professional documents
home
Upload
docsters
Upload
rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
Department of Energy Washington, DC 20585 March 23,2007 MEMORANDUM FOR MIKE HOLLAND, BHSO JULIE ERICKSON, PNSO RONALD LUTHA, ASO GERALD BOYD, OR JOHNNY MOORE, OR ROBERT WUNDERLICH, CH GEORGE MALOSH, SC-3 FROM: SUBJECT: REFERENCES: P~~CE Safety Basis Approvals (1) Memorandum from R. Orbach to Distribution dated December 1, 2006, Safety Basis Approvals (2) Memorandum from C. Sell to Distribution dated December 27, 2005, Delegations of Safety Authorities Per Reference (1) above, we have had a short implementation period to evaluate how the new delegations for 10CFR830, Subpart B are proceeding. I am superseding Reference (1) above by modifying and providing additional clarifications, effective the date of this letter. Consistent with Table 6, Safety Basis of DOE Manual 411.1-1C, I am delegating authority for approval of SC Hazard Category 1, 2 and 3 existing nuclear facilities safety basis responsibilities to the SC Chief Operating Officer (COO), SC-3. This includes safety basis actions including updates/revisions to Documented Safety Analyses and Technical Safety Requirements, approval of contractor Unreviewed Safety Question (USQ) procedures, USQ change packages and Justification for Continued Operations. The SC COO may subsequently re-delegate the authority for Hazard Category 2 and 3 nuclear facilities safety basis responsibilities to the senior Office of Science (SC) management official dependent upon the qualifications and expertise described in the reference (2). The responsibilities for approval of alternate safe harbors or exemptions shall remain with SC-1. I expect those Site Offices which do not have delegation for approval of safety basis documentation under 10CFR Part 830 Subpart B to prepare the Safety Evaluation Reports and submit that documentation and the contractor's submittal(s) to SC-3 for approval. We will work with your organizations to ensure timely reviews. * Printed w~h soy ink on recycled paper Please contact myself or Carol Sohn of my staff at (509) 554-3742 if you have any questions regarding this information. cc: G. Malosh, SC-COO C. Lagdon, US-CNS 1. Kelly, OR BJ.Parks, SC-31.1 bcc: C. Sohn, SC
flag this doc
3
0
not rated
0
5/30/2008
English
Preview

Memorandum from Dr Orbach Safety Basis Approvals March - Documents

EIA 5/30/2008 | 1 | 0 | 0 | legal
Preview

Memorandum from Dr Orbach Safety Basis Approvals December

EIA 5/30/2008 | 2 | 0 | 0 | legal
Preview

Memorandum from Dr Orbach Safety Basis Approvals December - Documents

EIA 5/30/2008 | 2 | 0 | 0 | legal
Preview

This publication and other Energy Information Administration EIA

EIA 5/30/2008 | 129 | 1 | 0 | legal
Preview

Administrator for Energy Information Administration

EIA 5/30/2008 | 82 | 0 | 0 | legal
Preview

U S Department of Energy Energy Information Administration - Technical Assistant

EIA 5/30/2008 | 109 | 0 | 0 | legal
Preview

Energy Information Administration Assumptions to the Annual Energy

EIA 5/30/2008 | 75 | 1 | 0 | legal
Preview

Energy Information Administration National Energy Modeling System runs

EIA 5/30/2008 | 95 | 1 | 0 | legal
Preview

This publication and other Energy Information Administration EIA - Natural Gas Publications (All)

EIA 5/30/2008 | 63 | 0 | 0 | legal
Preview

Careers in Solar Energy

EIA 5/30/2008 | 73 | 2 | 0 | legal
Preview

Careers in Wind Energy

EIA 5/30/2008 | 97 | 2 | 0 | legal
Preview

Energy in the Round

EIA 5/30/2008 | 74 | 1 | 0 | legal
Preview

The Energy in Hurricanes

EIA 5/30/2008 | 61 | 0 | 0 | legal
Preview

Nuclear Energy an Overview

EIA 5/30/2008 | 72 | 4 | 0 | legal
Preview

Related EIA Publications on Energy Consumption

EIA 5/30/2008 | 70 | 0 | 0 | legal
Preview

DE PART I THE SCHEDULE SECTION B SUPPLIES

EIA 5/30/2008 | 172 | 1 | 0 | legal
Preview

W P Federal Tax Withholding Only if making a change to current Federal Tax information

EIA 5/30/2008 | 83 | 0 | 0 | legal
Preview

A Farewell Salute to NLO

EIA 5/30/2008 | 65 | 0 | 0 | legal
Preview

More Than Years of Experience Will Depart FMPC When NLO Leaves

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Westinghouse Named FMPC Operator

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Pistol Clubbers Commence Firing

EIA 5/30/2008 | 64 | 0 | 0 | legal
Preview

Fernald Glassblower Practices A Fragile Art

EIA 5/30/2008 | 59 | 0 | 0 | legal
Preview

Fernald Plant million expansion program

EIA 5/30/2008 | 66 | 0 | 0 | legal
Preview

Community Relations our Company as a neighbor

EIA 5/30/2008 | 68 | 0 | 0 | legal
Preview

Plant Reaches Coveted Safety Goal

EIA 5/30/2008 | 61 | 0 | 0 | legal
 
review this doc