Word Document

Transmittal Cover letter for meeting minutes

You must be logged in to download this document
Reviews
Shared by: NPS
Stats
views:
17
downloads:
0
rating:
not rated
reviews:
0
posted:
5/30/2008
language:
English
pages:
0
United States Department of the Interior NATIONAL PARK SERVICE DENVER SERVICE CENTER 12795 W. Alameda Parkway P.O. Box 25287 Denver, Colorado 80225-0287 IN REPLY REFER TO: D5217 (DSC) 1443CX_____ PARK-PMIS Contractor Address City, State Zip Gentlemen: Reference: Park, _____ County, State, Contract No. 1443CX_____, Developed Area, Project Title, PARK-PMIS Pre-Construction Conference Minutes Subject: Attached please find your copy of the minutes from the pre-construction conference held on date. After reviewing the minutes for errors and omissions, please indicate receipt and approval of the minutes by signing and returning two copies of this letter to this office. Sincerely, Name Contracting Officer ************************************************************************************* Received: By: Company Name Title: _________________________________________ Date: _________________________________________ bcc: DSC-PM, Name Supt., _____
0
Related docs
Transmittal Cover letter for meeting minutes
Views: 17  |  Downloads: 0
Transmittal Cover letter for meeting minutes
Views: 8  |  Downloads: 0
Cover Transmittal Letter Table of Contents
Views: 8  |  Downloads: 0
LETTER OF TRANSMITTAL
Views: 11  |  Downloads: 0
Letter of Transmittal in a Proposal
Views: 7  |  Downloads: 0
Insert Letter of Transmittal here
Views: 2  |  Downloads: 0
Official Letter of Transmittal
Views: 7  |  Downloads: 1
Instructions for the Letter of Transmittal
Views: 1  |  Downloads: 0
Sample Letter of Transmittal
Views: 1  |  Downloads: 0
USE THIS LETTER OF TRANSMITTAL
Views: 3  |  Downloads: 0
Annual Report Transmittal Letter Template
Views: 11  |  Downloads: 0
Other docs by NPS
GLBA ANN RPT FINAL - Sea Otter Project Reports??
Views: 138  |  Downloads: 1
Oil Spill Response Needs Assessment
Views: 452  |  Downloads: 1
GPS for Fire Management and ICS - Training
Views: 201  |  Downloads: 3
Trimble GeoXT Quick Start Guide
Views: 483  |  Downloads: 7
Are You Really Mapping Submeter
Views: 217  |  Downloads: 3
Document to keep track of Trimble CE
Views: 171  |  Downloads: 2
Difference between NAD and WGS G at
Views: 171  |  Downloads: 0
What GPS Receiver Do I Need
Views: 160  |  Downloads: 0