Docstoc

Circuit Board Yield Report Template - Excel

Document Sample
Circuit Board Yield Report Template - Excel Powered By Docstoc
					                                                          INVENTORY OF PRODUCTIVITY ENHANCING PROGRAMS/TECHNOLOGIES


a)                                b)                                 c)                                  d)                                      e)                               f)
 Title and brief description of       Results/Impact of the
                                                                                                         Key Players/Implementors/
          Productivity             Productivity Program/                       Broker/Agent                                                           Potential Beneficiary            Issues/Problems
                                                                                                              Expertise/Champions
      Program/Technology                  Technology

AGRI-BUSINESS

   Multi-Crop Solar Dryer                                                 Department of Science &             Philippine Council for             This technology was
           (MCSD)                 The MCSD is already                       Technology (DOST)              Industry & Energy Research            envisioned to be transferred
                                  available for commercial use.                                             & Development (PCIERD)               to the 19 depressed
                                  It is best suited for upland and                                       DL: 837-2926/837-2935                   provinces. The Multi-Crop
This is a farm technology that    lowland farming communities.                                           TL: 837-2071 to 81 loc. 2120            Solar Dryer (MCSD) was
can dry crops even during the                                                                            Fax: 837-2925                           initially set up in 1) Batac,
rainy season. The roof and                                                                               E-mail: pcierd@dost.gov.ph              Ilocos Norter, 2) Sanchez
walls of the drying chamber                                                                              Website:                                Mira, Cagayan, 3) Abra and 4)
serve as the solar collectors.                                                                           http://www.pcierd.dost.gov.ph           Maydalong, Eastern Samar
It has a built-in auxilliary                                                                                                                     for drying different crops and
heating system which uses                                                                                Eight (8) demonstration units           products.
fuel wood or other fuels for                                                                             have been set up by the
continuous drying.                                                                                       DOST Regional Offices, Local
                                                                                                         Government Units (LGUs) of
                                                                                                         various municipalities and
                                                                                                         private firms in Regions 2 and
                                                                                                         9.




                                                                                                          Page 1 of 10
                                                                                    c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                                   Consolidated_new format
a)                                b)                                c)                                  d)                                      e)                              f)
 Title and brief description of       Results/Impact of the
                                                                                                        Key Players/Implementors/
          Productivity             Productivity Program/                      Broker/Agent                                                           Potential Beneficiary           Issues/Problems
                                                                                                             Expertise/Champions
      Program/Technology                  Technology
CONSTRUCTION
MATERIALS

                                  The results of this project led        Department of Science &             Philippine Council for
  Prefabricated Structural        to the development of the                Technology (DOST)              Industry & Energy Research
   Panels and Pavement            prefabricated structural                                                 & Development (PCIERD)
     Blocks from Lahar            panels and paving blocks.                                             DL: 837-2926/837-2935
                                                                                                        TL: 837-2071 to 81 loc. 2120
This project developed an                                                                               Fax: 837-2925
appropriate mix utilizing                                                                               E-mail: pcierd@dost.gov.ph
Pinatubo lahar materials and                                                                            Website:
Portland cement for                                                                                     http://www.pcierd.dost.gov.ph
prefabricated panels,
pavement blocks and soil
erosion control structures.


 Production of Composite          The project responds to the            Department of Science &             Philippine Council for             Out of 14 established Cement-
  Panels from Sugarcane           problem of scarcity of panel             Technology (DOST)              Industry & Energy Research            Bonded Board (CBB) plants in
         Bagasse                  products.                                                                & Development (PCIERD)               the Philippines, 5 CBB plants
                                                                                                        DL: 837-2926/837-2935                   are utilizing sugarcane
 Sugarcane bagasse is a           It is ready for commercial use.                                       TL: 837-2071 to 81 loc. 2120            bagasse as a raw material.
waste product of sugar mills      A 12 mm (1/2-inch) - thick                                            Fax: 837-2925
which can be utilized as          panel has a break-even price                                          E-mail: pcierd@dost.gov.ph
material for the production of    of P198.00/pc.                                                        Website:
composite panels, i.e. particle                                                                         http://www.pcierd.dost.gov.ph
boards and cement-bonded
boards.




FOOD PRODUCT

Combined Grinder-Finisher                                                Department of Science &              Philippine Council for




                                                                                                         Page 2 of 10
                                                                                   c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                                  Consolidated_new format
a)                                 b)                          c)                                    d)                                      e)                           f)
 Title and brief description of        Results/Impact of the
                                                                                                     Key Players/Implementors/
          Productivity              Productivity Program/                 Broker/Agent                                                            Potential Beneficiary        Issues/Problems
                                                                                                          Expertise/Champions
      Program/Technology                   Technology
      for Rootcrop Flour                                               Technology (DOST)      Industry & Energy Research
          Production                                                                           & Development (PCIERD)
                                                               Agent: Mabangon Rootcrop     DL: 837-2926/837-2935
The equipment is a more                                        Association (MARCA) and      TL: 837-2071 to 81 loc. 2120
appropriate and efficient                                      Maydolong Consumers'         Fax: 837-2925
version of the traditional                                     Cooperative in Eastern Samar E-mail: pcierd@dost.gov.ph
equipment used by the flour-                                                                Website:
producing industry. It                                                                      http://www.pcierd.dost.gov.ph
combines the grinding and
finishing operations in a single
equipment resulting to a fine
flour recovery of 90%.

IT SERVICES

   Philippine Research,                                               Advance Science and            Engr. Denis F. Villorente
Education and Government                                            Technology Institute (ASTI)      Deputy Director, ASTI
  Information Network or                                                                             Tel. No: 426-9766, 426-9767
        (PREGINET)                                                                                   Fax No: 426-9756, 426-7423
                                                                                                     E-mail:
It is a nationwide broadband                                                                             denis@asti.dost.gov.ph
network that interconnects
local academic, government
and research institutions with
other research and education
networks worldwide. This
network has established its
presence in almost all regions
of the country.



      Bayanihan Linux                                                 Advance Science and            Engr. Peter Antonio B. Banzon
                                                                    Technology Institute (ASTI)      Chief, Computer Software Div.
This is an open source system                                                                        ASTI
for workstations and servers.                                                                        Tel. No: 426-9759
It aims to integrate a free                                                                          Fax No: 426-9756, 426-7423
open-source operating system                                                                         E-mail:
and free applications to
eventually come up with a
complete system that can
work on a desktop, and to
provide the country with an                                                                           Page 3 of 10
alternative solution to address                                                 c: PCP Secretariat/Inventory of Productivity Technologies/
software piracy, to enhance                                                                    Consolidated_new format
software development skills of
the Filipinos, and to develop
more affordable computer
This
a) is an open source system b)                                 c)                                    d)                                      e)                                f)
  Title and brief and servers.
for workstationsdescription of     Results/Impact of the
                                                                                                     Key Players/Implementors/
           integrate a
It aims to Productivityfree     Productivity Program/                     Broker/Agent                                                            Potential Beneficiary             Issues/Problems
                                                                                                          Expertise/Champions
open-source operating system
       Program/Technology              Technology
and free applications to                                                                                  peter@asti.dost.gov.ph
eventually come up with a
complete system that can
work on a desktop, and to
provide the country with an
alternative solution to address
software piracy, to enhance
software development skills of
the Filipinos, and to develop
more affordable computer
systems.


 Process Development for          Limited the problems                Advance Science and            Mr. Alvin E. Retamar
 Multilayer Printed Circuit       associated with imported          Technology Institute (ASTI)      Special Projects Division
    Board Fabrication             customized boards such as                                          ASTI
                                  additional import costs,                                           Tel. No: 426-9764
A Facility that provides quick-   communication and                                                  Fax No: 426-9756, 426-7423
turn and reasonably priced        coordination problems.
PCB prototypes.




  Jumpstarting Electronic     March 2003 status report        > National Computer Center,                                                    > 330 pilot LGUs over 3 years;
   Governance in Local        showed that 95% of the 79         U.P. Diliman                                                                   slots are allocated per
 Government Units (eLGU)      provincial and 115 city                                                                                          region based on number of
                              governments, and 476 or 32% > AyalaPort and ePLDT for                                                            LGUs per region (49 from
- A 3-year nationwide program of municpal governments           webhosting the LGU                                                             Luzon, 25 from Visayas and
to bring LGUs into the        have already internet             websites                                                                       26 from Mindanao for a total
mainstream of information     presence. This is a significant                                                                                  of 100 annually for 3 years).
and communications            progress considering that in    > Systems Technology Insti-
technology. Its components    June last year, only 51% of       tute (STI) provides technical                                                > Pilot LGUs are selected
                              total provinces and cities, and
                              a meager 3% of total
                              municipalities nationwide had
                              web presence.
                                                                                                      Page 4 of 10
                                                                                c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                               Consolidated_new format
                                 March 2003 status report
                                 showed that 95% of the 79
                                 provincial and 115 city
                                 governments, and 476 or 32%
                                 of municpal governments
a)                               b)
                                 have already internet           c)                                 d)                                      e)                               f)
  Title and brief description of presence. This is a significant
                                       Results/Impact of the
                                                                                                    Key Players/Implementors/
           Productivity          progress considering that in
                                   Productivity Program/                  Broker/Agent                                                           Potential Beneficiary            Issues/Problems
                                                                                                         Expertise/Champions
       Program/Technology        June last year, only 51% of
                                             Technology
                                 total provinces and cities, and   support in the conduct of                                                 based on their responses in
> LGU IT Resources Survey        a meager 3% of total              workshops                                                                 the E-Governance
(to establish benchmark data municipalities nationwide had                                                                                   Readiness Survey
and identify project             web presence.                   > League of Municipalities of                                               conducted for all LGUs last
beneficiaries)                                                     the Philippines (LMP)                                                     year. The survey results
> advocacy and promotions        A good number of LGU                                                                                        showed how LGUs ranked
through seminars and tri-        websites assessed recently      > Development Academy of                                                    on E-Readiness.
media materials                  are still in Stage 1 (emerging    the Philippines (DAP)
> IS strategic planning          web presence) based on UN-
(assisting pilot LGUs to         ASPA 5 Stages of E-             > Intel
prepare their plans)             Government. 3% are in Stage
> formulation of data            2 (enhanced web presence); > K2ia
standards for LGUs               2% in Stage 3 (interactive
                                 web presence); and none has
> Local Government               reached Stage 4
application systems              (transactional web presence
development and user's           involving online payment) or
training (development of open Stage 5 (fully integrated web
source, web- and GIS-enable presence).
application systems - the Real NCC developed a website
Property Tax System in year      template with online content
1, the Business Permits and      management supporting static
Licensing System and the         website (Stage 1).
Treasury Operations
Management System later)

> establishment of LGU web
presence


 Big Brother-Small Brother      No backslide in performance        Employers Confederation                                                  Three regions & three specific
                                  due to influence of Big             of the Philippines                                                    industries:
- An industry chain program       Companies to its SME                     (ECOP)                                                           > processed food for NCR
being initiated and driven by a   suppliers                                                                                                 > furniture for RO3
large enterprise (Big Brother) Strong rapport due to                                                                                        > automotive parts &
adopted for one or two small      established relations                                                                                       components
and medium companies from         between firms
its pool of suppliers (Small    Adherence to complete cycle                                                                                 Potential : Downstream indus-
Brother) with an overall
objective of improving their
QCD performance.

                                                                                                     Page 5 of 10
                                                                               c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                              Consolidated_new format
- An industry chain program
being initiated and driven by a
large enterprise (Big Brother) b)
a)                                                            c)                                         d)                                      e)                            f)
  Title and brief or two small
adopted for onedescription of        Results/Impact of the
                                                                                                         Key Players/Implementors/
and medium companies from
           Productivity          Productivity Program/                        Broker/Agent                                                            Potential Beneficiary         Issues/Problems
                                                                                                              Expertise/Champions
its pool of suppliers (Small
       Program/Technology                 Technology
Brother) with an overall           flow of Advocacy,                                                                                             tries in the supply chain.
objective of improving their       Implementation, Monitoring
QCD performance.                   Continuous Improvement
                                Effective promotion of cost
                                   sharing scheme on
                                   participants
                                Fast networking & program
                                   transfer from government
                                   to private sectors
                                Transfer of knowledge thru
                                   multiplication of trainers


    Quality Control Circle         0.27% decrease in smear            Broker: Yazaki-Torres                                                      YTMI, its customers &
                                   printing defect                       Manufacturing, Inc. (YTMI)                                              suppliers, the community,
- A small group of employees                                                                                                                     academe, LGUs, NGOs
which systematically address       P 21,356.43 money savings,         Agent: Thousand Oaks
and resolve problems for           after 3 months study                 Packaging Corp. (TOPC)                                                   Potential: Whole industry &
improvement in their workarea                                                                                                                    its supply chain. Other
and who voluntarily perform        Intangible effect (self-improve-                                                                              industries & their supply
these activities related to        ment): teamwork, self-confi-                                                                                  chains
quality control.                   dence, QCC knowledge,
- The 11 Steps of QCC
  Activities are:

1. Formation and registration
2. Preparation of activity time-
   table
3. Analysis of present
   situation
4. Selection of theme/
   objective
5. Decision of target
6. Analysis of primary factors
7. Planning of counter-
   measure
8. Implementation of counter-
   measure




                                                                                                          Page 6 of 10
                                                                                    c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                                   Consolidated_new format
a)                                  b)                              c)                                  d)                                      e)                                f)
 Title and brief description of         Results/Impact of the
                                                                                                        Key Players/Implementors/
          Productivity               Productivity Program/                    Broker/Agent                                                           Potential Beneficiary             Issues/Problems
                                                                                                             Expertise/Champions
      Program/Technology                    Technology
9. Analysis of the result
10. Standardization
11. Reflection and future plan


  Knowledge Networking                                                   National Economic and                                                  NEDA, Office of the
     for Productivity                                                    Development Authority                                                  President, Congress, LGUs,
                                                                                (NEDA)                                                          SUCs, other government
- Encourages informed and                                                                                                                       agencies, business/industry
active participation of commu-                                                                                                                  and NGOs, and the public
nities and individuals.
- Person-to-person communi-
cation resulting in the develop-
ment of new knowledge.
- Combining individuals'
knowledge & skills in pursuit
of personal & organizational
objectives.

             ISTIV                  Beneficiary: Anjo Farms, Inc.         National Wages and                                                    SMEs with -
                                                                         Productivity Commission                                                > P1.5 M to 100 M assets
- A values-driven human             > increased production                       (NWPC)                                                         > 10 to 199 workers
resource strategy for               volume of processed bangus                                                                                  > Filipino-owned
productivity and quality. It puts   from 3,000 to 5,000 pcs. per                                                                                > With basic systems in
in place a quality                  day (67%)                                                                                                     place, e.g., hiring/selection
management systme in a                                                                                                                            of employees, production,
beneficiary firm.                                                                                                                                 maintenance
                                                                                                                                                > willingness to participate in
- It is an acronym for 5 ideal      > increased yield recovery                                                                                    the ISTIV Training Program/
attributes of a productive          from 80 to 95%                                                                                                implement ISTIV
person:                                                                                                                                           Productivity Technology

          I ndustrious              > decreased electric power
         S ystematic                consumption from 0.06 to
         T ime-conscious            0.03 kw/pc
          I nnovative
   strong V alue for work           > human resource-related
                                    improvements




                                                                                                         Page 7 of 10
                                                                                   c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                                  Consolidated_new format
a)                                b)                                c)                             d)                                      e)                           f)
 Title and brief description of       Results/Impact of the
                                                                                                   Key Players/Implementors/
          Productivity             Productivity Program/                 Broker/Agent                                                           Potential Beneficiary        Issues/Problems
                                                                                                        Expertise/Champions
      Program/Technology                  Technology

- The ISTIV approach              Beneficiary: Bolong Agri-
presents productivity in          Management Corporation
simple, user-friendly terms
that owners, managers and         > significant decrease in fuel
workers can relate to. It shows   and electricity consumption
everyone in an organization       through better production
that they share a common fate     planning
and need to do their best to         - 82% improvement in
survive and successfully               electricity consumption/
compete in a globalized                bag
economy.                             - 38% improvement in fuel
                                       consumption/bag
                                  > increased production from
                                  52,000 to 65,000 bags/month
                                  (25%)

                                  > introduction of a reward
                                  scheme for workers

                                  Beneficiary: Silangan Poultry
                                  Dressing Plant

                                  > significant decrease in:
                                     - ice consumption from
                                       P1.22 to P1.10 per
                                       chicken due to improve-
                                       ment in ice handling
                                     - ice delivery from 60 to 50
                                       blocks/day
                                  > increased compliance to
                                    Good Manufacturing
                                    Practices (GMP) from 55%
                                    to 80%

                                  > Magnolia committed to
                                  increase the toll fee from
                                  P4.20 to P4.50 per chicken
                                  after the improvement in GMP
                                  compliance.



                                                                                                    Page 8 of 10
                                                                              c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                             Consolidated_new format
a)                                b)                           c)                                 d)                                      e)                                f)
 Title and brief description of        Results/Impact of to
                                  > Magnolia committed the
                                                                                                  Key Players/Implementors/
          Productivity            increase the toll fee from
                                    Productivity Program/               Broker/Agent                                                           Potential Beneficiary             Issues/Problems
                                                                                                       Expertise/Champions
      Program/Technology          P4.20 to P4.50 per chicken
                                             Technology
                                  after the improvement in GMP
                                  compliance.

                                  Beneficiary: SLERS
                                  Industries, Inc.

                                  > a more efficient walk-in cold
                                  storage facility eliminated
                                  > vacuum packaging
                                  technology improved
                                  appearance of products


                                  > preventive maintenance
                                  minimized production
                                  downtime and increased
                                  production
                                  > utilization of trolleys and
                                  crates
                                  > conduct of active bench-
                                  making
                                  > improvement in monthly
                                  production and sales


     Small Enterprises            DOST recommended                  DOST and its Regional                                                 MSMEs all over the country
   Technology Upgrading           technologies to 548 existing            Offices                                                         numbering 823,558 as of
     Program (SET UP)             and 157 new MSMEs.                                                                                      1999.

- Launched in 2002, it is a                                                                                                               Initially, MSMEs falling under
nationwide strategy to            DOST assisted 370 MSMEs                                                                                 the following priority sectors:
encourage and assist MSMEs        in packaging development                                                                                > food processing
to adopt technological            and label design resulting into                                                                         > furniture
innovations to boost their        the development of 109 new                                                                              > gifts, toys, housewares,
competitiveness and               products, 12 of which are now                                                                             handicrafts, natural fibers
productivity.                     being exported, in increasing                                                                             and dyes
                                  their sales by P42.1 M, and in                                                                          > marine and aquatic
- DOST interventions include:     creating some 3,716                                                                                       resources
                                  additional jobs.




                                                                                                   Page 9 of 10
                                                                             c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                            Consolidated_new format
                                   DOST assisted 370 MSMEs
                                   in packaging development
                                   and label design resulting into
                                   the development of 109 new
a)                                 products, 12 of which are now c)
                                   b)                                                           d)                                      e)                               f)
  Title and brief description of   being exported, in increasing
                                        Results/Impact of the
                                                                                                Key Players/Implementors/
           Productivity            their sales by P42.1 M, and in
                                     Productivity Program/            Broker/Agent                                                           Potential Beneficiary            Issues/Problems
                                                                                                     Expertise/Champions
       Program/Technology          creating some 3,716
                                             Technology
> provision of technology          additional jobs.                                                                                     > horticulture (cut flowers,
(technology needs                                                                                                                         fruits and high value crops)
assessment and sourcing)           DOST attended to 21,854                                                                              > metals and engineering
> seed funding for technology      service calls for product
acquisition                        testing and laboratory
> training and consultancy         services from 10,158 clientele.
services
> product standards and            DOST provided technology
testing                            training opportunities to
> packaging and labeling           13,130 people.
> database management and
information system
> linkaging and networking

This program aims to
integrate all other related
technology transfer programs
notably the consultancy
schemes like MPEX and
CAPE and the Packaging
R&D services.




                                                                                                 Page 10 of 10
                                                                           c: PCP Secretariat/Inventory of Productivity Technologies/
                                                                                          Consolidated_new format

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:31
posted:11/14/2010
language:English
pages:10
Description: Circuit Board Yield Report Template document sample