Word Document

Princeton Plasma Physics Laboratory - Lab Summaries

Click to download
Reviews
Princeton Plasma Physics Laboratory Infrastructure Summary Overview 1. Quick Summary 725,066 37 111,943 0 1 1 1 57,000 $281 Million SC Fusion Energy Sciences Total Building Space (ft2):……………………. # of Buildings:………………………………….. Largest Building (ft2): Lyman Spitzer Office Bldg (office/lab)…… Trailers:………………………………………….. Wooden Buildings:……………………………. Excess Facilities: Uncontaminated ……….. Contaminated…………… Excess Space Cleaned up in FY02 (ft2):…… Replacement Plant Value1:…………………… Landlord Program:…………………………….. 1 Includes buildings and other structures and facilities, but not excess facilities . 2. Rank in Space and No. of Buildings PPPL Ranks 8th in Total Space PPPL Ranks 9th in No. of Buildings 600 No. of Buildings at SC Labs Square Feet (millions) 5 4 3 2 1 8th Total SC Lab Space = 21 million square feet. 500 400 300 200 100 0 Total Number of Buildings at SC Labs - 1,758 9th Fermi TJNAF SLAC PPPL ANL-E Ames LBNL PNNL ORISE ORNL BNL PPPL ORISE Fermi ORNL 3. Programmatic Funding – SC provides 98% of the operating funding. SC– Office of Science WFO– Work for Others June 6, 2002 1 TJNAF ANL-E Ames SLAC PNNL BNL LBNL Princeton Plasma Physics Laboratory Infrastructure Summary Overview 4. Age of Space–is the age of building space by gross square feet (gsf). More than 40 percent of PPPL building space is over 21 years old and 31% is over 40 years old. 5. Building Maintenance Funded –Actual maintenance is the expenditure of all real property maintenance activities in the current fiscal year regardless of funding source (indirect, operating or capital funding). Required maintenance is the estimate of all costs to perform maintenance activities deemed necessary by engineering and life-cycle studies (it does not address major renovations or improvements needed). Deferred maintenance is maintenance that was planned but was postponed to a future period due to lack of funds. Deferred maintenance is increasing while actual maintenance has declined from FY 2000 to FY 2001. 6. Building Maintenance Actual Deferred Required $18 $16 $14 $12 $10 $8 $6 $4 $2 $0 1999 2000 2001 Building Condition Index (BCI) – indicates the condition of space in ‘active’ buildings (excess facilities are excluded). BCI is calculated on a building-by-building basis, as Total Deferred Maintenance as a percentage of Replacement Plant Value (RPV), where Deferred Maintenance is maintenance that was planned but not performed. Buildings with a low BCI are rated in better condition than those with higher BCI – see chart below for quality rating for the BCI percentages. Generally deferred maintenance does not include major rehabilitation/renovations and improvements needed to better accommodate mission activities (e.g. improvements in vibration, air quality, temperature, access to power, etc.) Quality Rating: Building Condition Index Range:  Excellent BCI < 2%  Good 2% ≤ BCI < 5%  Adequate 5% ≤ BCI <10%  Fair 10% ≤ BCI <25%  Poor 25% ≤ BCI <60%  Fail BCI ≥ 60% June 6, 2002 2 Millions of Dollars Princeton Plasma Physics Laboratory Infrastructure Summary Overview Trends in Infrastructure Investment at PPPL 7. Infrastructure Investment–is composed of FY 01 FY 02 FY 03 funding for line-items, GPP/GPE, excess facilities, and $4 indirect maintenance. Line-items (LI) fund construction of general purpose infrastructure, such as roads, utility $3 systems, and general purpose buildings. Excess facilities funding provides for clean-up and removal of excess $2 buildings. Infrastructure line items and excess facilities are provided by the Science Lab Infrastructure program. $1 General Plant Project (GPP) and General Purpose Equipment (GPE) are funds for equipment and $0 infrastructure that are shared by facilities across the site. The SC Fusion Energy Science program provides GPP/GPE funds and the SC Science Lab Infrastructure program funds excess facilities clean-up starting in FY 2002. Indirect Maintenance is real property maintenance that is funded by laboratory overhead. It does not include housekeeping or groundskeeping. Millions of Dollars Line-Item Constr. Excess Facilities Most Recent Line-Item Project: Life Safety & Fire Protection Upgrade project, $4.9M in FY 1993 Summary of Proposed Modernization Projects from PPPL’s 2000 Strategic Facilities Plan: Line Item Construction $13.05M GPP/GPE $28.2M 8. Recapitalization Period–is the number of years needed to fully maintain infrastructure as it ages. It is calculated by dividing Total Replacement Plant Value by the total amount spent on construction (the sum of line-items and GPP/GPE). PPPL Recapitalization Periods FY ‘01 165 years FY ‘02 192 years FY ‘03 260 years 9. Third Party Facilities – PPPL has no plans for third-party financing of its facilities. Sources: Facilities Information Management System (FIMS) Database, April 2002 FY ’03 Budget Crosscut Lab Strategic Facilities Plan Institutional Plans and other documentation John Yates, SC-82 Tel: 301-903-8435 Fax: 301-903-8442 E-mail:John.Yates@science.doe.gov Contact: June 6, 2002 3 GPP/GPE Indirect Maint.

Related docs
premium docs
Other docs by EIA
AP US History
Views: 2093  |  Downloads: 7
AP French Literature 2004 Scoring Guidelines
Views: 715  |  Downloads: 1
Spanish Literacy Web Resources for Kids
Views: 787  |  Downloads: 15
We Praise Thee O God
Views: 186  |  Downloads: 1
So You Want to go to Grad School
Views: 610  |  Downloads: 19
Cheney Brothers v Doris Silk Corp
Views: 325  |  Downloads: 2
Helicopters Nacionales de Columbia v Hall
Views: 198  |  Downloads: 0
Deep Calls to Deep
Views: 158  |  Downloads: 0
dv108k
Views: 117  |  Downloads: 0
Trust
Views: 225  |  Downloads: 1
adopt226
Views: 135  |  Downloads: 0
civ050
Views: 100  |  Downloads: 0
French MenuFoods Glossary
Views: 2962  |  Downloads: 72
Trust
Views: 139  |  Downloads: 0
adr103
Views: 110  |  Downloads: 1