Call for Contract by rjb15458

VIEWS: 0 PAGES: 6

Call for Contract document sample

More Info
									                                   Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                SOLICITATION OR CONTRACT NUMBER      PAGE


                         Type Contractor Name Here                                          1-11-C005             Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                 QTY         UNIT        UNIT PRICE   AMOUNT


                                                           BASE YEAR
A.         PART A - DAYTIME HOURS
           Daytime Hours: 6:00 am through 8:00 pm
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               100          LF
     1.b   Cable GR                                                                100          LF
     1.c   Concrete Median Barrier                                                  25          LF
     1.d   Posts                                                                    10          EA
2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               800          LF
     2.b   GR-2A Strong Post W Beam                                                200          LF
     2.c   GR-3   Cable GR                                                         500          LF
     2.d   GR-8   Weak Post W Beam                                                 400          LF
     2.e   GR-8A Weak Post W Beam                                                  100          LF
     2.f   GR-8B Weak Post W Beam                                                  100          LF
     2.g   MB-3   Median Barrier W beam                                            400          LF
     2.h   MB-5   Weak Post Median Barrier W beam                                  100          LF
     2.i   MB-7A Concrete Median Barrier                                           100          LF
     2.j   MB-7B Concrete Median Barrier                                           100          LF
     2.k   MB-7C Concrete Median Barrier                                           100          LF
     2.l   GR11    Trailing End Unit                                                 1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    2          EA
     3.b   GR-7     Breakaway Cable Terminal                                         2          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   2          EA
     3.d   GR-FOA-2 Fixed Object Attachment W beam                                   2          EA
     3.e   GR-FOA-4 Fixed Object Attachment W beam                                   2          EA
4          Install New Guardrail (No Existing)                                     200          LF
5          Sand-Filled Module Impact Attenuators
     5.a   Replace Damaged Container/install sand                                    3          EA
6          Impact Attenuator Repairs
     6.a   Labor                                                                   80           HR
     6.b   Material Allowance                                                       1           LS                         $20,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          3          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         2          EA
           Subtotal - Part A - Daytime Hours
           (Items 1 through 7)

B.         PART B - NIGHTTIME HOURS
           Nighttime Hours: 10:00 pm through 5:00 am
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               50           LF
     1.b   Cable GR                                                                50           LF
     1.c   Concrete Median Barrier                                                 10           LF
     1.d   Posts                                                                    5           EA
                                   Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                SOLICITATION OR CONTRACT NUMBER      PAGE


                         Type Contractor Name Here                                          1-11-C005             Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                 QTY         UNIT        UNIT PRICE   AMOUNT

2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               160          LF
     2.b   GR-2A Strong Post W Beam                                                 40          LF
     2.c   GR-3   Cable GR                                                         100          LF
     2.d   GR-8   Weak Post W Beam                                                  80          LF
     2.e   GR-8A Weak Post W Beam                                                   20          LF
     2.f   GR-8B Weak Post W Beam                                                   20          LF
     2.g   MB-3   Median Barrier W beam                                             80          LF
     2.h   MB-5   Weak Post Median Barrier W beam                                   20          LF
     2.i   MB-7A Concrete Median Barrier                                            20          LF
     2.j   MB-7B Concrete Median Barrier                                            20          LF
     2.k   MB-7C Concrete Median Barrier                                            20          LF
     2.l   GR11    Trailing End Unit                                                 1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    1          EA
     3.b   GR-7     Breakaway Cable Terminal                                         1          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   1          EA
     3.d   GR-FOA-2 Fixed Object Attachment W beam                                   1          EA
     3.e   GR-FOA-4 Fixed Object Attachment W beam                                   1          EA
4          Install New Guardrail (No Existing)                                     50           LF
5          Sand-Filled Module Impact Attenuator
     5.a   Replace Damaged Container/install sand                                    1          EA
6          Impact Attenuator Repairs
     6.a   Labor                                                                   10           EA
     6.b   Material Allowance                                                       1           LS                          $5,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          1          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         1          EA
           Subtotal - Part B - Nighttime Hours
           (Items 1 through 7.b)

           TOTAL - BASE YEAR
           (Part A + Part B)
                                                      OPTION YEAR ONE
A.         PART A - DAYTIME HOURS
           Daytime Hours: 6:00 am through 8:00 pm
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               100          LF
     1.b   Cable GR                                                                100          LF
     1.c   Concrete Median Barrier                                                  25          LF
     1.d   Posts                                                                    10          EA
2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               800          LF
     2.b   GR-2A Strong Post W Beam                                                200          LF
     2.c   GR-3   Cable GR                                                         500          LF
     2.d   GR-8   Weak Post W Beam                                                 400          LF
     2.e   GR-8A Weak Post W Beam                                                  100          LF
     2.f   GR-8B Weak Post W Beam                                                  100          LF
                                    Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                SOLICITATION OR CONTRACT NUMBER      PAGE


                         Type Contractor Name Here                                          1-11-C005             Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                 QTY         UNIT        UNIT PRICE   AMOUNT

     2.g   MB-3        Median Barrier W beam                                       400          LF
     2.h   MB-5        Weak Post Median Barrier W beam                             100          LF
     2.i   MB-7A       Concrete Median Barrier                                     100          LF
     2.j   MB-7B       Concrete Median Barrier                                     100          LF
     2.k   MB-7C       Concrete Median Barrier                                     100          LF
     2.l   GR11        Trailing End Unit                                             1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    2          EA
     3.b   GR-7     Breakaway Cable Terminal                                         2          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   2          EA
     3.d   GR-FOA-2 Fixed Object Attachment W beam                                   2          EA
     3.e   GR-FOA-4 Fixed Object Attachment W beam                                   2          EA
4          Install New Guardrail (No Existing)                                     200          LF
5          Sand-Filled Module Impact Attenuators
     5.a   Replace Damaged Container/install sand                                    3          EA
6          Impact Attenuator Repairs
     6.a   Labor                                                                   80           HR
     6.b   Material Allowance                                                       1           LS                         $20,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          3          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         2          EA
           Subtotal - Part A - Daytime Hours
           (Items 1 through 7)

B.         PART B - NIGHTTIME HOURS
           Nighttime Hours: 10:00 pm through 5:00 am
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               50           LF
     1.b   Cable GR                                                                50           LF
     1.c   Concrete Median Barrier                                                 10           LF
     1.d   Posts                                                                    5           EA
2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               160          LF
     2.b   GR-2A Strong Post W Beam                                                 40          LF
     2.c   GR-3   Cable GR                                                         100          LF
     2.d   GR-8   Weak Post W Beam                                                  80          LF
     2.e   GR-8A Weak Post W Beam                                                   20          LF
     2.f   GR-8B Weak Post W Beam                                                   20          LF
     2.g   MB-3   Median Barrier W beam                                             80          LF
     2.h   MB-5   Weak Post Median Barrier W beam                                   20          LF
     2.i   MB-7A Concrete Median Barrier                                            20          LF
     2.j   MB-7B Concrete Median Barrier                                            20          LF
     2.k   MB-7C Concrete Median Barrier                                            20          LF
     2.l   GR11    Trailing End Unit                                                 1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    1          EA
     3.b   GR-7     Breakaway Cable Terminal                                         1          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   1          EA
                                     Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                SOLICITATION OR CONTRACT NUMBER      PAGE


                         Type Contractor Name Here                                          1-11-C005             Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                 QTY         UNIT        UNIT PRICE   AMOUNT

     3.d   GR-FOA-2        Fixed Object Attachment W beam                            1          EA
     3.e   GR-FOA-4        Fixed Object Attachment W beam                            1          EA
4          Install New Guardrail (No Existing)                                     50           LF
5          Sand-Filled Module Impact Attenuator
     5.a   Replace Damaged Container/install sand                                    1          EA
6          Impact Attenuator Repairs
     6.a   Labor                                                                   10           EA
     6.b   Material Allowance                                                       1           LS                          $5,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          1          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         1          EA
           Subtotal - Part B - Nighttime Hours
           (Items 1 through 7.b)

           TOTAL - OPTION YEAR ONE
           (Part A + Part B)
                                                       OPTION YEAR TWO
A.         PART A - DAYTIME HOURS
           Daytime Hours: 6:00 am through 8:00 pm
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               100          LF
     1.b   Cable GR                                                                100          LF
     1.c   Concrete Median Barrier                                                  25          LF
     1.d   Posts                                                                    10          EA
2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               800          LF
     2.b   GR-2A Strong Post W Beam                                                200          LF
     2.c   GR-3   Cable GR                                                         500          LF
     2.d   GR-8   Weak Post W Beam                                                 400          LF
     2.e   GR-8A Weak Post W Beam                                                  100          LF
     2.f   GR-8B Weak Post W Beam                                                  100          LF
     2.g   MB-3   Median Barrier W beam                                            400          LF
     2.h   MB-5   Weak Post Median Barrier W beam                                  100          LF
     2.i   MB-7A Concrete Median Barrier                                           100          LF
     2.j   MB-7B Concrete Median Barrier                                           100          LF
     2.k   MB-7C Concrete Median Barrier                                           100          LF
     2.l   GR11    Trailing End Unit                                                 1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    2          EA
     3.b   GR-7     Breakaway Cable Terminal                                         2          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   2          EA
     3.d   GR-FOA-2 Fixed Object Attachment W beam                                   2          EA
     3.e   GR-FOA-4 Fixed Object Attachment W beam                                   2          EA
4          Install New Guardrail (No Existing)                                     200          LF
5          Sand-Filled Module Impact Attenuators
     5.a   Replace Damaged Container/install sand                                    3          EA
                                   Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                SOLICITATION OR CONTRACT NUMBER      PAGE


                         Type Contractor Name Here                                          1-11-C005             Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                 QTY         UNIT        UNIT PRICE   AMOUNT

6          Impact Attenuator Repairs
     6.a   Labor                                                                   80           HR
     6.b   Material Allowance                                                       1           LS                         $20,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          3          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         2          EA
           Subtotal - Part A - Daytime Hours
           (Items 1 through 7)

B.         PART B - NIGHTTIME HOURS
           Nighttime Hours: 10:00 pm through 5:00 am
1          Removal of Guardrail (NO REPLACEMENT)
     1.a   W Beam GR                                                               50           LF
     1.b   Cable GR                                                                50           LF
     1.c   Concrete Median Barrier                                                 10           LF
     1.d   Posts                                                                    5           EA
2          Remove Damaged / Install New Guardrail
     2.a   GR-2   Strong Post W Beam                                               160          LF
     2.b   GR-2A Strong Post W Beam                                                 40          LF
     2.c   GR-3   Cable GR                                                         100          LF
     2.d   GR-8   Weak Post W Beam                                                  80          LF
     2.e   GR-8A Weak Post W Beam                                                   20          LF
     2.f   GR-8B Weak Post W Beam                                                   20          LF
     2.g   MB-3   Median Barrier W beam                                             80          LF
     2.h   MB-5   Weak Post Median Barrier W beam                                   20          LF
     2.i   MB-7A Concrete Median Barrier                                            20          LF
     2.j   MB-7B Concrete Median Barrier                                            20          LF
     2.k   MB-7C Concrete Median Barrier                                            20          LF
     2.l   GR11    Trailing End Unit                                                 1          EA
3          Remove Damaged / Install New Terminal Treatment
     3.a   GR-6     Terminal Treatment for W Beam                                    1          EA
     3.b   GR-7     Breakaway Cable Terminal                                         1          EA
     3.c   GR-FOA-1 Fixed Object Attachment W beam                                   1          EA
     3.d   GR-FOA-2 Fixed Object Attachment W beam                                   1          EA
     3.e   GR-FOA-4 Fixed Object Attachment W beam                                   1          EA
4          Install New Guardrail (No Existing)                                     50           LF
5          Sand-Filled Module Impact Attenuator
     5.a   Replace Damaged Container/install sand                                    1          EA
6          Impact Attenuator Repairs
     6.a   Labor                                                                   10           EA
     6.b   Material Allowance                                                       1           LS                          $5,000.00
7          Emergency Response Allowance
     7.a   Guardrail Repair (Within 12 hrs)                                          1          EA
     7.b   Attenuator Repair (Within 12 hrs)                                         1          EA
           Subtotal - Part B - Nighttime Hours
           (Items 1 through 7.b)

           TOTAL - OPTION YEAR TWO
                                   Metropolitan Washington Airports Authority
                                PRICE SCHEDULE - Revised - Amendment 001
NAME OF OFFEROR OR CONTRACTOR                                                  SOLICITATION OR CONTRACT NUMBER         PAGE


                         Type Contractor Name Here                                           1-11-C005                 Section III
SCOPE OF WORK

The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform the guardrail services at
Washington Dulles International Airport and the Dulles Airport Access Highway in accordance with the contract documents. All work to
be furnished under this contract shall be ordered by issuance of a Call Order by the Contracting Officer or the Contracting Officer’s
Technical Representative.
ITEM NO.   SUPPLIES/SERVICES                                                   QTY        UNIT         UNIT PRICE      AMOUNT

           (Part A + Part B)


           GRAND TOTAL
           BASE YEAR PLUS TWO OPTION YEARS                                           WARNING: PRICE SCHEDULE INCOMPLETE.
                                                                                     Pricing must be provided for all of the above items.
NOTES:

ELECTRONIC SUBMISSION OF PRICE SCHEDULE: This Price Schedule must be submitted in both electronic and hard copy. The
electronic copy of the Price Schedule must be submitted in its original Microsoft Excel Format on either a CD-ROM or USB Flash Drive.
The structure of the schedule is protected and shall not be modified in any way. Modified schedules may be deemed non-conforming
to the RFP. In the event of a discrepancy between the hard copy and the Microsoft Excel file on CD-ROM or USB Flash Drive, the
hard copy will take precedence.
BASIS OF AWARD: The Authority will award a contract to the conforming, responsible offeror with the lowest offer for the total price of
the base year plus the two option years. The Authority may award multiple contracts.
THE UNIT QUANTITIES ABOVE ARE ESTIMATED VALUES: This is an ON-CALL contract and the quantities above are estimates
only. The quantities may exceed or be less than the estimated amounts and are dependant on guardrail and roadway conditions.
THE PROPOSED PRICE SHALL NOT INCLUDE THE COSTS FOR INSURANCE PREMIUMS AND BONDS FOR OFFEROR, OR
SUBCONTRACTOR OF ANY TIER. The total cost of bond premiums for coverage required by this contract for the Offeror and
Subcontractor(s) shall be reimbursed by the Authority based on actual costs incurred, providing such costs are reasonable and
customary based on industry standards. Offerors should refer to Solicitation Provision 19 for bond reimbursement requirements for this
contract. Such costs shall not be included in the Offeror's proposal price.
NOTICE: This contract is covered by the Owner Controlled Wrap-up Insurance Program (OCWIP) and participation by the contractor
and subcontractor is required. OCWIP coverage, as described in Contract Provision 20 is provided by the Authority at no cost to the
contractor, except as described in 20.B which, if required, will be reimbursed to the contractor.
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK: The Contractor shall be required to (a) commence work under
this contract within 10 calendar days after the date the Contractor receives Notice to Proceed; (b) prosecute the work diligently; and (c)
complete all work ready for use not later than the number of days specified in the Statement of Work. The time stated for completion
shall include punch list and final cleanup of the premises.

								
To top