PRE-SOLICITATION DRAWING CHECKLIST
Date: Preliminary Check: Final Check: Account No.: Drawing No.: Contact Person: Checked by (TIC):
NOTE: Check TIC computer record for correct drawing No. and revision letter. 1. All signatures have been obtained. Yes ___ No ___ Corrected ___ Correct ___ Incorrect ___ Corrected ___ Correct ___ Not necessary ___ Corrected ___ Yes ___ No ___ No. of Sheets missing ___ Missing sheets brought to TIC ___ Yes ___ No ___ Corrected ___ Yes ___ No ___ Corrected ___ Yes ___ No ___ Corrected ___ Yes ___ No ___ Not needed ___ Acceptable ___ Unacceptable ___ Corrected ___ Yes ___ No ___ ½-size Mylars provided ___ Yes ___ No ___ Corrected ___
2. Park Code and Drawing No. is on all sheets.
Revision Number is on all sheets.
3. All sheets are included in set.
4. Index listing NPS sheet numbers and subsheet numbers is included 5. Drawings include IFB or RFP number.
6. Park Alpha Code and Package/PMIS is included under IFB/RFP number. 7. Revision block is included.
8. Acceptable for filing (no stick-on, diazo, sepias, etc.)
9. Photo sheets 10. Contractors’ name(s) temporarily concealed; seal is okay. Check each sheet. 11. Drawings have been checked.
12. Project is solicited via e-commerce. 13. Require printing by GPO. Copies requested: 14. Digital files (specifications, drawings, etc.) are included.
Tom Fair / Date Yes ___ No ___ Half-size _____ Full-size _____ No ___ Yes ___ Software/Version: ________________ Software/Version: ________________
NOTES:
Final Acceptance by TIC Representative / Date: ______________________________________