professional documents
home
Upload
docsters
Upload
rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
Cost Comparability Data Checklist NPS National Park Service Project Cost Comparability Data Checklist The following is a checklist to be used as an aid for gathering pertinent project information for comparable projects. 1 2 3 4 Project Title Geographic Location of Project Project Description (Narrative) Project Description (Visual) a. Drawings (Plan, Elevation Views) b. Photos Year Construction Completed Construction Type (New/Repair) Project's Primary Asset Type Project's Secondary Asset Types Site Information (Size and geographical features) Building Description (Size, function) Material Descriptions Cost Information a. Price Schedule (CSI or UNIFORMAT II format) b. Schedule of Values c. Square Foot or Unit Costs d. Date of Cost Information 5 6 7 8 9 10 11 12 Cost Comparability Data (Sample) NPS Project Title Geographic Location of Project Project Description (Narrative) Office & Visitor Center - Grand Lake State Park Grand Lake, Utah, (10 miles north of Canyon Creek) National Park Service The park office and visitor center is located on a tree-covered knoll with views northward to Grand Lake and southward toward Route 585. A relocated entrance-drive winds up to the building that is situated below the crest of the knoll facing south. A service drive leads to a lower level storage area in the basement. Great care was taken to maintain several trees adjacent to the main entrance. In addition to the visitor's center and year-round accessible restroom facilities, the building also houses offices for the park manager, park rangers, and park resource staff. The entrance is enhanced by a vaulted glu-lam framed covered porch. Large over-sized windows rise out of a native ledgerock bluestone base that ties the building to the site. Project Description (Visual) Year Construction Completed Construction Type (New/Repair) Project's Primary Asset Type Project's Secondary Asset Types Site Information Building Description Construction Period October 2000 to March 2002 New Construction Building Sitework 10 plus acres. See project description above. The visitor center is located perpendicular to the main east-west spine of the building, stretching out toward the lake. On the east side of the visitor center, french doors open up to a bluestone terrace whose corner stairway connects to the park trail system. Geothermal heat from Grand Lake is used for HVAC. Local products (such as Grand Lake bluestone and slate) and numerous recycled materials (such as the ceramic tile, linoleum and biocomposite paneling were incorporated into the design. Date Bid: Aug 2000 ● Total Square Feet 7,100 Material Descriptions Cost Information C.S.I. Divisions (1 through 16) COST % OF SQ. FT. COST COST 2.16 4.03 7.83 21.46 2.72 4.77 8.07 7.08 4.73 8.83 17.17 47.45 5.97 10.45 17.69 15.53 SPECIFICATIONS BIDDING REQUIREMENTS 1 3 4 5 6 7 8 GENERAL REQUIREMENTS CONCRETE MASONRY METALS WOOD & PLASTICS THERMAL & MOISTURE PROTECT DOORS & WINDOWS 31,715 59,111 115,000 315,000 40,000 70,000 118,500 104,000 1 3 4 5 6 7 8 Modification procedures, submittals, construction facilities & temporary controls. Cast-in-place. Unit, stone. Structural metal framing, fabrications. Ornamental. Rough carpentry, heavy timber construction, wood and metal systems, prefabricated structural wood, finish carpentry, architectural& roof tiles, manufactured roofing & siding, flashing & sheet Waterproofing, insulation, shingles woodwork. metal, roof specialties & accessories, joint sealers. Metal doors & frames, wood & plastic doors, special doors, wood & plastic windows, hardware. 9 FINISHES 137,000 19,100 ─ ─ ─ ─ 335,311 132,246 1,476,983 313,500 15,000 9.34 1.30 ─ ─ ─ ─ 22.84 8.40 100.00 20.45 2.85 ─ ─ ─ ─ 50.06 18.4 219.58 9 Gypsum board, tile, acoustical treatment, linoleum, carpet, painting. 10 SPECIALTIES 11 EQUIPMENT 12 FURNISHINGS 13 SPECIAL CONSTRUCTIONS 14 CONVEYING SYSTEMS 15 MECHANICAL 16 ELECTRICAL TOTAL BUILDING COST 2 SITE WORK LANDSCAPING & OFFSITE WORK TOTAL PROJECT COST 10 Compartments & cubicles, louvers & vents, grilles & screens, flagpoles, identifying devices, fire protection, toilet & bath accessories. 11 12 13 14 15 Basic materials & methods, plumbing, HVAC, change orders. 16 Basic materials & methods, change orders. 2 Preparation, earthwork, paving & surfacing, utility piping materials, water distribution, sewerage & drainage, ponds & reservoirs, improvements. Landscaping. 1,805,483 (Excluding architectural and engineering fees.) UPDATED ESTIMATE TO AUGUST 2003: $245.14 PER SQUARE FOOT
flag this doc
21
1
not rated
0
5/30/2008
English
Preview

National Parks of New York National Park Service

NPS 5/30/2008 | 123 | 2 | 0 | legal
Preview

Laws Relating to The National Park Service The National Parks and Monuments

NPS 5/30/2008 | 165 | 1 | 0 | legal
Preview

National Parks of New York National Park Service

NPS 6/2/2008 | 146 | 0 | 0 | legal
Preview

Views of the National Parks

NPS 5/30/2008 | 115 | 0 | 0 | legal
Preview

Views of the National Parks

NPS 6/2/2008 | 109 | 0 | 0 | legal
Preview

Volunteers In Parks National Park Service U S

NPS 5/30/2008 | 83 | 1 | 0 | legal
Preview

Volunteers In Parks National Park Service U S

NPS 6/2/2008 | 99 | 0 | 0 | legal
Preview

Volunteers In Parks National Park Service U S - Site Index

NPS 5/30/2008 | 87 | 0 | 0 | legal
Preview

NATIONAL PARKS III NATIONAL PARKS Acadia PUBLIC LAW

NPS 5/30/2008 | 76 | 0 | 0 | legal
Preview

NATIONAL PARKS III NATIONAL PARKS Death Valley PUBLIC

NPS 5/30/2008 | 77 | 0 | 0 | legal
Preview

Fort Dupont Park National Capital Parks East National

NPS 5/30/2008 | 80 | 0 | 0 | legal
Preview

Cost Comparability Data Checklist Sample

NPS 6/2/2008 | 9 | 0 | 0 | legal
Preview

Volunteers In Parks National Park Service U S - Site Index

NPS 6/2/2008 | 75 | 0 | 0 | legal
Preview

NATIONAL CAPITAL PARKS Franklin Delano Roosevelt Memorial Park

NPS 5/30/2008 | 62 | 0 | 0 | legal
Preview

National Parks of New York Harbor

NPS 5/30/2008 | 47 | 0 | 0 | legal
Preview

GLBA ANN RPT FINAL - Sea Otter Project Reports??

NPS 6/2/2008 | 94 | 1 | 0 | legal
Preview

Oil Spill Response Needs Assessment

NPS 6/2/2008 | 352 | 1 | 0 | legal
Preview

GPS for Fire Management and ICS - Training

NPS 6/2/2008 | 142 | 3 | 0 | legal
Preview

Trimble GeoXT Quick Start Guide

NPS 6/2/2008 | 401 | 7 | 0 | legal
Preview

Are You Really Mapping Submeter

NPS 6/2/2008 | 145 | 3 | 0 | legal
Preview

Document to keep track of Trimble CE

NPS 6/2/2008 | 114 | 2 | 0 | legal
Preview

Difference between NAD and WGS G at

NPS 6/2/2008 | 112 | 0 | 0 | legal
Preview

What GPS Receiver Do I Need

NPS 6/2/2008 | 101 | 0 | 0 | legal
Preview

September Global Positioning Systems and Mobile Mapping Subcommittee

NPS 6/2/2008 | 117 | 0 | 0 | legal
Preview

Description of GIS awards categories - Awards

NPS 6/2/2008 | 102 | 0 | 0 | legal
 
review this doc