					                  BID DOCUMENT

          TENDER FOR PROCUREMENT OF
  NEXT GENERATION PLAY NETWORK (GPON) EQUIPMENT.
TENDER NO. MM/TX/032008/000352 ISSUED ON 14.03.2008




          BHARAT SANCHAR NIGAM LIMITED
       (A GOVERNMENT OF INDIA ENTERPRISE)
                    MMT SECTION
       BHARAT SANCHAR BHAWAN, JANPATH,
                 NEW DELHI-110001
        FAX NO.91-11-23710198/91-11-23734262
              Visit us at www.bsnl.co.in




                                                      1
                                    TABLE OF CONTENTS




SECTION   TITLE                                   PAGES


I.        Notice Inviting Tender                  3-5

II.       Instructions to Bidders                 6-22

III.      General Conditions of the Contract      23-34


IV.       Special Conditions of Contract          35-44


V.        Schedule of Requirements                45-46


VI.       Technical Specification                 47


VII.      Bid Form and Price Schedules            48-56


VIII.     Bid Security Form                       57


IX.       Performance Security Bond Form          58-59

X         Letter of Authorisation for Attending   60
          Bid Opening

XI        Appendix-A&B                            61-62




                                                          2
                                      SECTION-I
                          BHARAT SANCHAR NIGAM LIMITED
                           (A GOVT. OF INDIA ENTERPRISE)
                         BHARAT SANCHAR BHAWAN, JANPATH
                                 NEW DELHI-110001.
                                  (MMT SECTION)


                          NOTICE       INVITING    TENDER



TENDER NO AND DATE           :   MM/TX/032008/000352 DATED 14.03.2008

DUE DATE OF RECEIPT          :     22.04.2008 TIME UPTO 11.30 HOURS

DATE OF OPENING              :     22.04.2008 TIME AT 12.00 HOURS

VENUE OF TENDER OPENING      :     MEETING HALL GROUND FLOOR,
                                   BHARAT SANCHAR BHAWAN,
                                   JANPATH, NEW DELHI-110001


  ON BEHALF OF CHAIRMAN AND MANAGING DIRECTOR, BHARAT SANCHAR NIGAM
LIMITED (CORPORATE OFFICE), NEW DELHI, SEALED TENDERS ARE INVITED FROM THE
INDIAN COMPANIES FOR PROCUREMENT OF NEXT GEMERATION PLAY NETWORK (GPON)
EQUIPMENT. AS PER SCHEDULE OF REQUIREMENT OF SECTION-V OF THE BID DOCUMENT.
(I)   ELIGIBLE BIDDER:

THE ELIGIBLE BIDDERS SHOULD BE INDIAN COMPANIES REGISTERED TO
MANUFACTURE THE TENDERED ITEM IN INDIA AND HAVE OBTAINED CLEARANCE
FROM RESERVE BANK OF INDIA, WHEREVER APPLICABLE. IN ADDITION THEY
SHOULD MEET THE FOLLOWING CRITERIA:


I)    A)     THE BIDDERS SHOULD HAVE GOT TECHNICAL SPECIFICATION
      EVALUATION CERTIFICATE (TSEC) FROM QUALITY ASSURANCE CIRCLE,
      BSNL, BANGALORE OR SHOULD HAVE GOT TYPE APPROVAL CERTIFICATES
      (TAC) FROM TEC NEW DELHI AGAINST THE TEC GR NO. GR/PON-01/01 DEC.
      2006.
                                  OR

      B)      THE BIDDERS SHOULD HAVE APPLIED FOR TSEC FOR THEIR PRODUCT
      IN QF-103 FORM TO QUALITY ASSURANCE CIRCLE, BANGALORE OR IN FORM –
      B TO TEC AT LEAST ONE DAY BEFORE THE OPENING OF THE TENDER. THE
      TYPE APPROVAL CERTIFICATE /TSEC /FORM-B /QF-103 SHALL BE OBTAINED
      FOR GPON EQUIPMENT FOR ACCESS APPLICATIONS AS PER THE TEC GR NO.
      GR/PON-01/01 DEC. 2006. THE REGISTRATION NUMBER ALLOTTED FOR THE
      TSEC PURPOSE BY QA CIRCLE/TEC SHALL ALSO BE SUBMITTED. HOWEVER
      ONLY TYPE APPROVED EQUIPMENT AGAINST THE ABOVE GR WILL BE

                                                                          3
      ACCEPTED WHICH WILL HAVE TO BE SUPPLIED WITHIN THE SCHEDULED
      DELIVERY PERIOD.


                                       OR

      C)    THE BIDDER SHOULD HAVE SUCCESSFULLY EXECUTED AN
      EDUCATIONAL/COMMERCIAL ORDER FROM BSNL FOR GPON EQUIPMENT
      AGAINST THE TEC GR NO GR/PON-01/01 DEC. 2006. HOWEVER ONLY TYPE
      APPROVED EQUIPMENT AGAINST THE GR MENTIONED ABOVE, WILL BE
      ACCEPTED WHICH WILL HAVE TO BE SUPPLIED WITHIN THE SCHEDULED
      DELIVERY PERIOD.


II)   THE ORIGINAL EQUIPMENT MANUFACTURER (OEM) CAN PARTICIPATE IN THE
      TENDER DIRECTLY OR MAY ALSO AUTHORIZE NOT MORE THAN ONE
      COMPANY TO PARTICIPATE IN THE TENDER WITH THE OEM AND/OR
      PRODUCT. IN CASE THE OEM DOES NOT PARTICIPATE IN THE TENDER, THEN
      IT CAN AUTHORIZE NOT MORE THAN ONE COMPANY TO PARTICIPATE IN THE
      TENDER WITH THE OEM‟S TECHNOLOGY AND/OR PRODUCT. IN CASE OF
      MORE THAN ONE BID OF THE SAME OEM, ONLY ONE LOWEST EVALUATED BID
      OF THEM SHALL BE CONSIDERED AND OTHER BIDS SHALL NOT BE
      EVALUATED.



(III) BID SECURITY IN THE FORM OF BANK GUARANTEE WILL BE RUPEES 2,00,00,000
(RUPEES TWO CRORES ) ONLY.


INTENDING BIDDERS MAY DOWNLOAD THE COPY OF THE TENDER DOCUMENT FROM BSNL
WEBSITE www.bsnl.co.in AFTER ONE WEEK. THE PAYMENT OF Rs.10,000/- (RUPEES TEN
THOUSAND) ONLY NON-REFUNDABLE AS COST OF THE TENDER DOCUMENT IS REQUIRED
TO BE SUBMITTED BEFORE SUBMISSION OF BID. THE BID WILL NOT BE ACCEPTED WITHOUT
THE PROOF OF PAYMENT OF COST OF
TENDER DOCUMENT.


HOWEVER, INTENDING BIDDERS MAY OBTAIN COPY OF TENDER DOCUMENT FROM THE
SECTION OFFICER (MMT) 2ND FLOOR BHARAT SANCHAR BHAWAN, JANPATH, NEW DELHI-
110001 ON PAYMENT OF RS.10,000/- (RS TEN THOUSAND) ONLY NON-REFUNDABLE W.E.F.
26.03.2008 TO 21.04.2008 BETWEEN 15.00 HRS. TO 16.00 HRS. ON ALL WORKING DAYS. THE
PAYMENT WILL BE ACCEPTED IN THE FORM OF CROSSED DEMAND DRAFT, DRAWN ON ANY
SCHEDULED BANK IN DELHI, IN FAVOUR OF ACCOUNTS OFFICER (CASH), BHARAT
SANCHAR NIGAM LIMITED, (CORPORATE OFFICE), NEW DELHI.




                                                                                4
                                         SECTION II
                                   INSTRUCTION TO BIDDERS

A.    INTRODUCTION

1.    DEFINITIONS:

(a)   “The Purchaser” means the Bharat Sanchar Nigam Ltd. (BSNL), New Delhi

(b)   “The Bidder” means the individual or firm who participates in this tender and
      submits its bid.

(c)   “The Supplier” means the individual or firm supplying the goods under the
      contract.

(d)   “The Goods” means all the equipment, machinery, and/or other materials which
      the Supplier is required to supply to the Purchaser under the contract.

(e)   “The Advance Purchaser Order” means the intention of Purchaser to place the
      Purchase Order on the bidder.

(f)   “The Purchase Order” means the order placed by the Purchaser on the Supplier
      signed by the Purchaser including all attachments and appendices thereto and all
      documents incorporated by reference therein. The purchase order shall be deemed                 as
      “Contract” appearing in the document.

(g)   “The Contract Price”means the price payable to the Supplier under the purchase order for the
      full and proper performance of its contractual obligations.

(h)    “Validation” is a process of testing the equipment as per the Generic Requirements in the
      specifications for use in BSNL network. Validation is carried out in simulated field environment
      and includes stability, reliability and environmental tests.

(i)   “Telecom Service Provider” means any Telecom operator in India, who is licensed by the
      Department of Telecommunications ( DOT ), Government of India to provide telecom services to
      the general public or to the other DOT licensed Telecom operators. “Telecom Service Provider”
      also refers to any Telecom operator in other countries providing telecom services to general
      public of that country or to other telecom operators of the same country.

(j)   “Original Equipment Manufacturer-OEM” is one who provides his own make product on
      technology transfer to the bidder. The Original Equipment Manufacturer must have the
      experience of the supply of their own products to any Telecom service provider. The agreement
      between the Original Equipment Manufacturer shall clearly mention which of the product
      components are proposed to be made by the OEM and which other parts shall be made by the
      bidder of the product under transfer. In case the complete product‟s technology is transferred the
      same must be incorporated along with the clear details of the product and its major
      components/cards/modules etc. This shall be mentioned along with the QF-103 clearly. The
      bidder must quote the same product in BSNL tender.

2.       ELIGIBLE BIDDER:
      2 (i) The eligible bidders should be Indian Companies registered to manufacture the tendered
            item India and have obtained clearance from Reserve Bank of India, wherever applicable.
            In addition they should meet the following criteria:
                                                                                                      5
I)     a)       The bidders should have got Technical Specification Evaluation Certificate (TSEC) from
       Quality Assurance Circle, BSNL, Bangalore or should have got Type Approval Certificates (TAC)
       from TEC New Delhi against the TEC GR No. GR/PON-01/01 DEC. 2006.

                                                    Or

       b)         The bidders should have applied for TSEC for their product in QF-103 form to Quality
       Assurance Circle, Bangalore or in form – B to TEC at least one day before the opening of the
       tender. The Type Approval Certificate /TSEC /FORM-B /QF-103 shall be obtained for GPON
       equipment for access applications as per the TEC GR No. GR/PON-01/01 DEC. 2006. The
       registration number allotted for the TSEC purpose by QA circle/TEC shall also be submitted.
       However only type approved equipment against the above GR will be accepted which will have to
       be supplied within the scheduled delivery period.

                                                    Or

       c)       The bidder should have successfully executed an educational/commercial order from
       BSNL for GPON equipment against the TEC GR No GR/PON-01/01 DEC. 2006. However only
       type approved equipment against the GR mentioned above, will be accepted which will have to be
       supplied within the scheduled delivery period.

II)    The Original Equipment Manufacturer (OEM) can participate in the tender directly or may also
       authorize not more than one company to participate in the tender with the OEM and/or Product. In
       case the OEM does not participate in the tender, then it can authorize not more than one company
       to participate in the tender with the OEM‟s Technology and/or Product. In case of more than one
       bid of the same OEM, only one lowest evaluated bid of them shall be considered and other bids
       shall not be evaluated.

3. 0    COST OF BIDDING
        The bidder shall bear all costs associated with the preparation and submission of the bid. The
        Purchaser will, in no case, be responsible or liable for these costs, regardless of the conduct or
        outcome of the biding process.

B.      THE BID DOCUMENTS

4.0     DOCUMENTS REQUIRED

4.1    The goods required to be supplied, bidding procedures and contract terms and conditions are
       prescribed in the Bid Documents. The Bid documents include :

        (a)     Notice Inviting Tender

        (b)     Instructions to Bidders

        (c)     General(Commercial) Conditions of Contract

        (d)     Special conditions of Contract, if any

        (e)     Schedule of Requirements

        (f)     Technical Specifications

        (g)     Bid Form and Price Schedules
                                                                                                        6
       (h)    Bid Security Form

       (i)    Performance Security Bond Form

       (j)    Letter of authorization to attend bid opening.

       (k)    Agreement for AMC

4.2    The Bidder is expected to examine all instructions, forms, terms and specifications in the
      Bid Documents. Failure to furnish all information required as per the Bid Documents or
      submission of the bids not substantially responsive to the Bid Documents in every
      respect will be at the bidder’s risk and may result in rejection of the bid.
5.0    CLARIFICATION OF BID DOCUMENTS

5.1    A prospective bidder, requiring any clarification on the Bid Documents shall notify the
       Purchaser in writing or by FAX at the Purchaser‟s mailing address indicated in the invitation of
       Bid. The Purchaser shall respond in writing to any request for the clarification of the Bid
       Documents, which it receives not later than 21 days prior to the date of opening of the
       Tenders. Copies of the query (without identifying the source) and clarifications by the
       Purchaser shall be sent to all the prospective bidders who have received the bid documents.

5.2    Any clarification issued by BSNL in response to query raised by prospective bidders shall form
       an integral part of bid documents and it may amount to an amendment of relevant clauses of
       the bid documents.


6.0     AMENDMENT OF BID DOCUMENTS

6.1 At any time, prior to the date of submission of Bids, the Purchaser may, for any reason, whether at
    its own initiative or in response to a clarification requested by a prospective bidder, modify bid
    documents by amendments.

6.2 The amendments shall be notified in writing or by FAX to all prospective bidders on the address
    intimated at the time of purchase of the bid document from the purchaser and these amendments
    will be binding on them.

6.3 In order to afford prospective bidders a reasonable time to take the amendment into account in
   preparing their bids, the purchaser may, at its discretion, extend the deadline for the submission of
   bids suitably.

C.     PREPARATION OF BIDS

7.     DOCUMENTS COMPRISING THE BID
       The bid prepared by the bidder shall comprise the following components:

         (a) Documentary evidence established in accordance with the clause 2 & 10 that the bidder
       is eligible to bid and is qualified to perform the contract if his bid is accepted.

        (b)   Bid Security furnished in accordance with clause 12.

        (c)   A Clause by Clause compliance as per clause 11.2 (c)

        (d)   A Bid form and price schedule completed in accordance with clause 8 & 9.




                                                                                                      7
8.     BID FORM

The bidder shall complete the bid form and appropriate Price Schedule furnished in the Bid
Documents, indicating the goods to be supplied, brief description of the goods, quantity and prices as
per section VII.

9.     BID PRICES

9.1    The bidder shall give the total composite price inclusive of all Levies & Taxes i.e. Sales Tax &
       Excise, packing, forwarding, freight and insurance etc. but excluding Octroi/Entry Tax which will
       be paid extra as per actuals, wherever applicable. The basic unit price and all other components
       of the price need to be individually indicated against the goods it proposes to supply under the
       contract as per the price schedule given in Section VII. Prices of incidental services should also
       be quoted. The offer shall be firm in Indian Rupees. No Foreign exchange will be made available
       by the purchaser.

9.2    Prices indicated in the Price Schedule shall be entered in the following manner :

        (i) The Basic Unit price (Ex-Factory Price) of the goods, Excise duty, Sales Tax, Freight,
        Forwarding, Packing, Insurance and any other Levies/Charges already paid or payable by the
        supplier shall be quoted separately item wise.

        (ii) The supplier shall quote as per price schedule given in section VII for all the items given in
             schedule of requirement.

9.3    A bid submitted with an adjustable price quotation will be treated as non - responsive and
       rejected.

9.4    The prices quoted by the bidder shall be in sufficient detail to enable the Purchaser to arrive at
       the price of equipment/system offered.

9.5    “DISCOUNT, if any, offered by the bidders shall not be considered unless specifically indicated
       in the price schedule. Bidders desiring to offer discount shall therefore modify their offers
       suitably while quoting and shall quote clearly net price taking all such factors like Discount, free
       supply, etc, into account”.

9.6    The price approved by BSNL for procurement will be inclusive of Levies and Taxes, packing,
       forwarding, freight and insurance as mentioned in Clause 9.1 subject to other terms and
       condition as stipulated in Clause 22.2 of Section –II and Clause 11 of Section-III of Bid-
       Document.

9.7     The freight by sea for transportation of equipment/Stores from the nearest port in the main land
        to Andaman & Nicobar Islands will be reimbursed to the supplier at the concessional rates
        levied by Ministry of Water and Surface Transport on production of proof.

10.     DOCUMENTS ESTABLISHING BIDDER’S ELIGIBILITY AND QUALIFICATION

10.1    The bidder shall furnish, as part of the bid documents establishing the bidder‟s eligibility, the
        following documents or which ever is required as per terms and conditions of Bid Documents.

        (i)    Certificate of incorporation.

        (ii) Article or Memorandum of Association or partnership deed or proprietorship
             deed as the case may be.


                                                                                                         8
       (iii)    Registration certificate from State Director of Industries or from Secretariat for Industrial
                Approval (SIA) , Ministry of Industries, Government of India.

       (iv)      Approval from Reserve Bank of India /SIA in case of foreign
                 collaboration.

       (v)      Latest and valid NSIC Certificate duly certified by NSIC.

       (vi)     Type Approval Certificate (TAC) issued by Telecom Engineering Centre/ TSEC issued by
                QA circle or proof of having applied for TEC/TSEC (Copy of Form B/QF 103 be
                attached. (If applicable)

       (vii)     Inspection Certificate issued by BSNL (QA) for execution of Educational/Commercial
                 Order. (If applicable).


       (viii)    Undertaking duly signed by front bidder and its technology/consortium partner stating
                 that both of them shall be liable for due performance of the contract jointly and severally.

10.2    (i)      The bidder shall furnish Annual Report and /or a certificate from its bankers as an
                 evidence that he has financial capability to perform the contract.

        (ii)     The bidder shall furnish documentary evidence about technical and production capability
                 necessary to perform the contract.

10.3    In order to enable the Purchaser to assess the proven ness of the system offered, the bidder
        shall provide documentary evidence regarding the system being offered by him.

10.4    The offered product has to be type approved. For this purpose, the supplier shall submit a
        sample type for evaluation. The sample would be evaluated for its ability to meet the technical
        specifications, manufacturability, reliability, testability, ease of installation, maintainability etc.
        Necessary documents to substantiate these attributes will have to be submitted at the time of
        application for approval by the supplier for obtaining type approval.
                                                      Or

        In case goods offered have already been type approved/ validated by the Purchaser,
        documentary evidence to this effect shall be submitted by the bidder.

10.5    A signed undertaking from Authorised Signatory of the bidder that shall certify that all
        the components/parts/assembly/software used in the Desktops and Servers like Hard disk,
        Monitors, Memory etc. shall be original, new components/parts/assembly/software and
        that no refurbished/duplicate/ second hand components/parts/assembly/software are being
        used or shall be used.

10.6    For supply of any software i.e. operating system or any applications software the bidder should
        have a Certificate Of Authenticity (COA), signed by Authorized Signatory stating that all
        Software supplied are authentic and legal copy is/are being supplied.

11.     DOCUMENTS ESTABLISHING GOOD’S CONFORMITY TO BID DOCUMENTS

11.1    Pursuant to clause 7, the bidder shall furnish, as part of his bid, documents establishing the
        conformity of his bid to the Bid Documents of all goods and services which he proposes to
        supply under the contract.

11.2    The documentary evidences of the “goods and services” conformity to the Bid Documents, may
        be, in the form of literature, drawings, data etc. and the bidder shall furnish :

                                                                                                             9
       (a)   a detailed description of goods with essential technical and performance characteristics;

       (b)    a list, giving full particulars including available sources and current prices of all spare
             parts, special tools, etc., necessary for the proper and continuous functioning of the goods
             for a period of three years following commencement of use of the goods by the purchaser,
             and


       (c)    a clause-by-clause compliance on the purchaser‟s Technical Specifications and
             Commercial Conditions demonstrating substantial responsiveness to the Technical
             Specifications and Commercial Conditions. In case of deviations, a statement of the
             deviations and exception to the provision of the Technical Specifications and Commercial
             Conditions shall be given by the bidder. A bid without clause-by-clause compliance of the
             Technical Specifications(Section VI), Commercial Conditions (Section III) and Special
             Conditions(Section IV) shall not be considered.

11.3   For the purpose of compliance to be furnished pursuant to the clause 11.2(c) above, the bidder
       shall note that the standards for the workmanship, material and equipment and reference to the
       brand names or catalogue number, designated by the Purchaser in its Technical specifications
       are intended to be descriptive only and not restrictive.

12.    BID SECURITY
12.1   Pursuant to clause 7, the bidder shall furnish, as part of his bid, a bid
        security for an amount of Rs. 2,00,00,000 (Rupees two crore ) only.

The bidders (small scale units) who are registered with National Small Scale Industries Corporation
UNDER SINGLE POINT REGISTRATION SCHEME are exempted from payment of bid security up to
the amount equal to their monetary limit. OR Rs. Fifty lakhs whichever is lower.:
       •      A proof regarding current registration with NSIC for the tendered items will have
       to be attached along with the bid.
       •      The enlistment certificate issued by NSIC will not be permanent and should be
       renewed within two years of its presentation.
       •      The unit claiming concession of NSIC is required to submit its monthly turnover in
       support of its claim for meeting the delivery schedule.


12.1   (ii) If a vender registered with NSIC under single point registration scheme claiming
       concessional benefits is awarded work by BSNL and subsequently fails to obey any of the
       contractual obligation, he will be debarred from any further work/ contract by BSNL for one year
       from the date of issue of such order. The bid security is required to protect the purchaser
       against the risk of bidder‟s conduct, which would warrant the forfeiture of bid security pursuant
       to para 12.7.

12.2   The bid security is required to protect the purchaser against the risk of bidder‟s conduct, which
       would warrant the fore feature of bid security pursuant to para 12.7.

12.3   The bid security shall be in the form of a bank Guarantee issued by a scheduled bank in favour
       of the purchaser, valid for a period of 180 days from the date of tender opening.

12.4   A bid not secured in accordance with para 12.1 & 12.3 shall be rejected by the Purchaser being
       non-responsive at the bid opening stage and returned to the bidder unopened.

12.5   The bid security of the unsuccessful bidder will be discharged/returned as promptly as possible
       but not later than 30 days after the expiry of the period of the bid validity prescribed by the
       purchaser pursuant to clause 13.


                                                                                                         10
12.6   The successful bidder‟s bid security will be discharged upon the bidder‟s acceptance of the
       advance purchase order satisfactorily in accordance with clause 27 and furnishing the
       performance security.

12.7   The bid security may be forfeited :
       (a)    If the bidder withdraws his bid during the period of bid validity specified by the bidder in
             the Bid form or
       (b)    In the case of successful bidder, if the bidder fails :
             (i)    to sign the contract in accordance with clause 28 or
             (ii) to furnish performance security in accordance with clause 27.
        (c) In both the above cases, i.e 12.7 (a) & (b), the bidder will not be eligible to participate in
             the tender for same item for one year from the date of issue of APO. The bidder will not
             approach the court against the decision of BSNL in this regard.
        (d)      ”The front bidder shall submit an irrevocable undertaking duly signed by it and its
        technology/consortium partner stating that both of them i.e the front bidder and its
        technology/consortium partner shall be liable for due performance of the contract jointly and
        severally ,failing which both of them shall be liable to be barred from having any business
        dealing with BSNL for a period of 3 years.”

13.    PERIOD OF VALIDITY OF BIDS

13.1   Bid shall remain valid for 150 days from the date of opening of bids prescribed by the purchaser
       pursuant to clause 19.1. A bid valid for a shorter period shall be rejected by the purchaser
       being non-responsive.

13.2   In exceptional circumstances, the purchaser may request the consent of the bidder for an
       extension to the period of bid validity. The request and the response thereto shall be made in
       writing. The bid security provided under clause 12 shall also be suitably extended. The bidder
       may refuse the request without forfeiting his bid security. A bidder accepting the request and
       granting extension will not be permitted to modify his bid.


14.     FORMAT AND SIGNING OF BID
14.1    (i) The bidder shall prepare five(5) number of copies of unpriced technical and
        commercial bid (Envelope-A) and five (5) copies of priced financial bid
        (Envelope-B) clearly mentioning one as „Original Bid’ and remaining four as
        ‘Copy No:1, Copy No:2, Copy No:3 and Copy No:4’. In the event of any discrepancy
          between the copies, the original shall govern.
        a. Envelope A : Unpriced original and four copies of Technical & Commercial
              Bid.
        b.     Envelope B : Priced Financial original and four copies of Priced Financial
             Bid.
        c.    Separate Cover : Bid Security of requisite amount in the prescribed format
             and the documents required as per clause-2 (i) of Section-IV).

       (ii)   The copy of quality manual and Article or Memorandum of Association may be provided in
              original copy and copy no:1.

14.2   The original and all copies of Bid shall be typed or printed and numbered consecutively and
       shall be signed by the bidder or a person all the pages or persons duly authorized to bind the
       bidder to the contract. The letter of authorization shall be indicated by written power-of-attorney
       accompanying the bid. All pages of the original bid, except for un-amended printed
       literatures, shall be signed by the person or persons signing the bid. The bids submitted
       shall be sealed properly.

14.3   The bid shall contain no interlineations, erasures or overwriting except as necessary to correct
       errors made by the bidder in which case such corrections shall be signed by the person or
       persons signing the bid.
                                                                                                       11
14.4   (i)The Power of Attorney should be submitted and executed on the non-judicial stamp paper of
       appropriate value as prevailing in the respective states(s) and the same be attested by a Notary
       public or registered before Sub-Registrar of the states(s) concerned.
       (ii) The Power of Attorney be executed by a person who has been authorized by the Board of
       Directors of the bidder in this regard ,on behalf of the Company/Institution/Body Corporate.
       (iii) In case of the bidder being a firm, the said Power of Attorney should be executed by all the
       partner(s) in favour of the said Attorney.


D.     SUBMISSION OF BIDS

15.    SEALING AND MARKING OF BIDS :

15.1 The bid should be submitted in three covers. The first cover shall contain the      original and
     four copies of Unpriced Technical & Commercial Bid duly marked „ORIGINAL‟ & „COPY‟. The
     second cover shall contain Priced Financial original and four copies of Priced Financial Bid and
     third cover shall contain Bid Security as per Clause 12 of Section-II and the documents required
     as per Clause-2(i) of Section-IV of the Bid Document. All the three covers should be sealed
     separately by the personal seal of the bidder.

15.2   (a)    The envelopes shall be addressed to the purchaser at the following
              address :
              Jt.DDG (MMT),
              Bharat Sanchar Nigam Limited (Corporate Office),
              2nd Floor, Bharat Sanchar Bhawan , Janpath, New Delhi-110001.

       (b)    The envelope shall bear (the project name), the tender number and the words „DO NOT
              OPEN BEFORE‟(due date & time).

        (c)   The inner and outer envelopes shall indicate the name and address of the bidders to
              enable the bid to be return unopened in case it is declared „late‟ or rejected.

        (d)    Tender may be sent by registered post or delivered in person on above mentioned
              address (address is given in Clause 15.2 (a) above). The responsibility for ensuring that
              the tenders are delivered in time would vest with the bidder.
       (e)    Bids delivered in person on the day of tender opening shall be delivered upto 11.30 Hrs.
              to Section Officer (MMT) {at the venue (address is given in clause 15.2 (f) below} of the
              tender opening. The purchaser shall not be responsible if the bids are delivered
              elsewhere.
       (f)    Venue of Tender Opening: Tender will be opened in meeting room , Ground Floor,
              Bharat Sanchar Bhawan, Janpath, New Delhi-110001 at 12.00 Hrs. on the due date. If
              due to administrative reason, the venue of Bid opening is changed, it will be displayed
              prominently on Ground Floor at reception office of Bharat Sanchar Bhawan , and notice
              board on 2nd Floor.

15.3   If both the envelopes are not sealed and marked as required at para 15.1 and 15.2 , the
       bid shall be rejected.

16.    SUBMISSION OF BIDS

16.1   Bids must be received by the Purchaser at the address specified under para 15.2 not
       latter than 11:30 hrs. on due date.

16.2   The Purchaser may, at its discretion, extend this deadline for the submission of bids by
       amending the Bid Documents in accordance with clause 6 in which case all rights and

                                                                                                      12
       obligations of the purchaser and bidders previously subject to the deadline will thereafter be
       subjected to the deadline as extended.

16.3   The bidder shall submit his bid offer against a set of bid documents purchased by him for all or
       some of the systems/equipment as per requirement of the Bid Documents. He may include
       alternate offer, if permissible as per the bid. However not more than one independent and
       complete offer shall be permitted from the bidder.

17.     LATE BIDS

       Any bid received by the purchaser after the deadline for submission of bids prescribed by the
       purchaser pursuant to clause 16, shall be rejected and returned unopened to the bidder.

18.     MODIFICATION AND WITHDRAWAL OF BIDS

18.1   The bidder may modify or withdraw his bid after submission provided that the written notice of
       the modification or withdrawal is received by the purchaser prior to the deadline prescribed for
       submission of bids.

18.2   The bidder‟s modification or withdrawal notice shall be prepared, sealed, marked
       and dispatched as required in the case of bid submission in accordance with the
       provision of clause 15. A withdrawal notice may also be sent by FAX but
       followed by a signed confirmation copy by post not later than the deadline for
       submission of bids.
18.3   Subject to clause 20, no bid shall be modified subsequent to the deadline for
       submission of bids.

E.      BID OPENING AND EVALUATION

19.     OPENING OF BIDS BY PURCHASER

19.1   The purchaser shall open bids in the presence of bidders or their authorized representatives
       who chose to attend, at 12:00 hrs on due date. The bidder‟s representatives, who are present,
       shall sign in an attendance register. Authority letter to this effect shall be submitted by the
       bidders before they are allowed to participate in bid opening (A Format is given in section X ).

19.2   A maximum of two representatives of any bidder shall be authorized and permitted to attend the
       bid opening.

19.3   The bidder‟s names, Bid prices, modifications, bid withdrawals and such other details as the
       purchaser, at its discretion, may consider appropriate will be announced at the time of opening.

19.4   The date fixed for opening of bids, if subsequently declared as holiday by the BSNL, the revised
       date of schedule will be notified. However, in absence of such notification, the bids will be
       opened on next working day, time and venue remaining unaltered.

20.    CLARIFICATION OF BIDS

       To assist in the examination, evaluation and comparison of bids, the purchaser may, at its
       discretion ask the bidder for the clarification of its bid. The request for the clarification and the
       response shall be in writing. However, no post bid clarification at the initiative of the bidder
       shall be entertained.
21.     PRELIMINARY EVALUATION

21.1   Purchaser shall evaluate the bids to determine whether they are complete, whether any
       computational errors have been made, whether required sureties have been furnished, whether
       the documents have been properly signed and whether the bids are generally in order.

                                                                                                         13
21.2   Arithmetical errors shall be rectified on the following basis. If there is a discrepancy between the
       unit price and total price that is obtained by multiplying the unit price and quantity, the unit price
       shall prevail and the total price shall be corrected by the purchaser. If there is a discrepancy
       between words and figures, the amount in words shall prevail. If the supplier does not accept
       the correction of the errors, his bid shall be rejected.

21.3    Prior to the detailed evaluation pursuant to clause 22, the Purchaser will determine the
        substantial responsiveness of each bid to the Bid Document. For purposes of these clauses, a
        substantially responsive bid is one which confirms to all the terms and conditions of the Bid
        Documents without material deviations. The purchaser‟s determination of bid‟s responsiveness
        shall be based on the contents of the bid itself without recourse to extrinsic evidence.

21.4   A bid, determined as substantially non-responsive will be rejected by the purchaser and shall
       not subsequent to the bid opening be made responsive by the bidder by correction of the non-
       conformity.
21.5   The Purchaser may waive any minor infirmity or non-conformity or irregularity in a bid which
       doesn‟t constitute a material deviation, provided such waiver doesn‟t prejudice or effect the
       relative ranking of any bidder.

22.    EVALUATION AND COMPARISON OF SUBSTANTIALLY RESPONSIVE BIDS

22.1   The Purchaser shall evaluate in detail and compare the bids previously determined to be
       substantially responsive pursuant to clause 21.

22.2           (a)The evaluation and comparison of responsive bids shall be done on the basis of Net
               cost to BSNL on the prices of the goods offered inclusive of Duties and taxes (but
               excluding CENVAT-able Duties & Taxes), Sales Tax, Packing, Forwarding, Freight and
               Insurance charges etc. as indicated in Col. 17 of the price schedule in the Sec.VII part II
               of the Bid-document. As stipulated in clause 9.1, Octroi/Entry Taxes are not to be
               included in the composite price and hence the same will not be considered for the
               purpose of evaluation and comparison of responsive bids. However, Octroi/Entry Taxes
               will be paid extra. as per actuals wherever applicable on production of proof of
               payment/relevant invoices/documents.

            (b) (i) “Duties & Taxes for which the firm has to furnish Cenvatable Challans/Invoices will
                      be indicated separately in the PO/APO.

                 (ii)     Vendors should furnish the correct E.D./Customs tariff Head in the price
                        Schedule. If the credit for the Duties and Taxes under CENVAT Credit Rules,
                        2004 is found to be not admissible at any stage subsequently owing to wrong
                        furnishing of Tariff Head, then the vendors will be liable to refund such non-
                        admissible amount, if already paid, along with penalty if charged by the
                        concerned authority.

                (iii)    In case the Duties & Taxes which are non CENVAT-able as per the quotes
                        indicated in the price schedule by the vendors and subsequently at any stage it
                        is found that Credit for such Duties & Taxes is admissible as per CENVAT Credit
                        Rules, 2004, then the vendors will be liable to refund the amount equivalent to
                        such Duties & Taxes if already paid to them. However, the purchaser may allow
                        the supplier to submit necessary documents in this regard which may enable the
                        purchaser to avail the CENVAT credit provided such credit is still available for
                        the amount so paid as per CENVAT Credit Rules 2004.

                 (iv) The purchaser reserves the right to ask the bidders to submit documentary proof
                      confirming the correct Tariff Head from the E.D./Customs authority where the
                      Tariff Head furnished against the particular tendered item by different bidders


                                                                                                          14
                       differs from each other or the same is found apparently not furnished in
                       accordance with E.D./Customs Tariff notifications.

                 (v)       “If the supplier fails to furnish necessary supporting documents i.e.
                       Excise/Customs invoices etc. in respect of the Duties/taxes which are
                       Cenvatable, the amount pertaining to such Duties/Taxes will be deducted from
                       the payment due to the firm.”

23.     CONTACTING THE PURCHASER

23.1   Subject to Clause 20, no bidder shall try to influence the Purchaser on any matter relating to its
       bid, from the time of the bid opening till the time the contract is awarded.

23.2   Any effort by a bidder to modify his bid or influence the purchaser in the purchaser’s bid
       evaluation, bid comparison or contract award decision shall result in the rejection of the
       bid.

F       AWARD OF CONTRACT

24.     PLACEMENT OF ORDER

       The Purchaser shall consider placement of orders for commercial supplies only on those
       eligible bidders whose offers have been found technically, commercially and financially
       acceptable and whose goods have been type approved/validated by the purchaser. The
       Purchaser reserves the right to counter offer price(s) against price(s) quoted by any bidder.

25.    PURCHASER’S RIGHT TO VARY QUANTITIES

       (a) BSNL will have the right to increase or decrease up to 25% of the quantity of goods and
       services specified in the schedule of requirements without any change in the unit price or other
       terms and conditions at the time of award of contract or upto 25% of the additional quantity
       can be ordered within 2 (Two) months of the placement of purchase order and supplies
       obtained within the original scheduled delivery period.

       (b)In exceptional situation where the requirement is of an emergent nature and it is necessary
       to ensure continued supplies from the existing venders, the purchaser reserves the right to
       place repeat order up to 50% of the quantities of goods and services contained in the running
       tender /contract within a period of twelve months from the earliest date of acceptance of APO at
       the same rate or a rate negotiated (downwardly) with the existing venders considering the
       reasonability of rates based on prevailing market conditions and the impact of reduction in
       duties and taxes etc.

26.    PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS

       The Purchaser reserves the right to accept or reject any bid, and to annul the bidding process
       and reject all bids, at any time prior to award of contract without assigning any reason
       whatsoever and without thereby incurring any liability to the affected bidder or bidders on the
       grounds of purchaser‟s action.

27.     ISSUE OF ADVANCE PURCHASE ORDER

27.1   The issue of an Advance Purchase Order shall constitute the intention of the Purchaser to enter
       into contract with the bidder.

27.2   The bidder shall within 14 days of issue of the advance purchase order, give his acceptance
       along with performance security in conformity with section IX provided with the bid document.

                                                                                                      15
28.         SIGNING OF CONTRACT

28.1        The issue of Purchase order shall constitute the award of contract on the
            bidder.

28.2       Upon the successful bidder furnishing performance security pursuant to clause 27, the
           Purchaser shall discharge the bid security in pursuant to clause 12.



29.        ANNULMENT OF AWARD
           Failure of the successful bidder to comply with the requirement of clause 28 shall constitute
           sufficient ground for the annulment of the award and the forfeiture of the bid security in which
           event the Purchaser may make the award to any other bidder at the discretion of the purchaser
           or call for new bids.

30.        QUALITY ASSURANCE REQUIREMENTS
           The supplier shall have Quality Management System supported and evidenced by the
           following :
       -           A Quality Policy.
       -           A management representative with authority and responsibility for fulfilling QA requirements
                   and for interfacing with purchaser in the matters of Quality.
       -           Procedure for controlling design/production engineering, materials, choice of
                   components/vendors, manufacturing and packaging process for supplying quality products.
       -            System of Inward Good Inspection.
       -           System to calibrate and maintain required measuring and test equipment.
       -           System for tracing the cause for non-conformance (traceability) and segregating product
                   which don‟t conform to specifications.
       -           Configuration management and change-control mechanism.
       -           A quality plan for the product.
       -           Periodical internal quality audits.
       -           A „Quality Manual‟ detailing the above Or infrastructure assessment certificate and Type
                   Approval Certificate issued by “TEC” shall be furnished.

31.                While all the conditions specified in the Bid documents are critical and are to be complied,
                   special attention of bidder is invited to the following clauses of the bid documents. Non-
                   compliance of any one of which shall result in out right rejection of the bid.

           (i)      Clause 15.1 of Section II : The bids will be recorded/returned unopened if covers are not
                    properly sealed with „PERSONAL SEAL‟ of the bidder.

           (ii)      Clauses 12.1, 12.3 & 13.1 of Section II : The bids will be rejected at opening stage if
                     Bid security is not submitted as per Clauses 12.1 & 12.3 and bid validity is less than the
                     period prescribed in Clause 13.1 mentioned above.

           (iii)     Clause 2 & 10 of Section II : If the eligibility condition as per clause 2 of Section II is not
                     met and/or documents prescribed to establish the eligibility as per Clause 10 of section II
                     are not enclosed, the bids will be rejected without further evaluation.

           (iv) Clause 11.2 ( c ) of Section II : If clause-by-clause compliance and deviation statements
                as prescribed are not given, the bid will be rejected at the stage of primary evaluation. In
                case of no deviations, a statement to that effect must be given.

           (v)        Section III Commercial conditions, Section IV Special Conditions of Contract &
                     Section VI Technical Specifications : Compliance if given using ambiguous words like
                     “Noted”, “Understood”, “Noted & Understood” shall not be accepted as complied. Mere
                                                                                                                 16
           “Complied” will also be not sufficient, reference to the enclosed documents showing
           compliances must be given.

      (vi) Section VII Price Schedule : Prices are not filled in as prescribed in price schedule.

      (vii) Section II clause 9.5 on discount which is reproduced below:

           “Discount, if any, offered by the bidder shall not be considered unless specifically
           indicated in the price schedule. Bidders desiring to offer discount shall therefore modify
           their offer suitably while quoting and shall quote clearly net price taking all such factors
           like Discount, free supply etc. into account”.

      (viii) Before outright rejection of the Bid by Bid-opening team for non-compliance of any of the
             provisions mentioned in clause 31(i), 31(ii) of Section II and clause 2(i) of Section IV
             though, the bidder company is given opportunity to explain their position, however if the
             person representing the company is not satisfied with the decision of the Bid opening
             team, he/they can submit the representation to the Bid opening team immediately but in
             no case after closing of the tender process with full justification quoting specifically the
             violation of tender condition if any.

           Bid opening team will not return the bids submitted by the bidders on the date of tender
           opening even if it is liable for rejection and will preserve the bids in sealed cover as
           submitted by taking the signatures of some of the desirous representatives of the
           participating bidder/companies present on the occasion.

           The in-charge of Bid opening team will mention the number of bids with the name of the
           company found unsuitable for further processing on the date of tender opening and
           number of representations received in Bid opening Minutes and if Bid opening team is
           satisfied with the argument of the bidder/company mentioned in their representation and
           feel that there is prima-facie fact for consideration, the in-charge of the bid opening team
           will submit the case for review to competent authority CGM in circles and Director (Plg. &
           NS) in corporate office as early as possible preferably on next working day and decision
           to this effect should be communicated to the bidder company within a week positively.
           Bids found liable for rejection and kept preserved on the date of tender opening will be
           returned to the bidders after issue of P.O. against the instant tender.

           If the reviewing officer finds it fit to open the bid of the petitioner, this should be done by
           giving three (working) days notice to all the participating bidders to give opportunity to
           desirous participants to be present on the occasion.

32.   Purchaser reserves the right to disqualify the supplier for a suitable period who habitually failed
      to supply the equipment in time. Further, the suppliers whose equipment do not perform
      satisfactory in the field in accordance with the specifications may also be disqualified for a
      suitable period as decided by the purchaser.

33.   Purchaser reserves the right to blacklist a bidder for a suitable period in case he fails to honour
      his bid without sufficient grounds.

34.   The bidder should give a certificate that none of his/her near relative is working in the units as
      defined below where he is going to apply for the tender. In case of proprietorship firm
      certificate will be given by the proprietor. For partnership firm certificate will be given by all the
      partners and in case of limited company by all the Directors of the company excluding
      Government of India/Financial institution nominees and independent non-Official part time
      Directors appointed by Govt. of India or the Governor of the state and full time Directors of
      PSUs both state and central. Due to any breach of these conditions by the company or firm or
      any other person the tender will be cancelled and Bid Security will be forfeited at any stage
      whenever it is noticed and BSNL will not pay any damage to the company or firm or the
      concerned person.
                                                                                                          17
The company or firm or the person will also be debarred for further participation in the
concerned unit.
The near relatives for this purpose are defined as:-
(a) Members of a Hindu undivided family.
(b) They are husband and wife.
(c) The one is related to the other in the manner as father, mother, son(s) & Son‟s wife
    (daughter in law), Daughter(s) and daughter‟s husband (son in law), brother(s) and
    brother‟s wife, sister(s) and sister‟s husband (brother in law).
The format of the certificate to be given is “I…………..s/o…….……r/o…………….. hereby
certify that none of my relative(s) as defined in the tender document is/are employed in BSNL
unit as per details given in tender document. In case at any stage, it is found that the
information given by me is false/incorrect, BSNL shall have the absolute right to take any
action as deemed fit/without any prior intimation to me.”




                                                                                                18
                                             SECTION III


                    GENERAL (COMMERCIAL) CONDITIONS OF CONTRACT

1.    APPLICATION

      The general condition shall apply in contracts made by the purchaser for the procurement of
      goods.

2.    STANDARDS

      The goods supplied under this contract shall conform to the standards prescribed in the
      Technical Specifications mentioned in section VI.

3.    PATENT RIGHTS

      The supplier shall indemnify the purchaser against all third-party claims of infringement of
      patent , trademark or industrial design rights arising from use of the goods or any part thereof in
      Indian Telecom Network.

4.    PERFORMANCE SECURITY

4.1   All suppliers (including small scale units who are registered with the National Small Scale
      Industries Corporation under Single point registration scheme) shall furnish performance
      security to the purchaser for an amount equal to 5% of the value of purchase order within 14
      days from the date of issue of Advance Purchase Order by the Purchaser.
4.2   The proceeds of the performance security shall be payable to the Purchaser as compensation
      for any loss resulting from the supplier‟s failure to complete its obligations under the contract.

4.3   The performance security Bond shall be in the form of Bank Guarantee issued by a scheduled
      Bank and in the form provided in „Section IX‟ of this Bid Document.

4.4   The performance security Bond will be discharged by the Purchaser after completion of the
      supplier‟s performance obligations including any warranty obligations under the contract.

5.    INSPECTION AND TESTS

5.1   The Purchaser or his representative shall have the right to inspect and test the goods as per
      prescribed test schedules for their conformity to the specifications. Where the Purchaser
      decides to conduct such tests on the premises of the supplier or its subcontractor(s), all
      reasonable facilities and assistance like Testing instruments and other test gadgets including
      access to drawings and production data shall be furnished to the inspectors at no charge to the
      purchaser.


5.2   Should any inspected or tested goods fail to conform to the specifications the purchaser may
      reject them and the supplier shall either replace the rejected goods or make all alterations
      necessary to meet Specification requirements free of cost to the purchaser.

5.3   Notwithstanding the pre-supply tests and inspections prescribed in clause 5.1 & 5.2 above, the
      equipment and accessories on receipt in the Purchaser‟s premises will also be tested during
      and after installation before “take over” and if any equipment or part thereof is found defective,
      the same shall be replaced free of all cost to the purchaser as laid down in clause 5.4 below.


                                                                                                      19
5.4   If any equipment or any part thereof, before it is taken over under clause 5.5, is found defective
      or fails to fulfill the requirements of the contract, the inspector shall give the Supplier notice
      setting forth details of such defects or failure and the supplier shall make the defective
      equipment good, or alter the same to make it comply with the requirements of the contract
      forthwith and in any case within a period not exceeding three months of the initial report. These
      replacements shall be made by the supplier free of all charges at site. Should it fail to do so
      within this time, the purchaser reserves the discretion to reject and replace at the cost of the
      supplier the whole or any portion of equipment as the case may be, which is defective or fails to
      fulfill the requirements of the contract . The cost of any such replacement made by the
      purchaser shall be deducted from the amount payable to the supplier.

5.5   When the performance tests called for have been successfully carried out, the inspector /
      ultimate consignee will forthwith issue a Taking Over Certificate. The inspector /ultimate
      consignee shall not delay the issue of any “taking Over Certificate” contemplated by this clause
      on account of minor defects in the equipment which do not materially affect the commercial use
      thereof provided that the supplier shall undertake to make good the same in a time period not
      exceeding six months. The Taking Over Certificate shall be issued by the ultimate consignee
      within six weeks of successful completion of tests. In this case, BCPC (Bills Copy Payable
      Challan) shall be equivalent to “Taking Over Certificate”, issuance of which shall certify receipt
      of goods in safe and sound condition. However, they shall not discharge the supplier of their
      warranty obligation. BCPC in respect of last consignment against the purchase order will be
      equivalent to “Taking Over Certificate”.

5.6   Nothing in clause 5 shall in any way release the Supplier from any warranty or other obligations
      under this contract.

6.     DELIVERY AND DOCUMENTS

6.1   Delivery of the goods and documents shall be made by the supplier in accordance with the
      terms specified by the purchaser in its schedule of requirements and special conditions of
      contracts, and the goods shall remain at the risk of the supplier until delivery has been
      completed. The delivery of the equipment shall be to the ultimate consignee as given in the
      purchase order.

6.2   The delivery of the goods and documents shall be completed within 6 months from the date of
      issue of Advance Purchase Order. First two months are for lead period and evenly distributed
      supplies are expected in remaining four months. The actual delivery schedule will be given in
      purchase order.

6.3   All Technical assistance for installation, commissioning and monitoring of the equipment shall
      be provided by the Supplier at no extra cost during laboratory evaluation, validation/ type
      approval and field trial, if any.

6.4   The extension of delivery period against the purchase order, if any, should be granted subject
      to the condition that BSNL shall have the absolute right to revise the price(s) and also to levy
      penalty for the delayed supplies.


7.    TRAINING

7.1   The bidder shall provide training for installation and maintenance staff of the purchaser free of
      cost where required.

7.2   The bidder shall specify in his bid the number of trainees, quantum of proposed training, pre-
      training qualifications required of the trainees and duration of the proposed training.

7.3   The bidder shall provide all training material and documents.

                                                                                                     20
7.4     Conduct of training of the purchaser‟s personnel shall be at the suppliers‟ plant and/or on-site in
        assembly start-up operation, maintenance and/or repair of the supplied goods.

8.       INCIDENTAL SERVICES

8.1     The supplier may be required to provide any or all of the following services:
        (a) Performance or supervision of on-site assembly and/or start-up of the supplied Goods;
        (b) Furnishing of tools required for assembly and/or maintenance of supplied Goods;
        (c) Performance of supervision or maintenance and/or repair of the supplied Goods, for a
             period of time agreed by the parties provided that this service shall not relieve the supplier
             of any warranty obligations under this contract.

9.       SPARES

9.1     The supplier shall be required to provide a list of the following material and notifications
        pertaining to spare parts manufactured or distributed by the supplier of spares including cost
        and quantity considered for arriving at the price of spares in sec. II, clause 9.

        (a)    Such spare parts as the purchaser may elect to purchase from the supplier provided
               that such purchase shall not relieve the supplier of any warranty obligation under the
               contract.



        (b)    In the event of termination of production of the spare parts, the supplier shall :
               i)      give advance notification to the purchaser pending termination (not less than 2
                       years), in sufficient time to enable the purchaser to procure life time spare; and

                ii)    following such advance intimation of termination, furnish at no cost to the
                       purchaser, the blue prints, drawings and specifications of spare parts, if and
                       when requested.

9.2    Over a period of three years starting from the date of final acceptance, the supplier shall supply,
       at his own cost, all necessary spares which have not been included in the offer as part of the
       requirement. These spares should be supplied within a maximum period of 30 days from the
       notification by the purchaser of his need.

10.     WARRANTY

10.1    The supplier shall warrant that the stores to be supplied shall be new and free from all defects
        and faults in materials used, workmanship and manufacture and shall be of the highest grade
        and consistent with the established and generally accepted standards for materials of the type
        ordered and shall perform in full conformity with the specifications and drawings. The supplier
        shall be responsible for any defect that may develop under the conditions provided by the
        contract and under proper use, arising from faulty material, design or workmanship such as
        corrosion of the equipment, inadequate quantity of material to meet equipment requirements,
        inadequate contact protection, deficiencies in circuit design and/or otherwise and shall remedy
        such defects at his own cost when called upon to do so by the Purchaser who shall state
        in writing in what respect the stores are faulty. This warranty shall survive inspection or
        payment for / and acceptance of goods, but shall expire (except in respect of complaints
        notified prior to such date) twelve months after the stores have been taken over under clause
        5.5 above.

10.2    If it becomes necessary for the Supplier to replace or renew any defective portion(s) of the
        equipment under this clause, the provisions of the clause 10.1 shall apply to the portion(s) of
        the equipment so replaced or renewed or until the end of the above mentioned period of twelve
        months, whichever may be later. If any defect is not remedied by the supplier within a
        reasonable time, the Purchaser may proceed to get the defects remedied from other supplier
                                                                                                        21
       etc., at the supplier‟s risk and expenses, but without prejudice to any      other rights which the
       purchaser may have against the supplier in respect of such defects.

10.3   Replacement under warranty clause shall be made by the supplier free of all charges at site
       including freight, insurance and other incidental charges.

11.     PAYMENT TERMS

11.1   Payment of 95% of the price shall be made on receipt of goods by consignee. For claiming this
       payment the following documents are to be submitted to the paying authority.

       (i)      Invoice clearly indicating break up details of composite price i.e Basic ,
                E.D., Sales Tax, any other Duties and Taxes ,Freight /Packing Charges,
                Service Tax etc.

       (ii)     Delivery Challan

       (iii)    Supplier certificate for dispatch

       (iv)     Excise gate pass / invoice or equivalent document

       (v)      Inspection certificate of QA

       (vi)     Consignee receipt

       (vii)    The sea freight receipt as per the rates approved by the Ministry of Water and Surface
                Transport, if any

       (viii)   Proof of payment of octroi/entry tax etc., if any.

       (ix)     “If the supplier fails to furnish necessary supporting documents i.e.
                 excise/customs invoices etc. in respect of the Duties/Taxes which are
                 Cenvatable, the amount pertaining to such Duties/Taxes will be
                 deducted from the payment due to the firm.”

11.2   (i)      The balance 5% payment shall be released within 6 months from the date of supply of
                the equipment in case there are no damage/shortages. In those cases where such
                shortages/damages are intimated to the supplier in writing, the balance payment shall
                be released only after the cases are settled in accordance with the provision of the P.O.

       (ii)     100% payment (in place of 95%) may be made on delivery, provided that an additional
                Bank Guarantee for an amount equivalent to 5% of the value of supplies valid for a
                minimum period of seven months is furnished by the supplier along with an undertaking
                that the equipment/stores supplied shall be free from damages/ shortages. In those
                cases, where such shortages/damages are intimated to the supplier in writing, the
                supplier shall extend the Bank Guarantee without fail for a suitable period at the request
                of purchaser in writing. Failure to do so shall result in forfeiture of Bank Guarantee. The
                Bank Guarantee shall be accepted at Circle Head Quarter and shall be released only
                after the cases are settled in accordance with the provisions available in the Bid
                Document/Purchase Order. In case, where the additional Bank Guarantee for 5% is not
                provided, then the payment will be settled as per clauses 11.1 & 11.2 (i) mentioned
                above.



                                                                                                        22
11.3   (i)        Form C and also a certificate stating that the tendered item (stores) are meant for the
                  use of BSNL shall be provided by the purchaser on the request of the bidder as and
                  when asked for.

       (ii)       No payment will be made for goods rejected at the site on testing.

11.4              The bidder has to give the mandate for receiving the payment costing Rs.5 lacs and
                  above electronically and the charges, if any, levied by bank has to be borne by the
                  bidder/contractor/supplier. The bidder company are required to give the following
                  informations for this purpose :–
                  (i) Beneficiary Bank Name :
                  (ii) Beneficiary Branch Name :
                  (iii) IFSC Code of beneficiary Branch :
                  (iv) Beneficiary account No.
                  (v) Branch Serial No. (MICR No.) :

12.     PRICES

12.1    (i)       Prices charged by the supplier for goods delivered and services performed under the
                  contract shall not be higher than the prices quoted by the Supplier in his Bid.

        (ii)     (a) Prices will be fixed at the time of issue of purchase order as per taxes and statutory
                       duties applicable at that time
                  (b) In case of reduction of taxes and other statutory duties during the scheduled
                       delivery period, purchaser shall take the benefit of decrease in these taxes/duties
                       for the supplies made from the date of enactment of revised duties/taxes.
                  (c)   In case of increase in duties/taxes during the scheduled delivery period, the
                       purchaser shall revise the prices as per new duties/taxes for the supplies, to be
                       made during the remaining delivery period as per terms and conditions of the
                       purchase order.

         (iii)    Any increase in taxes and other statutory duties/levies after the expiry of the delivery
                  date shall be to the supplier‟s account. However, benefit of
                  any decrease in these taxes/duties shall be passed on to the Purchaser
                  by the supplier.

13.      CHANGES IN PURCHASE ORDERS

13.1     The purchaser may, at any time, by a written order given to a supplier, make        changes within
        the general scope of the contract in any one or more of the following:

        (a) drawings, designs or specifications, where Goods to be supplied under the contract are to
            be specifically manufactured for the Purchaser;

        (b)      the method of transportation or packing;

         (c)     the place of delivery; or

         (d)     the services to be provided by the supplier.

13.2    If any such change causes an increase or decrease in the cost of, or the time required for the
        execution of the contract an equitable adjustment shall be made in the contract price or
        delivery schedule, or both, and the contract shall accordingly be amended. Any proposal by
        the supplier for adjustment under this clause must be made within thirty days from the date of
        the receipt of the change in order.


                                                                                                             23
14.      SUBCONTRACTS

       The Supplier shall notify the Purchaser in writing of all subcontracts awarded under this
       contract if not already specified in his bid. Such notification, in his original bid or later shall not
       relieve the supplier from any liability or obligation under the Contract.

15.      DELAYS IN THE SUPPLIER’S PERFORMANCE

15.1   Delivery of the Goods and performance of the services shall be made by the Supplier in
       accordance with the time schedule specified by the purchaser in its purchase order. In case the
       supply is not completed in the stipulated delivery period, as indicated in the Purchase Order,
       purchaser reserves the right either to short close /cancel this purchase order and/or recover
       liquidated damage charges. The cancellation/short closing of the order shall be at the risk and
       responsibility of the supplier and purchaser reserves the right to purchase balance unsupplied
       item at the risk and cost of the defaulting vendors.

15.2   Delay by the Supplier in the performance of its delivery obligations shall render the Supplier
       liable to any or all of the following sanctions: forfeiture of its performance security, imposition of
       liquidated damages and/or termination of the contract for default.

15.3 (i) If at any time during the performance of the contract, the supplier encounters condition
impending timely delivery of the goods and performance of service, the supplier shall promptly notify to
the Purchaser in writing the fact of the delay, its likely duration and its cause(s). As soon as practicable
after receipt of the supplier‟s notice, the purchaser shall evaluate the situation and may at its discretion
extend the period for performance of the contract (by not more than 20 weeks or as per provisions of
clause 16.2, Section-III) as per provision given below :
(ii) The vendor has to submit their request for extension along with the required additional BG,
undertaking as per clause 24 Section-III (Fall Clause) and a copy of QA inspection certificate at least
two weeks before the expiry of delivery period. The decision regarding extension shall be
communicated within two weeks of the receipt of request.



(iii) In case extension is being granted beyond 20 weeks then the vendor shall submit additional BG
while seeking extension. For peace meal items the amount of additional BG shall be 5% of the value of
balance quantity of items to be supplied for which extension in delivery period has been sought. In
case of infrastructure/turnkey projects other than as stated above, 1% of the total project value shall
be the value for additional BG. The additional BG shall be valid for six months beyond extension of.
delivery period sought and shall be discharged after the full ordered quantity has been supplied to the
ultimate consignee within the last extended delivery period on submission of inspection certificate from
QA and consignee receipt without prejudice to the other remedies available to the purchaser.
(iv) If the vendor fails to deliver the full ordered quantity even during extended delivery period then the
PO shall be short-closed and the Performance Bank Guarantee as well as additional BG shall be
forfeited.

Format of (i) letters conveying conditions of DP extension and (ii) DP extension letter are in appendix.

16       LIQUIDATED DAMAGES
16.1 The date of delivery of the stores stipulated in the acceptance of the tender should be deemed to
be the essence of the contract and delivery must be completed not later than the dates specified
therein. Extension will not be given except in exceptional circumstances. Should, however, deliveries
be made after expiry of the contracted delivery period, without prior concurrence of the purchaser and
be accepted by the consignee, such delivery will not deprive the purchaser of his right to recover
liquidated damage under clause 16.2 below. However, when supply is made within 21 days of the
contracted original delivery period, the consignee may accept the stores and in such cases the
provision of clause 16.2 will not apply.

                                                                                                           24
16.2 (i) Should the supplier fails to deliver the store or any consignment thereof within the period
prescribed and agreed for delivery, the purchaser, without prejudice to other remedies available to the
purchaser shall be entitled to recover, as agreed liquidated damages for breach of contract, a sum
equivalent to 0.5% of the value of the delayed supply and/or undelivered material/ supply for each
week of delay or part thereof for a period up to 10 (TEN) weeks, and thereafter at the rate of 0.7% of
the value of the delayed supply and/ or undelivered material/ supply for each week of delay or part
thereof for another TEN weeks of delay.
(ii) DP extension beyond 20 weeks would not be generally allowed. The extension beyond 20 weeks
may be decided in most exceptional circumstances on case to case basis, by the CGM concerned in
case of tenders floated by Circles and by the Functional Director concerned in case tenders floated by
Corporate Office, stating reasons and justifications for grant of extension of delivery period beyond 20
weeks.
(iii) In the case of package supply/turnkey projects when the delayed portion of the supply materially
hampers installation and commissioning of the systems, LD charges shall be levied as above on the
total value of the concerned package of the Purchase Order.
(iv) Quantum of liquidated damages assessed and levied by the purchaser and decision of the
purchaser thereon shall be final and binding on the supplier, further the same shall not be challenged
by the supplier either before Arbitration tribunal or before the court. The same shall stand specifically
excluded from the purview of the arbitration clause, as such shall not be referable to arbitration.
However, when supply is made to the ultimate consignee within 21 days of QA clearance in the
extended delivery period and the goods were despatched within this delivery period, the consignee
may accept the stores and in such cases the LD shall be levied up to the date of dispatch after QA
clearance only.
(v) The total value of the liquidated damages as per above sub-clauses shall be limited to a maximum
of 12% (Twelve percent) i.e. LD shall be levied upto 20 weeks only as per provision at para (i).

(Appendix-A and Appendix-B of this clause is available in last).

17.     FORCE MAJEURE

If, at any time, during the continuance of this contract, the performance in whole or in part by either
party of any obligation under this contract is prevented or delayed by reasons of any war or hostility,
acts of the public enemy, civil commotion, sabotage , fires, floods, explosions, epidemics, quarantine
restrictions, strikes, lockouts or act of God (hereinafter referred to as events) provided notice of
happenings of any such eventuality is given by either party to the other within 21 days from the date of
occurrence thereof, neither party shall by reason of such event be entitled to terminate this contract nor
shall either party have any claim for damages against other in respect of such non-performance or
delay in performance, and deliveries under the contract shall be resumed as soon as practicable after
such an event come to an end or cease to exist, and the decision of the Purchaser as to whether the
deliveries have been so resumed or not shall be final and conclusive. Further that if the performance
in whole or part of any obligation under this contract is prevented or delayed by reasons of any such
event for a period exceeding 60 days, either party may, at its option, terminate the contract.

        Provided, also that if the contract is terminated under this clause, the Purchaser shall be at
liberty to take over from the Supplier at a price to be fixed by the purchaser, which shall be final, all
unused, undamaged and acceptable materials, bought out components and stores in course of
manufacture which may be in possession of the Supplier at the time of such termination or such
portion thereof as the purchaser may deem fit, except such materials, bought out components and
stores as the Supplier may with the concurrence of the purchaser elect to retain.

18     TERMINATION FOR DEFAULT

18.1      The Purchaser may, without prejudice to any other remedy for breach of contract, by written
notice of default, sent to the supplier, terminate this contract in whole or in part.


                                                                                                       25
       a)   if the supplier fails to deliver any or all of the goods within the time period(s) specified in
              the contract, or any extension thereof granted by the purchaser pursuant to clause15;
       b) if the supplier fails to perform any other obligation(s) under the Contract; and
       c)    if the supplier, in either of the above circumstances, does not remedy his failure within a
             period of 15 days (or such longer period as the purchaser may authorize in writing) after
             receipt of the default notice from the purchaser.

       In the event the purchaser terminates the contract in whole or in part pursuant to para 18.1 the
       purchaser may procure, upon such terms and in such manner as it deems appropriate, goods
       similar to those undelivered and the supplier shall be liable to the Purchaser for any excess
       cost for such similar goods. However the supplier shall continue the performance of the
       contract to the extent not terminated.

19.    TERMINATION FOR INSOLVENCY
       The Purchaser may at any time terminate the Contract by giving written notice to the Supplier,
       without compensation to the supplier. If the supplier becomes bankrupt or otherwise insolvent
       as declared by the competent court provided that such termination will not prejudice or affect
       any right of action or remedy which has accrued or will accrue thereafter to the purchaser.

20.     ARBITRATION
      In the event of any question, dispute or difference arising under this agreement or in connection
      there-with (except as to the matters, the decision to which is specifically provided under this
      agreement), the same shall be referred to the sole arbitration of the CMD, BSNL or in case his
      designation is changed or his office is abolished, then in such cases to the sole arbitration of the
      officer for the time being entrusted (whether in addition to his own duties or otherwise) with the
      functions of the CMD, BSNL or by whatever designation such an officer may be called
      (hereinafter referred to as the said officer), and if the CMD or the said officer is unable or
      unwilling to act as such, then to the sole arbitration of some other person appointed by the CMD
      or the said officer. The agreement to appoint an arbitrator will be in accordance with the
      Arbitration and Conciliation Act 1996. There will be no objection to any such appointment on the
      ground that the arbitrator is a Government Servant or that he has to deal with the matter to which
      the agreement relates or that in the course of his duties as a Government Servant he has
      expressed his views on all or any of the matters in dispute. The award of the arbitrator shall be
      final and binding on both the parties to the agreement. In the event of such an arbitrator to whom
      the matter is originally referred, being transferred or vacating his office or being unable to act for
      any reason whatsoever, the CMD, BSNL or the said officer shall appoint another person to act
      as an arbitrator in accordance with terms of the agreement and the person so appointed shall be
      entitled to proceed from the stage at which it was left out by his predecessors.

      The arbitrator may from time to time with the consent of both the parties enlarge the time frame
      for making and publishing the award. Subject to the aforesaid, Arbitration and Conciliation Act,
      1996 and the rules made there under, any modification thereof for the time being in force shall
      be deemed to apply to the arbitration proceeding under this clause.

      The venue of the arbitration proceeding shall be the office of the CMD, BSNL, New Delhi or such
      other places as the arbitrator may decide.

21    SET OFF

       Any sum of money due and payable to the supplier (including security deposit refundable to
       him) under this contract may be appropriated by the purchaser or the BSNL or any other
       person(s) contracting through the BSNL and set off the same against any claim of the
       Purchaser or BSNL or such other person or person(s) for payment of a sum of money arising
       out of this contract or under any other contract made by the supplier with the Purchaser or
       BSNL or such other person(s) contracting through the BSNL.


                                                                                                              26
22.    The bidders, who are given Purchase Orders, must give the details of the supplies made
       against all the Purchase Orders every month on the first working day of the following month to
       MM and the concerned Planning Branches of BSNL (Corporate Office).
23.    The bidder should furnish the name of his collaborator (if applicable), brand name, model no.
       and type of the products offered in this tender. The technical literatures of the products should
       also be submitted. No change in either technology or product shall be permitted after opening
       of bids.


24. Fall Clause
24.1 The prices once fixed will remain valid during the scheduled delivery period except for the
     provisions in clause 12.1 of Section III. Further, if at any time during the contract

       (a) It comes to the notice of purchaser regarding reduction of price for the same or similar
           equipment/ service;
                                                    And /or
       (b) The prices received in a new tender for the same or similar equipment/ service are less
           than the prices chargeable under the contract.
           The purchaser, for the purpose of delivery period extension, if any, will determine and
           intimate the new price, taking into account various related aspects such as quantity,
           geographical location etc., and the date of its effect for the balance quantity/ service to the
           vendor. In case the vendor does not accept the new price to be made applicable during the
           extended delivery period and the date of its effect, the purchaser shall have the right to
           terminate the contract without accepting any further supplies. This termination of the
           contract shall be at the risk and responsibility of the supplier and the purchaser reserves the
           right to purchase the balance unsupplied quantity/ service at the risk and cost of the
           defaulting vendor besides considering the forfeiture of his performance security.

24.2       (a) The vendor while applying for extension of time for delivery of equipment/services, if
           any, shall have to provide an undertaking as “We have not reduced the sale price, and/ or
           offered to sell the same or similar equipment/ service to any person/organization including
           Department of central/state Government or any central/state PSU at a price lower than the
           price chargeable under the contract for scheduled delivery period.”


          (b)In case under taking as in Clause 24.2(a) is not applicable, the vendor will
           give the details of prices, the name(s) of purchaser, quantity etc. to the
           purchaser, while applying extension of delivery period.

25.        Court Jurisdiction:
          (i) Any dispute arising out of the tender/bid document/evaluation of bids/issue of APO shall
          be subject to jurisdiction of the competent court at the place from where the NIT/tender has
          been issued.
          (ii)Where a contractor has not agreed to arbitration, the dispute/claims arising out of the
          Contract/PO entered with him shall be subject to the jurisdiction of the Competent Court at
          the place from where Contract/PO has been issued. Accordingly ,a stipulation shall be made
          in the contract as under:

                  ‘This Contract/PO is subject to jurisdiction of Court at Delhi only”


                                                   ****




                                                                                                       27
                                              SECTION IV

                              SPECIAL CONDITIONS OF CONTRACT
                    Technical Specification of Next Generation Play (Version 2.2)


          The special conditions are split into two parts. The first part includes the special conditions
and the technical conditions of the access network using GPON. The second part deals with the
technical conditions of the aggregation network and Next Generation services.

                                                   Part-I

1. The special conditions of contract shall supplement the “Instructions to the Bidder” as contained in
   Section II & “General Conditions of the Contract” as contained in Section III and wherever there
   is a conflict, the provisions herein shall prevail over those in Section II and Section III.

2. (i) The bank guarantee for bid security or NSIC certificate for claiming exemption from
   submission of bank guarantee against bid security as prescribed in clauses 12.1 & 12.3, Section II of
   the bid documents, the documents establishing the eligibility conditions such as type approval
   certificate(TAC)/ Technical specification Evaluation certificate (TSEC)/proof of submission of Form
   B for TAC/ Copy of QF-103 for TSEC/ QA letter confirming the Registration number issued against
   QF-103/ EO/CO/MOU with the OEM or Collaborator or Technology Provider etc. shall be submitted
   along with the bid in a separate cover. The bank guarantee so submitted shall be as per format given
   in Section VIII on prescribed judicial paper with stamps of proper value and should contain full
   address of the issuing branch of the bank with its telephone and FAX numbers. This cover should be
   super-scribed as “BID SECURITY AND OTHER DOCUMENTS FOR TENDER NO.
   MM/TX/032008/000352 DATED 14.03.2008”.

   (ii) In case where the Bank Guarantee for bid security, documents establishing the eligibility are
   not submitted, cover containing the commercial, technical and financial offers SHALL NOT BE
   OPENED AND THE BID SHALL BE REJECTED AND RETURNED TO THE BIDDER
   UNOPENED. Further, additional set of eligibility documents are to be placed in each of the bid
   copies submitted.

   (iii) Selection Process : A two-stage process will be adopted in the selection of the bidders for
   providing the proposed equipment/solutions:
   Stage I: Inviting technical and financial bids through tendering process and short-list techno-
   commercially responsive and compliant Bidders who fulfill the eligibility and special conditions as
   per requirements set against the project as defined in this document. The loading, if any, to be done
   as per the tender conditions in the financial bid shall be determined in this stage using the unpriced
   BOM and the technical bid submitted by the bidder. The loading shall be done on the financial bid to
   be opened in the Stage-II.

   Stage II: The financial bids of technically and commercially responsive and compliant bidders shall
   be opened and evaluated with the loading determined in the stage-I, for determination of the rankings
   of the various bidders. The lowest evaluated bidders of two different technologies shall be designated
   as L-1, L-2 and L-3 for the purpose of ordering of the equipment.

   (iv) One soft copy ( Only in a CD-ROM/DVD ) of the commercial, technical and financial bid shall
   also be furnished by the bidder along with the hardcopy of the bid documents submitted in the sealed
   cover as mentioned in 2 (i) and 2 (ii). The soft copy shall not be used for evaluation purpose. Only

                                                                                                            28
   hardcopy of the bid documents shall be used for tender evaluation. The bid shall be summarily
   rejected if the soft copy is not furnished along with the bid document.

   (v) Copy no 1 shall be retained by MM cell. One of the other bid copies shall be marked as
   Technical copy. The Technical copy shall be made over to the transmission planning cell member
   of the CET along with the soft copy.

3. (i) The small scale industries registered with National Small Scale Industries Corporation (NSIC)
   for the tendered item under single point registration scheme and desirous of claiming concessions
   available to such units inclusive of bid security should submit their latest NSIC certificate and
   documents in respect of their monetary limit and financial capacity duly certified by NSIC.

   (ii) If a vendor registered with NSIC under single point registration scheme claiming concessional
   benefits is awarded work by BSNL and subsequently fails to obey any of the contractual obligations,
   he will be debarred from any further work/contract by BSNL for one year from the date of issue of
   such order.

4. (i) The purchaser intends to limit the number of technically and commercially responsive bidders to
   three from the list of such bidders arranged in increasing order of their evaluated prices starting from
   the lowest for the purpose of ordering against this tender. The bidder with the lowest evaluated
   price (L-1) will be considered for about 50% of the tendered quantity. The balance quantity shall be
   ordered on L-2 and L-3 in the inverse ratio of their quoted prices. The ordering of the SOR
   quantities may not be in the exact proportion of the above distribution as the equipment shall
   be allotted based on the circle wise distribution to be decided at the time of placement of
   APO/PO.

  (ii) In the event of any of the eligible bidder not agreeing to supply the equipment or not being
   considered by BSNL for ordering the equipment, inverse ranking of the vendors below the
   aforesaid bidders will be recast to fill up the vacated slots. This will be done to ensure that the
   numbers of bidders supplying the equipment remains same as earlier.

5. (i) The bidders have to obtain Technical Specification Evaluation Certificate (TSEC) from Quality
   Assurance circle, BSNL/Type Approval Certificates (TAC) from Telecommunication Engineering
   Centre, NewDelhi of Deptt. of Telecom against the TEC GR No. GR/PON-01/01 DEC. 2006,
   within two months of issue of Advance Purchase order. All the other items sought in the SOR shall
   be validated, during the field trial by QA circle, against the respective GRs mentioned in the clauses
   below.

   (ii) Field trial of the equipment should commence within one month of the issue of the advance
   purchase order. If the field trial of the equipment does not commence within one month of issue of
   the advance purchase order, based on the QA circle/TEC report, the purchaser reserves the right
   to cancel the P.O. and encash the performance Bank Guarantee.

   (iii) If a bidder who is given Purchase Order fails to obtain TSEC/Type Approval certificate for the
   product as per 5 (i) within two months from the date of issue of Advance Purchase Order, the
   purchaser reserves the right to cancel the P.O. and encash the Performance Bank Guarantee.

   (iv) The equipment shall be offered by the bidder for QA testing from second month onwards. In
  case the bidder do not offer the equipment for QA testing, based on the QA circle input, the
  purchaser reserves the right to cancel the P.O. and encash the Performance Bank Guarantee.

   (v) The delivery of goods shall be completed within 6 (six) months from the date of issue of
   Advance Purchase Order. First two months are for the lead period including obtaining TSEC.
                                                                                             29
     Evenly distributed supplies are expected in remaining time. Failure to adhere to this monthly
     delivery schedule will attract liquidated damages.

     (vi) If a bidder who is given Purchase Order fails to commence supply during the original delivery
     period or fails to deliver the goods evenly, the purchaser reserves the right to cancel the P.O.
     and encash the Performance Bank Guarantee.

6.    The bidder with the lowest evaluated price (L1) (in each package) shall provide training to Six
     batches of 20 Engineers each for a period of One week. L2 and L-3 shall provide training to Three
     batches of 20 Engineers each for a period of One week. The training shall be held at the Original
     Equipment Manufacturing (OEM) place of the bidder (all the successful bidders) for minimum of
     one batch. The location of OEM facility should be specified by the bidder in the tender. The training
     shall be completed within four months of the issue of the purchase order. BSNL reserves the right to
     decide the training for other/all batches at the regional training centres available in BSNL. The
     training shall be on installation/operation and maintenance and software aspects of the system along
     with the PON concepts and protocols. Hands-on experience shall be provided by the bidder on the
     GPON equipment ordered along with LCT and EMS. For this purpose, an GPON OLT, ONTs and
     other accessories shall be provided during the training period. One set of manuals shall be issued to
     every participant in soft copy form. The training shall commence two months after the issue of the
     purchase order. The proposed training schedule and training programme shall be submitted by the
     bidder along with the bid. The cost of travel expenses, boarding and lodging of trainees will be borne
     by the purchaser. The transmission planning cell shall certify the completion of training. The
     certificate shall be issued by ADG (OF) BSNL Co for this purpose.

7. (i) The supply will be accepted only after Quality assurance tests are carried out by Quality
   Assurance Wing of BSNL as per prescribed schedule and material passing the test successfully and
   after authenticated excise gate pass issued by excise authorities, Govt. of India or any other
   organization duly authorized by excise authorities for the purpose.

     (ii) The QA units of BSNL while clearing the equipment / stores will strictly adhere to the package
     discipline as described in Purchase Order. Supplies made in full, as per purchase order of all the
     packages during delivery period only will be deemed to have been supplied within the scheduled
     delivery period. The QA Circle shall verify the bill of material approved during TSEC / TAC
     process with the bill of material enclosed with the purchase order. QA circle shall ensure the supply
     of all the items not quoted by the bidders in the tender document but are required as per the tender
     condition & GR requirements. These additional items shall be supplied by the bidder at no extra
     cost.

     (iii) The QA units shall carry out inspection of the equipment offered by the bidder as per the terms
     and conditions of the PO, from second month ( from the date of issue of APO) onwards, and
     dispatch the same, pending TSEC, from third month ( from the date of issue of APO) onwards.
     Inspection Certificates (ICs) shall not be issued in this case.

     (iv) Any changes/modifications suggested by QA during the process of TSEC shall be incorporated
     free of cost in the supplied equipment at site by the bidder.

     (v) The Inspection Certificate (ICs) will be released by the QA only after completing the process &
     issue of the TSEC and incorporation of the changes and modifications in the supplied equipment at
     site.

     (vi) The 70% Payment for the supplied equipment shall be made only after the successful issuance
     of TSEC and Issuance of Inspection certificates by BSNL QA. 25% of the payment shall be done
     after the successful validation of the equipment. The integration of the Next Generation Play
                                                                                                   30
     equipment with NIB-II/Multiplay shall also be tested during the validation. The balance 5%
     payment shall be released there after as per the terms and conditions of the Purchase Order and
     Issuance of training completion certificate from TX cell.

     (vii) The QA unit shall carry out QA tests for the equipment offered by the bidder from second
     month onwards and dispatch the same pending TSEC.

8. The clarifications to be sought by the bidders from the purchaser shall be furnished in the following
   format.

           Sl No | Clause no/Sec No/GR No | Item description | Clarification sought

     The clarifications sought by the bidder prior to the tender and the replies to be submitted against the
     clarification sought by BSNL after the tender opening should be submitted in soft copy apart from
     the hard copy submitted to the ADG / Jt DDG of MM cell in BSNL. The clarifications should be
     sought for commercial conditions and technical conditions separately in the above format. The
     clarifications sought without any mention of the clauses of the tender document/GR may not be
     considered.

9.    Any clarification issued by BSNL in response to query raised by prospective bidders shall form an
     integral part of Bid Document and it may amount to amendment of relevant clauses of the Bid
     Documents.

10. Purchaser reserves the right to disqualify such bidders who have a record of not meeting contractual
    obligations against earlier contracts entered into with the purchaser.

11. The bidder shall submit the bid document duly signed every page by the person having the Power
    Of Attorney (POA). The signature on the bid documents on each page must match with the bidder‟s
    signature attested in the POA.

12. Purchaser reserves the right to blacklist a bidder for a suitable period in case he fails to honor his bid
    without sufficient grounds.

13. The Purchaser reserves the right to offer counter offer price(s) against the price(s) quoted by any
    bidder.

14. The bidders, who are given Purchase order must give the details of the supplies made against
    various purchase orders every month on first working day of the following month to TX Planning
    Cell & MM Cell of BSNL, New Delhi. TAC/TSEC status, PQT, Bulk Testing should be intimated
    in the report.

15. The bidders should indicate the technology for which the offer has been given along with the brand
   name, type / model number of the products. In case it is a case of transfer technology, the details
   such as name of the technology, name of country etc., should also be given and the copy of
   memorandum of understanding for transfer of technology and RBI clearance if applicable should be
   enclosed. No change in either Technology or product for the GPON equipment will be allowed after
   opening of Tender. The bidder shall submit the various technologies/models quoted by the bidder in
   the following format.


       Sl No   SOR item          Technology Provider/Collaborator/OEM               Model No


                                                                                                           31
16. The bidder shall have a nodal centre in India for repair of faulty units with maximum turn around
    time of three weeks. BSNL will handover all the faulty units of the nodal centre at their premises
    and thereafter it shall be the responsibility of the nodal centre to complete repair and inform the
    concerned units for collection. The performance guarantee shall be encashed in case the turn
    around time is not maintained by the supplier.

17. The GPON equipment may be used in point to point, point to multipoint topology. The software
    offered should be able to support any or all the above configurations as per requirement during
    operation.

18. High resolution ( Min 5 Mega Pixel) printed colour photographs ( Post card size ) of the complete
    equipment with rack, OLT subrack, Fibre Distribution Frame/FDMS, splitters, ONTs, LAN
    Switches, Ethernet to E1 converters and wiring (Front subrack view, wired view, card front view
    where the front access ports are available, Rack front view, Alarm panel view) should be supplied
    along with the bid. The photos of the front view of the individual cards also should be supplied. The
    photos of the mother board arrangements, cabling arrangements and the backplane connections (
    back view of the equipment) should also be submitted. The soft copy of these photos should be
    provided along with the bid document. Block diagrams shall also be submitted for every
    configuration sought in the tender. Configuration/Block diagrams including the links with the
    expansion chassis to be depicted.

19. The rack height shall be a minimum of 2600 mm.

20. The Ethernet interface termination shall be provided through a common terminal panel and
    extended to IO cards through backplane or through proper lacing of extended cables to the front
    access ports of the Ethernet IO cards.

21. All the patch cords/cables being terminated on the IO cards shall have proper lacing arrangement so
    that the patch cords/cables shall be fixed in line and the cables/cords of one IO card shall not
    overlap over other IO cards.

22. Each vendor shall ensure direct inter-connection of the Optical and Electrical Ethernet Signals to
   other suppliers equipment obtained by BSNL against this tender and other tenders. Vendors are
   required to give details regarding their proprietary protocols used, if any, and/or make suitable
   amendment to ensure its inter-operability with other vendors equipment during warranty and AMC
   period.

23. EMS shall be connected to the Gateway NE. EMS shall also have standby connectivity to another
    Gateway NE. The gateway NEs shall have control card redundancy.

24. Equipment backplane shall be equipped with all slots, connectors and necessary cabling in all the
    GPON subracks.

25. All the interface Cards shall be supplied along with the necessary cabling with termination at the
   wire wrap points/termination points. The cost of the cabling and associated wire wrapping points etc
   shall be included in the interface card cost. The same shall be shown in the bill of material.

26. The vendors who are selected to supply the equipment, will provide, without any additional cost, the
   software upgrades, patches for a period of Five years from the date of completion of supplies for
   their equipment. They will also provide / make necessary changes without any additional cost, in
   hardware / software to ensure compliance to Q3 interface of ITU-T or SNMPv2C or any other better
   interface (Shall be provided as the South Bound Interface) between the EMS and the Network
   elements. Further, TMF-814/CORBA shall be supplied as the North bound interface along with
                                                                                                      32
   suitable network interface and software in the EMS, so as to have a common / centralized network
   management system of different vendors during the same period.

27. The SNMP MIBs and CORBA IDLs shall be verified by QA circle during the TSEC testing. The
   bidder is required to provide the same and co-operate with the supplier of national NMS to be
   installed during the warranty and AMC agreement period of 5 years.

28. Bidders shall have to provide one number of 5 dB optical attenuators with each GPON OLT
   interface, for incorporating additional loss in the short links. Suitable adopters are to be provided for
   other types of patch cords for terminating in SC-PC adopters/connectors at customer premises and
   splitters. BOM should include all the items clearly.

29. Ten numbers of SFP modules for each type of optical SFP port in OLT and ONT shall be supplied
   as spares along with in addition to the maintenance spares sought in the bill of material.

30. Evaluation of the bids will be on package basis including all items as given in the Schedule Of
    Requirement (SOR). The optional items shall also be included in the evaluation. The optional items
    shall be ordered based on the requirement from field units.

31. The Bidders should quote the number of interfaces provided by the units/cards/modules in the
    following format.

     SL Item        Ports or    Cards/              Total       Remarks
     NO description Interfaces/ Chassis             ports    or
                    Card                            interfaces/
                                                    Chassis

32. Bidder shall quote Hardware and Software cost separately. All the columns of the price bid shall be
    filled properly by the bidder for each item mentioned in the SOR.

33. Bidder shall submit the diagrams of the rack and subracks along with the units/modules to be
   supplied for each configuration mentioned in the schedule of configuration. The bid submitted
   without these diagrams shall be rejected summarily.

34. The manuals are to be supplied with every GPON Chassis and maintenance spare. Hard copy of the
   manual shall be supplied along with 50% of the ordered Chassis. Soft copy in CD shall be supplied
   along with rest of the 50% ordered Chassis. Only soft copy of the manuals shall be supplied along
   with the maintenance spares. The manuals supplied along with the equipment shall be as per the
   clause below.

35. The equipment should be supplied as per Technical Specification mentioned in the section VI of the
    Bid documents. The Bidder shall provide complete technical literature for the equipment quoted.
    Both hard copy & soft copy of the Operations, Installation, Hardware, Software and Maintenance
    manuals for all the equipment      (GPON OLTs, ONTs, Splitters, FDF, EMS, LCT, Ethernet to E1
    converter, LAN switch etc ) shall be submitted by the bidder. The original printed manuals shall be
    supplied as the hard copy. Xerox of the manuals shall not be accepted. The bid shall be considered
    technically non-responsive and the bid shall be summarily rejected if these details are not
    furnished along with the bid document.


36. The bidder shall provide detailed priced Bill of Material (BoM) for every item mentioned in the
    SoR. Against every item of the SOR, the units, cards, modules, alarm cables, earthing cables, power
                                                                                                     33
   cables, subrack interconnecting cables, FC-PC patch chords, FC-PC adopters, LCT, EMC, Printer,
   LCT link cables, EMS link cables, Recovery CDs, OS CDs, LCT/EMS CDs, Key board, Printer,
   Printer link cable, Monitor, Mouse etc needs to be mentioned clearly in the priced Bill of material.
   The names/nomenclature of these units, as they appear in the technical manuals, shall be
   mentioned in the BOM. The priced bill of material shall be provided in the price schedule
   format only. The soft copy of the same shall be submitted along with the tender document. The bid
   submitted without the priced bill of material shall be rejected summarily. In case the price of the
   same unit/card/module differs between different items in the priced BOM, the lowest price quoted
   shall be applied for all the similar items.


37. The unpriced BOM shall be submitted along with the technical bid to be opened in the first
    Stage. The Price schedule and the Priced BOM shall be opened in the Stage-II.


38. The bidder shall submit the printed documents as one per page only using A4 pages. Multiple pages
    printing in one page shall not be acceptable. The print shall be in a legible font of minimum size of
    12 of „Times New roman‟ Font or equivalent size. The bidder may print the documents on both the
    sides of the paper.


39. The bidder shall submit the information regarding the units/modules/cards offered in the following
    format.


       Sl No     Unit/         Part     Hardware Software Remarks

                 module/       Code     version     version

                 Card –

                 Description




40. The price schedule and the detailed priced BOM should be submitted with the columns under
    Ex-factory price, Excise duty amount, Sales TAX amount, Freight Forwarding amount, unit
    price and total price rounded to two decimal digits. Soft copy of these financial statements
    should be submitted in such a manner that the calculations/formulas made in the soft copy can be
    examined. The sum of prices quoted against every item in the detailed priced BoM should
    match with the corresponding item‟s price quoted in the price schedule. For the purpose of
    evaluation loading shall be done with the highest and for ordering purpose lowest price among them
    shall be used.


41. The bidder must provide the cost for every interface mentioned in the SOR. The common statement
    that „cost included in the above item‟ shall not be acceptable. In case the purchaser wants to
    purchase additional interfaces the rates for each interface must be available.
                                                                                                 34
42. The bidder shall quote all the material required for the satisfactory working of the equipment as per
    the tender conditions. Any item, required as per the schedule of requirement/tender
    conditions/technical specifications/clarifications but not quoted/included by the bidder in the Bill of
    Material/Price Bid, shall be supplied free of cost by the bidder. The bill of material quoted by the
    successful bidder shall be verified with the Type approved product material of the same bidder.


43. The bidder shall also provide the cost of any other cards which will deliver additional services, not
    sought in the tender, which the bidder‟s equipment is capable of equipping in the subrack.

44. The maintenance spares set as mentioned in the Schedule of requirement shall be quoted. The prices
    of each individual items of equipment like units / cards / modules / sub-assemblies / subrack shall be
    mentioned in the priced Bill of material. The bids without provision of above list shall be
    rejected.

45. In case all the items in the Bill of Material (BOM) including the maintenance spares are not quoted
   as per the SOR, technical specifications and tender conditions, necessary loading shall be done for
   the purpose of evaluation of the bidder‟s ranking and the loaded components shall be supplied free of
   cost by the bidder considered for placement of APO.

46. Comprehensive Repair of Equipment: The vendors must quote the comprehensive repair charges
   indicating the all-inclusive rates as an average percentage of the cost of the product. For the purpose
   of evaluation, the value of repair charges will be worked out as a percentage of the total cost of 3
   years maintenance spares quoted by the bidder. The percentage quoted will be applicable for
   repairing all units/modules/subassemblies etc. of all items supplied by the bidder against the tender.
   If the quoted cost of all units / modules/subassemblies in BOM taken together exceeds the cost of
   that equipment offered in PO, the cost of complete equipment offered and the comprehensive repair
   charges will be paid with reference to the normalized cost.

47. a) Repair of cards : The exact quantity of the repairing shall be decided on the basis of actual
    requirement in the field at that time. The repair charges shall be valid for a period of 5 years after
    warranty period. The bids without provision of comprehensive repair charges for the
    equipment after warranty shall be rejected.

    b) AMC of EMS: The bidder shall quote comprehensive AMC charges in the price schedule for
    maintenance of EMS as per the terms and conditions given in Annexure I of the bid document. The
    evaluation of the tender shall be done for the total package price including repair charges for 3 year
    maintenance spare units / modules / cards / sub assemblies and AMC charges for EMS for 5 years
    discounted at the rate of 15% per year. As the warranty is for one year from the date of taking over,
    the AMC shall be discounted twice in the first year and thrice in the second year and so on for the
    purpose of evaluation.

    c) Towards fulfillment of vendors obligation in respect of repair of cards and AMC under clause 24
    (a) and Clause 24 (b) the vendor is required to submit a performance bank guarantee of 2% of the
    purchase order value, valid for a period of five and half years from the date of expiry of warranty
    period, three months before the expiry of warranty period. The 5% PBG taken initially will be
    released only after submission of the 2% PBG stated above, subject to the fulfillment of other terms
    and condition of the purchase order. A separate contract for maintenance of module/card of AMC of
    EMS will have to be signed at the time of issue of purchase order as per the terms and conditions

                                                                                                        35
    contained in the “Contract for repair of modules / Cards and AMC of EMS” as enclosed in
    Annexure-I of this bid document.

       The agreement shall remain in force for five years from the expiry of the warranty while at the
    same time the terms and conditions of this agreement shall also apply during the warranty period,
    except for payment of charges to the supplier. Extension of agreement beyond five years shall be
    negotiable depending upon the performance of supplier during the agreement period.

48. BSNL reserves its right to procure additional quantity of Maintenance spares in the form of modules
   / units / cards at prices worked out as follows : The price of each individual item of spares would be
   fixed based upon the price for the same quoted by the vendor multiplied by the factor L-1 price /
   vendor quoted price.

49. The bidder shall supply Laser printer, along with each EMS, capable of printing on both sides of
   the paper without manual feeding of the paper for the second side. The resolution of the printer shall
   be minimum of 1200 x 1200 dpi, minimum 64 Mb memory, 50,000 page/ month duty cycle and
   capable of printing minimum 20 A4 size pages per minute. The printer shall have 10/100 Mb/s LAN
   port and should be able to connect to the LAN network. The printer shall be supplied along with
   necessary operating/application software and computer and network link cables. The printer shall be
   supplied along with a new catridge. The printer shall be supplied with three years comprehensive
   maintenance warranty.

50. MOU for Seven years: As AMC for repair of cards is to be supported for Five years. Hence the
   bidder should have MOU with Technology Provider/Collaborator/Original Equipment Manufacturer
   for Seven years from the date of opening of tender ( One year for warranty + Five years for AMC
   period and additional period for Tender process).

51. EMS shall be tested during the field trial. EMS shall manage both OLT and ONTs. The EMS shall
   be connected to the Field trial equipment ring through vendor‟s equipment and with Data
   Communication Network (DCN) forming through Ethernet to E1 converters. As per the clause 27 of
   Appendix-I of GR, the interconnection of a disaster recover EMS with main EMS and its manual
   switch over shall be tested during the QA testing.

52. The bidder is required to provide support for generating performance reports in the pre-
   defined/customized format. The same shall prescribed by BSNL at the time TSEC testing.

53. The bidder shall provide all necessary interface details (with documents), as per the clause 23 of
    Appendix-I of the GR, for integration of its EMS with existing or proposed NMS (irrespective of its
    brand and make) and also provide support for its integration during the warranty and AMC period,
    at no extra cost.

54. One set of three year maintenance spare shall be equivalent to the complete set of GPON subrack
   along with all the cards required as per the item 1.0 except the wired rack alone. The spares shall be
   supplied inclusive of the installation material and soft copy of the manuals.

55. Clause by Clause compliance for the tender document shall be submitted by the bidder along with
    the No deviation certificate. For this purpose a copy of the tender document ( hard copy issued by
    MM cell of BSNL) issued by the purchaser and the original copy of the GR issued by the TEC
    along with the amendments shall be submitted by the bidder. Original copy of the GR shall be
    provided in all the copies of the bid document. Every page of the same shall be signed and written
    as complied against each clause. The Xerox copy of the clarifications/ corrigendum, as issued by
    MM cell, shall also be submitted by the bidder duly signed on every page along with compliance
    against each clause. Separate annexure shall be enclosed wherever the bidder‟s responses are
                                                                                                    36
    required against the above.

        The compliance against the clause shall also be submitted in the following format. The
   mechanism/ feature of the equipment which complies this clause needs to be explained in the
   technical literature submitted. The card/module/unit which is required for the compliance of this
   clause also needs to be explained.

Sl No Clause No of GR Page no in Technical literature Card/unit/module required.

56. The Clauses in the GR for LCT is modified as given below. Branded Laptop/Desktop should be
   provided as per the configuration mentioned below.

    Dual Core 2GHz/4 MB L2 Cache/ min 15” LCD screen/ min 15”TFT Screen/ 80GB / 1 GB RAM/
    DVD-CDRW Combo drive/ 10/100/1000 Mb/s LAN port-RJ-45/ Inbuilt Modem-RJ-11/ 101-102
    Keyboard/2 No USB Ports/ Printer port/ Video output port to LCD projector/ Mouse port/ PS-2
    Keyboard port/ touch pad with scroll/ min 3 Hours battery backup/power adaptor/leather case/
    Licensed Operating software preloaded/ Recovery CDs or Original CDs. The Laptop/Desktop shall
    be supplied with three years comprehensive warranty, which includes repairs to all the components
    including the battery pack from its manufacturer. Two (2) nos. of 1 GB memory pen drives shall be
    supplied with each laptop/desktop. Each Laptop shall also be supplied with a steel wire lock that can
    lock a laptop to a rigid and heavy object for securing the Laptop.

    The laptop/Desktop shall be supplied with the LCT software installed in it. The LCTs shall be
    supplied with branded Anti-Virus software. LCT Software shall be supplied separately in CD-ROM
    along with the necessary cable accessories required for connecting a PC to the network element. No
    software lock shall be incorporated in the LCT software. The software supplied shall be re-usable on
    other computer in case of LCT failure.

57. No software lock shall be incorporated in the EMS software also. The software shall be re-usable on
   other computer in case of EMS hardware failure. The EMSs and LCTs shall be supplied with
   branded Anti-Virus software.

58. The bidder is required to supply the IT hardware such as EMS, LCT, Printer etc as per the make and
   models quoted in the priced BOM. In case, the quoted IT hardware is no more supplied by the
   original equipment manufacturer at the time of dispatch of the tendered item, a certificate to this
   effect from the original manufacturer shall be submitted by the bidder. The bidder shall submit the
   next version of the model quoted in the tender. The new model of the IT hardware so quoted shall be
   from the same manufacturer of the original model quoted in the tender. Only on the confirmation of
   the QA circle, BSNL, Bangalore, the bidder may be permitted to supply the new version of the IT
   hardware, subject to the technical validation of the new version of the model. The new model of
    IT hardware, if agreed by QA Circle, shall be supplied at the same quoted cost in the tender.

59. Certified and licensed copies of the Original Operating Software CD and the application software
   CD required for the EMS servers with one back up copy CD each shall be supplied. No freeware
   software shall be supplied as solution. All software quoted as part of solution shall be licensed for
   unlimited period.

60. Certified and licensed copies of the Original Operating Software CD and the application software
   CD required for the LCT with one back up copy CD each shall be supplied. No freeware software
   shall be supplied as solution. All the software quoted as part of solution shall be licensed for
   unlimited period.

61. The equipment shall have optical power monitoring facility. It shall be possible to measure the
                                                                                                 37
   optical transmit and receive powers from the LCT and EMS on any optical interface of the
   equipment.

62. The bidder must supply the rack interconnecting interfaces and cabling also along with the
    expansion chassis. Only single mode long haul interfaces shall be used in the equipment. No
    multimode short haul interfaces shall be used by the bidders any where in the equipment.

63. PCM cable and optical patch chords etc. shall be supplied as per the specification of relevant TEC
    GRs.

64. The original copies of these GRs shall also be complied and submitted in all the bid document
    copies. The GRs to be submitted are TEC GR No. GR/PON-01/01 DEC. 2006, GR/OFJ-02/01.
    MAY 2004, FDMS TEC GR No. GR/FDM-02/01 JAN 2001, GR/FDM-01/01 DEC 99, GR
    G/LSW-01/03 Sep 2007 and GR GR/DCA-23/01 Nov 2006. The bidders or their collaborators may
    ensure that the specifications are purchased from the Telecom Engineering Centre, Khurshid Lal
    Bhavan, Janpath, New Delhi – 110 001.

65. Only FTTH architecture is required in this tender. Neither FTTC nor FTTCab architecture

    shall be required.

66. The system shall be capable of delivering multiplay services, viz. video, voice and data over IP, to
    the customers. For this purpose, the FTTH equipment shall be capable of interfacing with the
    existing Broadband network, existing MPLS Core network and proposed NGN networks of BSNL.

67. The OLT shall be as per Category-II of 3.4.a of the part-I of the TEC GPON GR. Each GPON
    chassis with Duplex OLT system shall be capable of supporting minimum of 300 ONTs at 1:32 split
    ratio. The two ports (of Duplex OLT) shall be on different cards.

68. The Duplex OLT system shall as per 5.2.1 of the Part-I of the GR and depicted at the Figure-5b.

69. The down stream bit rate shall be at 2.48832 Gb/s and the upstream bit rate shall be at 1.24416
    Gb/s.

70. The purchaser reserves the right to use the equipment in duplex mode or single OLT mode.

71. Switch matrix card shall be separate from the GPON OLT interface card. No PON interface shall be
    combined with the switch matrix for ensuring no single point failure.

72. The GPON system shall have a full fledged layer-2 MAC architecture that facilitates delivery of
    Layer-2 (point to point, point to multi-point and multi-point to multi-point) services and emerging
    Metro Ethernet Forum specified UNI and NNI specifications. The Layer-2 switching functionality is
    preferable to be internal to the OLT/Chassis. The bidder may optionally support the same using an
    external LAN Switch for each chassis (Each GPON Chassis is likely to be placed in different
    locations) with the specifications mentioned at Section VI. These LAN Switches shall be in addition
    to the quantity mentioned in the SOR.

73. The ONT shall have one optical fibre uplink as defined at category-1 of clause 5.3 of the part-I of
    the GR GR/PON-01/01 DEC. 2006.

74. The ONT shall be as per Type-1 of H-ONT mentioned as per the clause 3.2.1. The RF video
   interface and IEEE 802.11g Wifi interfaces are not mandatory. The H-ONT shall be supplied with 2
   POTs and 4 no of 10/100 BaseT Ethernet Ports.
                                                                                                 38
75. RF Video interface over coaxial „F‟ interface is required in the H-ONT.

76. The bidder supply the H-ONT with 4 hours battery backup. The H-ONT shall be AC powered at
   230V and 50Hz. The battery shall be supplied with three years comprehensive warranty. Incase of
   any failure the battery shall be replaced free of cost by the bidder, failing which the purchase may
   forfeit the PBG submitted against the clause 43 (C).

77. The FDMS/FDF shall be supplied as per the TEC GR No. GR/FDM-02/01 JAN 2001 and
   GR/FDM-01/01 DEC 99.

78. Each Fibre Distribution Frames (FDF)/Fibre Distribution Management System (FDMS) to be
   installed along with the GPON OLT supplied by the bidder shall accommodate atleast 288 ONT
   fibre terminations having SC connector type terminations. The FDF/FDMS shall also have the
   capability to terminate the equivalent or above number of fibre splice and patch shelves for OF
   cables having the aggregate count which is more than 288F. The FDFs/FDMS shall have the
   capability to terminate 96F fibre ribbon OF cables (Ref: TEC GR No GR/OFC-05/02 Mar 2006 and
   GR/OFC-05/01 Jul 2000). Each ribbon shall have 12Fibres. The FDMS/FDFs shall also have the 12F
   ribbon fanouts in the patching shelves. The OF cables shall be spliced, by the installation teams of
   BSNL, to these fanouts on one side and other side shall be terminated through an SC connector to a
   GPON Duplex OLT.

79. Each GPON chassis shall have a minimum of 8 no of Gigabit Ethernet optical ports and 2 no of
   10G Ethernet optical ports at SNI towards network side. The 1000 Base LX shall be at 1550nm using
   single mode fibre. The 10G Ethernet interface shall be at 10Gb Base LW interface at 1310 nm.

80. The bidder must explain with diagrams how the GPON equipment can be made scalable by adding
   additional subracks in the same site. The bidder must explain the intersubrack connectivity and
   communication required for this purpose.

81. The splitters shall have sufficient protection and coiling for the patch cords/fibres being terminated
   in the splitter. The wall-mountable type splitters are required to provide with lock and key
   arrangement in a strong metallic casing so that the fibres are not accessible to general public.

82. The EMS server shall be a single server and must be a branded server. The bidder shall assist the
   BSNL teams in integrating the EMS in each city with the GPON Chassis placed at different locations
   in the city. The assistance shall in terms of giving solutions to the problems in installation,
   commissioning, integration, DCN formation, Configuration of LAN Switches/Ethernet E1
   converters, Management of Network elements (GPON Chassis) and extending the personnel
   assistance at site for carrying out these operations. Non compliance of this clause shall attract the
   penalties mentioned at the Annexure-I.

83. In addition to the MOU sought for the tendered equipment, the bidder shall also submit the MOUs
   with the OEMs of LAN Switch, FDMS/FDF, Ethernet to E1 Converters, EMS and LCT Laptop/LCT
   Desktop. The certificate sought as per clause 10.1 (viii) of the section II of the tender document shall
   be submitted. The bidder shall not submit multiple options for these items. Only one make and
   model shall be submitted for all the SOR items. The bid is liable to be rejected without evaluation in
   case of the Non compliance of this clause.

84. The bidder shall submit the detailed breakup of the material list upto the card level and software
   module level along with the cost of each item given above in a separate Annexure. In the case of
   software, the bidder shall also provide the breakup of per-user/per interface/per device software
   license as applicable.
                                                                                                    39
85. The bidder shall include any other hardware/software item required for installing, commissioning
   the system & commercial launch of service.

86. Any other item not covered above but essential for successful completion of project should also be
   added in the price schedule and its details should be given in the separate Annexure.

87. In case it is found at any point of the implementation that any item is not provided in the bid and is
   needed for successful implementation of the project, will have to be supplied by the bidder free of
   cost.

88. In case of any conflict in interpretation, the latest IETF documents shall hold precedence. Bidder
   shall submit, a statement of deviation with respect to IETF documents. In case there is no deviation a
   NIL deviation statement shall be submitted.

89. The bidder shall supply the pigtail as per the technical specifications of the TEC GR No GR/OFJ-
   02/01 May 2004. However, the bidder supply the fibre confirming to ITU-T G.657 standard. The
   bidder shall supply 100 mtrs of pigtail per customer. The quantity required is placed in the SOR.
   This bend insensitive pigtail shall not cause any loss of signal even when a tight knot is made using
   the fibre. The pigtail may be supplied in continuous lengths of 2/3/4Kms or more. The purchaser
   shall use the same as per the field requirement.

90. The bidder shall also supply low loss mechanical fibre adopter. This shall be used to terminate the
   pigtail‟s fibre, supplied against the above clause, in the field without using any kind of fibre splicing.
   The bidder shall supply 2 nos of adopters per customer for terminating the pigtail into the coupler on
   one side and the customer‟s ONT on the other side. The quantity required is placed in the SOR. The
   loss due the mechanical fibre connector shall not be more than 0.5 dB. The connector shall match the
   connector used in the coupler and the H-ONT.

91. Type approval certificate is required to be obtained for LAN Switches and GPON equipment. All
   the accessories other than the GPON OLT, ONT and LAN Switches shall be validated by QA circle
   during the field trial.

92. The bidder shall integrate the NG play equipment with NIB-II and Multiplay network as per the
   tender conditions.

93. In case of the RPR switches, the number of interfaces to be used towards BNG shall decided by the
   purchaser.
94. As part of the NG Play network, VOIP will be provided to FTTH customers. The following
   requirements are to be met in the supplied solution for providing VOIP services.

   (i) The ONT will have provision to provide atleast 2 VOIP phones on H,248/SIP. The end terminals
   for VOIP services may be a SIP phone or POTS with ATA.
   (ii) The ONT may act as Access gateway on H.248/SIP for providing VOIP services.
   (iii) It will be possible to segregate VOIP traffic at OLT from other forms of traffic like internet,
   Video, etc., and send the segregated VOIP bearer stream on RTP/UDP/IP to access or trunk media
   gateways being set up/ to be set up as part of separate projects in BSNL network. The OLTs will
   support RTP and RTCP as per latest RFC 3550 and RFC 3551 and their latest updates/release.
   (iv) For the purpose of service creation, modification and control of VOIP services to FTTH
   customers, OLT will be interfaced with class 5 soft switches, proposed to be setup through a separate
   project in BSNL, on SIP.
   (v) OLT shall provide DSCP marking and re-marking QOS per packet for VOIP services based on
   TOS/DSCP bits.
                                                                                                     40
   (vi) It will be possible to send QOS related information and voice deterioration alarms to softswitch
   from OLT.

95. Supplier should guarantee the spares so long as the equipment is in service, atleast for 10 years from
   the date of supply. The purchaser would like to stock spares as and when the supplier decides to
   close down the production of the offered equipment. In such event, supplier shall give a two years
   notice to the purchaser so as to stock the spares.

96. The Bid shall be liable to be rejected without seeking any clarifications from the bidder, if any of
   the above clauses are not complied by the bidder.




                                                                                                       41
                                              Section IV
                         Technical Specification of Next Generation Play
                                                GPON
                                               Part-II


1. Introduction:
      1.1    This section describes the various network components required for the Next Generation
             Play Network, which shall be designed to provide Next Generation Play services such as
             Video on Demand, Video Multi cast, VPN service, Voice, High Speed Internet Service
             etc with guaranteed control over critical parameters like latency, jitter and throughput to
             ensure high grade delivery of real time service, near real time service and best effort
             service over Fibre To The Home-Gigabit Passive Optical Network (FTTH-GPON) lines,
             Wireless Local Area Network (WLAN) and Digital Subscriber Link (DSL). The main
             components of the project are – the RPR based L2 Aggregation Network, the GPON
             OLTs and the associated servers for Element Management System (EMS) application
             and the GPON Optical Network terminals constituting the subscriber terminal
             component. The Broadband access network deployed as part of Project 2.2 of NIB-II,
             Broadband Next Generation Play will also be integrated with the Broadband access
             network deployed through this project. This project shall be integrated with the existing
             broadband multiplay network and interfaced with the BNGs.
      1.2    BSNL‟s primary objective in setting up the Broadband – Next Generation Play Network
             are:
             1.2.1   The solution shall provide standardized prioritization of five different classes of
                     traffic in terms of treatment of packets with regard to latency, jitter, delivery and
                     committed throughput in order to effectively handle the diverse requirement of
                     real time traffic, near real time traffic, and best effort traffic.
             1.2.2   The solution shall also provide effective delivery of real time applications like
                     multicast video services, video-on-demand, Video Conferencing, VoIP etc
                     through guaranteed end-to-end quality of service.
             1.2.3   The solution shall also provide various Layer 2 VPN and Layer 3 VPN services.
             1.2.4    The solution shall also be used for high speed Internet connectivity and shall be
                     the primary source of Internet bandwidth for users for applications such as web
                     browsing, e-Commerce, etc
             1.2.5   The solution shall also be used for connecting dial VPN customers to the MPLS
                     VPN through the Narrowband RAS.
             1.2.6   The solution shall allow wholesale of BNG ports to be assigned to smaller ISPs
                     through the franchisee model wherein the latter has a separate network of OLTs,
                     AAA, LDAP through a revenue sharing scheme of BSNL.
             1.2.7   The solution shall provide a means to bill for the aforesaid services by either
                     time-based or volume-based billing. It shall provide the customer with the option
                     to select the services through web server.
             1.2.8   The solution shall provide support for both pre-paid and post paid broadband
                     services.
             1.2.9   The solution will also integrate the broadband access network already deployed
                     as part of Project 2.2 of NIB-II and Broadband Next Generation Play.

                                                                                                       42
1.3   Broad Network Architecture: The broad network architecture planned to be deployed
      in the current tender is given below.
      1.3.1   Next Generation Play Subscriber shall be connected to GPON OLT.
      1.3.2   Traffic of OLTs and other access technologies (not covered in this tender) shall
              be aggregated through aggregation network. One such aggregation unit shall be
              planned for around 10 thousand users.
      1.3.3   A total of 25 cities are planned to be covered with GPON technology.
      1.3.4   Traffic of such aggregation units shall be handed over to the backbone MPLS
              core directly.
      1.3.5   For establishing the broadband Aggregation Network, RPR based layer 2
              switches shall be deployed. The LAN Switch equipment shall also support the
              IEEE 802.3ad Ethernet Link aggregation technology and RSTP IEEE 802.1s.
      1.3.6   Both the options consist of multiple aggregation points, which will aggregate the
              broadband traffic spread over the country. The Aggregation points are likely to be
              collocated with the MPLS edge connected through multiple GE interfaces.
      1.3.7   The Aggregation network is planned in all the A cities.
      1.3.8   The network will be centrally managed from the Network Operation Centre
              (NOC) deployed under NIB-II and also from the Element Management System
              client located with in the same city. The main NOC is at Bangalore with
              provision of DR NOC at Pune. The element Management System (EMS)
              applications procured in this project shall be integrated with the HP‟s Network
              Management System (NMS) application (HP Open View) on standard
              northbound interface viz SNMP/XML/JAVA. FTP shall be used for bulk file
              transfer.
      1.3.9   The Provisioning in Next Generation play solution shall be done both centrally
              and distributed manner using an ASAP application. The required cartridges for
              integrating the different elements of Next Generation Play solution viz ONTs,
              OLTs, RPR based L2 switches etc. This needs to be quoted by the bidder for
              ensuring end-to-end provisioning in Next Generation play solution. The
              provisioning in NIB-II MPLS network shall continue to be handled with the
              existing provisioning system (HPOVSA).
      1.3.10 The back-office facility (such as AAA, LDAP, Billing and Provisioning and
             NMS servers) is located in the NOC at Pune and Bangalore procured in NIB-II
             and the same infrastructure will be leveraged for the Broadband – Next
             Generation Play.
      1.3.11 All the network element deployed in this project shall support IPv6 with dual
             stack.
1.4   Integration of Broadband Next Generation Play Network with NIB-II and Next
      Generation Play Network: The successful bidder has to work out the integration plan of
      NIB-II Broadband Access Network and Multi-Play Network with NG Play network. The
      same is planned to be done at Tier 2 Level, where the existing Tier 2 Switch of NIB-II
      and/or the RPR Tier 2 Switch of Multi-Play with NG Play RPR L2 switches on GE
      interfaces. Detailed plan for the complete migration described in this clause shall be
      worked out and submitted by the bidder in the bid document. The same shall be carried
      out in a seamless manner



                                                                                             43
2.   Customer Base and Interface Requirement:
     2.1    This tender deals with the deployment of broadband through GPON technology.
     2.2    The OLTs are proposed to be deployed in the 25 nos of cities.
     2.3    Broadband Access Network of 3.85 lakh GPON ports is planned in this tender.
     2.4    The requirement of LAN Switch where GPON OLTs will be aggregated along with the
            interface requirement is indicated in the schedule of requirement. For other Cities, the
            GPON OLTs will be aggregated using Ethernet LAN Switch/MSPP STM-16s/ADM-16s.
     2.5    Expansions: The racks, shelves and chassis shall be completely wired so that the
            expansions to the ultimate capacity of the equipment. Over-provisioning is also possible
            by adding PCBs/ Modules only.
     2.6     Documentation and add-on orders: The successful bidders shall provide the complete
            details of PCBs/ Modules/ sub-modules contained in each unit of the equipment along
            with their quantity & itemized price. The selected bidders shall be bound to supply the
            additional Hardware/ Software for expansions as per the need of the purchaser based on
            the availability of vacant slots in the chassis / racks on the finalized itemized price after
            applying the applicable duties & taxes for meeting the expansion needs.
     2.7    The spares requirement shall be provided to the extent of 10% of the total supplied
            quantities of LAN Switch and GPON OLTs etc. The same inducted in the SoR.
3.   Solution Description: This section describes various services that needs to be supported in the
     current network along with detailed technical implementation of broadband access network.
     3.1    Requirement of Services to be Supported: Solution shall be used for providing
            following services with and without SLA guarantee on all ports of the Network
            components:
            3.1.1    Basic Internet Access Service (controlled and uncontrolled): speed ranging from
                    256 kbps to 1000 Mbps
            3.1.2   TV over IP Service: It facilitates distribution of broadcast TV channels in digital
                    mode (MPEG2) on the broadband network to the customer and is converted back
                    to a analog format in the home for reception on a standard television set.
            3.1.3   Video on Demand Service (VoD): It provides users with the ability to select
                    video content (MPEG4) (usually a movie from a library) and view it at their
                    convenience. The user can pause, go backward, forward and repeat the content as
                    per their desire. It is similar to a video tape being played from VCR except that
                    the content is delivered via a content server which can be located at any point of
                    the network, instead of from a VCR.
            3.1.4   Audio on Demand Service: The mechanism is as explained in above except for
                    the content. In place of video, it is the audio file which the user selects.
            3.1.5   Bandwidth on Demand: User configurable and Service configurable.
            3.1.6   Point to point and point to multi point Video Conferencing: It permits users to
                    establish point-to-point connections between their PCs/H.323/SIP terminals and
                    allow them to see and hear each other as well as share PC data / applications.
            3.1.7   Remote Education: It combines both Video conferencing and the 2-way
                    interactive data capabilities of the broadband network to create a virtual
                    classroom where students participate remotely with an instructor in a way that
                    mimics a regular class.


                                                                                                      44
3.1.8   Voice and Video Telephony over IP: Allows H.323/ SIP terminals to set up point
        to point connections under control of centrally located soft switches.
3.1.9   Interactive gaming: both single user and multi user shall be supported.
3.1.10 Layer 3 VPN as per RFC 2457 bis/ Layer 2 VPN Service: It allows customers to
       connect their offices together over a public infrastructure with service similar to
       the leased line based Private WAN.
3.1.11 VPN on broadband: It facilitates access of VPN on the FTTH GPON ONT.
3.1.12 Dial up VPN Service: It facilitates access of VPN through dial up line (PSTN /
       ISDN). This is used for accessing the VPN from remote site or for using backup
       of leased VPN.
3.1.13 Virtual Private LAN Services (VPLS): Solution shall provide the VPLS service.
       It shall provide auto discovery feature.
3.1.14 Port based, Virtual LAN (VLAN) based, port + VLAN based and port + VLAN
       range based Ethernet services as following:
        3.1.14.1       Point-to-Point Ethernet Service: Ethernet Private Line (EPL) and
                Ethernet Virtual Private Line (EVPL) as per Technical Specification
                MEF-6 of Metro Ethernet Forum (MEF).
        3.1.14.2      Multipoint-to-Multipoint Ethernet services: Ethernet LAN (E-
                LAN) as per Technical Specification MEF-6 of MEF.
        3.1.14.3       Ethernet Virtual Leased Line (VLL): solution shall support the
                VLL implementation with the following IETF drafts. Support for the
                standardized version of the draft shall be provided within six months of
                standardization:
                   i.      Ethernet encapsulation - draft-ietf-pwe3-ethernet-encap-xx.txt
                   ii.     draft-martini-l2circuit-trans-mpls-xx.txt
                   iii. draft-martini-l2circuit-encap-mpls-xx.txt
                   iv. draft-ietf-pwe3-control protocol-xx.txt
        3.1.14.4           Differentiated priority access service as per following:
                    (i)           Separate priority per customer.
                    (ii)          Application Recognition and priority for separate applications
                                  for one customer shall also be configurable
        3.1.14.5           Differentiated bandwidth access service as per following:
                           (i)       Separate bandwidth per customer.
                           (ii)      Dedicated bandwidth per customer via committed access
                                     rates (CAR), which shall be definable. Following shall be
                                     supported: Committed Information Rate (CIR), Peak
                                     Information Rate (PIR), Committed Burst Size (CBS), and
                                     Maximum Burst Size (MBS).
                           (iii)     Range of configurable rates from kbps to Gbps (depending
                                     on the access mechanism allowances)
        3.1.14.6       The Differentiated Services model shall be implemented in
                compliance with RFC 2474, RFC 2597, RFC 3140 and RCF 3246.


                                                                                             45
3.2   Solution Architecture: The solution shall provide any service on any device connected
      to any Optical Network Terminal (ONT) port. The traffic shall be prioritized (by
      OLT/ONT for upside and by Broadband Network Gateway (BNG) for down side). This
      priority shall be carried across the network by one to one mapping of IEEE 802.1p bits/
      Type of Service (ToS) bits to IEEE 802.1p bits/ ToS bits, IEEE 802.1p bits/ ToS bits to
      EXP bits and vice versa.
      3.2.1   The connectivity of different solution components shall be over FE/ GE/ 10 GE
              interface. Solution shall consist of following layers:
              3.2.1.1 Access nodes (AN); GPON OLTs
              3.2.1.2 Metro aggregation unit (MAU) – aggregates multiple access nodes by
                      their Ethernet uplink.
              3.2.1.3 Back end applications (EMS, SSSC, SSSS etc.)
      3.2.2   Access Node: GPON OLT:
              3.2.2.1 The GPON OLT shall in general be collocated with existing PSTN
                      exchanges, which provide first mile access to customers over fibre up to
                      average span lengths of 20 kms.
              3.2.2.2 All OLTs will be aggregated through 10GbE and Gigabit Ethernet (GE)
                      interfaces with redundancy. The OLTs will be connected in link
                      aggregation fashion to the same LAN switch on different paths.
              3.2.2.3 All the OLTs, in a particular city, shall be aggregated through RPR LAN
                      Switches of aggregation network on GE and 10GbE interfaces.
              3.2.2.4 Existing fibre infrastructure shall be allocated for use by the solution and
                      provision of such fibre does not form part of this project. However, the
                      interfaces required to use the fibre infrastructure shall be within the scope
                      of deliverables.
              3.2.2.5 The OLTs shall be as per the part-I of the Special Conditions.
              3.2.2.6 The OLT shall be capable of adding single/dual VLAN tags.
      3.2.3   Metro Aggregation Unit (MAU): The Broadband Next Generation Play
              network shall be constructed by interconnecting the basic building block defined
              as Metro Aggregation Unit (MAU) over the National MPLS backbone network.
              Per subscriber per application queue implemented by intelligent controller
              (Broadband Network Gateway) acting as single network gateway over layer 2
              aggregation network. The proposed network diagram is given below.




                                                                                                46
3.2.3.1 MAU shall provide following features.
   (i)     Each MAU will be catering to around 10000 customers. The BNG of
           Broadband Multiplay is used in each of the aggregation unit. The
           GPON OLTs shall be aggregated through RPR Switches, and will be
           connected to the nearest BNGs through an RPR switch which as a
           gateway network element.
   (ii)    The Gateway element shall be connected to BNGs by optical n x GE
           and 10 GE links as per traffic requirement. Minimum of 40 Km
           distance shall be supported by all optical GE/ 10 GE interfaces.
   (iii)   The LAN Switch will be connected to BNG, which in turn will be
           connected to MPLS PE router.
   (iv)    For residential users, ONT shall be configured to send different type
           of traffic in different PVCs and same can be mapped into different
           service VLANs. OLT shall put unique inner VLAN tag on each port
           or shall use DHCP option 82, with common outer VLAN tag per
           service as per PVC information. This common outer VLAN tag
           (service based) shall be unique to every OLT. Inner tag marking or
           port identification by DHCP option 82 is required for user port
           identification. OLT shall support both capabilities i.e. insertion of
           DHCP option 82 as well as inner tag marking per port. It shall be
           possible to identify any port uniquely with the combination of inner
           and outer tags or by DHCP option 82 .
   (v)     For business users, OLT shall put unique Outer tag (unique for that
           MAU) on each port without modifying the Inner tag. Inner tag may be

                                                                             47
                             put by business user and has to be carried on the network
                             transparently. 50% of the total users are assumed as business users.
                 (vi)        The entire traffic from business users and the rest of the service traffic
                             are switched in the same way as normal traffic. LAN Switch shall
                             shape and forward such traffic based upon combination of VLAN ID
                             and IEEE 802.1p bit marking.
                 (vii)       Multicast traffic shall be carried in the MAU in multicast VLANs.
                 (viii) The switching in the aggregation network shall be done based on
                        Outer VLAN tag / Pseudo Wires.
                 (xi)        Layer 2 aggregation network shall transparently pass the outer & inner
                             tag information to the broadband network gateway (BNG).
                 (xii)       BNG shall be single point of entry of all traffic in the MAU.
                             Communication is only allowed between subscribers and BNG/ BNG
                             and subscribers. BNG shall take a layer 3 decision and send the traffic
                             to MPLS PE as a CE; traffic belonging to different VPN/ VRF shall
                             be in different VLANs . Traffic to and from edge VoD server shall be
                             untagged.
                 (xiii) It shall be possible to configure the mapping of the traffic marked
                        with IEEE 802.1p bit in Ethernet header to one of five traffic
                        treatment classes of RPR. Further the IEEE 802.1p bit marking shall
                        be preserve in RPR enabled part of network so that the traffic, leaving
                        the RPR enabled part of network, contains the same IEEE 802.1p bit
                        value. It shall be possible to pre-configure such mapping from NMS
                        (through EMS of RPR switches).
                 (xiv)       The MAU shall provide the services as per Clause 3.1 & 3.4 and the
                             QoS features as per Clause 3.3. the MAU shall have following
                             components:
                        a.      Metro Provider edge router (PE) – existing in BSNL as part of
                                NIB-II.
                        b.      RPR LAN switch (LSW) – shall be as per tender conditions
                        c.      Broadband network gateway (BNG) – existing in BSNL as part of
                                the Broaband Multiplay.
3.3   QoS features: Solution shall support end-to-end QoS to provide various services with
      required SLA, where bandwidth for each user/service (flows) can be pre-signalled and
      reserved. In addition, the performance bounds for each flow shall be predictable in terms
      of throughput, loss, delay and delay variation, according to their respective defined
      service classes. All components of solution shall be designed and integrated to provide
      the following QoS features:
      3.3.1   Solution shall have multiple hardware-based individual flow queues and
              aggregate flow queues.
      3.3.2   Strict Priority Queuing shall be used to ensure end-to-end QoS treatment between
              different classes of services.
      3.3.3   Weighted Round Robin Queuing shall be used to ensure fairness of traffic within
              the same class of service. It shall be possible to guarantee end-to-end bandwidth.
      3.3.4   Solution shall provide Connection Admission Control (CAC) whenever new
              session cannot be allowed in the VLAN because bandwidth of the VLAN is not
                                                                                                    48
        enough. CAC shall be enforced in solution at BNG. It shall be possible to
        determine the aggregate usage of a customer by looking at multiple sessions of
        the users. It shall support:
        3.3.4.1 Policing, Rate Limiting and Shaping actions shall be applicable on a per
                circuit basis (i.e. VLAN / port etc).
        3.3.4.2 In addition, shaping shall be applicable on a per trunk basis.
        3.3.4.3 Within the solution devices, end-to-end QoS shall be applicable to all
                kinds of traffic – that includes all Layer 2 traffic as well as Layer 3 traffic.
3.3.5   Service Ingress Policing and Marking: Once the service has been classified, the
        Ingress Service QoS Policy applied to the service shall map traffic into queues by
        comparing each packet to match. The criteria in the QoS policy. QoS requirement
        of components are divided in two categories:
            (a) Requirement for all
            (b) Requirement of edge devices (GPON OLT, RPR LAN Switches when
                used to connect user directly)
        Marking of traffic for desired QoS shall be done by edge device at ingress; other
        devices of solution shall only carry such traffic as per QoS marking. Criteria that
        shall be used as match criteria in ingress QoS Policies can be one or the
        combinations of the criterion in the order listed below:
            (i)         Classification based on following: In layer 2 devices (OLT and LAN
                        Switches) it shall be possible to mark the traffic based on parameter
                        given below with corresponding (as configured by BSNL) IEEE
                        802.1p bit and/or VLAN tag. Dual-rate, 3 colour, “leaky bucket”
                        marking at edge devices, rest of the network shall forward the traffic
                        based upon the “colour”.
                   a.      Source and Destination IP address/subnet mask
                   b.      DSCP value
                   c.      TOS bits
                   d.      Protocol type (TCP, UDP, etc.)
                   e.      Source and Destination layer 4 port/range numbers
                   f.      IEEE 802.1p bit value
                   g.      VLAN ID with Q-in-Q as given below
            The above features shall be available for both upstream and downstream.
            (ii)        Traffic policing - Requirement for all devices: In layer 2 devices
                        (OLT and LAN Switch) it shall be possible to perform QoS treatment
                        of the traffic based on IEEE 802.1p bit and/or VLAN tag and/ or
                        physical port. For BNG it shall be all parameter (L2 and L3) except
                        EXP bits. Following shall be supported.
                           a. Maximum Burst Size (MBS)
                           b. Committed Burst Size (CBS)
                           c. Peak Information Rate (PIR)
                           d. Committed Information Rate (CIR)
                           e. At least three level dropping precedence levels in each queue.
                                                                                             49
                 (iii)   Q-in-Q support - ingress QoS Policies: Based on outer Q tag only (i.e.
                         ignore inner tag) and classification based on outer IEEE 802.1p bits.
                 (iv)    DiffServ, ToS and IP Precedence remarking for L3 services (for
                         BNG)
                 (v)      IEEE 802.1p remarking for L2 services (for OLT and LAN Switch)
                 (vi)    Default queue for non-matching traffic- Requirement for all devices
      3.3.6   Service Egress Queuing and Shaping – All devices except ONTs: Service
              egress queues shall map the forwarding class to an egress service queue. Egress
              service queues shall have the following distinct parameters defining its operation:
              3.3.6.1 Queue-ID (Used for queue management purposes)
              3.3.6.2 Five Forwarding Classes
              3.3.6.3 Class-based scheduling/queuing with at least five Classes that provides
                      configurable minimum bandwidth allocation to each class.
              3.3.6.4 Shall support Strict Queuing within CAR and Weighted-Fair-Queuing/
                      WRR for traffic above CAR.
              3.3.6.5 All ingress and egress queues shall be implemented in hardware and
                      operate within the context of a scheduler.
3.4   Service models: Solution shall serve both residential and business users. Business users
      are users with direct access to their private VPN. Following service model shall be used.
      3.4.1   Access to all services shall be based on client less model. Initially users shall be
              assigned an IP address by which they can log on to the BSNL portal only. The
              same shall also happen as soon as user tries to browse any site without portal
              authentication. No service shall be allowed at this stage. User shall have to
              provide his/her username and password. DHCP option 60/77 along with 82 shall
              be used to identify the user/device. User can select his/her default service here for
              that device.
      3.4.2   When the user tries to access a service subsequent to the step above, from the
              same device and wants to continue with his/her default service, he shall be
              allowed to do so in the same session. Other wise if they select a new service
              through portal, his/her default service for that device shall get changed and they
              shall be asked to re-login.
      3.4.3   In case users re-login, they shall be asked to enter his user name and password.
              After successful authentication, they shall be allowed to access his/her default
              service and portal access.
      3.4.4   The IP address assignment shall be based upon his service selection. It shall be
              possible to use private IP address for services like content delivery services, etc.
      3.4.5   In case the residential user wants to be part of private VPN, he/ she shall use
              PPPoE / IPSec based dial VPN access. In case the business user wants to access
              service provided to residential user, they shall configure his CPE to access these
              services through second PVC. OLT shall treat the traffic of this PVC in same way
              as traffic from residential user.
      3.4.6   ONT of business user shall have at least four Ethernet ports, each mapped to
              different PVCs. One PVC shall be used for VPN services and others for other
              services. OLT shall map PVC for VPN service with unique VLAN tag and treat
              the traffic of second PVC in same way as traffic from residential user.

                                                                                                50
3.4.7   It shall also be possible to use PPPoE for all unicast services like internet access
        and VoD, etc.
3.4.8   Overlapping IP addressing shall only be used for the business VPN users. Other
        services shall not be accessed by overlapping IP addresses.
3.4.9   Ethernet over MPLS: Following shall be supported for Ethernet over MPLS:
        3.4.9.1 Ingress and egress bandwidth profile per User to Network Interface
               (UNI).
        3.4.9.2 Ingress bandwidth profile per destination UNI within a single,
                provisioned Ethernet service.
        3.4.9.3 Egress bandwidth profile per source UNI within a single, provisioned
                Ethernet service.
        3.4.9.4 VLAN Tag support (IEEE 802.1Q) on the UNI.
        3.4.9.5 VLAN CoS preservation: The IEEE 802.1p priority bits shall be
                preserved between UNI‟s.
        3.4.9.6 VLAN CoS differentiation: appropriate service differentiation shall be
                applied between UNI‟s according to the IEEE 802.1p bits. By mapping
                the IEEE 802.1p bits to EXP-bits in the MPLS header. One to one
                correspondence or configurable value of EXP bits shall be possible.
        3.4.9.7 L2-protocol transport: L2-protocols like Spanning Tree Protocol,
                BPDU‟s, etc. shall be transported in a transparent way between the UNI‟s
                of the same circuit. There shall be no interference with L2-protocols of
                the BSNL‟s network.
        3.4.9.8 Service multiplexing: a single UNI can support multiple Ethernet Services
        3.4.9.9 Security filters:
            (i)     Limitation of MAC addresses learned on the UNI. The number of
                    MAC addresses learned on the UNI shall be configurable. Frames
                    with new source MAC-addresses exceeding the configured value shall
                    be dropped.
            (ii)    Filtering based on L2-L4 criteria as detailed in Clause 3.3.5 point (i).
            (iii)   Limitation of multicast and/or broadcast frames to avoid pumping of
                    such frames from unauthorised users.
            (iv)    Secure BPDU-handling: ignoring Body‟s and tunnel them across the
                    virtual circuit
3.4.10 Internet access:
        3.4.10.1        Upon authentication, the BNG shall keep the record of duration,
                volume, etc. and generate the usage data record (UDR). It shall be
                possible to restrict the user for a particular speed, etc with the BNG based
                upon his profile. Users can also access to the portal page where they can
                choose any service other than their default service and can also modify
                the session speed.
        3.4.10.2         There shall also be controlled internet service. User‟s upstream
                traffic for this service shall be redirected to a policy server. The URL of
                user shall be first examined by policy server before access to the web site
                is allowed. Policy server shall inspect the URL of web server request and

                                                                                           51
                           if it is in allowed category, the request is forwarded to web server as it is;
                           in case it is not allowed, the request is redirected to an error web page.
            3.4.11 L2 VPN: Layer 2 VPN (including EPL, EVPL, VLL, E-LAN and VPLS) shall be
                   provided by solution.
            3.4.12 L3 VPN: Layer 3 VPN shall be provided by solution as per RFC 2547 bis.
            3.4.13 Dial VPN: This service shall be accessed through PPPoE / IPSec client. The
                   PPPoE / IPSec session shall either be terminated by BNG / PE of NIB-II. Same
                   Services shall be extended for the users join through Narrow band RAS or
                   Internet. This service will be provided by two methods:
                   3.4.13.1        User initiates PPPoE session with BNG. The users shall be
                           identified as part of any particular VPN based upon their domain
                           information i.e. user abc@xyz belong to a VPN related to xyz domain
                           name. BNG shall act as L2TP access concentrator (LAC) for this service
                           and initiate L2TP session with L2TP Network Server (LNS). The existing
                           BRAS deployed in NIB-II will be used as LNS. The LNS authenticates
                           the User/Tunnel with Radius and terminate the tunnel in respective VRF.
                           IP address for the user will be assigned by LNS (from local pool or
                           Radius).
                   3.4.13.2        This service shall also be provided by use of IPSec tunnels over
                           internet (It shall be possible to block internet access and make VPN only
                           account for such users, if required). In such scenario, user shall connect to
                           internet and use IPSec client to login into the VPN by connecting to IPSec
                           module of PE of NIB-II. PE of NIB-II, through Radius server validates
                           the user and authorizes to join him with respective VPN VRF. PE router
                           of NIB-II shall terminate the IPSec session into corresponding VPN.
                           There will be two IP for the PC. One Public IP assigned by first BNG and
                           VPN IP assigned by IPSec PE from local pool or Radius.
            3.4.14 Voice and video telephony over IP: MPLS PE Routes of NIB-II shall put the
                   traffic belonging to these services into VPN for VoIP. All call setup messages
                   shall be routed to softswitch of BSNL first. The procurement of the soft switch
                   and media gateways are not in the scope of the current tender.
            3.4.15 IPTV: Multicast traffic of IPTV shall be carried with security and required QoS
                   into multicast VPNs/ multicast tunnels in the MPLS enabled part of solution,
                   thereafter the same shall be carried by multicast VLANs. Traffic handoff shall be
                   as shown in figure 1. The multicast VLAN shall be used for carrying the traffic to
                   the last aggregation point (Line card of OLT) without any adverse effect on QoS.
            3.4.16 Bandwidth on Demand: It shall be possible for an Internet or VPN user to
                   change access speed by logging on to the portal without closing the existing
                   session. Solution shall provide the different rate of charging mechanism for the
                   same.
4. Hardware and Software description of Network Components:
      i.    The performance of device shall not be degraded upon enabling of one or more features.
     ii.    All type of interfaces, if more than one, for all devices shall be supplied on at least two
            cards mounted in different physical slots of chassis.
     iii.   Wherever the redundant interface(s) have been asked, the same shall be provided using
            interface(s) on different cards mounted in different physical slots of chassis.
     iv.    All devices shall support SNMP v3
                                                                                                      52
     v.     All components of Next Generation Play solutions including Servers as per this tender
            shall support general requirement as per Annexure [I]. These requirements shall
            supercede the requirements contained in the individual TEC GRs.
     4.1    Broadband Network Gateway (BNG), Subscriber Service Selection System (SSSS)
            and Subscriber Service Selection Centre (SSSC): The provisioning of BNG, SSSS and
            SSSC are not in the scope of the current tender. However, the bidder is required to
            interface the RPR Gateway LAN Switch with the existing BSNL’s BNG at multiple 10G
            and 1G links.
     4.2    LAN Switch of MAU: The LAN Switch shall provide the services and the QoS features.
            It shall be High range LAN switch as per TEC GR: GR/LSW-01/03 SEP 2007.
     4.3    LapTop:
            4.3.1   The technical Specifications of the laptops are as given below: Dual Core 1.7
                    GHz or higher / 512 KB L2 Cache / 1GB RAM, 15‟‟ TFT Screen / 80 GB Hard
                    Disk/ DVD-CDRW Combo / 56 Kbps internal Modem/ Ethernet /2x USB 2.0/
                    Wi-LAN/ external infrared mouse / one serial and one parallel port/ infrared
                    port/Touch pad / Win XP Professional/office XP
5.   Telecom Management Network Architecture: The Telecom Management Network
     Architecture for Broadband Next Generation Play shall be based on the five Layer TMN Model
     of the ITU(T). The TMN hierarchy is pyramidal from top to bottom consisting of Business
     Management Layer (BML), Service Management Layer (SML), Network Management Layer
     (NML), Element Management Layer (EML) and the Network Element Layer (NEL). In
     Broadband Next Generation Play, bottom two Layers are taken into account while the top
     three Layers are part of NIB-II and Broadband Multiplay Project. The graphical diagram
     depicting the Framework and interconnectivity of various components in the TMN Layers is
     given in Figure 6A and 6B. The bidder shall commit to provide full support to all activities that
     relate to successful implementation of the TMN model and providing necessary interface
     information. The functions of bottom three layers are as follows.
     5.1    Network Element Layer (NEL): The different Network Elements involved in the
            Broadband Next Generation Play Network are GPON OLT & ONT, LAN Switches.
     5.2    Element Management Layer (EML): For each group of Network Element there will be
            Element Management System (EMS). Thus there will be separate EMS for each
            Broadband Component of Broadband Next Generation Play as indicated above. The role
            of EMS is to control and manage all aspects of the domain such as Fault, Configuration,
            Accounting, Performance and Security (FCAPS) as defined by ITU-T and to ensure
            maximum usage of the devices resources. The EMS communicates with NE on either
            vendor proprietary interface or standard interface like SNMP, CMISE, TL1. These
            EMSs inturn communicate via open standard, northbound interface (SNMP/Java API/
            CORBA API/XML API) to NMS/PMS of NIB-II, which is in Network Management
            Layer (NML). The EMS performs the following functions:
            5.2.1   Service Delivery: It consist of
                    5.2.1.1 Inventory Management Support: It involves maintaining a record of all
                            the NE resources that are installed in the sub network to support the
                            provisioning of services; it includes collection of locations, quantities of
                            equipment, model numbers, serial numbers, versions, installation dates
                            etc. To ensure ongoing operational integrity, the EMS periodically
                            resynchronizes its database with the NE using the auto discovery
                            mechanism. It also auto discovers equipment-provisioning parameters that
                            are stored in the EMS database for use in other service-provisioning,
                            service-assurance operations.
                                                                                                     53
              5.2.1.2 Configuration Management Support: It involves complete control of sub
                      network resources, topologies, and redundancies and includes the
                      installation and turn-up of new equipment resources; it may include the
                      assignment of resources to trunk routes or service areas, the control of
                      equipment, and network protection switching.
              5.2.1.3 Provisioning Support: involves the creation of specific connections or the
                      enabling of specific sub network features and the assignment of these to a
                      specific subscriber for an extended period; the connections and features
                      may take into account or be determined by a QoS level that is guaranteed
                      to the subscriber.
              5.2.1.4 Service Usage Support: involves the measurement of the usage of the sub
                      network resources by the various subscribers; this is the basis for billing.
      5.2.2   Service Assurance: It consist of
              5.2.2.1 Fault Management Support: involves the monitoring of the network
                      resources to detect malfunction, preempt failures, and detect faults. After
                      faults are discovered, the operator must troubleshoot, repair, and restore
                      the network as quickly as possible. Fault management ensures that service
                      remains available.
              5.2.2.2 Performance Data Collection Support: involves the periodic collection of
                      quality metrics that characterize the performance of the network resources
                      over service intervals. It also facilitates the visualization of trends that can
                      indicate periodic or gradual degradation of physical resources.
              5.2.2.3 Resource utilization data Collection Support: involves the collection of
                      data on the level of utilization of network resources assigned to
                      subscribers. This data can be used to determine whether the service
                      product is appropriately matched to the subscribers' usage characteristics.
                      It can also be used to forecast demand and suggest service upgrades
                      before QoS suffers.
              5.2.2.4 QoS Assurance Support: involves ensuring that the quality metrics
                      characterizing network performance remain within the agreed limits. It
                      requires proactive monitoring of the network fault, performance, and
                      utilization parameters to preempt any degradation in service quality
5.3   Network Management Layer (NML): The NML basically has three primary functions.
      5.3.1   Integrated Fault Management and Root-Cause analysis of multivendor and
              multitechnology networks. This function is taken care by NMS of NIB-II which
              is HP OpenView.
      5.3.2   Integrated, single screen, end-to-end service provisioning of multivendor and
              multitechnology networks. This function is to be taken care by the Provisioning
              Management System. The conceptual view of the same is shown in Figure 5A
              and 5B.
      5.3.3   Integration Layer between the eML and the SML; This role is to bring together
              information from the EMSs that support it, and then integrate, correlate and
              summarize that information, so as to pass on relevant information to Service
              Management SystEMS (SMSs) in the SML; in the reverse direction, the NML
              receives information from the SML, processes it and passes on relevant
              commands and data to the appropriate EMS; the EMS then sends specific
              command to the NE. The EMS shall support SNMP/ Java API/ CORBA API /

                                                                                                   54
              XML for communicating with NMS so that complete management of the
              network is efficient.

                         Figure 5A: Integration of EMS with NMS of NIB-II



                                    NMS of NIB-II (HP Open View)
                                        Temip        IUM PI
      Network Management               F    C      A    P     S
          Layer (NML)
                                                                                    Standard NMS-
                                                                                    /NEM Interface
                                                                                   (CORBA/ SNMP/
                                                                                     JAVA / XML)
        Element
       Management                         NEM of                     NEM of
                           NEM of                     NEM of
          Layer            Eqpt A
                                          Eqpt B
                                                      Eqpt C
                                                                     Eqpt D
         (EML)
                                                                                      Vendor
                                                                                    specific or
                                                                                     Standard
                                                                                     Interface
        Network                                                                       (SNMP,
                                                                                   CMISE, TL1)
        Element
         Layer
         (NEL)


                                                                       BNG, &
                                            OLT       RPR LAN
                           OLTs                        Switch        SSSS/SSSC




                 Figure 5B: A conceptual view of PMS of NIB-II with eMS of NG Play




         Network
       Management
       Layer (NML)                    Provisioning Management System

                                                                                        Standard PMS
        Element                                                                         /NEM Interface
       Management                                                                      (CORBA / SNMP/
          Layer                              NEM of                     NEM of           JAVA / XML)
                             NEM of                      NEM of
         (EML)               Eqpt A
                                             Eqpt B
                                                         Eqpt C
                                                                        Eqpt D

                                                                                            Vendor
                                                                                          specific or
                                                                                           Standard
                                                                                           Interface
                                                                                            (SNMP,
       Network                                                                           CMISE, TL1)
       Element
        Layer
        (NEL)


                              ONTs            GPON      LAN Switch        L3PE &
                                                                           BNG




5.4   EMS architecture planned for Broadband Network:
      5.4.1   At each circle POP, there will be server running in clustered mode running
              element management application of GPON OLT, LAN Switch and GPON ONTs.
              This will ensure scalability of the network.
      5.4.2   The servers thus deployed shall have sufficient capacity to store data at
              maximum load for at least a month.
      5.4.3   The EMS/NMS of BNG and system management of SSSS/SSSC will be running
              at Main NOC with disaster Recovery at Secondary NOC. These are existing as
              part of the BSNL‟s BB Multiplay infrastructure. The EMS clients of GPON and
              RPR LAN Switches shall be available at the circle POPs also.
                                                                                                         55
      5.4.4   The setup/EMS deployment architecture at the circle POP shall be submitted in
              the diagram in the bid document by the bidder.
      5.4.5   System Integrators along with network and application products vendors must
              quote for the suitable components related to network hardware, software and
              EMS System in such a way that the NMS application bought in Project 1 of NIB-
              II shall be seamlessly integrated through Java API/CORBA API/XML API.
      5.4.6    Integrators would offer solutions and products based on Open APIs and Software
              Development Kits along with their products and solutions so that their product
              shall be integrated with third party network and solution providers. Software
              development kits shall allow System integrators to develop appropriate plug-ins
              in the products itself to make them integrated using CORBA API / JAVA
              API/XML at the interface level.
      5.4.7   The EMS / NMS application of GPON and RPR L2 Switch will be running in
              main NOC with DR.


5.5   EMS Specification:
      5.5.1   The role of the EMS is to control and manage all aspects of the domain such as
              Fault, Configuration, Accounting, Performance, and Security (FCAPS) to ensure
              maximum usage of the devices resources.
      5.5.2   The EMS shall be flexible and modular. It shall be able to provide configurations
              from a single machine to a powerful and open client/server architecture.
      5.5.3   The EMS shall seamlessly integrate with NMS of NIB-II on JAVA/XML.
      5.5.4   The EMS shall support the inventory management to discover all the elements
              and their subsystEMS etc.
      5.5.5 The EMS shall keep a record of the inventory changes, which take in network from
             time to time.
      5.5.6   The EMS shall provide a single GUI for configuration of all devices.
      5.5.7   The EMS shall support discrete configuration of the network elements.
      5.5.8   The EMS shall be able to buffer recent commands and be re-displayed, re-edited
              and re-issued on request.
      5.5.9   The EMS shall be able to store configurations of the network elements.
      5.5.10 The EMS shall provide configuration file management through push/pull, either
             on demand or scheduled.
      5.5.11 The EMS shall maintain an active archive of configuration files for managed
             network devices.
      5.5.12 The EMS shall be able to export configuration files to 3rd party applications for
             modeling, integrity checking, or generation reports.
      5.5.13 The EMS shall provide a chassis view / device view of all the devices.
      5.5.14 The EMS shall have an Embedded Object Oriented Database for efficient
             administration & cost effectiveness. The database shall have sufficient capacity to
             store data at peak load for minimum one month.
      5.5.15 The EMS shall have interface support to an external RDBMS for a common data
             repository.

                                                                                             56
             5.5.16 The EMS shall support CORBA/JAVA/XML interfaces to facilitate integration
                    for end to end processes such as flow through service provisioning and service
                    assurance.
             5.5.17 It shall allow multiple users to simultaneously view real time events/alarms,
                    maps and tables.
             5.5.18 It shall deliver graphical maps, tables and event lists to the remote operator via
                    HTML and Java.
             5.5.19 Have flexible management and administrative functions so that users can
                    remotely manage and monitor network alerts and allow both read only and read-
                    write access.
             5.5.20 Restrict access of views to certain users and groups to minimize the risk of data
                    distortion.
      5.6    The EMS shall support FCAPS as per TEC standard SD/NMS-02/01

      5.7    License charges: The Network architecture and Customer base support required has
             been clearly specified. License is chargeable by vendors on number of servers on which
             the application is hosted. The details of such charging indicating future scalability to
             100% of present requirement shall have to be furnished in the Software costs.
6. Server Specifications (Hardware and Software):
      6.1    All Servers procured in this tender shall be managed through Enterprise Management
             System (EMS) of NIB-II.
      6.2    Servers offered must be 64-bit RISC based system with the latest clock speed processor
             that the manufacturer provides at the time of submission of bid. Must be SNMP
             manageable.
      6.3    All hardware components shall be rack mounted in server vendor‟s OEM rack. The
             number of racks shall be minimised for optimised floor space utilization.
      6.4    In case the hardware equipment offered is not available with –48V DC power supplies,
             vendor shall provide the UPS to interface with the –48V DC input available at BSNL.
             However, no UPS is to be quoted for laptops. The capacity of the equipment offered
             shall keep in consideration the initial surge current. Necessary power equipment
             provided for the above shall be a single consolidated system with redundancy and
             automated fail over.
      6.5    Capacity of the UPS shall be worked out by the bidder as follows:
             6.5.1   Work out the total rated load (T) of all AC powered components including
                     workstations, consoles and printer etc (fully equipped) of the project.
             6.5.2   Provide UPS System with Capacity (C) = 1.5 * T
             6.5.3   UPS System shall have UPS Units in 3 (main) + 1 (redundant) Parallel
                     Redundant Configuration.
             6.5.4   Capacity of each UPS Unit shall be identical and equal to (C/3).
             6.5.5   UPS shall support all features as per TEC GR no. GR/UPS-01, and the capacity
                     of the quoted UPS System shall be arrived at on the basis of the above formula
                     (as per Clause-8.4)
             6.5.6   Each UPS system shall feed power to the redundant power supplies of equipment
                     / power supplies of equipment in high-availability configuration.


                                                                                                   57
      6.5.7   UPS system shall be SNMP v2 or higher compliant and shall be managed from
              EMS.
      6.5.8   UPS system shall be 3-Phase and Online (double-conversion).
      6.5.9   UPS system shall provide a backup of at least 2 hour at 100% load. It shall be
              possible to enhance the backup time further through additional battery packs.
      6.5.10 UPS system shall have the adequate provisions (both automatic and manual
             switchover between units through static transfer switch, without single point of
             failure). UPS shall not fail due to failure of the switching unit. No shut down of
             the AC powered equipment in the data centre shall be required for maintenance.
      6.5.11 Power distribution from UPS system to the equipment shall be fault resilient to
             survive inevitable load faults or human error.
      6.5.12 Requisite provision for ground/earth shall be made by the bidder as
             recommended by the UPS OEM.
6.6   GENERAL HARDWARE REQUIREMENT: Servers for applications specified in
      Table-8A shall have following peripherals/interfaces/HDD in addition to CPU, RAM and
      clustering requirements as indicated in schedule of requirements:
      6.6.1   Servers shall use 64 bit RISC CPUs of latest processor in the family and 1.2 GHz
              or higher clock speed, available from the bidder at the time of submission of bid.
              The SPECint_2000 base and SPECint_rate_2000 base of the servers shall be as
              follows [Note: SPECint_2000 base and SPECint_rate_2000 base specified below
              is for single-core CPU] :
              6.6.1.1 SPECint_2000 base (1 CPU) > 600
              6.6.1.2 SPECint_rate_2000 base (2 CPUs) > 14
              6.6.1.3 SPECint_rate_2000 base (4 CPUs) > 30
              6.6.1.4 SPECint_rate_2000 base (8 CPUs) > 70
              6.6.1.5 SPECint_rate_2000 base (16 CPUs) > 140
              6.6.1.6 SPECint_rate_2000 base (32 CPUs) > 315
              6.6.1.7 SPECint_rate_2000 base (64 CPUs) > 580
      6.6.2   Servers other than blade servers shall have Symmetrical Multi-Processing (SMP)
              architecture.
      6.6.3   One CD R/DVD ROM combo Drive
      6.6.4   40 GB or higher DAT Drive (Only for SSSC, PMS and Subscriber Management
              application Servers)
      6.6.5   Two RJ45 GigE Ports (10/100/1000) on different cards (both electrical)
      6.6.6   A minimum of 8 MB of L2/L3 Cache per CPU
      6.6.7   A minimum of 4 GB of ECC RAM per CPU
      6.6.8   One console port on servers; one parallel port, one serial port and one console
              port on management consoles.
      6.6.9   2 USB ports (USB 2.0 or above) on management consoles.
      6.6.10 2 x 73 GB mirrored, hot swappable FCAL/SCSI Hard Disk, 15,000 RPM or
             higher


                                                                                                58
      6.6.11 Two numbers of 2 Gbps, full duplex fibre channel host Interfaces for SAN (Only
             for SSSC, PMS and Subscriber Management application Servers)
      6.6.12 6 PCI Expansion Slots
      6.6.13 Redundant load sharing and hot swappable power supplies.
      6.6.14 Redundant power supplies shall have multiple feeds.
      6.6.15 High availability cluster: For Back end Servers as specified in Table 8A. Bidder
             shall quote cluster software license along with application HA agents.
      6.6.16 Journal File System and volume manager to mirror OS disks.
      6.6.17 Solution shall provide two 16 ports SAN Switches and 10TB of SAN Storage in
             RAID 0+1 configuration. SAN Switch shall be as per TEC GR: GR/ESI-01 and
             SAN Storage shall be mid Tier Storage as per TEC GR: GR/ESI-01
      6.6.18 The database clustering shall be based on an architecture that shall eliminate the
             application or its part going down in case of failure of any of the node in cluster.
      6.6.19 All servers shall be rack mounted in server vendor’s 19” (42 U) racks (OEM).
             The number of racks shall be minimised for optimised floor space utilization.
      6.6.20 Shall be mounted using rack mounting kit to be supplied by the server vendor
             (OEM)
6.7   RACKS FOR Servers and Storage: The number of racks shall be minimised for
      optimised floor space utilization.
      6.7.1   Bidder shall ensure that the racks are identical
      6.7.2   OEM rack mounting kit shall be supplied along with the racks
      6.7.3   Provision shall be available for power cable terminations, power switches, along
              with lacing of cables.
      6.7.4   Fan shall also be available in the rack for cooling.
6.8   HARDWARE  SIZING FOR     SERVERS,                          STORAGE,       APPLIANCES,
      MANAGEMENT STATIONS AND CONSOLES:
      6.8.1   Hardware sizing shall be based on the following CPU utilization metric (CPU
              Utilization = 100 – CPU Idle)%
              6.8.1.1 Peak CPU Utilization shall not exceed 75% at any time, on 24x7 basis
              6.8.1.2 Average CPU Utilization over any hour, measured at 5 minute intervals,
                      shall not exceed 60%.
      6.8.2   In case CPU utilization exceeds the value defined the bidder shall supply
              additional hardware free of cost to BSNL.
      6.8.3   Bidders must note that the hardware sizing indicated in this document is
              minimum and indicative.
              6.8.3.1 Bidder shall provide a certificate from the application OEM that the
                      hardware quoted in the bid is sufficient to meet the application
                      requirements as per the tender, failing which the bid shall be considered
                      non-compliant. Format of the certificate is given at Annexure-II. The
                      certificate shall be strictly as per format given at Annexure-II and no
                      additional details shall be included. Certificate shall be signed by the
                      Authorized Signatory/Country Manager of the OEM.


                                                                                              59
         6.8.3.2 Bidder shall also provide a certificate jointly from both the application
                 OEM and storage OEM that the storage hardware quoted in the bid is
                 sufficient to meet the applications IOPS and RAID type requirements as
                 per the tender, failing which the bid shall be considered non-compliant.
                 Format of the certificate is given at Annexure-III. The certificate shall
                 be strictly as per format given at Annexure-III and no additional details
                 shall be included. Certificate shall be signed by the Authorized
                 Signatory/Country Manager of the OEM.
6.8.4    If any additional hardware, software and licenses are needed to meet the
         requirement of this tender document to the same shall be quoted, by the bidder,
         along with sizing details and bill of material.
6.8.5    If any specific module of the application requires separate hardware for proper
         functioning, the same shall be quoted, by the bidder, along with sizing details and
         bill of material.
6.8.6    Audited results for SPECint_2000 base and SPECint_rate_2000 base for the
         quoted servers shall be submitted by the server OEM. However, in case of a
         server for which SPEC testing has already been conducted and the results have
         been submitted to SPEC Organization for audit and are due for publication on the
         SPEC website, a letter from the authorized signatory of the SPEC Organization
         confirming the same (along with the result details) shall also be accepted.
         However, if at any stage it is found that the published results indicated lower
         ratings than submitted, bidder shall compensate the same by providing additional
         hardware and software to meet the required ratings (free of cost); any other
         dependent hardware and software shall also be provided free of cost.
6.8.7    Dual Core CPU shall be treated as two CPUs only when two CPUs of the latest
         generation of CPU (available at the time of submission of bid) quoted are
         packaged together e.g. only if the generation of CPU quoted is Gen-M and
         Speed-K and two Gen-M processors of Speed-K are packaged together and the
         processor is named Dual Core Gen-M processor by the OEM, the same shall be
         treated as two CPUs to meet the requirement of minimum number of CPUs
         specified in the tender document.
6.8.8    Bidder has to meet the requirement of minimum number of CPUs and
         SPECint_rate_2000 base, specified, simultaneously.
6.8.9    If at any stage of this project and till the full capacity is reached it is found that
         the solution requires additional hardware, software, licenses or other resources or
         any customization effort to meet the requirements envisaged in this tender
         document, the same shall be supplied and implemented free of any cost to BSNL.
6.8.10 The EMS server shall have 4 CPUs. Hardware sizing depends upon the type of
       applications which are categorized below:
6.8.11 Hardware type for different applications shall be as categorized below:
                     TABLE-8B: TYPE OF SERVER HARDWARE
        APPLI-             HARDWARE
SN                                                       NOTES
        CATION                 TYPE
                        Option-1:        (a)        Bidder shall use any of these
                        Blade x N            options for the solution
1       EDGE                             (b)        Each application shall be
                        Option-2:            deployed at least on two servers
                        Standalone x N       i.e. N ≥ 2 for each application

                                                                                            60
                                           (c)          Minimum capacity of server
                     Option-3:                   shall be 2 CPUs
                     Consolidation x N     (d)          Refer Clause-6.8.12 for
                                                 further details
                                           (a)        Applications shall be deployed
                                                 on one or more partitioned servers
                                           (b)        Each server shall be deployed
                                                 in 1+1 cluster. These servers shall
                                                 be physically separate servers.
                                           (c)        Minimum capacity of the
                                                 server shall be at least 32 CPUs
                                           (d)        Sufficient number of servers
2   BACKEND          Consolidated
                                                 shall be provided to meet the
                                                 requirement of partitions. At least
                                                 9 partitions shall be supported.
                                           (e)        Each server shall meet the
                                                 SPECint_2000 base and
                                                 SPECint_rate_2000 base as
                                                 described in the document.

6.8.12 SERVERS FOR EDGE APPLICATIONS
     6.8.12.1       For edge applications servers with one of the following two
             configurations can be used. The number of CPUs and Specint_rate_2000
             base for each application shall be as per Table 8A.
     6.8.12.2      BLADE SERVER
                  Different blades, for the same application shall be placed in
                  minimum of two different shelves. Provision for logging without
                  any performance degradation shall be made available by bidder.
                BLADE
                  64-bit RISC, 2 CPUs x 1.2 GHZ or higher clock speed
                  16 GB ECC RAM
                  2 x 80 GB Drives of 10,000 RPM or higher
                  Shelf mounted in Rack
                  Hot swappable
                RACK
                  42 U OEM Rack
                  N+1 Redundant and Hot Swappable Power Supplies per shelf
                  Dual Gigabit Ethernet Ports per shelf
                  2 x FCAL Ports per shelf
                  CD-R/W-DVD-ROM
                  2 Console Ports
                  Redundant Management Module with 1 FE port
                  One spare blade in each shelf
                  One extra shelf (ready for use except for blades ) of similar type
                      per site
     6.8.12.3      STAND ALONE SERVERS:
                   Stand alone servers may also be deployed for edge applications.
                   The number of CPU per application shall be same as specified for
                                                                                 61
                          edge applications at Table 8A. Each application shall be
                          configured to run on at least two servers. The minimum
                          configuration of server shall be as follows:
                          (i)     64-bit RISC, 2 CPUs x 1.2 GHZ or higher clock speed
                          16 GB ECC RAM per 2 CPU
                          All the general requirements as per Clause-6.6
           6.8.12.4       CONSOLIDATION
                          (i)     Bidder shall use partition able servers. i.e. it shall be
                                  possible to create partitions on a single server to run
                                  multiple applications.
                          (ii)    It shall be possible to have independent resources i.e.
                                  processors, memory, I/O and Operating System assigned to
                                  each partition.
                          (iii)   It shall be possible to dynamically reallocate these
                                  resources amongst the partitions without need for
                                  rebooting.
                          (iv)    GUI based management application shall be provided to
                                  manage the partitions.
                          (v)     Server specification shall be as per Clause-6.6.1 to
                                  Clause-6.6.20.
      6.8.13 SERVER FOR BACK END APPLICATION
           6.8.13.1       Server for these applications shall be partition able i.e. it shall be
                   possible to create partitions on a single server to run multiple applications.
           6.8.13.2     It shall be possible to have independent resources i.e. processors,
                   memory, I/O and Operating System assigned to each partition.
           6.8.13.3      It shall be possible to dynamically reallocate these resources
                   amongst the partitions without need for rebooting.
           6.8.13.4        GUI based management application shall be provided to manage
                   the partitions. A minimum of two server OEM workstations with at least
                   1*1.2 GHz or latest speed Processor, 4 GB RAM, 4x73 GB Hard-disk and
                   21” TFT color monitor, console and Ethernet interface shall be quoted.
           6.8.13.5       Server specification shall be as per Clause-6.6.1 to Clause-6.6.20.
           6.8.13.6       The number of CPUs and Specint_rate_2000 base for each
                   application shall be as per Table 8A.
           6.8.13.7        CPUs shall be hot swappable. In case CPUs are not hot swap able
                   then a minimum of two deactivated CPUs shall be provided which can be
                   activated in case of failure of any CPU without need to reboot the server.
           6.8.13.8       At least 20% extra capacity shall be available in the each of the
                   servers for future expansion e.g. for 26 CPU requirement 30 CPU box
                   shall be supplied. This extra capacity is required on all the backend
                   servers for CPUs and RAM. It shall be possible to equip the box with
                   CPUs and RAM to fill this capacity. CPUs for this extra capacity are not
                   required to be quoted. This extra capacity is over and above the
                   requirement of Clause-8.8.13.7
6.9   GENERAL SOFTWARE REQUIREMENT FOR SERVERS: Different software
      components shall have the following management features:

                                                                                              62
6.9.1   All components shall use UNIX as an operating system
6.9.2   Microsoft Windows-2003, Microsoft Windows-XP Professional and Linux shall
        also be quoted for use on Work-Stations and Consoles etc. A minimum of 2
        licenses per site for each of the above software shall be quoted along with equal
        number of Anti-Virus application software licenses. Support as per
        AMC/Warranty terms and conditions shall be provided.
6.9.3   All components shall have provision for Ethernet and RS232C Console Ports
6.9.4   All components shall provide clients for administration.
6.9.5   Installation/Un-installation of system and application software from a central
        location.
6.9.6   Centralised management and control of different versions and releases of system
        and application software for different OSS components.
6.9.7   Installation/Rollback of software patches from a central location.
6.9.8   During the installation of software, message regarding successful installation or
        failure (including the stage of installation when failure occurred) shall be
        displayed
6.9.9   FTP/TFTP shall be supported for downloading software, configuration, patches
        etc to the OSS components.
6.9.10 GUI based configuration and reconfiguration of system and application software
       from a central location.
6.9.11 Monitoring tools shall be provided for detection and diagnosis of the faulty OSS
       component.
6.9.12 Open interfaces for logging and monitoring.
6.9.13 All software applications shall be HA cluster aware.
6.9.14 Ability for tracing and debugging the system and applications through logs. Level
       of tracing and debugging shall be configurable.
6.9.15 User interfaces of software shall have the following features:
        6.9.15.1       Provision for search and help
        6.9.15.2       Customize and define help content
6.9.16 Multi-lingual support where-ever asked shall include Hindi and other Indian
       languages.
6.9.17 Backup/Restore support shall be available for all applications:
        6.9.17.1       Through Command Line Utilities and GUI
        6.9.17.2        Provide integration with 3rd party solutions for automated backup
                and restore capabilities.
6.9.18 Appropriate methodologies at the application level or file system level have to be
       implemented for optimizing the file system size for messaging and billing etc for
       fast clean and recovery even in the case of file system crash.
6.9.19 File System and Volume Manager Software supplied with servers shall have
       following general features:
        6.9.19.1       Shall provide quick-recovery journaling file system.


                                                                                      63
       6.9.19.2        Shall support automatic restoration of data redundancy when disks
               fail and returns the configuration to its original state after a failed disk has
               been replaced
       6.9.19.3       Shall support online growth of a data volume as per the
               application requirement. Bidder shall plan the volume size requirement
               optimally and shall be responsible for modifying it as and when required
               by BSNL.
       6.9.19.4        Shall support volume-based snapshot.
       6.9.19.5       Shall support split-mirror and fast resynchronization of a mirrored
               data Volume.
       6.9.19.6        Shall support Extent-based allocation of disk to files.
       6.9.19.7        Shall support online file de-fragmentation.
       6.9.19.8        Shall support RAID 0, 1, 0+1, 1+0 and 5
       6.9.19.9        Shall support re-layout (i.e. change the no of columns of a striped
               volume, change stripe size, convert striped to non-striped volume and vice
               versa) as per the application requirement.
       6.9.19.10     Shall provide Centralized, Cross platform, Single console
               management GUI
       6.9.19.11      Shall have functionality of spreading I/O between the available
               multiple paths between server and multi-controller disk arrays
       6.9.19.12      Shall support logical data             volume      expansion      between
               heterogeneous SAN storage arrays
6.9.20 High Availability Cluster Software supplied with servers shall have following
       general features:
       6.9.20.1         Shall support integrated load balancing of the workload in the
               cluster.
       6.9.20.2        Shall support Ethernet cluster heartbeat link
       6.9.20.3        It shall be possible to form a Cluster across different classes of
               servers from the same vendor
       6.9.20.4        Shall provide flexibility for adding or removing servers in the
               cluster as needed without bringing the cluster or applications offline
       6.9.20.5        Shall Ensure cluster members stay in sync and communicates
               status instantly throughout the cluster interconnect
       6.9.20.6        Shall allow simultaneous access to storage from multiple servers
               that is load sharing between servers and enables full use of enterprise
               RAID subsystEMS
       6.9.20.7        Shall allow policy based fail-over.
       6.9.20.8       Shall provide wide range of application support such as Oracle
               and APIs to develop agents for non-standard application. Cluster solution
               proposed for database servers shall be Oracle aware.
       6.9.20.9      Shall     provide    both    system-based     and    application     based
               monitoring.
       6.9.20.10      Shall have Extensive scalability of at least 8 cluster nodes. Cluster
               nodes could be added and removed as business needs change.
                                                                                        64
                     6.9.20.11       Shall have support for WAN based High availability cluster
                             solution. Shall support data replication.
              6.9.21 Unix Operating System Software supplied with servers shall have following
                     general features:
                     6.9.21.1       64-bit UNIX
                     6.9.21.2       Interface standard: X/Open UNIX 98
                     6.9.21.3       Year 2000 compliant
                     6.9.21.4       C2 level security
                     6.9.21.5       Graphics standard : X11, post script, OpenGL, Display Postscript
                     6.9.21.6       Desktop standard : CDE, Motif
                     6.9.21.7       Object standard : Java IDL
                     6.9.21.8      Connectivity standard: ONC, ONC+, NFS, WebNFS, SMB.
                             Support for other standards, if any, shall be indicated by the bidder.
                     6.9.21.9     Internet standards: HTTP, FTP, Telnet, DNS, NTP, IMAP4,
                             DHCP, SNMP, SMTP, Ipv6, IPSec, Kerberos, SASL, OCF
                     6.9.21.10      Support for NIS+
                     6.9.21.11      Network and IO multi-pathing
                     6.9.21.12      TCP logging
                     6.9.21.13     Support for Wizard based installer for OS and Bundled software
                             which works in a browser
                     6.9.21.14      Hot patch framework
                     6.9.21.15     Control and provision IP traffic priorities and bandwidth
                             dynamically
                     6.9.21.16       Dynamically manage and control CPU, Virtual memory, IO
                             resources to various users, groups and applications for fine grained
                             control on system resources
                     6.9.21.17      Binary compatibility across the family of servers proposed
                     6.9.21.18      Shall provide BIND 9.2.x or latest implementation of DNS
                     6.9.21.19      Shall provide IPSec, SSH and IP-Filtering.
                     6.9.21.20      Standard Utilities for system administration
                     6.9.21.21      Shall provide for role based access control to provide limited
                             administrative capabilities to other users
       6.10   element Manager Application of GPON OLT, ONT & LAN Switch: The Server will
              be running in clustered mode and the EMS clients shall be located at all the circle POPs.
              The bidder shall submit the server deployment architecture.
7. Training setup : The bidder shall integrate the equipment allotted under training with the existing
   Multiplay training setup for conducting the training to the personnel of BSNL on the GPON and the
   aggregation layer.
8. Integration with NIB-II/Multiplay:




                                                                                                    65
8.1   The network components and EMS applications getting deployed under Next Generation Play
      needs to be integrated with Broadband Network gateway (BNG) of Multiplay and with
      NMS/PMS of NIB-II.
8.2   The EMS application will be integrated with the NMS application of NIB-II (HP Open View) on
      standard interface such as SNMP, JAVA or XML. The respective EMS of Next generation play
      shall provide all the FCAPS information as defined in the TEC GR SD/NMS-02/01 on
      SNMP/JAVA/XML. For configuration („C‟), the cut through approach will be used from the
      NMS.
8.3   THE EMS application of Next Generation Play will also be integrated with the PMS application
      (Metasolve ASAP) on SNMP/JAVA/XML. The catridges required for integrating Metasolve‟s
      ASAP with the Next Generation Play needs to be quoted by the bidder.
8.4   The RPR switches of NG Play will be integrated with the BNG deployed under Multiplay. The
      access network of Next Generation Play shall be configured in such a way that all traffic flow
      happens with BNG. The RPR switch will hand over the priority information/VLAN information
      (single or double) to BNG for upstream traffic. Similarly BNG will pass on the priority
      information/VLAN information (single or double) to RPR switch for downstream traffic.
9. The Engineering, Operational, Qualitative, safety, EMC requirements etc. shall be as per the
   Annexure-I.




                                                                                                 66
                                           Annexure [I]



1.   Engineering Requirements:
     The solution component shall meet the following engineering requirements:
     i.      The equipment shall be fully solid state and adopt state of the art technology.
     ii.     The equipment shall be compact, composite construction and light weight. The actual
             dimensions and weight of the equipment shall be furnished by the manufacturers.
     iii.    All connectors shall be reliable, low loss and standard type so as to ensure failure free
             operations over long operations.
     iv.     The equipment shall have adequate cooling arrangements.
     v.      All cables shall be of Gigabit Ethernet ready standards.
     vi.     Each sub-assembly shall be clearly marked with schematic reference to show its
             function, so that it is identifiable from the layout diagram in the handbook.
     vii.    Each terminal block and individual tags shall be numbered suitably with clear
             identification code.
     viii.   All controls, switches, indicators etc. shall be clearly marked to show their circuit
             diagrams and functions.


2.   Operational Requirement (OR):
     The solution component shall meet the following maintenance & operational requirements:
     i.      The equipment shall be designed for continuous operation.
     ii.     The equipment shall be able to perform satisfactorily without any degradation at an
             altitude up to 3000 meters above mean sea level.
     iii.    Suitable visual indications shall be provided to indicate the healthy and unhealthy
             conditions.
     iv.     The design of the equipment shall not allow plugging of a module in the wrong slot or
             upside down.
     v.      The removal or addition of any cards shall not disrupt traffic on other cards.
     vi.     Special tools required for wiring shall be provided along with the equipment.
     vii.    In the event of a bug found in the software, the Manufacturer shall provide patches and
             firmware replacement if involved, free of cost. Compatibility of the existing hardware
             shall be maintained with future software/firmware.
     viii.   In the event of a full system failure, a trace area shall be maintained in non-volatile
             memory for analysis and problem resolution.
     ix.     A power down condition shall not cause loss of connection configuration data storage.
     x.      The solution component shall support built in power diagnostics system to detect
             hardware failures.
     xi.     The solution component shall be 19”/23 “ Euro Rack Mountable.
     xii.    The Hardware and software components shall not pose any problEMS in the normal

                                                                                                         67
             functioning of all network elements wherever interfacing with the service provider‟s
             network for voice, data and transmission systEMS, as the case may be.


3.   Qualitative Requirements (QR):
     The solution component shall meet the following qualitative requirements:
     i.      The equipment shall be manufactured in accordance with international quality standards ISO
             9001:2000 for which the manufacturer shall be duly accredited. A quality plan describing the
             quality assurance system followed by the manufacturer shall be required to be submitted.
     ii.     The equipment locally Manufactured in India shall be as per guidelines issued by Chief General
             Manager, Quality Assurance Wing of the BSNL vide Documents No. QM 118, QM 205, QM 206,
             QM 210 and QM 301.
     iii.    The equipment shall meet the environmental requirements as per Category A of QM-333/Issue-
             1/Sept 1990
     iv.     All components used shall be as per approval procedures prescribed by BSNL in QA document QM
             – 324.
     v.      Marking and identification of the equipment, sub assemblies, PCBs etc. shall be as per
             guidelines given in Para 5.1.7 Quality Assurance Telecom Document QM 351/Issue 2
             /Jan.‟95.

     vi.     The MTBF (Mean Time Between Failure) and MTTR (Mean Time To Restore) predicted and
             observed values shall be furnished along with calculations by the Manufacturer.

4    Electromagnetic Compatibility (EMC):
     The solution component shall conform to the EMC requirements as per the following standards and limits
     indicated therein. A test certificate and test report shall be furnished:-
            i. Conducted and radiated emissions: To comply with Class A of CISPR 22 {2003}
               “Limits and methods of measurement of radio disturbance characteristics of Information
               Technology Equipments”;
            ii.       Electrostatic discharge: To comply with IEC 61000-4-2 {2001}”Testing and
              measurement techniques of Electrostatic discharge immunity test” under following test
              levels:
                 o Contact discharge level 2 {± 4 kV};
                 o Air discharge level 3 {± 8 kV};


            iii.     Fast transients common mode (burst): To comply with IEC 61000-4-4 {1995
              with Amendment 1 (2000) and Amendment 2 (2001)}”Testing and measurement
              techniques of electrical fast transients/ burst immunity test” under Level 2 {1 kV for DC
              power lines; 1 kV for signal control lines};
            iv.       Immunity: IEC 61000-4-3{2002} Radiated RF Electromagnetic Field Immunity
              test under test level 2 (test field strength 3 v / m) for general purposes in frequency range
              80 MHz to 1000 MHz and under test level 3 (10 v / m) for protection against digital
              radio telephones in frequency ranges 800 MHz to 960 MHz and 1.4 GHz to 2.0 GHz.
            v.       Surges line to earth coupling and line to line coupling : To comply with IEC
             61000-4-5{2001}Test & Measurement techniques for Surge immunity tests” under test
             levels of 0.5 kV for line to line coupling and 1kV for line to earth coupling ;
            vi.   Radio frequency common mode: To comply with IEC 61000-4-6{2001}”
             Immunity to conducted disturbances, induced by radio frequency fields” under the test
                                                                                                              68
               level 2 {3 V r.m.s.} clamp injection method for DC lines and Signal Control lines.


    Note: For tests to check compliance of above EMC requirements, the following shall be taken
          into account:
               a)     The test agency for EMI/EMC compliance shall be an accredited one and details
                      of accreditation shall be submitted.
               b)     The methods of measurement shall be as per IEC/CISPR standards as mentioned
                      in sub clauses No. 1.1.3.g i) to 1.1.3.g vi) and TEC standard No. SD/EMI-02/02
                      Sep 2001 & the references mentioned therein. Alternatively, corresponding
                      relevant Euro Norms of the above IEC/CISPR standards are also acceptable
                      subject to the condition that frequency range and test level are met as per above
                      mentioned sub clauses from 1.1.3.g i) to 1.1.3.g vi and TEC standard No.
                      SD/EMI-02/02 Sep 2001. The details of IEC/CISPR and corresponding Euro
                      Norms are as follows:


                       IEC/CISPR                                Euro Norm


                      CISPR 22                                  EN55022
                      IEC 61000-4-2                             EN61000-4-2
                      IEC 61000-4-3                             EN61000-4-3
                      IEC 61000-4-4                             EN61000-4-4
                      IEC 61000-4-5                             EN61000-4-5
                      IEC 61000-4-6                             EN61000-4-6


5   Safety Requirements:
          i.     The operating personnel shall be protected against shock hazards as per IS 8437
               (1993) – Guide on the effects of current passing through the human body (equivalent to
               IEC publications 479-1 (1984). The manufacturer / supplier shall submit a certificate in
               respect of compliance to these requirements.


         ii.     The equipment shall conform to IS 13252 (1992) – Safety of Information Technology
               equipment including electrical business equipment (equivalent to IEC publication 95
               (1986) and IEC 215 (1987) Safety requirements of Radio transmitting equipments (for
               Radio equipments only). The manufacturer/ supplier shall submit a certificate in respect
               of compliance to these requirements.


6   Other Requirements:


    i.         The solution component hardware / software shall not pose any problem, due to changes
               in date and time caused by events such as changeover of millennium / century, leap year
               etc., in the normal functioning of the system.


                                                                                                     69
      ii.     Wherever, the standardized documents like ITU-T, IETF, QA, TEC etc. documents are
              referred, the latest issue and number with the amendments shall be applicable.



      iii.    Power Supply:

              The solution component power supply requirements details for different components are
              given in respective Clauses. In addition, it shall meet the following requirements:

              i) The equipment shall be able to function over the range specified in the respective
                 Clauses, without any degradation in performance.

              ii) The equipment shall be protected in case of voltage variation beyond the range
                 specified and also against input reverse polarity.

              iii) The derived DC voltages shall have protection against short circuit and overload.


7     Documentation: Following documents shall be provided with solution component.
      All technical documents shall be in English language both in CD-ROM and in hard copy. The
      documents shall comprise of:

      i)      System description documents.
      ii)     Installation, Operation and Maintenance documents.
      iii)    Training documents.
      iv)     Repair manual.


7.1   System description documents:
      The following system description documents shall be supplied along with the solution
      component:
      i.      Over-all system specification and description of hardware and software.
      ii.     Equipment layout drawings.
      iii.    Cabling and wiring diagrams.
      iv.     Schematic drawings of all circuits in the system with timing diagrams wherever
              necessary.
      v.      Detailed specification and description of all Input / Output devices.
      vi.     Adjustment procedures, if there are any field adjustable units.
      vii.    Spare parts catalogue – including information on individual component values,
              tolerances, etc. enabling procurement from alternative sources.
      viii.   Detailed description of software describing the principles, functions, and interactions
              with hardware, structure of the program and data.


                                                                                                       70
      ix.      Detailed description of each individual software package indicating its functions and its
               linkage with the other packages, hardware, and data.
      x.       Program and data listings.
      xi.      Graphical description of the system. In addition to the narrative description a functional
               description of the system using the functional Specification.


7.2   System operation documents:
      The following system operation documents shall be supplied:
             i. Installation manuals and testing procedures.
             ii.      Precautions for installation, operations and maintenance.
             iii.     Operating and Maintenance manual of the system.
             iv.      Safety measures to be observed in handling the equipment.
             v.       Man-machine language manual.
             vi.      Fault location and trouble shooting instructions including fault dictionary.
             vii.    Test jigs and fixtures required and procedures for routine maintenance,
              preventive maintenance and unit / card / sub-assembly replacement.
             viii.    Emergency action procedures and alarm dictionary.


7.3   Training Documents:
      i.       Training manuals and documents necessary for organizing training in installation,
               operation and maintenance and repair of the system shall be made available.
      ii.      Any provisional document, if supplied, shall be clearly indicated. The updates of all
               provisional documents shall be provided immediately following the issue of such
               updates.
      iii.     The structure and scope of each document shall be clearly described.
      iv.      The documents shall be well structured with detailed cross-referencing and indexing
               enabling easy identification of necessary information.
      v.       All diagrams, illustrations and tables shall be consistent with the relevant text.


7.4   Repair Manual:
      i.       List of replaceable parts used.
      ii.      Detailed ordering information for all the replaceable parts.
      iii.     Procedure for trouble shooting and sub-assembly replacement.
      iv.      Test fixtures and accessories for repair.
      v.       Systematic trouble shooting charts (fault tree) for all the probable faults with their
               remedial actions.




                                                                                                      71
7.5   Installation:
      i.       All necessary interfaces, connectors, connecting cables and accessories required for
               satisfactory installation and convenient operations shall be supplied. Type of connectors,
               adopters to be used shall be in conformity with the interfaces defined in this tender.
      ii.      It shall be ensured that all testers, tools and support required for carrying out the stage by
               stage testing of the equipment before final commissioning of the network shall be
               supplied along with the equipment.
      iii.     All installation materials, consumables and spare parts to be supplied.
      iv.      All literature and instructions required for installation of the equipment, testing and
               bringing it to service shall be made available in English language.
      v.       For the installations to be carried out by the supplier, the time frames shall be furnished
               by the supplier including the important milestones of the installation process well before
               commencing the installations.
      vi.      The equipment shall have:
      vii.     Proper earthing arrangement.
      viii.    Protection against short circuit / open circuit.
      ix.      Protection against accidental operations for all switches / controls provided in the front
               panel.
      x.       Protection against entry of dust, insects and lizards.


8     Software Maintenance:
              i. All the software updates shall be provided on continuous basis.
              ii.       The software for the support of all protocols and interfaces mentioned in this
                tender shall be ensured in the devices.




                                                                                                            72
                                                                                    Annexure [II A]

The,
       Jt DDG (MMT)
       BSNL Co
       NewDelhi


Subject: Broadband Next Generation Play Network of BSNL – Certificate from OEM about
        sizing of hardware with OEM‟s application software.


Certified that the solution and hardware quoted in the bid of M/s ……., for the applications (including
all the modules), for which our company, M/s ……… is the OEM, is sufficient to meet all the
requirements mentioned in the tender. The details of the Applications and Hardware are as under:

S.N. Application Software Name         Application Version          Hardware Required
1.
2.
3.




Signature of Authorized signatory of OEM/Country Manager of OEM




                                                                                                   73
                                                                                 Annexure [III B]
The,
       Jt DDG (MMT)
       BSNL Co
       NewDelhi


Subject: Broadband Next Generation Play Network of BSNL – Certificate from OEM about
        sizing of Storage with OEM‟s application software.


Certified that the storage solution, for which our company, M/s ……………. is the OEM, quoted in the
bid of M/s ……..…., for the applications (including all the modules), for which our company, M/s
……… is the OEM, is sufficient to meet all the requirements mentioned in the tender. The details of
the Applications and Hardware are as under:

S.N. Application           Application Version    IOPS Required on          RAID Type
     Software Name                                Storage                   Required on
                                                                            Storage
1.
2.
3.




Signature of Authorized signatory of OEM(Application)/Country Manager of OEM(Application)


Signature of Authorized signatory of OEM(Storage)/Country Manager of OEM(Storage)




                                                                                               74
                                                                                       Annexure [IV]
                                  RPR functionalities in the Switch



1.0   Ring Termination: The following ring inter-connection topologies shall be supported.
         Single-Node Interconnected Rings
         Two-Node Overlapping Rings
         Two-Node Interconnected Rings

      1.1    Single-Node Interconnected Rings: This topology uses one node to connect two
      separate rings. The interconnecting node uses four optical ports (two for each ring). Each
      ring must use two ring-ports on two separate modules (east and west). Equipment shall
      support the following protection schemes in single-node inter-connections-




                                                         Figure 2 – Single-Node Interconnected Rings




      •




       SNCP ring <–> SNCP ring.
      • SNCP ring <–> MS-SPRing
      • MS-SPRing <–> MS-SPRing.


      1.2 Two-Node Overlapping Rings: This
      topology connects two rings using a single fiber
      between two optical modules. At each
      interconnecting node there are three optical
      ports: two east and a shared west. Each ring
      shares the bandwidth of the west port.
                                                                   Figure 3- Two-node overlapping
      Equipment shall support the following
                                                                                rings
      protection schemes in two-node overlapping
      ring interconnections:
      • SNCP ring <–> SNCP ring.
      • SNCP ring <–> MS-SPRing
                                                                                                       75
• MS-SPRing <–> MS-SPRing.




1.3 Two-Node Interconnected
Rings: This topology uses four trunk
ports in each node to connect two
separate rings. The east and west port
of each ring must be on two separate
modules. Equipment shall support the
following protection schemes in two-
node ring interconnections:
• SNCP ring <–> SNCP ring.
• SNCP ring <–> MS-SPRing
• MS-SPRing <–> MS-SPRing.                    Figure 4: Two-node interconnected rings




1.4    Four Node Interconnected Rings: This topology uses four nodes to connect two
rings. The links between the interconnecting nodes are unprotected. This topology protects
traffic within each ring as well as from any failure on the interconnecting node. In this
configuration, each ring can be different speeds and the connecting links do not have to be the
same speed as either of the rings.




                                                                                              76
2.0   Performance Requirements: The equipment shall be tested for error performance as
      follows:
      2.1   In laboratory: BER performance over simulated hop shall be tested for BER
            better than 1E-12 for 48 hours on each port at reference „receive level‟ (nominal
            level). For Ethernet payloads, IETF RFC-2544 and ITU-T G.7041 (GFP)
            compliance shall be tested.
      2.2    In field: BER performance shall conform to ITU-T Rec. G.821 for 2Mb/s, G.828
            for SDH lower order & higher order paths & G.826 for ≥ 2Mb/s, as applicable,
            for 48 hours.




                                                                                          77
78
                                          ANNEXURE –1
                   REPAIR OF CARDS/UNITS/MODULE AND ANNUAL MAINTENANCE CONTRACT FOR
                         EMS OF NEXT GENERATION PLAY NETWORK (G-PON) EQUIPMENT



This agreement is made on the ________ day of ________________(month, year) between M/s.
Bharat Sanchar Nigam Limited, a company registered under the Companies Act 1956 having licence
to provide all types of services of Telegraph and having its registered office at 5 th Floor, Sanchar
Bhawan, 20 Ashoka Road, New Delhi – 110 001 and Corporate Office at Statesman House, B-148,
Barakhamba Road, New Delhi – 110 001 (hereinafter called BSNL), of the ONE PART and
_______________________________________________ a company registered under the Companies
Act          1956          and          having        its          registered        office        at
______________________________________________________________________________
(hereinafter called SUPPLIER which expression shall unless repugnant to the context, include its
successors in business, legal representatives and administrators or permitted assigns) of the OTHER
PART.

WHEREAS, BSNL has placed purchase order on the SUPPLIER vide No. _________________ dated
________ for supply & Annual Repair/Maintenance of NEXT GENERATION PLAY NETWORK (G-
PON) equipment against tender No._________________, dated____________.

        WHEREAS the SUPPLIER has made the offer to duly comply with all the provisions of the Bid
Document, including those pertaining to Post Warranty Annual Repair/Maintenance Contract, after
making himself fully aware and understanding fully the implications of the terms and conditions and
specifications mentioned therein and which has been accepted by BSNL on the terms and conditions
mentioned hereafter and after ascertaining that the SUPPLIER is fully capable of complying with the
aforesaid terms of the Bid Document.

NOW the AGREEEMENT WITNESSETH as follows:

1.0    GENERAL

1.1    This Agreement shall come into effect from the date of expiry of warranty.

1.2    The expiry of warranty of the NEXT GENERATION PLAY NETWORK (G-PON) equipment,
       for the purpose of initiation of AMC, shall be deemed to occur 18 months from the receipt of
       last supply of the equipment or 12 months after the date of commissioning of equipment
       whichever is earlier and the expiry of warranty of the EMS for the purpose of initiation of
       AMC, shall be deemed to occur 12 months after the date of commissioning of EMS.

1.3    This Agreement shall remain in force for five years after the expiry of warranty, while at the
       same time the terms and conditions of this agreement except for payment of charges to the
       SUPPLIER shall also apply during warranty period.

1.4    Extension of this Agreement beyond five years shall be negotiable depending on the
       performance of the SUPPLIER during the Agreement period.

1.5    In addition to complying with all the terms and conditions recorded in the bid document, the
       SUPPLIER hereby agrees and unequivocally undertakes to fully comply with all the terms and
       conditions stipulated in this Agreement and without any deviation or reservations of any kind.

1.6    Unless otherwise mentioned or appearing from the context, the Tender (Bid) Document and any
       clarifications thereof and the purchase order shall form part and parcel of this agreement,
                                                                                                   79
       provided that in case of conflict or inconsistency on any issue relating to this Agreement, the
       terms set out in the body of this agreement with schedules and Annexure thereto shall prevail.

1.7    (a) This AMC agreement covers comprehensive repair of all types of cards/modules/sub-
       assemblies including motherboards etc. used in NEXT GENERATION PLAY NETWORK (G-
       PON) equipment.

       (b) This AMC also covers comprehensive maintenance of hardware, firmware and software of
       the NEXT GENERATION PLAY NETWORK (G-PON) equipment.

1.8    The SUPPLIER shall have to undertake repair work of any or all of the faulty CARD/UNITs
       offered irrespective of geographical location of the equipment. There will be no minimum or
       maximum limit of the number of faulty cards.

1.9    During the period of AMC the SUPPLIER shall, inter alia:

       i)      Repair or replace the faulty CARD/UNIT and any other equipment or part thereof.
       ii)     Diagnose the hardware and software faults of EMS.
       iii)    Rectify the hardware/software faults of EMS so detected.
       iv)     Carry out half-yearly preventive maintenance of EMS.
       v)      Upkeep the EMS software as and when required.
       vi)     Upgrade the EMS software to latest version.
       vii)    Create customized reports from EMS.
       viii)   Provide full & time bound assistance as per the special conditions on EMS given in
               Section IV, in integrating the EMS and associated systems with any NMS as required by
               BSNL.
       ix)     Provide API‟s of systems supplied by it against the Purchase Order for sharing with
               NMS or similar systems supplied for the purpose of integration.

1.10   The SUPPLIER shall prepare the schedule of preventive maintenance of EMS for each quarter
       and shall submit the same to BSNL in advance. The preventive maintenance shall not affect the
       normal functioning of the system.

1.11   The SUPPLIER shall provide all software updates of EMS to BSNL free of cost as a part of the
       AMC as well the maintenance of these updates, if it can be supplied on the same hardware.

1.12   The SUPPLIER shall be solely responsible for the repair of cards/modules and maintenance.
       BSNL shall not be liable to interact with any of the partners/ collaborators or subcontractors of
       the SUPPLIER.



2.0    PERFORMANCE GUARANTEE

2.1    The Performance Bank Guarantee of the value of 5% of the P.O. cost deposited at the time of
       issue of P.O., which is valid during warranty period, shall also cover the performance obligation
       regarding this AMC during the initial period of AMC.

2.2    Two months before the expiry of the above mentioned PBG (5% of P.O. value), the SUPPLIER
       shall deposit another performance guarantee of 2% of the P.O. value in the form of a bank
       guarantee for AMC obligation (valid for the remaining AMC duration plus six months), as per
       format given in Section VIII on prescribed judicial paper with stamps of proper value and should

                                                                                                     80
      contain full address of the issuing branch of the bank with its telephone FAX number, in favour
      of BSNL issued by a nationalised bank payable at New Delhi, in favour of Accounts Officer
      (Cash), BSNL Head Quarter. If for any reason AMC period is extended, the SUPPLIER shall
      extend the PBG accordingly.

2.3   The purchaser shall have the absolute right to forfeit the Performance Guarantee, valid at the
      time, for unsatisfactory performance of the SUPPLIER or for any non-compliance of any of the
      conditions of this Agreement.

2.4   The Bank Guarantee shall be discharged after successful completion of SUPPLIER‟s
      performance obligations under the Agreement and subsequent extension if any or in the event of
      any default in the execution of the Agreement by the SUPPLIER as per terms and conditions of
      the Agreement, the Bank Guarantee shall be invoked either in part or in full.

3.0   TECHNICAL SUPPORT CENTRE

3.1   The SUPPLIER shall have at least two Technical Support Centres in India. The SUPPLIER may
      set up more such centres to meet the criteria for faulty unit repair times/EMS fault restoration as
      mentioned in the AMC. The SUPPLIER shall furnish the names, locations, complete postal
      address, Telephone numbers and FAX numbers of all Technical Support Centres at the time of
      signing this Agreement. The SUPPLIER shall also specify the areas/stations to be covered by
      each Technical Support Centre in the format given at Appendix-„A‟ to this agreement.

3.2   Any change in Address, Phone number, FAX Number etc shall have to be intimated in writing
      by the SUPPLIER to the concerned Circle/Region heads of BSNL as well as BSNL Corporate
      Office at the earliest. .

3.3   The Technical Support Centre (s) shall work as repair centre (s) and they shall be responsible
      for repairing the faulty cards/units and shall also maintain a requisite minimum stock of such
      cards/equipment often going faulty, in order to keep the down time within limits as envisaged in
      this agreement.
3.4   The SUPPLIER shall ensure that all the Technical support centre/s are manned by fully
      competent and responsible Engineers and are:

      (i)    Capable of giving all types of necessary technical guidance/assistance over phone to the
             respective station Incharge of testing instruments, for fast restoration of faults and

(     ii)    Capable of attending the faults at the testing instruments sites whenever needed by
             deputing competitive technical expert .



3.5   The SUPPLIER shall also ensure that Technical support Centre/s are manned and are able to
      provide service to BSNL round the clock, all the seven days of the week throughout the year.
      The level of service provided to BSNL shall not go down during nighttime or due to any day
      being holiday, or for any other reason.




                                                                                                      81
      4.0      TERMS AND CONDITIONS FOR REPAIR OF CARDS/UNITS/MODULES




      4.1      The SUPPLIER shall set up at least one repair centre in India within 6 months from the date of
               purchase order, with the facilities for repair of all types of modules/units/equipment supplied by
               it. For third party equipment like Server Hardware at EMS site, etc, it shall be at the option of
               the SUPPLIER to either carryout the repair on its own or through the facilities of third party.
               In all cases, however, BSNL shall interface only with this SUPPLIER.

      4.2      One collection and despatch/receive window for faulty/repaired cards/units shall be declared in
               each Circle/Region of BSNL. All field units of the Circle/Region shall send the faulty cards to
               the designated window in the Circle/Region. The authorized officer(s) of the designated window
               shall arrange to send the faulty cards/units to the SUPPLIER‟s designated Repair Centre /
               Technical support Centre through the courier nominated/declared by the SUPPLIER for this
               purpose. The cost of the courier on both sides shall be borne by the SUPPLIER.


      4.3      The SUPPLIER shall arrange and ensure repair or replacement of the faulty card/unit, to the
               concerned BSNL despatch/receive window within 21 days of handing-over the faulty card/unit
               by BSNL to the SUPPLIER nominated courier. While the responsibility of delivering the faulty
               card/unit to the SUPPLIER‟s courier will lie with BSNL, the responsibility of
               repairing/replacing and sending back the same to the respective BSNL window will be with the
               SUPPLIER.


      4.4.1    After handing-over the cards/units to the courier and till they are returned back, the safety of
               cards/units will be the responsibility of the SUPPLIER. The SUPPLIER‟s courier can ensure at
               the time of taking the cards/units that they are not damaged, burnt, etc.

      4.4.2    The turn-around time shall be calculated from the date of handing-over the faulty equipment by
               the designated BSNL window to the SUPPLIERs designated courier to the date of receiving
               back of the repaired / replacement of the same at the concerned BSNL despatch/receive window
               including the day of despatch and receipt. However, the turn-around shall be calculated by
               excluding any time delay in issue of any permit for passage of the cards/units. The SUPPLIER
               shall produce documentary evidence for claiming exclusion of delay in issue of permit from the
               turn-around time.

      4.5      The SUPPLIER shall undertake the repair of cards/units at his own repair centres. The
               components required and to be used for such repair shall be procured and stocked by the
               SUPPLIER at his own cost and shall not be separately chargeable in addition to AMC charges.
               Neither repairing cards/units through sub contractor nor diversion of contract to other parties
               will be acceptable.

4.6         The SUPPLIER will not be allowed to use any unconventional hardware component other than
            those used in original equipment.


4.7         No repair in any case shall be carried out by taken-out components of the faulty cards/units or
            cannibalizing the other cards/units.


                                                                                                              82
4.8         The decision of concerned BSNL officials shall be final on the functional acceptability of the
            repaired card/unit. In case, a card received from the SUPPLIER after repair is found to be
            unattended/un-repaired/faulty and so intimated to the SUPPLIER within two weeks time of its
            receipt, the same shall be repaired free of charge and the counting of time of repair will be reckoned
            from original receipt of the card by the SUPPLIER for repair; penalty provisions applicable as per
            clause 6.


4.9         The SUPPLIER shall not refuse to repair any card/unit on the plea of the obsolescence or
            unavailability of spares.


      4.10     Burnt/Physically broken Cards:
               In general burnt/broken cards will not be given to the SUPPLIER for repair. A card will be
            considered burnt/physically broken if it is so visible with naked eye.


      5.0      TERMS AND CONDITIONS/ TECHNICAL SUPPORT PROCEDURE FOR
               MAINTENANCE OF EMS


5.1         In case of any fault, abnormality in the EMS, partial or total failure of the EMS, the duty officer
            incharge of the BSNL EMS site will immediately contact the designated Technical support Centre
            of the SUPPLIER and give information about the nature of fault over phone / FAX / pager / e-mail.


5.2         The details of the fault reported shall be recorded in a prescribed format, called the “FAULT –
            DOCKET” as given in Appendix-B of this Agreement. Changes in the “FAULT – DOCKET”
            may be incorporated for better reporting and recording reconciliation of the faults at BSNL site and
            also at Technical support Centre of the SUPPLIER by mutual agreement and understanding, to best
            utilize the Fault Docket facility of EMS or as and when such need is felt. To this end changes in
            fault reporting procedures can also be incorporated.


5.3         Even if the fault is reported over phone to the Technical support Centre a copy of the “Fault Docket”
            duly filled in by the station Incharge of BSNL shall be sent by FAX and also by post to the
            Technical support Centre of the SUPPLIER for records. The time of occurrence of fault as recorded
            in the fault docket shall only be taken into consideration for calculating the actual duration of faults.


5.4         Similarly, after rectification of fault a fresh Fault-Docket duly filled in and after recording the time
            of restoration and total duration of fault, will be sent by station Incharge of BSNL to the Technical
            support Centre, preferably by FAX, for records.


5.5         In case of any dispute arising regarding duration of fault etc., the Fault Docket as maintained at the
            BSNL station shall be the guiding documents to be agreed by both parties.


5.6         The “Fault Docket” shall be filled with utmost care, giving all the details of the faults and other
            information as prescribed in the Fault Docket and the entries made shall be authenticated by
            signature of the Incharge of the EMS station concerned.


                                                                                                                   83
5.7      Technical instructions shall be given to the BSNL staff of the concerned EMS site, over phone. If
         the fault is restored by following the instructions given over phone, the station Incharge of EMS site
         will close the Fault Docket after making suitable entries and after satisfying himself of the proper
         restoration of the fault. A copy of the Fault Docket duly filled in shall be sent to the Technical
         support Centre for records.


5.8      The SUPPLIER shall also ensure visits of the expert and competent technical staff of the
         SUPPLIER in case the fault is not rectified to the satisfaction of BSNL even after following the
         telephonic instructions and advices.


5.9      Once the fault has been rectified and the system & services were restored to normalcy, the visiting
         engineer of the SUPPLIER shall record in the station Log Book, the details of the works done by
         him for restoration of the faults and also record the details of steps to be taken and procedures to be
         followed for not only restoration of similar faults by BSNL staff but also for preventing the
         occurrence of similar faults in future. Similar entries shall be made in the fault docket also.


      5.10   FAULTS: SEVERITY LEVELS AND RESTORATION TIME:

      5.10.1 If the EMS servers (hardware and/or software) are down/faulty such that service is not available
             from EMS then fault/s shall be treated as Severity Level 1. Such faults shall be rectified such
             that EMS service is restored within 24 hours of reporting to the supplier. If any other associated
             equipment at the EMS site remains faulty after service restoration then the fault will continue in
             the Severity Level 2 from the time of reporting of the fault initially.

      5.10.2 Faults at the EMS site in the server or any other associated equipment such that service from the
             EMS is partially affected or the system response becomes slow in terms of
             access/downloading/printing/data collection from network elements, shall be treated as Severity
             Level 2. Such faults shall be rectified within 72 hours of reporting to the supplier.

      5.10.3 Faults at the EMS site in any of the server and/or any other associated equipment such that
             service from the EMS is not affected but the redundancy is affected so that the system becomes
             highly susceptible to failure shall be treated as Severity Level 3. Such faults shall be rectified
             within 72 hours of reporting to the supplier.

      5.10.4 Any fault at the remote location leading to non-execution of commands or non-collection of data
             from that site shall be treated as fault of Severity Level 4. Such faults shall be rectified within
             07 days (168 hours) of reporting to the supplier.

      5.10.5 Time periods prescribed above shall include any travel if required as well as replacement of
             faulty card/unit etc. by the supplier out of the spares stocked by him.

      5.10.6 The time for restoration of fault will be counted from the time of reporting to the technical
             support centre as per procedure prescribed in clauses 5.1 to 5.3 of this agreement.




                                                                                                              84
      6.0      PENALTIES


6.1         In case the SUPPLIER fails to return the repaired/replaced cards within stipulated period mentioned
            in clause-4.3 & 4.4, the SUPPLIER shall be liable to pay penalty @ 0.5% of the cost of card/unit per
            week, or part there of, per card/unit for the next 4 weeks delay, @ 1% of the cost of card/unit per
            week, or part there of, per card/unit for the next 2 weeks after the 4 weeks delay and thereafter a
            penalty of 2 % of the cost of card/unit per week, or part there of, per card/unit shall be charged. The
            total penalty shall be limited to 10% of the cost of the card. However, beyond 6 weeks delay, BSNL
            may rescind the contract for consistent poor performance.


6.2         In case, a card/unit is damaged by the SUPPLIER, an OK tested card/unit will be replaced by the
            SUPPLIER free of cost within the stipulated time of 21 days from the date of despatch of card/unit
            by BSNL failing which penalty prescribed in para 6.1 above will be levied but without the 10%
            limit, i.e., full cost of card/unit shall be deducted from the bills if the card is not replaced.


6.3         In case the SUPPLIER refuses to repair any card/unit on the plea of obsolescence of components, an
            OK tested card/unit shall be replaced by the SUPPLIER free of cost within the stipulated time of 21
            days from the date of despatch of card/unit by BSNL failing which penalty prescribed in para 6.1
            above will be levied but without the 10% limit.


6.4         If hardware version of any card/unit is changed then the supplier shall have to repair cards of both
            the versions.

      6.5      A system of despatch and receipt of challans shall be worked out between BSNL and the
               supplier within three months of the placement of Purchase Order in order to account for the time
               taken in repair and transit. Decision of BSNL as to how the system is designed shall be final.

      6.6      If the supplier fails to restore the EMS hardware/software fault within the time limit specified in
               clause 5.10 above, following penalties shall be applicable.

                       Severity Level                 Penalty for delay of 24 hours or part/per occasion

                               1                                     Rs. 2500/-
                               2                                     Rs. 2000/-
                               3                                     Rs. 1000/-
                               4                                     Rs. 500/-

               The penalty shall be deducted from the half-yearly bills. The maximum value of penalty for
               fault in EMS hardware/software shall not exceed 20% of AMC amount in that half-year.

      7.0      AMC CHARGES AND PAYMENTS: The charges for AMC will be as given in the purchase
               order.

      7.1      For fulfilling the above obligations, the following procedure shall be followed for paying the
               SUPPLIER the charges for the services rendered by the SUPPLIER under this Agreement.

      7.2      BSNL shall not pay any charges in advance. Bills for testing instruments and the repair charges
               of cards/modules/units shall be paid by BSNL at the end of each half-year, after successful
               execution of the works under this Agreement normally within 30 (thirty) days of the receipt of
               the bill duly completed.

                                                                                                                   85
      7.3      The SUPPLIER shall submit the bill to each BSNL Circle Head on half-yearly basis, with the
               satisfactory performance report by the incharge of the designated repair window of the circle.
               The penalty, if any, shall be deducted from the sums due.

      7.4      BSNL reserves the right to adjust any over-payment of AMC charges in any half-year, any time
               during the period of AMC.

      7.5      If BSNL is not satisfied with the performance of the SUPPLIER during AMC it reserves the
               right to terminate the AMC during its currency, after giving two months notice to the
               SUPPLIER.

      8.0      TERMINATION OF CONTRACT

8.1         Pursuant to clause-4.2, if the SUPPLIER fails to return the repaired and tested OK CARD/UNITs
            within stipulated period mentioned in clause-4.3 and 4.4, the SUPPLIER will be liable to pay
            penalty in accordance with clause-6.1 till the card/unit is repaired/replaced, however beyond 6
            weeks of delay BSNL will have the right to terminate the contract and forfeit the performance
            guarantee.


8.2         Failure on the part of SUPPLIER to comply with any of the clauses of this agreement shall
            constitute to be sufficient ground for termination of contract and the BSNL (purchaser) shall have
            the right to forfeit the performance securities submitted to BSNL.


8.3         The purchaser has the right to issue notice of two months in writing to terminate the contract at any
            time during its currency if the purchaser does not find SUPPLIER's services satisfactory and does
            not want to continue the contract further.
9.0         FORCE MAJEURE


            Neither BSNL nor the SUPPLIER shall be liable to the other for any delay in or failure of
            performance of their respective obligation under the agreement caused by occurrences beyond the
            control of BSNL or the SUPPLIER including but not limited to fire (including failure or
            reductions), acts of God, acts to the public enemy, was, insurrections, riots, strikes, lockouts,
            sabotage, any law, status or ordinance, thereof of any other local authority, or any compliance
            therewith or any other causes, contingencies of circumstances similar to the above. Either party
            shall promptly but not later than twenty days thereafter notify the other of the commencement, and
            cessation of such contingencies, and if such contingencies continues beyond three months. Both
            parties agree upon the equitable solution for termination of this agreement or otherwise decide the
            course of action to be adopted.


      10.0     DISPUTES & ARBITRATION:

      10.1     In the event of any question, dispute or difference arising under this agreement or in
               connection there-with (except as to matter the decision of which is specifically provided under
               this agreement), the same shall be referred to sole arbitration of the CMD, BSNL, New Delhi
               or in case his designation is changed or his office is abolished then in such case to the sole
               arbitration of the officer for the time being entrusted (whether in addition to his own duties or

                                                                                                                 86
       otherwise) with the functions of the CMD, BSNL or by whatever designation such officers
       may be called (hereinafter referred to as the said officer) and if the CMD, BSNL or the said
       officer is unable or unwilling to act as such the sole arbitration or some other person appointed
       by the CMD, BSNL or the said officer. The agreement to appoint an arbitrator will be in
       accordance with the Arbitration and Conciliation Act, 1996.
       There will be no objection to any such appointment on the ground that the arbitrator is BSNL
       Servant or that he has to deal with the matter to which the agreement relates or that in the
       course of his duties as BSNL Servant he has expressed views on all or any of the matter under
       dispute. The award of the arbitrator shall be final and binding on the parties to the agreement.
       In the event of such arbitrator to whom the matter is originally referred, being transferred or
       vacating his office or being unable to act for any reasons whatsoever the CMD, BSNL or the
       said officer shall appoint another person to act as arbitrator in accordance with terms of the
       agreement and the person so appointed shall be entitled to proceed from the stage at which it
       was left out by his predecessors.
10.2   The arbitrator may from time to time with the consent of parties enlarge the time for making
       and publishing the award. Subject to aforesaid Arbitration and Conciliation Act, 1996 and the
       Rules made thereunder, any modification thereof for the time being in force shall be deemed to
       apply to the arbitration proceeding under this clause.
10.3   The venue of the arbitration proceeding shall be the Office of the CMD, BSNL, New Delhi or
       such other Places as the arbitrator may decide.

10.4   Any party shall not use any information obtained from other party during the course of dispute
       resolution process under this clause for any purpose other than to resolve the dispute and such
       information shall not be used in any litigation.

10.5   Both parties shall use their best efforts in good faith and best intention to resolve disputes by
       mutual negotiation and consultation and shall settle amicably any dispute that may arise or
       relate to this agreement or a breach thereof. Pending resolution of a dispute, the supplier shall
       continue to fulfill its obligations under this agreement.

11.0   SET OFF:
       Any sum of money due and payable to the SUPPLIER (including security deposit refundable
       to him) under this contract may be appropriated by the purchaser or the BSNL or any other
       person or persons contracting through the BSNL and set off the same against any claim of the
       Purchaser or BSNL or such other person or persons for payment of a sum of money arising out
       of this contract or under any other contract made by the SUPPLIER with the Purchaser or
       BSNL or such other person or persons contracting through BSNL.


IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed through their respective
authorized representatives on the day and year first above written.

Signed and Delivered for and on behalf of BHARAT SANCHAR NIGAM LIMITED.

By____________

Signed on behalf of M/s.___________________

By Shri _______________ holder of General Power of Attorney dated__________ executed in accordance with the
Resolution No. __________ dated _____________ passed by Board of Directors.

                                                                                                           87
In the presence of:

Witness:

1.     _____________________

2.     _____________________




                               88
                                       Appendix: “A”
                                          to the AMC

Details of Technical support Centres

Sl.   Location of   Area/Stations      Postal    Telephone   Mobile   FAX
No.    Technical    Served             Address   Numbers     Phone    Number
      support                                    Minimum     Number
      Centre                                     two
1                   1
                    2
                    3
                    4
                    5
2




3




4.




5




6




7




                                                                               89
                                                  Appendix-B
                                                   to the AMC
                                                                                                Page 1 of 3


BHARAT SANCHAR NIGAM LIMITED


FAULT- DOCKET FOR EMS OF THE NEXT GENERATION PLAY NETWORK (G-PON)
EQUIPMENT


Name of Station:                 SSA/Sub-Region                                Docket Sl. No:
File No:                                                                      Date:
From:-
       Name:
       ( of the officer incharge/duty officer of the station)
       Designation:
To,
       M/s.---------------------------------------------------------------- ( the SUPPLIER)
       Address:
       ( of the Technical support / Centre)


1.1     Date ---------------------------- Time------------------- ( of occurrence of fault)

1.2     Date.--------------------------- Time------------------- (of Reporting of Fault )
2.      Fault Reported to: Technical support Centre ( Name of the person) on phone :

3.1     Mode of Reporting :           Phone,                      FAX,          e-mail/
        ( Tick whichever is applicable)                                            Pager

4.      Description of fault & observation of the reporting officer:

5.      Details of Services affected :

6.      Date_____________ Time ____________ ( of receiving the 1st assistance
                                                over phone from Technical support Centre)

7.      Details of Assistance received:


         (Note: Add additional sheet if needed.)




                                                                                                        90
                                              Appendix-B
                                               to the AMC
                                                                                              page 2 of 3


8.    Date_____________ Time ____________ ( of receiving the 2nd assistance
                                            over phone from Technical support Centre)

9.    Details of assistance received:




      (Note: Add additional sheet if needed.)
10.   Was the fault restored by following the instructions given over phone?
           A- YES               B- NO                ( Tick whichever is applicable)
11.   If Yes, record date & time of restoration & duration of fault:
               Date____________ Time _________( in hours & minutes)
               Duration of Fault: ________ days _____ Hours _____minutes.
12.   Was the fault restored?
               A- Partially            B- Fully      ( Tick whichever is applicable)
13.   If the fault is not restored or restored only partially, give details of observation:

      ( Note: Add additional sheet if needed )
14.   Note date & time of giving feed back vide Srl No: 14 above to the Technical support Centre:
      ( only in the event of partial / non restoration of faults )
              Date ________________ Time ____________ . ( in hours & minutes)

15.   Date & Time of arrival of SUPPLIER‟s Expert at site / station of fault:
             Date ___________ Time ___________ . ( in hours & minutes)
16.   Brief observation and works done by the SUPPLIER‟s staff / expert:


      ( detailed entry to be made by SUPPLIER‟s staff in the station Log-Book)

17.   Date & Time of complete restoration of the system :
            Date ____________ Time ____________ . ( in hours & minutes)

18    Total Duration of Fault: _________ days _______ hrs.




                                                                                                      91
                                              Appendix-B
                                               to the AMC
                                                                                           page 3 of 3




19.    Remarks of Station in charge ( if any) :


20.    Remarks of visiting engineer ( of SUPPLIER), if any :




Signature :
Name      :
Designation :
( of BSNL staff / in charge of the station)

Note:
1.    Each page of the Docket must be signed by designated officer of BSNL
      (including the additional sheets, if attached)
2.    A copy of the Fault- Docket must be sent to the Technical support Centre of the SUPPLIER,
      immediately by FAX / Post after restoration of fault.
3.    At the time of first reporting it may not be possible to pinpoint the fault. Hence more than one
      box can be ticked against Sl.3.2. Similarly observation of the local impact of fault may not be
      possible against Sl.5. The duty officer shall provide observation that is immediately available.




                                                                                                   92
93
                                           Section -V
                                     Schedule of requirement
                                 Nexet Generation Play equipment


Sl. No.                               DESCRIPTION                              Quantity/     Total
                                                                                GPON        Quantity
                                                                                Chassis
1.0       Managed Duplex GPON system with single Fibre                                          1200

1.1       Managed GPON equipment Chassis with single Fibre, Duplex                     1        1200
          OLT, Switch units, Control units, Power Unit and Manuals etc.

1.2       Duplex OLTs                                                                 10       12000
1.3       Patch Cords 20 mtr length with SC connector on ODF side                     10       12000
1.4       Patch Cords 10 mtr length with SC connector on ODF side                     10       12000
1.5       5 dB Optical Attenuators                                                    10       12000
1.6       Installation Material set                                                    1        1200
1.7       Wired Rack with alarm & power panel on racktop                               1        1200
1.8       Maintenance Spares Set consisting of complete equipment from                0.1        120
          1.1 to 1.6 including Soft copy of manuals.

2.0       Indoor Splitters                                                                     66000

2.1       2:4 ratio splitter (ETSI rack mountable)                                     4        4800
2.2       2:4 ratio splitter Wall mountable                                            4        4800
2.3       2:32 ratio splitter Wall mountable                                           3        3600
2.4       1:8 ratio splitter Wall mountable                                           32       38400
2.5       1:16 ratio splitter Wall mountable                                           5        6000
2.6       2:4 ratio splitter (ETSI rack mountable)*                                    1        1200
2.7       2:4 ratio splitter Wall mountable*                                           1        1200
2.8       1:8 ratio splitter Wall mountable*                                           3        3600
2.9       2:32 ratio splitter Wall mountable*                                          1        1200
2.10      1:16 ratio splitter Wall mountable*                                          1        1200
2.11      Optical Patch cords with SC-PC connector on ODF side, 10mtr                 20       24000
          length
2.12      Optical Patch cords with FC-PC connector on ODF side, 10mtr                 10       12000
          length
2.13      Optical Patch cords with suitable connector on coupler side, 10mtr          20       24000
          length
2.14      Optical Pigtails with suitable connector on coupler side, 10mtr             20       24000
          length

                                                                                               94
3.0    H-ONT - Single Fibre, Wallmountable, 2 POTs and 4 Ethernet                 385,000
       ports
3.1    ONTs with Battery backup (4 Hours)                                    1    385,000

3.2    Pigtail with G.657 standard fibre (bend insensitive fibre) 100 mtr    1    385,000
       length with no connector
3.3    Optical connector (field crimpable using the pigtail at 3.2)          2    770,000
3.4    Maintenance Spares Set consisting of complete equipment from         0.1    38,500
       3.1 to 3.2 including Soft copy of manuals.
3.5    Optical connector (field crimpable using the pigtail at 3.2)         0.2    77,000
3.6    Pigtail Crimping Tool                                                0.2      240

4.0    Fibre Distribution Frames/FDMS                                                300


4.1    Fibre Distribution Frames/FDMS with Splicing shelves &                1       300
       patching shelves having Fanouts for 288 Fibre termination and
       with SC-PC Connectors.
4.2    Technical,                 Installation,Operation/Configuration,      1       300
       Maintenance/Repair Manuals of GPON OLT, ONT, Splitters and
       FDMS
4.3    Maintenance Spares Set consisting of complete equipment at 4.1                   30
       including Soft copy of manuals.
5.0    RPR based LAN Switches (Optional)                                             234

5.1    LAN Switch Chassis, Power Unit and Manuals etc.                       1       234
5.2    Control and Switch Unit set                                          10      2340
5.3    100 Base FX @ 1310nm                                                 16      3744
5.4    10/100 Base T                                                        16      3744
5.5    GE Interfaces 1000 Base T                                            16      3744
5.6    GE Interfaces 1000 Base LX @ 1550nm                                  16      3744
5.7    10GE interfaces 10G @1310nm                                          20      4680
5.8    Patch Cords 20 mtr length with SC connector on ODF side              52     12168
5.9    Patch Cords 10 mtr length with SC connector on ODF side              52     12168
5.10   5 dB Optical Attenuators                                             20      4680
5.11   Installation Material set                                             1       234
5.12   Wired Rack                                                            1       234
5.13   Maintenance Spares Set consisting of complete equipment from         0.1         23
       5.1 to 5.11 including Soft copy of manuals.
6.0    LAN Switch Element Management System with CORBA                                   2
       NBIF and SNMP/Q3 SBIF with a backup server (Optional)



                                                                                   95
6.1   EMS Server hardware with EMS software loadedand cable                                    2
      accessories.
6.2   EMS Software and associated cables and accessories                                       2
6.3   Technical,                Installation,Operation/Configuration,                         12
      Maintenance/Repair Manuals set
6.4   EMS Clients to be located at all the circle POPs                                        30

7.0   GPON Element Management System with CORBA NBIF and                                       2
      SNMP/Q3 SBIF with a backup server
7.1   EMS Server hardware with EMS software loadedand cable                                    2
      accessories.
7.2   EMS Software and associated cables and accessories                                       2

7.3   Technical,                Installation,Operation/Configuration,                         12
      Maintenance/Repair Manuals set
7.4   EMS Clients to be located at all the circle POPs                                        30

8.0   GPON Local Craft Terminal                                                               30


8.1   Laptop Computer with GPON LCT software and associated cables                            30
      with 3 years comprehensive maintenance warranty. Warranty for
      battery pack also for three years
8.2   GPON LCT Software and associated cable accessories                                      33


9.0   Comprehensive Repair Charges and AMC for EMS as per
      Annexure-I and Section IV
9.1   Comprehensive Repair Charges for the equipment/PCBs                Percentage   on 3 year
      indicating all inclusive rates as percentage of its cost for the      to be         Mtce
      quantity mentioned in the 3 Years Mtce Spares Sets at 1.8, 2.6,      quoted     spares of
      2.7, 2.8, 2.9, 2.10, 3.4, 4.3 and 5.13.                                             SOR
9.2   AMC Charges, for EMS at 6.0 and 7.0, for one year after warranty   Percentage            4
      as a percentage of the cost of the EMS                                to be
                                                                           quoted
9.3   AMC Charges, for EMS at 6.0 and 7.0, for second year after         Percentage            4
      warranty as a percentage of the cost of the EMS                       to be
                                                                           quoted
9.4   AMC Charges, for EMS at 6.0 and 7.0, for third year after          Percentage            4
      warranty as a percentage of the cost of the EMS                       to be
                                                                           quoted
9.5   AMC Charges, for EMS at 6.0 and 7.0, for fourth year after         Percentage            4
      warranty as a percentage of the cost of the EMS                       to be
                                                                           quoted
9.6   AMC Charges, for EMS at 6.0 and 7.0, for fifth year after          Percentage            4
      warranty as a percentage of the cost of the EMS                       to be
                                                                           quoted
                                                                                         96
10.0     WDM Coupler                                                                       120

11.0     EDFA amplifier for Analog TV broadcast                                                50

12.0     Optical Transmitter for Broadcast signal amplification                                25




*        Maintenance spares of the splitters

Note 1   Purchaser reserves the right to procure the additional maintenance spare set in the
         form of cards/units/modules based on bill of material and not necessarily as a full
         GPON Chassis
Note 2   AMC charges shall be discounted including the warrany period for the purpose of
         discounting.
Note 3   Each Duplex ONT shall have two OLTs located on two different cards

Note 4   The bidder may supply industry standard WDM coupler, EDFA Amplifier and Optical
         transmitter for ensuring the Analog TV broadcasting on PON system. The same shall
         be tested during Validation of the solution.




                                                                                         97
                                    Section VI

                               Technical Specifications



Package     Item Description                Technical Specifications



  1       Duplex GPON system        TEC GR No. GR/PON-01/01 DEC. 2006.




  2          LAN Switch             TEC GR No GR G/LSW-01/03 Sep 2007




                                     TEC GR No GR/OFJ-02/01. MAY 2004
  3           Patch Cords
                                           With ITU-T G.657 fibre


                                                                         98
     4         Ethernet to E1 Converter         TEC GR No GR GR/DCA-23/01 Nov 2006



                                                FDMS TEC GR No. GR/FDM-02/01 JAN
                  Fibre distribution
     5                                           2001, GR/FDM-01/01 DEC 99 or better
                 Management system
                                                             standard.




                                                SECTION VII
                                                  PART-I
                                                 BID FORM

Tender No.MM/TX/032008/000352                                              Date :- 14.03.2008

To
       Jt DDG (MMT)
       Bharat Sanchar Nigam Limited,
       (Corporate Office)
       2nd Floor, Bharat Sanchar Bhawan,
       Janpth, New Delhi – 110 001.
Dear Sir,

1.       Having examined the conditions of contract and specifications including addenda
         Nos......................the receipt of which is hereby duly acknowledged, we, undersigned, offer to
         supply and deliver .............................................. in conformity with the said drawings,
         conditions of contract and specifications for the sum shown in the schedule of prices attached
         herewith and made part of this Bid.

2.       We undertake, if our Bid is accepted , to commence deliveries within (          ) months and to

         complete delivery of all the items specified in the contract within (          ) months calculated

         from the date of issue of your advance purchase order.


                                                                                                              99
3.        If our Bid is accepted, we will obtain the performance guarantees of a Scheduled Bank for a sum

          @ 5% of the contract value for the due performance of the contract.

4.        We agree to abide by this Bid for a period of 150 days from the date fixed for Bid opening and
          it shall remain binding upon us and may be accepted at any time before the expiration of that
          period.

5.        Until a formal Purchase Order of Contract is prepared and executed, this Bid together with your
          written acceptance thereof in your notification of award shall constitute a binding contract
          between us.

6.        Bid submitted by us is properly sealed and prepared so as to prevent any subsequent alteration
          and replacement.

7.        We understand that you are not bound to accept the lowest or any bid, you may receive.

8.        We understand that the Bid document so submitted is the true copy of BSNL tender documents
          available on the BSNL website www.bsnl.co.in. Any deviation will result in the rejection of the
          bid.

Dated this .............................. day of ........................ 200

Name and Signature ------------------------
In the capacity of ----------------------
Duly authorised to sign the bid for and on behalf of ..............................................

witness .........................................
Address ......................................
Signature




                                                                                                      100
101
102
                                                                                                                                         SECTION VII
                                                                                                                                           PART II
                                                                                                                              Price Schedule for Indigenous Items
                                                                                                                                              (A)




                                                                                                                                                                                                                                                                Unit Price excluding Duties & Taxes CENVAT able
                                                      Ex-factory Price (Basic Unit Price exclusive of all




                                                                                                                                                                                                                                                                                                                                                                                          Total discounted price excluding Duties & Taxes
                                                                                                                                                                                                                                                                                                                      Total Price Inclusive of all levies & charges
                                                                                                                                                                                                                Duties & Taxes CENVAT-able on unit price
 Sl.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Percentage (%) of Customs duty
No.                                                                                                         Excise Duty   Sales Tax     F.F.Pkg




                                                                                                                                                   Other levies & charges, if any
                                                                                                                                           &I




                                                                                                                                                                                                                                                                                                                               excluding Duties & Taxes
                                                                                                                                                                                    Unit Price (all inclusive
                                                                      levies & charges)




                                                                                                                                                                                                                                                                                                                                                                      Discount offered,
         Item description




                                                                                                                                                                                                                                                                                                                                                                                                                                                             Import content
                                                                                                                                                                                                                                                                                                                                                                                                                                            E.D.Tarif Head
                                                                                                                                                                                                                                                                                                                                                                                                           CENVAT-able
                                                                                                                                                                                         (4+6+8+10+11)
                                    Total Qty..




                                                                                                                                                                                                                                                                                      (12-13)




                                                                                                                                                                                                                                                                                                                                                                                                               (15-16)
                                                                                                                                                                                                                                                                                                                                                                           if any
                                                                                                                                                                                                                                                                                                                                         (3X14)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Customs Tariff Head
                                                                                                            %     Amt     %    Amt     %     Amt




1                           2                     3                                  4                      5     6       7     8       9    10             11                         12                                                           13                                         14                                        15                             16                            17                                                18       19                    20                        21



       Sl. No.                                                                                              DESCRIPTION                                                                   Quantity/                                                                                      Total
                                                                                                                                                                                           GPON                                                                                         Quantit
                                                                                                                                                                                           Chassis                                                                                        y
       1.0                      Managed Duplex GPON system with single Fibre                                                                                                                                                                                                                                       1200

       1.1                      Managed GPON equipment Chassis with single Fibre,                                                                                                                                                                           1                                                      1200
                                Duplex OLT, Switch units, Control units, Power Unit and
                                Manuals etc.
       1.2                      Duplex OLTs                                                                                                                                                                                                                10                                                     12000
       1.3                      Patch Cords 20 mtr length with SC connector on ODF                                                                                                                                                                         10                                                     12000
                                side
       1.4                      Patch Cords 10 mtr length with SC connector on ODF                                                                                                                                                                         10                                                     12000
                                side
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               103
1.5    5 dB Optical Attenuators                                    10     12000
1.6    Installation Material set                                    1      1200
1.7    Wired Rack with alarm & power panel on racktop               1      1200
1.8    Maintenance Spares Set consisting           of complete     0.1      120
       equipment from 1.1 to 1.6 including         Soft copy of
       manuals.
2.0     Indoor Splitters                                                  66000

2.1    2:4 ratio splitter (ETSI rack mountable)                     4      4800
2.2    2:4 ratio splitter Wall mountable                            4      4800
2.3    2:32 ratio splitter Wall mountable                           3      3600
2.4    1:8 ratio splitter Wall mountable                           32     38400
2.5    1:16 ratio splitter Wall mountable                           5      6000
2.6    2:4 ratio splitter (ETSI rack mountable)*                    1      1200
2.7    2:4 ratio splitter Wall mountable*                           1      1200
2.8    1:8 ratio splitter Wall mountable*                           3      3600
2.9    2:32 ratio splitter Wall mountable*                          1      1200
2.10   1:16 ratio splitter Wall mountable*                          1      1200
2.11   Optical Patch cords with SC-PC connector on ODF side,       20     24000
       10mtr length
2.12   Optical Patch cords with FC-PC connector on ODF side,       10     12000
       10mtr length
2.13   Optical Patch cords with suitable connector on coupler      20     24000
       side, 10mtr length
2.14   Optical Pigtails with suitable connector on coupler side,   20     24000
       10mtr length
3.0    H-ONT - Single Fibre, Wallmountable, 2 POTs and 4                 385,000
       Ethernet ports


                                                                                   104
3.1   ONTs with Battery backup (4 Hours)                            1    385,000

3.2   Pigtail with G.657 standard fibre (bend insensitive fibre)    1    385,000
      100 mtr length with no connector
3.3   Optical connector (field crimpable using    the pigtail at    2    770,000
      3.2)
3.4   Maintenance Spares Set consisting          of complete       0.1    38,500
      equipment from 3.1 to 3.2 including        Soft copy of
      manuals.
3.5   Optical connector (field crimpable using    the pigtail at   0.2    77,000
      3.2)
3.6   Pigtail Crimping Tool                                        0.2      240
4.0   Fibre Distribution Frames/FDMS                                        300


4.1   Fibre Distribution Frames/FDMS with Splicing shelves &        1       300
      patching shelves having Fanouts for 288 Fibre
      termination and with SC-PC Connectors.
4.2   Technical,           Installation,Operation/Configuration,    1       300
      Maintenance/Repair Manuals of GPON OLT, ONT,
      Splitters and FDMS
4.3   Maintenance Spares Set consisting of complete                          30
      equipment at 4.1 including Soft copy of manuals.
5.0   RPR based LAN Switches (Optional)                                     234

5.1   LAN Switch Chassis, Power Unit and Manuals etc.               1       234
5.2   Control and Switch Unit set                                  10      2340
5.3   100 Base FX @ 1310nm                                         16      3744
5.4   10/100 Base T                                                16      3744
5.5   GE Interfaces 1000 Base T                                    16      3744
5.6   GE Interfaces 1000 Base LX @ 1550nm                          16      3744

                                                                                   105
5.7    10GE interfaces 10G @1310nm                                20     4680
5.8    Patch Cords 20 mtr length with SC connector on ODF         52    12168
       side
5.9    Patch Cords 10 mtr length with SC connector on ODF         52    12168
       side
5.10   5 dB Optical Attenuators                                   20     4680
5.11   Installation Material set                                   1      234
5.12   Wired Rack                                                  1      234
5.13   Maintenance Spares Set consisting of complete              0.1      23
       equipment from 5.1 to 5.11 including Soft copy of
       manuals.
6.0    LAN Switch Element Management System with                            2
       CORBA NBIF and SNMP/Q3 SBIF with a backup
       server (Optional)
6.1    EMS Server hardware with EMS software loadedand                      2
       cable accessories.
6.2    EMS Software and associated cables and accessories                   2
6.3    Technical,         Installation,Operation/Configuration,            12
       Maintenance/Repair Manuals set
6.4    EMS Clients to be located at all the circle POPs                    30

7.0    GPON Element Management System with CORBA                            2
       NBIF and SNMP/Q3 SBIF with a backup server
7.1    EMS Server hardware with EMS software loadedand                      2
       cable accessories.
7.2    EMS Software and associated cables and accessories                   2

7.3    Technical,         Installation,Operation/Configuration,            12
       Maintenance/Repair Manuals set


                                                                                106
7.4    EMS Clients to be located at all the circle POPs                                  30

8.0    GPON Local Craft Terminal                                                         30


8.1    Laptop Computer with GPON LCT software and                                        30
       associated cables with 3 years comprehensive
       maintenance warranty. Warranty for battery pack also for
       three years
8.2    GPON LCT Software and associated cable accessories                                33


9.0    Comprehensive Repair Charges and AMC for EMS as
       per Annexure-I and Section IV
9.1    Comprehensive Repair Charges for the equipment/PCBs Percentage                  on 3
       indicating all inclusive rates as percentage of its cost for to be quoted       year
       the quantity mentioned in the 3 Years Mtce Spares Sets at                       Mtce
       1.8, 2.6, 2.7, 2.8, 2.9, 2.10, 3.4, 4.3 and 5.13.                           spares of
                                                                                       SOR
9.2    AMC Charges, for EMS at 6.0 and 7.0, for one year after Percentage                  4
       warranty as a percentage of the cost of the EMS         to be quoted
9.3    AMC Charges, for EMS at 6.0 and 7.0, for second year         Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.4    AMC Charges, for EMS at 6.0 and 7.0, for third year          Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.5    AMC Charges, for EMS at 6.0 and 7.0, for fourth year         Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.6    AMC Charges, for EMS at 6.0 and 7.0, for fifth year after Percentage               4
       warranty as a percentage of the cost of the EMS           to be quoted
10.0   WDM Coupler                                                                      120



                                                                                               107
11.0                  EDFA amplifier for Analog TV broadcast                                                        50

12.0                  Optical Transmitter for Broadcast signal amplification                                        25




*                     Maintenance spares of the splitters

Note 1                Purchaser reserves the right to procure the additional maintenance spare
                      set in the form of cards/units/modules based on bill of material and not
                      necessarily as a full GPON Chassis
Note 2                AMC charges shall be discounted including the warrany period for the
                      purpose of discounting.
Note 3                Each Duplex ONT shall have two OLTs located on two different cards

Note 4                The bidder may supply industry standard WDM coupler, EDFA Amplifier and
                      Optical transmitter for ensuring the Analog TV broadcasting on PON
                      system. The same shall be tested during Validation of the solution.

Note:-

    1. “We hereby declare that in quoting the above prices, we have taken into account the entire credit on inputs available under the MODVAT SCHEME introduced w.e.f.
        st
       1 March 1986 and further extended on more items till date”.
    2.If Annual maintenance Contract charges are required to be quoted as per SOR, basic charges should be shown in column-4B & the service tax in column 11 & 13.
     3.“We hereby certify that E.D/Customs Tariff Head shown in column 18 are correct & CENVAT Credit for the amount shown in column 13 above are admissible as
         per      CENVAT Credit Rules 2004”.
    4.The bidder shall quote separately for hardware and software as per special conditions of the contract.
     5.The bidder submitted the offer with concessional E.D/sales tax shall submit the proof of applicable concessional ED/Sales Tax




                                                                                                                                                                 108
                                                                                                                                           SECTION VII
                                                                                                                                             PART II
                                                                                                                              Price Schedule for Imported Equipment
                                                                                                                                                (B)




                                                                                                                                                                                                                                                   Duties & Taxes CENVAT-able on unit


                                                                                                                                                                                                                                                                                        Unit Price excluding Duties & Taxes
                                                                                                                                                                                                       Price per Unit for site (all inclusive)




                                                                                                                                                                                                                                                                                        Total Price Inclusive of all levies &
                                                                                                                                                                                                                                                                                         charges excluding Duties & Taxes
                                             Ex-factory Price (Basic Unit Price
                                             exclusive of all levies & charges)




                                                                                                                                                                                                                                                                                                                                                    Total discounted price excluding
                                                                                                                                                                 Other levies & charges, if any




                                                                                                                                                                                                                                                                                                                                                     Duties & Taxes CENVAT-able
                                                                                                            Custom Duty   Sales Tax           Pkg & Inland




                                                                                                                                                                                                                                                                                                                                Discount offered,
        Item description




                                                                                                                                                                                                                 (4B+6+8+10+11)




                                                                                                                                                                                                                                                                                                    CENVAT able
                                                                                                                                                freight
                               Total Qty..




                                                                                                                                                                                                                                                                                                       (12-13)




                                                                                                                                                                                                                                                                                                                                                                                                       (15-16)
                                                                                                                                                                                                                                                                                                                                     if any
                                                                                                                                                                                                                                                                                                       (3X14)
                                                                                                                                                                                                                                                                  price
                                                                                  Unit price per Unit CIF




                                                                                                                                                                                                                                                                                                                                                                                       Customs Tariff Head
Sl.
No.
                                                                                                            %       Amt   %       Amt        %         Amt


 1                         2         3          4A                                     4B                       5    6    7         8         9         10                                  11                        12                               13                                14                    15                 16                    17                             18



      Sl. No.                                                                                                 DESCRIPTION                                    Quantity/                                                      Total
                                                                                                                                                              GPON                                                         Quantit
                                                                                                                                                              Chassis                                                        y
      1.0                      Managed Duplex GPON system with single Fibre                                                                                                                                                                       1200

      1.1                      Managed GPON equipment Chassis with single Fibre,                                                                                                                   1                                              1200
                               Duplex OLT, Switch units, Control units, Power Unit and
                               Manuals etc.
      1.2                      Duplex OLTs                                                                                                                                                        10                                             12000
      1.3                      Patch Cords 20 mtr length with SC connector on ODF                                                                                                                 10                                             12000
                               side
      1.4                      Patch Cords 10 mtr length with SC connector on ODF                                                                                                                 10                                             12000
                               side
      1.5                      5 dB Optical Attenuators                                                                                                                                           10                                             12000

                                                                                                                                                                                                                                                                                                                                                                                                                 109
1.6    Installation Material set                                    1      1200
1.7    Wired Rack with alarm & power panel on racktop               1      1200
1.8    Maintenance Spares Set consisting           of complete     0.1      120
       equipment from 1.1 to 1.6 including         Soft copy of
       manuals.
2.0     Indoor Splitters                                                  66000

2.1    2:4 ratio splitter (ETSI rack mountable)                     4      4800
2.2    2:4 ratio splitter Wall mountable                            4      4800
2.3    2:32 ratio splitter Wall mountable                           3      3600
2.4    1:8 ratio splitter Wall mountable                           32     38400
2.5    1:16 ratio splitter Wall mountable                           5      6000
2.6    2:4 ratio splitter (ETSI rack mountable)*                    1      1200
2.7    2:4 ratio splitter Wall mountable*                           1      1200
2.8    1:8 ratio splitter Wall mountable*                           3      3600
2.9    2:32 ratio splitter Wall mountable*                          1      1200
2.10   1:16 ratio splitter Wall mountable*                          1      1200
2.11   Optical Patch cords with SC-PC connector on ODF side,       20     24000
       10mtr length
2.12   Optical Patch cords with FC-PC connector on ODF side,       10     12000
       10mtr length
2.13   Optical Patch cords with suitable connector on coupler      20     24000
       side, 10mtr length
2.14   Optical Pigtails with suitable connector on coupler side,   20     24000
       10mtr length
3.0    H-ONT - Single Fibre, Wallmountable, 2 POTs and 4                 385,000
       Ethernet ports
3.1    ONTs with Battery backup (4 Hours)                           1    385,000


                                                                                   110
3.2   Pigtail with G.657 standard fibre (bend insensitive fibre)    1    385,000
      100 mtr length with no connector
3.3   Optical connector (field crimpable using    the pigtail at    2    770,000
      3.2)
3.4   Maintenance Spares Set consisting          of complete       0.1    38,500
      equipment from 3.1 to 3.2 including        Soft copy of
      manuals.
3.5   Optical connector (field crimpable using    the pigtail at   0.2    77,000
      3.2)
3.6   Pigtail Crimping Tool                                        0.2      240

4.0   Fibre Distribution Frames/FDMS                                        300


4.1   Fibre Distribution Frames/FDMS with Splicing shelves &        1       300
      patching shelves having Fanouts for 288 Fibre
      termination and with SC-PC Connectors.
4.2   Technical,           Installation,Operation/Configuration,    1       300
      Maintenance/Repair Manuals of GPON OLT, ONT,
      Splitters and FDMS
4.3   Maintenance Spares Set consisting of complete                          30
      equipment at 4.1 including Soft copy of manuals.
5.0   RPR based LAN Switches (Optional)                                     234

5.1   LAN Switch Chassis, Power Unit and Manuals etc.               1       234
5.2   Control and Switch Unit set                                  10      2340
5.3   100 Base FX @ 1310nm                                         16      3744
5.4   10/100 Base T                                                16      3744
5.5   GE Interfaces 1000 Base T                                    16      3744
5.6   GE Interfaces 1000 Base LX @ 1550nm                          16      3744
5.7   10GE interfaces 10G @1310nm                                  20      4680

                                                                                   111
5.8    Patch Cords 20 mtr length with SC connector on ODF         52    12168
       side
5.9    Patch Cords 10 mtr length with SC connector on ODF         52    12168
       side
5.10   5 dB Optical Attenuators                                   20     4680
5.11   Installation Material set                                   1      234
5.12   Wired Rack                                                  1      234
5.13   Maintenance Spares Set consisting of complete              0.1      23
       equipment from 5.1 to 5.11 including Soft copy of
       manuals.
6.0    LAN Switch Element Management System with                            2
       CORBA NBIF and SNMP/Q3 SBIF with a backup
       server (Optional)
6.1    EMS Server hardware with EMS software loadedand                      2
       cable accessories.
6.2    EMS Software and associated cables and accessories                   2
6.3    Technical,         Installation,Operation/Configuration,            12
       Maintenance/Repair Manuals set
6.4    EMS Clients to be located at all the circle POPs                    30

7.0    GPON Element Management System with CORBA                            2
       NBIF and SNMP/Q3 SBIF with a backup server
7.1    EMS Server hardware with EMS software loadedand                      2
       cable accessories.
7.2    EMS Software and associated cables and accessories                   2

7.3    Technical,         Installation,Operation/Configuration,            12
       Maintenance/Repair Manuals set
7.4    EMS Clients to be located at all the circle POPs                    30


                                                                                112
8.0    GPON Local Craft Terminal                                                         30


8.1    Laptop Computer with GPON LCT software and                                        30
       associated cables with 3 years comprehensive
       maintenance warranty. Warranty for battery pack also for
       three years
8.2    GPON LCT Software and associated cable accessories                                33


9.0    Comprehensive Repair Charges and AMC for EMS as
       per Annexure-I and Section IV
9.1    Comprehensive Repair Charges for the equipment/PCBs Percentage                  on 3
       indicating all inclusive rates as percentage of its cost for to be quoted       year
       the quantity mentioned in the 3 Years Mtce Spares Sets at                       Mtce
       1.8, 2.6, 2.7, 2.8, 2.9, 2.10, 3.4, 4.3 and 5.13.                           spares of
                                                                                       SOR
9.2    AMC Charges, for EMS at 6.0 and 7.0, for one year after Percentage                  4
       warranty as a percentage of the cost of the EMS         to be quoted
9.3    AMC Charges, for EMS at 6.0 and 7.0, for second year         Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.4    AMC Charges, for EMS at 6.0 and 7.0, for third year          Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.5    AMC Charges, for EMS at 6.0 and 7.0, for fourth year         Percentage            4
       after warranty as a percentage of the cost of the EMS       to be quoted
9.6    AMC Charges, for EMS at 6.0 and 7.0, for fifth year after Percentage               4
       warranty as a percentage of the cost of the EMS           to be quoted
10.0   WDM Coupler                                                                      120

11.0   EDFA amplifier for Analog TV broadcast                                            50



                                                                                               113
12.0                  Optical Transmitter for Broadcast signal amplification                                        25




*                     Maintenance spares of the splitters

Note 1                Purchaser reserves the right to procure the additional maintenance spare
                      set in the form of cards/units/modules based on bill of material and not
                      necessarily as a full GPON Chassis
Note 2                AMC charges shall be discounted including the warrany period for the
                      purpose of discounting.
Note 3                Each Duplex ONT shall have two OLTs located on two different cards

Note 4                The bidder may supply industry standard WDM coupler, EDFA Amplifier and
                      Optical transmitter for ensuring the Analog TV broadcasting on PON
                      system. The same shall be tested during Validation of the solution.

Note:-

    1. “We hereby declare that in quoting the above prices, we have taken into account the entire credit on inputs available under the MODVAT SCHEME introduced w.e.f.
        st
       1 March 1986 and further extended on more items till date”.
    2.If Annual maintenance Contract charges are required to be quoted as per SOR, basic charges should be shown in column-4B & the service tax in column 11 & 13.
     3.“We hereby certify that E.D/Customs Tariff Head shown in column 18 are correct & CENVAT Credit for the amount shown in column 13 above are admissible as
         per      CENVAT Credit Rules 2004”.
    4.The bidder shall quote separately for hardware and software as per special conditions of the contract.
     5.The bidder submitted the offer with concessional E.D/sales tax shall submit the proof of applicable concessional ED/Sales Tax




                                                                                                                                                                 114
                                                     SECTION VIII

                                                BID SECURITY FORM

Whereas .................................. (hereinafter called “the Bidder”) has submitted its bid dated............for the

supply of ........................ vide Tender No. MM/TX/032008/000352 dated 14.03.2008 KNOW ALL MEN

by these presents that WE ....................... OF .................... having our registered office at

.................(hereinafter called “the Bank”) are bound unto Bharat Sanchar Nigam Limited (hereinafter

called “the Purchaser”) in the sum of Rs.................... for which payment will and truly to be made of the

said Purchaser, the Bank binds itself, its successors and assigns by these present.


THE CONDITIONS of the obligation are :

1.      If the Bidder withdraws his bid during the period of bid validity specified by the Bidder on the Bid
        form or

2.      If the Bidder, having been notified of the acceptance of his bid by the Purchaser during the period
        of bid validity

        (a)      fails or refuses to execute the Contract, if required; or

        (b) fails or refuses to furnish the Performance Security, in accordance with
            the instructions to Bidders.
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand,

without the purchaser having to substantiate its demand, provided that in its demand, the purchaser will

note that the amount claimed by it is due to it owning to the occurrence of one or both of the two

conditions, specifying the occurred condition or conditions.

This guarantee will remain in force as specified in clauses 12 and 28.2 of section II of the Bid Document
upto and including THIRTY (30) days after the Period of bid validity and any demand in respect thereof
should reach the Bank not later than the specified date/dates.

                                                                     Signature of the Bank Authority.

                                                                        Name

                                                                        Signed in Capacity of

Name & Signature of witness                                            Full address of Branch

Address of witness                                                      Tel No. of Branch
                                                                        Fax No. of Branch

                                                                                                                       115
                                               SECTION IX

                           PERFORMANCE SECURITY GUARANTEE BOND

In consideration of the CMD, BSNL (hereinafter called „BSNL‟) having agreed to exempt
___________________ (hereinafter called „the said contractor(s)‟) from the demand under the terms and
conditions of an agreement/Advance Purchase Order No ________________ dated ____________
made        between _____________________ and __________________ for the supply of
_______________________ (hereinafter called “the said agreement ”), of security deposit for the due
fulfillment by the said contractor (s) of the terms and conditions contained in the said Agreement, on
production of the bank guarantee for _____________________________________we, (name of the
bank) _________________________ ( hereinafter refer to as “the bank”) at the request of
___________________________________ (contractor(s)) do hereby undertake to pay to the BSNL an
amount not exceeding ___________________ against any loss or damage caused to or suffered or
would be caused to or suffered by BSNL by reason of any breach by the said Contractor(s) of any of the
terms or conditions contained in the said Agreement.

2.        We (name of the bank) ____________________ do hereby undertake to pay the amounts due
and payable under this guarantee without any demure, merely on a demand from the BSNL by reason of
breach by the said contractor(s)‟ of any of the terms or conditions contained in the said Agreement or by
reason of the contractors(s)‟ failure to perform the said Agreement. Any such demand made on the bank
shall be conclusive as regards the amount due and payable by the Bank under this guarantee where the
decision of BSNL in these counts shall be final and binding on the bank. However, our liability under this
guarantee shall be restricted to an amount not exceeding ___________________________________.

3.         We under take to pay to the BSNL any money so demanded notwithstanding any dispute or
disputes raised by the contractor(s)/supplier(s) in any suit or proceeding pending before any court or
tribunal relating thereto our liability under this present being absolute and unequivocal. The payment so
made by us under this bond shall be valid discharge of our liability for payment there under and the
contractor(s)/supplier(s) shall have no claim against us for making such payment.

4.        We( name of the bank)_________________________ further agree that the guarantee herein
contained shall remain in full force and effect during the period that would be taken for the performance
of the said agreement and that it shall continue to be enforceable till all the dues of the BSNL under or by
virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till
________________________(office/Department) BSNL certifies that the terms and conditions of the
said Agreement have been fully or properly carried out by the said contractor(s) and accordingly
discharges this guarantee. Unless a demand or claim under this guarantee is made on us in writing on or
before the expiry of TWO/TWO AND HALF/THREE YEARS (as specified in P.O) from the date hereof,
we shall be discharged from all liabilities under this guarantee thereafter.

5. We (name of the bank)_________________________ further agree with the BSNL that the BSNL
shall have the fullest liberty without our consent and without affecting in any manner our obligations
hereunder to vary any of the terms and conditions of the said Agreement or to extend time of
performance by the said contractor(s) from time to time or to postpone for any time or from time to time
any of the powers exercisable by the BSNL against the said Contractor(s) and to forbear or enforce any
of the terms and conditions relating to the said agreement and we shall not be relieved from our liability
by reason of any such variation, or extension being granted to the said Contractor(s) or for any
forbearance, act or omission on the part of the BSNL or any indulgence by the BSNL to the said
Contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would,
but for this provision, have effect of so relieving us.

6.   This guarantee will not be discharged due to the change in the constitution of the
     Bank or the Contractor(s)/supplier(s).
                                                                                                        116
7.   We (name of the bank) ____________________ lastly undertake not to revoke this
     guarantee during its currency except with the previous consent of the BSNL in writing.


                                                  Dated the ________________ day of _______

                                                   for __________________________________
                                                                   (indicate the name of bank)




                                                                                          117
                                              SECTION X

                   LETTER OF AUTHORISATION FOR ATTENDING BID OPENING
                        ( To reach Jt DDG (MMT) before date of bid opening )


To

       The Jt DDG (MMT),
       Bharat Sanchar Nigam Limited,
       (Corporate Office),
       2nd Floor, Bharat Sanchar Bhawan,
       Janpath, New Delhi – 110 001

Subject : Authorisation for attending bid opening on ________________________________(date) in the
        Tender of _________________________________________________________.


       Following persons are hereby authorised to attend the bid opening for the tender mentioned
above on behalf of ______________________________________________ (Bidder) in order of
preference given below.


Order of Preference          Name                                 Specimen Signatures

I.

II.

Alternate
Representative


Signatures of bidder
            Or
Officer authorized to sign the bid
Documents on behalf of the bidder.

Note : 1. Maximum of two representatives will be permitted to attend bid opening. In cases where it is
          restricted to one, first preference will be allowed. Alternate representative will be permitted
          when regular representatives are not able to attend.

       2. Permission for entry to the hall where bids are opened, may be refused in case authorization
          as prescribed above is not recovered.
                                                   ******




                                                                                                     118
                                              Appendix-A
              Model Amendment Letter Intimating Conditions for Extension of Delivery Period


                                                                                                       Registered Acknowledgement Due

                                                                                                                          Address of the purchaser
                                                                                                                           --------------------------------
                                                                                                                           --------------------------------
                                                                                                                           --------------------------------
To
M/s ………………………………..
………………………………………

Sub : This office contract no………….. dated …………. placed on you for supply of ………………

Ref : Your letter no……………………………… dated ……………….


You have failed to deliver the goods/ entire quantity of the goods/ execution/ installation/ commissioning
of the entire project within the contract delivery period/ delivery period as agreed schedule or last
extended up to ______________. In your above referred letter, you have asked for extension/ further
extension of time for delivery/ execution/ installation/ commissioning. In view of the circumstances stated
in your above referred letter, the time of delivery can be extended from _______ (original/ last delivery
period) to ____________ (presently agreed delivery period) subject to your unconditional acceptance of
the following terms and conditions:

1.   That, liquidated damages shall be levied in accordance with agreed clause 16.2 Section III of terms and conditions of the tender/ PO.

2.   That, notwithstanding any stipulation in the contract for increase in price on any ground, no such increase, whatsoever, which takes place after zzz shall
     be admissible on such of the said goods as are delivered after the said date as per clause 12 Section III.


3.   That, the prices during this extended delivery period shall be provisional and shall be governed as per agreed clauses 12 and 24 of Section III and shall be
     finalized in accordance with the current PO price or the current PO price with latest budget/ duty impact or the prices in the new tender (T.E. no.
     ………..) from the date of its opening, on whichever is lower basis.


4.   An additional BG of Rs. _________in accordance with clause 15.3, Section III of the contract with validity upto _______.


5.   An undertaking as required vide clause 24, Section III.
   Please intimate your unconditional acceptance of this letter alongwith the additional BG within ten
days of the issue of this letter failing which the contract will be cancelled at your risk and expense without
any further reference to you. This letter shall form part and parcel of the agreement/ contract/ APO/ PO
and all other terms & conditions of the contract remain unaltered.

                                                                                                                                  Yours faithfully,
                                                                                                                            (………………………)
                                                                                                                      for and on behalf of………..

zzz Original delivery date or the last extended/ re-fixed delivery period (as the case may be)
NB : The entries which are not applicable for the case under consideration are to be deleted.




                                                                                                                                                           119
                                          Appendix-B
                      Model Amendment Letter for Extension of Delivery Period


                                                                      Registered Acknowledgement Due

                                                                                  Address of the purchaser
                                                                                   --------------------------------
                                                                                   --------------------------------
M/s ………………………………..
………………………………………

Sub : This office contract no………….. dated …………. placed on you for supply of ………………

Ref :   1. Your letter no……………………………… dated ………………. requesting DP extension
        2. This office letter no. ……………… dated ……… intimating conditions for DP extension
        3. Your letter no………………….. dated …………. accepting the conditions for DP extension

You have failed to deliver the goods/ entire quantity of the goods/ execution/ installation/ commissioning
of the entire project within the contract delivery period/ delivery period as agreed schedule or last
extended up to ______________. In your above letter under reference (1), you have asked for
extension/ further extension of time for delivery/ execution/ installation/ commissioning. The terms and
conditions for extension of delivery period were conveyed to you vide this office letter under reference
(2). In view of the circumstances stated in your above referred letter, and upon your unconditional
acceptance of the terms and conditions of this extension vide your letter under reference (3), the time of
delivery is hereby extended from _______ (last delivery period) to ____________ (presently agreed
delivery period) on the terms and conditions in letter under reference (2) above and agreed by you vide
letter under reference (3) i.e.:

(a) Liquidated damages shall be levied in accordance with agreed clause 16.2 Section III of terms and
    conditions of the tender/ PO.
(b) Notwithstanding any stipulation in the contract for increase in price on any ground, no such increase,
    whatsoever, which takes place after zzz shall be admissible on such of the said goods as are
    delivered after the said date as per clause 12 Section III.
(c) The prices during this extended delivery period shall be provisional and shall be governed as per
    clauses 12 and 24 of Section III and shall be finalized in accordance with current PO price or the
    current PO price with latest budget/ duty impact or the prices in the new tender (T.E. no. ………..)
    from the date of its opening, on whichever is lower basis.

The letters under reference above and this letter shall form part and parcel of agreement/ contract/ APO/
PO and all other terms & conditions of the contract remain unaltered.

                                                                                            Yours faithfully,
                                                                                      (………………………)
                                                                                for and on behalf of………..
Copy to :
…………………..
…………………..
…………………..
(All concerned)
zzz Original delivery date or the last unconditionally re-fixed delivery date (as the case may be)
NB : The entries which are not applicable for the case under consideration are to be deleted.


                                                                                                              120
THE END




          121

				