7-S of Project Management by ohd39540

VIEWS: 556 PAGES: 20

More Info
									  S&N Monitoring plan:

                                                                                                              Project Boundary
    Soroosh
      SPP-2

                                                                     AB-PP
                                    Gas
      SPP-1
                                                                            C1




                                                                     Gas
                                  8" 27km
                               subsea pipe
                                                                                      26" 82km
                                                                                     subsea pipe
                                                                 Aboozar
                                                                 AB-GCP
                                 16" 25km
                               subsea pipe                                                                             8" 3.8 km         Kharg Island
    Nowrooz                                                                                                            pipeline

                                    Gas
      NPP-2
                                                                                                                                   C3
                                                                                                               Points C2 and C2           Precipitate
                                                                                                               C3 located after
                                                                                                               separators at              Dorod
                                                                                                               Dorood II, before            II
                                                                                                               any consumption

                                                                                                                                              Gas

   AM0009 version 03.1                                                                                                                   6"
   Schematic illustration of the project activity                                                                     Dorod
                                                              Condensate         LPG   Dry gas                         III
                                                                                                                                   L
                                                                                                                                   12“
      CO2              CH4                      Other oil                        B                                                                  NIOC
                                                 wells
                                                                 X         Gas processing                                                           power
                                                                               plant
     Flaring         Venting
                                                                                                                                         6"
                                                                                 A                                                                        6"
                                                                                                   Natural                     10“
                                                                                             C
                                          Recovery                         Transportation          gas
                                                             D                                     pipeline                                   Dorod
                                                                                                                                                I
               Project                 Re-                    On-site
               oil wells            injection               consumption
                                                                                                                                                    16"

                                                                                                                                              KPC



  This excel sheet should be used to:

1) Store aggregated data from the monitoring of Soroosh & Nowrooz Early Gas Gathering and Utilization Project (S&N project) - by addi
2) Report new monitored data on a monthly basis by IOOC for QA/QC by Carbon Limits and relevant DOE


* Detailed data logs should be attached for all values that are continuously monitored and separate lab-reports should be provided for
 oundary




 " 3.8 km         Kharg Island
 ipeline



           C3
and C2             Precipitate
 after
s at               Dorod
  before             II
 mption

                       Gas

                  6"
orod
III
           L
            12“
                             NIOC
                             power

                  6"
                                   6"
       10“

                       Dorod
                         I

                             16"

                       KPC




g and Utilization Project (S&N project) - by adding the most recent month to the historical data overview




nd separate lab-reports should be provided for all composition samples.
S&N Monitoring plan:

Data collection




Data quality




Data calculation
Maintenance and calibration




Management structure for monitoring plan




Staff training
Prior to starting up project monitoring, training of relevant staff will be provided.
S&N Monitoring plan:

Data collection
The management structure will have the Technical Director IOOC assuring that the data is collected as required.
He will report to the Project Management Department at IOOC’s Headquarters in Teheran. Data to be collected
are specified in sheet "Reporting last month".

A monthly report should be prepared by the 10th of each subsequent month. The report will be used for QA by
the Project Management Department at IOOC’s Headquarters, who will undertake all necessary consistency
checks with operational and commercial data by the 15th of each subsequent month. The monthly report,
following QA procedures, will be sent to Carbon Limits for final QC.

Data quality
To ensure that the measurement equipment is properly installed, calibrated and maintained, provisions provided
in international standards ISO 5167-1: 2003 “Measurement of fluid flow by means of pressure differential devices
inserted in circular cross-section conduits running full” and ASTM D 1945 “Standard Test Method for Analysis of
Natural Gas by Gas Chromatography” should be followed.

For the values that are continuously monitored, the data should be aggregated on a daily basis for the purpose of
calculating the emission reductions. Potential outliers should be identified and the variation with respect to the
trend explained in the monthly monitoring report.



In case of missing or erroneous daily data for the continuously monitored gas flows due to problems with the
measurement device(s), the average of the last seven days of measurements can be utilized if the variation in the
sample is below a threshold level of 10%. If gas flows does not show a consistent pattern, the day with the lowest
reported flow during the last thirty days of reliable data should be utilized as a conservative approach. In all cases
where missing data is replaced by trend data or conservative minimum values, it needs to be demonstrated that
the physical flows are not affected by the problems with the measurement device(s).

In case of missing data for the weekly monitoring of gas composition, the average of the last four weeks of reliable
measurements can be utilized if the variation in the sample is below a threshold level of 10%. If the gas
composition is not stable, the lowest gas composition measured during the last eight weeks of reliable
measurements should be used to replace the missing weekly data as a conservative approach. The monitoring
report has to highlight missing data and include a justification of the non-existence of data whenever a missing
data entry is replaced according to the procedure above.

Data calculation

The operator must install all necessary meters and assure that data is recorded as specified in this excel sheet to
generate the monthly monitoring reports. This excel sheet will determine the following:

BL y
LE y
ER y
QA of the calculations will be the responsibility of the Project Management Department at IOOC’s Headquarters.
A final monthly report will be sent to Carbon Limits for final QC.

Data storage and archiving
All data must be archived electronically and stored on site. An electronic copy of all relevant data aggregated on a
daily, weekly and monthly basis will be sent along with the monthly report to Carbon Limits.

The monthly monitoring reports will be stored at IOOC’s Teheran office to allow easy access for certification until
2 years after the end of the crediting period. For information on operations of the facility and training of
personnel, see:

Data verification
The Technical Director at IOOC will be responsible for making all relevant information available for verification
procedures.

Maintenance and calibration
An annual report will be sent to Carbon Limits detailing when all relevant monitoring and measurement
equipment was last calibrated for quality control. The last date of calibration will also be specified in the monthly
monitoring reports.

Management structure for monitoring plan
The management structure will have the Technical Director IOOC assuring that the data is collected as required.
He will report to the Project Management Department at IOOC’s Headquarters in Teheran.

Staff training
Prior to starting up project monitoring, training of relevant staff will be provided.
Leakage emissions during period y

Emission reductions during period y
S&N project - Monitored Emission Reductions - all historical data:

Variable in PDD:

Quantity of gas recovered measured in the pipeline delivering fuel gas to AB-PP (Point C1 in schematic) during period y

Quantity of gas recovered measured in the pipeline delivering fuel gas to Dorood II for distribution on Kharg Island (Point C2 in schematic) during period y

Quantity of gas condensate delivered to crude oil processing units (Point C3 in schematic) during period y

Quantity of gas delivered as fuel gas to Dorood III facilities (Point L in schematic) during period y



Variable in PDD:
Average carbon content of recovered gas measured in the gas pipeline delivering fuel gas for distribution on Kharg Island (Point C2 after separators at Dorood
II in schematic)
Average carbon content of recovered gas condensate measured at the outlet of the separators at Dorood II before transportation to crude oil processing units
(Point C3 in schematic)


Equation in PDD:

Baseline emissions during period y

Project emissions during period y

Leakage emissions during period y

Emission reductions during period y
Production/consumption data:   Jun-09   Jul-09   Aug-09   Sep-09   Oct-09
VC ,1, y             m3            0        0        0        0        0
VC , 2, y            m3            0        0        0        0        0
VC ,3, y             m3            0        0        0        0        0
VL , y               m3            0        0        0        0        0



Composition data:              Jun-09   Jul-09   Aug-09   Sep-09   Oct-09
wcarbon,C , 2 , y    kgC/m3    0.0000   0.0000   0.0000   0.0000   0.0000
wcarbon,C , 3, y     kgC/m3    0.0000   0.0000   0.0000   0.0000   0.0000



Calculated values:             Jun-09   Jul-09   Aug-09   Sep-09   Oct-09
BE y                 tCO2e         0        0        0        0        0
PE y                 tCO2e         0        0        0        0        0
LE y                 tCO2e         0        0        0        0        0
ER y                 tCO2e         0        0        0        0        0
Nov-09   Dec-09   Jan-10   Feb-10   Mar-10   Apr-10   May-10

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0



Nov-09   Dec-09   Jan-10   Feb-10   Mar-10   Apr-10   May-10

0.0000   0.0000   0.0000   0.0000   0.0000   0.0000   0.0000

0.0000   0.0000   0.0000   0.0000   0.0000   0.0000   0.0000



Nov-09   Dec-09   Jan-10   Feb-10   Mar-10   Apr-10   May-10

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0

    0        0        0        0         0       0         0
Jun-10   Jul-10   Aug-10   Sep-10   Oct-10   Nov-10

    0        0        0        0        0        0

    0        0        0        0        0        0

    0        0        0        0        0        0

    0        0        0        0        0        0



Jun-10   Jul-10   Aug-10   Sep-10   Oct-10   Nov-10

0.0000   0.0000   0.0000   0.0000   0.0000   0.0000

0.0000   0.0000   0.0000   0.0000   0.0000   0.0000



Jun-10   Jul-10   Aug-10   Sep-10   Oct-10   Nov-10

    0        0        0        0        0        0

    0        0        0        0        0        0

    0        0        0        0        0        0

    0        0        0        0        0        0
Leakage emissions during period y

Emission reductions during period y
S&N project - Monitored Emission Reductions - data for verification:

Variable in PDD:

Quantity of gas recovered measured in the pipeline delivering fuel gas to AB-PP (Point C1 in schematic) during period y

Quantity of gas recovered measured in the pipeline delivering fuel gas to Dorood II for distribution on Kharg Island (Point C2 in schematic) during period y

Quantity of gas condensate delivered to crude oil processing units (Point C3 in schematic) during period y

Quantity of gas delivered as fuel gas to Dorood III facilities (Point L in schematic) during period y



Variable in PDD:
Average carbon content of recovered gas measured in the gas pipeline delivering fuel gas for distribution on Kharg Island (Point C2 after separators at Dorood
II in schematic)
Average carbon content of recovered gas condensate measured at the outlet of the separators at Dorood II before transportation to crude oil processing units
(Point C3 in schematic)


Equation in PDD:

Baseline emissions during period y

Project emissions during period y

Leakage emissions during period y

Emission reductions during period y
Fill in all cells market in white:             FILL IN                     Completed report to be sent to Carbon Limits by the 15

Production/consumption data:         Responsible:           Month XX       Comments to reported data:
VC ,1, y                  m3                                               Continuous monitored data are to be aggregated on a monthly basis - full log of m

VC , 2, y                 m3                                               Continuous monitored data are to be aggregated on a monthly basis - full log of m

VC ,3, y                  m3                                               Continuous monitored data are to be aggregated on a monthly basis - full log of m

VL , y                    m3                                               Continuous monitored data are to be aggregated on a monthly basis - full log of m



Composition data:                    Responsible:           Month XX
wcarbon,C , 2 , y         kgC/m3                                           Average value for the relevant month. The weekly laboratory logs should be provi

wcarbon,C , 3, y          kgC/m3                                           Average value for the relevant month. The weekly laboratory logs should be provi



Calculated values:                   Responsible:        Month XX
BE y                      tCO2e      Carbon Limits                     0   Automatic

PE y                      tCO2e      Carbon Limits                     0   Automatic

LE y                      tCO2e      Carbon Limits                     0   Automatic

ER y                      tCO2e      Carbon Limits                     0   Automatic
report to be sent to Carbon Limits by the 15th of the subsequent month


tored data are to be aggregated on a monthly basis - full log of monitored values on a daily basis should be provided separately. In case of missing data, values could be reproduced as specified in the monitor

tored data are to be aggregated on a monthly basis - full log of monitored values on a daily basis should be provided separately. In case of missing data, values could be reproduced as specified in the monitor

tored data are to be aggregated on a monthly basis - full log of monitored values on a daily basis should be provided separately. In case of missing data, values could be reproduced as specified in the monitor

tored data are to be aggregated on a monthly basis - full log of monitored values on a daily basis should be provided separately. In case of missing data, values could be reproduced as specified in the monitor




r the relevant month. The weekly laboratory logs should be provided as attachments. In case of missing data for the relevant period, the guidance provided in the monitoring plan can be followed to replace m

r the relevant month. The weekly laboratory logs should be provided as attachments. In case of missing data for the relevant period, the guidance provided in the monitoring plan can be followed to replace m
missing data, values could be reproduced as specified in the monitoring plan if the physical operation can be documented (i.e. not including shut-downs).

missing data, values could be reproduced as specified in the monitoring plan if the physical operation can be documented (i.e. not including shut-downs).

missing data, values could be reproduced as specified in the monitoring plan if the physical operation can be documented (i.e. not including shut-downs).

missing data, values could be reproduced as specified in the monitoring plan if the physical operation can be documented (i.e. not including shut-downs).




dance provided in the monitoring plan can be followed to replace missing data.

dance provided in the monitoring plan can be followed to replace missing data.
S&N - Monitoring Plan - technical description of devices:

Variable in PDD:

Quantity of gas recovered measured in the pipeline delivering fuel gas to AB-PP (Point C1 in schematic) during period y

Quantity of gas recovered measured in the pipeline delivering fuel gas to Dorood II for distribution on Kharg Island (Point C2 in schematic) during period y

Quantity of gas condensate delivered to crude oil processing units (Point C3 in schematic) during period y

Quantity of gas delivered as fuel gas to Dorood III facilities (Point L in schematic) during period y



Variable in PDD:
Average carbon content of recovered gas measured in the gas pipeline delivering fuel gas for distribution on Kharg Island (Point C2 after separators at Dorood
II in schematic)
Average carbon content of recovered gas condensate measured at the outlet of the separators at Dorood II before transportation to crude oil processing units
(Point C3 in schematic)
Fill in all cells market in white:                                 FILL IN          Completed sheet to be sent to Carbon Lim

Production/consumption data:         Technical description of measurement device:   Last calibrated (date):
VC ,1, y                  m3
VC , 2, y                 m3
VC ,3, y                  m3
VL , y                    m3



Composition data:                    Technical description of measurement device:   Last calibrated (date):
wcarbon,C , 2 , y         kgC/m3
wcarbon,C , 3, y          kgC/m4
B
L
PEE   y
      y




ER    y
ompleted sheet to be sent to Carbon Limits ASAP when all meters are installed

                   Filled in by:         Comments:
                                         Orifice plate - installation and calibration following standard ISO 5167-1:2003

                                         Orifice plate - installation and calibration following standard ISO 5167-1:2003

                                         Orifice plate - installation and calibration following standard ISO 5167-1:2003

                                         Orifice plate - installation and calibration following standard ISO 5167-1:2004



                   Filled in by:
                                         Gas chromatography - installation and calibration following standard ASTM D 1945

                                         Gas chromatography - installation and calibration following standard ASTM D 1946

								
To top