MAYOR AND CABINET

Document Sample
MAYOR AND CABINET Powered By Docstoc
					                                  MAYOR AND CABINET

Report Title          Local Assemblies and Mayor’s Fund

Key Decision          Yes                                                       Item 9

Ward                  Crofton Park, Evelyn, Ladywell, Perry Vale and Sydenham

Contributors          Executive Director for Community Services, Head of Law,
                      Executive Director for Resources

Class                 Part 1                                     Date: 18 November 2009


1      Purpose

       This report seeks to inform the Mayor of progress made by Local Assemblies in
       particular Crofton Park, Evelyn, Ladywell, Perry Vale, Sydenham and
       Whitefoot. Contained in the report is the assembly action plan for Evelyn. It
       recommends that the Mayor approves the Mayor’s Fund allocations detailed in
       section 3 below.

2      Policy Context

2.1    Section 138 of the Local Government and Public Involvement in
       Health Act came into effect on April 1st 2009. It makes it a duty on all local
       authorities to involve local representatives when carrying out 'any of its
       functions' by providing information, consulting or ‘involving in another way’.
       The Local Assemblies programme is a key aid to the council in fulfilling this
       new duty.

2.2    In May 2007 the Mayor’s Commission on empowering communities and
       neighbourhoods recommended that the London Borough of Lewisham
       introduce local ward assemblies for each of the borough’s 18 wards. The
       Commission believed that these localised bodies, defined by the active
       involvement of the ward councillors, would enable the people living and
       working in each area to have a stronger and more direct influence in shaping
       their local community, supporting an ongoing process for identifying and
       resolving local concerns and implementing local solutions.

2.3    The local assemblies programme is helping to deliver the Lewisham
       Sustainable Community Strategy priority outcome `Empowered and
       responsible - where people can be actively involved in their local area and
       contribute to supportive communities.’ The assemblies programme also
       supports the delivery of LAA target NI4 - percentage of residents who feel they
       are able to influence decisions locally.

2.4    The work of the Local Assemblies is directly linked to the Council’s priority for
       community leadership and empowerment.

2.5    The Local Assemblies programme was established in March 2008 and each
       assembly has met between four and seven times since then. In October 2008
      the Mayor announced that £50,000 would be allocated to each of the 18 wards
      to enable assemblies to propose projects that would support the delivery of
      their local action plans and encourage residents to work with the council to find
      local solutions to local problems.

3     Recommendations

3.1   It is recommended that the Mayor notes the progress made by Crofton Park,
      Evelyn, Ladywell, Perry Vale, Sydenham and Whitefoot Assemblies. Further
      recommendations regarding the Mayor’s Fund ward allocations are listed
      below:

3.2   £ 5,000 from the Crofton Park Mayor’s Fund allocation is agreed for the
      following projects:
       £5,000 St Hilda’s and Croftonpark.com – Crofton Park Website - Community
      Website to promote community identity in Crofton Park


3.3   £39,624 from the Evelyn Mayor’s Fund allocation is agreed for the following
      projects:
       £5,204 Second Wave – Working with young people to create young active
        citizens and potential leaders
       £10,254 Ahoy Centre – ‘Making Waves in Evelyn’ - Sailing and volunteering
        project for young people
       £7,116 Riverside Youth Club – Steel Pan Band – Training young people in
        music to perform in public and purchase of new equipment to expand the
        band
       £5,050 Somali Education Development Centre – Young Refugees at Risk
        Project – Football coaching, swimming lessons, education, training and
        guidance sessions for any refugee in Evelyn ward
       £7,000 – London and Quadrant, Saturday Life Skills – Saturday sports
        leadership and first aid workshops for young people
       £5,000 Deptford Family Project – Health, wellbeing and nutritional workshops
        for young people and their parents

3.3    £30,419 check from the Ladywell Mayor’s Fund allocation is agreed for the
      following projects:
       £7,019 City Irrigation Ltd (Payment from LB Lewisham on behalf of Hilly
       Fields (Francis Drake) Community Bowls Club) – Irrigation System – To
       purchase and install an irrigation system
       £10,000 LBL Youth Service – Youth Village – part-funding to give access to
       3 nights youth provision for the year
       £4,965 LBL Youth Service – Mural Project – Young peoples graffiti
       workshops and mural project
       £3,090 Ahoy Centre – Making waves in Ladywell - Sailing and volunteering
        project for young people
       £7,222 Lewisham Safer Neighbourhood Team - Alert Box – Safety scheme
        for businesses in Ladywell Village, Ladywell Road


3.4   £3,024 from the Perry Vale Fund allocation is agreed for the following projects:
       £3,024 Ahoy ‘Making Waves in Perry Vale’ - Sailing and volunteering project
        for young people

3.5   £10,000 from the Sydenham Mayor’s Fund allocation is agreed for the
      following projects:
       £10,000 Venner Road Management Committee – Informal supervised play
      area at Silverdale Hall




4     Local Assemblies Programme

4.1   The first local assembly was held at Sydenham on the 6 March 2008. Since
      then, all 18 of Lewisham's local assemblies have met between 4 and 7 times.
      Anyone living, working or learning in the ward is encouraged to attend
      assembly meetings. Additionally a number of targeted pieces of work have
      taken place in wards to attract a broader cross section of the community.
      Assemblies are able to influence decision making in a number of ways and are
      encouraged to work with the council and other partners to influence
      mainstream service delivery. A principle route for this is by the articulation of
      ward priorities for change at the Link Officer group. This group has
      representation from officers across the council as well as from the Police and
      the Lewisham Primary Care Trust.



5     Crofton Park

5.1   The Crofton Park Assembly has met five times to date. Attendance figures
      have ranged from 35 to 85 averaging 61 over the period. There are 10
      members in the co-ordinating group. At the 29 June 2009 assembly meeting 5
      projects were proposed, 2 have since been approved by Mayor and Cabinet. A
      further project is presented for approval, summarised in 5.2 below. The action
      plan for the assembly was previously presented in the 15 July 2009 Mayor and
      Cabinet report.

5.2   £5,000 St Hilda’s and Croftonpark.com – Crofton Park Website - Community
      Website to promote community identity in Crofton Park. The total cost of the
      project will be £5,000

6     Evelyn

6.1   The Evelyn Assembly met for the first time on 12 June 2008 and has met 6
      times to date. Attendance figures have ranged from 35 to 80 averaging 56
      over the period. There are 12 members of the coordinating group.
      The assembly have chosen the following priorities:
         not enough youth facilities
         too much traffic
         anti-social behaviour
         dumping of rubbish
         drug problems

      A detailed action plan is attached at Appendix F that specifies the actions to
      date and planned actions against each of the 5 priorities.

6.2   The assembly has had a number of early successes including:
         Delivery of Evelyn Participatory Budgeting event in February 2009 funding 7
          projects using £11,500 of Locality Funding
          Installation of yellow lines to stop lorries parking and improve safety near a
          local scrap metal yard

6.3   The assembly agreed to ring fence £9,830 for youth activities to be decided by
      young people, at the assembly on 21 May 2009. A further 6 proposals were
      agreed at the 7 September 2009 assembly. 6 project proposals are contained
      in this report, for Mayor and Cabinet approval summarised at 6.2 – 6.7 below

6.2   £5,204 Second Wave – Working with young people to create young active
      citizens and potential leaders (Appendix B1) The project aims to improve
      confidence of young people in the police through a series of workshops
      including use of drama and role play. The total cost of the project will be £5,204

6.3   £10,254 Ahoy Centre ‘Making waves in Evelyn’ Sailing activities for young
      people. (Appendix B2) To engage 72 local young people in sailing activities,
      enabling them to gain a nationally recognised qualification. The total cost of
      the project will be £10,254

6.4   £7,716 LBL Youth Service - Riverside Youth Club – Steel Pan Band (Appendix
      B3) Purchase of steel band equipment and provision of tuition to expand the
      size and reinvigorate with new talent, the current steel pan band. The total cost
      of the project will be £7,716

6.5   £5,050 Somali Education Development Project – Young Refugees at Risk
      Project (Appendix B4) Working with local providers to provide free football
      coaching sessions for men and swimming lessons for young refugee women.
      The total cost of the project will be £5,050

6.6   £7,000 London and Quadrant with Hornafric, Leap and Millwall Community
      Scheme - Saturday Life Skills Academy (Appendix B5) Workshops to provide
      young people with first aid training and community sports leadership skills over
      the course of 20 weeks. The total value of the project is £7,000
6.7    £5,000 Deptford Family Project (Appendix B6) – Young people, parent and
       guardian yoga and nutrition classes and social events over 20 weeks. The total
       cost of the project will be £5,000


7     Ladywell

7.1   The Ladywell Assembly has met 7 times to date. Attendance figures have
      ranged from 45 to 80, averaging 60 over the period. There are 9 members in
      the co-ordinating group. At the 23 June 2009 assembly meeting 2 projects were
      proposed, which were approved by Mayor & Cabinet on 21 October 2009. At the
      22 September 2009 meeting the assembly proposed a further 5 projects, which
      are now presented for approval, summarised in 7.2 – 7.6 below. The action
      plan for the assembly was previously presented in the 21 October 2009 Mayor
      and Cabinet report.

7.2   £8,257 Hilly Fields (Francis Drake) Community Bowls Club (Appendix C1) –
       Purchase and installation of water efficient irrigation system. The total cost of
       the project is £8,257

7.3   £10,000 LBL Youth Service – Youth Village (Appendix C2) – The project will
       fund access to 3 nights youth activities in local centre. The project is being
       supported by Lewisham Central and Rushey Green assemblies as well as
       receiving funding from the youth service. Total value of the project is £120,000

7.4   £4,965 LBL Youth Service – Get the Message Mural Project (Appendix C3) –
       To engage 30 young people in designing and painting mural including 30 hours
       of evidenced group work on public perceptions of graffiti. Total value of the
       project is £4,965

7.5   £3,394 Ahoy Centre – ‘Making Waves in Ladywell’ (Appendix C4) – Working in
       partnership with the Ladywell Safer Neighbourhood Team, to engage 7 young
       people at risk of offending in sailing activities, enabling them to gain a
       nationally recognised qualification. The total cost of the project will be £3,394

7.6   £6,288 Safer Neighbourhood Team – ‘AlertBox’ Scheme (Appendix C5) – to
       purchase and install 18 Alertbox boxes in retailers in Ladywell Village as part of
       the Business Watch scheme. The technology allows discreet and instant
       communication when crime / antisocial behaviour is detected. The total cost of
       the project is £6,288


8      Perry Vale

       The Perry Vale Assembly has met five times to date. Attendance figures have
       ranged from 50 to 100, averaging 70 over the period. There are eight
       members in the co-ordinating group. On 2 July 2009 the assembly proposed 3
       projects 2 of which were approved by Mayor & Cabinet on 8 September 2009;
       and the third on 21 October 2009. At the 15 October 2009 meeting the
       assembly proposed a further 2 projects, 1 of which is now presented for
       approval, summarised in 8.1 below. The action plan for the assembly was
       previously presented in the 8 September 2009 Mayor and Cabinet report.
8.1    £3,024 Ahoy Centre ‘Making Waves in Perry Vale’ (Appendix D1) –Working in
       partnership with Brent Knoll School, to engage young people with learning
       difficulties in sailing activities, enabling them to gain a nationally recognised
       qualification. The total cost of the project will be £3,090



9     Sydenham

9.1   The Sydenham Assembly has met seven times to date. Attendance figures
      have ranged from 70 - 180, averaging 117 over the period. There are 11
      members in the co-ordinating group. The Mayor approved 2 projects on
      13 May 2009, Sydenham Arts Festival and Forest Hill and Sydenham Youth
      Forum. The remainder of the Mayor’s Fund was earmarked by the assembly on
      3 September 2009, where 7 projects were supported for approval by the Mayor.
      5 of the projects were approved by Mayor and Cabinet on 16 September, with a
      further project approved at 21 October Mayor and Cabinet. The final project is
      presented for approval, summarised in 9.2 below. The action plan for the
      assembly was previously presented to Mayor and Cabinet in May 2009.

9.2   £10,000 Venner Hall Management Association (Appendix E1) – Silverdale Hall
      Play Area – to create an informal supervised play area on the currently
      overgrown and disused Silverdale Hall land to the rear of the property. The total
      cost of the project will be £10,000


10    Financial Implications
      The report recommends that the following awards totalling £90,248 are agreed
      from the Mayor’s Fund
                                                                                       £
      Crofton Park - Balance remaining                                            18,500
      Croftonpark.com                                                              5,000
                                                                                 (5,000)
      Balance remaining                                                           13,500


      Evelyn - Balance available                                                  50,000
      Second Wave                                                                  5,204
      Ahoy Centre                                                                 10,254
      Riverside Youth Club                                                         7,116
      Somali Education Development Centre                                          5,050
      London and Quadrant                                                          7,000
      Deptford Family Project                                                      5,000
                                                                                (39,624)
      Balance remaining                                                           10,376


      Ladywell - Balance available                                                32,600
      LB Assemblies Team (on behalf of Hilly Fields Bowls Club)                    7,019
      LBL Youth Service – youth village                                           10,000
       LBL Youth Service – Mural project                                           4,965
       Ahoy Centre                                                                 3,394
       LBL Local Assemblies Team (on behalf of Lewisham Safer                      7,222
       Neighbourhood Team)
                                                                                (32,600)
       Balance remaining                                                               0



       Perry Vale - Balance available                                              6,000
       Ahoy Centre                                                                  3,024
                                                                                  (3,024)
       Balance remaining                                                            2,976


       Sydenham - Balance available                                               10,000
       Venner Hall Management Association                                         10,000
                                                                                (10,000)
       Balance remaining                                                               0



10.1    Proposals relating to any balance of the funds available for these wards will be
        brought to subsequent Mayor and Cabinet meetings. All recommendations in
        section 3 of this report can be contained within the Mayor’s Fund budget
        allocation.

11      Legal Implications

11.1    As the Local Assemblies do not have decision making powers under the
        Council’s constitution, it is for the Mayor to take the decision on the
        recommendations as to how the sums from the Mayor’s Fund will be spent,
        taking into consideration the views of the relevant assembly.

11.2    Where funding is being awarded to any voluntary organisation or community
        group, the conditions attached to such funding must comply with the Council’s
        requirements relating to accountability including monitoring and auditing where
        appropriate.

12.     Crime and Disorder Implications

        Reducing crime and anti social behaviour is a key priority for many ward
        assemblies. Links have been forged between the Local Assemblies
        Programme and Safer Neighbourhood Panels and closer partnership working
        is planned to ensure coordination in this area. In this report there are a number
        of projects with a young people and crime diversion focus and a project
        delivered by the local Safer Neighbourhood Panel working with local
        businesses in Ladywell.

13.     Equality Implications
      A significant number of projects contained within this report will have a positive
      impact on equalities and cohesion. These include intergenerational activities,
      projects that bring different sectors of the community together in volunteering
      activities, projects aimed at refugees and additional provision for young people
      and the young disabled people .

14.   Environmental Implications

      A number of projects may assist in maintaining good environments through
      their focus on young people and crime diversion. The mural project in particular
      should assist with reduction in graffiti.

15.   Conclusion

      The Local Assemblies are providing residents with opportunities to identify and
      resolve local concerns and implement local solutions. Proposals for using the
      £50,000 Mayor’s Fund ward allocation are demonstrating what can be
      achieved when the council works closely in partnership with local residents.
BACKGROUND PAPERS

APPENDICES
Mayor’s Fund Project Proposals:


Crofton Park
Appendix A1      St Hilda’s and croftonpark.com


Evelyn
Appendix B1      Second Wave
Appendix B2      Ahoy Centre
Appendix B3      Riverside Youth Club
Appendix B4      Somali Education Development Project
Appendix B5      London and Quadrant
Appendix B6      Deptford Family Project

Ladywell
Appendix C1      Hilly Fields Community Bowls Club
Appendix C2      LBL Youth Service – youth village
Appendix C3      LBL Youth Service – Mural project
Appendix C4      Ahoy Centre
Appendix C5      Ladywell Safer Neighbourhoods Team

Perry Vale
Appendix D1      Ahoy Centre

Sydenham
Appendix E1      Venner Road Management Committee


Local Assemblies Action Plans:

Appendix F1      Evelyn

If you would like more information on this report please contact Liz Dart
Community & Neighbourhood Development, Community Services Directorate
on 020 8314 6115
                                    Mayor’s Fund Project Proposals – Crofton Park
                                                  Appendix A1 – Croftonpark.com

Name of Assembly: Crofton Park
Project Title: Croftonpark.com A community website
Project Idea:
A community website for the Crofton Park ward, called www.Croftonpark.com. This
project will be led by led by St Hilda’s in partners hip with a community website steering
group.

The project aims to:
    profile and increase access to all aspects of local life. The website would
    host a variety of web pages including: an introduction to the area and its
      opportunities; local businesses; community and voluntary organisations; venues;
      young peoples and elders pages; Safer Neighbourhood’s Team; local services;
      events and Local Assembly news
    host monitored interactive forums to air local issues and promote local activities
    provide links to local institutions including the council website and service
      providers to Crofton Park

The proposal is to allocate £5,000 to cover the development and running of the website
for design and implementation

Management responsibility of Croftonpark.com
Finalising ongoing management responsibilities and the management of contents will be
led by the Croftonpark.com steering group and St Hilda’s, supported by the Local
Assembly. It is the intention to create an ongoing management body. The steering group
currently consists of four Local Assembly coordinating group volunteers including Fr
Bates, one member of the group is from St Saviours church. A further able member of St
Hilda’s has offered to be a member. A constitution and management document will be
drawn up by this group.


In the long-term, it is proposed that the website be made sustainable by charging a small
fee for local businesses to advertise on the webpage, to cover the on going hosting fees
and management costs. Provision of email addresses @croftonpark.com and other on
line methods would be used to ensure the site can continue unaided .

Financial responsibility and auditing
St Hilda's will hold the fi nances - and they will be audited under SORP policies
With church accounts in the Croftonpark community link restricted fund - they will be held
as restricted funds for Croftonpark .com.

What does the project want to achieve and which of the assembly pr iorities does it
address?

One of the assembly’s priorities is Community Cohesion, feedback from assembly
meetings and community cohesion working group meetings showed that there was a
need to create a sense of identity for the Crofton Park ward and that there is a lack of
awareness amongst residents and visitors about the types of community facilities and
groups operating in the area, as well as the variety of local businesses in the ward.

It was a proposed that a medium was required to promote the ward, share information
                                   Mayor’s Fund Project Proposals – Crofton Park
                                                 Appendix A1 – Croftonpark.com

and support communication between residents, community and voluntary groups, faith
groups, young people and local business and local statutory services.




How will the success of the project be measured?

The success will be measured by the regular usage of the website and will be monitored
by the number of hits the webpage has on a monthly basis. The use of forums, and also
the contribution of local groups to building the pages and managing them will be a
measurable a part of judging the success. Local groups and organisations who are
profiled will be asked to feed back any increase in interest membership or support. We
will also attempt to construct the site so that we can count the number of people
accessing information about local service provision Safer neighbourhoods etc.

By the uptake of local businesses and community / voluntary groups using website to
promote their services, which in the long runs enabled the website to be sustainable by
the small advertising revenue received.

Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                     £
Revenue Costs i.e. fees, room hire, publicity etc
Publicity (including                                                                £700
Content management training                                                         £300
Use of office space for the community                                               £500
Hosting (2years)                                                                    £150




Capital Costs i.e. equipment purchase, building works etc
Website design and construction (Design, Forums, Content                         £3,350
Management Systems (CMS), Advertising-letters-forums CMS

Total Expenditure
Income
Mayors Fund allocation                                                           £5,000
Other Council funding (please specify)

Other funding (please specify)     Applied for      Confirmed
-                                  -                -

Total Income                                                                     £5,000
                                    Mayor’s Fund Project Proposals – Crofton Park
                                                  Appendix A1 – Croftonpark.com

Project Management Team (details of signatories)

 Name                                     Contact Number         Email address
 Project Manager: Father Bates, St        020-8699 1277          frbates@croftonpark.com
 Hilda’s supported by
 Croftonpark.com steering group
 Treasurer: Father Bates, St Hilda’s      020-8699 1277          frbates@croftonpark.com


Key stages in delivering the project:
 Action                                    Lead                             Deadline
 Draft terms of agreement with steering    Father Bates, Steering Group     Oct 09
 group
 Go out to tender                          Father Bates, Steering   Group   Dec 09
 Commission web developer                  Father Bates, Steering   Group   Feb 10
 Webpage development                       Father Bates, Steering   Group   Feb-Apr 10
 Advertise webpage                         Father Bates, Steering   Group   May 10

What impact will the project have on equalities within the ward?

This webpage will be open to anyone interested in Crofton Park and aims to provide
services for all age groups, the community and voluntary sector, and local businesses.
For those without IT facilities, the group will work with Crofton Park Library to encourage
promotion and usage.


What else is happening that may impact on this project?

There are no other community websites aimed at Crofton Park, however some residents
of Crofton park do use the Brockley Central WebPages demonstrating an interest
amongst residents of Crofton Park for a local community website.

The Crofton Park Community Notice Board project will be happening at the same time
and will help promote the community webpage.


What are the risks with this project?
Initial low uptake and usage of the website, leading the webpage to not being sustainable
in the long term.

The community website project is interlinked with community notice board project which
will advertise the website, connections with the Crofton Park youth forum will promote
usage of the youth webpage by members of the youth forum.

The webpage will be advertised in Lewisham Life, Impact magazine a Crofton park
publication, links to The Ackroyd Centre webpage and advertised on posters in the library
and local community venues.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?
                                   Mayor’s Fund Project Proposals – Crofton Park
                                                 Appendix A1 – Croftonpark.com


The delivery and maintenance of the website would be led by St Hilda’s in partnership
with a Croftonpark.com steering group. It is also proposed to involve young people in
maintaining the content and design of the webpage, possibly through links with Crofton
Park Youth Forum, a formal working agreement between St Hilda’s and the community
will be drafted.

An external web developer would be commissioned for the design and development of
the website, which would provide training sessions on updating content.
                                          Mayor’s Fund Project Proposals - Evelyn
                                                     Appendix B1 – Second Wave
Name of Assembly: Evelyn
Project Title: Second Wave Outreach Initiative: Youth Action for Safer Communities
Project Idea:

This initiative will seek to build bridges for partnership work between young volunteers at
Second Wave and young people who are curre ntly less actively involved in their
communities. It will strengthen the involvement of local young people in an initiative
designed to make our neighbourhoods safer for people of all ages, and to build the skills
needed by the next generation of community leaders. We aim to develop an approach to
social responsibility and peer-support based on Restorative Approaches to anti-social
behaviour at a local level. We also aim to involve young people more directly in local
democracy and decision-making.

This will consolidate and strengthen the work we are already developing with Lewisham
Community Police Consultative Group, Voluntary Action Lewisham, SSLC (Somali and
Somaliland Lewisham Community), Silwood Integrated Youth Support Service, Sedgehill
School, and Lewisham Police.

Young people at Second Wave have been working closely with police officers and the
local authority for 5 years to address particular issues of concern: youth-on-youth crime,
violence, intimidation, hate crime, and gang-related activities throughout the borough.
The aim is to strengthen the wider involvement of local young people and their skills in
finding creative solutions.

As a youth-centred organisation, we have a track record of 27 years working positively to
strengthen the local community.
What does the project want to achieve and which of the assembly priorities does it
address?
     To motivate local young people by making the project take account of the young
       people’s ideas involved
     To help improve the social well-being of local people by increasing trust and
       confidence in the police
     Promoting inter-generational debate of local issues of concern
     To help change perceptions of local young people and the potential they offer as
       active citizens (i.e. as young citizens who care about their families, friends,
       neighbourhoods and the wider community).

The project seeks to help address the Evelyn Assembly ward priorities of:
           Not enough youth facilities
           Anti-social behaviour crime


How will the success of the project be measured?
The deliverables for this programme include:
    Participation of 50 local young people aged 13-24 years
    Participation of 10 local police officers
    2 taster workshops (with emphasis on 13 -18 age group)
    2 training workshops (in leadership skills for young volunteers)
    4 community outreach workshops (held in various local venues)
    2 seminar/debate events e.g. at Silwood IYSS and Sedgehill)
                                           Mayor’s Fund Project Proposals - Evelyn
                                                        Appendix B1 – Second Wave
      2 evaluation sessions (open to all participants)
      A review based on evaluations and data provided by Lewisham police and the
       crime reduction service

Drama-based methods are used to overcome the distrust felt by young people towards
the police and the uncertainty police officers feel in their encounters with young people.
We insist that police officers attend the sessions wearing casual clothes in order to
overcome the barriers caused by police uniforms. (Please refer below for more
information about the impact of this work from a police perspective.)

We attach particular importance to the taster sessions which bring young people together
with the police initially to establish a positive and creative atmosphere for non-
confrontational interaction. The purpose of the taster sessions is to raise awareness of
crime and policing issues in the Deptford/Evelyn area and to identify the role young
people can play as citizens who care about their families, friends, neighbourhoods and
communities. These sessions also involve young volunteers who are slightly older and
have more experience of working with the police in this way. These volunteers act as
‘trusted intermediaries’, building bridges of respect and confidence, and helping to
reduce any tensions.

In a typical workshop session we include 8-12 young participants, 4-6 youth volunteers,
and 3-5 police officers. These workshops are led by practitioners with extensive
experience of working with young people and the police in community settings. The
choice of venue will constantly depend on the needs of the group. Space at Second
Wave is available, but it may be more appropriate, for example, to hold outreach
sessions with local Somali young people at Evelyn Community Centre, or with other
young people at the community centre on the Silwood Estate. All sessions are planned,
delivered and evaluated with the involvement of young volunteers.

The role of workshop leaders and facilitators is to enable participants and police officers
to work more confidently together as members of the community, with an increased
sense of collective responsibility.

We particularly welcome the opportunity offered by the Mayor’s Fund to focus our work
on local young people who have not been previously involved in any Second Wave
activities. For these young people, the opportunity to build a different and more positive
relationship with local police officers may be a whole new experience. We hope this will
strengthen their sense of safety in their neighbourhoods without needing to resort to
gangs or weapons in their efforts to protect themselves from violence, intimidation or
hate crime. Second Wave’s previous work with the local Somali community has identified
inter-cultural and inter-generational perspectives as important priorities. But the dialogue
needed to explore these issues has to be based on trust built gradually by careful and
sustained methods.

Once we have established a fundamental level of trust, the sessions can explore a
deeper understanding of key questions (for example, through role play and drama-based
scenarios). This encourages young people to think about the choices and the decisions
they need to make for themselves. For example: What helps you as a young person to
feel safe? How do you identify situations that are not safe? How are young people
harmed by other young people? Can you rely on the police for protection? What is the
best way to manage an encounter with the police? What are your legal rights when you
are questioned by the police?
                                      Mayor’s Fund Project Proposals - Evelyn
                                                  Appendix B1 – Second Wave
Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                     £
Revenue Costs i.e. fees, room hire, publicity etc
Programme facilitation (31 hrs @ £24 per hr) - cost of tutor/organiser               744
employed at freelance tutor rate of £24 per hour
Workshop and volunteers coordination (118 hrs @ £20 per hr) - cost of               2,360
workshop leaders (84 hrs) and volunteers co-ordinator (34 hrs)
employed at freelance practitioner rate of £20 per hour
Programme management (15 hrs @ £25 per hr)                                           375
Administration (16 hrs @ £20 per hr)                                                 320
Volunteers expenses (£5 per day per volunteer). Participation of 10                  340
volunteers for 5 sessions each at £5 expenses, and 2 volunteers for 9
sessions at £5 expenses.
Publicity and workshop materials (leaflets and information)                          480
Contribution to rent and overheads (including telephone, postage,                    585
photocopying, etc)

Capital Costs i.e. equipment purchase, building works etc
                                                                                       0

Total Expenditure                                                                   5,204
Income
Mayors Fund allocation                                                              5,204
Other Council funding (please specify)                                                  0

Other funding (please specify)    Applied for       Confirmed
-                                 -                 -                                    -

 Total Income                                                                       5,204
Project Management Team (details of signatories)

Name                                     Contact Number         Email address
Project Manager: Ann Considine           O208.694. 2444         ann@secondwave.org.uk
Treasurer: Cheryl Brown                  0208 694. 2444         info@secondwave.org.uk


Key stages in delivering the project:
Action                                    Lead                           Deadline
Phase One: consultation and taster        Phil Turner                    Nov 2009
workshops                                 (Programme facilitator)
Phase Two: leadership training and        Talmud Bah                     31 January
outreach activity                         (Workshop co-ordinator)        2010
Phase Three: organisation and             Hena Chowdhury                 28 February
delivery of seminar/debate events         (events and volunteers         2010
                                          coordinator)
Phase Four: evaluation and review         Phil Turner                    31 March 2010
                                          (Programme facilitator)
                                          Mayor’s Fund Project Proposals - Evelyn
                                                         Appendix B1 – Second Wave
Individuals delivering the programme will be qualified freela nce tutors and trainers with
previous experience of working with Second Wave, with relevant local knowledge and
expertise and CRB disclosures.

Local police officers will be involved as participants, engaging in workshops and
discussions with young people; and all aspects of the programme will be designed to
build the leadership skills of young volunteers in the community.

Overall supervision and management of the programme will be the responsibility of the
Director (Ann Considine) and the Trustees of Second Wave.

What impact will the project have on equalities within the ward?
The key features of this programme involving young people and the police will be:
    To encourage local young people to assume responsible roles as active citizens
      and decision-makers in their communities
    To strengthen the voices of these young people on issues of equality and social
      justice
    To work closely with people of all ages, marginalised groups and those who feel
      particularly vulnerable to hate crime and intimidation (e.g. elderly people and the
      local Somali community)
    To encourage meaningful dialogue between local young people, the police and
      the wider community, on the basis of mutual respect and collective responsibility
    To build trust and confidence in the police and to reduce conflict & confrontation in
      neighbourhood situations
    To reduce crime & anti-social behaviour and to record and evaluate best practice
      in the development of this approach
    To work closely in consultation with the local authority (e.g. the crime reduction
      service and community safety team) in sharing information and relevant expertise
      with other parts of the borough

What else is happening that may impact on this project?
We are working closely with Lewisham Community Police Consultative Group, the
Metropolitan Police Service and the Metropolitan Police Authority to develop innovative
approaches relevant to these issues of community safety and crime reduction.
Second Wave’s partnership work with Lewisham Community Police Consultative Group
was formally recognised at a full meeting of Lewisham Council on 24 September 2009.
This work also received an Award for Good Practice in Community Engagement from the
Metropolitan Police Authority (27 June 2009). In March 2007, Second Wave received a
Commendation from the Metropolitan Police Service for ‘professionalism and
commitment’ in working with police officers in Lewisham.
The creative drama-based approach developed by Second Wave in partnership with the
local Territorial Support Group (TSG4) has been acknowledged b y a Lewisham Police
Superintendent for successfully making ‘the TSG more accountable and accessible to
the local community’ and providing ‘a greater awareness and understanding of the
importance of community engagement, trust and confidence.’ In the view of one local
officer the advantage of this approach depends on non-confrontational interaction:
‘Together with the help of volunteers at Second Wave we created a positive ongoing
dialogue between young people and police officers, building bridges of mutual trust,
respect, confidence and understanding on both sides … Police officers cannot know
what is happening in young people’s lives, or how young people think about their daily
experiences, unless there are opportunities to meet and talk on informal basis beyond
                                             Mayor’s Fund Project Proposals - Evelyn
                                                          Appendix B1 – Second Wave
that zone of confrontation’ (Lewisham Police Inspector). In a safe environment, young
people, volunteers and police officers gain the knowledge and skills they need to address
serious issues (e.g. youth-on-youth crime) and to identify creative local solutions.
Our work has formed the basis of a national recommendation for improved police
training, as part of the Centre for Social Justice’s report on street gangs in Britain: ‘Dying
to Belong’ (February 2009). We are working with the Runnymede Trust on a new report
on ethnic profiling by the police, and the associated issues of social justice (for
publication in 2010). We have a partnership with the Open Society Justice Initiative to
establish links with youth projects in other parts of Europe to address the problem of
disproportionality and the misuse of police powers (such as ‘Stop and Search’).

What are the risks with this project?
We will make every effort to protect the safety and well-being of all participants, and to
ensure that high standards of safe practice are applied throughout the programme.
We will take care not to duplicate existing work or similar initiatives of this kind.
With the advice and support of the police, we will take all necessary safeguarding
measures, and undertake appropriate risk assessment procedures, to establish and
maintain a safe workshop environment for all participants.
How will this project be delivered and how will individuals / organisations
delivering the project be identified?
We are interested in building sustainable links with local organisations and schools and
using this funding to initiate a process of long-term collaboration. We would be
particularly interested in meeting teachers and pupils (especially young people in the 14 -
16 age group) who are concerned about neighbourhood safety issues and their relations
with the police in the Evelyn area. Second Wave staff will be pleased to arrange
meetings to facilitate this process of dialogue and to include police officers in these
meetings. We welcome the opportunity to consult closely with Evelyn Assembly on all
aspects of delivery. We are also working closely with Voluntary Action Lewisham to
identify community groups and young people in our area who feel particularly
marginalised and vulnerable to criminal behaviour, but who do not necessarily have
adequate support to overcome these difficulties.
                                        Mayor’s Fund Project Proposals - Evelyn
                            Appendix B2 – Ahoy Centre ‘Making Waves in Evelyn’

Name of Assembly: Evelyn
Project Title: Making Waves in Evelyn
Project Idea:
To engage 72 young people in activities at The AHOY Centre. 36 young people to
participate in sailing activities one day a week (as part of their National Curriculum),
enabling the young people to gain a Nationally Recognised Qualification and 36 young
people to participate in a Fun/Taster Day at AHOY during the school holidays, givi ng
them the opportunity to sign up as volunteers at The AHOY Centre at the end of each
programme. Volunteering at the AHOY will engage the young people in the evening,
weekends and school holidays, in a active way; at the same time emphasising life skills,
team work and building on confidence.


What does the project want to achieve and which of the assembly priorities does it
address?
Funding is required to contribute to improving the facilities for young people in the Evelyn
ward by running an alternati ve education programme within its local schools and
providing school holiday activities for young people from the Evelyn Ward.

The experience AHOY provides disadvantaged and disabled people is not just over the
few days they attend a course – it goes a long way; involving them in their local
community by becoming part of an established sailing centre. This inclusion provides a
long-lasting contribution to the community as a whole. Through these activities and
courses the benefits include:

Enabling self-development by imparting a sense of achievement, responsibility and
teamwork. It further offers:
 The opportunity for all sections of the community to become involved in water sports
   and it’s social aspects by offering support and skill, increasing the sense of
   community spirit
 Young people to utilise sailing skills to participate in schemes such as the Duke of
   Edinburgh and Youth Achievement Awards
 Increase health awareness and fitness
 Focus the mind and provide a channel for energy for all participants within an exciting
   environment
 Increase the sense of achievement for both young people & adults providing the
   opportunity to compete nationally and gain industry recognised coaching
   qualifications
 Give a positive example to young children, providing role models, mentors and
   facilitating the realisation of what they can aim for
 Enable the local community to participate in a sport that few would have access to
   otherwise

Sailing on the Thames, participants have the increased opportunity to learn about the
river, its wildlife and historic past.
                                           Mayor’s Fund Project Proposals - Evelyn
                             Appendix B2 – Ahoy Centre ‘Making Waves in Evelyn’
How will the success of the project be measured?
Evaluation forms for every activity are completed by participants, staff and project
partners
        After the activity we review the evaluation forms received and make an
         assessment of the findings
        We meet and discuss with teachers, groups and individuals involved in order to
         ascertain what positive outcomes have resulted from individuals’ participation in
         the project
        We record volunteer membership
        We keep a record of all sailing and power boating certificates awarded

We complete an evaluation report which includes our findings together with photographs
Budget breakdown for the project: (provide a detailed breakdown of costs)

 Expenditure                                                                      £
 Revenue Costs i.e. fees, room hire, publicity etc
 Sailing Activities - Based on group of 12 young people attending a
 6 day course.
 Instructors x 3 per day (90 per day x 6) = £1,620 per course x 3                     4,860
 Safety Boat Cover (70 per day x 6) = £420 per course x 3                             1,260
 Fuel and Oil (58 per day x 6) = £348 per course x 3                                  1,044
 Management and Admin (30 per day x 6) = £180 per course x 3                            540
 Overheads/Light/heat/etc (26 per day x 6) = £156 per course x 3                        468
 Volunteer expenses to cover, travel, food, whistles, tools and some
 items of clothing (30 per day x 6) = £180 per course x 3                               540
 Log books and certification (10 per person) = £120 x 3                                 360
 Cost per course £3,024 x 3                                                           9,072

 Fun Day2
 Instructors x 2 (90 per day) – 180 x 3                                                540
 Safety Boat Cover (70 per day) – 70 x 3                                               210
 Fuel and Oil (58 per day) – 58 x3                                                     174
 Management and Admin (30 per day) – 30 x 3                                             90
 Overheads/Light/heat/etc (26 per day) – 26 x 3                                         78
 Volunteer expenses (5 x 6) - 30 x 3                                                    90

 Cost (group of 12 per day £394) x3                                                   1,182

 Total Expenditure                                                                10,254
 Income
 Mayors Fund allocation                                                           10,254
 Other Council funding (please specify)

 Other funding (please specify)    Applied for       Confirmed
 -                                 -                 -                                 -
 Total Income                                                                     10,254
                                     Mayor’s Fund Project Proposals - Evelyn
                       Appendix B2 – Ahoy Centre ‘Making Waves in Evelyn’
Project Management Team (details of signatories)

 Name                                      Contact Number           Email address
 Project Manager: Sarah Corcoran           020 8691 7502            sarah@ahoy.org.uk
 Treasurer: Clive Ongley                   020 8691 7502            clive@ahoy.org.uk



Key stages in delivering the project:

 Action                                    Lead                              Deadline
 Funding Approved                          Sarah Corcoran                    Nov 09
 Schools recruited and programmes          Sarah Corcoran                    Dec 09
 confirmed
 Courses Commence                          Sarah Corcoran                    Jan 2010
 Local Assembly update and report          Sarah Corcoran                    April 2010




What impact will the project have on equalities within the ward?

The AHOY Centre believes it is their personal approach and time invested in all it’s’
members that really makes that extra difference to its many activities. Traditionally,
sailing has not been available to those with disabilities, or anyone disadvantaged and
unable to pay club memberships and those suffering from the barriers of social exclusion.
Learning how to sail and becoming part of a club can significantly build self -esteem and
confidence in young people who are vulnerable and isolated in their communities. The
AHOY Centre are currently developing facilities so that any person, no matter what their
disability or ability, will be able to operate a sailing boat.

One of AHOY’s youth volunteers has said ‘At AHOY I do sailing, power boating and help
with the maintenance of the boats, AHOY has changed my life, not only have I not got in
trouble with the law but I have certificates to prove it!’

Sailing is one of the very few sports in which young people and adults can participate on
equal terms, helping to break down social barriers. Your generous support will give
opportunity to those that otherwise may not be able to participate in this type of activity.

What else is happening that may impact on this project?

There are no detrimental impacts locally that will affect this project. However, there is a
positive impact on the community – the young people will be given the opportunity to sign
up as a volunteer after the course and be engaged in activities at the AHOY in the
evenings, on the weekends and in the school holidays. AHOY offers young people an
alternative to crime and the gang culture. There are no other establishments in the area
that has what the AHOY has on offer.


What are the risks with this project?
                                            Mayor’s Fund Project Proposals - Evelyn
                              Appendix B2 – Ahoy Centre ‘Making Waves in Evelyn’
AHOY is a Royal Yachti ng Association (RYA) accredited training centre and holds an
Adventure Activities Licensing Authority license. All courses leading to RYA
qualifications have to be in the presence and under the direction of a RYA Qualified
Instructor, they in turn are assisted by member-volunteers assistant instructors who have
been trained to be either qualified instructors; assistant instructors’ safety boat officers;
competent helms or shore masters, In house shipmate training, First Aid, Day skipper,
VHF radio and rowing. The Instructor ensures that each course is provided with
sufficient qualified personnel to receive the necessary tuition and safety cover. Everyone
regardless of the type of course or activity completes an assessment form. All staff and
volunteers have enhanced CRB checks.

We have the following documentation that is available on request
Full risk assessments
safeguard policy,
CRB checks,
Insurance,
Health and safety policy,
Equal Opportunities policy
Volunteering policies.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?
Education programme - Participants experience the opportunity to escape the classroom
environment and gain knowledge and understanding by participating in a sailing
curriculum course. The course is bespoke to meet the needs of the young people,
depending on their requirements and ensuring sailing can be delivered to those that have
special educational or physical needs. This is an ideal ‘alternative education programme’
which covers all aspects of outdoor and adventure activities. Many National Curriculum
subjects are covered, whilst at the same time emphasising life skills. Courses can be
targeted for the most hard to reach young people. Initial training is undertaken at a dock
on safe water and can be either 12 afternoon sessions or 6 full days – with a River
Induction course delivered at AHOY on the last day. Content of course: health and
safety; introduction to boats; rigging, educational activities; understanding of weather;
local ecology and history; off-site educational visit; principles of sailing and capsize
recovery.

Fun/Taster Day in sailing – The participants get the opportunity to go sailing in Laser
Stratos keels (3-man sailing dinghies) and/or Devon Lugger day sailing vessels, where
they learn to work together as a team to crew the boat. Content of day: health and
safety; rope work; following instructions; learning the names of the different parts of the
boat; steering and tidal work. The aim of the days is for participants to have fun and sign
up as volunteers at The AHOY Centre.

The Plan - We plan to engage 36 young people from Deptford Park, Tidemill Primary
School, St Josephs RC Primary School and Grinling Gibbons Primary school a education
programme during term time and to engage 36 young residents in fun days over the
school holidays from Deptford Adventure Playground, River Side Youth Centre and
Evelyn Community Centre
                                             Mayor’s Fund Project Proposals- Evelyn
                                                Appendix B3 Riverside Youth Club–


Name of Assembly: Evelyn
Project Title: Riverside Youth Club - Steel Pan Band
Project Idea:
Riverside Youth Club will revive the Riverside performing steel pan band, consisting
young people from the area. We need:
     New equipment to expand the band
     Tuition fees to develop new recruits
The project will involve steel pan learning and performing for young people aged 10 – 19
on Saturdays during term times. This project provides the opportunity for young people
wanting to learn to play steel pans and join the band and perform at local fetes, People’s
Day and various public events. The project will be 31.5 weeks in length.
What does the project want to achieve and which of the assembly priorities does it
address?
The project aims to revive the Riverside Steel Pan Band and offer more young people
the chance to attend and learn by holding classes on a Saturday in a safe environment
as many young people are not able to get out on a school week day to attend. Many
young people have informed tutors that they are not able to access the youth club on
school week nights due to varied reasons and would like to come on a Saturday.
The assembly priorities that this meets are:
     not enough youth facilities
     anti-social behaviour

How will the success of the project be measured?
The success of the project will be measured by using Lewisham council’s Quality
Assurance framework (QAF). This measures young people’s attendance, evaluations at
each session, work plans, age and ethnic break downs. It will also be measured by the
increase of young people participating, we anticipate at least 30, and progressing to
become experienced players and participating in live performances.

Budget breakdown for the project: (provide a detailed breakdown of costs)

 Expenditure                                                                      £
 Revenue Costs i.e. fees, room hire, publicity etc
 1 tutor (£19.64) and 1 support worker (£10.60) to deliver pan learning               1,116
 at 2 hour sessions each Saturday in term time (18.5 weeks in total)

 Capital Costs i.e. equipment purchase, building works etc
 Steel pan tuning existing pans                                                         600
 Replacement drum kit                                                                 1,000
 10 custom made pans, stands and pan sticks (440 each)                                4,400
 Total Expenditure                                                                    7,116
 Income
 Mayors Fund allocation                                                               7,116
 Other Council funding (please specify)                                                   0

 Other funding (please specify)    Applied for       Confirmed
          Youth Service                 800                 800                        800
                                             Mayor’s Fund Project Proposals- Evelyn
                                                Appendix B3 Riverside Youth Club–

Total Income                                                                      7,916




Project Management Team (details of signatories)

Name                               Contact Number        Email address
Project Manager: Joan Barker –     0208 692 4611         Joan.barker@lewisham.gov.uk
Riverside Youth Club               07930403798
Treasurer: Lewisham Youth          020 8314 9543         Matthew Lilley
Service

Key stages in delivering the project:

Action                                   Lead                             Deadline
Tune existing pans/drums                 Joan Barker                      Dec 09
Buy new drums/pans & equipment           Joan Barker                      Jan 09
Recruit new players/learners/leaflets    Joan Barker                      Jan 09
Saturday Learn session running           Joan Barker                      Jan 09
Continued Saturday sessions via          Joan Barker                      Sept 2010
Youth Services
Young people performing in public        Riverside Steel Band/ JB         May 2010




What impact will the project have on equalities within the ward?
This project brings all multi-culture groups and people together within the community.
Steel pan band members and learners providing entertainment by performing at local
events, such as People’s Day and local events fetes, open days etc. Steel pan learning is
available to all young people regardless of their race and ability we aim to encourage
young people with autism to participate. The detached youth team will help encourage
participation from those currently disengaged with youth activity.
What else is happening that may impact on this project?
There are a lot of young people looking to do positive things at weekends as most youth
clubs are closed at this time. We hope this will impact positively on young people and
encourage them to come along and join in.

What are the risks with this project?
We do not anticipate any risks with this project. We feel confident that we can encourage
the numbers of young people required to take part in the project. The sessions will be
held in a safe environment along with qualified youth workers and tutors.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?
The project will be delivered by a qualified music tutor and a support worker that
presently teach steel pans at the Riverside Youth Club each Saturday during term time.
                                               Mayor’s Fund Project Proposals- Evelyn
                                                   Appendix B3 Riverside Youth Club–
The steel pan tutor and support worker are highly experienced music teachers in the
local schools who deliver steel pan sessions to the Riverside young people during the
week for the Lewisham Youth Service. The Lewisham Youth Service Riverside Centre
Manager, Joan Barker, will be overseeing the project and supporting the project. Young
people will be recruited via local schools and detached youth team. A lot of young
people have already asked for Steel pans on a Saturday and want to attend.
                                              Mayor’s Fund Project Proposals- Evelyn
                                               Appendix B4 Young Refugees at Risk–


Name of Assembly: Evelyn
Project Title: Young Refugees at Risk
Project Idea:
This project has been developed after the successful Young Refugees Tournament held
on 14 August 2009 at Power League Catford funded by One Lewisham. The partnership
delivering this, the Young Refugees at Risk Project Committee, is led by Somali
Education Development Centre (SEDEC) and has developed a further programme of
activity aimed at engaging 80 young people who will have the opportunity to receive 1.5
hours per week for 7 weeks in: 7 a-side football and coaching sessions; swimming
sessions for young refugee women; and three awareness workshops on health, drug
misuse and employment. The programme is aimed at providing activities for young
refugees and helping to prevent them becoming involved in crime. The programme is
aimed at young people between 9 – 25 yrs old. The following service providers are
involved in delivery: Primary Care Trust; Connexions; and the Lewisham Youth Service.
Young Refugees at Risk Project Committee consists of six young people with
representatives from Somali Education Development Centre (SEDEC). The project is
delivered by SEDEC in partnership with Refugee Employment Education, Training and
Advice (REETA) who will offer the information, advice and guidance programme element.


What does the project want to achieve and which of the assembly priorities does it
address?

The Project will:
   Engage 80 young people at risk identified through Lewisham College, SEDEC and
      REETA
   20 of these will not be in education or employment
   REETA will provide information, advice and guidance to the young people
   Organise and conduct young people -led monthly networking meeting where
      service providers e.g. PCT, Connexions and Lewisham Youth Service will explain
      services they offer
   Three workshops on drug misuse, health and employment
   Reduce the crime and gang culture by creating a positive environment through
      the workshops and meetings to help young people unlock their full potential
   Train young people so they can lead – leadership skills course, coaching for
      those on the committee supported by Voluntary Action Lewisham
   Organise Drug Education projects with – Community Drug Education Lewisham

The project will meet the Evelyn assembly priorities:
    not enough youth facilities
    anti-social behaviour
    drug problems
                                         Mayor’s Fund Project Proposals- Evelyn
                                           Appendix B4 Young Refugees at Risk–
How will the success of the project be measured?

      Records of participants
      Action plans and evidence of progress for 18+ aim for further education or work
       (REETA)
      Photos and videos
      Review the project monthly and produce monthly progress reports
      Annual report and evaluation at the end of the project

Budget breakdown for the project: (provide a detailed breakdown of costs)
Expenditure                                                                        £
Revenue Costs i.e. fees, room hire, publicity etc
1.5hrs per week 7 Side Pitch hire - £75 per week for 20 weeks –                        1,500
Powerleague for 25 participants
1.5hrs per week 7 Side Football Coaching - £60 for 20 weeks                            1,200
Professional Coach fees
2hrs Swimming classes for young refugee women (£50 per week) –                         1,000
Wavelengths – Swimming Tutor and entry fee 16+ for 20 participants
for 20 weeks
materials and refreshments -3 Awareness workshops                                        50
1-day Tournament: at Powerleague
hall hire £400
pitch £300
referee £100
trophies £100
refreshments £100                                                                      1,000
Capital Costs i.e. equipment purchase, building works etc:
Sport equipment for football coaching – set of 10 player kits (balls, shin              300
pads, bibs) and set of 3 coach kits

Total Expenditure                                                                      5,050
Income
Mayors Fund allocation                                                                 5,050
Other Council funding (please specify)

Other funding (please specify)     Applied for       Confirmed
                -                         -                   -                            -

 Total Income                                                                          5,050
Project Management Team (details of signatories)
Name                                     Contact Number           Email address
 Chairman: Ahmed Hassan               020 8692 4448               sedec@hotmail.co.uk
 Treasurer: Abdullah Mohammed         07958 342 954               reetajobs@hotmail.co.uk
 Project Manager: Fuad Mahdi          020 8692 0509               sedec@hotmail.co.uk
Key stages in delivering the project:
Action                                    Lead                               Deadline
Engage 80 young people                    Project Manager and SEDEC          Dec 2010
Recruiting coach and hiring a pitch       Project Manager and SEDEC          Dec 2009
Provide information, advice and           REETA Coordinator                  Feb/Mar 2010
                                                 Mayor’s Fund Project Proposals- Evelyn
                                                  Appendix B4 Young Refugees at Risk–
 guidance and signpost or refer clients
 Organise and conduct young people           Project Manager and youth          Monthly
 led monthly networking meeting and          leaders
 workshops so service providers can
 access the group
 Tournament                                  Project Manager                    May 2010
 Monitor and report progress monthly         Project Manager and SEDEC          Monthly until
 with full evaluation at end of project                                         May 2010



What impact will the project have on equalities within the ward?

      We will provide opportunities to young refugees at risk. It will create an
       environment for role models and also give young people a chance to overcome
       their barriers
      The project will engage all ethnic refugees in Evelyn and we will carry out all the
       steps which we can to increase the participation by a marketing campaign with
       Lewisham College and Powerleague
      The project will make outreach to refugee community centres i.e. SEDEC,
       REETA, Lewisham Refugee Network and Lewisham College
      We will try and engage all refugee football teams
      We will make sure all young refugees have equal access by our promotional
       activities to ensure inclusivity
      We will discuss and review representation at our monthly networking meetings

What else is happening that may impact on this project?
This project will provide guidance to young people at risk so they can find employment,
education or training in a ward where deprivation is significantly higher than the national
average.

This project will reduce gang culture and create role models / help facilitate a brighter
future for young refugees at risk.

This project will for the first time ever in Evelyn’s, give young refugees in the ward a
chance to organise events, chair meetings, get presentation and leadership skills by
working with Voluntary Action Lewisham.

What are the risks with this project?
If some young people find it difficult to travel to Power League Catford (we will consult
first), which has good facilities for football, then we will find a local suitable venue i.e.
Deptford Green and Deptford Park.

All necessary precautions are in place such as CRB checks, health and safety and
insurance can be viewed at our office.
How will this project be delivered and how will individuals / organisations
delivering the project be identified?

      First we will establish contacts with other young refugee groups and recruit young
       people for the programme through refugee communities, Lewisham College,
       Connexions and Lewisham Youth Service.
                                            Mayor’s Fund Project Proposals- Evelyn
                                              Appendix B4 Young Refugees at Risk–
   We will organise professional football coaching sessions and swimming lessons
   All young people aged 16 -25 will receive will receive 1-2 hrs guidance sessions or
    signposting depending on their needs from REETA IAG workers to find out what
    career or training/education they want to some of them will be referred to
    Accredited training such as youth work. Football and basket ball coaching and
    leadership skills.
   Youth at risk youth team leaders will be responsible to keep the register and
    attendance sheet. REETA Coordinator will organise monthly networking events
    and guidance.
   In the networking meeting we will discuss the progress of the project and any
    other business. We will also invite other service provider for presentation
   Somali Education Development Centre (SEDEC) will manage the funds, plus
    monitor and evaluate the project.
                                              Mayor’s Fund Project Proposals- Evelyn
                                           Appendix B5 Saturday Life Skills Academy–

Name of Assembly: Evelyn
Project Title: Saturday Life Skills Academy
Project Idea:

To run a series of accredited life skills workshops for young people on Saturdays over a
10 week period at the Lewington Centre.

These workshops will include courses such as:
      first aid training for young people
      Community Sports leaderships awards

These are course which the young people have requested. Running the sessions on
Saturday will ensure that they get the full benefit of the courses and that it is accessible
to all young people.

The young people will be fully involved in the planning, delivery and evaluation of the
project.

This will be run in partnership with Hornafrik and Millwall Community Scheme and Leap.
The Lead organisation will be London and Quadrant Housing Trust.

Hornafrik is an organisation now based at the Lewington Centre providing advice and
support to East African refugees in Southwark and Lewisham. They also run after school
activities for children and young people. The organisation will support in distributing and
encouraging uses to take part in the programme.

Millwall Community Scheme run community based activities for children and young
people and has agreed to support and run the Community Sports Leadership awards
part of the programme. They will provide the tutors and the resources for this activity.
Funded through the their Positive Futures allocation.

Local Employment Access Project (Leap) is a long established organisation who works
and train young people in outdoor pursuits and skills. They will be delivering the First
aid, life skills course including health and safety.


What does the project want to achieve and which of the assembly priorities does it
address?

      The project aims to achieve a reduction in the numbers of young people loitering
       outside the Lewington Centre particularly at weekends
      The project will also provide young people with positive progression routes and
       accredited outcomes.

The project aims to address assembly priorities more youth facilities and a nti social
behaviour.
                                          Mayor’s Fund Project Proposals- Evelyn
                                       Appendix B5 Saturday Life Skills Academy–
How will the success of the project be measured?

      reduction in the number of complaints from local residents
      number of accredited out comes by young people
      provide young people with useful life skills training
      provide young people with positive progression routes
      youth lead evaluation of the project
      the community will benefit from reduction in anti social behaviour and improved
       family and community cohesion




Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                      £
Revenue Costs i.e. fees, room hire, publicity etc
Tutor fees (£250 per 5 hour session x 10 weeks) - 1 Tutor and 1                      2,500
support worker
Premises hire and caretaking:
Meeting room hire (£15 per hour x 5hrs x10weeks)                                       750
Hall Hire (£30 per hour x 3 hours x 10 weeks)                                          900
Project administrator (£10 per hour x 10hrs per week x 20 weeks)                     2,000
Courses run consecutively over 2 academic terms
Volunteer expenses – 5 Volunteers / session = 25 x 20 sessions                        500
Training material – Work books, handouts and graduation certificates                  350
and graduation event costs

Capital Costs i.e. equipment purchase, building works etc


Total Expenditure                                                                    7,000
Income
Mayors Fund allocation                                                               7,000
Other Council funding (please specify)

Other funding (please specify)        Applied for    Confirmed
See Millwall’s contribution above                    yes                                 0

 Total Income                                                                        7,000
Project Management Team (details of signatories)

Name                                  Contact Number         Email address
Project Manager: Patricia Okonkwo 02073231669                pokonkwo@lqgroup.org.uk
Finance administrator: Michelle   02073231669                mdobson@lqgroup.org.uk
Dobson
                                                Mayor’s Fund Project Proposals- Evelyn
                                             Appendix B5 Saturday Life Skills Academy–
Key stages in delivering the project:

 Action                                      Lead                             Deadline
 Finalise content of sessions with Leap      Patricia and Hornafrik           Nov 09
 organisation (First aid delivery)

 Finalise details of session with Millwall   Patricia and Hornafrik           Nov 09
 Community Scheme
 Recruit project administrator               Patricia and Hornafrik           Nov 09

 Meet with local key stakeholders            Patricia                         Nov 09
 (young people, Hornafrik, Catch 22,
 under 5’s)
 Agree and prepare publicity                 Patricia and administrator       Nov 09
 Meet with volunteers to discuss role        Patricia and administrator       Nov 09
 and distribution of publicity
 Delivery of sessions                                                         Jan – Jul 10

What impact will the project have on equalities within the ward?

      The project will target both boys a nd girls within the Evelyn Ward
      The activities are gender friendly and will boost self esteem and confidence of all
       young people taking part

What else is happening that may impact on this project?

The Lewington Centre already hosts evening, weekday youth provision, an under 5’s
club and day time IT and exercise courses. These Saturday activities will e nhance and
help promote current activities at the Centre and support a growing demand from young
people and their families of things to do.

What are the risks with this project?

       Dealing with high demand for the activities with limited spaces for each course.-
        this will be managed on a registration (first come first served)
      relying on volunteers for the distribution of leaflets (L&Q will also use their leaflet
        distributor)
      recruitment of a local administrator for the project (Can recruit from Catch 22, who
        have a pool of youth workers who are CRB checked)
(all these risks need statement to mitigate against)
Leap and Millwall are fully insured to deliver these programmes, will forward copies of the
risk assessments.

All staff and volunteers are (or will be) CRB checked by L&Q or the lead organisations
(Millwall or Leap).
How will this project be delivered and how will individuals /organisations
delivering the project be identified?

      Young people’s views will be taken into account by working with the Centre Youth
       Forum and using feedback via questionnaires after each session
      Many of the young people are already known to the Centre
                                             Mayor’s Fund Project Proposals- Evelyn
                                          Appendix B5 Saturday Life Skills Academy–
   Leaflets will be distributed around local estates, local youth clubs, libraries and in
    schools to ensure that all potential users are informed
   Millwall Community Scheme is the social community side of the football club.
    They have a long established history of working within the community delivering
    sports and social skills activities, many with accreditation.
   Leap is a long established outward bound Lewisham based organisation. They
    are experienced in working with and delivering training to young people. They will
    be providing the first aid element to the project
   The project is managed by London and Quadrant.
                                               Mayor’s Fund Project Proposals- Evelyn
                                                Appendix B6 Deptford Family Project–

Name of Assembly: Evelyn
Project Title: Deptford Family Project
Project Idea:
This is a family focused project with the following aims:
    to raise awareness of cardio-vascular disease (CVD) and raise awareness of the
        importance of a healthy life style among the local community.
    To give updated information on the importance of health and well-being related
        issues
    to encourage participation from parents and children from disadvantaged and
        ‘hard to reach’ communities (asylum seekers, refugees and migrants) who are
        highly isolated in Evelyn ward, due to language, culture barriers and lack of
        confidence and self esteem
    to encourage refugees to participate in a variety of activities such as keep fit
        sessions, nutrition classes and coffee mornings
    to raise awareness of depression, diabetes, and childhood obesity
The project will deliver these aims through a series of social events including: coffee
morning every Wednesday from 10 – 12pm; Yoga (2 class morning and afternoon to
encourage more people to participate) every Thursday from 10 11 and afternoon class
2pm -3pm; Nutrition class every Friday from 11am – 1pm.

What does the project want to achieve and which of the assembly priorities does it
address?
By early intervention and awareness-raising, we will improve mental health and well
being in the community. Other health outcomes we want to achieve will be a reduction in
premature death from CVD, a reduction of other diseases like diabetes. We will also
improve the lifestyle around health of the local community, and seek to have a positive
effect on the incidences of childhood obesity.

We will reduce problems of mental health like depression in the community. The
objectives will be achieved through outreach work in the community and weekly
sessions.

The project will meet the Assembly objectives of tackling anti-social behaviour by
bringing parents and children together in fun activities like cooking, games and sports.
The more understanding between parents and children the less likely there will be anti -
social behaviour from the children. We also aim to empower the parents through
activities like exercise classes and healthy lifestyle classes, and parenting classes so that
they can find effective and strategic ways of tackling anti-social behaviour in their
children. The biggest reason for anti-social behaviour is parents not being able to
communicate properly with their children.

We will reach groups through outreach groups using community activists, and through
places where parents and children go like schools and community centres. We will also
advertise in libraries, community centres and doctor’s surgeries.
We hope to have 200 participants. The age group will be teenagers 13 – 19 years and
their parents 25 – 50 years.

The project helps to meet the following Evelyn assembly priorities:
    not enough youth facilities
    antisocial behaviour
                                                Mayor’s Fund Project Proposals- Evelyn
                                                 Appendix B6 Deptford Family Project–
How will the success of the project be measured?
The project will be measured by recording statistics of those attending on age, gender,
nationality, disability. To measure the success we will ask all participants to fill in a form
with details of the age, ethnicity, and mental and physical health. They will then be given
another form at the end of the project with additional questions regarding the
improvement to their mental and physical well-being since doing the project activities.
We will do a survey to assess impact of the project and the extent to whic h it helped
empower them as parents. We will fill in the questionnaire with staff (and interpreters if
necessary) face-to-face.

Budget breakdown for the project: (provide a detailed breakdown of costs)

 Expenditure                                                                          £
 Revenue Costs i.e. fees, room hire, publicity etc
 Project Manager - £30 ph x 5 hrs per week x 10 weeks –                                   1,500
 Duties include administration, advertising the project, capacity building,
 identifying target group, managing sessions and activities
 Nutrition Tutor (cooking) - £30 ph x 2hr x 10 weeks = £600                                600
 Yoga Tutor - £30 ph x 2hr x 10 weeks = £600 – There will be 20 people                     600
 per class.
 2 Crèche workers - £9.50 ph x 2 x 4hrs x 10 wk= £800                                      760
 Venue hire - £15 ph x 5hrs x 10wks= £750                                                  750
 Ingredients for the nutrition class: £70 x 10wk= £700 . There will be 10                  500
 people per class
 Publicity/admin                                                                           150
 Coffee morning provisions                                                                 140
 Capital Costs i.e. equipment purchase, building works etc


 Total Expenditure                                                                        5,000
 Income
 Mayors Fund allocation                                                                   5,000
 Other Council funding (please specify)

 Other funding (please specify) Applied for    Confirmed
                 -                     -                -                                     -
 Total Income                                                                             5,000
Project Management Team (details of signatories)

 Name                                     Contact Number         Email address
 Project Manager: Amina Ismail            07947824321            aminaismail@yahoo.co.uk
 Treasurer: Bongiwe Mgabi                 07932369285            Mga892@aol.com.uk


Key stages in delivering the project:

 Action                                     Lead                              Deadline
 Identifying client group and devising      Project Manager                   Oct/Nov 2009
 ways of reaching and attracting client
                                               Mayor’s Fund Project Proposals- Evelyn
                                                Appendix B6 Deptford Family Project–
 group
 Securing premises to run project          Project Manager                   Oct 2009
 Compiling programmes of activities        Project Manager                   Oct 2009
 Recruiting tutors/drawing up job          Project Manager/treasurer         Oct 2009
 contracts
 Advertise the project                     Project Manager/volunteers        Nov
 Project delivery                          Project Manager/volunteers        Jan-Mar
 Monitor / evaluate the project            Project Manager/treasurer         Apr-May

What impact will the project have on equalities within the ward?

The project could have a significant impact on the health inequalities in the area. It will
particularly impact on families on unemployment benefit or low income as they suffer a
higher proportion of health inequalities. The health of women and children from refugee
communities will particularly benefit.

What else is happening that may impact on this project?

At the moment there is a gap in the market for this kind of project in the Evelyn ward.
There was a healthy lifestyle project at Lewisham Refugee Network but that has finished.
There are no nutrition /cooking programmes in the area.

What are the risks with this project?

The risks are that we will not be able to reach enough of our client group. We aim to
mitigate against this by working in partnership with Lewisham Refugee Network,
Children’s Centre, Evelyn Community Centres and Community Action 2000. Each
partner will undertake to recruit a certain number of participants.

There is also a risk of clients losing interest if the project does not meet their needs. We
will have regular discussions with clients for their feedback of the project. If they are
unhappy with any aspect of it we will work to change it. We will also look at other funding
to ensure the long term sustainability of the project.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?

This project will run 3-days a week There will be a 2-hour yoga session and a 2-hour
cooking session with qualified tutors and crèche provision. There will be a coffee morning
with parents and children together. We intend to deliver classes both practically and
theoretically with hand outs and debates on the progress of the work

The project will recruit people in the community to run the project. They will have a track
record of delivering successful projects at a local level.

Medical professionals will not be involved as we have not been registered by the
Healthcare Commission to provide medical care. We will however, refer participants on if
necessary.
Deptford family project will manage the project.
                                          Mayor’s Fund Project Proposals- Ladywell
                                Appendix C1 Hilly Fields Community Bowling Green–

Name of Assembly: Ladywell
Project Title: Hilly Fields (Francis Drake) Community Bowling Green
Project Idea: To install a modern irrigation system to rejuvenate the playing surface. The
area of the green is approximately 1,200 metres and is currently watered by the use of
hoses, which is very labour and time intensive and does not deliver sufficient water to the
green. The system is designed to give maximum coverage with minimum levels of water
required to keep the green, green. Computerised operation allows for maximum
absorption and minimum evaporation by sprinkling after daylight hours. The system
automatically shuts down should there have been rain.

The club currently has around 70 users and is actively seeking to increase this number
by 30 (including attracting young people) during 2010.


What does the project want to achieve and which of the assembly priorities does it
address?
(1) Continuation of a community sporting facility which has been in existence since 1906.
(2) To return the green to an acceptable standard for County and National level
competitions.
(3) To be able to continue offering free coaching to the local community. Francis Drake
is the only local bowls club which offers the opportunity to learn from Bowls England
qualified coaches.
(4) Encouraging more people to benefit from the facility, parts of which have become
unusable. Potentially this facility is available to every resident from the local community.
(5) We are in contact with local schools and youth organisations to introduce pupils and
young people to bowls as a sporting activity. This could help reduce anti-social
behaviour and address the lack of youth and community facilities, both of which are key
priorities for Ladywell
The project helps address the following key priorities for Ladywell:
      streetscape and environment
      lack of youth and community facilities
and may further help to address the followi ng priority:
      anti-social behaviour and crime

How will the success of the project be measured?
Lewisham Council are currently engaged in a major bowls promotion with Sport England.
It is planned to get hundreds of new people bowling. This project, which will result in
increased use of the green on a daily basis, will be closely monitored. Bowls is an
accredited part of the Government Health Scheme. Under the project hundreds of
elderly/retired people will be encouraged to become more active, while at t he same time
enjoying the social side of bowls.
                                       Mayor’s Fund Project Proposals- Ladywell
                           Appendix C1 Hilly Fields Community Bowling Green–
Budget breakdown for the project: (provide a detailed breakdown of costs)

 Expenditure                                                                      £
 Revenue Costs i.e. fees, room hire, publicity etc

 Capital Costs i.e. equipment purchase, building works etc
 Purchase and installation of irrigation system                                       7,019

 Total Expenditure                                                                    7,019
 Income
 Mayors Fund allocation                                                               7,019
 Other Council funding (please specify)

 Other funding (please specify)     Applied for      Confirmed



 Total Income                                                                         7,019




Project Management Team (details of signatories)

 Name                                   Contact Number        Email address
 Project Manager: Michael Singer        020 8291 9243         m.singer542@btinternet.com
 Treasurer: Tim Deacon                  020 8692 3479         isthisthehill@hotmail.co.uk




Key stages in delivering the project:

 Action                                   Lead                             Deadline
 Securing funding                         Local Assemblies Team            Nov 09
 Installation begin                       Michael Singer                   Jan/Feb 10
 Installation complete                    Michael Singer                   Jan/Feb 10

What impact will the project have on equalities within the ward?
Unlike many sports bowls encourages people to socialise and exercise together
regardless of age, gender, sexuality, cultural background, race, or socio economic status.
Francis Drake attend the Brockley Max Festival to promote the club and had a stall. The
club will continue this outreach work.

What else is happening that may impact on this project?
The club provides refreshments at the Hillyfields Fun Run and will to continue to raise the
profile of the club at this event.
                                           Mayor’s Fund Project Proposals- Ladywell
                                 Appendix C1 Hilly Fields Community Bowling Green–

What are the risks with this project?
No risks are identified with the installation of this irrigation system.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?
A specialist contractor (City Irrigation) will be engaged to install the irrigation system. The
contractor has history of installing similar systems at other bowls clubs.
                                            Mayor’s Fund Project Proposals- Ladywell
                                                          Appendix C2 Youth Village

Name of Assembly: Ladywell

Project Title: Youth Village
Project Idea:

Involving 3 wards to work together to address the issue of lack of youth provision as all
three have youth as a priority. The Youth Village will have provisions running for young
people from the age of 5-19 and up to 25 years old if they have learning difficulties and/or
disabilities. Once this is running it would bring in various other opportunities for young
people within the wards.

What does the project want to achieve and which of the assembly priorities does it
address?

Location:

The project will operate from the Ladywell Centre, St Mary’s Centre and the forthcoming
adventure playground.

Aim:
To provide young people aged between 13-25 with a safe environment, where they could
come in and enjoy education, social and recreational activities. All activities will have
recorded and/or accredited outcomes.

Objectives:
The education will be completed through workshops and informal discussions. The topic
will be initially on Drugs, sexual relationship education (SRE), Healthy Living, arts &
crafts, sports etc as these issues influence their lives daily.

The recreational activities will be undertaken through the youth club programme, skate
boarding, utilising Ladywell centre to do multi sports, performing a rts (as they have an
indoor space) activities that include club based activities such as Pool, Table Tennis,
board games etc.

The Social element is covered through the events, outings, residential trips, holiday
programmes etc. It will also include a chill out zone where young people can socialise,
relax and talk.

The young people will have a youth forum that ensures the Quality of work is maintained
and the activities are matched to what they would like to see happening.

The project will be ensure that all 5 Every Child Matters outcome are covered.

Funding:
Please see the start up cost, this is an estimate only. There is a need to organise a
management committee comprising from the 3 wards which includes young people from
these wards. This group will ensure with the support of the youth service to raise funds
from external funding sources to sustain future work.

Partners:
       Local community: Management Committee (made up from each assembly
                                            Mayor’s Fund Project Proposals- Ladywell
                                                          Appendix C2 Youth Village
         group),
        Lewisham Youth Services and Adventure Playground,
        Venue Providers: Ladywell Centre, St Mary's Centre, Adventure playground and
         Skate boarding place
        Ladywell, Lewisham Central and Rushey Green wards together with Lewisham
         Youth Service.

Value for Money:
The project demonstrates value for money as it will ensure it can get young people away
from negative activities, to getting involved in positive activities. It will ensure young
people’s voices are heard and acted upon by getting young people to take part in positive
activities and ensure anti-social behaviour is reduced. As the premises will be able to
host multi agency work it will attract more resource to the area.

Proposed time and days of opening:
If all parties contribute to the proposed finance we can have the venues opened on
separate nights this will allow opening for 3 nights a week. 1 nights in each place
including Saturday.

Additional support:
Young people will have additional support as we can make the adventure playground into
a satellite point where there will be different agencies coming in on separate night to do
workshops and/or run one to one support sessions, i.e., drugs, SRE, Education
Employment and Training (EET), Advice Information and Guidance (AIG), Connexions to
develop work experience placements for Not in Education Employment or Training
access services.

In the long term this will also draw in young people from all three wards and build
community cohesion. It will also help reduce the issues of territorial warfare and gang
issues which are becoming an increasing issue in the borough.

The project addresses the youth priorities for Ladywell assembly.

How will the success of the project be measured?

Success
All activities will be selected by young people and all young people will receive
certificates (recorded certificates for all young people who take part in activities and
accredited certificates for all young people who take part in activities where accreditation
can be achieved through AQA’s qualifications, Duke of Edinburgh Award, Arts and
Crafts, SRE, Drugs, Community safety, Asdan)

Each year we will hold an awards evening to celebrate the success thank all the young
people, volunteers and staff to motivate them. During this time certificates will be
presented to the young people and volunteers.
                                       Mayor’s Fund Project Proposals- Ladywell
                                                       Appendix C2 Youth Village
Budget breakdown for the project: (provide a detailed breakdown of costs)*

Expenditure                                                                     £
Revenue Costs i.e. fees, room hire, publicity etc
-Staff                                                                             23,725
-Premises                                                                           5,590
-Admin and others                                                                     500
-Activities                                                                         2,000
-Adventure running cost including staff                                            85,000

Capital Costs
-Equipments                                                                          785

Total Expenditure                                                              117,600
Income
Mayors Fund allocation                                                             10,000
Other Council funding – Lewisham Youth Service Adventure                           87,600
Playground (Confirmed)

Other funding (please specify)     Applied for      Confirmed
Rushey Green                       10,000           10,000 (Awaiting               10,000
                                                    Mayor’s Approval)
Lewisham Central                   10,000           10,000 (Awaiting               10,000
                                                    Mayor’s Approval)
Total Income                                                                   117,600


Project Management Team (details of signatories)

Name                       Contact Number        Email address
Project Manager:           077930 637 169        Muhammad.rahmani@lewisham.gov.uk
Muhammad Rahmani           0208 314 9545
Treasurer: Lewisham        Lewisham Youth        Lewisham Youth Service
Youth Services             Service


Key stages in delivering the project:

Action                                   Lead                             Deadline
Initial engagement of young people       Youth Worker In Charge           Nov 09
                                         Muhammad Rahmani
On Going Hire of Venue                   Muhammad Rahmani                 Dec 09
Start up costing                         Muhammad Rahmani                 complete
Purchase of equipment                    Muhammad Rahmani                 Dec 09
                                         Youth worker in charge
Risk Assessment                          Muhammad Rahmani                 On Going
Recruitment of Staff                     Muhammad Rahmani                 Dec 09

What impact will the project have on equalities within the ward?
                                            Mayor’s Fund Project Proposals- Ladywell
                                                             Appendix C2 Youth Village
Our project has an open access policy and we ensure that all the young people feel
welcome regardless of their race, gender, ethnicity, sexuality etc and encourage to
participate in the full programme. To ensure we implement Lewisham Council’s policy at
all time we display various posters and leaflets representing diversity. We also ensure
staff are able to challenge and re-address Lewisham’s equal opportunities policy. We
will make group rules with young people and also displayed it on the wall so all young
people can remind themselves of it.

We will also ensure access for disabled young people is created in all centres.

What else is happening that may impact on this project?

The monitoring and evaluating of the project will be done as following:

We will have a written evaluation from staff
We will have a verbal and written evaluation from young people
This will be done through our youth service existing Quality Assurance Framework (QAF)
form to ensure high standard is maintained

Daily briefing and de –briefing of staff will take place to ensure staff are fully aware of
their responsibilities for the day.

Through the signing in sheet we will be able to draw out the number of young people
attending including the record of age, ethnicity, gender etc.

Regular meeting with staff will ensure quality of work and deal with any outstanding
issues including any change to programme to make it affective. The young people of the
programme will also be represented at these meeting to ensure that their views are fully
considered.

There will be a Senior Youth & Community Worker in place to ensure all the QAF is
completed and the smooth running of the summer programme, also all staff will be
trained adequately on relevant issues. Also all staff will be recruited through the formal
process and have all the relevant checks.

There will be a strict health and safety controls in place which is monitored by Lewisham
Youth Services’ management this includes registration of all young people.

What are the risks with this project?

The sustainability of the project will be a challenge as it would require large amount of
money each year, but this will be dealt with through the management committee who will
receive full support for future fund raising.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?

Managed Appropriately
The project is delivered by Lewisham Youth Service. All activities will be risk assessed by
staff and by the venue young people will be visiting. All forms of health and safety comply
with Lewisham Youth Service Health and safety. Polices. All venues are asked to send
copies of their health and safety polices, risk assessments and public liability insurance.
                                            Mayor’s Fund Project Proposals- Ladywell
                                                            Appendix C2 Youth Village
Also followed through talks and equipment checks, public liability insurance to ensure
young people are not at risk.
Such workshops as community safety and voluntary services from community police
officers will insure and educate the young people on how to stay safe.

Delivery staff on the project will attend child protection training / safeguarding young
people training and will raise child protection concerns if necessary. All staff and
volunteers working will all have had an enhanced Criminal records bureau (CRB) check,
which the Youth worker in Charge will take copies of. All young people will receive a
health and safety induction which will include emergency evacuation procedures,
meeting points and reporting an accident or incident.
                                          Mayor’s Fund Project Proposals- Ladywell
                                                        Appendix C3 Mural Project

Name of Assembly: Ladywell ward
Project Title: Get The Message Murals Project
Project Idea:
To engage 30 young people in the process consulting, designing and painting murals as
part of a team using aerosol paint. It will include 30 hours of evidenced group work
covering:
         How and why the general public view graffiti the way they do.
         When and where is the use of aerosol paint acceptable?
         Is it the medium or the end product that people respond to?
The project is delivered by the Lewisham Youth Service and a site to display the finished
product. Participants have the opportunity to get an accredited qualification.

What does the project want to achieve and which of the assembly priorities does it
address?
       Change and develop participants and the public’s view on how aerosol paint can
        be used creatively and positively.
       Engage local young people in producing community art.
       At least two of the every child matters outcomes, Enjoy & Achieve and Make a
        Positive Contribution.

How will the success of the project be measured?
Participants would have:
        Practiced and developed aerosol painting techniques working as a group.
        Acquired an accredited Arts Award.
        Been involvement in producing a piece of public art
The public response to the artwork will be measured via the local assembly.
                                       Mayor’s Fund Project Proposals- Ladywell
                                                       Appendix C3 Mural Project
Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                    £
Revenue Costs i.e. fees, room hire, publicity etc
Staffing                                          £35 x 35 = 1,225 x 3             3,675
Arts Award                                                   £18 x 30                540
Art Materials                                                                        750

Capital Costs i.e. equipment purchase, building works etc

Total Expenditure                                                                  4,965
Income
Mayors Fund allocation                                                             4,965
Other Council funding (please specify)

Other funding (please specify)      Applied for    Confirmed
-                                   -              -

Total Income                                                                       4,965




Project Management Team (details of signatories)

Name                                 Contact Number      Email address
Project Manager: Mark Davis          020 83148011        mark.davis@lewisham.gov.uk
                                     07932 605201
Treasurer: Lewisham Youth            Lewisham Youth      Lewisham Youth Service
Service                              Service



Key stages in delivering the project:

Action                                    Lead                           Deadline
Liaise with assembly to establish         Mark Davis                     Feb 10
mural
Publicise locals youth projects           Mark Davis                     Feb/Mar 10
Consultation and design                   Mark Davis                     Mar 10
Delivery of workshops                     Mark Davis                     Mar 10
Project completion                        Mark Davis                     May10
                                            Mayor’s Fund Project Proposals- Ladywell
                                                             Appendix C3 Mural Project
What impact will the project have on equalities within the ward?
The project is aimed at young people (age 13-19) from all backgrounds and ethnic
groups. If possible, partnership work with Brighter Futures (Lewisham Homes &
Lewisham Youth Service) will engage less economically well off young people based on
estates. The project may involve working with some young offenders. Both girls and boys
will be invited to join the project.

What else is happening that may impact on this project?
Brighter Futures might be functioning in southern part of borough. As the youth service
has worked with the Brighter Futures on four occasions in the north of the borough if the
timing is right we could work in partnership with them to capitalise on their work in
estates in the ward to refer young people onto the project.

What are the risks with this project?
Participants stealing paint and using them illegally. Adequate staffing per young person
will help mitigate against this. The workers will reinforce positive messages around
appropriate behaviours from young people on the project. Should not enough young
people from the ward be recruited onto the project, a reserve list will be able to able to
‘top up’ numbers.

How will this project be delivered and how will individuals / organisations
delivering the project be identified?
Via the local youth projects, School and local housing providers.
The Youth Service area co-ordinator and project worker will coordinate and deliver the
project.
                                            Mayor’s Fund Project Proposals- Ladywell
                                              Appendix C4 Making Waves in Ladywell

Name of Assembly: Ladywell
Project Title: Making Waves in Ladywell
Project Idea:
The Aim:
Funding is required to work with young people that are at risk of offending and/or are
involved in the local gang culture – AHOY and Ladywell SNT will identify 7 young people
(aged 15 to 21) and engage them in an activity at AHOY, giving them an alternative to
being on the streets and partaking in things that may lead them into crime. We want to
give them the opportunity to get involved in a community activity, by participating in a
Powerboat Course (over 3 days) on the river Thames, enabling them to gain a Nationally
Recognised Qualification. They will do the course with 2 SNT officers with the aim to
break down any social barriers, while giving the young people a positive activity to do
with the police

Also we would like to offer the two youth clubs in the ward the opportunity to come along
to AHOY for a Taster day to experience what we have to offer.

At the end of the powerboat course and the taster days the young people will be given
the opportunity to sign up as volunteers at The AHOY Centre. Volunteering at the AHOY
will engage the young people in the evening, weekends and school holidays, in a active
way; at the same time emphasising life skills, team work and building on confidence.

What does the project want to achieve and which of the assembly priorities does it
address?
Funding is required to contribute to improve the facilities for young people in the Ladywell
ward by providing holiday activities for young people from the Ladywell Ward.
The experience AHOY provides disadvantaged and disabled people is not just over the
few days they attend a course – it goes a long way; involving them in their local
community by becoming part of an established sailing centre. This inclusion provides a
long-lasting contribution to the community as a whole. Through these activities and
courses the benefits include:
 Enabling self-development by imparting a sense of achievement, responsibility and
    teamwork.
 The opportunity for all sections of the community to become involved in water sports
    and it’s social aspects by offering support and skill, increasing the sense of
    community spirit.
 Allowing youths to utilise sailing skills to participate in schemes such as the Duke of
    Edinburgh and Youth Achievement Awards
 Increase health awareness and fitness.
 Through focusing the mind and providing a channel for energy for all participants
    within an exciting environment.
 Increase the sense of achievement for both youths & adults in providing the
    opportunity to compete nationally and gain industry recognised coaching
    qualifications.
 Giving a positive example to young children, providing role models, mentors and
    facilitating realisation of what they can aim for.
 Enabling the local community to participate in a sport that few would have access to
    otherwise.
Sailing on the Thames, participants have the increased opportunity to learn about the
river, its wildlife and historic past
                                             Mayor’s Fund Project Proposals- Ladywell
                                                Appendix C4 Making Waves in Ladywell
How will the success of the project be measured?
Evaluation forms for every activity are completed by participants, staff and project
partners
      After the activity we review the evaluation forms received and make an
assessment of the findings.
      We meet and discuss with teachers, groups and individuals involved in order to
ascertain what positive outcomes have resulted from individuals’ participation in the
project.
      We record volunteer membership.
      We keep a record of all sailing and power boating certificates awarded.

We complete an evaluation report which includes our findings together with photographs
Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                   £
Revenue Costs i.e. fees, room hire, publicity etc
Revenue Costs i.e. fees, room hire, publicity etc

RYA Power Boat Level 2 course (250 per person) x10                                2,250
Fun Days and Presentation (Group of 12 x 3 days)                                  1,144




Total Expenditure                                                                 3,394
Revenue Costs i.e. fees, room hire, publicity etc

Income
Mayors Fund allocation
Other Council funding (please specify)

Other funding (please specify)     Applied for      Confirmed
-                                  -                -
Total Income                                                                      3,394
                                      Mayor’s Fund Project Proposals- Ladywell
                                        Appendix C4 Making Waves in Ladywell
Project Management Team (details of signatories)

 Name                                      Contact Number           Email address
 Project Manager: Sarah Corcoran           020 8691 7502            sarakh@ahoy.org.
 Treasurer: Clive Ongley                   020 8691 7502            clive@ahoy.org.uk



Key stages in delivering the project:

 Action                                    Lead                              Deadline
 Funding Approved                          Sarah Corcoran                    Nov 09
 Young People recruited and                Sarah Corcoran                    Nov 09
 programmes confirmed
 Courses Commence                          Sarah Corcoran                    Jan 10
 Local Assembly update and report          Sarah Corcoran                    April 10

What impact will the project have on equalities within the ward?

The AHOY Centre believes it is their personal approach and time invested in all its’
members that really makes that extra difference to its many activities. Traditionally,
sailing has not been available to those with disabilities, or anyone disadvantaged and
unable to pay club memberships and those suffering from the barriers of social exclusion.
Please do refer to the appendix attached for more detailed research carried out by The
AHOY Centre.

Learning how to sail and becoming part of a club can significantly build self -esteem and
confidence in young people who are vulnerable and isolated in their communities. The
AHOY Centre are currently developing facilities so that any person, no matter what their
disability or ability, will be able to operate a sailing boat.

One of AHOY’s youth volunteers has said ‘ At AHOY I do sailing, power boating and
help with the maintenance of the boats, AHOY has changed my life, not only have I not
got in trouble with the law but I have certificates to prove it!’

Please refer to a police report from 2005 that is an example representing what the AHOY
offers and I have also enclosed a case study which shows an example of how The AHOY
Centre has changed one young person’s life.

Sailing is one of the very few sports in which young people and adults ca n participate on
equal terms, helping to break down social barriers. Your generous support will give
opportunity to those that otherwise may not be able to participate in this type of activity,
because it has to be said;
‘Sometime to be given a chance is all that some one needs.

What else is happening that may impact on this project?
There are no any detrimental impacts locally that will affect this project. However, there is
a positive impact on the community – the young people will be given the opportunity to
sign up as a volunteer after the course and be engaged in activities at the AHOY in the
evenings, on the weekends and in the school holidays. AHOY offers young people an
alternative to crime and the gang culture. There are no other establishments in the area
                                            Mayor’s Fund Project Proposals- Ladywell
                                              Appendix C4 Making Waves in Ladywell
that has what the AHOY has on offer.


What are the risks with this project?
AHOY is a Royal Yachting Association (RYA) accredited training centre and holds an
Adventure Activities Licensing Authority license. All courses leading to RYA qualifi cations
have to be in the presence and under the direction of a RYA Qualified Instructor, they in
turn are assisted by member-volunteers assistant instructors who have been trained to
be either qualified instructors; assistant instructors’ safety boat officers; competent helms
or shore masters, In house shipmate training, First Aid, Day skipper, VHF radio and
rowing. The Instructor ensures that each course is provided with sufficient qualified
personnel to receive the necessary tuition and safety cover. Everyone regardless of the
type of course or activity completes an assessment form. All staff and volunteers have
enhanced CRB checks.

We have the following documentation that is available on request
Full risk assessments
safeguard policy,
CRB checks,
Insurance,
Health and safety policy,
Equal Opportunities policy
Volunteering policies.
How will this project be delivered and how will individuals /organisations
delivering the project be identified?
The Programme:
         RYA Power Boat Level 1 (National Recognised Qualification) To provide a
          practical introduction to boat handling and safety in power boats. The course
          may be conducted in a variety of boat types, both planning and displacement,
          and the certificate issued will be endorsed to show the type(s) of boat in which
          the training took place. The ratio of students to instructors is 3:1. Content of
          day: Launching and preparing the boat, basic boat handling and returning to
          shore, background theory. Ability after day: Able to drive under supervision.

        RYA Power Boat Level 2 (National Recognised Qualification) To teach
         boat handling and seamanship in power boats. The course may be conducted
         in a variety of boat types, both planning and displacement, and the certificate
         issued will be endorsed to show the type(s) of boat in which the training took
         place. The ratio of students to instructors is 3:1. Content of day: self-sufficient
         power boating at a basic level includes launching, mooring, anchoring and
         recovery, plus all the boat driving skills required for basic competence in a
         power boat. Ability after day: Self-sufficient power boat in the right conditions:
         aware of own limitations and those of craft.

Fun/Taster Day in sailing – The participants get the opportunity to go sailing in Laser
Stratos keels (3-man sailing dinghies) and/or Devon Lugger day sailing vessels, where
they learn to work together as a team to crew the boat. Content of day: health and
safety, rope work, following instructions, learning the names of the different parts of the
boat, steering and tidal work. The aim of the days is for participants to have fun and sign
up as volunteers at The AHOY Centre.
                                            Mayor’s Fund Project Proposals- Ladywell
                                                               Appendix C5 AlertBox

Name of Assembly: Ladywell
Project Title: AlertBox Scheme – Ladywell Village

Project Idea: To purchase 25 AlertBox boxes and supply to retailers within Ladywell
Village as part of a Business Watch scheme. The traders will then be fully trained on how
to use the AlertBoxes along with the Safer Neighbourhood Team who will be further
trained in analysing crime data from the AlertBoxes. Traders within networked
communities can communicate instantly when personal safety issues or crime is a
concern. Each device contains the name, address and telephone number of the business
that it is located. When the warning or help button is pressed, the network is made aware
of the issue, the location and the person who originated the message. Essentially it is a
form of electronic neighbourhood watch to counter the effects of low-level crime and anti-
social behaviour. The presence of an AlertBox network creates a better flow of
information to community safety partnerships and safer neighbourhood teams due to
"witness power" which in turn promotes community engagement and a more effective
use of police resources.

What does the project want to achieve and which of the assembly priorities does it
address?
The scheme will help retailers to reduce levels of crime and anti-social behaviour within
their premises, it will also enable shops to work together to reduce crime and the fear of
crime by sharing information and assisting other businesses participating in the scheme
(see above). There are now numerous AlertBox schemes operating nationwide including
several in Lewisham.
The project helps address the following Ladywell assembly priorities:
     local shops
     anti-social behaviour and crime

How will the success of the project be measured?
  1. Creation of a Business Watch Scheme – This is similar to a neighbourhood watch
     and will bring businesses together so that they can work with other businesses to
     reduce crime by supporting each other.
  2. Increase in crime detections – The scheme will enable a problem / potential
     problem to be identified at initiation, the activation of the AlertBox will ensure that
     more potential witnesses see the incident that police are aware earlier.
  3. Better intelligence to the local Safer Neighbourhood Team – All data from the
     AlertBox can be analysed thus allowing the police to review crime patterns and
     locations of incidents.
  4. Reduction in anti-social behaviour both within and outside Lad ywell village shops
     – The issue of an AlertBox is a good deterrent as the retailer is no longer alone.
     By pressing a single button they can have the support of all the other businesses
     on the network.
                                       Mayor’s Fund Project Proposals- Ladywell
                                                           Appendix C5 AlertBox
Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                   £



Capital Costs i.e. equipment purchase, building works etc
25 AlertBoxes at £268.16 each                                                     6,704
Alert box operation laptop                                                          342
3G Internet connections                                                             176

Total Expenditure                                                                 7,222
Income
Mayors Fund allocation                                                            7,222
Other Council funding (please specify)
None
Other funding (please specify)   Applied for       Confirmed
-                                -                 -                                  -
Total Income                                                                      7,222




Project Management Team (details of signatories)

Name                              Contact Number      Email address
Project Manager: David Hawtin     020 8721 2484       David.hawtin@met.pnn.police.uk
(Metropolitan Police Sergeant
Ladywell Safer Neighbourhood
Team)

Key stages in delivering the project:

Action                                  Lead                           Deadline
 Delivery and installation of AlertBoxes Safer Neighbourhood Team         Jan 09
 to Safer Neighbourhood Team and
 training in how to use them including
 programming.
 Installation of AlertBoxes at shops and Safer Neighbourhood Team         Jan/Feb 09
 training of shop staff.
What impact will the project have on equalities within the ward?
The new AlertBox scheme will promote a sense of community between businesses in the
town centre, allowing them to work closer together and support each other. It is
envisaged that the scheme will promote closer partnership working between businesses
beyond just crime, in other issues that are important to them.
The scheme will also benefit shoppers, local residents and passers -by through reduced
crime and sense of crime. In this way the impact will hopefully promote confidence in
                                            Mayor’s Fund Project Proposals- Ladywell
                                                                Appendix C5 AlertBox
people using the shops and passing through the area, particularly single women, older
people, those using the area at night, and some ethnic groups.

What else is happening that may impact on this project?

The creation of the Business watch to run alongside the scheme will ensure that retailers
are not only aware of the benefits of the AlertBox, but in addition they are working
alongside other retailers and the police to reduce crime.


What are the risks with this project?

Few risks are envisaged, however, there may be the risk of shops not using the
AlertBoxes or using them properly. However, the Safer Neighbourhood Team will be
working closely with all shops to support in using the new system. An additional small
risk is a shop owner taking the AlertBox with them when vacating the shop (e.g. end of
lease). In order to mitigate this, a contract (which will include a condition of issue
requiring them to return) will be provided to all shops participating in the scheme and in
addition it is envisaged that the new Town Centre Manager will work closely with the SNT
to highlight vacating shops.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?

There are now numerous AlertBox schemes nationally and several in Lewisham. This is
an established company used to working alongside local authorities and the police. The
three partners involved are AlertBox who will train the police, the Safer Neighbourhood
Team who will issue the AlertBoxes and train the retailers and the retailers themselves
who will agree to support the scheme and work alongside other retailers to help reduce
crime and anti-social behaviour. The project will be managed by Lewisham Police Safer
Neighbourhood Team.
                                        Mayor’s Fund Project Proposals- Perry Vale
                                          Appendix D1 Making Waves in Perry Vale
Name of Assembly: Perry Vale
Project Title: Ahoy Centre – ‘Making Waves In Perry Vale’
Project Idea:
To engage 12 local young people in sailing activities one day a week, enabling the young
people to gain a Nationally Recognised Qualification, as well as being given the
opportunity to sign up as volunteers at The AHOY Centre at the end of the programme.
This program will give them the opportunity to get involved in a community activity and
sign up as a volunteer at AHOY. Volunteering at the AHOY will engage the young people
in the evening, weekends and school holidays, in a active way; at the same time
emphasising life skills, team work and building confidence.

What does the project want to achieve and which of the assembly priorities does it
address?
Funding is required to contribute to improve the facilities for young people in the Perry
Vale ward by running an alternative education programme within Brent Knoll School.

The experience AHOY provides disadvantaged and disabled people is not just over the
few days they attend a course – it goes a long way; involving them in their local
community by becoming part of an established sailing centre. This inclusion provides a
long-lasting contribution to the community as a whole. Through these activities and
courses the benefits include:

Enabling self-development by imparting a sense of achievement, responsibility and
teamwork. It further offers:
 The opportunity for all sections of the community to become involved in water sports
   and it’s social aspects by offering support and skill, increasing the sense of
   community spirit
 Young people to utilise sailing skills to participate in schemes such as the Duke of
   Edinburgh and Youth Achievement Awards
 Increase health awareness and fitness
 Focus the mind and provide a channel for energy for all participants within an exciting
   environment
 Increase the sense of achievement for both young people & adults providing the
   opportunity to compete nationally and gain industry recognised coaching
   qualifications
 Give a positive example to young children, providing role models, mentors and
   facilitating the realisation of what they can aim for
 Enable the local community to participate in a sport that few would have access to
   otherwise

Sailing on the Thames, participants have the increased opportunity to learn about the
river, its wildlife and historic past.

How will the success of the project be measured?

  Evaluation forms for every activity are completed by participants, staff and project
   partners
  After the activity we review the evaluation forms received and make an assessment of
   the findings
  We meet and discuss with teachers, groups and individuals involved in order to
   ascertain what positive outcomes have resulted from individuals’ participation in the
                                          Mayor’s Fund Project Proposals- Perry Vale
                                            Appendix D1 Making Waves in Perry Vale
   project
  We record volunteer membership
  We keep a record of all sailing and power boating certificates awarded
  We complete an evaluation report which includes our findings together with
   photographs


Budget breakdown for the project: (provide a detailed breakdown of costs)

 Expenditure                                                                         £
 Revenue Costs Based on group of 12
 - x6 days Instructors x 3 per day (90 per day)                                  1,620
 - x6 days Safety Boat Cover (70 per day)                                          420
 - x6 days Fuel and Oil (58 per day)                                               348
 - x6 days Management and Admin (30 per day)                                       180
 - x6 days Overheads/Light/heat/etc (26 per day)                                   156
 - x6 days Volunteer expenses (30 per day)                                         180
 - x6 days Log books and certification (10 per person)                             120
 - Total Per group of 12                                                         3,024
 Capital Costs i.e. equipment purchase, building works etc


 Total Expenditure                                                               3,024
 Income
 Mayors Fund allocation                                                          3,024
 Other Council funding (please specify)

 Other funding (please specify)    Applied for       Confirmed
 -                                 -                 -

 Total Income                                                                    3,024
Project Management Team (details of signatories)

 Name                                      Contact Number        Email address
 Project Manager: Sarah Corcoran           020 8691 7502         sarah@ahoy.org.uk
 Treasurer: Clive Ongley                   020 8691 7502         clive@ahoy.org.uk



Key stages in delivering the project:

 Action                                    Lead                         Deadline
 Funding Approved                          Sarah Corcoran               Nov 09

 School recruited and programmes           Sarah Corcoran               Nov/Dec 09
 confirmed

 Courses Commence                          Schools                      Feb10
                                          Mayor’s Fund Project Proposals- Perry Vale
                                            Appendix D1 Making Waves in Perry Vale

 Local Assembly update and report          Sarah Corcoran                    Apr 10




What impact will the project have on equalities within the ward?

The AHOY Centre believes it is their personal approach and time invested in all it’s’
members that really makes that extra difference to its many activities. Traditionally,
sailing has not been available to those with disabilities, or anyone disadvantaged and
unable to pay club memberships and those suffering from the barriers of social exclusion.
Learning how to sail and becoming part of a club can significantly build self -esteem and
confidence in young people who are vulnerable and isolated in their communities. The
AHOY Centre are currently developing facilities so that any person, no matter what their
disability or ability, will be able to operate a sailing boat.

One of AHOY’s youth volunteers has said ‘At AHOY I do sailing, power boating and help
with the maintenance of the boats, AHOY has changed my life, not only have I not got in
trouble with the law but I have certificates to prove it!’

Sailing is one of the very few sports in which young people and adults can participate on
equal terms, helping to break down social barriers . Your generous support will give
opportunity to those that otherwise may not be able to participate in this type of activity.

What else is happening that may impact on this project?

There are no detrimental impacts locally that will affect this project. However, there is a
positive impact on the community – the young people will be given the opportunity to sign
up as a volunteer after the course and be engaged in activities at the AHOY in the
evenings, on the weekends and in the school holidays. AHOY offer young people an
alternative to crime and the gang culture. There are no over establishments in the area
that has what the AHOY has on offer.


What are the risks with this project?

AHOY is a Royal Yachting Association (RYA) accredited training centre and holds an
Adventure Activities Licensing Authority license. All courses leading to RYA
qualifications have to be in the presence and under the direction of a RYA Qualified
Instructor, they in turn are assisted by member-volunteers assistant instructors who have
been trained to be either qualified instructors; assistant instructors’ safety boat officers;
competent helms or shore masters, In house shipmate training, First Aid, Day skipper,
VHF radio and rowing. The Instructor ensures that each course is provided with
                                           Mayor’s Fund Project Proposals- Perry Vale
                                              Appendix D1 Making Waves in Perry Vale
sufficient qualified personnel to receive the necessary tuition and safety cover. Everyone
regardless of the type of course or activity completes an assessment form. All staff and
volunteers have enhanced CRB checks.

We have the following documentation that is available on request
Full risk assessments
safeguard policy,
CRB checks,
Insurance,
Health and safety policy,
Equal Opportunities policy
Volunteering policies.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?

Education programme - Participants experience the opportunity to escape the classroom
environment and gain knowledge and understanding by participating in a sailing
curriculum course. The course is bespoke to meet the needs of the young people,
depending on their requirements and ensuring sailing can be delivered to those that have
special educational or physical needs. This is an ideal ‘alternative education programme’
which covers all aspects of outdoor and adventure activities. Many National Curriculum
subjects are covered, whilst at the same time emphasising life skills. Courses can be
targeted for the most hard to reach young people. Initial training is undertaken at a dock
on safe water and can be either 12 afternoon sessions or 6 full days – with a River
Induction course delivered at AHOY on the last day. Content of course: health and
safety; introduction to boats; rigging, educational activities; understanding of weather;
local ecology and history; off-site educational visit; principles of sailing and capsize
recovery.

The Plan - We plan to engage 12 young people from Brent Knoll Special Needs School
in education programme during term time.
                                     Mayor’s Fund Project Proposals- Sydenham
            Appendix E1 Renovation and development of Silverdale Hall playground


Name of Assembly: Sydenham
Project Title: Renovation and development of Silverdale Hall playground
Project Idea: To transform a derelict playground into a green space with opportunities for
children & youth to play and exercise in safety; and to provide a garden and raised bed
growing area; to encourage community enterprise training schemes to follow. To make
the space open to the community.
This will involve:
     Clearing grounds of vegetation and chip for later use
     Removing any roots and repair the playground surfacing ready for installation of
       railway sleepers and wood chips to create informal supervised play area
     Making good, and where necessary, replacing perimeter fencing to improve safety
       and security
     Providing new fencing for ball park play area
     To clear access via side entrance and making good of separate access gate
     To provide for a community garden by installation of raised beds for an organic
       growing project
This presents phase 1 of a larger scheme which will seek additional funding to create an
adventure playground with play equipment and better community garden facilities.
Venner Hall Community Association (leading this project) is working in partnership with
LBL Community Sector Unit, LBL Green scene, Community PayBack team and
Envirowork Lewisham. The project will make use of community volunteers both in
execution of the work and to improve the access by the community (supervised play
sessions etc).

What does the project want to achieve and which of the assembly priorities does it
address?
The project seeks to open this currently discussed space for community use by creating
a pleasant and safe environment for children to play in and learn about community
gardening and environmental sustainability.

The project addresses the following Sydenham priorities:

      improving community safety and tackling anti- social behaviour
      more activities for children and young people
      environmental improvement

How will the success of the project be measured?

      Delivery of a disused space back to community use
      Monitoring the number of children and young people using the area
      Monitoring volunteer uptake with the project
                                    Mayor’s Fund Project Proposals- Sydenham
           Appendix E1 Renovation and development of Silverdale Hall playground


Budget breakdown for the project: (provide a detailed breakdown of costs)

Expenditure                                                                        £
Revenue Costs i.e. fees, room hire, publicity etc
Hire of equipment (wood chipper) volunteer tools: cutters, gloves,                      500
safety goggles, bags
Skip hire costs for disposal of unusable refuse                                         200

Capital Costs
Purchase and installation of railway sleeper and woodchip play surface                 2,000
Repair and replacement of sections of perimeter fence                                  2,000
Installation of raised beds for organic growing                                          500
Playground surface repairs                                                               800
Clearance of side entrance and repair / installation of locks to side gate             1000
Raised rear protective fence for ball & games area                                     3,000

Total Expenditure                                                                  10,000
Income
Mayors Fund allocation                                                             10,000
Other Council funding (please specify)                                                  -

Other funding (please specify)     Applied for       Confirmed
None                               none              None                               -
Total Income                                                                       10,000
Project Management Team (details of signatories)

Name                                 Contact Number        Email address
Project Manager: Chrystia            020 87768597          justchrystia@googlemail.com
Hertogs
Treasurer: John Thresher             07821 805073          None
Kaiya Williams                       020 88526349          Kaiyawin4@gmail.com


Key stages in delivering the project:

Action                                    Lead                               Deadline
Site clearance                            Chrystia Hertogs with                    Mar 10
                                          PayBack team
Playground surface repairs                Chrystia Hertogs                         May 10
Repairs to perimeter fencing              Chrystia Hertogs with                    May 10
                                          Envirowork
Clearance of side entrance and repair     Chrystia Hertogs with                    May 10
to access gate                            Envirowork
Installation of ball park fencing         Chrystia Hertogs with                    Jun 10
                                          Envirowork
Raised bed installation                   Chrystia Hertogs                         Jun 10
                                     Mayor’s Fund Project Proposals- Sydenham
            Appendix E1 Renovation and development of Silverdale Hall playground




What impact will the project have on equalities within the ward?
The project is aimed at increasing access to young people and volunteers from across
the community and will have a positive impact on cohesion in the ward by engaging
young people in play and gardening. The Venner Road Management Committee brings
together a diverse range of individuals of ethnic background, faith and socio-economic
status . Working together will increase bonds and understanding in and between
communities.

What else is happening that may impact on this project?
Improvements have recently been made to Silverdale Hall
There is a possibility that management of Silverdale Hall could be passed to Venner Hall
Community Association. This would follow agreement on a plan for future use and
discussion with the Sydenham Local Assembly.
Lewisham’s Community Sector Unit is exploring how accessibility can be improved to
Silverdale Hall for example making the toilet DDA compliant.

What are the risks with this project?
The project has been phased to allow immediate use of the space and reduce risk from
more complicated project elements (installation of play equipment) that would have had
an ongoing health and safety inspection implication. The Venner Hall Community
Association will be working in partnership with Envirowork to further reduce risk of project
elements by use of a contractor with proven track record.

How will this project be delivered and how will individuals /organisations
delivering the project be identified?
Some of the project will be delivered by Envirowork for example fencing & gates,
installation of sleeper and bark chipping play surface. The clearance aspect will be
managed by Venner Hall Community Association with PayBack team and use of
volunteers. The project will be managed by Venner Hall Community Association.
                                                                                                                           Appendix F1




                                          Evelyn Assembly Action Plan 2009 / 2010

1. Priority: Not enough youth facilities
Objective        Actions                 Time frame and                         How will we                 Who will we work
                                         progress                               measure success?            with?
Provide youth     Ring fence £10,000 of           Agreed at May 09              Wide participation of       Primary, secondary
facilities that   Mayor’s Funding for youth       assembly                      young people in the         Schools and youth clubs
meet the needs    provision.                                                    Evelyn ward in the          in the Evelyn ward
of young people                                   Consultation delivered        voting event recorded
decided by        Young people will be            October - February            through attendance lists.   LBL Youth Service
young people.     consulted via making links                                                                LBL Extended Schools
                  with schools via school         Activities delivered across   Submission of projects      Coordinator
                  councils, YOT and youth         2010                          from schools and youth
                  clubs in the ward and asked                                   clubs, leading the
                  to submit project ideas.                                      commissioning of youth
                                                                                projects in 2010.
                  Projects will be investigated
                  and costed by LBL.

                  Young people will vote on
                  which projects are funded
                  through a ward youth voting
                  event.




Objective         Actions                         Time frame and                How will we                 Who will we work
                                                                                                                         Appendix F1


                                                    progress                 measure success?             with?
Provide outdoor      Mayor’s Fund project youth     Agreed at September 09   72 young people              Primary schools and
youth facilities for sailing at the Ahoy Centre     assembly                 engaged in activities at     Youth Clubs in Evelyn
all age groups       as part of school curriculum                            the AHOY centre              and the Ahoy
                     for primary schools in         Delivered across 2010
                     Evelyn and Summer                                       Young people at primary
                     sessions for Secondary                                  school age participating
                     schools                                                 in sailing classes as part
                                                                             of their school
                                                                             curriculum.

                                                                             Young people of
                                                                             secondary school age in
                                                                             Evelyn attending taster
                                                                             sessions in the school
                                                                             holidays and
                                                                             consequently signing up
                                                                             to be volunteers at the
                                                                             sailing centre
Provision of        Localities Fund 2008/09         PB event February 2009   Young people activity        Teach Sport
summer holiday      project, decided via an                                  engaged in sport
sport activity      Evelyn Assembly PB event.       Delivered Summer 2009    activities in Evelyn over
                                                                             the summer.
                    10 week multi sport activity.
                    It aims to engage young
                    people who may otherwise
                    be on the streets and in
                    parks unsupervised
Objective           Actions                         Time frame and           How will we                  Who will we work
                                                    progress                 measure success?             with?
Provide             Mayor’s Fund project            Agreed at assembly       Young people achieving       Lewington Centre.
accredited youth    Saturday Life skills            September 09             training and                 Hornafrik
activities and      Academy                                                  accreditation through
                                                                                                                             Appendix F1


raise aspirations                                    Delivered early 2010        courses
of young people     The project will run a series
                    of structured accredited life
                    skill work shops for young
                    people. These workshops
                    will include:
                          Full First Aid training
                            for young people
                          Junior Sports
                            Leaders Award
                    Community Sports Leaders
                    Award
Provide more        Localities Fund project          Agreed at assembly          A reduction in the          XLP
youth facilities    09/10 XLP boy’s community        September 09                number of boys loitering    Lewington Centre
and tackle anti-    at the Lewington Centre                                      outside the Lewington
social behaviour                                     Delivered November 2009 -   Centre on girls only
                    The project aims to provide      2010                        nights.
                    young people with positive
                    progression routes with
                    accreditation and will
                    complement the current
                    XLP community bus, girls’
                    workshops happening at the
                    Lewington Centre.
Objective           Actions                          Time frame and              How will we                 Who will we work
                                                     progress                    measure success?            with?
Young people        Localities Fund 2008/09          PB event February 2009      The of a locally led        Brighter Futures,
promoting their     project, decided via an                                      commissioning and           Riverside Youth Club,
local area          Evelyn Assembly PB event         Delivered in 2009           installation of a sign by   Artmongers

                    Young people from the
                    Brighter Future Project
                    commissioned artists from
                                                                                                                          Appendix F1


                     Artmongers to design a
                     welcome sign for their local
                     area.

Save Deptford        Localities Fund project        Agreed at assembly       35 - 40 children in          Scouts
2nd Scout group      09/10 Repairs to Deptford      September 09             Evelyn aged between 6
from closure         Second Scout Hut                                        – 14 years can continue
                                                    Delivered October –      to attend the scouts on
                     Boiler replaced and physical   November 09              a weekly basis from
                     repairs to the hut                                      November 2009.
                                                                             Scout Hut available as a
                                                                             venue for community
                                                                             use.
After school         Localities Fund 2008/09        PB event February 2009   Provision of local           Emmanuel Childcare
activity provision   project, decided via an                                 afterschool activities for
for 4 -12 year       Evelyn Assembly PB event       Delivered in 2009        4 – 12 year olds
olds                 Emmanuel Childcare
                     service offers a wide range
                     of activities around arts,
                     computers, cooking.
Objective            Actions                        Time frame and           How will we                  Who will we work
                                                    progress                 measure success?             with?
Linking young        Mayor’s Fund project,          PB event February 2009   Greater intergeneration      Riverside Youth club,
people to the        Intergenerational workshops                             links between the            local community
wider community      at the Lewington Centre.       Delivered in 2009        community and
                     The workshops included, 2                               Riverside Youth Club.
                     jewellery making
                     workshops, healthy eating
                     promotion workshops, and
                     gardening workshops. The
                     young people who attended
                     the youth club at the
                     Lewington centre planned
                                                                                                                        Appendix F1


                   and promoted the
                   workshops with the support
                   of staff.
Linking young      Localities Fund 2008/09        PB event February 2009   A local event took place    Riverside Youth Club
people to the      project, decided via an
wider community    Evelyn Assembly PB event       Delivered in 2009

                   Riverside Youth Club 40th
                   Anniversary open event
                   The event will included
                   music from the youth steel
                   pan band, go karting,
                   Caribbean food, drama and
                   dance performances, face
                   painting and music mixing
                   performance.
Objective          Actions                        Time frame and           How will we                 Who will we work
                                                  progress                 measure success?            with?
Holiday youth      Localities Fund 2008/09        PB event February 2009   24 young people             The Albany
provision          project, decided via an                                 participated resulting in
                   Evelyn Assembly PB event       Delivered Easter 2009    a film show case at the
                                                                           Albany Theatre
                   Inspiring Your Imagination a
                   film production course for
                   local young people that took
                   place during the Easter
                   break.
Promote early      Mayor’s Fund project,          Agreed at assembly       Raised awareness of         Deptford family Project,
Years and family   Family Support project         September 09             CVD, Depression             Refugee Network, PCT
health outcomes    By the Deptford Family                                  Diabetic, and Child
                   project                        Delivered in 2010        Obesity in isolated
                                                                           seldom heard
                   The project is aimed at                                 communities.
                                                                                                                          Appendix F1


                    families from disadvantaged
                    and hard to reach
                    communities (Asylum
                    Seekers, Refugees and
                    Migrants) who are highly
                    isolated in Evelyn ward
                    A family intervention project
                    around health and nutrition
                    to improve the health
                    outcomes of families and
                    their children.

Objective           Actions                         Time frame and             How will we                Who will we work
                                                    progress                   measure success?           with?
Computer access Localities Fund 2008/09     PB event February 2009             New computer suite         Community Action
in the local    project, decided via an                                        provided for the local     Centre
community       Evelyn Assembly PB event    Delivered in 2009                  community on Pepy’s
                2000 Community Action                                          Estate.
                Centre, to update and
                maintain the suite of
                computers at the community
                centre located on the Pepys
                estate for community use

Provide             Mayor’s Fund Project , the      To be delivered in early   The active participation   Riverside Youth Club
opportunities for   expansion of the Riverside      2010                       of young people in steel
Saturday youth      steel pan band to offer more                               pan band classes on
Provide more        young people the chance to                                 Saturdays
youth facilities    attend and learn on a
activities and      Saturday                                                   Public performances by
maintain                                                                       the steel pan band
Riverside Steel     The tuning and upgrading of
Pan Band            instruments
                                                                                                                         Appendix F1



Promotion of        Localities Fund 2008/09        PB event February 2009        60 children attending   Soul Food 4 All
healthy eating to   project, decided via an                                      workshops.              Lewington Centre
children            Evelyn Assembly PB event       Project delivered summer      Evaluation officer
                    Soul Food 4 All , culinary     holidays - July/August 2009   attended the event,
                    and cultural workshops. on                                   positive feedback
                    healthy eating and a healthy                                 provided by young
                    lifestyle aimed at children.                                 people at the event,

2. Priority: Too much traffic
Objective        Actions                           Time frame and                How will we             Who will we work
                                                   progress                      measure success?        with?
Improving child     Assembly action a request      Request made on 2008,         No lorries parking on    LBL Highways
road safety         made to LBL to replace and     action completed in 2009      Oxstalls Rd and Grove    Councillors
Reduce the          extend double yellow lines                                   St.                      Pepys Community
number of lorries   on the two relevant roads.                                                            Forum
parking on                                                                       This has been achieved Evelyn Assembly
Oxstalls Road                                                                    to some extent, however coordinating group
and Grove St                                                                     the yellow lines are not
                                                                                 long enough so this has
                                                                                 dispersed the problem,
                                                                                 so has not been fully
                                                                                 achieved.
                                                                                                                  Appendix F1




3. Priority: anti-social behaviour
Objective         Actions                         Time frame and           How will we             Who will we work
                                                  progress                 measure success?        with?
Tackling youth   Mayor’s Fund project,            Passed by assembly       50 local young people   Police, Second Wave
anti-social      Second Wave Youth                September 2009           aged 13 – 24 engaged    volunteers
behaviour        Intervention projects youth                               in the project
                 engagement and education         To be delivered across
                 workshops.                       2010

                 The project aims to tackle
                 issues of anti-social
                 behaviour, community
                 safety and gang related
                 activities in the area and
                 build relationships with local
                 police.

Tackling youth   Mayor’s Fund project,            Passed by assembly       The engagement in the   Catford Power League,
anti-social      Catford Power league             September 2009           project of 80 young     Somali Education
behaviour and    refugee and swimming                                      people identified as    Development Centre
gang culture     project aimed at young           To be delivered across   being at risk, 20 of    (SEDEC) and The
and drugs        people identified as being at    2010                     whom will not be in     Refugee Employment
                 risk.                                                     education or            Project (REETA)
                                                                           employment.
                                                                                                                      Appendix F1



Objective          Actions                       Time frame and             How will we                Who will we work
                                                 progress                   measure success?           with?
Provide more       Localities Fund project       Agreed at assembly         A reduction in the         XLP
youth facilities   09/10 XLP boy’s community     September 09               number of boys loitering   Lewington Centre
and tackle anti-   at the Lewington Centre                                  outside the Lewington
social behaviour   The project aims to provide   To be delivered from       Centre on girls only
                   young people with positive    November 2009 and across   nights.
                   progression routes with       2010
                   accreditation and will
                   complement the current
                   XLP community bus, girls’
                   youth workshops happening
                   at the Lewington Centre.

Promotion of       Localities Fund 2008/09       PB event February 2009     Art therapy sessions       Co-pepy’s
emotional being    project, decided via an                                  take place delivered to
                   Evelyn Assembly PB event      Delivered 2009             those indentified as
                                                                            needed support.
                   Co-Pepys, this project is a
                   weekly art therapy group
                   which aims to increase the
                   physical, emotional and
                   mental well-being of the
                   participants through art
                   activities
                                                                                                                   Appendix F1


Priority 4: Dumping of rubbish

Objective          Actions                         Time frame and              How will we             Who will we work
                                                   progress                    measure success?        with?
                   Love Lewisham poster            A reduction in litter was   A reduction in litter   LBL
Reduce the         campaign                        achieved in the ward in
amount of litter                                   2009.
on the             This campaign was also
                   promoted in the assembly
                   but was a borough wide
                   project independent of the
                   assembly.

                   This campaign resulted in a
                   significant reduction in the
                   amount of litter in Evelyn,
                   reported by Environmental
                   Services

                   The assembly are looking to
                   drop this priority which will
                   be reviewed in February
                   2010
                                                                                                                     Appendix F1


Priority 5: drug problems

Objective        Actions                         Time frame and               How will we             Who will we work
                                                 progress                     measure success?        with?
Tackling youth   Mayor’s Fund project,           Mayor’s Fund agreed in       The engagement in the   Catford Power League,
anti-social      Catford Power league            September 2009               project of 80 young     Somali Education
behaviour and    refugee and swimming                                         people identified as    Development Centre
gang culture     project aimed at young          Project to be delivered in   being at risk, 20 of    (SEDEC) and The
and drugs        people identified as being at   2010                         whom will not be in     Refugee Employment
                 risk.                                                        education or            Project (REETA)
                                                                              employment.

				