                                   SECTION 13038
                           UG-1 CLEANROOM CEILING GRID


            Grid
            Blanks
            Lights

PART 1 - GENERAL

1.1     SUMMARY

        A.    Section includes design, materials, hardware, installation, supervision and
              testing, complete in all aspects necessary for installation of a laminar flow
              ceiling grid.

1.2     QUALITY ASSURANCE

        A.    Performance: The resultant ceiling grid shall be capable of providing
              cleanroom class conditions indicated for the specific area installed, support
              all live loads, dead loads, and hanging loads as indicated.

1.3     SUBMITTALS

        A.    Product data: Submit manufacturer's published specifications,
              recommendations and installation instructions for intended use.

        B.    Shop drawings shall be prepared by the ceiling system manufacturer. Show
              details of all finished work as indicated on drawings including the following
              items: attachments, anchors, reinforcements, assemblies and closing
              connections between members and with adjacent construction; location of
              all joints, joinery techniques and materials, fastening and sealing methods;
              and sealant materials and sealant systems. Identify all materials, including
              metal alloys, fasteners, all shop and field sealants by product name and
              locate on shop drawings. Shop drawings shall include instructions and
              explanatory details for sequence of installation of all materials. Show
              relative layout of all adjacent construction, all correctly dimensioned.
              Provide isometric or other drawings which explain or define certain
              interconnections when requested by the Architect.

              1.      Special requirement: Each ULPA filter framing system and framing
                      system hanger for cleanroom ceilings shall be capable of carrying a
F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 1 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96


                      working load of 220 lbs. at any point along the ceiling grid, a live
                      load of 15 lbs./sq. ft. and a system dead load of 12 lbs./sq. ft.

                      Design working loads, minimum ultimate loads (yield), deflection
                      and permanent set at working loads shall be as shown below for
                      components or assemblies:

                                         Design        Min.
                      Component/         Working       Ultimate       Deflection/Set
                      Assembly           Load          Load (Yld.)    (Working Load)

                      Lower rod to   800 lbs.          3,600 lbs.     .0310”/.0000"
                      tee connection

                      Cross to main      800 lbs.      3,600 lbs.     .0480”/.0100"
                      tee (load at
                      cross tee)

                      Tee profile     220 lbs.         1,800 lbs.     .0630”/.0000"
                      4'’-0” span
                      (load mid-span)

                      Tee profile     220 lbs.         1,600 lbs.     .0600”/.0000"
                      4'’-0” span
                      spliced,
                      (load mid-span)

                      Utility clip       220 lbs.      3,600 lbs.     .0000”/.0000"

                      Provide laboratory test reports on load testing and ultimate loading
                      of component assemblies. Submit calculations certified by a
                      registered structural engineer.

        C.    Samples: Submit samples of each material and finish. Identify production
              processes and materials on each sample. Finish samples for all materials
              should be submitted in sets which shall include a minimum of two samples
              which show extreme dark and light color range for each finish. Color range
              and textures of production material shall conform to reviewed range
              samples.
        D.    Mock up: Provide a representative mock-up with a minimum of 2 pieces of
              each component assembled per manufacturer's instructions with all
              applicable grid accessories.
F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 2 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96




1.4     TRANSPORTATION AND PROTECTION

        A.    Grid:

              1.      Main tee components shall be pre-assembled prior to shipping. Pack
                      tees in manufacturer's standard molded packing blocks, skid and
                      shrink wrap bundles for shipping.

              2.      All cross tees to be packed in manufacturer's standard molded
                      packing blocks, skid and shrink wrap bundles for shipping.

              3.      Components, crossovers, splices, hold down clips, etc., shall be
                      boxed and shrink wrapped for shipping.

1.5     SPECIAL PACKAGING (Specify as required)

1.6     TESTING (Grid)

        A.    Provide manufacturers testing data stating that grid system and components
              meet all working loads, ultimate loads, and deflection and permanent set
              requirements as set forth in 1.3.B.1

1.7     SUPERVISION

        A.    Factory representative shall supervise entire cleanroom ceiling installation.

1.8     MAINTENANCE STOCK

        A.    Provide       extra main tees;        extra 4' and 2' cross tees;        extra
              splices and crossovers;        extra filter hold down clips;          extra
              blank hold down clips.




PART 2 - PRODUCTS

2.1     FRAMING SYSTEM

F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 3 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                   Rev. #1; 04/19/96


        A.    UG-1 inverted T-grid system as manufactured by F.H. Chase, Inc., 120
              Forbes Boulevard, Mansfield, MA 02048-1150. All tee members and
              components shall be extruded aluminum 6063-T5. All components shall be
              fabricated and/or machined to specified lengths and tolerances prior to
              anodizing.

              1.      System design allows for grid suspension points @ 4'-0" o.c. along
                      main tee. Each suspension point along main tee shall be with a 3/8"
                      dia. x 1/2" stainless steel cross dowel nut inserted thru the tee
                      section. The cross dowel nut accepts a 1/4" dia. threaded stainless
                      steel rod. Load bearing shall not be dependent on extruded
                      aluminum screw slot. The ultimate load capacity of each suspension
                      point shall be 3,600 lbs.

              2.      Cope each end of cross tee component for direct bearing of cross tee
                      members on main tee.

              3.      Components:

                      a.      Main tee: 2 1/2" deep x 2" wide lower flange in profile as
                              shown. Top portion shall provide a continuous screw slot for
                              assembly and component attachments. Lower portion shall
                              provide continuous slots for utility component attachments.
                              Hanger points shall incorporate cross dowel inserts with
                              factory assembled lower hanging components and splice
                              assemblies. Overall length shall be 12'-0" with tolerances +
                              .000", - .010" (or length as shown on drawings).

                      b.      Cross tee: Same profile as main tee with ends coped to
                              provide full bearing on main tees. Nominal lengths: 8'-0", 4'-
                              0", 3'-0”, 2'-0" (or as shown) on drawings. Length tolerances
                              shall be + .000", - .010".

                      c.      Perimeter components: Half tee or three quarter tee profile
                              with telescoping wall molding insert and retaining clip as
                              detailed; full tee profile with flush extrusion filler as detailed;
                              or full tee profile with retaining clips as detailed.

                      d.      Closures: Column enclosure frames shall be extruded
                              aluminum profiles to provide a flat surface in line with the
                              exposed lower face of the tee, and shop fabricated prior to
                              anodizing.
F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                             Section 13038
Fax:    (508) 339-3306                                                     Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                           Page 4 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96




                      e.      Sprinkler pans (100% filter areas): Extruded aluminum
                              profiles to provide a flat surface in line with the exposed
                              lower face of the tee, shop fabricated and punched for      dia.
                              sprinkler head prior to anodizing.

                      f.      Assembly components:

                              1.       Crossover: At intersection of cross tee to main, an 8"
                                       long extruded member which mates with the upper
                                       profile of the tee members shall be fully bolted in
                                       place. Member shall contain a machined notch to
                                       capture the main tee and, when fully engaged, shall be
                                       capable of eliminating any lateral or torsional
                                       movements of the assembled joint. Where cross tees
                                       are not continuous, provide a half crossover.

                              2.       Splices: At ends of main tees, provide a fully bolted
                                       splice assembly capable of developing the loading
                                       requirements of the system.

                              3.       All assembly components are to be 6063-T5
                                       aluminum, anodized after fabrication.

                      g.      Clamping components: Provide filter and blank hold down
                              clip assemblies designated to secure filter units, blank panels
                              and flow thru lighting modules within the grid system.

                              1.       Filter clips (minimum 4 per filter module) shall be
                                       fabricated to interface with the grid components and
                                       filter frame to prevent lateral movement and to seat
                                       when filter gasket is compressed to 50%. Clips shall
                                       be spring loaded to allow for tee deflection.

                              2.       Blank panel clips (minimum 4 per blank panel) shall
                                       be fabricated to interface with the grid components
                                       and blank panel to prevent lateral movement and to
                                       seat when the blank panel gasket material is
                                       compressed to 50%. Clips shall be spring loaded to
                                       allow for tee deflection.


F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 5 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96


                              3.       Flow thru lighting fixtures/filter assemblies shall be
                                       clamped utilizing an anodized aluminum yoke
                                       assembly at each end of the fixture, spring loaded and
                                       attached to the upper tee screw slots

                              4.       All aluminum clamping components shall be
                                       anodized after fabrication.

        B.    Utility components: Shall be provided to interface within the inverted T-
              grid lower attachment slots. All utility components shall be fabricated of
              aluminum and anodized after machining and fabrication.

              1.      Utility clip: 4" long sliding dovetail locking clip with 2 each
                      stainless steel fasteners and 3/8" dia. hole (to accept hanging device
                      by others).

              2.      Access clip: 3" aluminum sliding dovetail locking clip with 2 each
                      stainless steel fasteners, stainless locking plate, bolt and plastic
                      thumb screw. Provide 4 each clip assemblies at each access panel.

              3.      Light mounting clip: 5" aluminum sliding dovetail light clip with 2
                      each stainless steel fasteners fabricated to accept surface mounted
                      light fixture.

              4.      Partition clip: 4" wide extruded aluminum clip anchors to side slot
                      of tee. Secures to each side of partition head track. Notched partition
                      clip occurs at areas of grid intersection.

        C.    Finish: All aluminum components to be clear anodized after fabrication,
              prior to assembly; exposed components @ R204-R1, 8 min. etch.; assembly
              components (top side hardware) @ R204-R1, lite etch.

        D.    Fasteners:

              1.      All assembly fasteners shall be ¼”-20 full thread hex washer head
                      machine bolts, zinc plated, Grade 2, unless noted.
              2.      Turnbuckle body 3/8”-16 shall be forged steel, zinc plated or
                      galvanized.

              3.      Lower threaded rod with integral upper stop and locking nuts shall
                      be ¼”-20 stainless steel.

F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 6 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96


              4.      Cross dowel nuts shall be 3/8" dia. x 1/2" with ¼”-20 to internal
                      thread, stainless steel.

              5.      Robotic/utility clip fasteners shall be 10-24 x 5/8” flat head socket
                      cap screw, stainless steel, 2/clip.

              6.      Self tapping machine bolts or thread forming screws are not
                      acceptable.

        E.    Plenum dividers: Provide air-tight plenum dividers above ceiling grid (top
              of tee to underside of deck, etc.) as shown on drawings. Provide extruded
              aluminum plenum adapter to interface with ceiling tee properly notched to
              accommodate all splices, hangers, hold down clips, etc.

        F.    Leveling: Overall ceiling shall be level within +/-0.10" and shall be within
              +/-0.062" in 10'-0".

2.2     SOLID OR BLANK-OUT CEILING PANELS

        A.    Provide blanks, pre-fabricated of sizes shown on drawings, manufactured by
              __________________, gasketed prior to installation.

              1.      Overall thickness shall be constructed of .032" aluminum face and
                      backer sheet laminated          .

              2.      Finish shall be            .

              3.      Gasket shall be shop applied with staggered saw tooth mitered
                      corners.

              4.      Sprinkler blanks at core areas - nominal 24" x 48" shall be factory
                      punched in locations shown on drawings. Dia. to be coordinated
                      with sprinkler drop.


2.3     FIXTURES (FLOW THRU)

        A.    Lighting fixture to be flow thru type suitable for mounting in custom grid
              profiles and accepting nominal 24" x 42" long filter terminal unit to provide
              a clamped unitized gasketed assembly.


F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 7 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                Rev. #1; 04/19/96


              1.      Fixture to accept four 4'-0" 40 watt/277 volt lamps with shields.
                      Wired and switched as single unit.

                      Lamps and shields to be provided by others under Section              .

              2.      Fluorescent ballasts are to be mounted within a ballast
                      cover/enclosure along the 48" dimension of the fixture, accessible
                      and serviceable from the downstream (room side) of the fixture.

                      a.      Ballasts shall be high frequency Triad-Utrad #B-240R277 or
                              equal.

              3.      Fixture to be shop wired to external connector (reloc Lithonia:
                      MSR). Connector to be provided by electrical contractor to fixture
                      manufacturer. All penetrations shall be air tight.

              4.      All components shall be UL listed.

              5.      Lens shall be 1/2" cube egg-crate acrylic, sized to fixture and
                      contained within a removable anodized aluminum lens frame.

                      a.      Lens finish to be "White" acrylic.

              6.      All power, final wiring of light fixtures to be by others. Refer to
                      Section          .

        B.    Lamps: Refer to Electrical Fixture Schedule.

2.4     GASKET/SEALANTS

        A.    Gasket 1/4" x 3/8" pressure sensitive one-side, applied with staggered saw
              tooth mitered corners to filters, blank panels and flow thru lighting fixtures.



              1.      Color: Gray

              2.      Material: Gray "poly-B"

        B.    Caulking shall be Dow Corning #732 clear/aluminum and applied as
              follows:

F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                           Section 13038
Fax:    (508) 339-3306                                                   Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                         Page 8 of 9
File: 981a621f-6bb0-4590-957e-7f806feeeaef.doc                                   Rev. #1; 04/19/96


              1.      In conjunction with tape sealants as shown on drawings at (wall)
                      perimeter and other vertical intersections.

              2.      Grid assembly: Intersection of cross tees to main tee or wall details
                      will receive a bedding of #732 on the upstream sections of the joints.

                      Excess will be wiped flush or removed with razor tool prior to
                      installation of filters or blanks.

        C.    Garlite inserts shall be installed in tee slots (robotics groove) at all
              intersections.

PART 3 - EXECUTION

3.1     INSTALLATION

        A.    General: Install cleanroom ceiling system and light fixtures in accordance
              with manufacturer's published installation instructions.

        B.    Tolerances: Overall ceiling shall be level within +/-0.10". and shall be level
              within +/- 0.062" in 10'-0".

        C.    The interface of the framing system at the perimeter walls shall provide a
              finished, architecturally integrated appearance.

                   END - SECTION 13038 - CLEANROOM CEILING GRID




F.H. Chase, Inc.
120 Forbes Boulevard
Mansfield, MA 02048-1150
U.S.A.
Tel:    (508) 339-3309                                                             Section 13038
Fax:    (508) 339-3306                                                     Cleanroom Ceiling Grid
E-Mail: FHCI@FHCHASEINC.COM                                                           Page 9 of 9

								
To top