professional documents
home
Upload
docsters
Upload
rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
SECURITY OF UNCLASSIFIED CONTROLLED AND PROPRIETARY INFORMATION (FEB 2008) Seller shall be responsible for safeguarding all unclassified controlled and proprietary information and materials in connection with the performance of the work under this subcontract. Seller shall protect against sabotage, espionage, loss, and theft of the unclassified controlled and proprietary information and materials in Seller’s possession. Unclassified Controlled and proprietary information includes, but is not limited to, information classified as Unclassified Controlled Nuclear Information (UCNI) and Official Use Only (OUO) in accordance with the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) Information Security Program and the Y12 UCI Program. Seller shall: (a) complete the requisite briefing (for UCNI) and/or certification (for OUO) provided by the Subcontract Technical Representative (STR), a Y-12 Information Security Officer, or designee; (b) ensure unclassified controlled information is granted only to persons with a need to know and is not released without review for release restrictions; (c) ensure unclassified controlled information is never released to foreign nationals, (d) notify the Subcontract Administrator of any security breach immediately. (e) be responsible for recognizing the sensitivity of information before it is used, processed, or stored on an information system.. (f) certify to the STR that any unclassified controlled documents, materials, or information storage media (disk drives, thumb drives, hard drives) in Seller’s possession or in the possession of any person under the Seller’s control in connection with the performance of this subcontract are returned to the STR in conformance with Y-12 specifications upon completion of the subcontract. (g) Flow these requirements down to all lower-tier subcontractors and suppliers. supci.doc
flag this doc
6
0
not rated
0
5/30/2008
English
Preview

This publication and other Energy Information Administration EIA

EIA 5/30/2008 | 129 | 1 | 0 | legal
Preview

Administrator for Energy Information Administration

EIA 5/30/2008 | 81 | 0 | 0 | legal
Preview

U S Department of Energy Energy Information Administration - Technical Assistant

EIA 5/30/2008 | 109 | 0 | 0 | legal
Preview

Energy Information Administration Assumptions to the Annual Energy

EIA 5/30/2008 | 74 | 1 | 0 | legal
Preview

Energy Information Administration National Energy Modeling System runs

EIA 5/30/2008 | 94 | 1 | 0 | legal
Preview

This publication and other Energy Information Administration EIA - Natural Gas Publications (All)

EIA 5/30/2008 | 63 | 0 | 0 | legal
Preview

Section Energy Security Nuclear Energy FY Current Approp

EIA 5/30/2008 | 28 | 0 | 0 | legal
Preview

Nuclear Energy Investing In Our Energy Security

EIA 5/30/2008 | 39 | 1 | 0 | legal
Preview

Careers in Solar Energy

EIA 5/30/2008 | 72 | 2 | 0 | legal
Preview

Careers in Wind Energy

EIA 5/30/2008 | 97 | 2 | 0 | legal
Preview

Energy in the Round

EIA 5/30/2008 | 74 | 1 | 0 | legal
Preview

The Energy in Hurricanes

EIA 5/30/2008 | 61 | 0 | 0 | legal
Preview

Nuclear Energy an Overview

EIA 5/30/2008 | 72 | 4 | 0 | legal
Preview

Energy Information Administration Office of Integrated Analysis and - Legislation and Regulations

EIA 5/30/2008 | 56 | 0 | 0 | legal
Preview

Related EIA Publications on Energy Consumption

EIA 5/30/2008 | 70 | 0 | 0 | legal
Preview

DE PART I THE SCHEDULE SECTION B SUPPLIES

EIA 5/30/2008 | 172 | 1 | 0 | legal
Preview

W P Federal Tax Withholding Only if making a change to current Federal Tax information

EIA 5/30/2008 | 82 | 0 | 0 | legal
Preview

A Farewell Salute to NLO

EIA 5/30/2008 | 64 | 0 | 0 | legal
Preview

More Than Years of Experience Will Depart FMPC When NLO Leaves

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Westinghouse Named FMPC Operator

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Pistol Clubbers Commence Firing

EIA 5/30/2008 | 63 | 0 | 0 | legal
Preview

Fernald Glassblower Practices A Fragile Art

EIA 5/30/2008 | 59 | 0 | 0 | legal
Preview

Fernald Plant million expansion program

EIA 5/30/2008 | 66 | 0 | 0 | legal
Preview

Community Relations our Company as a neighbor

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Plant Reaches Coveted Safety Goal

EIA 5/30/2008 | 59 | 0 | 0 | legal
 
review this doc