Letter to residents - alley resurfacing
/ 0
Document Sample


Celebration
Community Development District
610 Sycamore Street, Suite 140, Celebration, FL 34747
407-566-1935; FAX 407-566-4128
May 1, 2009
Dear North Village Residents:
This letter is to notify you that the Celebration CDD will begin the long awaited repaving of the
alleys within North Village starting the week of May 11, 2009. Work will start North of
Celebration Blvd, which includes the alleys behind Grace Avenue, Reserve Place, Longview
Avenue and Grinnell Place and will proceed through the rest of North Village.
The first phase of the work will be the milling (removal of the existing asphalt). During this
phase your alley may be closed for up to two days. Some dust can also be expected during this
process. During the work access to your driveway will be restricted. It is strongly recommended
that you move your vehicle to the street parking in front of your home. After the milling of each
alley is complete the alley will be reopened, and access to the alley will be available until phase II
of the work begins which is the laying of the asphalt. During this phase the alleys may be closed
for up to two days as well.
A tentative schedule will be provided on the CDD website www.celebrationcdd.org before work
begins, although this schedule will change depending on product availability, production and
weather. However, notification via door hangers and signs at the entrance to each alley will be
provided at least 48 hours prior to the closing of your alley.
The following are some things you can expect during this work effort.
• Alley closures
• Sidewalk and crosswalk closures
• Dust
• Intermittent irrigation water availability
• Tracking within 48 hours of asphalt being laid
• Large pieces of equipment and trucks using roadways and alleys
• Possible trash pick up schedule changes. Notification will be given prior to any
changes.
• Daily work schedule 7:00 am to 5:00 pm. – Monday thru Friday
Thank you for your cooperation.
If you have any questions or need further information regarding this project, please do not
hesitate to contact the District Office at 407-566-2018.
Sincerely,
Brian Smith
Field Manager
CELEBRATION NORTH VILLAGE PAVING PROJECT
Periodic Alley Closure Schedule
MILLING
North Section
Locations
Grace Ave., Reserve Pl., Longview Ave., May 11 & 12
And Clayton Ave.
Ficus St., Grinnel Pl., Drake St., North Village St., May 12 & 13
Redbud St., Longview Ave. - West end.
South Section
Locations
Eastpark, Reeves St., North Village St., Norfolk May 13 & 14
Pl.,
Norfolk St., Parlor Ave., Eastpark Crescent and May 14 & 15
Eastpark Dr. - East end.
NOTE: During the milling process only small sections of the alleys will be closed at a
time. In an emergency equipment can be removed and access granted. But it is strongly
recommended that cars be parked on the streets during the dates identified.
* Schedule is subject to change.
PAVING
North Section
Locations
Grace Ave., Reserve Pl., Longview Ave., May 14 to 16
And Clayton Ave.
Ficus St., Grinnel Pl., Drake St., North Village St., May 16 to 18
Redbud St., Longview Ave. - West end.
South Section
Locations
Eastpark, Reeves St., North Village St., Norfolk May 19 & 20
Pl.,
Norfolk St., Parlor Ave., Eastpark Crescent and Schedule pending
Eastpark Dr. - East end.
NOTE: During alley paving full section of alleys will be closed and access will be
restricted. All cars or necessary items must be removed from alley garages during the
dates work is being performed. Access will be granted the following day however
tracking may occur for up to three days.
* Schedule is subject to change.