									                                                                                                      Projects of the Amur region

                                                    Estimated capacity (resource,        Period of         Investments,       Investor or initiator                                      Stage of the project
№    Project name
                                                              output)                  construction        mln. roubles
     Power industry

     In process
1    Power line ring construction in                           110 MWt                  2009- 2011           2162.6             "DVEUC" OJSC               Construction documents are desined, had affirmative decision of "Amurexpertiza".
     Blagoveschensk                                                                                                                                            There is an agreement between Ministry of energy and "DVEUC" OJSC

2    Power line Blagoveschenskaya - Tambovka -                 300 MWt                   2008-2013           1405.0       The amur shop of main power The project is included to investment programm of "FPC EES" OJSC for 2009 year
     Varvarovka with "Tambovka" substation                                                                                line - subsidiary of "FPC EES"
     construction                                                                                                                       OJSC
     Planning
3    Construction of the Nizne-Bureyskaya HPP                  320 MWt                   2010-2015            18067            "RusHydro" OJSC              "Nizne-Bureyskaya HPP" OJSC is registered in the Amur region. Construction
                                                                                                                                                                             documents are on the project appraisal.
4    Construction of the Nizne-Zeyskaya HPP                    400 MWt                   2010-2016           18356.0           "RusHydro" OJSC             "Nizne-Zeyskaya HPP" OJSC is registered in the Amur region. Design and survey
                                                                                                                                                                                     works are in process.
5    Power line Zeyskay HPP - Amurskaya state                  500 MWt                   2010-2013            8200        The amur shop of main power                        Design and survey works are in process.
     boundary construction                                                                                                line - subsidiary of "FPC EES"
                                                                                                                                        OJSC
6    The second stage of Blagoveschensk heat and               390 MWt                      2010              3974                "DVEUC" OJSC                                  Design and survey works are in process.
     power plant construction
7    Erkovetskaya thermal power plant                         1800 MWt                   2013-2015           21540.0        INTER RAO UES OJSC                 Technical and economic assessment and project of the plant are in process
     construction
     Transport
     In process
8    "Amur" highway (Chita-Khabarovsk)                         858,5 km                  2001-2010            18286        "Dalniy Vostok" FSA DCR            858,5 km are set in operation . There is renewal of surfacing from 2008 year
     construction
 9   Air terminal construction in Blagoveschensk       300 paasangers per hour           2010-2012             912        The Amur region Government                            The construction was resumed in 2007
10   Ulak-Elga railway road construction                        313 km                   2008-2010           45000.0           "Yakutugol" OJSC                                   Construction works are in process
     Planning
11   Construction of the approach from "Amur"         11 km / 3500 running metre        2009- 2013            8000        The Amur region Government            The project is included to "Far East and Zabaykalie" federal programm
     federal highway to Blagoveschensk and bridge
     across Zeya river
12   Construction of the aproches to 14 settlements             65,4 km                  2008-2013           3218.5       The Amur region Government            The project is included to "Far East and Zabaykalie" federal programm
     from "Amur" federal highway
13   Construction of "Fevralsk-Ekimchan" roadway                217 km                   2011-2015            10580       The Amur region Government                                There is a substantiation report
     and bridge across Selemdzha river
14   Tygda-Zeya railway road construction                       105 km                   2016-2030           11000               RZD OJSC                   The project is included to "Railway developnent strategy till 2030"
15   Schimanovsk-Gar-Fevralsk railway road                      289 km                   2016-2030           28000        The Amur region Government        The project is included to "Railway developnent strategy till 2030"
16   The second landing strip construction in       length - 3200 metre, width - 60      2013-2015           5840.5       The Amur region Government The project is included to "Russian transport system modernization on 2010-2015"
     Blagoveschensk                                              metre                                                                                                                federal programm
17   The Blagoveschensk (RF) - Heihe (PRC)                      3120 м                   period of            6,773       The Amur region Government    Technical and economic assessment is made. There is the intergovernmant
     bridge across Amur river construction                                            construction still                                                                         agreement for construction
                                                                                        not defined
     Pipeline
     In process
18   Eastern Siberia - Pacific ocean oilpipeline          252 km., 30 mln. ton          2007-2009                           "Transneft" OJSC                                   252 km of pipeline is constructed
     construction (the first stage from Sakha
     (Yakutia) Republic to Skovorodino)
19   "Skovorodino - PLC state boarder" oilpipeline              64,3 km                 2009-2010                           "Transneft" OJSC          Сварено в нитку 31 км. Рачистка трассы -47,92 км, разработка траншеи -21,45
                                                                                                                                                                             км, укладка и засыпка -13 км.
20   Eastern Siberia - Pacific ocean oilpipeline                 822 km                 2010-2012                           "Transneft" OJSC                     Design and survey works are finished in the Amur region.
     construction (the second stage from
     Skovorodino to kosmino bay)
     Other infrastructure
21   Bank consolidation and Amur river quay                     5,58 km                 2008-2013      в ценах 4 кв        Blagoveschensk city                              Works were started in December 2008.
     reconstruction in Blagoveschensk                                                                 2007 г. 6086,6          administration
     Planning
22   "Vostochniy" civil space launching site               first launch in 2015         2012-2020        96000.0               Roskosmos                  Technical and economic assessment and project of the plant are in process
     (Uglegorsk)
     Natural resources
     Planning
23   Garinskoe iron deposit development and ore-     10 mln. ton of ore and 7,25 mln.   2007-2013        11351.5             "Garinskiy gorno-             Design & survey works, technical & economic assessment are in process
     dressing and processing enterprise                    ton of end product                                          metallurgicheskiy combinate"
     construction                                                                                                                  LLC
24   "Bolshoy Seim" titanium-magnetite deposit         1,8 mln. ton of concentrate      2007-2017         9720              "Uralmining" LLC                            Technical & economic assessment is in process
     development
25   Bamskoye gold ore deposit development                  2 mln. ton of ore           2009 - 2013       4000           "Amurskaya GRP" LLC          There is geological survey. The processing and oredressing eneterprise construction
                                                                                                                                                                                     will be started in 2010.
26   Malomyrskoye gold ore deposit development               6-10 ton of gold           2010-2011         4828         "Malomyrskiy rudnik" CJSC      There is geological survey. The processing and oredressing eneterprise construction
                                                                                                                                                                                     will be started in 2010.
27   "Pioneer" goldore mining development                  3,9 mln. ton of ore          2009-2010         3650          "Porkrovskiy rudnik" OJSC                          The second stage of the pit is completing.
28   Phosphate fertilizer production on basis of               not defined              2009-2010          530                 "Basis" LLC                      Geological survey is completed. The company needs an investor
     Evgenievskoye apatite deposit
     Wood processing
     In process
29   Wood processing complex construction in            saw-timber -105 th.cub.m;       2008-2010          352             "AmurForest" LLC              Technical & economic assessment is made. Drying cell and wood processing
     Zeya                                            wooden houses - 50; pellets - 3                                                                                       equipment are put into operation.
                                                       th.ton; timber -175 th.cub.m
30   "Vostochniy wood processing plant                   saw-timber -28 th.cub.m;       2007-2009         346,8             "Turanles" CJSC             There is technical & economic assessment . The productin was started in 2008.
     construction                                     squared beam - 14 th.cub.m;
                                                           timber -117 th.cub.m
31   Woodprocessing complex development in           wooden houses - 150; timber -      2008-2010         1225            "Mostootryad-T" LLC            The productin was started in 2008. The company needs an investor for futher
     Belogorsk                                                  252 th.cub.m                                                                                                            development.
32   Woodprocessing complex in Fevralsk,               saw-timber - 151 th.cub.m,       2009-2010          856           "Vostokstroyinvest" LLC               The equipment was purchased. The company needs an investor.
     Ovsyanka and Ogoron                                veneer sheets -12 th.cub.m,
                                                       pellets - 12 th.ton, OSB - 60
                                                        th.cub.m; timber - 500 th.
                                                                   cub.m.
     Planning
33   The second stage of the dihydroquercetin      dihydroquercetin - 20 ton,           2010-2011          300                "Ametis" LLC            Technical & economic assessment is in process. The company got land area for this
     (taxifolin) plant construction                 arabinogalactan - 40 ton                                                                                                              project.
34   Hi-tech woodprocessing complex construction volume of processing - 502 th.         2009-2012         2140           "LPC "Tyndales" OJSC                            The company is looking for an investor.
                                                            cub.m
35   Woodprocessing complex and pulp and paper saw-timber - 240 th.cub.m. pulp         2009-2011          5212              "WC "Kedr" LLC                There is concept of the project. The company is looking for an investor.
     plant construction                                   - 100 th. Ton
     Other projects
     Planning
36   Cement plant construction on basis of        cement - 1,2 mln. ton, lime          2010-2013          2700              "AZZhBK" LLC                 The company has license for the deposit. Commercial tests were made in
     Chagoyanskoye deposit                      powder - 600 th. ton, dry mix -                                                                        "SibNiiCement". Land-surveying is completed. The company is looking for an
                                               1 th. ton. Deposit capacity - 366                                                                                                        investor.
                                                            mln. Ton
37   Glass works construction                                 glass                    not defined        4400          "BureyaGESstroy" OJSC       There is idea of the project. The region has enough resorses of glass sands.
38   Grain harvester combine assembly shop                 not defined                 not defined     not defined     "Krancpetzburmash" CJSC   The company has free production space that can be used for combine assembling.
                                                                                                                                                The market researches of combine requirements were made. The company needs an
                                                                                                                                                                                       investor.
39   Development of Nothern residential area in   area - 199 hectare, living space -   not defined   98797, including     Blagoveschensk city   There is construction of the infrastructure, Technical and economic assessment for
     Blagoveschensk                                         1,8 mln.sq.m                               41977,5 for    administration    "MISKC" basic roads. The first stage of roadconstruction is completed. They need an investor
                                                                                                      infrastructure         CJSC, Moscow                                         for house building.

								