									                                             MCACES CW-WBS



CWBS                                                                               1 Apr 92


                                         CIVIL WORKS

                              WORK BREAKDOWN STRUCTURE

                     MCACES CONSTRUCTION FEATURE/SUBFEATURE WBS


Number                Feature/Subfeature Description

02   --    --   --    RELOCATIONS
02   01    --   --    ROADS, Construction Activities
02   02    --   --    RAILROADS, Construction Activities
02   03    --   --    CEMETERIES, UTILITIES, AND STRUCTURES, Construction Activites

03 -- -- --           RESERVOIRS

04   --    --   --    DAMS
04   01    --   --    MAIN DAM
04   02    --   --    SPILLWAY
04   03    --   --    OUTLET WORKS
04   04    --   --    POWER INTAKE WORKS
04   05    --   --    AUXILIARY DAMS
04   06    --   --    MUNICIPAL AND INDUSTRIAL WATER DELIVERY FACILITIES

05 -- -- --           LOCKS

06   ---   --   --    FISH AND WILDLIFE FACILITIES
06   01    --   --    FISH FACILITIES AT DAMS
06   02    --   --    FISH HATCHERY, (Including Trapping and Release Facilities)
06   03    --   --    WILDLIFE FACILITIES AND SANCTUARIES

07   --    --   --    POWER PLANT
07   01    --   --    POWERHOUSE
07   02    --   --    TURBINES AND GENERATORS
07   03    --   --    ACCESSORY ELECTRICAL EQUIPMENT
07   04    --   --    MISCELLANEOUS POWER PLANT EQUIPMENT
07   05    --   --    TAILRACE
07   06    --   --    SWITCHYARD

08 -- -- --           ROADS, RAILROADS, AND BRIDGES
08 01 -- --           ROADS
08 02 -- --           RAILROADS

09 -- -- --           CHANNELS AND CANALS (Except Navigation Ports and Harbors)
09 01 -- --           CHANNELS
09 02 -- --           CANALS

10 -- -- --           BREAKWATERS AND SEAWALLS


                                                   Page 1
                                   MCACES CW-WBS



11 -- -- --   LEVEES AND FLOODWALLS
11 01 -- --   LEVEES
11 02 -- --   FLOODWALLS

12 -- -- --   NAVIGATION, PORTS AND HARBORS
12 01 -- --   PORTS
12 02 -- --   HARBORS

13 -- -- --   PUMPING PLANT

14 -- -- --   RECREATION FACILITIES

15 -- -- --   FLOODWAY CONTROL AND DIVERSION STRUCTURES

16 -- -- --   BANK STABILIZATION

17 -- -- --   BEACH REPLENISHMENT

18 -- -- --   CULTURAL RESOURCE PRESERVATION

19 -- -- --   BUILDINGS, GROUNDS, AND UTILITIES

20 -- -- --   PERMANENT OPERATING EQUIPMENT




                                       Page 2
                                                WBS 01



CWBS                                                           30 Nov 93


                                       CIVIL WORKS

                            WORK BREAKDOWN STRUCTURE

                                  PRODUCT CHECKLIST


Number              Product Description

01 -- -- --         LANDS AND DAMAGES

01 18 -- --         GENERAL REVALUATION REPORT (GRR)

01   18   03   --   Real Estate Analysis Documents
01   18   03   01   Real Estate Supplement/Plan
01   18   03   02   Gross Appraisal/Report
01   18   03   03   Preliminary Real Estate Acquisition Maps
01   18   03   04   Physical Takings Analysis Report
01   18   03   05   Preliminary Attorneys Opinion of
                     Compensability
01 18 03 06         Rights of Entry
01 18 03 07         All Other Real Estate Analysis/Documents

01 19 -- --         LIMITED REVALUATION REPORT (LRR)

01   19   03   --   Real Estate Analysis Documents
01   19   03   01   Real Estate Supplement/Plan
01   19   03   02   Gross Appraisal/Report
01   19   03   03   Preliminary Real Estate Acquisition Maps
01   19   03   04   Physical Takings Analysis Report
01   19   03   05   Preliminary Attorneys Opinion of
                     Compensability
01 19 03 06         Rights of Entry
01 19 03 07         All Other Real Estate Analysis/Documents

01 20 -- --         PROJECT DESIGN MEMORANDUM (PDM)

01   20   03   --   Real Estate Analysis Documents
01   20   03   01   Real Estate Supplement/Plan
01   20   03   02   Gross Appraisal/Report
01   20   03   03   Preliminary Real Estate Acquisition Maps
01   20   03   04   Physical Takings Analysis Report
01   20   03   05   Preliminary Attorneys Opinion of
                     Compensability
01 20 03 06         Rights of Entry
01 20 03 07         All Other Real Estate Analysis/Documents

01 21 -- --         FEATURE DESIGN MEMORANDUM (FDM)


                                                 Page 3
                                                WBS 01



01   21   03   --   Real Estate Analysis Documents
01   21   03   01   Real Estate Supplement/Plan
01   21   03   02   Gross Appraisal/Report
01   21   03   03   Preliminary Real Estate Acquisition Maps
01   21   03   04   Physical Takings Analysis Report
01   21   03   05   Preliminary Attorneys Opinion of
                     Compensability
01 21 03 06         Rights of Entry
01 21 03 07         All Other Real Estate Analysis/Documents

01 23 -- --         CONSTRUCTION CONTRACT(S) DOCUMENTS

01   23   03   --   Real Estate Analysis Documents
01   23   03   01   Real Estate Planning Documents
01   23   03   02   Real Estate Acquisition Documents
01   23   03   03   Real Estate Condemnation Documents
01   23   03   04   Real Estate Inleasing Documents
01   23   03   05   Real Estate Appraisal Documents
01   23   03   06   Real Estate PL 91-646 Assistance
                      Documents
01 23 03 07         Real Estate Rights of Entry/
                      Temporary Permits
01 23 03 08         Real Estate Audit Documents
01 23 03 09         Real Estate Encroachment/Tresspass
                      Documents
01 23 03 10         Real Estate Disposal Documents
01 23 03 11         Real Estate Real Property
                      Accountability Documents
01 23 03 12         Real Estate Project Related
                      Administrative Documents
01 23 03 13         Real Estate Facility/Utility
                      Relocations Analysis
01 23 03 14         Real Estate Withdrawals (Public
                      Domain Land) Documents
01 23 03 15         Real Estate Payment Documents
                     Land Payments
                     PL 91-646 Payments
                     Damage Payments
                     Other Payments
01 23 03 16         Real Estate Receipt Documents
                     Disposal Receipts-Reimbursements
                      (CR-Lands)
                     Disposal Receipts-General Funds
                      (CR-Lands)
01 23 03 17         Real Estate LERRD Crediting Documents
01 23 03 18         Real Estate All Other Documents




                                                 Page 4
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

02 -- -- --       RELOCATIONS

02 01   --   --   ROADS, Construction Activities
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   05   --   Bridges, Foundations
   01   06   --   Bridges, Abutments and Piers
   01   07   --   Bridges, Superstructure and Deck
   01   08   --   Bridges, Associated General Items
   01   13   --   Traffic Control
   01   19   --   Construct Roadbed to Subgrade
   01   21   --   Tunnel Construction
   01   26   --   Government Furnished Materials and Equipment
   01   28   --   Credits for Salvaged Material
   01   39   --   Road Surfacing
   01   99   --   Associated General Items

02 02   --   --   RAILROADS, Construction Activities
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   05   --   Bridges, Foundations
   02   06   --   Bridges, Abutments and Piers
   02   07   --   Bridges, Superstructure and Deck
   02   08   --   Bridges, Associated General Items
   02   13   --   Traffic Control
   02   19   --   Construct Roadbed to Subgrade
   02   21   --   Tunnel Construction
   02   26   --   Government Furnished Materials and Equipment
   02   28   --   Credits for Salvaged Material
   02   40   --   Track Work
   02   99   --   Associated General Items

02 03 -- --       CEMETERIES, UTILITIES, AND STRUCTURES,
                  Construction Activities
   03   01   --   Mobilization, Demobilization and Preparatory Work
   03   18   --   Utilities
   03   26   --   Government Furnished Materials and Equipment
   03   28   --   Credits for Salvaged Material
   03   46   --   Cemeteries
   03   47   --   Structures
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


 Number           Product Description
03 -- -- --       RESERVOIRS

03 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   02   --   Drainage
   00   48   --   Clearing and Debris Removal
   00   49   --   Boundary Line Survey and Marking
   00   50   --   Permanent Debris Collection Facilities

04 -- -- --       DAMS

04 01   --   --   MAIN DAM
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   02   --   Drainage
   01   03   --   Care and Diversion of Water
   01   04   --   Permanent Access Roads and Parking
   01   05   --   Bridges, Foundations
   01   06   --   Bridges, Abutments and Piers
   01   07   --   Bridges, Superstructure and Deck
   01   08   --   Bridges, Associated General Items
   01   10   --   Earthwork for Structures
   01   11   --   Foundation Work
   01   12   --   Seepage Control
   01   25   --   Embedded Metal Work
   01   32   --   Apron, Stilling Basin and Deflectors
   01   42   --   Earth and Rockfill Dam
   01   45   --   Roller Compacted Concrete Dam
   01   51   --   Concrete Dam, Non Overflow Section
   01   52   --   Concrete Dam, Overflow Section
   01   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

04 02   --   --   SPILLWAY
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   02   --   Drainage
   02   03   --   Care and Diversion of Water
   02   04   --   Permanent Access Roads and Parking
   02   05   --   Bridges, Foundations
   02   06   --   Bridges, Abutments and Piers
   02   07   --   Bridges, Superstructure and Deck
   02   08   --   Bridges, Associated General Items
   02   10   --   Earthwork for Structures
   02   11   --   Foundation Work
   02   12   --   Seepage Control
   02   25   --   Embedded Metal Work
   02   32   --   Apron, Stilling Basin and Deflectors
   02   41   --   Gates, Stoplogs and Equipment
   02   52   --   Concrete Overflow Section
   02   53   --   Spillway Channels
   02   99   --   Associated General Items

04 03   --   --   OUTLET WORKS
   03   01   --   Mobilization, Demobilization and Preparatory Work
   03   03   --   Care and Diversion of Water
   03   04   --   Permanent Access Roads and Parking
   03   05   --   Bridges, Foundations
   03   06   --   Bridges, Abutments and Piers
   03   07   --   Bridges, Superstructure and Deck
   03   08   --   Bridges, Associated General Items
   03   09   --   Buildings, Project Operations
   03   10   --   Earthwork for Structures
   03   11   --   Foundation Work
   03   12   --   Seepage Control
   03   29   --   Approach and Outlet Channels
   03   54   --   Outlet Portal and Stilling Basin
   03   55   --   Conduit or Tunnel
   03   56   --   Intake Structure
   03   57   --   Intake Gates and Equipment
   03   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

04 04   --   --   POWER INTAKE WORKS
   04   01   --   Mobilization, Demobilization and Preparatory Work
   04   09   --   Buildings, Project Operations
   04   33   --   Penstocks
   04   36   --   Surge Tanks
   04   41   --   Gates and Operating Equipment
   04   57   --   Intakes Works
   04   58   --   Tailrace
   04   99   --   Associated General Items

04 05   --   --   AUXILIARY DAMS
   05   01   --   Mobilization, Demobilization and Preparatory Work
   05   02   --   Drainage
   05   03   --   Care and Diversion of Water
   05   04   --   Permanent Access Roads and Parking
   05   05   --   Bridges, Foundations
   05   06   --   Bridges, Abutments and Piers
   05   07   --   Bridges, Superstructure and Deck
   05   08   --   Bridges, Associated General Items
   05   10   --   Earthwork for Structures
   05   11   --   Foundation Work
   05   12   --   Seepage Control
   05   42   --   Earth and Rockfill Dam
   05   45   --   Roller Compacted Concrete Dam
   05   99   --   Associated General Items

04 06   --   --   MUNICIPAL AND INDUSTRIAL WATER DELIVERY FACILITIES
   06   01   --   Mobilization, Demobilization and Preparatory Work
   06   37   --   Water Tanks
   06   59   --   Water Supply System
   06   60   --   Pumping Plants
CWBS                                                                    1 Apr 92


                                      CIVIL WORKS

                           WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

05 --   --   --   LOCKS
   00   01   --   Mobilization, Demobilization and Preparatory Work
   00   02   --   Drainage
   00   03   --   Care and Diversion of Water
   00   04   --   Permanent Access Roads and Parking
   00   05   --   Bridges, Foundations
   00   06   --   Bridges, Abutments and Piers
   00   07   --   Bridges, Superstructure and Deck
   00   08   --   Bridges, Associated General Items
   00   09   --   Buildings, Project Operations
   00   10   --   Earthwork for Structures
   00   11   --   Foundation Work
   00   12   --   Seepage Control
   00   29   --   Approach Channels
   00   57   --   Lock Gates and Operating Machinery, Upper and Lower
   00   61   --   Guide and Guard Walls, Upper and Lower
   00   62   --   Approach Walls, Upper and Lower
   00   63   --   Lock Structure
   00   64   --   Culvert Valves and Operating Machinery
   00   65   --   Piping System
   00   66   --   Power and Lighting Systems
   00   99   --   Associated General Items

06 --- -- --      FISH AND WILDLIFE FACILITIES

06 01   --   --   FISH FACILITIES AT DAMS
   01   09   --   Buildings, Project Operations
   01   43   --   Fish Transportation Facilities and Equipment
   01   44   --   Fishways and Fish Ladders
   01   63   --   Fish Locks and Elevators
   01   67   --   Fish Collection Facilities
   01   68   --   Fish Sorting and Holding Facilities
CWBS                                                                           1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

06 02   --   --   FISH HATCHERY, (Including Trapping and Release Facilities)
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   03   --   Care and Diversion of Water
   02   04   --   Permanent Access Roads and Parking
   02   09   --   Buildings, Project Operations
   02   18   --   Site Utilities
   02   22   --   Parking Lots and Service Roads
   02   23   --   Site Grading and Landscaping
   02   24   --   Buildings, Residences and Dormitories
   02   43   --   Fish Handling and Transport Facilities and Equipment
   02   44   --   Fish Ladders, Barriers and Traps
   02   59   --   Water Supply System
   02   69   --   Rearing and Holding Ponds
   02   70   --   Drain and Waste Water System
   02   99   --   Associated General Items

06 03   --   --   WILDLIFE FACILITIES AND SANCTUARIES
   03   09   --   Buildings, Project Operations
   03   37   --   Water Wells
   03   71   --   Fences
   03   72   --   Signs
   03   73   --   Habitat and Feeding Facilities
CWBS                                                                     1 Apr 92


                                      CIVIL WORKS

                           WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

07 -- -- --       POWER PLANT

07 01   --   --   POWERHOUSE
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   02   --   Drainage
   01   03   --   Care and Diversion of Water
   01   04   --   Permanent Access Roads and Parking
   01   10   --   Earthwork for Structures
   01   11   --   Foundation Work
   01   12   --   Seepage Control
   01   33   --   Penstocks
   01   36   --   Surge Tanks
   01   41   --   Gates and Operating Equipment
   01   57   --   Power Intake Dam
   01   58   --   Tailrace Structure
   01   74   --   Powerhouse Substructure
   01   75   --   Powerhouse Superstructure

07 02   --   --   TURBINES AND GENERATORS
   02   76   --   Furnish and Install Turbines
   02   77   --   Furnish and Install Governors
   02   78   --   Furnish and Install Generators
   02   79   --   Unloading, Hauling, Storing and Painting
   02   80   --   Install Generator Foundation Bolts, Sole
                     Plates and Rotor Erection Plates
   02 81 --       Furnish and Install Valves

07 03   --   --   ACCESSORY ELECTRICAL EQUIPMENT
   03   82   --   Conduit System
   03   83   --   Cable Tray System
   03   84   --   Main Control Switchboards and Associated Equipment
   03   85   --   480-Volt Station Service Switchgear and Transformers
   03   86   --   125-Volt Station Battery
   03   87   --   Power Transformers
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

07 04   --   --   MISCELLANEOUS POWER PLANT EQUIPMENT
   04   62   --   Hoisting and Maintenance Equipment
   04   63   --   Heating, Cooling and Ventilating
   04   64   --   Plumbing
   04   65   --   Fire Protection
   04   66   --   Emergency Power
   04   67   --   Lubricating and Cooling Oil
   04   68   --   Compressed Air System
   04   69   --   Flow and Water Level Monitoring
   04   99   --   Associated General Items

07 05 -- --       TAILRACE
   05 31 --       Earthwork
   05 99 --       Associated General Items

07 06   --   --   SWITCHYARD
   06   04   --   Permanent Access Roads and Parking
   06   88   --   Switchyard Structures
   06   89   --   Switchyard Tunnel

08 -- -- --       ROADS, RAILROADS, AND BRIDGES

08 01   --   --   ROADS
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   02   --   Drainage
   01   05   --   Bridges, Foundations
   01   06   --   Bridges, Abutments and Piers
   01   07   --   Bridges, Superstructure and Deck
   01   08   --   Bridges, Associated General Items
   01   13   --   Traffic Control
   01   19   --   Construct Roadbed to Subgrade
   01   21   --   Tunnel Construction
   01   39   --   Road Surfacing
   01   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

08 02   --   --   RAILROADS
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   02   --   Drainage
   02   05   --   Bridges, Foundations
   02   06   --   Bridges, Abutments and Piers
   02   07   --   Bridges, Superstructure and Deck
   02   08   --   Bridges, Associated General Items
   02   13   --   Traffic Control
   02   19   --   Construct Roadbed to Subgrade
   02   21   --   Tunnel Construction
   02   40   --   Track Work
   02   99   --   Associated General Items

09 -- -- --       CHANNELS AND CANALS (Except Navigation Ports and Harbors)

09 01   --   --   CHANNELS
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   13   --   Traffic Control
   01   14   --   Sidecaster/Special Purpose Dredging
   01   15   --   Mechanical Dredging
   01   16   --   Pipeline Dredging
   01   17   --   Hopper Dredging
   01   20   --   Disposal Areas
   01   30   --   Bank Stabilization, Dikes and Jetties
   01   99   --   Associated General Items

09 02   --   --   CANALS
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   13   --   Traffic Control
   02   14   --   Sidecaster/Special Purpose Dredging
   02   15   --   Mechanical Dredging
   02   16   --   Pipeline Dredging
   02   17   --   Hopper Dredging
   02   20   --   Disposal Areas
   02   30   --   Bank Stabilization, Dikes and Jetties
   02   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

10 -- -- --       BREAKWATERS AND SEAWALLS

10 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   46   --   Breakwaters
   00   47   --   Seawalls
   00   48   --   Seawall Drainage Facilities
   00   99   --   Associated General Items

11 -- -- --       LEVEES AND FLOODWALLS

11 01   --   --   LEVEES
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   02   --   Drainage
   01   03   --   Care and Diversion of Water
   01   04   --   Permanent Access Roads and Parking
   01   99   --   Associated General Items

11 02   --   --   FLOODWALLS
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   02   --   Drainage
   02   03   --   Care and Diversion of Water
   02   04   --   Permanent Access Roads and Parking
   02   99   --   Associated General Items

12 -- -- --       NAVIGATION, PORTS AND HARBORS

12 01   --   --   PORTS
   01   01   --   Mobilization, Demobilization and Preparatory Work
   01   14   --   Sidecaster/Special Purpose Dredging
   01   15   --   Mechanical Dredging
   01   16   --   Pipeline Dredging
   01   17   --   Hopper Dredging
   01   20   --   Disposal Areas
   01   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

12 02   --   --   HARBORS
   02   01   --   Mobilization, Demobilization and Preparatory Work
   02   14   --   Sidecaster/Special Purpose Dredging
   02   15   --   Mechanical Dredging
   02   16   --   Pipeline Dredging
   02   17   --   Hopper Dredging
   02   20   --   Disposal Areas
   02   99   --   Associated General Items

13 -- -- --       PUMPING PLANT

13 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   03   --   Care and Diversion of Water
   00   10   --   Earthwork for Structures
   00   11   --   Foundation Work
   00   18   --   Utilities
   00   74   --   Pumping Plant Substructure
   00   75   --   Pumping Plant Superstructure
   00   76   --   Pumping Machinery and Appurtenances
   00   77   --   Gates and Valves
   00   78   --   Auxiliary Equipment
   00   99   --   Associated General Items

14 -- -- --       RECREATION FACILITIES

14 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   04   --   Permanent Access Roads and Parking
   00   09   --   Buildings, Project Operations
   00   18   --   Utilities
   00   22   --   Parking Lots and Service Roads
   00   23   --   Site Grading and Landscaping
   00   24   --   Buildings, Residences and Dormitories
   00   27   --   Buildings, Public Use
   00   71   --   Activity Guides and Controls
   00   72   --   Day Use Areas
   00   73   --   Camping Areas
   00   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                     CIVIL WORKS

                          WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description

15 -- -- --       FLOODWAY CONTROL AND DIVERSION STRUCTURES

15 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   02   --   Drainage
   00   03   --   Care and Diversion of Water
   00   05   --   Bridges, Foundations
   00   06   --   Bridges, Abutments and Piers
   00   07   --   Bridges, Superstructure and Deck
   00   08   --   Bridges, Associated General Items
   00   10   --   Earthwork for Structures
   00   11   --   Foundation Work
   00   12   --   Seepage Control
   00   25   --   Embedded Metal Work
   00   41   --   Gates, Stop Logs and Associated Equipment
   00   53   --   Overflow Structure
   00   54   --   Stilling Basin
   00   99   --   Associated General Items

16 -- -- --       BANK STABILIZATION

16 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   31   --   Earthwork
   00   81   --   Riprap Slope Treatment
   00   82   --   Wooden Mattress Protection
   00   83   --   Asphalt Slope Protection
   00   84   --   Articulated Concrete Protection
   00   85   --   Pile Dike Protection
   00   99   --   Associated General Items

17 -- -- --       BEACH REPLENISHMENT

17 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   14   --   Sidecaster/Special Purpose Dredging
   00   15   --   Mechanical Dredging
   00   16   --   Pipeline Dredging
   00   17   --   Hopper Dredging
   00   70   --   Beach Fill
   00   99   --   Associated General Items
CWBS                                                                  1 Apr 92


                                      CIVIL WORKS

                           WORK BREAKDOWN STRUCTURE

                      MCACES CONSTRUCTION PRODUCT WBS


Number            Product Description
18 -- -- --       CULTURAL RESOURCE PRESERVATION

18 00   27   --   Buildings, Public Use
   00   86   --   Identification, Data Analysis and Reports
   00   87   --   Recover and Remove Artifacts
   00   88   --   Preservation on Site
   00   89   --   Relocate Structures

19 -- -- --       BUILDINGS, GROUNDS, AND UTILITIES

19 00   01   --   Mobilization, Demobilization and Preparatory Work
   00   09   --   Buildings, Project Operations
   00   18   --   Utilities, Lines and Service
   00   22   --   Parking Lots and Service Roads
   00   23   --   Site Grading and Landscaping
   00   24   --   Buildings, Residences and Dormitories
   00   27   --   Buildings, Public Use
   00   49   --   Streets and Public Roads
   00   55   --   Utilities, Treatment Facilities

20 -- -- --       PERMANENT OPERATING EQUIPMENT

20 00   49   --   Equipment, Office
   00   50   --   Equipment, Shop
   00   51   --   Equipment, Laboratory
   00   52   --   Communications Systems
   00   53   --   Maintenance Work Equipment
   00   54   --   Sedimentation and Degrading Measurement
   00   99   --   Associated General Items
                                              WBS 02-20le4



CWBS                                                                     1 Apr 92


                                      CIVIL WORKS

                           WORK BREAKDOWN STRUCTURE

                       MCACES CONSTRUCTION PRODUCT WBS


Number              Product Description

02 -- -- --         RELOCATIONS

02   01   --   --   ROADS, Construction Activities
02   01   01   --   Mobilization, Demobilization and Preparatory Work:
02   01   05   --   Bridges, Foundations:
02   01   05   02   Site Work
02   01   05   03   Concrete
02   01   06   --   Bridges, Abutments and Piers:
02   01   06   02   Site Work
02   01   06   03   Concrete
02   01   06   06   Wood and Plastic
02   01   07   --   Bridges, Superstructure and Deck:
02   01   07   03   Concrete
02   01   07   05   Metals
02   01   07   06   Wood and Plastic
02   01   07   09   Finishes
02   01   08   --   Bridges, Associated General Items:
02   01   08   05   Metals
02   01   08   15   Mechanical
02   01   08   16   Electrical
02   01   13   --   Traffic Control:
02   01   13   02   Site Work
02   01   19   --   Construct Roadbed to Subgrade
02   01   19   02   Site Work
02   01   19   03   Concrete
02   01   21   --   Tunnel Construction:
02   01   21   02   Site Work
02   01   21   03   Concrete
02   01   21   05   Metals
02   01   21   13   Special Construction
02   01   21   15   Mechanical
02   01   26   --   Government Furnished Materials and Equipment
02   01   28   --   Credits for Salvaged Material
02   01   39   --   Road Surfacing
02   01   39   02   Site Work
02   01   99   --   Associated General Items
02   01   99   02   Site Work

02 02 -- --         RAILROADS, Construction Activities


                                                 Page 18
                                              WBS 02-20le4


02   02   01   --   Mobilization, Demobilization and Preparatory Work:
02   02   05   --   Bridges, Foundations
02   02   05   02   Site Work
02   02   05   03   Concrete
02   02   06   --   Bridges, Abutments and Piers
02   02   06   02   Site Work
02   02   06   03   Concrete
02   02   06   06   Wood and Plastic
02   02   07   --   Bridges, Superstructure and Deck
02   02   07   03   Concrete
02   02   07   05   Metals
02   02   07   06   Wood and Plastic
02   02   07   09   Finishes
02   02   08   --   Bridges, Associated General Items
02   02   08   05   Metals
02   02   08   15   Mechanical
02   02   08   16   Electrical
02   02   13   --   Traffic Control
02   02   13   02   Site Work
02   02   19   --   Construct Roadbed to Subgrade
02   02   19   02   Site Work
02   02   19   03   Concrete
02   02   21   --   Tunnel Construction:
02   02   21   02   Site Work
02   02   21   03   Concrete
02   02   21   05   Metals
02   02   21   13   Special Construction
02   02   21   15   Mechanical
02   02   26   --   Government Furnished Materials and Equipment
02   02   28   --   Credits for Salvaged Material
02   02   40   --   Track Work:
02   02   40   02   Site Work
02   02   99   --   Associated General Items
02   02   99   02   Site Work

02   03   --   --   CEMETERIES, UTILITIES, AND STRUCTURES,
02   03   01   --   Mobilization, Demobilization and Preparatory Work:
02   03   18   --   Utilities
02   03   18   02   Site Work
02   03   18   15   Mechanical
02   03   18   16   Electrical
02   03   26   --   Government Furnished Materials and Equipment
02   03   28   --   Credits for Salvaged Material
02   03   46   --   Cemeteries
02   03   46   02   Site Work
02   03   46   03   Concrete
02   03   46   15   Mechanical
02   03   47   --   Structures
02   03   47   02   Site Work
02   03   47   03   Concrete
02   03   47   04   Masonry
02   03   47   05   Metals


                                                 Page 19
                                              WBS 02-20le4


02   03   47   07   Thermal and Moisture Protection
02   03   47   08   Doors and Windows
02   03   47   09   Finishes
02   03   47   10   Specialties
02   03   47   15   Mechanical
02   03   47   16   Electrical

03 -- -- --         RESERVOIRS

03   00   01   --   Mobilization, Demobilization and Preparatory Work:
03   00   02   --   Drainage
03   00   02   02   Site Work
03   00   48   --   Clearing and Debris Removal:
03   00   48   02   Site Work
03   00   49   --   Boundary Line Survey and and Marking:
03   00   49   --   General Requirements
03   00   49   02   Site Work
03   00   50   --   Permanent Debris Collection Facilities:
03   00   50   02   Site Work
03   00   50   03   Concrete
03   00   50   05   Metals
03   00   50   06   Wood and Plastic

04 -- -- --         DAMS

04   01   --   --   MAIN DAM
04   01   01   --   Mobilization, Demobilization and Preparatory Work:
04   01   02   --   Drainage
04   01   02   02   Site Work
04   01   02   15   Mechanical
04   01   03   --   Care and Diversion of Water:
04   01   03   02   Site Work
04   01   03   15   Mechanical
04   01   03   16   Electrical
04   01   04   --   Permanent Access Roads and Parking:
04   01   04   02   Site Work
04   01   05   --   Bridges, Foundations:
04   01   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
04 01 05 03         Concrete
                        (See Account 08010503 for detailed breakdown)
04 01 06 --         Bridges, Abutments and Piers:
04 01 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
04 01 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
04 01 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
04 01 07 --         Bridges, Superstructure and Deck:
04 01 07 03         Concrete
                        (See Account 08010703 for detailed breakdown)
04 01 07 05         Metals


                                                 Page 20
                                              WBS 02-20le4


                       (See Account 08010705 for detailed breakdown)
04 01 07 06         Wood and Plastic
                       (See Account 08010706 for detailed breakdown)
04 01 07 09         Finishes
                       (See Account 08010709 for detailed breakdown)

04 01 08 --         Bridges, Associated General Items:
04 01 08 05         Metals
                        (See Account 08010805 for detailed breakdown)
04 01 08 15         Mechanical
                        (See Account 08010815 for detailed breakdown)
04 01 08 16         Electrical
                        (See Account 08010816 for detailed breakdown)
04   01   10   --   Earthwork for Structures:
04   01   10   02   Site Work
04   01   11   --   Foundation Work:
04   01   11   02   Site Work
04   01   11   03   Concrete
04   01   12   --   Seepage Control:
04   01   12   02   Site Work
04   01   51   --   Concrete Dam, Non Overflow Section:
04   01   51   03   Concrete
04   01   51   13   Special Construction
04   01   52   --   Concrete Dam, Overflow Section:
04   01   52   03   Concrete
04   01   52   13   Special Construction
04   01   32   --   Apron, Stilling Basin and Deflectors:
04   01   32   03   Concrete
04   01   32   13   Special Construction
04   01   25   --   Embedded Metal Work:
04   01   25   05   Metals
04   01   25   15   Mechanical
04   01   25   16   Electrical
04   01   45   --   Roller Compacted Concrete Dam:
04   01   45   03   Concrete
04   01   42   --   Earth and Rockfill Dam:
04   01   42   02   Site Work
04   01   99   --   Associated General Items:
04   01   99   02   Site Work
04   01   99   05   Metals
04   01   99   14   Conveying Systems
04   01   99   16   Electrical

04 02 -- --         SPILLWAY

04   02   01   --   Mobilization, Demobilization and Preparatory Work:
04   02   02   --   Drainage:
04   02   02   02   Site Work
04   02   02   15   Mechanical
04   02   03   --   Care and Diversion of Water:
04   02   03   02   Site Work
04   02   03   15   Mechanical


                                                 Page 21
                                              WBS 02-20le4


04   02   03   16   Electrical
04   02   04   --   Permanent Access Roads and Parking:
04   02   04   02   Site Work
04   02   05   --   Bridges, Foundations:
04   02   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
04 02 05 03         Concrete
                        (See Account 08010503 for detailed breakdown)
04 02 06 --         Bridges, Abutments and Piers:
04 02 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
04 02 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
04 02 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
04 02 07 --         Bridges, Superstructure and Deck:
04 02 07 03         Concrete
                        (See Account 08010703 for detailed breakdown)
04 02 07 05         Metals
                        (See Account 08010705 for detailed breakdown)
04 02 07 06         Wood and Plastic
                        (See Account 08010706 for detailed breakdown)
04 02 07 09         Finishes
                        (See Account 08010709 for detailed breakdown)

04 02 08 --         Bridges, Associated General Items:
04 02 08 05         Metals
                        (See Account 08010805 for detailed breakdown)
04 02 08 15         Mechanical
                        (See Account 08010815 for detailed breakdown)
04 02 08 16         Electrical
                        (See Account 08010816 for detailed breakdown)
04   02   10   --   Earthwork for Structures:
04   02   10   02   Site Work
04   02   11   --   Foundation Work:
04   02   11   02   Site Work
04   02   11   03   Concrete
04   02   11   03   Seepage Control:
04   02   11   02   Site Work
04   02   51   --   Concrete Overflow Section
04   02   51   03   Concrete
04   02   51   13       Waterstops
04   02   32   --   Apron, Stilling Basin and Deflectors
04   02   32   03   Concrete
04   02   52   13   Special Construction
04   02   25   --   Embedded Metal Work:
04   02   25   05   Metals
04   02   25   15   Mechanical
04   02   25   16   Electrical
04   02   53   --   Spillway Channels:
04   02   53   02   Site Work
04   02   42   03   Concrete


                                                Page 22
                                               WBS 02-20le4


04   02   41   --   Gates, Stoplogs and Equipment
04   02   41   05   Metals
04   02   41   06   Wood and Plastic
04   02   41   14   Conveying Systems
04   02   41   15   Mechanical
04   02   99   --   Associated General Items:
04   02   99   02   Site Work
                    Metals
04 02 99 05            Miscellaneous Structures,
04 02 99 14         Conveying Systems
04 02 99 16         Electrical

04 03 -- --         OUTLET WORKS

04   03   01   --   Mobilization, Demobilization and Preparatory Work:
04   03   03   --   Care and Diversion of Water:
04   03   03   02   Site Work
04   03   03   15   Mechanical
04   03   03   16   Electrical
04   03   04   --   Permanent Access Roads and Parking:
04   03   04   02   Site Work
04   03   05   --   Bridges, Foundations:
04   03   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
04 03 05 03         Concrete
                        (See Account 08010503 for detailed breakdown)
04 03 06 --         Bridges, Abutments and Piers:
04 03 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
04 03 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
04 03 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
04 03 07 --         Bridges, Superstructure and Deck:
04 03 07 03         Concrete
                        (See Account 08010703 for detailed breakdown)
04 03 07 05         Metals
                        (See Account 08010705 for detailed breakdown)
04 03 07 06         Wood and Plastic
                        (See Account 08010706 for detailed breakdown)
04 03 07 09         Finishes
                        (See Account 08010709 for detailed breakdown)
04 03 08 --         Bridges, Associated General Items:
04 03 08 05         Metals
                        (See Account 08010805 for detailed breakdown)
04 03 08 15         Mechanical
                        (See Account 08010815 for detailed breakdown)
04 03 08 16         Electrical
                        (See Account 08010816 for detailed breakdown)

04 03 09 --         Buildings, Project Operations:
                       (This includes gate operating house, service buildings etc.)


                                                   Page 23
                                               WBS 02-20le4


                        (See Account No. 0509---- for detailed breakdown)
04   03   10   --   Earthwork for Structures:
04   03   10   02    Site Work
04   03   11   --   Foundation Work:
04   03   11   02    Site Work
04   03   11   03    Concrete
04   03   12   --   Seepage Control:
04   03   12   02    Site Work
04   03   29   --   Approach and Outlet Channels:
04   03   29   02    Site Work
04   03   29   03    Concrete
04   03   54   --   Outlet Portal and Stilling Basin
04   03   54   02    Concrete
04   03   54   13    Special Construction
04   03   55   --   Conduit or Tunnel:
04   03   55   02    Site Work
04   03   55   03    Concrete
04   03   55   05    Metals
04   03   55   13    Special Construction
04   03   55   15    Mechanical
04   03   56   --   Intake Structure:
04   03   56   03    Concrete
04   03   56   03       Reinforcing Steel
04   03   56   05    Metals
04   03   56   13    Special Construction
04   03   56   15    Mechanical
04   03   57   --   Intake Gates and Equipment:
04   03   57   05    Metals
04   03   57   14    Conveying Systems
04   03   57   15    Mechanical
04   03   99   --   Associated General Items:
04   03   99   02    Site Work
04   03   99   05    Metals
04   03   99   14    Conveying Systems
04   03   99   16    Electrical

04 04 -- --         POWER INTAKE WORKS

04 04 01 --         Mobilization, Demobilization and Preparatory Work:
04 04 09 --         Buildings, Project Operations:                          LS
                        (See Account No. 0509---- for detailed breakdown)
04   04   57   --   Intakes Works:
04   04   57   03    Concrete
04   04   57   05    Metals
04   04   57   13    Special Construction
04   04   57   15    Mechanical
04   04   58   --   Tailrace:
04   04   58   03    Concrete
04   04   58   05    Metals
04   04   58   13    Special Construction
04   04   33   --   Penstocks:
04   04   33   02    Site Work


                                                  Page 24
                                              WBS 02-20le4


04   04   33   03   Concrete
04   04   33   05   Metals
04   04   33   13   Special Construction
04   04   33   15   Mechanical
04   04   36   --   Surge Tanks:
04   04   36   03   Concrete
04   04   36   05   Metals
04   04   36   15   Mechanical
04   04   41   --   Gates and Operating Equipment:
04   04   41   03   Concrete
04   04   41   05   Metals
04   04   41   14   Conveying Systems
04   04   41   15   Mechanical
04   04   99   02   Site Work
04   04   99   05   Metals
04   04   99   14   Conveying Systems
04   04   99   16   Electrical

04 05 -- --         AUXILIARY DAMS

04   05   01   --   Mobilization, Demobilization and Preparatory Work:
04   05   02   --   Drainage:
04   05   02   02   Site Work
04   05   02   15   Mechanical
04   05   03   --   Care and Diversion of Water:
04   05   03   02   Site Work
04   05   03   15   Mechanical
04   05   03   16   Electrical
04   05   04   --   Permanent Access Roads and Parking:
04   05   04   02   Site Work
04   05   05   --   Bridges, Foundations:
04   05   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
04 05 05 03         Concrete
                        (See Account 08010503 for detailed breakdown)
04 05 06 --         Bridges, Abutments and Piers:
04 05 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
04 05 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
04 05 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
04 05 07 --         Bridges, Superstructure and Deck:
04 05 07 05         Metals
                        (See Account 08010705 for detailed breakdown)
04 05 07 06         Wood and Plastic
                        (See Account 08010706 for detailed breakdown)
04 05 07 09         Finishes
                        (See Account 08010709 for detailed breakdown)

04 05 08 --         Bridges, Associated General Items:
04 05 08 05         Metals


                                                 Page 25
                                              WBS 02-20le4


                       (See Account 08010805 for detailed breakdown)
04 05 08 15         Mechanical
                       (See Account 08010815 for detailed breakdown)
04 05 08 16         Electrical
                       (See Account 08010816 for detailed breakdown)
04   05   10   --   Earthwork for Structures:
04   05   10   02   Site Work
04   05   11   --   Foundation Work:
04   05   11   02   Site Work
04   05   11   03   Concrete
04   05   12   --   Seepage Control:
04   05   12   02   Site Work
04   05   42   --   Earth and Rockfill Dam:
04   05   42   02   Site Work
04   05   45   --   Roller Compacted Concrete Dam:
04   05   45   02   Concrete
04   05   99   --   Associated General Items:
04   05   99   02   Site Work
04   05   99   05   Metals
04   05   99   16   Electrical

04 06 -- --         MUNICIPAL AND INDUSTRIAL WATER
                      DELIVERY FACILITIES

04   06   01   --   Mobilization, Demobilization and Preparatory Work:
04   06   37   --   Water Tanks:                                         LS
04   06   37   02   Site Work
04   06   37   03   Concrete
04   06   37   05   Metals
04   06   37   16   Electrical
04   06   59   --   Water Supply System:
04   06   59   02   Site Work
04   06   59   15   Mechanical
04   06   59   16   Electrical
04   06   60   --   Pumping Plants:
04   06   60   02   Site Work
04   06   60   03   Concrete
04   06   60   04   Masonry
04   06   60   05   Metals
04   06   60   07   Thermal and Moisture Protection
04   06   60   08   Doors and Windows
04   06   60   09   Finishes
04   06   60   15   Mechanical
04   06   60   16   Electrical

05 -- -- --         LOCKS

05   00   01   --   Mobilization, Demobilization and Preparatory Work:
05   00   02   --   Drainage:
05   00   02   02   Site Work
05   00   02   15   Mechanical
05   00   03   --   Care and Diversion of Water:


                                                 Page 26
                                                 WBS 02-20le4


05   00   03   02   Site Work
05   00   03   15   Mechanical
05   00   03   16   Electrical
05   00   04   --   Permanent Access Roads and Parking:
05   00   04   02   Site Work
05   00   05   --   Bridges, Foundations:
05   00   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
05 00 05 03         Concrete
                        (See Account 08010502 for detailed breakdown)
05 00 06 --         Bridges, Abutments and Piers:
05 00 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
05 00 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
05 00 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
05 00 07 --         Bridges, Superstructure and Deck:
05 00 07 03         Concrete
                        (See Account 08010703 for detailed breakdown)
05 00 07 05         Metals
                        (See Account 08010705 for detailed breakdown)
05 00 07 06         Wood and Plastic
                        (See Account 08010706 for detailed breakdown)
05 00 07 11         Equipment
                        (See Account 08010711 for detailed breakdown)

05 00 08 --         Bridges, Associated General Items:
05 00 08 05         Metals
                        (See Account 08010805 for detailed breakdown)
05 00 08 15         Mechanical
                        (See Account 08010815 for detailed breakdown)
05 00 08 16         Electrical
                        (See Account 08010816 for detailed breakdown)
05 00 09 --         Buildings, Project Operations:
                        (This will include control buildings, service buildings etc.)
05   00   09   02   Site Work
05   00   09   03   Concrete
05   00   09   04   Masonry
05   00   09   05   Metals
05   00   09   07   Thermal and Moisture Protection
05   00   09   08   Doors and Windows
05   00   09   09   Finishes
05   00   09   10   Specialties
05   00   09   15   Mechanical
05   00   09   16   Electrical
05   00   10   --   Earthwork for Structures:
05   00   10   02   Site Work
05   00   11   --   Foundation Work:
05   00   11   02   Site Work
05   00   11   03   Concrete
05   00   12   --   Seepage Control:


                                                     Page 27
                                              WBS 02-20le4


05   00   12   02    Site Work
05   00   29   --   Approach Channels:
05   00   29   02    Site Work
05   00   29   03    Concrete
05   00   57   --   Lock Gates and Operating Machinery, Upper and Lower:
05   00   57   05    Metals
05   00   57   06    Wood and Plastic
05   00   57   09    Finishes
05   00   57   15    Mechanical
05   00   57   16    Electrical

05   00   61   --   Guide and Guard Walls, Upper and Lower:
05   00   61   03    Concrete
05   00   61   13    Special Construction
05   00   62   --   Approach Walls, Upper and Lower:
05   00   62   03    Concrete
05   00   62   13    Special Construction
05   00   63   --   Lock Structure:
05   00   63   03    Concrete
05   00   63   05    Metals
05   00   63   13    Special Construction
05   00   64   --   Culvert Valves and Operating Machinery:
05   00   64   05    Metals
05   00   64   15    Mechanical
05   00   65   --   Piping System:
05   00   65   15    Mechanical
05   00   66   --   Power and Lighting Systems:
05   00   66   16    Electrical
05   00   99   --   Associated General Items:
05   00   99   02    Site Work
05   00   99   05    Metals
05   00   99   14    Conveying Systems

06 -- -- --         FISH AND WILDLIFE FACILITIES

06 01 -- --         FISH FACILITIES AT DAMS
06 01 09 --         Buildings, Project Operations:
                       (See Account No. 050009-- for detailed breakdown)
06   01   43   --   Fish Transportation Facilities and Equipment:
06   01   43   02   Site Work
06   01   43   03   Concrete
06   01   43   05   Metals
06   01   43   11   Equipment
06   01   43   15   Mechanical
06   01   43   16   Electrical
06   01   44   --   Fishways and Fish Ladders:
06   01   44   02   Site Work
06   01   44   03   Concrete
06   01   44   05   Metals
06   01   44   15   Mechanical
06   01   44   16   Electrical
06   01   63   --   Fish Locks and Elevators:


                                                 Page 28
                                                WBS 02-20le4


06   01   63   03   Concrete
06   01   63   05   Metals
06   01   63   14   Conveying Systems
06   01   63   15   Mechanical
06   01   67   --   Fish Collection Facilities:
06   01   67   03   Concrete
06   01   67   05   Metals
06   01   67   15   Mechanical
06   01   67   16   Electrical
06   01   68   --   Fish Sorting and Holding Facilities:
06   01   68   02   Site Work
06   01   68   03   Concrete
06   01   68   05   Metals
06   01   68   11   Equipment
06   01   68   14   Conveying Systems
06   01   68   15   Mechanical
06   01   68   16   Electrical

06 02 -- --         FISH HATCHERY (Including Trapping and Release Facilities)

06   02   01   --   Mobilization, Demobilization and Preparatory Work:
06   02   03   --   Care and Diversion of Water:
06   02   03   02   Site Work
06   02   03   15   Mechanical
06   02   03   16   Electrical
06   02   04   --   Permanent Access Roads and Parking:
06   02   04   02   Site Work
06   02   09   --   Buildings, Project Operations:
06   02   09   02   Site Work
06   02   09   03   Concrete, in Place including Cement
06   02   09   04   Masonry
06   02   09   05   Metals
06   02   09   07   Thermal and Moisture Protection
06   02   09   08   Doors and Windows
06   02   09   09   Finishes
06   02   09   10   Specialties
06   02   09   15   Mechanical
06   02   09   16   Electrical
06   02   18   --   Site Utilities:
06   02   18   02   Site Work
06   02   18   15   Mechanical
06   02   18   15   Electrical
06   02   22   --   Parking Lots and Service Roads:
06   02   22   02   Site Work
06   02   23   --   Site Grading and Landscaping:
06   02   23   02   Site Work
06   02   23   03   Concrete
06   02   23   15   Mechanical
06   02   24   --   Buildings, Residences and Dormitories:
                        (See Account 190024-- for detailed breakdown)

06 02 43 --         Fish Handling and Transport Facilities and Equipment:


                                                   Page 29
                                               WBS 02-20le4


06   02   43   03   Concrete
06   02   43   05   Metals
06   02   43   11   Equipment
06   02   43   15   Mechanical
06   02   43   15   Electrical
06   02   44   --   Fish Ladders, Barriers and Traps:
06   02   44   02   Site Work
06   02   44   03   Concrete
06   02   44   05   Metals
06   02   44   15   Mechanical
06   02   59   --   Water Supply System:
06   02   59   02   Site Work
06   02   59   03   Concrete
06   02   59   05   Metals
06   02   59   14   Conveying Systems
06   02   59   15   Mechanical
06   02   59   16   Electrical
06   02   69   --   Rearing and Holding Ponds:
06   02   69   02   Site Work
06   02   69   03   Concrete
06   02   69   05   Metals
06   02   69   15   Mechanical
06   02   69   16   Electrical
06   02   70   --   Drain and Waste Water System:
06   02   70   02   Site Work
06   02   70   03   Concrete
06   02   70   15   Mechanical
06   02   70   16   Electrical
06   02   99   --   Associated General Items:
06   02   99   02   Site Work

06 03 -- --         WILDLIFE FACILITIES AND SANCTUARIES

06 03 09 --         Buildings, Project Operations:
                       (Includes Guard Stations, Control Buildings, etc.)
                       (See Account 060209-- for Detailed Breakdown)
06   03   37   --   Water Wells:
06   03   37   02   Site Work
06   03   37   15   Mechanical
06   03   37   16   Electrical
06   03   71   --   Fences:
06   03   71   02   Site Work
06   03   72   --   Signs:
06   03   72   02   Site Work
06   03   73   --   Habitat and Feeding Facilities:
06   03   73   02   Site Work
06   03   73   06   Wood and Plastic

07 -- -- --         POWER PLANT

07 01 -- --         POWERHOUSE
07 01 01 --         Mobilization, Demobilization and Preparatory Work:


                                                   Page 30
                                             WBS 02-20le4


07   01   02   02   Site Work
07   01   02   15   Mechanical
07   01   03   --   Care and Diversion of Water:
07   01   03   02   Site Work
07   01   03   15   Mechanical
07   01   03   16   Electrical
07   01   04   --   Permanent Access Roads and Parking:
07   01   04   02   Site Work
07   01   10   --   Earthwork for Structures:
07   01   10   02   Site Work
07   01   11   --   Foundation Work:
07   01   11   02   Site Work
07   01   11   03   Concrete
07   01   12   --   Seepage Control:
07   01   12   02   Site Work
07   01   33   --   Penstocks:
07   01   33   02   Site Work
07   01   33   03   Concrete
07   01   33   05   Metals
07   01   33   13   Special Construction
07   01   33   15   Mechanical
07   01   36   --   Surge Tanks:
07   01   36   03   Concrete
07   01   36   05   Metals
07   01   36   15   Mechanical
07   01   41   --   Gates and Operating Equipment:
07   01   41   03   Concrete
07   01   41   05   Metals
07   01   41   14   Conveying Systems
07   01   41   15   Mechanical

07   01   57   --   Power Intake Dam:
07   01   57   03   Concrete
07   01   57   05   Metals
07   01   57   13   Special Construction
07   01   57   15   Mechanical
07   01   58   --   Tailrace Structure:
07   01   58   03   Concrete
07   01   58   05   Metals
07   01   58   13   Special Construction
07   01   74   --   Powerhouse Substructure:
07   01   74   03   Concrete
07   01   74   05   Metals
07   01   74   13   Special Construction
07   01   74   15   Mechanical
07   01   75   --   Powerhouse Superstructure:
07   01   75   03   Concrete
07   01   75   04   Masonry
07   01   75   05   Metals
07   01   75   07   Thermal and Moisture Protection
07   01   75   08   Doors and Windows
07   01   75   09   Finishes


                                                Page 31
                                               WBS 02-20le4


07 01 75 10         Specialties
07 01 75 12         Furnishings
07 01 75 15         Mechanical

07 02 -- --         TURBINES AND GENERATORS

07   02   76   --   Furnish and Install Turbines:
07   02   76   15   Mechanical
07   02   77   --   Furnish and Install Governors:
07   02   77   15   Mechanical
07   02   78   --   Furnish and Install Generators:
07   02   78   16   Electrical
07   02   79   --   Unloading, Hauling, Storing and Painting
07   02   79   01   General Requirements
07   02   79   09   Finishes

07   02   80   --   Install Generator Foundation Bolts, Sole
07   02   80   05    Metals
07   02   81   --   Furnish and Install Valves:
07   02   81   15    Mechanical

07 03 -- --         ACCESSORY ELECTRICAL EQUIPMENT

07   03   82   --   Conduit System:                            LS
07   03   82   16    Electrical
07   03   83   --   Cable Tray System:
07   03   83   16    Electrical
07   03   84   --   Main Control Switchboards and Associated
07   03   84   16    Electrical
07   03   85   --   480-Volt Station Service Switchgear and
07   03   85   16    Electrical
07   03   86   --   125-Volt Station Battery:
07   03   86   16    Electrical
07   03   87   --   Power Transformers:
07   03   87   16    Electrical

07 04 -- --         MISCELLANEOUS POWER PLANT EQUIPMENT

07   04   62   --   Hoisting and Maintenance Equipment:
07   04   62   11    Equipment
07   04   62   14    Conveying Systems
07   04   63   --   Heating, Cooling and Ventilating:
07   04   63   15    Mechanical
07   04   64   --   Plumbing:
07   04   64   15    Mechanical
07   04   65   --   Fire Protection:
07   04   65   15    Mechanical
07   04   66   --   Emergency Power:
07   04   66   16    Electrical
07   04   67   --   Lubricating and Cooling Oil:
07   04   67   15    Mechanical
07   04   68   --   Compressed Air System:


                                                  Page 32
                                               WBS 02-20le4


07 04 68 15         Mechanical

07   04   69   --   Flow and Water Level Monitoring:
07   04   69   15   Mechanical
07   04   99   --   Associated General Items:
07   04   99   07   Thermal and Moisture Protection
07   04   99   11   Equipment
07   04   99   15   Mechanical

07 05 -- --         TAILRACE

07 05 31 --         Earthwork:
07 05 31 02         Site Work
07 05 99 --         Associated General Items

07 06 -- --         SWITCHYARD

07   06   04   --   Permanent Access Roads and Parking:
07   06   04   02   Site Work
07   06   88   --   Switchyard Structures:
07   06   88   02   Site Work
07   06   88   03   Concrete
07   06   88   05   Metals
07   06   89   --   Switchyard Tunnel:
                       (See Account 080221-- for detailed breakdown)

08 -- -- --         ROADS, RAILROADS, AND BRIDGES

   01
081--     --   --   ROADS
08 01     01   --   Mobilization, Demobilization and Preparatory Work:
08 01     02   --   Drainage:
08 01     02   02   Site Work
08 01     02   03   Concrete
08 01     05   --   Bridges, Foundations:
08 01     05   02   Site Work
08 01     05   03   Concrete
08 01     06   --   Bridges, Abutments and Piers:
08 01     06   02   Site Work
08 01     06   03   Concrete
08 01     06   06   Wood and Plastic
08 01     07   --   Bridges, Superstructure and Deck:
08 01     07   03   Concrete
08 01     07   05   Metals
08 01     07   06   Wood and Plastic
08 01     07   09   Finishes
08 01     08   --   Bridges, Associated General Items:
08 01     08   05   Metals
08 01     08   15   Mechanical
08 01     08   16   Electrical
08 01     13   --   Traffic Control
08 01     13   02   Site Work
08 01     19   --   Construct Roadbed to Subgrade


                                                 Page 33
                                                WBS 02-20le4


08   01   19   02   Site Work
08   01   19   03   Concrete
08   01   21   --   Tunnel Construction:
08   01   21   02   Site Work
08   01   21   03   Concrete
08   01   21   05   Metals
08   01   21   13   Special Construction
08   01   21   15   Mechanical
08   01   39   --   Road Surfacing
08   01   39   02   Site Work
08   01   99   --   Associated General Items:
08   01   99   02   Site Work

   02
081-- -- --         RAILROADS

   02
081--     01   --   Mobilization, Demobilization and Preparatory Work:
08 02     02   --   Drainage:
08 02     02   02   Site Work
08 02     02   03   Concrete
08 02     05   --   Bridges, Foundations:
08 02     05   02   Site Work
08 02     05   03   Concrete
08 02     06   --   Bridges, Abutments and Piers:
08 02     06   02   Site Work
08 02     06   03   Concrete
08 02     06   06   Wood and Plastic
08 02     07   --   Bridges, Superstructure and Deck:
08 02     07   03   Concrete
08 02     07   05   Metals
08 02     07   06       Wood Trusses, Girders and Beams
08 02     07   09   Finishes
08 02     08   --   Bridges, Associated General Items:
08 02     08   05   Metals
08 02     08   15   Mechanical
08 02     08   16   Electrical
08 02     13   --   Traffic Control
08 02     13   02   Site Work
08 02     19   --   Construct Roadbed to Subgrade
08 02     19   02   Site Work
08 02     19   03   Concrete
08 02     21   --   Tunnel Construction:
08 02     21   02   Site Work
08 02     21   03   Concrete
08 02     21   05   Metals
08 02     21   13   Special Construction
08 02     21   15   Mechanical
08 02     40   --   Track Work:
08 02     40   02   Site Work
08 02     99   --   Associated General Items:
08 02     99   02   Site Work

09 -- -- --         CHANNELS AND CANALS (Except Navigation Ports and Harbors)


                                                  Page 34
                                              WBS 02-20le4



09   01   --   --   CHANNELS
09   01   01   --   Mobilization, Demobilization and Preparatory Work:
09   01   13   --   Traffic Control:
09   01   13   02   Site Work
09   01   14   --   Sidecaster/Special Purpose Dredging
09   01   14   02   Site Work
09   01   15   --   Mechanical Dredging
09   01   15   02   Site Work
09   01   16   --   Pipeline Dredging
09   01   16   02   Site Work
09   01   17   --   Hopper Dredging
09   01   17   02   Site Work
09   01   20   --   Disposal Areas:
09   01   20   02   Site Work
09   01   30   --   Bank Stabilization, Dikes and Jetties:
09   01   30   02   Site Work
09   01   99   --   Associated General Items:
09   01   99   02   Site Work
09   01   99   03   Concrete
09   01   99   05   Metals

09   02   --   --   CANALS
09   02   01   --   Mobilization, Demobilization and Preparatory Work:
09   02   13   --   Traffic Control:
09   02   13   02   Site Work
09   02   14   --   Sidecaster/Special Purpose Dredging
09   02   14   02   Site Work
09   02   15   --   Mechanical Dredging
09   02   15   02   Site Work
09   02   16   --   Pipeline Dredging
09   02   16   02   Site Work
09   02   17   --   Hopper Dredging
09   02   17   02   Site Work
09   02   20   --   Disposal Areas:
09   02   20   02   Site Work
09   02   30   --   Bank Stabilization, Dikes and Jetties:
09   02   30   02   Site Work
09   02   99   --   Associated General Items:
09   02   99   02   Site Work
09   02   99   03   Concrete
09   02   99   05   Metals

10 -- -- --         BREAKWATERS AND SEAWALLS

10   00   --   --   Mobilization, Demobilization and Preparatory Work:
10   00   46   --   Breakwaters:
10   00   46   02   Site Work
10   00   46   03   Concrete
10   00   46   05   Metals
10   00   46   06   Wood and Plastic
10   00   47   --   Seawalls:


                                                 Page 35
                                               WBS 02-20le4


10   00   47   02   Site Work
10   00   47   03   Concrete
10   00   47   13   Special Construction
10   00   48   --   Seawall Drainage Facilities:
10   00   48   02   Site Work
10   00   48   03   Concrete
10   00   48   05   Metals
10   00   48   06   Wood and Plastic
10   00   99   --   Associated General Items:
10   00   99   02   Site Work
10   00   99   05   Metals

11 -- -- --         LEVEES AND FLOODWALLS

11   01   --   --   LEVEES
11   01   01   --   Mobilization, Demobilization and Preparatory Work:
11   01   02   --   Drainage:
11   01   02   02    Site Work
11   01   02   03    Concrete
11   01   02   05    Metals
11   01   02   06    Wood and Plastic
11   01   03   --   Care and Diversion of Water:
11   01   03   02    Site Work
11   01   03   15    Mechanical
11   01   04   --   Permanent Access Roads and Parking:
11   01   04   02    Site Work
11   01   99   --   Associated General Items:
11   01   99   02    Site Work
11   01   99   13    Special Construction

11 02 -- --         FLOODWALLS

11   02   01   --   Mobilization, Demobilization and Preparatory Work:
11   02   02   --   Drainage:
11   02   02   02   Site Work
11   02   02   03   Concrete
11   02   02   05   Metals
11   02   02   06   Wood and Plastic
11   02   03   --   Care and Diversion of Water:
11   02   03   02   Site Work
11   02   03   15   Mechanical
11   02   04   --   Permanent Access Roads and Parking:
11   02   04   02   Site Work
11   02   99   --   Associated General Items:
11   02   99   02   Site Work
11   02   99   13   Special Construction

12 -- -- --         NAVIGATION, PORTS & HARBORS

12 01 -- --         PORTS
12 01 01 --         Mobilization, Demobilization and Preparatory Work:
12 01 14 --         Sidecaster/Special Purpose Dredging


                                                   Page 36
                                               WBS 02-20le4


12   01   14   02   Site Work
12   01   15   --   Mechanical Dredging
12   01   15   02   Site Work
12   01   16   --   Pipeline Dredging
12   01   16   02   Site Work
12   01   17   --   Hopper Dredging
12   01   17   02   Site Work
12   01   20   --   Disposal Areas:
12   01   20   02   Site Work
12   01   99   --   Associated General Items

12 02 -- --         PORTS

12   02   01   --   Mobilization, Demobilization and Preparatory Work:
12   02   14   --   Sidecaster/Special Purpose Dredging
12   02   14   02   Site Work
12   02   15   --   Mechanical Dredging
12   02   15   02   Site Work
12   02   16   --   Pipeline Dredging
12   02   16   02   Site Work
12   02   17   --   Hopper Dredging
12   02   17   02   Site Work
12   02   20   --   Disposal Areas:
12   02   20   02   Site Work
12   02   99   --   Associated General Items

13 -- -- --         PUMPING PLANT

13   00   01   --   Mobilization, Demobilization and Preparatory Work:
13   00   03   02   Site Work
13   00   03   15   Mechanical
13   00   10   --   Earthwork for Structures:
13   00   10   02   Site Work
13   00   11   --   Foundation Work:
13   00   11   02   Site Work
13   00   18   --   Utilities:
13   00   18   15   Mechanical
13   00   18   16   Electrical
13   00   74   --   Pumping Plant Substructure:
13   00   74   03   Concrete
13   00   74   05   Metals
13   00   74   14   Conveying Systems
13   00   75   --   Pumping Plant Superstructure:
13   00   75   03   Concrete
13   00   75   04   Masonry
13   00   75   05   Metals
13   00   75   07   Thermal and Moisture Protection
13   00   75   08   Doors and Windows
13   00   75   09   Finishes
13   00   75   15   Mechanical
13   00   75   16   Electrical
13   00   76   --   Pumping Machinery and Appurtenances:


                                                 Page 37
                                               WBS 02-20le4


13   00   76   15   Mechanical
13   00   76   16   Electrical
13   00   77   --   Gates and Valves:
13   00   77   05   Metals
13   00   77   06   Wood and Plastic
13   00   77   15   Mechanical
13   00   78   --   Auxiliary Equipment:
13   00   78   14   Conveying Systems
13   00   78   15   Mechanical
13   00   78   16   Electrical
13   00   99   --   Associated General Items

14 -- -- --         RECREATION FACILITIES

14 00 01 --         Mobilization, Demobilization and Preparatory Work:
14 00 04 --         Permanent Access Roads and Parking:
                        (Only include parking adjacent to roads)
14 00 04 02         Site Work
14 00 09 --         Buildings, Project Operations:
                        (Includes Control Stations, Offices, Maintenance
                        Facilities, Garages, Support Buildings, etc.)
                        (See Account No. 190009-- for detailed breakdown)
14   00   18   --   Utilities:
14   00   18   02   Site Work
14   00   18   05   Metals
14   00   18   15   Mechanical
14   00   18   16   Electrical
14   00   22   --   Parking Lots and Service Roads:
14   00   22   02   Site Work
14   00   23   --   Site Grading and Landscaping:
14   00   23   02   Site Work
14   00   23   15   Mechanical
14   00   24   --   Buildings, Residences and Dormitories:
                        (Includes Operators Quarters and Dormitories)
                        (See Account No. 190024-- for detailed breakdown)
14 00 27 --         Buildings, Public Use:
                        (Includes Comfort Stations, Shower Facilities
                        Group Shelters, Concession Facilities etc.)
14   00   27   02   Site Work
14   00   27   03   Concrete
14   00   27   04   Masonry
14   00   27   05   Metals
14   00   27   06   Wood and Plastic
14   00   27   07   Thermal and Moisture Protection
14   00   27   08   Doors and Windows
14   00   27   09   Finishes
14   00   27   10   Specialties
14   00   27   15   Mechanical
14   00   27   16   Electrical

14 00 71 --         Activity Guides and Controls:
14 00 71 02         Site Work


                                                    Page 38
                                                WBS 02-20le4


14   00   71   06   Wood and Plastic
14   00   72   --   Day Use Areas:
14   00   72   02   Site Work
14   00   72   03   Concrete
14   00   72   06   Wood and Plastic
14   00   73   --   Camping Areas:
14   00   73   02   Site Work
14   00   99   --   Associated General Items:
14   00   99   02   Site Work

15 -- -- --         FLOODWAY CONTROL AND DIVERSION STRUCTURES

15   00   01   --   Mobilization, Demobilization and Preparatory Work:
15   00   02   --   Drainage:
15   00   02   02   Site Work
15   00   03   --   Care and Diversion of Water:
15   00   03   02   Site Work
15   00   03   15   Mechanical
15   00   03   16   Electrical
15   00   05   --   Bridges. Foundations:
15   00   05   02   Site Work
                        (See Account 08010502 for detailed breakdown)
15 00 05 03         Concrete
                        (See Account 08010503 for detailed breakdown)
15 00 06 --         Bridges, Abutments and Piers:
15 00 06 02         Site Work
                        (See Account 08010602 for detailed breakdown)
15 00 06 03         Concrete
                        (See Account 08010603 for detailed breakdown)
15 00 06 06         Wood and Plastic
                        (See Account 08010606 for detailed breakdown)
15 00 07 --         Bridges, Superstructure and Deck:
15 00 07 03         Concrete
                        (See Account 08010703 for detailed breakdown)
15 00 07 05         Metals
                        (See Account 08010705 for detailed breakdown)
15 00 07 06         Wood and Plastic
                        (See Account 08010706 for detailed breakdown)
15 00 07 09         Finishes
                        (See Account 08010709 for detailed breakdown)
15 00 08 --         Bridges, Associated General Items:
15 00 08 05         Metals
                        (See Account 08010805 for detailed breakdown)
15 00 08 15         Mechanical
                        (See Account 08010815 for detailed breakdown)
15 00 08 16         Electrical
                        (See Account 08010816 for detailed breakdown)

15   00   10   --   Earthwork for Structures:
15   00   10   02   Site Work
15   00   11   --   Foundation Work:
15   00   11   02   Site Work


                                                  Page 39
                                              WBS 02-20le4


15   00   12   --   Seepage Control:
15   00   12   02   Site Work
15   00   25   --   Embedded Metal Work:
15   00   25   05   Metals
15   00   25   15   Mechanical
15   00   25   16   Electrical
15   00   41   --   Gates, Stop Logs and Associated Equipment:
15   00   41   05   Metals
15   00   41   06   Wood and Plastic
15   00   41   14   Conveying Systems
15   00   41   15   Mechanical
15   00   53   --   Overflow Structure:
15   00   53   03   Concrete
15   00   53   13   Special Construction
15   00   54   --   Stilling Basin:
15   00   54   03   Concrete
15   00   54   13   Special Construction
15   00   99   --   Associated General Items:
15   00   99   02   Site Work
15   00   99   05   Metals
15   00   99   16   Electrical

16 -- -- --         BANK STABILIZATION

16   00   01   --   Mobilization, Demobilization and Preparatory Work:
16   00   31   --   Earthwork:
16   00   31   02   Site Work
16   00   81   --   Riprap Slope Treatment:
16   00   81   02   Site Work
16   00   82   --   Wooden Mattress Protection:
16   00   82   02   Site Work
16   00   83   --   Asphalt Slope Protection:
16   00   83   02   Site Work
16   00   84   02   Site Work
16   00   84   03   Concrete
16   00   85   --   Pile Dike Protection:
16   00   85   02   Site Work
16   00   99   --   Associated General Items

17 -- -- --         BEACH REPLENISHMENT (Except by Dredging)

17   00   01   --   Mobilization, Demobilization and Preparatory Work:
17   00   14   --   Sidecaster/Special Purpose Dredging
17   00   14   02   Site Work
17   00   15   --   Mechanical Dredging
17   00   15   02   Site Work
17   00   16   --   Pipeline Dredging
17   00   16   02   Site Work
17   00   17   --   Hopper Dredging
17   00   17   02   Site Work
17   00   70   --   Beach Fill:
17   00   70   02   Site Work


                                                 Page 40
                                               WBS 02-20le4


17 00 99 --         Associated General Items

18 -- -- --         CULTURAL RESOURCE PRESERVATION

18 00 27 --         Buildings, Public Use:
                        (Includes Buildings, Displays and Shelters)
                        (See Account 190024-- & 190027-- for detailed breakdown)
18   00   86   --   Identification,Data Analysis and Reports:
18   00   87   --   Recover and Remove Artifacts:
18   00   88   --   Preservation on Site:
18   00   88   02    Site Work
18   00   89   --   Relocate Structures:

19 -- -- --         BUILDINGS, GROUNDS, AND UTILITIES

19 00 01 --         Mobilization, Demobilization and Preparatory Work:
19 00 09 --         Buildings, Project Operations:
                        (Includes Administration Buildings, Shop Buildings
                        Storage Buildings and Garage Buildings)
19   00   09   02   Site Work
19   00   09   03   Concrete
19   00   09   04   Masonry
19   00   09   05   Metals
19   00   09   06   Wood and Plastic
19   00   09   07   Thermal and Moisture Protection
19   00   09   08   Doors and Windows
19   00   09   09   Finishes
19   00   09   10   Specialties
19   00   09   14   Conveying Systems
19   00   09   15   Mechanical
19   00   09   16   Electrical
19   00   18   --   Utilities, Lines and Service:
19   00   18   02   Site Work
19   00   18   05   Metals
19   00   18   15   Mechanical
19   00   18   16   Electrical
19   00   22   --   Parking Lots and Service Roads:
19   00   22   02   Site Work
19   00   23   --   Site Grading and Landscaping:
19   00   23   02   Site Work
19   00   23   15   Mechanical
19   00   24   --   Buildings, Residences and Dormitories:
19   00   24   02   Site Work
19   00   24   03   Concrete
19   00   24   04   Masonry
19   00   24   05   Metals
19   00   24   06   Wood and Plastic
19   00   24   07   Thermal and Moisture Protection
19   00   24   08   Doors and Windows
19   00   24   09   Finishes
19   00   24   10   Specialties
19   00   24   15   Mechanical


                                                  Page 41
                                              WBS 02-20le4


19 00 24 16         Electrical
19 00 27 --         Buildings, Public Use
                        (See account 190024-- for detailed breakdown
19   00   49   --   Streets and Public Roads:
19   00   49   02   Site Work
19   00   49   03   Concrete
19   00   55   --   Utilities, Treatment Facilities:
19   00   55   15   Mechanical

20 -- -- --         PERMANENT OPERATING EQUIPMENT

20   00   49   --   Equipment, Office:
20   00   49   12   Furnishings
20   00   50   --   Equipment, Shop:
20   00   50   12   Equipment
20   00   50   13   Special Construction
20   00   50   14   Conveying Systems
20   00   51   --   Equipment, Laboratory:
20   00   51   12   Equipment
20   00   51   --   Communications Systems:
20   00   51   16   Electrical
20   00   53   --   Maintenance Work Equipment:
20   00   53   11   Equipment
20   00   54   --   Sedimentation and Degrading Measurement
20   00   54   11   Equipment
20   00   99   --   Associated General Items




                                                 Page 42
                                                 WBS 30



CWBS                                                                 30 Nov 93


                                       CIVIL WORKS

                            WORK BREAKDOWN STRUCTURE

                                  PRODUCT CHECKLIST


Number              Product Description

30 -- -- --         PLANNING, ENGINEERING AND DESIGN

30 11 -- --         PROJECT COOPERATION AGREEMENT (PCA)

30   11   01   --   Initial Draft PCA Package
30   11   01   01    Initial Draft PCA
30   11   01   02    Federal/Non-Federal Allocation of Funds Table
30   11   01   03    Deviation Report
30   11   01   04    Certification of Legal Review
30   11   01   05    MSC Review Comments

30   11   02   --   Final Draft PCA Package
30   11   02   01   Final Draft PCA
30   11   02   02   Federal/Non-Federal Allocation of Funds Table
30   11   02   03   Deviation Report
30   11   02   04   Certification of Legal Review
30   11   02   05   Sponsor's Financing Plan & Statement
                      of Finicial Capability
30 11 02 06         Project Fact Sheet/Project Data Sheet
30 11 02 07         Computation of Cost Sharing, 902
                      Limit, Ability to Pay, Territories
                      Waiver as Applicable
30 11 02 08         Final Draft 3rd Party Sub-Agreements
30 11 02 09         MSC Review Comments
30 11 02 10         All Other Final Draft PCA Documents

30 11 03 --         Minutes of HQUSACE PCA Review Committee
                     Meetings

30   11   04   --   Executed PCA
30   11   04   01   MSC Approved PCA
30   11   04   02   HQUSACE Approved PCA
30   11   04   03   ASA(CW) Approved PCA
30   11   04   04   OMB Approved PCA
30   11   04   05   Local Sponsor Executed PCA, Certificate
                     of Authority, and Lobbying Certificate
30 11 04 06         ASA(CW) Executed PCA

30 11 05 --         Escrow Agreement


                                                 Page 43
                                                WBS 30


30 11 05 01         HQUSACE Approved Escrow Agreement
30 11 05 02         Executed Escrow Agreement

30 11 06 --         Initial Draft PCA Amendment Package
30 11 06 01          Initial Draft PCA Amendment
30 11 06 02          Amended Federal/Non-Federal Allocation
                       of Funds Table
30 11 06 03          Amended Deviation Report
30 11 06 04          Amended Certification of Legal Review
30 11 06 05          Initial Draft Amendment MSC
                       Review Comments

30 11 07 --         Final Draft PCA Amendment Package
30 11 07 01         Final Draft PCA Amendment
30 11 07 02         Amended Federal/Non-Federal Allocation
                      of Funds Table
30 11 07 03         Amended Deviation Report
30 11 07 04         Amended Certification of Legal Review
30 11 07 05         Amended Sponsor's Financing Plan &
                      Statement of Finicial Capability
30 11 07 06         Amended Project Fact Sheet/Project
                      Data Sheet
30 11 07 07         Computation of Amended Cost Sharing,
                      902 Limit, Ability to Pay,
                      Territories Waiver as Applicable
30 11 07 08         Amended Final Draft 3rd Party
                      Sub-Agreements
30 11 07 09         Final Draft Amendment MSC
                      Review Comments
30 11 07 10         All Other Final Draft PCA Amendment
                      Documents

30 11 08 --         Minutes of HQUSACE PCA Amendment Review
                     Committee Meetings

30   11   09   --   Executed PCA Amendment
30   11   09   01   MSC Approved PCA Amendment
30   11   09   02   HQUSACE Approved PCA Amendment
30   11   09   03   ASA(CW) Approved PCA Amendment
30   11   09   04   OMB Approved PCA Amendment
30   11   09   05   Local Sponsor Executed PCA Amendment,
                     Certificate of Authority, and
                     Lobbying Certificate
30 11 09 06         ASA(CW) Executed PCA Amendment

30 11 10 --         Amendments to Escrow Agreement
30 11 10 01         HQUSACE Approved Amended Escrow
                     Agreement
30 11 10 02         Executed Amended Escrow Agreement

30 12 -- --         PROJECT MANAGEMENT PLAN (PMP)




                                                Page 44
                                                 WBS 30


30 12 01 --         Revisions to PMP

30 18 -- --         GENERAL REEVALUATION REPORT (GRR)

30   18   01   --   Engineering Analysis/Report
30   18   01   01   Surveys and Mapping Except Real Estate
30   18   01   02   Site Development Analysis/Report
30   18   01   03   Hydrology and Hydraulic Studies Report
30   18   01   04   Engineering and Design Analysis Report
                     with Preliminary Drawings
30 18 01 05         Geotechnical Studies Report
30 18 01 06         Model Studies
30 18 01 07         All Other Technical Investigation Documents

30   18   02   --   Socio/Economic Analysis/Report
30   18   02   01   Economic Analysis/Report
30   18   02   02   Social Studies/Report
30   18   02   03   Institutional Studies/Report
30   18   02   04   Ability to Pay Report
30   18   02   05   All Other Socio/Economic Analysis Documents

30   18   04   --   Environmental Studies Documents (EA, EIS, SEIS)
30   18   04   01   Minutes of Scoping Meetings
30   18   04   02   Biological Assessment
30   18   04   03   Environmental Assessment (EA) or Findings
                     No Significant Impact (FONSI)
30 18 04 04         Environmental Impact Statement (EIS) or
                     Supl Environmental Impact Statement (SEIS)
30   18   04   05   Coordination Documents with Other Agencies
30   18   04   06   Resource Inventory Report
30   18   04   07   Mitigation Analysis Report
30   18   04   08   Fish and Wildlife Coordination Act Report
30   18   04   09   Section 404(b)(1) Analysis Report
30   18   04   10   401 State Water Quality Certification
30   18   04   11   Record of Decision (ROD)
30   18   04   12   Section 103 Evaluation
30   18   04   13   Statement of Findings (SOF)
30   18   04   14   Coastal Zone Management Consistency
                     Determination Report
30 18 04 15         All Other Environmental Documents

30   18   05   --   HTRW/RCRA Studies Report
30   18   05   01   HTRW Assessment Report
30   18   05   02   HTRW Site Inspection Report
30   18   05   03   HTRW Remedial Investigations
30   18   05   04   All Other HTRW Documents

30   18   06   --   Cultural Resource Studies Documents
30   18   06   01   Survey Field Report
30   18   06   02   Data Collection and Analysis Report
30   18   06   03   National Register Eligibility
30   18   06   04   No Effects Determination


                                                 Page 45
                                                   WBS 30


30   18   06   05   No Adverse Effects Determination
30   18   06   06   Mitigation Plan Report
30   18   06   07   Memorandum of Agreement
30   18   06   08   One Percent Waiver
30   18   06   09   All Other Cultural Resources Studies/Reports

30   18   07   --   Cost Estimates
30   18   07   01   GRR - Study Cost Estimates
30   18   07   02   PED Cost Estimate
30   18   07   03   Project Cost Estimate
30   18   07   04   OMRR&R Cost Estimate Updates
30   18   07   05   Fully Funded Cost Estimate
30   18   07   06   All Other Cost Estimates

30   18   08   --   Public Involvement Document
30   18   08   01   Notice of Public Meeting
30   18   08   02   Minutes of Public Meeting
30   18   08   03   Public Comments Report
30   18   08   04   Newsletters
30   18   08   05   All Other Public Involvement documents

30 18 09 --         Plan Formulation and Evaluation Report

30   18   10   --   Draft Report Documentation
30   18   10   01   Review Conference Documents
30   18   10   02   In-House Review Comments
30   18   10   03   Public Review Comments
30   18   10   04   Project Guidance Memorandum (PGM)
30   18   10   05   All Other GRR Documents

30 18 11 --         Final Report Documentation
30 18 11 01         Division Commanders Notice
30 18 11 02         All Other Final Report Documents

30   18   12   --   Washington Level Approved Report
30   18   12   01   Policy Review Approval
30   18   12   02   Chief's Report (PAC Only)
30   18   12   03   OMB Approved Report (PAC Only)
30   18   12   04   ASA(CW) Approved Report

30 18 13 --         All Other Studies/Investigations

30 18 14 --         Damages Assessed AE Contractor Documents

30   18   15   --   Management
30   18   15   01   AE Contract Documents
30   18   15   02   Study Funds Control Documents
30   18   15   03   Trip Reports
30   18   15   04   Coordination Documents
30   18   15   05   Minutes of Technical Review Conference
30   18   15   06   All Other Management Documents




                                                   Page 46
                                                 WBS 30


30 19 -- --         LIMITED REEVALUATION REPORT (LRR)

30   19   01   --   Engineering Analysis/Report
30   19   01   01   Surveys and Mapping Except Real Estate
30   19   01   02   Site Development Analysis/Report
30   19   01   03   Hydrology and Hydraulic Studies Report
30   19   01   04   Engineering and Design Analysis Report
                     with Preliminary Drawings
30 19 01 05         Geotechnical Studies Report
30 19 01 06         Model Studies
30 19 01 07         All Other Technical Investigation Documents

30   19   02   --   Socio/Economic Analysis/Report
30   19   02   01   Economic Analysis/Report
30   19   02   02   Social Studies/Report
30   19   02   03   Institutional Studies/Report
30   19   02   04   Ability to Pay Report
30   19   02   05   All Other Socio/Economic Analysis Documents

30   19   04   --   Environmental Studies Documents (EA, EIS, SEIS)
30   19   04   01   Minutes of Scoping Meetings
30   19   04   02   Biological Assessment
30   19   04   03   Environmental Assessment (EA) or Findings
                     No Significant Impact (FONSI)
30 19 04 04         Environmental Impact Statement (EIS) or
                     Supl Environmental Impact Statement (SEIS)
30   19   04   05   Coordination Documents with Other Agencies
30   19   04   06   Resource Inventory Report
30   19   04   07   Mitigation Analysis Report
30   19   04   08   Fish and Wildlife Coordination Act Report
30   19   04   09   Section 404(b)(1) Analysis Report
30   19   04   10   401 State Water Quality Certification
30   19   04   11   Record of Decision (ROD)
30   19   04   12   Section 103 Evaluation
30   19   04   13   Statement of Findings (SOF)
30   19   04   14   Coastal Zone Management Consistency
                     Determination Report
30 19 04 15         All Other Environmental Documents

30   19   05   --   HTRW/RCRA Studies Report
30   19   05   01   HTRW Assessment Report
30   19   05   02   HTRW Site Inspection Report
30   19   05   03   HTRW Remedial Investigations
30   19   05   04   All Other HTRW Documents

30   19   06   --   Cultural Resource Studies Documents
30   19   06   01   Survey Field Report
30   19   06   02   Data Collection and Analysis Report
30   19   06   03   National Register Eligibility
30   19   06   04   No Effects Determination
30   19   06   05   No Adverse Effects Determination
30   19   06   06   Mitigation Plan Report


                                                 Page 47
                                                   WBS 30


30 19 06 07         Memorandum of Agreement
30 19 06 08         One Percent Waiver
30 19 06 09         All Other Cultural Resources Studies/Reports

30   19   07   --   Cost Estimates
30   19   07   01   LRR - Study Cost Estimates
30   19   07   02   PED Cost Estimate
30   19   07   03   Project Cost Estimate
30   19   07   04   OMRR&R Cost Estimate Updates
30   19   07   05   Fully Funded Cost Estimate
30   19   07   06   All Other Cost Estimates

30   19   08   --   Public Involvement Document
30   19   08   01   Notice of Public Meeting
30   19   08   02   Minutes of Public Meeting
30   19   08   03   Public Comments Report
30   19   08   04   Newsletters
30   19   08   05   All Other Public Involvement documents

30 19 09 --         Plan Formulation and Evaluation Report

30   19   10   --   Final Report Documentation
30   19   10   01   Review Conference Documents
30   19   10   02   In-House Review Comments
30   19   10   03   Public Review Comments
30   19   10   04   Project Guidance Memorandum (PGM)
30   19   10   05   All Other LRR Documents

30   19   12   --   Washington Level Approved Report
30   19   12   01   Policy Review Approval
30   19   12   02   Chief's Report (PAC Only)
30   19   12   03   OMB Approved Report (PAC Only)
30   19   12   04   ASA(CW) Approved Report

30 19 13 --         All Other Studies/Investigations

30 19 14 --         Damages Assessed AE Contractor Documents

30   19   15   --   Management
30   19   15   01   AE Contract Documents
30   19   15   02   Study Funds Control Documents
30   19   15   03   Trip Reports
30   19   15   04   Coordination Documents
30   19   15   05   Minutes of Technical Review Conference
30   19   15   06   All Other Management Documents

30 20 -- --         PROJECT DESIGN MEMORANDUM

30   20   01   --   Engineering Analysis/Report
30   20   01   01   Surveys and Mapping Except Real Estate
30   20   01   02   Site Development Analysis/Report
30   20   01   03   Hydrology and Hydraulic Studies Report


                                                   Page 48
                                                 WBS 30


30 20 01 04         Engineering and Design Analysis Report
                     with Preliminary Drawings
30 20 01 05         Geotechnical Studies Report
30 20 01 06         Model Studies
30 20 01 07         All Other Technical Investigation Documents

30   20   02   --   Socio/Economic Analysis/Report
30   20   02   01   Economic Analysis/Report
30   20   02   02   Social Studies/Report
30   20   02   03   Institutional Studies/Report
30   20   02   04   Ability to Pay Report
30   20   02   05   All Other Socio/Economic Analysis Documents

30   20   04   --   Environmental Studies Documents (EA, EIS, SEIS)
30   20   04   01   Minutes of Scoping Meetings
30   20   04   02   Biological Assessment
30   20   04   03   Environmental Assessment (EA) or Findings
                     No Significant Impact (FONSI)
30 20 04 04         Environmental Impact Statement (EIS) or
                     Supl Environmental Impact Statement (SEIS)
30   20   04   05   Coordination Documents with Other Agencies
30   20   04   06   Resource Inventory Report
30   20   04   07   Mitigation Analysis Report
30   20   04   08   Fish and Wildlife Coordination Act Report
30   20   04   09   Section 404(b)(1) Analysis Report
30   20   04   10   401 State Water Quality Certification
30   20   04   11   Record of Decision (ROD)
30   20   04   12   Section 103 Evaluation
30   20   04   13   Statement of Findings (SOF)
30   20   04   14   Coastal Zone Management Consistency
                     Determination Report
30 20 04 15         All Other Environmental Documents

30   20   05   --   HTRW/RCRA Studies Report
30   20   05   01   HTRW Assessment Report
30   20   05   02   HTRW Site Inspection Report
30   20   05   03   HTRW Remedial Investigations
30   20   05   04   All Other HTRW Documents

30   20   06   --   Cultural Resource Studies Documents
30   20   06   01   Survey Field Report
30   20   06   02   Data Collection and Analysis Report
30   20   06   03   National Register Eligibility
30   20   06   04   No Effects Determination
30   20   06   05   No Adverse Effects Determination
30   20   06   06   Mitigation Plan Report
30   20   06   07   Memorandum of Agreement
30   20   06   08   One Percent Waiver
30   20   06   09   All Other Cultural Resources Studies/Reports

30 20 07 --         Cost Estimates
30 20 07 01         PDM Study Cost Estimate


                                                 Page 49
                                                   WBS 30


30   20   07   02   PED Cost Estimate
30   20   07   03   Project Cost Estimate
30   20   07   04   OMRR&R Cost Estimate Updates
30   20   07   05   Fully Funded Cost Estimates
30   20   07   06   All Other Cost Estimates

30   20   08   --   Final Report Documentation
30   20   08   01   Minutes of Review Conference
30   20   08   02   In-House Review Comments
30   20   08   03   Public Review Comments
30   20   08   04   All Other Report Documents

30 20 09 --         Other Studies/Investigations

30 20 10 --         Damages Assessed AE Contractor Documents

30   20   11   --   Management
30   20   11   01   AE Contract Documents
30   20   11   02   Coordination Documents
30   20   11   03   Minutes of Technical Review Conference
30   20   11   04   All Other Management Documents

30 21 -- --         FEATURE DESIGN MEMORANDUM

30   21   01   --   Engineering Analysis/Report
30   21   01   01   Surveys and Mapping Except Real Estate
30   21   01   02   Site Development Analysis/Report
30   21   01   03   Hydrology and Hydraulic Studies Report
30   21   01   04   Engineering and Design Analysis Report
                     with Preliminary Drawings
30 21 01 05         Geotechnical Studies Report
30 21 01 06         Model Studies
30 21 01 07         All Other Technical Investigation Documents

30   21   04   --   Environmental Studies Documents (EA, EIS, SEIS)
30   21   04   01   Minutes of Scoping Meetings
30   21   04   02   Biological Assessment
30   21   04   03   Environmental Assessment (EA) or Findings
                     No Significant Impact (FONSI)
30 21 04 04         Environmental Impact Statement (EIS) or
                     Supl Environmental Impact Statement (SEIS)
30   21   04   05   Coordination Documents with Other Agencies
30   21   04   06   Resource Inventory Report
30   21   04   07   Mitigation Analysis Report
30   21   04   08   Fish and Wildlife Coordination Act Report
30   21   04   09   Section 404(b)(1) Analysis Report
30   21   04   10   401 State Water Quality Certification
30   21   04   11   Record of Decision (ROD)
30   21   04   12   Section 103 Evaluation
30   21   04   13   Statement of Findings (SOF)
30   21   04   14   Coastal Zone Management Consistency
                     Determination Report


                                                   Page 50
                                                   WBS 30


30 21 04 15         All Other Environmental Documents

30   21   05   --   HTRW/RCRA Studies Report
30   21   05   01   HTRW Assessment Report
30   21   05   02   HTRW Site Inspection Report
30   21   05   03   HTRW Remedial Investigations
30   21   05   04   All Other HTRW Documents

30   21   06   --   Cultural Resource Studies Documents
30   21   06   01   Survey Field Report
30   21   06   02   Data Collection and Analysis Report
30   21   06   03   National Register Eligibility
30   21   06   04   No Effects Determination
30   21   06   05   No Adverse Effects Determination
30   21   06   06   Mitigation Plan Report
30   21   06   07   Memorandum of Agreement
30   21   06   08   One Percent Waiver
30   21   06   09   All Other Cultural Resources Studies/Reports

30   21   07   --   Cost Estimates
30   21   07   01   FDM Study Cost Estimate
30   21   07   02   PED Cost Estimate
30   21   07   03   Project Cost Estimate
30   21   07   04   OMRR&R Cost Estimate Updates
30   21   07   05   Fully Funded Cost Estimates
30   21   07   06   All Other Cost Estimates

30   21   08   --   Final Report Documentation
30   21   08   01   Minutes of Review Conference
30   21   08   02   In-House Review Comments
30   21   08   03   Public Review Comments
30   21   08   04   All Other Report Documents

30 21 09 --         Other Studies/Investigations

30 21 10 --         Damages Assessed AE Contractor Documents

30   21   11   --   Management Documents
30   21   11   01   AE Contract Documents
30   21   11   02   Coordination Documents
30   21   11   03   Minutes of Technical Review Conference
30   21   11   04   All Other Management Documents

30 23 -- --         CONSTRUCTION CONTRACT(S) DOCUMENTS

30   23   01   --   Plans and Specifications (P&S)
30   23   01   01   Field Investigation Report
30   23   01   02   Plans and Specifications
30   23   01   03   Permits for Construction
30   23   01   04   BCO Review Certification
30   23   01   05   All Other P&S Documents




                                                   Page 51
                                                   WBS 30


30 23 04 --         Environmental Studies Documents
30 23 04 01         Coordination Documents with
                     Other Agencies
30 23 04 02         Construction Contract Resource
                     Inventory Report
30   23   04   03   Mitigation Analysis Report
30   23   04   04   Fish and Wildlife Coordination Act Report
30   23   04   05   401 State Water Quality Certification
30   23   04   06   Section 404(b)(1) Analysis Report
30   23   04   07   Record of Decision (ROD)
30   23   04   08   Coastal Zone Management Consistency
                     Determination Report
30   23   04   09   Planning RCRA Permits
30   23   04   10   NPDES Permit
30   23   04   11   Air Emissions Permits
30   23   04   12   All Other Environmental Documents

30 23 05 --         HTRW Studies/Report
30 23 05 01         Local Sponsor HTRW Study/Report
30 23 05 02         USACE HTRW Study/Report

30   23   06   --   Cultural Resource Studies Documents
30   23   06   01   Site Investigation Surveys
30   23   06   02   National Register Eligibility
30   23   06   03   No Effects Determination
30   23   06   04   No Adverse Effects Determination
30   23   06   05   Mitigation Plan Report
30   23   06   06   Memorandum of Agreement
30   23   06   07   One Percent Waiver
30   23   06   08   All Other Cultural Resources Studies/Reports

30   23   07   --   Cost Estimates
30   23   07   01   Contract Cost Estimates
30   23   07   02   PED Cost Estimate
30   23   07   03   Project Cost Estimate
30   23   07   04   OMRR&R Cost Estimate Updates
30   23   07   05   Fully Funded Cost Estimates
30   23   07   06   All Other Cost Estimates

30 23 08 --         Other Studies/Investigations

30   23   09   --   Contract Award Documents
30   23   09   01   Contract Negotiation/Award Documents
30   23   09   02   CBD Announcement
30   23   09   03   Advertised/RFP Contract
30   23   09   04   Davis Bacon Wage Rates
30   23   09   05   Abstract of Bids/Record of Negotiation
30   23   09   06   Reasonable Contract Cost Estimate
30   23   09   07   Awarded Contract
30   23   09   08   Notice to Proceed
30   23   09   09   All Other Contract Award Documents




                                                   Page 52
                                                  WBS 30


30 23 10 --         Engineering & Design During Construction
                     Documents

30 23 13 --         Damages Assessed AE Contractors

30   23   14   --   Management Documents
30   23   14   01   AE Contract Documents
30   23   14   02   Amendments to Plans & Specifications
30   23   14   03   Coordination Documents
30   23   14   04   All Other Management Documents

30 23 15 --         Local Sponsor Project Coordination
                     Team Participation Documents

30 24 -- --         VALUE ENGINEERING ANALYSIS DOCUMENTS

30 24 01 --         Value Engineering Screening/Studies
30 24 02 --         Value Engineering Related Redesign

30 25 -- --         PROJECT OR FUNCTIONAL ELEMENT CLOSEOUT
                     AND LOCAL SPONSOR ASSUMPTION OF OMRR&R

30   25   01   --   Physical Closeout Documents
30   25   01   01   Minutes of Final Inspection
30   25   01   02   Project Dedication Ceremony
30   25   01   03   All Other Physical Closeout Documents

30   25   02   --   Project Fiscal Closeout Documents
30   25   02   01   Local Sponsor Audit
30   25   02   02   USACE Audit
30   25   02   03   Final Accounting Report
30   25   02   04   All Other Fiscal Closeout Documents

30 25 03 --         Final Project or Functional Element Closeout
                     and Local Sponsor Assumption of OMRR&R
30 25 03 01         Cash Payment to Balance Cost Sharing
                      Per Final Accounting
30 25 03 02         OMRR&R Manual
30 25 03 03         Written Notice of Completion and Local
                      Sponsor Assumption of OMRR&R

30 26 -- --         PROGRAMS AND PROJECT MANAGEMENT DOCUMENTS

30   26   01   --   Project Coordination Documents
30   26   02   --   Funds Control Documents
30   26   03   --   Trip Reports
30   26   04   --   Upward Reporting Documents
30   26   05   --   Budgetary Documents
30   26   06   --   Project Authorization Documents
30   26   07   --   Annual Notification Letter to Local Sponsor
                     for Cost Sharing Funding Requirements
30 26 08 --         Fact Sheets


                                                  Page 53
                                              WBS 30


30   26   09   --   Correspondence (Congressional, State)
30   26   10   --   Schedule and Cost Changes (SACCR)
30   26   11   --   Project Work Directives
30   26   12   --   Project Closeout Coordination Documents
30   26   13   --   Quarterly Cost Report to Local Sponsor
30   26   14   --   All Other Programs/Project Management Documents




                                              Page 54

								