31/07/2011                                                                       1      1      1      1      1      1      1      1      1      1      1      1      1      1
  5    Acceptance / Performance test to the owners                                                  01/12/2011    01/01/2012                                                                                                                                                                                                                                                 1      1
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure B: Asset Hirarchy

1              Utility shall submit SLDs of the complete network of the Project Area along with the following information.
2              SLDs shall be submitted in hard and soft format along with the DPR
               Nodal diagram shall be embedded on geographical map showing electrical distribution network in Project Area indicating EHV, HV S/s,
3
               lines upto 11 KV and DTRs.

Details of EHV Sub-stations feeding project area
                                                                                             EHV Transformer Details
    Sl. No.      Name of EHV Substation             Voltage Ratio                                                            Capacity
                                                                                  Rating (MVA)                Nos.
                                                                                                                             (MVA)
      1           132 kV Shanti Nagar                  132/33                           40                      2              80
                                                       220/132                         160                      1              160
      2              220 kV Paharua
                                                        220/33                          20                      1               20

Details of 33/11 kV Sub-stations feeding project area
                                                                                             EHV Transformer Details
    Sl. No.        Name of Substation               Voltage Ratio                                                            Capacity
                                                                                  Rating (MVA)                Nos.
                                                                                                                             (MVA)
      1        33 kV Jhinjhari                          33/11                            5                      2              10
      2        33 kV Katyghat                           33/11                            5                      2              10
      3        33 kV madhav nagar                       33/11                            8                      1               8
      4        33 kV NKJ                                33/11                            8                      2              16
      5        33 kV Paharua                            33/11                            8                      2              16
      6        33 kV Shanti nagar                       33/11                            5                      2              10

Details of connection from EHV to 33/11 Sub-stations feeding project area
 Sl. No.       From EHV Substation          to 33/11 KV S/S        Name of 33KV feeder
                                            upto 33 kV Dabaur via 33
              1 132 kV Shanti nagar                                       33 kV Dabur
                                            kV 33 kv Jhinjhari s/stn


              2 132 kV Shanti nagar         upto 33 kV Katya Ghat         33 kV Katya ghat

                                            upto 33 kV NKJ via 33 kV
              3 132 kV Shanti nagar                                       33 kV NKJ
                                            Madhav nagar S/tn
            4 132 kV Shanti nagar      upto 33 kV ordance factory   33 kV ordance factory

            5 132 kV Shanti nagar      upto 33 kV ACC S/tn          33 kV ACC

            6 132 kV Shanti nagar      upto 33 kV Paharua S/tn      33 kV Paharua

            7 220 kV paharua           upto 33 kV Paharua S/tn      33 kV Katni



Details of 11 KV feeders emanating from 33/11 Sub-stations feeding project area
                                                                                                             Distribution Transformer Details
                                           Capacity of Power                                  Peak Demand
  Sl. No.        From 33/11 kV S/Stn                                   Name of 11 KV feeder                                   Total capacity
                                          Transformer ( MVA )                                  ( in Amps )         Nos.
                                                                                                                              ( KVA )
                                                                        11kV Dadda Dham            10                6             1063
                                                                         11kV Kachgawan           105               51             5291
                   33kV Jhinjhari               2*5MVA
                                                                         11kV Police Line          10                3              263
                                                                         11kV Collectrate          10                2              200
                                                                           11kV City-7            240               27             5301
                  33kV Katayaghat               2*5MVA                    11kV Industrial         130               49             7126
                                                                        11kV Pump House            70               23             2340
                                                                      11kV Exepress Feeder         20                6              860
                33KV Madhav Nagar                8MVA                  11kV Madhav Nagar          190               47             7159
                                                                        11kV Mansarovar            40               20             2667
                                                                       11kV Gayatri Nagar         150               31             5093
                     33kV NKJ                   2*8MVA                     11kV NKJ                90               17             2388
                                                                         11kV Khirehni            130               31             3726
                                                                          11kV City-5             270               41             6973
                   33kV Paharua                 2*8MVA                    11kV City-6              80               19             2277
                                                                          11kV Kanwara            100               22             2085
                                                                           11kV City-1            190               44             6685
                                                                           11kV City-2             55               16             2678
                 33kV Shanti Nagar              2*5MVA
                                                                           11kV City-3            205               33             5061
                                                                           11kV City-4            155               34             5371
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure C: Single Line Diagrams

            Attached SLDs and Nodal Diagrams wherever necessary
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure D: Quality Management System

    In order to ensure the proper quality of the material utilized in erection and construction works according to
    their scope, the following measures have been adopted:

    1. Third party pre delivery inspection of the material got conducted as per approved guaranteed technical
    particular, Technical specifications, Drawings and applicable ISS. The applicable IS standards are followed
    while framing of tender specification and guaranteed Technical particulars in respect of procured equipments
    and materials.
    2. At present pre-dispatch inspection and quality assurance services for materials and equipment procured by
    company is being conducted by the third party agencies i.e. M/a WAPCOS, Gurgaon as per the order placed
    on them.
    3. For ensuring the proper workmanship of the executed capital works, the work of supervision monitoring
    and quality control consultancy services for various capital work s involving construction / commissioning
    and renovation works under the jurisdiction of MPPKVVCL, Jabalpur has been awarded to M/s ERADA. The
    monitored by them are erection, testing and commissioning of new 33kV lines; 11kV lines: LT lines;
    33.11kV S/S, Distribution transformers, augmentation of HT and LT lines. The Consultant scope covered is,
    a. Assisting Company in engineering, Administration and management of the contract.
    b. Supervision, Monitoring and quality control of the construction works in accordance with the approved
    drawings, technical specifications, environmental management plan, construction equipments, resource
    deployment and other stipulations of contract documents including safety and care of the work.
    c. Ensuring quality of material and works
    d. Assisting field measurements
    e. Monitoring timely progress of work
    f. The above supervision of works is in addition to the quality control, inspection and checks already being
    exercised by the engineers of the MPPKVVCL from Time to time.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure E : Procurement Procedures/Guildelines

    The capital works as finalized according to the approved DPR by the PFC shall be executed on turnkey basis.

    To ensure the quality standards in construction work, the agencies are asked to procure the material from the
    approved vendors of MPPKVVCL as per Guaranteed Technical particulars, Drawings and applicable IS standards as
    approved by the company

    The procurement procedures and guidelines and procedure of awarding work execution contract in general is narrated
    hereunder:

    Issue of NIT:
    NIT of the specified work will be advertised to the national press or official gazette, or a free and open access
    website. The bidding documents will be uploaded to the MPPKVVCL official website. The bidding documents shall
    provide clear instructions on how bids should be submitted, how prices should be offered, and the place and time for
    submission of bids.
    Tender Procedure:
    Normally Two-Stage bidding procedure is adopted: in two-Envelope bidding procedure, at the first stage, Bidders
    submit two sealed envelopes simultaneously, one containing the Technical Proposal and the other the Price Proposal,
    enclosed together in an outer single envelope.
    Only the Technical Proposals are opened at the date and time advised in the Bidding Document, and the Price
    Proposals remain sealed and are held in custody by the Purchaser. The Technical Proposals are evaluated and if the
    Purchaser requires amendments or changes to the Technical Proposals, such amendments and changes are discussed
    with the Bidders. The Bidders are allowed to revise or adjust their Technical Proposals to meet the requirements of
    the Purchaser.
    The objective of the exercise is to ensure that all Technical Proposals conform to the same acceptable technical
    standard and meet the technical solution required by the Purchaser. Bids of Bidders who are unable or unwilling to
    bring their Technical Proposals to conform to the acceptable technical standard will be rejected as deficient Bids with
    MPPKVVCL's approval.
    Following MPPKVVCL approval of the evaluation of Technical Proposals, Bidders are invited, at the second stage,
    to submit Modified Bid Proposals consisting of Revised Technical Proposals and Supplementary Price Proposals
    based on the technical standard agreed.
    The original Price Proposals and the Modified Bid Proposals are opened at a date and time advised by the Purchaser.
    In setting the date the Purchaser will allow sufficient time for the Bidders to incorporate the changes in the Revised
    Technical Proposals that are needed to meet the agreed technical standard and to prepare the Supplementary Price
    Proposals that reflect these changes.
    The Price Proposals, Supplementary Price Proposals, and Revised Technical Proposals are evaluated, and following
    MPPKVVCL's approval, the Contract is awarded to the Bidder whose Bid is determined to be the lowest evaluated
    substantially responsive Bid.
    Placement of the detailed orders:
    After obtaining the approval to the purchase proposal from the competent authority, detailed letter of Award is
    placed. The detailed LOA contains the technical specifications of the work, guaranteed technical particulars of the
    material and other commercial terms and conditions like payments, delivery and penalty clauses as per tender
    conditions.
POWER FINANCE CORPORATION LTD.
Detail Project Report - Part B
Annexure-F: Check List



                     Check the following information required to be filled in the Formats

    Index
    Date of submission                                                          Yes/No            Yes

    Guidelines
    We have gone through the Guidelines of Part- B and confirm compliance of the
                                                                                 Yes/No     Yes
    same till the completion of the project

    Declaration Form
    Declaration Form has been read and signed by designated authority           Yes/No


    Volume I
    Stated objectives of the Project                                            Yes/No      Yes

    Volume II
    Name of the State                                                           Yes/No            Yes
    State Power Sector Information                                              Yes/No      Yes
    State Map                                                                   Yes/No      Yes
    Name of the Utility                                                         Yes/No            Yes
    Other basic information related to Utility                                  Yes/No      Yes
    Utility's Consumer Information                                              Yes/No      Yes
    Utility's Asset Information                                                 Yes/No      Yes
    Utility's key Commercial and Financial Information                          Yes/No      Yes
    Scope
    Organisational Setup

    Website Information                                                         Yes/No      Yes

    Volume III.a
    Basic information about project area                                        Yes/No      Yes
    Consumer Information                                                        Yes/No      Yes
    Asset Information                                                           Yes/No      Yes
    Commercial Information                                                      Yes/No      Yes

    Volume IV.a
    Bill of Quantities                                                          Yes/No      Yes

    Volume IV.a
    Project Summary                                                             Yes/No      Yes

    Volume V.a
    AT&C Loss Computaion- Filled in all the information asked in the Format     Yes/No      Yes

    Volume V.b
    Cost Benefit Analysis- Filled in all the information asked in the Format    Yes/No      Yes

    Annexure A
    Implementation Schedule completed and attached with the DPR                 Yes/No      Yes

    Annexure B
    Assets detail completed and attached with the DPR                           Yes/No      Yes
Annexure C
Whether hard copy of the SLDs are attached with the DPR?                  Yes/No   Yes
Whether soft copy of the SLDs are attached with the DPR?                  Yes/No   Yes
Whether hard copy of the Nodal Diagrams are attached with the DPR?
                                                                          Yes/No   Yes
Whether soft copy of the Nodal Diagrams are attached with the DPR?
                                                                          Yes/No   Yes


Annexure D
Whether Standards for Quality Management Systems attached with DPR?
                                                                                   Yes


Annexure D
Whether Standard Procurement Procuredures/Guideline followed by utility
                                                                                   Yes
attached with DPR?

Annexure F
Check List completed and attached with the DPR                            Yes/No   Yes

						