Mill Energy Summary and Analysis
sponsored by:
TAPPI Steam, Power and Energy Management Committee
Thank you for participating in the Mill Energy Survey!
Purpose:
Process energy consumption is a function of feedstock, technology,
maintenance and operations.
This Summary and Analysis will provide an initial summary and periodic
reference to help Pulp and Paper engineers better understand the range and
potential of energy requirements for specific processes.
As Mill conditions and operations change, and process changes come on-
line, this Analysis will demonstrate the net change of energy consumption by
each process area.
TAPPI respects the confidential nature of each Mill's process information,
and this Analysis may be used for strictly internal purposes. To maintain
confidentiality, information is analyzed on a per-unit of production basis. The
Mill's actual production rates are not reported in the printouts. This may
provide an opporunity for Mill Engineers to compare energy consumption
data with peers.
Data Input Methods:
The following pages are designed be be completed interactively (point and
click on the spreadsheet).
Some general site information will need to be specified only once.
Some information can be provided by clicking the appropriate check box or
boxes. Click here to test!
In a few places, text entry is needed. Please place entry in the outlined block.
Most of the data requested is numerical, on a per-unit of production basis.
Recognizing that Mill data is frequently reported on a totalized basis for an
accounting period,
calculation templates (scratchpads) have been placed adjacent to
appropriate data fields.
These are provided to simplify conversion from typical Mill reporting units to
generic per-unit of production basis.
Mill specific data can be entered in the blue fields;
the conversion to per-unit of production is reported in green,
and arrows indicate where the converted data should be entered on the
survey form.
Page 1 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Introduction
Data Input Methods: (continued)
When there are two or more operating units, like Paper Machines, to be
reported, use the parallel columns on the scratchpad to evaluate each data
set.
Once the per-unit data is entered on the survey form, delete the entries from
the scratchpad to preserve Mill data confidentiality.
Results: Please select all TABS from Cover to Paper Machines, and print as a set.
Page 2 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Introduction
CREDITS
This DRAFT benchmarking tool has been developed at the direction and under
the guidance of:
Energy Subcommittee
Steam & Power/Energy Management Committee
of the TAPPI Engineering Division
The primary editor of this spreadsheet-based document is:
Tom Harriz, PE
Power Process Engineer
Jacobs Engineering
1041 E Butler Road
Greenville, SC 29607
864-676-6883 (V)
864-676-6005 (F)
Tom.Harriz@Jacobs.com
Please direct you questions, comments and recommendations for the use of or
improving this document to any officer of the Steam & Power/Energy Management
Committee, or this editor directly.
Page 3 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Credits
Mill Energy Summary and Analysis
sponsored by:
TAPPI Steam, Power and Energy Management Committee
This summary represents operations at:
Over the operating period:
From To:
Page 4 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Cover
Winter Minimum Temperature Zones
General Mill Data
Select Mill location:
Use known ZONE or select based on
map color code. 1
Zones 1 - 4 Northern
less than -20F Min - Above Green band
2
Zones 5 - 6 Middle
-20 to 0F Min - Green or Yellow band 3
Zones 7 - 11 Southern
5
greater than 0 F min - Below Yellow band
6
7
4
8
Zone 1: below -46 C (below -50 F)
9
Zone 2: -46 to -40 C (-50 to -40 F)
Zone 3: -40 to -34 C (-40 to -30 F) 10
Zone 4: -34 to -29 C (-30 to -20 F) 11
Zone 5: -29 to -23 C (-20 to -10 F)
Zone 6: -23 to -18 C (-10 to 0 F)
Zone 7: -18 to -12 C (0 to 10 F)
Zone 8: -12 to -7 C (10 to 20 F)
Zone 9: -7 to -1 C (20 to 30 F)
Zone 10: -1 to 4 C (30 to 40 F)
Zone 11: above 4 C (above 40 F)
% Internal Steam
from By-Product % Internal Steam
Bark and from Liquor
% Purchased % Sold purchased fuels Recovery
Steam Supply
% Self-Generated % Self- % Self-
% Purchased % Sold Stm Turbs Generated Gas Generated
Electric Power Turbs Hydroelectric
Page 5 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls General
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
800,000 mlb/accounting period - Total Steam Generation
350,000 mlb/accounting period - Recovery Boiler Steam Generation
20,000 mlb/accounting period - Purchased Steam
- mlb/accounting period - Sold Steam
35 days/accounting period
820,000 mlb/accounting period - Total Steam Supplied to Site (not incl Sales)
976.2 mlb/hr - Average
Purchased Internal Steam
Steam - % of Sold Steam - % from by- Note: Does not
Total supplied of Total product bark Internal Steam from total 100% w/Steam
to Site Generation and purch fuels Liquor Recovery Sale
2.4% 0.0% 54.9% 42.7% 100.0%
30,240,000 kWh/period - generated w/steam turbine generators
20,000,000 kWh/period - generated w/gas turbines
5,000,000 kWh/period - generated w/hydro
500,000 kWh/Period Sold
20,000,000 kWh/period Purchased
74,740,000 kWh/Period used by Site (not including sales)
35 days/accounting period for electricity
83,619 kW avg demand
Purchased Sold kWh % of Self-Generated Self-Generated Gas Self-Generated
kWh % of Total Stm Turbs % Turbs % of Gen Hydro % of Gen
Total Site
26.8% Generation
0.9% of Gen
54.7% 36.2% 9.1%
Page 6 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls General
Woodyard Energy Usage
Line 1 Line 2 Line 3
Feedstock for swing lines, mark all that apply if individual data is not available.
Hardwood
Softwood
Other
Species
Feedstock select one per Line
Roundwood
Long Wood? Check for 'Yes', leave blank for Short Wood
Chips
Sawdust
Debarking Method
Barrel
Ring
Other
Chip Transport
Pneumatic
Mechanical
Energy Usage:
Electricity kWh/Net Bone Dry Ton of Screened Chips
Water Used for Log Debarking/Washing
Gal/Net Bone Dry Ton of Screened Chips
Fresh
Reused
Page 7 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Woodyard
Sample Data supplied as example only - replace with Mill Data
Line 1 Line 2 Line 3
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
180,000 180,000 180,000 kWh/Electricity Billing Period
35 35 35 Days/Elec Billing Period - defaults to Accounting Period, defined below
40,000 40,000 40,000 As-Recieved Cords/Woodyard Accounting Period
35 35 35 Days/Accounting Period
1,143 1,143 1,143 Cords/day
1.5 1.5 1.5 Tons/Cord - as recieved
50.0% 50.0% 50.0% As Recieved moisture %
60,000 60,000 60,000 Wet Tons Recieved/Woodyard Accounting Period - calculation may be replaced by data
1,714 1,714 1,714 Wet Tons/Day Recieved - calculation may be replaced by data
10.0% 10.0% 10.0% Woodyard and Debarking Loss % of total Wood Recieved
5.0% 5.0% 5.0% Chip Screening Loss % of Total Chips
12,900,000 12,900,000 12,900,000 Gallons of log and chip Wash Water/Woodyard Accounting Period
5,143 5,143 5,143 kWh/Day - calculation may be replaced by data
733 733 733 Net Bone Dry Tons/Day Screened Chips
7.0 7.0 7.0 kWh/Net Bone Dry Ton of Screened Chips
503 503 503 gal/Net Bone Dry Ton of Screened Chips
Page 8 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Woodyard
Pulp Mill Energy Usage
Line 1 Line 2 Line 3
Type of Pulp
Kraft - Sulfate
Sulfite
Feedstock
Hardwood
Softwood
Other
Feedstock
Roundwood
Chips
Sawdust
Digesters
Batch
Continuous
Process
Kraft (sulfate)
Sulfite
Semi-Chemical
Mechanical
Yield % Bone Dry Washed Pulp / Bone Dry Feedstock
Energy:
mmBtu/Ton Bone Dry Washed Pulp
Med Pres Steam (>100#)
Low Pres Steam (<100#)
Steam Condensate Returned - % of Steam Supplied
For Steam Generation decimal %
For Process Water
Where Steam Enthalpy Drop is:
For Preheating Liquor: Steam Enthalpy Supplied - Condensate Enthalpy Returned
For Direct Heating: Steam Enthalpy Supplied - Avg Cooking Liquor Enthalpy
Water Used for Pulp Washing: Gal/Ton Bone Dry Washed Pulp
Fresh
Reused
Page 9 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Pulp Mill
Sample Data supplied as example only - replace with Mill Data
Line 1 Line 2 Line 3
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
23,000 23,000 23,000 Tons/Accounting Period Chips Supplied
35 35 35 days/Accounting Period
45.0% 45.0% 45.0% moisture in Chips supplied
7,000 7,000 7,000 Tons/Accounting Period Air Dry Washed Pulp
10% 10% 10% Moisture in Air Dry Pulp
180 180 180 Tons/Day Bone Dry Washed Pulp (calculated)
49.8% 49.8% 49.8% Yield - Bone Dry Pulp/Bone Dry Feed
######## ######## ######## Avg lbs Steam/Accounting Period
35 35 35 days/Accounting Period
425 425 425 Steam Temperature Supplied
150 150 150 PSIG - Steam Pressure Supplied
220 220 220 Deg F - Steam Condensate or Cooking Liquor Temp
200 200 200 Tons/Day Air Dry Washed Pulp
10% 10% 10% Moisture in Air Dry Pulp
180 180 180 Tons/Day Bone Dry Washed Pulp (calculated)
#NAME? #NAME? #NAME? Btu/lb Enthalpy drop (calculated)
#NAME? #NAME? #NAME? Million Btu/Ton Bone Dry Pulp (calculated)
5,000,000 5,000,000 5,000,000 gallons Washwater/Accounting Period
35 35 35 days/Accounting Period
145 145 145 Washed Air Dry Tons/Day
10% 10% 10% Moisture in Air Dry Pulp
130.5 130.5 130.5 Tons/Day Bone Dry Washed Pulp (calculated or linked)
1095 1095 1095 gallons/Ton Bone Dry Pulp (calculated)
Page 10 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Pulp Mill
Recycle Pulp
Line 1 Line 2 Line 3
Feedstock
OCC
Newsprint
MOW
Makeup Water Supply
Fresh
Recycled from other processes
Fiber Loss wt% of Bone Dry Feedstock
Filler Loss wt% of Bone Dry Feedstock
Brightness:
Energy:
Electricity kWh/Ton
Steam mmBtu/Ton Bone Dry Pulp
High Pressure (>100#)
Low Pressure (<100#)
Water gal/Ton Bone Dry Pulp
35
500
Page 11 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Recycle Pulp
Sample Data supplied as example only - replace with Mill Data
Line 1 Line 2 Line 3
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
14,000 14,000 14,000 Pulp Tons Produced per Accounting Period - Air Dry Basis
10.0% 10.0% 10.0% moisture in Air Dry Pulp
35 35 35 Days per Accounting Period
10.0% 10.0% 10.0% moisture in Feedstock
1750 1750 1750 Tons per Accounting Period sludge effluent - Air Dry Basis
10.0% 10.0% 10.0% moisture in Air Dry Sludge
10.0% 10.0% 10.0% Fiber content of Sludge - % of Bone Dry Sludge
450 450 450 Tons per day Feedstock as-recieved
405 405 405 Tons per day Feedstock Bone Dry Basis
360 360 360 net Fiber recovered - Bone Dry Tons per day
45 45 45 Sludge - Bone Dry Tons per day
4.5 4.5 4.5 Fiber Loss in Sludge - Bone Dry Tons per day
40.5 40.5 40.5 Filler removed - Bone Dry Tons per day
1.1% 1.1% 1.1% Fiber Loss - % of Bone Dry Feedstock
10.0% 10.0% 10.0% Filler Loss - % of Bone Dry Feedstock
250,000 250,000 250,000 kWh/Accounting Period
35 35 35 Days per Accounting Period
19.8 19.8 19.8 kWh per Bone Dry Ton of Deink Pulp
16,800 16,800 16,800 Steam - mlb/Accounting Period
65 65 65 psig - Steam Pressure supplied
325 325 325 Deg F - Steam Temperature Applied
150 150 150 Deg F - Steam condensate (if any) or process supply Temperature
35 35 35 days per Accounting Period
#NAME? #NAME? #NAME? million Btu/Bone Dry Ton of Deink Pulp
6.300 6.300 6.300 million gal/Accounting Period
35 35 35 Days per Accounting Period
500 500 500 gal per Bone Dry Ton of Deink Pulp
Page 12 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Recycle Pulp
Bleach Plant Energy Usage
Line 1 Line 2 Line 3
Type of Pulp
Kraft - Sulfate Click on Boxes to make selection
Sulfite
Recycle
Mechanical
Feedstock
Hardwood
Softwood
Other
Bleach sequence includes:
A (acid) Please Check all that apply
C (elemental chlorine)
D (chlorine dioxide)
E (caustic extraction)
H (hypochlorite)
O (oxygen) Oxygen generated on-site
P (hydrogen peroxide)
Z (ozone)
% Shrinkage decimal %
Final Brightness decimal % GE ISO
Total Bleaching Sequence Duration hours
Species Transfers/Off Spec decimal %
Energy Usage:
Bleaching Energy Used: [Daily Avg Steam Usage (lbs/hr) x (24 Hours/Day) x Steam Enthalpy Drop]
[[Tons/Day Bone Dry Bleached Pulp]
mmBtu/Ton Bone Dry Bleached Pulp
Med Pres Steam (>100#)
Low Pres Steam (<100#)
Steam Condensate Returned - % of Steam Supplied
For Steam Generation enter as decimal %
For Process Water
Where Steam Enthalpy Drop is:
For Preheating Liquor: Steam Enthalpy Supplied - Condensate Enthalpy Returned
For Direct Heating: Steam Enthalpy Supplied - Bleaching Enthalpy
Water Used for Bleached Pulp Washing:
Gal/Ton Bone Dry Bleached Pulp
Fresh
Reused
Electric Energy Usage kWh/Ton Bone Dry Bleached Pulp
200
10%
180
50.8
Page 13 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Bleaching
Sample Data supplied as example only - replace with Mill Data
Line 1 Line 2 Line 3
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
208 208 208 Unbleached Stock - Air Dry Tons/Accounting Period
200 200 200 Bleached Stock - Air Dry Tons/Accounting Period
35 35 35 days per Accounting Period
3.8% 3.8% 3.8% Bleach Plant Shrinkage
17,500 17,500 17,500 mlbs Steam/Accounting Period
35 35 35 days per Accounting Period
325 325 325 Steam Temperature Supplied
70 70 70 PSIG - Steam Pressure Supplied
220 220 220 Deg F - Steam Condensate or Bleaching Temp
200 200 200 Tons/Day Air Dry Bleached Pulp
10% 10% 10% Moisture in Air Dry BleachedPulp
180 180 180 Tons/Day Bone Dry Bleached Pulp (calculated)
#NAME? #NAME? #NAME? Btu/lb Enthalpy drop (calculated)
#NAME? #NAME? #NAME? Million Btu/Ton Bone Dry Bleached Pulp (calculated)
Line 1 Line 2 Line 3
1,750 1,750 1,750 thousand gallons Washwater/Accounting Period
35 35 35 days per Accounting Period
200 200 200 Bleached Air Dry Tons/Day (from above or input)
10% 10% 10% Moisture in Air Dry Pulp (from above or input)
180 180 180 Tons/Day Bone Dry Bleached Pulp (calculated)
278 278 278 gallons/Ton Bone Dry Bleached Pulp (calculated)
320,000 320,000 320,000 kWh/Accounting Period (include Ozone Plant, if any)
35 35 35 Days/Accounting Period
9,143 9,143 9,143 kWh/Day (calculated or input)
200 200 200 Bleached Air Dry Tons/Day (from above or input)
10% 10% 10% Moisture in Air Dry Pulp (from above or input)
180 180 180 Tons/Day Bone Dry Bleached Pulp (calculated)
50.8 50.8 50.8 kWh/Bone Dry Bleached Ton of Pulp
Page 14 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Bleaching
Evaporator Energy Usage
Line 1 Line 2 Line 3
Click on Boxes to make selection
Type of Pulp
Kraft - Sulfate
Sulfite
Feedstock
Hardwood
Softwood
Other
Process Heat Augmented Evaporation? Check for 'Yes'
Unsweetened Weak Liquor Feed 10.0% 12.0% 13.0%
Sweetened Weak Liquor Feed 10.0% 12.0% 13.0% decimal percent solids
Product Liquor, including Concentrator 65.0% 68.0% 69.0%
mmBtu/lb Liquor Solids
Evaporator Steam Energy Used:
Is there a foul condensate stripper? Check for 'Yes'
Is stripper integrated with evaporator? Check for 'Yes'
Energy above include stripping? Check for 'Yes'
Does sripper feed include Check for 'Yes'
more than evaporator condensate?
Condensate Returned
Steam To Util Condensate System percent rtn
Process Cond to Process Water percent rtn
Btu/lb Condensate Stripped
Stripper Energy Used:
gal/lb Virgin Solids Fired
Stripped Condensate Recovered:
Page 15 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Evaporators
Sample Data supplied as example only - replace with Mill Data
Line 1 Line 2 Line 3
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
2.800 2.800 2.800 mmppd Solids Fired at the gun
7.0% 7.0% 7.0% Saltcake Recirculation % of fired
1,000 1,000 1,000 ppd Fresh Saltcake added after Evaps
150,000 150,000 150,000 pph Avg Evaporator Steam
60 60 60 psig Steam Pressure Supplied
385 385 385 Deg F - Steam Temp Supplied
20 20 20 psig Evaporator Steam Pressure
2.603 2.603 2.603 mmppd Virgin Solids Fired (calc'd)
#NAME? #NAME? #NAME? Btu steam/lb Virgin Liquor Solids (calc'd)
6.12 4.96 4.51 Economy (calc'd) (incl integrated Stripper)
1,431,650 1,457,680 1,457,680 ppd Evaporator condensate
172,488 175,624 175,624 gal/day Evap Process Water condensate
25% 25% 25% % Evap Process Condensate recovered
directly for wash water or other use
Stripping Steam Usage
10,000 10,000 10,000 mlb/hr Stripping Steam (separately steamed)
FALSE FALSE FALSE Integrated with Evaporator?
35% 35% 35% Percent of Dirty Evap Condensate Stripped
51% 51% 51% Percent of total Evap Process Cond rtn
180 180 180 Stripper Feed Temperature (F)
100,000 100,000 100,000 gal/day - Other Condensate Stripped, too
60 60 60 psig Steam Pressure Supplied
385 385 385 Deg F - Steam Temp Supplied
5 5 5 psig Stripper Pressure
145,278 146,101 146,101 gal/day Condensate stripped
1,205,808 1,212,641 1,212,641 lb/day Condensate Stripped
#NAME? #NAME? #NAME? MMBtu/lb of Condensate Stripped
0 0 0 Btu/lb Virgin Solids excess heat to Evap
56 56 56 gal/1000 lb of Virgin Solids Fired
Page 16 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Evaporators
Kiln and Causticizing
Lime Reduction decimal %
Lime Availability decimal %
Purchased Lime Percent of Total Used
Energy Usage
Steam mmBtu/Ton
Fuel mmBtu/Ton
Electricity Btu/Ton
Page 17 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Kiln & Caust
Sample Data supplied as example only - replace with Mill Data
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
12,000 Tons finished Lime (CaO) Calcined / Accounting Period
500 Tons of Lime Purchased /Accounting Period
35 Days in Accounting Period
200,000 Gal #6 Oil 150,000 Btu/Gal
- Gal #2 Oil 145,000 Btu/Gal
30,000 MSCF Gas 1,010 Btu/SCF
10,000 Avg lb/hr Steam
60 PSIG Steam Supply Pressure
385 Deg F Steam Supply Temperature
75 Deg F Makeup water for steam
200,000 kWh/Accounting Period
4.0% Purchased Lime
#NAME? mmBtu Steam / Ton Lime Calcined
5.03 mmBtu Fuel / Ton Lime Calcined
16.7 KWh Electricity / Ton Lime Calcined
Page 18 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Kiln & Caust
Paper Machines & Pulp Dryers
1st PM 2nd PM 3rd PM 4th PM 5th PM
Bleached - Fine Paper
Coated Check all that apply
Uncoated
Free Sheet
Bleached - Other
Tissue
Newsprint
Board
Unbleached
Board
Paper
Other: Specify
Lightest Grade Basis Weight
Heaviest Grade Basis Weight
Most Grades Coated ? Check for 'Yes'
Colors? Check for 'Yes'
Moisture % of Sheet at Reel decimal %
% Recycle in fiber furnish % of fiber (not incl broke)
% Repulped Broke in fiber supply % of fiber supplied
Fiber % Losses on Machine % of fiber supplied
wt% Filler & Coating % Machine Dry Basis
Reel and Winder Trim % Losses decimal %
Machine Availability % on-line
Energy Usage: Steam - mmBtu/Machine Dry Ton
HP Steam > 200#
IP Steam 100# < > 200#
LP Steam < 100#
Does Machine use Radiant Drying? Check for 'Yes'
Energy Usage: Radiant Drying - Energy/Machine Dry Ton (MDT)
Natural Gas - mmBtu/MDT
Electricity - kWh/MDT If measured separately
Steam turbine driven? Check for 'Yes'
Part turbine & part motor drive? Check for 'Yes'
Energy Usage: Electric Motors - mmBtu/Machine Dry Ton
Includes radiant heating kW? Check for 'Yes'
Page 19 3c34a2c2-5d12-49d2-889f-8f8c95b8b1c0.xls Paper Machines
Sample Data supplied as example only - replace with Mill Data
1st PM 2nd PM 3rd PM 4th PM 5th PM
This Scratchpad can be used to develop inputs.
Clear INPUT Fields when complete to preserve confidentiality
20 20 20 20 20 Product Basis Weight - lb/std unit area
358 358 358 358 358 Scheduled Operating days/yr
349 349 349 349 349 Actual Operating days/year
35 35 35 35 35 Days/Accounting Period
7,250 7,250 7,250 7,250 7,250 Off-the-Reel Machine Dry Tons /Accounting Period
75 75 75 75 75 Tons trim / Accounting Period
75 75 75 75 75 Tons fiber to Sewer / Accounting Period
900 900 900 900 900 Tons Filler on the sheet/Accounting Period
400 400 400 400 400 Tons Coating /Accounting Period
50 50 50 50 50 Tons Repulped Broke in fiber supply/Accounting Period
90.0% 90.0% 90.0% 90.0% 90.0% Filler & Coating Retention in/on Sheet
5.0% 5.0% 5.0% 5.0% 5.0% Moisture in Sheet
207.1 207.1 207.1 207.1 207.1 Machine Dry Tons/Day Off-the-Reel
0.7% 0.7% 0.7% 0.7% 0.7% Repulped Broke in Fiber Supply
1.0% 1.0% 1.0% 1.0% 1.0% Fiber Loss to sewer
16.14% 16.14% 16.14% 16.14% 16.14% Filler and Coating on Sheet
1.03% 1.03% 1.03% 1.03% 1.03% Reel and Winder Trim Losses
97.5% 97.5% 97.5% 97.5% 97.5% availability
84,000 84,000 84,000 84,000 84,000 Steam - mlb/Accounting Period
35 35 35 35 35 Days in Accounting Period
150 150 150 150 150 psig - steam supply pressure
395 395 395 395 395 Deg F - steam supply temperature
35 35 35 35 35 psig - wet end (lowest) steam pressure
100.0 100.0 100.0 100.0 100.0 mpph Steam Avg - calculation may be replaced by data
#NAME? #NAME? #NAME? #NAME? #NAME? mmBtu/Off-the-Reel-Ton
30,000 30,000 30,000 30,000 30,000 MSCF Gas/Accounting Period 1,010 Btu/SCF
35 35 35 35 35 Days/Accounting Period (from above or input)
207.1 207.1 207.1 207.1 207.1 Tons/Day Off-the-Reel (from above or input)
4.2 4.2 4.2 4.2 4.2 mmBtu/Off-the-Reel-Ton
320,000 320,000 320,000 320,000 320,000 Electricity - kWh/Accounting Period
35 35 35 35 35 Days/Accounting Period (from above or input)
9,143 9,143 9,143 9,143 9,143 kWh/Day (calculated or input)
207.1 207.1 207.1 207.1 207.1 Tons/Day Off-the-Reel (from above or input)
44.1 44.1 44.1 44.1 44.1 kWh/Ton Off-the-Reel