Public Notice of Special Amendment to the STIP - May 4, 2009

Document Sample
Public Notice of Special Amendment to the STIP - May 4, 2009 Powered By Docstoc
					Public Notice of Special Amendment to the STIP
The Federal Highway Administration [FHWA] has advised Wisconsin Department of Transportation
[WisDOT] that highway infrastructure funding included in the American Recovery and Reinvestment Act
[ARRA] is a resource for programming projects in the Wisconsin Statewide Transportation Improvement
Program. This amendment notice is for the eleven Wisconsin DOT projects [listed below] that are not
part of the 2009-2012 STIP. These projects may be amended into the STIP subject to any Federal
requirements and the actual amount of American Recovery and Reinvestment Act funds requested.
The following projects may be let in Calendar Year 2009.
Projects:
6355-00-72           CTH Z   STH 12 – 18th Lane            Reconstruction
                       Adams County    STP – Rural

6676-06-70           Ross Avenue Metro Drive – Eau Claire River Bridge
                     Village of Weston              Pavement Replacement
                         Marathon County STP – Urban (50,000 – 200,000)

6999-09-70           S. 17th Street Stewart Ave – Elm Street
                     City of Wausau                    Pavement Replacement
                        Marathon County STP – Urban (50,000 – 200,000)

6770-02-70           CTH D IH 39 – CTH J                   Pavement Replacement
                       Portage County STP – Rural

9325-02-70           CTH U Marinette County Line – CTH N
                     Florence County, Pavement Replacement, STP – Rural

9896-04-70           Trout Lake Bicycle Trail Non – Hwy
                     Town of Boulder Junction Trail and Bathroom facilities
                        Vilas County Transportation Enhancement (TE)

6584-01-70           N. 12th Street Hemlock Street – Green Tree Road
                     City of Clintonville              Pavement Replacement
                        Waupaca County STP – Rural

9818-00-70           Mole Lake Multi-use Trail Non – Hwy
                     Sokaogon Chippewa Band of Mole Lake   Multi-use Trail
                       Forest County Transportation Enhancement (TE)

4810-01-71           Kiel Road – Local Road     Kiel Road Bridge & Approaches
                         Fond du Lac County     BRRLP P-20-0075

8887-03-74           CTH A Pine Creek Bridge & Approaches
                       Taylor County         BRRHB        B-60-0013

5990-00-79           Various Local Streets      Pavement Rehabilitation
                     Blackbridge Road, East Milwaukee Street, Kellogg Avenue,
                     Mount Zion Avenue; and, Oakhill Avenue
                     Rock County - City of Janesville
                         STP-Urban (50,000 –200,000)

These amended projects are listed in PDF format under “Special Amendments to the STIP” link on
http://www.dot.wisconsin.gov/localgov/highways/stip.htm . As with all STIP amendments, a 15-day
public comment period will be offered for the eleven projects beginning on May 20, 2009 and ending on
June 3, 2009.
                                                                      2009-2012 STIP
                                                  American Recovery and Reinvestment Act Project Amendment
                                               Orig                                     Orig
Project    County      Hwy           Prg       Estimate       Curr Estimate             Sched    Curr Sched Title/Concept/Limit            Reason
6355-00-72 ADAMS       CTH - Z       206       0.00           $5,000,000 - $5,999,999               7/28/2009 STH 21 - 18th LANE           ADVANCED
                                                                                                              RECONSTRUCTION
                                                                                                               METRO DRIVE - EAU CLAIRE
6676-06-70 MARATHON    LOC - STR     206       0.00           $2,000,000 - $2,999,999                7/28/2009 BRIDGE                      ADVANCED
                                                                                                               CONST/PAVEMENT
                                                                                                               REPLACEMENT
6999-09-70 MARATHON    LOC - STR     206       0.00           $500,000 - $749,999                    7/28/2009 STEWART AVE - ELM STREET    ADVANCED
                                                                                                               CONST/PAVEMENT
                                                                                                               REPLACEMENT
6770-02-70 PORTAGE     CTH D         206       0.00           $3,000,000 - $3,499,999                7/28/2009 IH39 - CTH J                ADVANCED
                                                                                                               CONST/PAVEMENT
                                                                                                               REPLACEMENT
9325-02-70 FLORENCE    CTH U         206       0.00           $3,000,000 - $3,499,999                7/28/2009 MARATHON CO. LINE - CTH N   ADVANCED
                                                                                                               CONST/PAVEMENT
                                                                                                               REPLACEMENT


9896-04-70 VILAS       NON - HWY 214           0.00           $100,000 - $499,999                    7/28/2009 TROUT LAKE BICYCLE TRAIL    ADVANCED
                                                                                                               TRAIL AND BATHROOM
                                                                                                               FACILITIES
                                                                                                               HEMLOCK STREET - W. GREEN
6584-01-70 WAUPACA     LOC - STR     206       0.00           $100,000 - $499,999                    7/28/2009 TREE ROAD                 ADVANCED
                                                                                                               CONST/PAVEMENT
                                                                                                               REPLACEMENT
                                                                                                               MOLE LAKE MULTI - USE
9818-00-70 FOREST      NON-HWY 214             0.00           $500,000 - $749,999                    7/28/2009 TRAIL                       ADVANCED
                                                                                                               CONST/ MULTI - USE TRAIL
                                                                                                               KEIL ROAD BRIDGE &
4810-01-71 FOND DU LAC LOC - STR     205       0.00           $100,000 - $499,999                    7/28/2009 APPROACHES                  ADVANCED
                                                                                                               BRIDGE REPLACEMENT
                                                                                                               PINE CREEK BRIDGE &
8887-03-74 TAYLOR      CTH A         205       0.00           $100,000 - $249,999                    7/28/2009 APPROACHES                  ADVANCED
                                                                                                               BRIDGE REHABILITATION
5990-00-79 ROCK        LOC - STR     206       0.00           $1,000,000 - $1,999,999                7/28/2009 VARIOUS LOCAL STREET        ADVANCED
                                                                                                               CONST/ PAVEMENT
                                                                                                               RESURFACING
                       Advanced: Project moved into STIP Period                         Deferred: Project moved out of STIP Period
                       Increase: Project Estimate Increased                             Decrease: Project Estimate Decreased