Environmental Monitoring Plan for Illinois Power Hennepin Unit Enhancing the use Eastern and Midwestern Coals by Reburning Sorbent Injection

Click to download
1 III ENHANCING THE USE OF EASTERN AND MIDWESTERN COALS BY GAS REBURNING-SORBENT INJECTION ENVIRONMENTAL MONITORING for Illinois Power Hennepin PLAN Unit 1 Submitted Energy and Environmental Irvine. California 18 Mason by Research Corporation 92718 October 1989 CONTENTS 1.0 SUMMARY ........................................................ INTRODUCTION 2.1 Process Background EMP Purpose Overall Material Emissions Purpose Current Construction Operation Post-Operation Permits Schedules Purpose Phase Phase Phase I: II: III: ................................................... Technology ....................................... of Project ........................ .................................... ...................................... ......................................... ................................. .......................................... ........................................ Requirements .......................... ......................................... ............................................. ................................................ ........................................... ................................................ ........................................ ........................................ ............................... .................................. .................................... and Scope .................................................. and History and Scope l-l 2-1 2.0 2.2 2.3 3.0 3.1 3.2 3.3 4.0 4.1 4.2 2-1 2-1 2-3 3-1 3-1 3-4 3-4 4-1 4-1 4-1 4-5 4-5 4-5 4-6 4-6 4-a 5-l 5-l 5-l 5-4 5-4 5-17 5-17 PROJECT DESCRIPTION Storage ............................................ Description and Discharges and Scope Monitoring COMPLIANCE MONITORING 4.3 4.4 4.5 4.6 4.7 4.0 5.0 5.1 Pre-Construction SUPPLEMENTAL MONITORING 5.2 5.3 5.4 5.5 5.6 6.0 6.1 Pre-Construction Construction Operation Post-Operation Schedules Purpose Current GR-SI Purpose Sampling Sample Calibration Analytical Data Reduction ........................................... ................................................ .................. at IP Hennepin Stat ....... . ............... ............... on ............ HEALTH AND SAFETY MONITORING and Scope Safety Health 6-l 6-l 6-l ........................ Monitoring 6.2 6.3 7.0 7.1 Program and Safety DUALITY ASSURANCE AND CONTROL .................. and Scope Procedures Custody Procedures Procedures ........................................ ...................................... and Frequency ............... ............... 6-2 7-l 7-1 7-1 7-1 7.2 7.3 7.4 7.5 7.6 ........................................... ..................... .................................... ............................ 7-2 7-2 7-2 and Validation i 7.7 Internal Performance Preventive Calculation Corrective Duality Purpose Reporting Monitoring A Permit Duality Control Checks Audits .......................... ............................ 7-6 7-7 7-9 7-9 7-12 ............... 7-15 8-l 7.8 7.9 7.10 7.11 7.12 8.0 and System Maintenance of Action Data of ................................... Quality Outside Indicators Organizations ................... ........................................ .................................. ................................... Assurance and Scope Data DATA MANAGEMENT AND REPORTING 8.1 a.2 0.3 APPENDIX ........................................ Requirements Review ................................... 8-l a-3 a-4 Operating NPDES Permit ii TABLES l-l l-2 4-l Project Project Hennepin Discharge Monitoring Monitoring Unit Streams in in Phases Phase Permit I and III in II .......................... Requirements NPDES Permit ......................... ......... .......... 1-2 l-4 ................................ Monitoring Hennepin Plan 1 Current Emissions 4-3 4-4 4-2 5-l 5-2 5-3 5-4 5-5 5-6 6-l 7-1 7-2 7-3 7-4 7-5 Designated Characterization Supplemental Solid Continuous Monitoring 5-2 5-5 5-10 By-Product .............................. Discharges Analyzers ........................................... Plan for Aqueous .......................................... Supplemental Monitoring and Solid By-Products Aqueous Effluent Illinois Worker Calibration Continuous Preventive Critical Program Monitoring Streams General Health 5-13 and 5-14 ................... 5-15 ....................... for Ash Pond Influent ............................................... Use Water Duality Monitoring Plan Standards and Safety Procedures 6-5 7-3 ......................................... Instruments Procedures Critical ................................ .............................. Measurement Plan ............... Analysis Maintenance Spare Objectives Parts 7-4 7-10 7-11 7-13 ........................................... for FIGURES 3-1 3-2 5-l Application for NOxlSOx of Gas Reburning-Sorbent Injection Control ............................................ During 3-2 3-5 5-7 5-8 7-5 7-14 8-2 Process Flow Diagram for GR-SI Operation Full Load Output ............................................... Continuous Phase Data Data Monitor Sampling Probe and Validation Procedure System Flow Train Discrimination Reduction Action Management .............................. 5-2 7-l ..................................... .................................. .................................... Diagram ............................ 7-2 B-l Corrective 111 . / / Iii 1.0 Energy demonstration fired of utility Department Energy demonstrate realized process. a dedicated prerequisite This at Illinois demonstration cooperative will project. Act health develop to the specific impacts be demonstration SUMMARY and Environmental to the percent generation pond. evaluate Funding Resources. SOz control of the will Successful Gas Research for the The Corporation project objective and 60 is of percent fly the (EER) being this is conducting for coalby is can (GR-SI) to is a the to be a project boilers. of and that through Bottom settling to volume Power sites agreement conducted project. since at eventual Energy, Natural 50 ash an SO2 and NOx control Institute, and the technology provided project Injection ash will of the GR-SI Plan one of is course a key Illinois NOx control Gas Research Department application Reburning-Sorbent and of demonstration be reduced application be sluiced technology commercial the process. (EMP) three required monitoring of aspect not be the of result to used related of sitefor by Unit EER's that GR-SI this Policy in human to 1 presents Company's in the with Environmental (IP) Hennepin describes Station supplement the standards, of potential of the The Monitoring Station, the during EMP. which technology EER project. DOE, environmental the is National project or 2) are will Hennepin will that applicable mitigation for replication Environmental ensure monitoring the demonstration monitoring monitoring to 1) violate for and Environmental does also detrimental problems independent documentation which or the a data technology parameters. Monitoring environment. base Environmental environmental technology will discharges, for be conducted and other with about to characterize and State, GR-SI health air and emissions. concerns. local which possible. are water Monitoring and are solid waste safety Federal, monitoring the requirements discussed, to will ment this provide utilize methods volume. Monitoring planning compliance and and compliance with information which regulations are IP and described along further supplemental EPA measurement no standard requirements system are whenever available designed EER in Measure- performance. standard for procedures procedures is design. required construction, during monitoring all and three operation. which phases of the demonstration: summarizes Phase the I and Table l-l supplemental was conducted during l-l mmmm ECE:T .r .r .r .P+wc, yIv)u)w .C ‘2 ‘S ‘Z ‘2 Q)aaJal x r; .C :: z s -he. NNN YYU 1-2 will be conducted are operation will during expected will during remain will the that a data Supplemental Phase to II of the demonstration the will The same provide parameters I and as project. current baseline listed Compliance II. major objectives: in Compliance monitoring data against Table monitoring Supplemental l-2 measurements requirements. which will GR-SI be remain measurements be evaluated. Phase the same III. as in monitored requirements evaluate ensure create compliance to of to U.S. with Statimrv quality Assurance their the operation. Phases three toward requirements monitoring . . . The according requirements Duality according in of the be focused project's the project for base success is safe for employees and the environment GR-SI will technology be conducted Protection measurements custody procedures Air Pollution EPA-600/4-77-027b, data will checks are achieved. of will the selected be data input in and all reports potential compliance been procedures by which Agency has will Illinois satisfy (IEPA). been in prepared Section Svstm August be conducted by the This test during may tests. to a of noted 1977. by 3 be followed Power the A measurements quality Illinois for the of . Specific for will plan EPA's assurance Environmental supplemental Sample custody for the with be taken goals procedures. EPA guidelines. chain AssuranceHandbook Source control Assurance checks Officer action assurance of quality configured formats. derived has to accordance Qualitv III as recorded Volume Internal EER's audits involve Metho&. supplemental independent if or Duality or the supervisor. Corrective quality recalculation deficiencies not repetition data have measurements been store, EER will will verified, process. submit on also the emphasis Once computer of data the system and output quarterly data copies a variety operator-selected data areas. submitted plant's .Data will This data and annual summaries of period. environmental problem reports of the to DOE with reports status. These permit be contain reporting by IP to IEPA during and a description reviewed results by will or EER and be verified to in all IP as and it becomes appropriate available. action the EER and taken Data if addition IP will showing required. of review significant may include parameter, modification change throughout monitoring of the frequency, location. demonstration a monitoring monitoring phases continuously project. l-3 1 ; I i ; : G:rE h... .-aJ)o)al w-U”“rnECCrl T)ooo8 2 : . A ; : I ==Z.==: c)c(.W+lc(+ .r v .r cn*v)lnv)v I L&EEEE c .r .r .r .r I .r I .r .r I .r :: .r - ; ; ; I : I -A^ mmm VVY VI 2 2 .r h-grnOOO --u-r s - LLL ,h,h,h i328 Eg& ” : E A Monitoring capacity from data for project will and formats. members Certain EER. DOE. the review Review funding meet at Committee participants. least on once will be established will and its to ongoing that: and the to comprise act in host an advisory utilities. will include tasks or monitoring. The Committee per year, representatives demonstration functions The Committee reporting information. recommendations Based of the the for modifications can recommend monitoring review of Committee's monitoring Committee tasks techniques quarterly project (1) (2) (3) If monitoring of the be discontinued, or instrumentation and annual management changes at modified reports DOE and or added: or New analytical The format are the be substituted: be changed. EER will recommendations to made. consider modification EMP and authorize as appropriate. l-6 2.0 Energy demonstration Technology control switching involves will range of be of INTRODUCTION and program. technology or the other for Environmental as The costly of on coal-fired the Resources. of of this this and section history presents of the a description of project, the GR-SI and the part project pollution gas three full boilers. Gas Research Research of is the utility control with scale reburning Corporation Department to boilers of that sorbent is (EER) demonstrate does injection boilers being and the is an not This conducting Clean SO2 and require CGR-SI). representing co-funded by Illinois technology and the the Coal NOx coal a project Energy's designed coal-fired alternatives. utility combination demonstrated pre-NSPS of and Energy, Natural The project Institute, Department Energy The process, purpose and Department remainder the scope background demonstration document. Gas release reburning hydrocarbon react of into this the in reburning to is the effective radical fuel-rich furnace. of to involves produce in species zone, The the introduction reduction with NO to air injection in which and atmosphere of of slightly form to natural gas above by the At the the main zone. heat Gas of which end zone a homogeneous, oxygen-deficient nitrogenous intermediates NOx emissions produce Nz. reaction oxygen-deficient sorbent step, CaO. is control and downstream are injected as a sequential calcines where the sulfate. ash burnout calcium-based process the can calcium-based sulfation to form with along sorbent be viewed step, solid the coal sorbent coupling dehydrates reacts plant 2.2 an activation produce gas-phase sulfate or CaO and a heterogeneous oxygen removed with SOz/SOs and excess calcium fly The calcium subsequently equipment. &storv by the particulate of Prolect conducted range of by EER will pre-NSPS Station, boiler Unit focus on three The technical Illinois . utility Central (net). demonstration boilers Illinois front wall representing Light fired. project the technology: 1: 117 MWe Company. Edwards 2-1 . . Illinois tangentially City (net). Power Water, cyclone Company, and Hennepin Power, Station, Lakeside Unit Station, 1: 71 MWe (net). Unit 7; 33 MWe fired. Light fired. comprises net generating is in percent Power being Preliminary emission of the Hennepin 67.6 two coal-fired of County, 300 steam MWe. Illinois. Station electric Unit fired 1, steam This is generating which unit owned will had a electric and Hennepin units host facility capacity operated with the GR-SI located factor by the The project and permitting. determine construction the GR-SI Station a total capacity Putnam in (IP). three were discharge system. its of demonstration. near of Illinois is a 71 MWe tangentially 1986. Hennepin Company in conducted tests and GR-SI phases. conducted levels. Phase Phase during I includes this design phase to of includes current system and Phase II and startup III involves control were being isothermal operation potential. monitored used flow will in demonstration has data been NOxlSOz Air These of emission emissions data are Phase boiler system and information During metric. baseline operating against parametric range emissions sorbents information boiler performance and and design I testing and about Phase long-term of completed. recorded. and GR-SI models performance thermal were providing worker safety testing testing. the The is to verification computer models. during will First, boiler results will conditions performance, as well. of The injection control. evaluate the of the occur physical Phase performance II monitoring process. stages: be conducted under will a range provide The over in the provide construction in three will GR-SI) tests evaluated. performance resulting and cost. long-term equipment requirements III. baseline, to of the paraestablish selected baseline of operating the of and on tests these be performance conditions. which to will GR-SI determine be on the performance. in terms testing reductions, (without performance objective a wide best system balance coals will impacts provide boiler evaluated reliability including of emission Alternate evaluation and long-term and overall maintenance system 2-2 2.3 This IP's the and requirement monitoring operation LMJ! Puroose document Station, for of of required purposes. Environmental special the is and Saw? the Environmental in Monitoring with Plan the factors supplemental (EMP) cooperative during site, both for Unit 1 at of Hennepin submitted reports. GR-SI by system accordance agreement construction compliance for The EMP provides and health at the permits related and demonstration a detailed description environmental monitoring research environmental monitoring monitoring to of goals will determine be one of the NOX emissions Boiler met. also In and will operating the key of without methods this will used by EER and The impacting to be and will Water basis. goal the is other funding to effect boiler if participants control performance project boiler discharge will following success project. adversely measurements on a regular operation. of sorbent project and the SO.? and parameters. have streams to emissions addition, be monitored determine made to solid been monitor performance characteristics. system by-product be monitored GR-SI detailed Measurements The process process atmospheric monitoring compliance Supplemental required methods discusses health lists sample and the be made prior section impacts and are currently during or to Section and including for state conduct that will 7. is on and during a more provides ancillary in by-product given all required described description including The Section Station the goals GR-SI for the and its systems. disposal. Section at in the of Section 3.3. the This supplemental to Hennepin 5. storage, discharges, emission which monitoring monitoring, by any EER will the safety. sampling procedures permit use 4 describes anticipated phases regulation. GR-SI is demonstration monitoring also protection Plan will Section be for the used to monitoring. that project. is not the 6 worker ensure the describes Section of project, section ensure monitoring be conducted the Duality procedures and data Assurance which data analytical audits monitoring integrity. OC checks. and the 8 describes format. management reporting 2-3 3.0 PROJECT DESCRIPTION DveralLQe5crioti~ Several technologies coal-fired wall-, practices. species strategy. two technologies: boiler of the Since the boiler. for reburning sorbent GR-SI in in-situ the for in-furnace or NOx control convective Figure when applied pass 3-1 to and two are power technology GR-SI and, available plants. which to is reduce generally boilers the is emissions of SO2 and to both be an NOx (GRa wide from SI) range of acid acid pulverized is of rain rain cyclone-, Gas Reburning-Sorbent applicable that are of to Injection characteristic a retrofittable design precursor control and tangential-fired reduces therefore, pre-NSPS emissions expected suspected effective GR-SI and the of a presents due spatial processes 3.1.1 to combines of injection pulverized a simplified capture zones a calcium-based schematic furnace process coal-fired boiler. by within SO2 removal. by reburning combined occur in a tangential-fired NOx reduction sorbents it is and SO2 reduction thermal the consider calcium-based different to convenient separately. The concept decade. . The overall Main the operate of reburning process Release heat under input for can NOx control be divided - In this to the boiler fuel-lean into has been recognized zones. namely: for over a three Heat total zone. is approximately released. and do 80 percent The coal not burners require of overall conditions modification. . Reburnina natural of heat radicals This the gas total release in Zo~.e is heat zone the by reduced The input. to main the create heat partial reburning and It is zone for injected zone oxidation is the region of of zone. with the reburning intermediates, where the the main NO injected. accounts a fuel-rich release a maximum downstream reburning reacts of reaction 20 percent The fuel. produced hydrocarbon formed produces nitrogen-containing 3-1 SECONDARY ,;;\ SORBENT mCOAL- REBURNINGZONE WIN HEAT RELEASE ZONE FUfMCE AIR PREHEATER Figure 3-l. Application of Gas Reburning-Sorbent For NO,/SO, Control Injection 3-2 such form as amines and cyano path compounds, which can which may further by: react to Nz by a reaction CH + NO + HCN + OH + NHi + OH * NH1 + NO + be summarized HCN + 0 NH1 + COZ NZ + NO + Hz0 NZ + Hz0 burnout fuel-lean reburning either reburning is the zone gas. to zone maximized. is the region and Nz. where ensure reduced The burnout fuel zone air is added . mnout to create oxidation species adjusted &be of are that t Iniectim - The overall the in converted conditions NO or complete nitrogen and are air so Remaining and the stoichiometries Nz formation . 3.1.2 The use of has of lime, sulfation the utilization . The is is been studied a calcium-based producing zone calcium-based extensively. sorbent. calcium oxide. solid calcium of of Reactivity is sorbents which may This calcium in the the the with be furnace involves either oxide injection calcination a carbonate reacts for or or with parameters SO2 control dehydration a hydrated SOt in the control The process calcium sulfate. sorbent: oxide the to to calcine equilibrium below active sulfur and producing of the Two major reactivity strongly a function calcium upon sorbent tends due the and negligible the the formed area as growth. underitions and the bv calcinatinr! of thermal the the calcine history sorbent - This which of particle the dependent surface type grain decrease calcine. temperature . increased time of time of rate of in Jhe residg%s because . &Ucive sulfatlon 2250°F of the sulfation - Significant becomes important unreacted sulfation cannot occur limitations, above approximately and 1600°F. the rate Thus. approximately within process. ash are this residence is particle capture coal fly temperature window The gas calcium stream sulfate, prior to sorbent, removed from the the stack by an electrostatic precipitator. 3-3 3.1.3 As was means results the coal Thus, levels heat of in described rnlna in for SO2 Control Section level in the 3.1.2. than sorbent gas reburning process fuel available process applying injection with sorbent by the coal. for since is sorbent injection This baseline the primary injection alone. of reduced SO2 SO2 control. a lower of which the is natural However. SO2 offgas gas of would amount combining The combustion input use reduces SO2 control are reburning be supplied in the replaces 20 percent SO2 formation. otherwise sulfur by the enhanced reburning reduced. and IP's 3-2. sorbent Hennepin The remaining streams injection Station. from are discussion the plant being A flow in combined diagram this during for for section GR-SI NOx and the system describes operation. SO2 is Gas reburning control shown material 3.2 Materials are tests provisions percent the Coal 3.3 A coal-fired and output spent flow to output fuel streams sorbent. rates handle for the these streams. (coal include and bottom include for furnace the sorbent. will be for natural by plant in in Unit Figure storage 1 of and discharge al Mami Storaw will gas, The and firing be utilized and lime, sorbent unloading. capability. There currently are stored in coal. with will during The lime the or GR-SI used limestone in gas storage coal a silo is Station demonstration in the majority tested appropriate has directly for 100 to gas. with currently provided requirements pile. being project of the for that natural purposes. loading gas is pipeline. sorbent be stored Hennepin Natural hydrated comparative no on-site an on-site boiler The and bottom ash incorporating main inputs gas). combustion These 1 in fly Figure ash natural gaseous ash. Unit and the to and GR-SI the sorbent process system. for fly are shown to is not ash contains as described SO2 capture. ash which with GR-SI in pond. many input above, Major the is in the products, streams 3-2. will GR-SI to the includes corresponding system Hennepin materials. ash will When the operation. bottom be sluiced system existing a new pond operation, designed When the be sluiced ash and fly 3-4 L ! 3-5 3.3.1 At demonstration percent. 4.88 percent regulations from and lb/106 process, trigger 3.3.2 Fly water will pH will Pipe if conditions required, water. pond. on the laden disposal material required to ash from a newly for turbulence for the will The pipe through Hennepin is expected GR-SI Btu (48 but lb/lOs Btu Hennepin. project The current (3758 NOX control. reduction if and Unit to lb/hr the . . . and emission reduce rate Cu control the load). to 0.69 the existing from Hennepin The utility Btu Btu to GR-SI in constraint The current lb/106 (534 (217 increase any lb/hr emission due limit strategy 502 emission Unit 1 is will this to at at to rate which for system for the level GR-SI by 50 60 thus rain rate load) load) of the 0.062 GR-SI might the is lb/hr There could when 1 is be at increase of the SO2 to at is SO2 emission full approximately provide unit, acid full full no NOx emission are to load) promulgated. 0.28 is Air lb/lOs expected to Act. be NOx emission be useful response lblhr they reduced full is NOx emission approximately implementation. The baseline expected particulate below requirements Clean s Dlscharaes the GR-SI and Contcnl process on-site to for of will the total time in be sluiced by mixing will in preventing be disposed pond. suspended acid available lowering a chemical with the the build-up into pH. Illinois by sluicing Effluent River. solids. the will the from Treatment discharge provide Treatment polymer fly of into ash to for the the ash with the will piping. adequate TSS. ashnew pond be for constructed and then by and disposal be treated discharged injection pH and may be required the residence Treatment be provided sulfuric H2SO4 to bottom will walls. be effective ash aid be accomplished This cementitious 3-6 4.0 COMPLIANCE MONITORING EER has project requirements analysis, Station, result monitoring of to evaluated aid of DOE the that project. in in the National the potential environmental the necessary Policy Information are both this expected risks Act. associated to results for and IP The Volume with of this this as a preparing documentation satisfy Hennepin Environmental Environmental effects Nevertheless. to is verify that of of the documented indicate this will no adverse on the environment supplemental compliance be required monitoring for operation regulations. new. the Act. of conclusion. monitoring are though some required specified are in by State permits Compliance regulatory obtained imposed In required of meet result specifically definition no significant which is to discharge The at operation, IP (IEPAI facility water permit. requirements requirements 4.2 IEPA emission has source to of the the in by IP environmental these obligations facility, obligations. by general general. to Clean meet Air Most requirements modified Certain Significant net addition in trigger required or reconstructed modified in air emissions. sources sources (PSD) control upon of are air also emissions required if from (e)(5)]. of are to they the and GR-SI New Source Performance new or Standards (NSPSI developed as part Prevention a significant exempt Deterioration of pollution is expected requirements equipment initiation increase that However. EPA regulations a modification increase would may trigger NSPS C40 CFR 60.14 emissions PSD. by the from as well section and of the will this currently water will remainder implement Illinois Hennepin Environmental Unit minor. the project. 1. Protection Modifications New permits to the existing compliance for existing Agency to the air a new monitor discharges GR-SI of phases be relatively be required Station as modifications describes the anticipated monitoring monitoring Hennepin all during demonstration issued and permits a water to IP for discharge operating source. Hennepin Unit 1 as an air Compliance monitoring 4-l / /Ii requirements which will The monitoring been emission submittal copy of the for both permits by this source and SDz. is reports daily are summarized in Table 4-l for the discharges be affected air emission for is permit met is quarterly project. operating reporting The monitoring coal showing in Appendix by issued lists in in the Table pond project water sampling. daily A. the the permit 4-2. will is for pH. this month. the National and enforced monitoring from with It is require The only ash in pond 005 is the Pollution by plant. seven anticipated modification existing discharge, flow includes solids. to The effluent suspended required to Appendix IEPA. Discharge IEPA's Water and are the the permit requirements. requirement The coal usage establishes to reporting and emission verify that limits, limit has this is A requirements limit of An emission established requirement composition. provided are (NPDESI The Water Elimination Pollution allowable three discharge discharge existing which 005. Monitoring determinations monitoring monthly discharge copy of the is discharges System Division. discharge regulated permit, for all listed NPDES permit described are constructed GR-SI requirements There contributing that of levels outfalls These discharges discharge streams. from the newly NPDES permit, may be affected This discharge required of of reports current oil expected the with by and creating by the would the grease the to have discharge a new discharge. experience NPDES permit flow twice of similar rate, per a decrease discharge number rate. weekly and submit new a discharge and total IP monitoring results requirements. A contains NPDES permit. concerning Air Pollution at the standard Pollution property Division. non-attainment emission by IEPA. control fugitive Rules and emissions Regulations. require Further, area shall Hennepin program must be These boundary. are that ensure operated Station is not listed and are no that is in Part Illinois 212. through emissions a particulate source emissions attainment of subpart IEPA's regulations K of Air ambient possible control area: the enforced visible within every an an in under be observable operations fugitive program thus. particulate approved emissions a fugitive required. 4-2 TABLE 4-1. HENNEPIN UNIT 1 CURRENT PERMIT MONITORING REDUIREMENTS I MEASUREMENT SAMPLE TYPE FREDUENCY LOCATION Coal composition sulfur. ash, Btu. moisture 24 hr composite Daily Coal hoppers WDES Flow PERMIlI Rate Single reading estimate Grab 24 hr Grab sample composite sample Oncelwk Once/wk Oncelwk Twice/m0 Existing discharge Existing discharge Existing discharge Existing discharae ash pond PH Total Suspended Solids Oil and Grease ash pond ash ash pond pond 4-3 II TABLE 4-2. DISCHARGE STREAMS DESIGNATED IN HENNEPIN NPDES PERMIT DISCHARGE NUMBER 001 DISCHARGE NAME Condenser Boiler Intake Roof cooling water 001(a) 001(b) blowdown screen drain backwash discharge #2 and #4 discharge #3 discharge metal cleaning sytem effluent waste 001(C) 003 005 005(a) Ash lagoon Ash lagoon Chemical treatment 4-4 4.3 Pre-Con5tructioJ.l Hennepin Station I. In of effect of later all Unit Phase the although I. 1 continues EER conducted plant. current during monitoring of the phases These Phase I will program. monitoring and be to operate supplemental measurements required are being available under existing tests were by the for to not air permits assess taken by IP the for as during operating compliance permits required. test 4.4 Phase condition purposes, remain in from Records and NPDES with conducted comparison results Construction The monitoring during described required Phase in by will Table IEPA remain 4-1. permits the for same as air the emissions current and water discharges requirements. II monitoring 4.5 QDerati on Additional compliance from the be total measurement requirements the newly required and for NPDES permit from to pH. of will monitoring new ash require constructed for the solids. sample the type existing new pond will be imposed due The oil pond and during to the the near monitoring grease to be the levels. same as as listed test the program new pond. of which measurement the is of The the in for the discharge and for modification pond. groundwater The current discharge anticipated flowrate. frequency monitoring Table 4-l. addition discharge and are ash expected includes suspended discharge. Compliance water from the new ash temperature, calcium, groundwater baseline quarterly until and pond. monitoring monitoring The total parameters dissolved should of bi-monthly completion for wells to groundwater placed be measured sulfate. (TDSI. one the GR-SI round first will are The prior six include and pH. boron. to months grab sampling from oxygen of the (DO). upgradient downgradient dissolved manganese, for of operation conductivity. monitoring results. elevation, solids be for the magnesium, compliance to obtain and frequency operation, demonstration. 4-5 4.6 Post-Ooeration When the GR-SI which GR-SI to monitoring system for is the demonstration was system of not installed remains in the is for intact, If quarterly will quarterly and post-closure complete. the GR-SI IP IP IP may has the or to operate of to of choice having the operate unit with of it keeping removed. with or GR-SI wells wells is the If equipment the system the system chooses monitoring continue equipment use the without operation. pond discharge and continue and weekly If will the GR-SI continue new ash pond. operated. closure monitoring groundwater be requirements. period, which monitoring GR-SI approximately 4.7 one year. Permits The only air emission addition boiler for demonstration as the to the ments permits source project of and governing operating will plant permits, operation both modification a construction for discussed for currently issued of by these permit disposal below. of requiring the GR-SI type, nature raw operating of application are IEPA. the permits NPDES and The GR-SI as well Require- necessitate including permits by silo, to permit. are IEPA permit others, for modifications pond. a construction an ash new and modified is is required case the A permit source. vent. permit. require information and source quantities other data must of to a In this which The construction for source, for permit including on the sorbent any new will emission have also contain emission expected and a constructed emission boiler Each equipment, information description the storage, system considered modifications the provided. the operating made boiler of In the some to in a new a construction will efficiency, the must size. of construction about be In controlled quantify proposed addition. specifications. including and uncontrolled entire permit any The cases, operation, startup the materials, emissions, procedures. process. must be reviewed source. a modification for procedures construction this and to and and revised the the GR-SI boiler modification expected operating permits by IEPA when system will must operating are operating The existing modifications cause permit contain characteristics. changes will be details are emission application Since required. permit 4-6 issued the jointly if IEPA phase. perceives no complications or unexpected problems in construction IEPA requires The a permit application for construction must contain: criteria and of any new wastewater treatment facility. permit 1) 2) 3) 4) 51 61 IEPA IP as also site assessment and selection study plans hydrogeological engineering characterization impacts updated requires to has The for to water the require oil quality permit of for of the of which structural The of joint the an of effluent water an construction of flow NPDES specifications new discharge on receiving diagram permit which for for or operation process would this which require permit permit. be groundwater is of any affects modification essentially The monitored NPDES for new the facility discharge. for the permit pH. wells total for a new same is or waters modification currently that discharge. expected suspended various an existing information new facility that and related application facility required the grease, new NPDES permit construction discharge and the solids. monitoring parameters. to (Division Agency which lake, and will or Corps the U.S. of Army Water of take stream. impacts. of Engineers the plan. as also be Corps Water place The in of Engineers, and the Illinois Illinois is floodplain must The pond of contain Illinois as a Class to IDOT and review an state requirements Control) A joint Department Environmental required or are impact details Department Transportation Protection any construction river, part of Resources). Pollution (Division a loo-year a wetland. as could application No monitoring permit. new ash Periodic a part subject and construction Transportation require permit Illinois integrity expected anticipated dam. the (IDOT) would may classify be required would of III assure permit. a maintenance application Department inspection such to other the authority federal Conservation agencies. 4-7 / 4.0 The provided continued to demonstration months. schedule. choose removed, and either at timetable below. for for various two (Phase will At phases monitoring weeks. after the is end of the GR-SI place demonstration early of to design. during period Phase last outage Unit II. is project Phase I. scheduled The entire 18 load IP may have it is and Preliminary approximately took The construction initiation scheduled on final of the be completed about program other to 16 months III) the approximately schedule. program, 1 or The exact schedule details. keep to the them. depend demonstration on Hennepin equipment installed no cost Phase I - 18 months Preliminary System Permitting Design (applications) Monitoring Phase II - 16 months (secure permits) Permitting Construction Phase III - 18 months Testing Testing Operation Equipment Removal Baseline Parametric Long-Te,rm Optional 4-a 5.0 5.1 EER will which This upon is type three not of SUPPLEMENTAL MONITORING conduct required monitoring goals: monitoring for is termed during with the three any phases or of the test program compliance federal monitoring, state and will regulations. be focused supplemental major Provide project. Ensure Create this 1. 2. 3. a basis that a data the or to for evaluating the will and others success not safety. be of the demonstration to the of demonstration worker from the health which future. detrimental for replication environment technology base in may draw This be section made during describes each methods, chase . the phase and the _ supplemental of the monitoring measurements demonstration schedule. which project, have the been and will corresponding measurement 5.2 Monitoring mental monitoring other include emissions, addressed beginning are in of parameters took ash will place will pond worker 6. be conducted which prior water may to quality. health. Baseline prior 5.4. of studies. the monitoring to All be to document by of Phase baseline the project. values in for Some environof this affected in installation Illinois worker water GR-SI monitoring and be conducted II GR-SI equipment or Phase III. River safety data the water and will Phase of I. and Areas quality, concern gaseous are at the health issues Section Phase in quality initiation: be collected III. associated measurements discussed Section Supplemental These and data physical will are emissions being modeling utilized NOx. 02 and CO were as system beginning program For design of Additional Phase measured and baseline early to Table verify gaseous in Phase emission shows I. inputs Phase computer the and measurements supplemental be made at III. I, 5-1 gaseous as well as Phases II III. 5- LLLLL 00000 LLL z:fi .r .r .r EEEo ccc SEE WYY z 5-2 1 ; . i I I : : : : i al ;.$ 2 m ‘; ” ti ,h .- 5-3 Other purposes. containing material generated ash was characterization concentration characteristics. listed under The fly ash the in will in data A major were also of obtained of unreacted in test a new the during GR-SI and on-site under disposal the inorganic Phase process pond. spent I for is sorbent design the with solid and fly Phase The permitting stream This ash was The waste level, leaching ash specified hazardous. Hennepin the GR-SI in ratio the this of and this are pose should ash. I. solid pH by-product disposed waste a mixture be to levels Table 5-2. well a pilot-scale During GR-SI ash furnace its on simulated properties. elements, tests that of all the classify for to the of ash conditions. tested characterize conducted of Specific various simulated include and toxicity characterization results that indicate would to required however, ash mass is the ratio that concentrations similar be performed wet eight the on the metals ash as to The test Leachate below time caution at a water ash indicate is disposal no serious GR-SI ash. indicates problems. ash settling that RCRA were values increase will limits: to that disposal conventional was added that while 17.6:1. satisfy evaluation the rise the The temperature within during tests for acceptable wet use uses observed when water ensure temperature observed actual Finally, the of III remains tests expected preliminary specification other project. 5.3 temperature 4:l. may occurred approximately GR-SI Further standard as a concrete of GR-SI admixture. beneficial ash will be undertaken during Phase Phase The only II: Construction monitoring of performed the Illinois downstream in during River sample of Section will the 5.4.2. the to construction document be taken new pond from discharge. phase baseline the supplemental will 100 this III: parameters. feet of river this at program for various points of be sampling upstream are levels More 5.4 One composite and provided details monitoring Ooeratia monitoring emissions, in the detail Illinois Phase The supplemental will are include described gaseous in more ambient monitoring of solid environmental by-product parameters discharges. during water These Phase discharges, III River, and groundwater. measurements below. 5-4 TABLE 5-2. SO110 BY-PROOUCT CHARACTERIZATION CHEMICAL Mineral CHARACTERISTICS. Analysis CaO Carbon Demand EP Toxicity Free Total Chemical Organic Sulfate Oxygen Phenol Cyanide Chloride Sulfide Paint Filter Test EHILICAL CHARACTERISTICS Specific Gravity Fineness Pozzolanic Activity Soundness 5-5 . lSSlQu$ . The control emissions. operation. particularly will within emissions be the objective SO2 and In air monitored furnace monitoring emissions 02 of NOx this emissions project boiler is without to verify adversely will that GR-SI impacting can effectively particulate system streams. occurring the gaseous project. include continuous SOz. addition, of to aid plan to emissions during performance SOz. the all NOx. and understanding be evaluated is the 5-1 the the Other during output The focus all in environmental of GR-SI measurements particulates. of Table phases during EER will problems of parameters processes operation. three summarizes demonstration for Gaseous NOx. and CO, in-probe COz. monitoring continuous injection . . . . . For gaseous be monitored to overcome Figure developed Key features the such a the test use a program special and hydrocarbons. 5-1 system designed as gaseous schematic the system evaluation include: stratification diagram of of the sorbent SOz capture. monitoring system boilers. probes to allow shows by of EER for on utility Multiple Rotameters Phase All Zero accurate probes upstream for to flow of rate balancing removal discrimination heated gases six flow of This gas operating is the to of regular using separated the potential sampling eliminate each of basis. a Beckman and span components moisture calibration instrument are measurements, sample. probe separation the from of each 16 probes rotameters Phase Figure plumbed are used to to a mixing provide probes the design by to manifold an on-line are of used a to to of phase provide indication provide the gas an average inertial with Glass rate. discrimination while 5-2 minimizing shows developed prior excess of which between are of is (HC) flame in the particulate probe has contacting separate of sample to in with the 250°F zero at particulate. sample via discrimination particulate Under particulate This the above system. span economizer greatly particulate and gases insulated Calibration on inlet typical probe. probe matter reduces in been effects gas All EER to percent to heated gas inertial conditions, from for system. the the the SO2 measurement. 90 the and or and the A be monitored. stream is the interaction components possibility gas monitors condensation accomplished will be ionization sample a Hydrocarbon 402 heated measured detector. 5-6 lI I i -------------------------Portable I E*k.,,.-t CAdIY”2C ,L-pg/-+q fp=ppJy Cabinet ---I I Stria I i m /iI I I L ? I I essan I I I L-- __d_ t ~-------.---------,--. lJnheated.3/8" Teflon Tubing Orain I- 3/8" Heated I-- Teflon Samole Line I Heated Enclosure --1 eated.Line Heated Filters Phase Discrimination Probes I Sampling Duct I I Figure 5-l. Continuous 5-7 Monitor Sampling Train . . . l t .5 2L 1. ‘al ‘; I . r; k P separate the 3 lists single the point loss or sampling hang-up to the of system be used heated for to in each 350°F the of the will sampling be used system. to minimize Table 5- potential hydrocarbons instrumentation of can at system, the sampling SO2 in of the and outlet. the the cause gases monitored. is the be difficult of than the SO2 SO2 and all of to Measurement due to the reaction This exist in moisture. actually measurement sorbent at the outlet the presence of unreacted active particulate calcium in to SO2 with higher inlet. possibility EER will Because presence reported of SO2 capture Due of perform the at the outlet primarily C02. used to levels the the interactions probe the system, importance primary removes will for be not at diagnostic measured flue the gas between nearly be the SO2 measurements subject economizer purposes. to confirm an emissions of checking balance. of 200 ppm if the of CO and precipitator from also precipitator particulate, will SO2 measurements reactive and will 02. excess on the CO, air fuel be taken of conditions. the to boiler based (HC) a standard interference particulate. be used HC. and and is Measurements Concentrations boiler indication concentrations the CO and combustion in coal-fired causes fuel-air EER will ments verify once the Both obtained CO2 and during methods the train process burner operating of will in to The 02 concentration condition. concentrations CO and in the emissions economizer HC will or the provides convert and a other mass than The CO2 provides composition provide of be outlet CO is a means a carbon 02 measurements hydrocarbon efficiency. boilers. relative less to indication determine Also. The concentration typically completeness. monitored can be used a change across balance. utilize with the combustion 02 stratification as an indication EPA Reference continuous in Methods monitors. Phase Method will during a modified particulate out-of-stack to once verify during the emissions 3 will for be measureused to and of 6. during SO2 to 5 the than testing EPA Method 7 will be used 02 measurements operation. III baseline using testing 6 to is used reduces the outlet long-term verification EPA Method and once measure gas. rather the sample to NOx measurement. operation. interaction with cake, SO2 measurements be used EER utilizes of train. the active heated The a 4-inch once be verified baseline Method and filter heated loss of the filter SO2 in 6 and 7 will long-term minimize sample standard of a filter The Method sample A Method build-up system. further Method 6 sample minimizing will large at potential 6 sampling be conducted precipitator 5-9 TABLE 5-3. CONTINUOUS ANALYZERS I GAS MEASURED so2 NOx DETECTION PRINCIPAL NOUV Chemiluminescent Paramagnetic Nondispersive Infrared Nondispersive Flame Ionization MANUFACTURER Western Research TECO Taylor ANARAD ANARAD Beckman MODEL NO. 721AT 1DAR OA57D AR5DDR RANGE O-5000 ppm D-2.5 ppm to D-IO.000 ppm D-10X. D-25% 02 co CD2 HC D-500 ppm to D-2.000 ppm D-25% ARSDDR 402 5-10 minimize regarding the data Nitrous potential quality oxide for SDz/particulate can be found be measured interactions. in during until Sampling parametric term the an tests. need opacity during for testing At the additional monitor Phase Section 7. Additional details assurance (NzO) of by kept gas times the to will baseline, will be will analyzed. parametric extracted, occur once of this and dried, during for the time, long will baseline first results term for be testing conducted tests. months Phase in III. Measurements flasks scrubbed SO?. then several sampling during long NzO analysis monthly monitoring. chromatography. and end three will Opacity during be analyzed will This determine with be measured instrument placed through parametric in the the flue and stack gas. long breeching. Opacity term will testing. Total using size stack the a high because appropriate ESP will measured size baseline long 5.4.2 During Unit also 1 will be term distribution cascade low measures continuously light transmittance be measured III particulate will impactors. flow grain relatively for the low rate emissions Method also of will the be measured ESP outlet at the will will flow cyclonic impactor rate flow will Resistivity at the precipitator Method and at outlet the inlet at the is will entering sample sampler gases Velocity 5. using time inlet Particle inwith outlet more the be because EPA Reference 17 and at A Brinks this using be used be measured impactor sample loading. a Wahlco Method the 2. and ESP inlet allow of of of impactor sample inlet the a longer will this the probe. be loading. high grain using resistivity. once An Andersen be used be measured using EPA Reference Measurements velocity as required testing, for particulate, taken and once once particle during the during distribution, operation. operation, during parametric and additionally diagnostic purposes. normal be sluiced to to of the some operation to the new of a newly ash the GR-SI system. ash pond. the pond. The in addition modified new Section to pond the fly will 4.7, ash from constructed disposal as described The bottom ash will require including compliance sluiced modifications monitoring measurements, NPOES permit. discharge parameters. monitoring will In some supplemental be conducted. 5-11 Supplemental point. results treatment implementation quality. during the Table at will the for ash be used the will monitoring pond to discharge gauge will the ash. the be conducted point and various and also effect aqueous in the effectiveness to at of on the Illinois gravity verify the sluice River. that Illinois to line discharge Monitoring as project water monitored a sedimentation the River be GR-SI have lists no detrimental 5-4 discharges demonstration. of be and the of ash sluice from thereafter period. will the (35 that Water pond. exceeds Ill. Adm. pollutant Quality for place will at indicate In the in water each for Analysis the the and which location the of first the of the are ash listed as six samples solids event available or limitations treatment the Adm. for Phase River. of upstream a discharge Code which Monitoring 302) soon months from and that pond in as of discharge Table the the both other the or the 5-5. pond the will is influent be Water in Monitoring conducted samples operation, and and being level Effluent long-term effluent collected of any Standards for Use are will discharge spaced will on the be additional General are will for will a number monthly testing streams in pollutant constituents, collected parametric pollutants Illinois will amount unlikely concentration measures pipe. listed is for baseline of at the testing impact of increases mitigating program ensure that to the The GR-SI of GRin eight in no these NPDES permit the ash pond (35 of the the Illinois 100 feet will river to During with determine the to Ill. Code 304). be implemented General Table specific pollutants operation. ash pond evenly samples system Phase SI any will occurs 5-6 Standards waters the Samples applicable which take state there designation. Measurements includes be taken the beginning III from during a boat sampler. of and downstream location. across analyzed be collected the GR-SI If tests, above are intervals river composite effects parametric the separately will Duality during and Illinois cross-section. samples Use Water detected III. pollutant be collected parameters. screening outlined River evaluate significant on the appropriate monitoring designed heron measures no adverse be identified impact to of the implemented, and a routine nearby be instituted. as a result The procedures GR-SI and the rookery/hatchery implementation. 5-12 5-13 TABLE 5-5. AWEOUS MONITORING FOR ASH POND INFLUENT AND EFFLUENT STREAMS Arsenic, Barium. Boron, Cadmium, Chromium, Iron, Lead, Mercury, Oil Total Total Total Total Total Total Total Total and Grease PH Total Total Solids Solids Selenium, Silver. Sulfates Total Total Dissolved Suspended Zinc 5-14 TABLE 5-6. ILLINOIS GENERAL USE WATER DUALITY STANDARDS CONSTITUENT Arsenic Barium Boron Cadmium Chloride Chromium Chromium Copper Cyanide Flouride Iron Lead Mercury Nickel Phenols Selenium Silver Sulfate Total Zinc Dissolved Solids (total) (total) (total) (total) (total) (total) (total) (total (total (total) hexavalent) trivalent) (total) (total) (total) (total) CONCENTRATION (mgll) 1.0 5.0 1.0 0.05 500.0 0.05 1.0 0.02 0.025 1.4 1.0 0.1 1.0 0.005 1.0 0.1 1.0 0.005 500.0 lDDD.D Manganese 1.0 5-15 / A major containing SI ash the system pond. for solid is by-product of to operating, of unreacted the the mixture GR-SI and spent will the and the Phase by in the process sorbent ash. is the fly in solid ash. waste stream GRand lists on-site a mixture with samples properties. When the be disposed physical a dedicated must be obtained Table 5-4 In order chemical waste the from characterize plan stage openings screw environment. be analyzed when the stage results purposes of for waste for of analyzed constituents sampling second the with dry will demonstration project. testing, Samples and placed will will in be the GR-SI four-ounce labeled and ash During will with sample stored a scoop in III. parametric be sampled containers a clean. on a daily basis lids. EER personnel. ESP hoppers Sample containers be obtained Ash samples the month of the parametric period in be conducted for screening is on first a monthly purposes generated. basis to at for define the the beginning will first At trends the and three- of then end to testing the Analysis testing. screening third period. Phase will III. long-term three-month appropriate will be evaluated determine Tests were carbon listed polynuclear follow-up analyses. for Table physical 5-2. which and In chemical addition, characteristics screening on fly ash tests or which for unburned be performed in hydrocarbons previously aromatic will analyses and will constituents may be adsorbed particles The data be conducted. will to be used add to to the with present constituent three-month will from will also modification. the aid screening EER in fully limited processes literature in the will period ash. be in tests characterize existing similar data or the have to for if identified long-term been if the data by-product base of GR-SI. consistency. constituents testing. basis. evaluated. handling or to as a future from ash If are Results the from any GR-SI the process, and analyses composition unexpected at for characterization be compared are the first the levels, constituents results require from present monitoring analyses be Screening disposal unexpected need. certain when test results After be conducted on an as-needed determining determined procedures 5-16 5.5 The operation from the effects when this in concern. disposed all claims. the is associated beyond Therefore, program 5.6 the GR-SI will Post-OI&X&JM supplemental stages operation system already project All is is of after be the monitoring designed the known. generated ash losses end pond. and by-products. complete, to GR-SI field If there identify system. IP conducted effects If does will during EER shall expenses considered is during on the to period, operate no be Phase arising part anticipated of IP elects not the construction resulting Unit operate the the this Illinois from future monitoring compliance when the GR-SI program Power and environment 1 with demonstration environmental equipment effects will against liability requirements monitoring. demonstration of be environmental of by-products an on-site damages, III indemnify with Phase disposal Groundwater III date.are monitoring no supplemental complete. Supplemental construction tests for Phase duration testing. be used provides product for and gaseous Phase of and for long the monitoring operating emissions two weeks. is defined phases will of occurred as Table monitoring be the during the 5-1 of required demonstration the middle only of phase the of during Phase will and schedule and and testing. the prelasted during have a program. Preliminary I and occur will approximately No supplemental including monitoring operating baseline gaseous describes II. III term for approximately supplemental 18 months, testing. parametric which Table solid will 5-4 by- emissions, aqueous a schedule discharges. supplemental monitoring 5-17 II HEALTH AND SAFETY MONITORING 6.1 Jwoose To protect the and Srppe safety as well during and health This the section GR-SI as the of plant employees. the safety and some general current safety health safety program practices at Hennepin will which must be followed. describes project. Station. be conducted additional monitoring Lurrent The (DSHAI variety of Federal industry, Sub-parts Surfaces, Hazardous All has of Department produced industries. Regulations. but Means Materials. utilities cover of Safetv haxinat of Labor's of These most topics Egress, such These are IP Hwin Safety can Title not in are general, Safety Health and Station and 29. specific including and Health, Health Part to Administration nationwide to a Occupational standards specified in General guidelines as which a set be applied 1910 of the each particular utilities. Control, public Code industries Occupational include Walking-Working and Environmental are all IP are required an additional facilities, used for continually, monthly, to are to follow safety including OSHA's program protection. all potential standards which listed ensures Station. in safe 29 CFR working Several 1910. different program sessions but IP maintains at is in are approaches progress at weekly, conducted Employees the be all this rules may to in exposed. conditions Hennepin employee and An extensive hazards with Safety new Data are Mandatory Sheets education identified training and (MSDSI to the brought which is also about which utility. and and discussed procedures. which workers available The rules provide by past IP Physicals an extended physical indicate and quarterly with Material of there the most of safety of meetings. familiarize provided and properties personnel all is the a equipment hazards the regulations which substances Manual of were In addition. Safety employees manual as well to for and basis. developed describing incorporate as suggestions provide all IP OSHA standards, safety accidents has are by IP safety personnel employees. a program required absence. physical examinations and those that all other for returning all to employees. work after have a new employees recommends employees on a yearly 6-1 6.3 GR-SI I-kaldk Maintaining the is Power effect. GR-SI at and Web and Monltorlnq safety to In in of the the be general. Safety the all employees the primary safety will of source during management practices remain the course which in of are for health a top the GR-SI project in priority EER project Manual. team as well effect as to currently during safety Illinois the management. as described and will project Hennepin which guidelines practices Station. may occur required and is required anticipated at the for to to plant the due to for abide construction by them. during be required the addition phase this of listed will No additional phase, the in be Any construction GR-SI 19 informed health except process of and asbestos Boiler asbestos construction contractor contractor's OSHA and air contractor implemented. Prior to the monitoring is will All these safety CFR 1926. be governed personnel standards monitoring by OSHA standards construction, abatement tubes are will activities. insulated be required All with to the include proper verify asbestos perform asbestos including disposal that to minimize will containing that asbestos proper heat be loss. conducted material. all applicable guidelines, When are the being removal measures and some by a The handling qualified necessary modifications during activities. to work specifications EPA regulations requirements, on site, asbestos with removal will be satisfied, and EER will a requirement considerations. initiation The purpose of of Phase this have III. survey been a safety is and to survey ensure will be and are will that: met. be conducted by EER personnel. 1) 2) All related All test In to all GR-SI Monitoring addition. operation will test OSHA to testing regulations noise, facilities arrive. of annually for will dust specifically before and and asbestos safety removal: equipment available personnel monitoring and results be conducted worker hearing health and will until pulmonary be conducted, project function. both prior of the thereafter be maintained completion. Records throughout employees' confidentially 6-2 II demonstration optional for Noise determine areas process four the the the information fan fourth areas exceed determine beginning the are or project. IP employees monitoring which areas established, equipment fans indicates These is not these III. Monitoring expected is of required the area increases will that fans 'action yet equipment fans three will available. noise are plant will to be required be associated for with all plant (29 EER employees operations. CFR 1910.95) Once a change and by OSHA regulations hearing not noise for noise in level. the levels areas Sound GR-SI is required to in that require protection. unless system. do not these monitoring or decreases be required fans level' EER anticipates below which level will exposure. conducted 85 decibels additional casing. fan installed where of Phase Vendor at for to of at the currently have of be installed Noise level installed OSHA noise 85 dB. information be conducted Monitoring once monitoring will be and worker A hearing will The within annually who have hearing exceed hearing the an equivalent conservation eight level six months to check of program. governing to mg/ms could or 2.4 coal. hour program time (higher program of for must weighted noise requires be instituted average over monitoring to establish in hearing will exposure of level if 85 of level. employee decibels time employee All included exposure or period). hearing level, in and the employees an exposure first thereafter, a possibility conservation a shorter a baseline be conservation exposure, a change noise excessive OSHA regulations employees coal the visible determine exposure and dust compliance, is dust sorbent. dust limits, anticipated not level that the will employee be exposed of dust dust exposure dust level during (29 CFR 1910.1000) of time greater weighted system startup. will to will to exceed system areas controls not feasible No additional observed GR-SI than require 15 mg/ms that or a is from with to a total on an eight-hour be generated fly and If and controls shall ash. workers levels are are be used. engineering During average. operation areas be evaluated It the be monitored, exposure. administrative When such measures task allowable identified full for be implemented. protective anticipated. achieve monitoring The only include handling particular of natural safety gas. issues sorbent. which and are the unique solid to the GR-SI project Safety by-product. 6-3 procedures well good industry for transporting All practice. and hardware Gas utilizing and controls firing natural installed no poses gas in will boiler problems furnaces for are with this established. be consistent unusual application. The baseline will caustic According lime but Station familiar available Handling minimize be directly filter safety health mask plants is not be hydrated irritant to the show injurious safe all sorbent lime and that is used in in the GR-SI fine hydrated for use with the powder. will glasses sorbent demonstration to lime system.1 in another Material hydrated systems In lime are addition. be provided with utilization. side be studies can be IP at powder suspendable performed irritating personnel process, Data will workers shields. and and all with be which a lightweight Minimal no additional plant Safety Hennepin form and if at Station that is a in [CaCOHlz] Lime from lime working dust with the fitting expected considered product particulate have lime the a fine (micron-sized) sufficiently inhalable. inhaled, Hennepin and Sheets are are will National dust to handle handling those and to Association, on workers respiratory procedures. suppression powder safety from dry necessary. generated been However, in currently with for the posted. who will procedures exposed and tight are is waste in the available human contact problems monitoring The only the process equipment. is the This fly mixture ashlsorbent contains calcium with will for the of mixture sorbent oxide. significant caught particles collection sulfated will controlled which oxide release. hydrate other than as well hydrate when as some exposed of neutralize 5.4.2. unreacted to the moisture product the The calcium heat to is it material the There material are those hydration and monitoring in Section be performed before spent aqueous sorbent completely no specific material disposed. requirements monitoring described discharge. Table 6-1 during shows the worker II during and Phase health III I. and of safety the monitoring which project. will be No conducting monitoring Phases demonstration was conducted I National Lime Association, Bulletin 213. National Lime "Lime Association, Handling, Arlington. 6-4 Application. VA. 1982. and Storage." TABLE 6-1. WORKER HEALTH AND SAFETY MONITORING PLAN MONITORING PHASE L No monitoring PHASE 11 Safety PARAMETER FREQUENCY LOCATION Survey once All applicable areas of plant PHASE LU oust Worker Health Function Hearing Pulmonary Noise Level as required annually (1) Areas N/A with visible dust once Near fans of the 1. Initial screening must be conducted prior GR-SI system. Annual exams will continue demonstration is complete. to operation until the 6-5 7.0 DUALITY ASSURANCE AND DUALITY and Scg~e the Duality CONTROL 7.1 This project the the 7.2 DA currently section contains the for at for the Assurance will has (DA) described plan in prepared for this as the they GR-SI are to concerning procedures practiced supplemental compliance plant. quality measurements monitoring This GA plan plans. document; according continue been EPA guidelines Shmplina Sampling assurance Prom for each in are have in to the measurement 4 and and where in to 5. be employed The sampling more detail to used each the during the for 5. of Clean prepared wash by samples Samples or GR-SI each which procedures are described demonstration sampling measurement. are not standard Reagents the reference containers in sample rinsing are are Sections procedures, used been description frequency and procedures in Section includes location, sampling protocol EPA procedures appropriate. described to be used are used and rapidly required measurements grade For chemicals samples. example. are conform are with air-dried specifications methods. appropriate as are Reagent solutions. all as for is exclusively. container probe rinsing. preservation collect containers practical: these particulate after no special acetone-rinsed, analyzed times however. measurements. holding 7.3 Many involve not sample groups generating and particle accuracy sampling, characterization washes .and the require of the of measurements continuous procedures. related will to be employed or work sampling. physical NOx matter substrates. the other closely All compliance during the GR-SI demonstration which stringent assurance measurements loading verify by-product particulate in SOz and probe NOx the do use monitors EER will require measurement monitoring with The IP's are method collected the test methods requires quality particle to custody any custody on procedures. compliance that size supplemental samples of the and on custody measurements, on glass measurements, continuous water include cascade sampling. particulate impactor EPA reference Samples SO2 and solid for filters, for fiber Samples 7-1 verification solutions. will Qualitv utilize legal AssurV EPA for are Pond the liquid effluent "chain samples and of custody. containing River procedures SO2 and samples for are NOx collected are all aqueous samples listed in in aqueous EER by 3 of 111 - Illinois These samples. as defined Section custody" for Air &&a&. sample procedures Pollution M-t EPA-600/4-77-027b. and Freauebcy for in will is each Table Svstems: Volume August 1977. 7.4 Calibration listed is will to in Table for the 7-l. conducted be used ensure that . ion Procedures and is the of procedures Opacity to system. internally each accuracy frequency not included system measurement 7-l since at to the calibration system calibration are instrument. Each the measurement Standard procedures a frequency calibration be calibrated traceable standards. 7.5 Continuous opacity, These sensitivity instruments provide HC. CO, and will permanent The monitoring measurements and solids own instruments 7.6 Figure collection sampling each independent of and 7-l shows EPA instruments be tical Procem instrumentation and SO2 concentrations selected possible. with a strip results. in 7-2. Table Where 7-l are used the such utilizing with the recorded of test specifically interferences to is be to used described provide Test data chart to analyze in Table the from recorder NOx. 7-2. highest the to monitoring COz. 02. were minimum documentation standard other will continuously procedures listed standard in given Table procedures. instruments use analysis possible, laboratory remaining as water their Some measurements be conducted by an outside and calibration tion the to The by the portion test procedures. and Validation general reporting and each scheme reporting results to verify for of are the results then each results. are measurement Following calculated to subjected from the for an raw data analysis validation of preliminary supervisor measurement, measurement. check following: 7-2 7-3 / TABLE 7-2. CONTINUOUS ANALYSIS INSTRUMENTS I GAS MEASURED OETECTION PRINCIPAL Nondispersive Infrared Nondispersive Paramagnetic NOUV Chemiluminescent Flame Ionization Detector CFIDl Light Transmittance MANUFACTURER ANARAD ANARAO Taylor Servomex Western Research TECO Beckman To Be Determined MODEL NO. ARSOOR AR500R OA570 721AT 1OAR 402 RANGE O-500 ppm to o-2.000 ppm 0-25X co co2 02 so2 0-10x 0-25X O-5000 O-2.5 ppm ppm to ppm I NOx O-10.000 HC Opacity 7-4 Calculation of Results - Yes calculation Errors Made? Fail , L Invalidate Data I Quality Control Checks FIGURE7-l. DATA REDUCTION VALIDATION AND 7-5 / . . . Data are obtained then not Accuracy Proper of calculations and analytical experimental sampling are with with then other existing procedures. the criteria performed and analytical independently will The be above used checks to are then data validated are the and added to or results data procedures conditions analytical to are procedures. Results identify subjected to passing potential a double or under the nonchecks check of sampling Representative with improper representative Results calculations conditions. correlated correlating invalidated. outliers. and measurement passing Specific Measurements the data base. validate following: experimental 1. 2. 3. The and on-site validation that Measurement conditions. Proper sampling under representative procedures utilized. Calculations Test of the Officer procedures Engineer data. will are checked. for Supervisor program verifying the results the collection, will that reduction, for Quality data The specified the be responsible on-site fulfil1 and Test the for that be responsible the meet ensuring Assurance handling criteria. 7.7 measurements followed objectives. responsible validation Internal EER will conduct items: Routine Internal Periodic Quality Control Checks quality control program which will include an internal the following . . . The calibrations audits quality and maintenance control checks for data collection of all and will instruments frequency also be and are engineers/technicians for in routine 7.4. calibration Specific systems. Section responsible and calibration responsible measurement discussed maintenance procedures 7-6 The measurement reauirements The The quality EER Duality systems are met. Assurance and These also to Officer to are audits administer be used and checks gases are ((IAO) ensure discussed will in conduct that all Section quality internal quality 7.8. control audits assurance of procedures EER (IA0 will control Calibration - a program listed of below. checks. checks 1. Standards equipment reagents zero Control blanks spiked surrogate charts samples and span Samples Devices 2. Duality - samples 3. 4. Replicates Control 7.8 EER will system system analysis, collected. assessment of audit used data the is for System participate an the on-site total audits following: . and ~siblllty are these - Are is it Is used? written to calibration In establish addition, sensor. procedures a review traceability available should of and are be made Are written . Is the quality assurance procedures available data validation and in and conduct and for system review system each and of (sample monitoring performance the quality collection. sensor appraisal or and audits. assurance sample sample include A inspection measurement etc.) are normally processing, a qualitative 1. 2. 3. 4. 5. Draanlzatlon organization Sample available Samole are Data available . w these of schedule these operational? Collecti~ and sample-collection as written? analysis of criteria procedures for followed written a list Analvsis followed and . followed ValldatloD - Are as written? as written? used procedures and data calibration by measurement 7-7 6. 7. Augj& Ireviewed? - Are control charts - Are for performance from preventive the OA plan? audits reviewed? testing schedule results the in interlaboratory maintenance a. being Performance auditor analysis 1. 2. 3. These control having the system control should to ensure audits checks the routine or audit of charts be applied that to evaluate system. Sampling Analysis Data are followed audits the Maias refer quality - Is recommended to audits independent of data checks produced are made by the by the total categorized supervisor sampling as follows: or and Performance audits audits generally processing performed by the audits independently of and in addition from sampling into subsequent of external operator/analyst, operating conditions. from several the one The the the or plotting reference if to can the normal be one or of quality by the on operator/analyst. or, in the case standards and the The knowledge reflect by most - The reference rate use of normal Independence operator/analyst of achieved conducting by analysis results standards possible, made by a different external by the without recorded audits routine of &g.jj, and flow reference comparison supervisor. the results made the measurements interlaboratory analysis, introduction sampling Performance conducting following the are a different may be common type auditor uses operator/analyst conducted of audits. a separate to check the set in measurement ways. examples 1. Samolina flow meters a. b. C. of calibrated collection standards sample system: devices calibration calibration auditor is gases, commonly for when applicable provided a portion or instrument instrument Audit& aliquot of several - The 2. routine samples analysis. 7-a 3. Qata check Proon calculations. in the data of by review EER's provide in to the internal conduct the - Data and these quality processing processing data system commonly may a dummy involves be set of a spotby data raw validation data. program system and of !&alitv and II. will types checked inserting followed As part 7.7, These the audits of will according Pollution 1976 and the appropriate Following them action audits reports. 7.9 Proper ments. preventive ensure equipment procedures to these performance 7.10 The indicator ensure precision, that precision, measurements the quality accuracy, that During Preventive equipment this quality malfunctions. and routine to detect critical maintenance to the will Test be procedures validated control discussed performance conformance the Aaudits in Section audits. with will the be EER DA0 will specified independent OA plan. Svstems. August developed. and Where specified a comprehensive procedures evaluation applicable. in I For audits the systems. evaluate identify Section in requirements conducted for March audit following etc., Air Measurement EPA-600/4-77-027b. have for each initiated corrective the audit. as been EPA guidelines specific the Volumes 1977. the EPA-600/g-76-005. where conducted audit samples, no EPA by be of measurements substituting measurement EER DA0 will If the will audits in the results The results and report of all Supervisor. action DA problems, 7.11. the quarterly corrective monitoring discussed and any be discussed Maintenance operation project. and data maintain are Tables spare and allow n of parts EER is essential utilire an 7-3 for inventory and and the of Indlw completeness over are these of the goals of each of of the this Project measurement data quality to for are goals data to 7-4 to obtaining of list critical data standard systems. monitor problems. quality for spare loss In measureroutine parts due addition equipment to to EER will collected standard procedures minimize maintenance measurement continually equipment procedures, personnel correction DaLRJDal1t.v and accuracy, will and be monitored assurance completeness duration project achieved. critical 7-9 TABLE 7-3. PREVENTIVE MAINTENANCE PROCEDURES EOUIPMENT INSTCalibration Instrument Conditions Leak Check System Clean Tips Sample Filters Sample Flow Rate Probe Probes Gases Operating Sample Filter Verify PROCEDURE FREQUENCY pressure > 100 psig Daily Daily Daily Verify to manufacturer's specifications Vacuum and pressure component check Reverse gas purge compressed air Balance sample each probe Change Verify Verify constant constant flow with in Daily Daily Weekly, or as required Daily Daily Daily Monthly System Vacuum/ Pressure Heater and Chiller Temperatures NOx Vacuum Pump Oil Verify within specifications Change LABORATORY EOUIPMENT Balances Calibration check Service and calibration by manufacturer Routine service Daily Semiannually As specified manufacturer by Instrumentation 7-10 TABLE 7-4. CRITICAL SPARE PARTS CONTINUOUS MONITORING INSTRUMENTATION Filters Probe Sample Back Filter Pump Diaphragm Regulator Capillary Sample Flowmeters and Cells Pressure Frits MANUAL SAMPLING EQUIPMENT Sample Nozzles Pump Oil Manometer Fuses Glass Nozzle Sample Probe "0" Filters and Liners Rings Oil Pump LABORATORY EQUIPMENT Reagents GC Columns Glassware Instrument Combustion Filters Scrubbers Spare Tubes Parts: Pump Valves, NOx Sample Infrared Valves, Misc. Tubing Fittings Thermocouples Lead Wire Glassware Reagents Ash Sampling Containers 7-11 / listed interval in Table will of 7-5 also the for be results supplemental determined to will monitoring for each parameters. measurement The to confidence allow the significance Duality and to 005. a loss accuracy show any charts Control of be evaluated. be maintained a loss of or deterioration and maintained to monitor on a daily control in data standard determinations. limit be and 23s established as this review for to for in quality quality and deviation. Control the based necessary project. to determine quality on after the basis for precision and Quality indicate of s. of lines results Measurements cause each each will control of a data control to trends will charts for be the at +2s will and identify in charts immediately improvement will any plotted be utilized measurements. as the the limits is will being the warning will and will any measurement control. in and to accuracy EPA-600/9-76- control be constructed as described control The precision measurement measurement be established limit. previous base of 7.11 the of exceeding loss relative mean of for these accuracy Initially, measurement 15 to the of warning control programs limit before Action occurrences Not Achim be modified 20 determinations obtained validated. be subjected Corrective The following 1. 98 7.1. 2. 3. between 4. Sianifimions This Audit and/or Goals will require - This corrective includes the criteria action: failure to achieve in during the precision, accuracy and completeness - Deficiencies audits. specified Section systems Deficiencies performance oratorv similar involves may be identified - This by separate Reaulated by or the concerns schematically to the attention The the above. and will compare actually includes CMlparlson samples a Problm analyzed of discrepancies group that laboratories. Unregulated advisory exist. in Figure of GA and the 7-2. EER determination and health is shown significant The It Test then goals is the review. to corrective responsibility (TS) determine if environmental action of any the of what procedure the the data EER (IA0 to problems are suspect, bring listed Supervisor determine TS and QAO will project in specific QA problem 7-12 cause a problem 7-13 (IA PROBLEMS GOALS NOT ACHIEVED PRECISION ACCURACY COMPLETENESS EXTERNAL/INTERNAL AUDIT DEFICIENCIES SYSTEHS PERFORMANCE INTERLABORATORY COMPARISON FAILURES OK 4-b PROBLEMS REPORTEDTO TS BY CIAO v REVIEW/COMPARE OA AND PROGRAM GOALS AND DEFINE POTENTIALLY INVALID DATA BY TS AN0 QAO PROB REVIEW MEASUREMENT SYSTEMS AND PROCEDURE BY PE PRO8 SOLVE PROBLENS BY PE OK REVISE (IA AND/OR VERIFY OPERATION BY CIAO 1 OK t . 1 REvI~~~OVAL j REPEAT v EVALUATE REPEAT I f REPEAT SELECTED TESTS 1 TO S OK BY TS AND OAO REPORT INCIDENT TO TS AND DOE I TS - EER TEST SUPERVISOR PE - EER PROJECT ENGINEER (IA0 - EER QUALITY ASSURANCE OFFICER Figure 7-2. Corrective 7-14 action procedure. BY OAO I achieving stringent, The GA plan If will system problems include remaining EER project project they will will goals. then If it is to by the are determined reflect the that current the GA goals project are too be modified be revised project of the as (PE). solved. will goals subject The required. the objectives. GAO accordingly. determined proceed the verify to to be satisfactory, and solve the procedures the that This etc. the to measurement the may Any TS an the (IA and review engineer etc., been delegate problems. have specific measurement PE will When and/or PE. solution the process systems PE has determined results. audits, EER GAO will systems by the OA plan, review calibration, performance problems be handled of the and the TS will validation Following other with specific related the data tests Although valid Significant situations effort possible. characteristics concentrations health process requiring reports. 7.12 In this contract be Quditv some concerns, modification to and revision actions. reduction must of (Figure measurement data 7-l) and problems in determine and if questionable accordance be repeated. it actually of operations. nature the application exist be will at taken be will treatment action of high is possible much some In the to that higher substances these problem this levels to boiler. which correct in the the suspect (or lower) could situations. and may If data are than indicate EER will correct simply it is it found to be unlikely, are GR-SI the cases. GR-SI action or substances concentrations values during determine In some of of anticipated. unforeseen make every as soon that as the any or with incident concentrations represent found environmental either each of generate The details problem, quarterly technologies. reported corrective monitoring Assurance of OuLside will order . . Oraanuaiarts be obtained and data of plan analyses quality these with performed laboratories from regard to organizations for and these will data instances, by non-EER the into the samples personnel, In quality program including to verify assurance both plans utility laboratories. measurements/analysis. incorporated by those supplied EER quality assurance laboratories. 7-15 l / 8.0 8.1 The any test ensure information be flexible the which The will of depend data. required, Finally, format data DATA MANAGEMENT AND REPORTING and Ssg,p~ management program. quality. storage enough and the system user for must of They data must They capacity the of requires. management in which acquisition data procedures the data applied are to environmental and upon via the of any data type the which must for user the have been in of data capability generated with a system or to is an integral backups which years. any data functions the has part sufficient must be a well. in may as data of to be recorded a period to faithfully months access of and checks The system which be stored have capable performing have processing reproducing specific upon means: the data manner acquired Environmental may be accomplished following 1. 2. 3. 4. Direct in field Laboratory results in-situ acquisition analysis of of discrete data data (e.g. samples chart on-line pH meter with reading recorded of logbook). manual recording on laboratory data data on disk. the will directly a hard will procedures logic to copy and is testing is format. the data in an 8-l behind the will the data as manual management for the noted and system. Once data to a data data sheets. on strip by recorders. computer, with data Continuous Continuous recording recording acquisition Figure are have of computer 8-1 illustrates they or system entered. Printouts generated been be recorded either computer, with manually subsequent entry After the above. validity for of the be produced checked. data be compared documentation validation recording Once the hardware. verified system. will also Some required, and corrected Any be stored reports of the as for can and necessary, information data be relevant identification by the The may manner. require generated the data which data within to data produce quality the the reporting will be stored pertinent As in a to computer additional may be purposes. system processing user-specified information applicable 8-2 computer test 8.2 The performed EER will with reports system has the capability for any data processing necessary for the program. Beportina communication on submit will a regular quarterly on include: Summaries prior 2. Copies regulatory includes monthly 3. data Reouirements of basis and process with annual and complete reports and potential measurement reporting of the problem information of all areas. relevant data to must be DOE, data. environmental emphasis summaries Iluarterly 1. of environmental monitoring data collected during the quarter. of all a one compliance by submission reports. time reports IP during of and analyses previous test submitted quarter. results, data. unregulated comprising to This plus authorities NPDES monitoring and present concern, from of significant issued of and the compliance and coal of of composition and group Identification substances and health representatives characterization at concentrations EER and the plant's changes by the problem of permit to the regulatory areas actual, as determined regulated significant environmental by an advisory utilities. status, terms of including permits 4. Description of any violations a description or notices of authorities. encountered anticipated. during or the prior 5. Identification quarter solutions. indication possible 6. Recommendation defined information. in the of modifications Monitoring a basis Plan for to or which the deletion are not of specific yielding tasks useful including recommendation. 0-3 Annual reports will The fourth Summary and the patterns include: quarterly of four in the of monitoring previous data report. information quarterly and summary of of from reports, data. or health concern, based all prior including annual reports and 1. 2. trends 3. Indication on previous any trends which any of environmental been problem have be taken. been reports whether or annual measures have the submitted. areas identified and, if in previous not, what 4. Indication quarterly mitigation reports should resolved a.3 Data showing taken addition will project. Data Committee. participants, providing review provided ongoing recommend is host to in review that: Certain monitoring of the tasks techniques quarterly project be discontinued, or instrumentation and annual management changes at reports DOE and modified or added: or will be including sites determine the quarterly of monitoring for if reviewed will EER. the there and on the are annual information. an annual of basis participants. projects. significant reports. members findings Based of on the by a Monitoring from and The main the purpose among the all Review project utilities of the this data can if will required. of review data be reviewed results This will by EER and be reviewed. modification or change all in IP as it to becomes monitoring monitoring of the available. frequency. location. demonstration Data action the EER significant verified, and appropriate may include parameter. a monitoring continuously throughout phases The Committee be composed funding any demonstration representatives Committee's Committee 1) 2) 3) If New analytical The format are the be substituted: be changed. EER will recommendations to made, consider modification EHP and authorize as appropriate. a-4 I I APPENDIX A . e Illinois 217/782-2113 Environmental Protection Agency - P. 0. BOX 19276. Springlield. IL 61794.9276 OPERATING PERMIT PERMITTEE Illinois Power Companv Attn: Aric D. Dierick, Supervisor - Environmental Administration 500 South 27th Street 62525 Decatur, Illinois :“p; pa;Fo: ;,“a; ‘,m;; PP 9 Subject: Hennepin Eoiler I1 -sued: February 22, 1989 Location: P.O. 80x 195. Hennepin I.D. No.: 155OlOAAA DateReceived: December 23. 1988 Expiration Date: March 31, 1991 Permit is hereby granted to the above-designated Permittee to OPERATEemission source!s) and/or air pollution control equipment consisting of boiler #l with associated electrostatic precipitator as described in the above-referenced This Permit is subject to standard conditions attached hereto application. and the following special condition(s): 1. Emissions of sulfur dioxide from boilers 1 and 2 (caabined) limited to 17,050 lbs in any one hour period. standards is shall be during Za. Emissions in excess of applicable emission startup, malfunction and breakdown. allowed b. Combustion of the chemical metal cleaning waste sludge and waste oils may not be initiated during startup, malfunction or breakdown. If a malfunction or breakdown should occur while the sludge or waste oil is being combusted. the loading of the sludge/coal/waste oil mixture to the bunker shall be discontinued until the malfunction or breakdown is corrected. Records shall be maintained of the hours that the sludge/coal/waste oil mixture was combusted during malfunction or breakdown condftions. 3. The Permittee shall notify the Agency's regional office by telephone as soon as possible during normal working hours upon the occurrence of excess emissions due to malfunctions. or breakdowns. The Pennittee shall comply wfth all reasonable and safe directives of the regional office regarding such malfunctions and breakdowns. Within five (5) working days of such occurrence the Permittee shall give a written follow-up notice to the Agency's regional offfce providing an explanation of the occurrence, the length of time during which operation continued under such conditions. measures taken by the Permittee to minimize excess emissions and correct deficiencies, and when normal operation resumed. . Q Illinois Environmental Protection Agency . P.O.Box 19176.Sprin@isld. IL 61791.9276 Page 2 shall maintain and breakdowns. records OF excess emissions during As a minimum, these records shall or breakdown; of the cause for such emissions; of 4a. The permittee malfunctions (I) (ii) (iii) (iv) Iv) include: date and duration a full and detailed of malfunction explanation emitted the contaminants emissions; and an estimate the quantity and of the quantity of emissions the measures used to reduce duration of the occurrence; and the or the steps taken to prevent similar malfunctions reduce their frequency and severity. or breakdowns b. These records shall be retained for at least two years following an event, maintained at a readily accessible locatfon at the plant, and be available to representatives of the Agency during normal wDrkfng and/or operating hours. 5a. Organic liquid by-products or waste oils other than that permitted by Condition #Sb shall not be burned in these fuel combustion emission sources without written approval from this Agency. b. Waste oils fitting the following description not to exceed approximately 10,000 gallons and 2 (combined). (i) (ii) lubricating engines, hydraulic oil fluids. with coal all on the conveyor fuels stored belt leading to from coal mills, may be burned in quantities per year in Hennepin boilers pumps, turbines, 1 fan motors, and IC c. The waste oil shall be blended the breaker buildfng. 6. 7. The Agency shall location. be allowed to sample at the above of 10, This permit allows the burning of chemical metal cleaning waste sludge the same general composition as outlined in your letter dated February 1986. The plantwide quantity of sludge to be generated and burned is estimated to be 45,500 gallons every 3 years. a. The Pennittee shall analyze one time individual waste oil streams prior to and mixing together for arsenic, cadmium, chromium, lead, flash point. total halogens. The analysis report shall be submitted to the Agency by August 1, 1989. . . a Illinois Page 3 Environmental Protection Agency - P. 0. Box 19276. Spring&Ad. IL 62?44-9276 9. The Permittee shall also analyze one tfme a representative sample of waste oil to be burned for sulfur, ash, BTU, and bottom sediments and water. The representative sample shall be prepared by mixing individual waste oil streams in the ratio normally expected to be produced. The analysis report shall be submitted to the Agency by August 1, 1989. shall analyze a representative sample of waste oil to be 10. The Permittee burned for arsenic. cadmium. chromium, lead, flash point, total halogens, The analysis report shall be submitted to the sulfur. and BTU values. Agency with the next permit renewal application. The frequency of sampling may be reduced depending upon the outcome of analytical results. 11. The Permittee shall keep records of the quantity and analyses of waste oil fuel burned for energy recovery and the estimated quantity of chemical metal cleaning waste sludge burned for a period of three (3) years. These records shall be kept on site and shall be made available to Agency personnel on request during normal working and/or operating hours. The Permittee shall report to the Agency the annual quantity of waste oil fuel and chemical metal cleaning waste sludge burned by February 15 of each year. shall submit quarterly reports of the daily tonnage and 12. The Pennittee daily analyses of the coal burned in the above-referenced equipment. For any day in which the SO2 emission rate exceeded 5.8 lbs. per million btu. the maximum hourly heat input to the coal fired boilers shall also be Coal samples shall reflect daily averages of the fuel as burned reported. in each fuel combustion emission source for percent moisture, percent ash, ASM procedures shall be used in percent sulfur and heat content. sampling and analysis of the coal. This report shall be due within 30 days after the end of each calendar quarter. TAS:WG:jmn/0067K/60-62 cc: Region 2 R; Watson - DLPC STATE UNOIS OF ENVIRONMENTAL PROlEenON AGENCY 0lw.l0N OFAIR POU”llON CONTROL mm CHVRCHU ROAD SPRINGFIELD. 52706 u.uNOlS STANDARD CONDITIONS FOR OPERATING PERMITS Juiy 1.1935 The Ninois Envimnmenkl Envimnmenkl Prokction The following conditions Proketion Act Clliioia Revised Statutea. Chapkr 111-l/2, Section Agency authority to impose conditiona on permik which it issues. are applicable unle~ aupeneded by ape&l permit condition(s). 1039) grants the 1. The i&ence of thii permit doz, not release the permittee from compliice with akk and federal regulations which e.re pert of the Illinois Skk Implementation Plan, LI well aa with other applicable statutes and regufationr of the United Skka or the Skk of Ninoiq or with applicable local laws, ordinances and regulationa. 2. The Agency has issued this permit based upon the information submitkd by the permitke in the permit application. Any misinformation. false statement or mispresenktion in the application shall be groun& for revocation under 35 Ill. Adrn. Code 201.207. 3. a. The permittee shall not authorize. uuse, direct or allow any modfflution, u defined in 35 Ill. Adm. Code 201.102. of equipment, opmtione or practioca which are refleckd in the permit application aa mdunitkd unlesll a new application or request for revision of the existing permit is filed with the Agency and unless a new permit or revision of the existing prmitb) is iaaued for mzch modification. b. This permit only covers end&on aourcea and control equipment while phyclically present at the indicated plant location(s). Unless the permit specifically pmvides for equipment relocation. this permit is void for an item of equipment on the day it is removed from the permitted location(s) or if all equipment is removed. notwithstanding the expiration dak specified on the permit agent of the Agency, upon the presenktion of credentials. at 4. The permittee shall allow any duly authorized reenonable times: a to enter the permitke’a property where actual or potential effluent, where any activity ie k be conducted pursuant k thin permit emia@ion or noise sources are located or b. C. to have access to and k copy any records required k be kept under the krme and conditions of tbia permit, to inspect, including during any hours of operation of equipment constructed or operated under this pen& such equipment and any equipment required to be kept, used, operated. calibrated and maintained under tbii pemif to obtain and remove samples of any discharge or emission of pollutants. to enter and utilize any photographic. recording, testing. preserving, testing, monitoring or recording any activity, and d e. monitoring or other equipment for the purpose of discharge or emission authorized by this permit. 5. The issuance of this permit: a. shall not be considered facilities are located, as in any manner affecting the title of the premises upon which the permitted b. does not release the permittee from any liability for damage LOperson or property caused by or resulting from the construction. maintenance, or operation of the facilities. c. d. does not take into consideration or attest ta the structural stability of any unit or part of the pmject, *nd : : in no manner implies or suggests that the Agency (or its offi~en, agents or employees) ~~somes any liobilit directly or indirectly, for any loss due to damage, installation. maintenance, or operation of the proposeu equipment or facility. 6. The facilities covered by this permit shall be operated in such a manner that the dispal of air contaminants collected by the equipment ahall not cause a violation of the Envimnment.al Protection Act or regulations promulgated thereunder. 7. The permittee shall maintain all equipment covered under t&ii permit in such a manner that the performance of ouch equipment shall not cause a violation of the Environmental Protection Act or regulations promulgated thereunder. 8. The permittee ahall maintain a maintenance record on the premises for each item of air pollution control equipment. This record shall be made available to any agent of the Environmental Protection Agency at any time during normal working hours and/or operating hours. As a minimum, this record sball show the dates of performance and nature of preventative maintenance activities. 9. No person ahall cause or allow continued operation during malfunction, breakdown or startup of any emission source or related air pollution control equipment if such operation would cause a violation of an applicable emission standard or permit limitation. Should a malfunction. breakdown or startup occur which results in emissions in excess of any applicable standard or permit limitation, the permittee ahall: a. immediately report the incident to the Agency’s Regional Field Operations Section Office by telephone, ~telegraph. or other method as constitutes the f-test available alternative, and shall comply with all reasonable directives of the Agency with respect to the incidenr; maintain i. ii. the following records for a period of no lew than two (2) years: of malfunction. breakdown or startup. b. i date and duration full and detailed explanation of the cause. of emissions. , breakdown or startup, and iii. contaminants emitted and an estimate of quantity iv. measures taken to minimise the amount of emissions during the malfunction, occurrences and frequency of incidents. Y. measures taken to reduce future 10. If the permit application contains a compliance program and pmject completion schedule. the permittee shall submit a project completion status report within thirty (30) days of any dati specified in the compliance program and project completion schedule or at six month intervals. whichever is more frequent 11. Beginning one year from the date of :his permit the permittee shall submit an “Annual Emission Report,” form APC-208. as required by 35 Ill. Adm. Code 201.302. (Note: If the permittee has other operating permiLs for this facility, the “Annual Emission Report” for all such permits may be included in a single annual submission.) “POE5 PermttNO.IL0001554 1lli”OIL E”“ironmntal PrDtectlonAgency Dirtsion Of water Poll”tlo” Control 2ZOD Churchill Road P.O. 00x 19276 SpringField. Illl"OiS 627944276 Nodlfied (NPOES) Perm,t Issue Date: Effective July 1s. 1965 1989 2. 1989 Explrrtlon Date: April 1. 1990 Hod!flc*tlon "odlficatlon Nuns and Address of Permittee: Facility 0at.s: ruqurt 14. 19as Issue Date: ,"ru 2, Effective gate: July and Address: N&m Illlnols Power Cmpany 5.00 South 27th Street 62525 Decatur. xllinols gtscharge No. No. No. No. No. No. No. Number and Name: Illinois power Cmpa"y ncnnepln Power Plant Hcnnepi". Illinois 61327 Putnam county Receiving 111inais uaters RI"W 001 Condenser Cooltng Mater 001(a) Boiler Blowdom 001(b) Intake Screen Uckwlsh 001(c) Roof Drain Discharge 003 Ash Lsgaon "2 and I4 O+scharge 005 Ash ‘lgoon #l and #3 Discharge 005(a) Chemical "eta1 Clernlng "aste Treatment System Effluent the Act. Ylbtttle C Rules above-nerd prrittee recetrlng stru ,n In cocqllmce rlth the prpvisions of the I111nois En"lromnt.1 Prptcctlm and Regul~tlons of the Illinois Pollution Control Board. and the WPCA. 1s hereby uthorized to discharge at the .bo"e location to the rbove-n-d accordance with the standard Condltlons and l ttachmnts herein. Permittee authortzatlon application days prior Is I" ores* to I-CCCIVC not authorlzed tp dlsChWgC after the abo"e cxplrrtlon date. tp dtscharqe beyond the explratlon date. the PermIttee shall submit the prwr as rcqutred by the Illlnols En Irormmtal Prote tton
Related docs
Other docs by EIA
MORTGAGE DEED
Views: 441  |  Downloads: 8
10
Views: 161  |  Downloads: 0
Application To Rent Or Lease
Views: 1247  |  Downloads: 60
Authorization to Release Information
Views: 216  |  Downloads: 1
Tenant_Moveout_Report
Views: 163  |  Downloads: 3
Truman Doctrine info
Views: 222  |  Downloads: 1
Insured buy and sell agreement
Views: 379  |  Downloads: 18
4mega
Views: 123  |  Downloads: 0
Chinese Exclusion Act info
Views: 208  |  Downloads: 0
Three types of bankrptcy cases
Views: 322  |  Downloads: 7
Devise of real property as consideration
Views: 196  |  Downloads: 2