									PROJECT:                                                                                                                                        DATE:
CONTROL NO:                                                        EST. PREPARED BY:                                   WORK TYPE:
                                                                       SURVEY PHASE ACTIVITIES
                                                                                                                                                Survey/Drill
Activity                             Tasks                         Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech.      Crew        Clerc.
     100 INTERACTIVE PROJECT EVAL.
           Attend Scoping Meeting                                       0
           Develop Project schedule                                     0
           Determine project activities and cost proposal               0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0

     102 PRELIMINARY ROADWAY DESIGN
           Draft & Distribute News Release                              0
           Prepare for & Conduct Informational Meeting                  0
           Preliminary Plans Preparation                                0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0

     106 PRELIMINARY GEOTECH & MATERIALS
           Deflection Testing & Analysis                                0
           Preliminary Soil Survey Investigations                       0
           Borrow & Surface Pit Investigation                           0
           Preliminary Geotechnical Evaluation                          0
           Prepare Preliminary Surfacing Typical Sections               0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0
      108 CONTROL SURVEY
           Vertical Control Survey                                      0
           Horizontal Control Survey                                    0
           Computation and Adjustment Sheets                            0
           Recovery Descriptions                                        0
           Coordinate Listings                                          0
           Control Diagram                                              0
           Calibration Baseline Reports                                 0
           Peg Test Notes                                               0
           Survey Piezometer Locations                                  0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0
      109 DETAILED NOISE STUDY
           Detailed Noise Analysis Report                               0
           Neighborhood opinion survey                                  0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0

     110 PRELIMINARY RIGHT OF WAY
           Ownership Report                                             0
           Relocation Assistance Conceptual Study                       0
           Access Control Study & Recommendations                       0
           Irrigation Report                                            0
           Cadastral Survey Request                                     0
           Preliminary Areas of Acquisition                             0
           Stockpass Study                                              0
           Obtain landowner permission to enter                         0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0

     112 PRELIMINARY TRAFFIC REPORT
           Data Collection and Review                                   0
           Traffic/Safety Review and Analysis                           0
           Preliminary Traffic Reports                                  0
           Prepare Preliminary Geometrics Report                        0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0

     113 PRELIMINARY UTILITY CONFLICTS/S.U.E.
           Coordination with Utility Companies & Kickoff Meeting        0
           Subsurface Utility Engineering (Phase I)                     0
           Utility Conflict Report                                      0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0            0             0          0            0           0             0           0




                                                                                    Page 1 of 11
PROJECT:                                                                                                                                       DATE:
CONTROL NO:                                                        EST. PREPARED BY:                                   WORK TYPE:
                                                                   SURVEY PHASE ACTIVITIES (CONT.)
Activity                             Tasks                         Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech. Survey Crew Clerc.
       114 PRELIMINARY BRIDGE LAYOUT
           Size, Type, Location Study & Report w/Cost Estimate          0
           Preliminary Bridge Layout Plans                              0
           Order Bridge Cores                                           0
           Preliminary Foundation Design                                0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       170 PRELIMINARY HYDRAULICS
           Hydrologic & Hydraulic Analyses                              0
           Prepare Location Hydraulic Study Report                      0
           Preliminary Hydraulic Design                                 0
           Preliminary Hydraulics Report                                0
           Size Bridge Openings                                         0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       177 Cultural Resource Report
           Draft Cultural Resource Report                               0
           Final Cultural Resource Report                               0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       178 Request Environmental Information
           Draft request for Information Letters                        0
           Final request for Information Incorporating
           MDT comments                                                 0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       179 Preliminary Traffic Noise Study
           Preliminary Traffic Noise Analysis Report or ISA Form        0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       180 Air Quality Conformity Determination
           Draft ISA Form Regarding Conformity of Project               0
           Conformity Determination Letter (if required)                0
           Final ISA Form or Memo Regarding Comformity
           of Project as necessary                                      0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
           Hazardous Materials/Substances and Water Quality
       181 ISA
           Draft ISA checklist or report                                0
           Final ISA checklist or report                                0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0

       182 Biological Resource Report/Biological Assessment
           Draft Biological Report                                      0
           Final Biological Report                                      0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0

           PRELIMINARY ENVIRONMENTAL DOCUMENT OR
           CATEGORICAL EXCLUSION/SECTION 4(f)
       116 EVALUATION
           Preliminary Site Investigation Report (if applicable)        0
           Develop Preliminary Environmental Document
           or Preliminary Categorical Exclusion                         0
           Section 4(f) Evaluation                                      0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0
       118 ROADWAY ALIGNMENT PLAN
           Preliminary Alignment & Grade                                0
           Establish Major Control                                      0
           Preliminary Plans Preparation                                0
           Preliminary Specifications/Cost Estimate                     0
           Work Zone Safety & Mobility                                  0
           QA/QC of Deliverables                                        0
                                                                        0
           SUBTOTAL (HOURS)                                             0              0             0          0           0           0           0              0




                                                                                      Page 2 of 11
PROJECT:                                                                                                                     DATE:
CONTROL NO:                                      EST. PREPARED BY:                                   WORK TYPE:
                                                 SURVEY PHASE ACTIVITIES (CONT.)
Activity                               Tasks     Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech. Survey Crew Clerc.
       120 CADASTRAL SURVEY
           Cadastral Survey - RW retracement          0
           Cadastral Survey - Section Corner          0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0

       121 ENGINEERING SURVEY
           Topographical Survey                       0
           Hydraulic Survey                           0
           Pick-Up Surveys                            0
           Develop Survey Strip Map                   0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0

       122 ALIGNMENT AND GRADE TRAFFIC
           Preliminary Geometric Details              0
           Signing Study (Inventory)                  0
           QA/QC of Deliverables                      0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0

       124 FINALIZE ALIGNMENT AND GRADE
           Finalize Alignment and Grade               0
           Alignment and Grade Review/Report          0
           Comment Response Document                  0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0
           FINAL CATEGORICAL EXCLUSION
       126 SECTION 4(f) EVALUATION
           Programmatic CE(d)                         0
           Narrative CE(d)                            0
           Section 4(f) Evaluation                    0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0
       128 PREPARE SCOPE OF WORK
           Prepare/Submit Scope of Work Report        0
           Prepare Cost Estimate                      0
           Prepare Design Exception Request           0
                                                      0
           SUBTOTAL (HOURS)                           0              0             0          0           0           0           0              0


           TOTAL SURVEY PHASE HOURS                   0              0             0          0           0           0           0              0




                                                                    Page 3 of 11
PROJECT:                                                                                                                                        DATE:
CONTROL NO:                                                         EST. PREPARED BY:                                   WORK TYPE:
                                                                         DESIGN PHASE ACTIVITIES
Activity                                Tasks                       Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech. Survey Crew Clerc.
       115 UTILITY CONFLICTS FOR PIH
           Design Utility Conflict Report                                0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0
           FINAL GEOTECHNICAL &
       130 MATERIALS REPORT
           Prepare Final Surfacing Sections                              0
           Primary Soils Survey                                          0
           Geotechnical Surveys and Field Investigations                 0
           Core Drill - Structures                                       0
           Core Drill - Alignment                                        0
           Geotechnical Engineering - Structures                         0
           Geotechnical Engineering - Alignment                          0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0

       134 PREPARE PLANS FOR PIH
           Prepare Road Plans-plan set, spec. provision, cost est        0
           Workzone Safety & Mobility Plan                               0
           QA/QC of Deliverables                                         0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0

       136 PRELIMINARY STRUCTURE PLANS FOR PIH
           Prepare Structure Plans (bridge, walls,etc.) for PIH          0
           Preliminary Structure Cost Estimate                           0
           QA/QC of Deliverables                                         0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0
       138 PRELIMINARY R/W PLAN FOR PIH
           Preliminary R/W Plan Sheets and CADD Files                    0
           QA/QC of Deliverables                                         0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0
       164 PREPARE TRAFFIC PLANS FOR PIH
           Prepare Electrical Plans                                      0
           Prepare Geometric details(Intersection, Roundabout
           interchange details, etc)                                     0
           Prepare Signing and Striping Plans                            0
           Analyze traffic plans, special provisions, cost est.          0
           QA/QC of Deliverables                                         0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0
       172 FINAL HYDRAULICS REPORT
           Storm Drain Design                                            0
           Size Box or Pipe Culverts                                     0
           Size Irrigation Structures                                    0
                                                                         0
           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0

       140 PLAN-IN-HAND
           Office Review                                                 0
           Field Review                                                  0
           Prepare Plan-In-Hand Report                                   0
           Prepare Design Exceptions                                     0
           Workzone Safety & Mobility Plan                               0
           Comment Response Document                                     0
           QA/QC of Deliverables                                         0
                                                                         0


           SUBTOTAL (HOURS)                                              0              0             0          0           0           0           0              0


           TOTAL DESIGN PHASE HOURS                                      0              0             0          0           0           0           0              0




                                                                                       Page 4 of 11
PROJECT:                                                                                                                                 DATE:
CONTROL NO:                                                  EST. PREPARED BY:                                   WORK TYPE:
                                                             RIGHT OF WAY PHASE ACTIVITIES
Activity                              Tasks                  Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech. Survey Crew Clerc.
       142 R/W PLANS
           Determine Final Construction Limits                    0
           Complete Final R/W Plans                               0
           Review Cost Estimates for R/W                          0
           Prepare Route Descriptions                             0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0

       144 R/W PLAN REVISIONS
           Revise R/W Plan Sheets and CADD Files                  0
           Prepare Exhibits                                       0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0
           GEOTECHNICAL AND
       158 MATERIALS REVISIONS
           Finalize geotechnical design after PIH                 0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0

       146 STRUCTURE DESIGN
           Complete Structure Plans                               0
           Structures Cost Estimate                               0
           Special Provisions                                     0
           QA/QC of Deliverables                                  0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0

       147 FINAL BRIDGE PLANS
           Final Bridge Plans                                     0
           Special Provisions                                     0
           Bridge Cost Estimate                                   0
           QA/QC of Deliverables                                  0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0
           FINAL ENVIRONMENTAL MATTERS
       148 & DRAFT PERMITS
           Environmental Water Quality Permits                    0
           Wetlands Finding Report                                0
           Cultural Mitigation                                    0
           Final Environmental/Biological Review                  0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0

       152 FINAL PLAN PREPARATION
           Revise Plans after PIH                                 0
           QA/QC of Deliverables                                  0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0
           FINAL HYDRAULIC UPDATES,
       174 PERMITS and REVISIONS
           Final Hydraulics Recommendations (R/W Related)         0
           Prepare, Submit & Coordinate Regulatory Permits        0
           Revise & Update Hydraulic Recommendations              0
           Final Hydraulic Plans Updates                          0
                                                                  0
           SUBTOTAL (HOURS)                                       0              0             0          0           0           0           0              0




                                                                                Page 5 of 11
PROJECT:                                                                                                                               DATE:
CONTROL NO:                                                EST. PREPARED BY:                                   WORK TYPE:
                                                        RIGHT OF WAY PHASE ACTIVITIES (CONT.)
Activity                               Tasks               Total Hours   Principal   Proj. Mgr.   Proj. Eng.   Design Eng. CADD Tech. Survey Crew Clerc.
       150 R/W APPRAISALS
           Appraise R/W                                         0
           Prepare Deeds                                        0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       154 CONDUCT & COMPLETE R/W ACQUISITION
           Conduct and Complete R/W Acquisition                 0
           Provide and Complete Relocation Assistance           0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0
           R/W PLAN REVISIONS AFTER
       156 AUTHORIZATION (BLUE SHEETS)
           Revise R/W Plan & Deed Exhibits                      0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       160 PROCESS FOR CONDEMNATION
           Process For Condemnation                             0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       175 FINAL PLAN REVIEW
           Final Plan Office/Field Review                       0
           Submit Final Plan Review Report                      0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       162 FINAL PLAN REVISIONS
           Revise Plans after Final Plans Review                0
           Update Cost Estimate/Special Provisions              0
           Comment Response Document                            0
           Finalize Traffic Management Plan                     0
           QA/QC of Deliverables                                0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       165 FINAL TRAFFIC DESIGN
           Finalize Electrical Plans                            0
           Finalize Geometric Details                           0
           Finalize Signing and Striping Plans                  0
           QA/QC of Deliverables                                0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

       166 UTILITY PLANS
           Prepare/Complete/Submit Utility Plans                0
           Complete Compliance Review Checklist                 0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

      XXX ADDITIONAL PLAN REVISIONS
           Address Questions from Blue Sheet Review             0
           Revise Plans after Blue Sheet Review                 0

           Address Questions during Advertising                 0
                                                                0
           SUBTOTAL (HOURS)                                     0              0             0          0           0           0           0              0

           TOTAL RIGHT OF WAY PHASE HOURS                       0              0             0          0           0           0           0              0




                                                                              Page 6 of 11
                                                                                            COST SUMMARY
PROJECT:                                                                                                                                             DATE:
CONTROL NO:                                                             EST. PREPARED BY:                                         WORK TYPE:
                                                                                            Hours                    Rate                                    Extension
      Principal                                                                                         0                                                            0.00


      Project Manager                                                                                   0                                                            0.00


      Project Engineer                                                                                  0                                                            0.00


      Design Engineer                                                                                   0                                                            0.00


      CADD/Designer                                                                                     0                                                            0.00


      Survey Crew                                                                                       0                                                            0.00


      Clerical                                                                                          0                                                            0.00


      Contract Administration                                                                           0                                                            0.00



                                               TOTAL HOURS                                              0
                                                                                                                     LABOR SUBTOTAL                                 $0.00
                               GENERAL OVERHEAD @                                                                    OVERHEAD SUBTOTAL                              $0.00
                                                                                                            TOTAL LABOR/OVERHEAD                                    $0.00


                                                                                            DIRECT NONLABOR
          Miscellaneous           (Blueline prints, mylars, multilith paper, telephone,
       postage, misc. equipment rental, maps, photos, survey mtls., display boards, etc.)                                                                            0.00
      Computer                                                                              Hours                    Per Hour                                        0.00
      Title commitments                                                                     Parcels                  Per Parcel                                      0.00
      Vehicle Rental                                                                        Days                     Per Day                                         0.00
      Mileage                                                                               Miles                    Per Mile                                        0.00
      Airline Trips                                                                         Trips                    Per Trip                                        0.00
      Per Diem                                                                              Days                     Per Day                                         0.00
      Other                                                                                                                                                          0.00




                                                                                                                                  TOTAL DIRECT NONLABOR             $0.00
                                                OUTSIDE SERVICES AND SUBCONTRACTS
      R/W Appraisals, Negotiation & Acquisition
      Soils/Geotechnical Survey/Report/Testing
      Cultural Resource Studies/Report
      Noise Study
      Traffic Study/Report
      Biological Resources Studies/Report
      Surveys
      Subsurface Utility Engineering (Phase lI)
      Hazardous Materials (Initial Site Assessment)
      Landscaping Plans
      Electrical/Lighting Signalization etc
      Aerial Photography/Mapping
      Other
      Drilling Contractor


                                                                                            TOTAL OUTSIDE SERVICES AND SUBCONTRACTS                                 $0.00
                                                                                             RECAPITULATION
      Total Labor/ Overhead                                                                                                                                          0.00
      Total Direct NonLabor                                                                                                                                          0.00
      Total Outside Services & Subcontracts                                                                                                                          0.00
      Profit (to be negotiated)                                                                                                                                      0.00
                                                                                                                     TOTAL ESTIMATED COST                           $0.00




                                                                                                    Page 7 of 11
                                               Hours                              Rate
          Principal                               #REF!                                     35.00


          Project Manager                         #REF!                                     30.00


          Project Engineer                        #REF!                                     25.00


          Design Engineer                         #REF!                                     20.00


          CADD Technician                         #REF!                                     20.00


          Survey Crew                             #REF!


          Clerical                                     #REF!                                12.00




       TOTAL HOURS                                #REF!
                                                                                  LABOR SUBTOTAL
GENERAL OVERHEAD @                      1.65                                      OVERHEAD SUBTOTAL
                                                                TOTAL LABOR/OVERHEAD


                                                        NONLABOR
                                               DIRECT NONLABOR
          Miscellaneous (Blueline prints, mylars, multilith paper, telephone, postage, misc. equipment rental, maps, photos, survey mtls., display boards, etc.)
          Computer                    Hours                                   Per Hour                         10
          Title memos                 Parcels                                 Per Parcel                     100
          Vehicle Rental              Days                                    Per Day                          45
          Mileage                     Miles                                   Per Mile                      0.50
          Airline Trips               Trips                                   Per Trip
          Per Diem                    Days                                    Per Day                          70
          Other

                                                                                                    TOTAL DIRECT NONLABOR
                      OUTSIDE SERVICES AND SUBCONTRACTS
          R/W Negotiation & Acquisition
          Soils/Geotechnical Survey/Report
          Cultural Resource Studies/Report
          Noise Study
          Traffic Study
          Biological Resources Studies/Report
          Surveys
          Subsurface Utility Engineering
          Hazardous Materials
          Landscaping Plans
          Other
                                               TOTAL OUTSIDE SERVICES AND SUBCONTRACTS
                                                                RECAPITULATION
Total Labor/ Overhead
Total Direct NonLabor
Total Outside Services & Subcontracts
Profit (10% -12% of Total Labor Costs)
                                         TOTAL ESTIMATED COST
Extension
   #REF!


   #REF!


   #REF!


   #REF!


   #REF!


   #REF!


   #REF!




   #REF!
   #REF!
   #REF!




        0.00
        0.00
        0.00
        0.00
        0.00
        0.00
        0.00
        0.00


      $0.00




      $0.00
#REF!
    0.00
    0.00
#REF!
#REF!

								
To top