Docstoc

Addendum to Contract

Document Sample
Addendum to Contract Powered By Docstoc
					IFB 10A-0216 - Asphalt Paving Workbook for Addendum 3
Contract Vendor's Name:

Section One: General Information Summary
Step One - Enter the Cost for Services listed below:
                                                                                                                                       Regular                   Sunday
                                                                                                                                       Business                   and
                                                                                                                                        Hours           Overtime Holiday
Additional Labor/Service/Installation Rates, Misc., if applicable (Specify Type of
Service) Add lines or additional price schedules, as necessary to provided all labor,
service and installation rates.
Repair Rates (Add rows for different repair rates, if necessary.)
Bond Rate (Percentage of job total, Dollar amount per thousands, etc)

Provide all permit costs or indicate if permits are a pass through charge to member.
Restock Fees (not higher than 15%), if applicable. Mark "N/A" if not applicable.
Describe your return policy, if applicable, (include the number of days from the delivery date for
acceptable returns.) Mark "N/A" if not applicable.

Describe shipping charges on returns.

Describe any exclusions or limitations applicable to your return policy.



Section Two: Mileage, M&IE, and Lodging Rates Information
Transportation, Mileage, Lodging, Meals and Incidental Expenses:
Specify pricing in accordance with the pricing requirements on the price and discount page. If rates are not specified for these reimbursements, no charges will be allowed.

Travel Time, Mobilization, and Trip Charges:
Specify pricing in accordance with the pricing requirements on the price and discount page. If rates are not specified for these charges, no charges will be allowed.


                                                                                                                                   Current State    Rates to be
                                                                                                                                       Rates     applied other than
Mileage                                                                                                                                 YES
M&IE (Meals and Incidental Expenses)                                                                                                    YES
Lodging                                                                                                                                 YES
                                                                                                                                     Regular               Sunday
                                                                                                                                     Business               and
                                                                                                                                      Hours      Overtime Holiday
Travel/Drive Rate - per hour/per man, if applicable.
Mobilization rates shall be priced out separately on Full Price Schedule tab.
Section Three Additional Services Pricing Information
Step One - Enter cost for additional services not listed in Section One, or on your full price schedule.
                                                                                           Mohave Price
                                                                                               (Fixed
                                                                                              Pricing)
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                                                                    $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
                                                             $0.00
Add additional rows, as necessary for full price schedule.   $0.00

Revised 2/16/10 NLC for Addendum 3
Required Market Basket pricing
Market Basket Pricing Notes:
Review Special Terms and Conditions & Discount and Price Schedule for additional pricing requirements and instructions.
•The Market Basket is required. If the Market Basket is not completed as required, your bid may be non-responsive.
•The Market Basket does not represent an actual job.
•Pricing used here MUST match product and service pricing included in your bid. Review locations and fixed pricing provided on the Market Basket.
•Please note on which tab(s) or price list that the Market Basket pricing is located along with the column and row number or page number. If this
information is not provided, your bid may be considered non-responsive.


 If bidder is offering a regional bid and not providing services in the requested area (Apache Junction) for the Market Basket , please complete the Market Basket as if you are
 providing service to this area. Note on the Market Basket the regions you are willing to service, if awarded.

Market Basket revised 2/16/10 for the highlighted changes
Asphalt Project at Apache Junction

   Line                                                                                                           Location on Price List           Mohave Price         Extended
 Item #      Qty    Description                                                 Notes (Unit, etc.)            (i.e. - page or row number)         (Fixed Pricing )     Mohave Price

           ASPHALT SAW CUTTING
    1           1 Mobilization Charge                                                                                                                         $0.00        $0.00
    2          60 Linear feet time 3 inch thickness                                                                                                           $0.00        $0.00
           CONCRETE SAW CUTTING
    3           1 Mobilization charge, if applicable                                                                                                          $0.00        $0.00
    4           4 Linear feet time 3 inch thickness                                                                                                           $0.00        $0.00
           DEMO/HAUL ASPHALT, DIRT, ETC.
    5           1 Mobilization charge                                                                                                                         $0.00        $0.00
    6        1225 Cubic yard of material                                                                                                                      $0.00        $0.00
           FINE GRADE AREA
    7           1 Mobilization Charge                                                                                                                         $0.00        $0.00
    8        8300 Square yard                                                                                                                                 $0.00        $0.00
           GRADE/PLACE ABC
    9           1 Mobilization Charge                                                                                                                         $0.00        $0.00
   10       54600 Square feet times thickness of 6" inches of ABC                                                                                             $0.00        $0.00
           ASPHALT CONCRETE OVERLAY
   11           1 Mobilization Charge                                                                                                                         $0.00        $0.00
   12       54600 Square feet 3 inch depth                                                                                                                    $0.00        $0.00
           WATER/SEWER COVER ADJUSTMENTS
   13           1 Mobilization Charge                                                                                                                         $0.00        $0.00
   14           2 Each per unit                                                                                                                               $0.00        $0.00
           CONCRETE CURB AND GUTTER
   15        3100 Linear feet                                                                                                                                 $0.00        $0.00
           CONCRETE FLATWORK
   16        1300 8 inches thick per square feet                                                                                                              $0.00        $0.00
           SAFETY BOLLARDS PLACED IN ASPHALT
   17           1 Mobilization Charge                                                                                                                         $0.00        $0.00
   18          12 4-inch diameter, concrete filled, charge per each                                                                                           $0.00        $0.00
           STRIPING
   19           1 Mobilization Charge                                                                                                                         $0.00        $0.00
   20        4400 Linear feet 4" line, (new layout)                                                                                                           $0.00        $0.00
   21        2200 Linear feet curb (top and face)                                                                                                             $0.00        $0.00
   22           5 Arrows, charge per each                                                                                                                     $0.00        $0.00
   23          80 24 inch numbers/letters, charges per each                                                                                                   $0.00        $0.00
           SPEED BUMPS
   24          10 Speed Bumps, charge per each for standard size of 1 1/2' X 24'                                                                              $0.00        $0.00
                                                                                                                                                          Subtotal         $0.00

           BOND
   25          1 Bond (fill-in percentage bid%) as per submitted bond rates on your pricing                                                                  0.00%         $0.00
                                                                                                                                                  GRAND TOTAL             $0.00

Revised 2/16/10 NLC
Full Pricing Schedule
Notes:
  •All pricing must be fixed price per the Special Terms and Conditions.
  •Provide all pricing necessary to meet the IFB's scope of work and specifications that your firm is bidding.
  •Products and Services listed below are a guide to help you understand some of the requested pricing. This
  may not be a full comprehensive list of products and services. Add to the list, or provide a price schedule for
  your offered pricing.
  •Pricing may be offered for geographical areas (zones) for the State of Arizona. A map shall be provided, or
  detailed information provided describing the zones. Zone locations must be logic for product pricing and
  mobilization. (DO NOT provide zone pricing for New Mexico for Cooperative Educational Services [CES] in
  New Mexico. See information in the IFB for CES.)



                                                                          Mohave Price             Add columns for
                                                                      including the Admin          zones pricing, if
                             Product and Services                      Fee     (Fixed Price)         applicable
ASPHALT SURFACE PATCH                                                                     $0.000
Mobilization Charge                                                                       $0.000
Charge per square foot                                                                    $0.000
Charge per square foot (over 10,000 sq ft)                                                $0.000
ASPHALT SPEED BUMPS                                                                       $0.000
Mobilization Charge (same as Asphalt surface patch)                                       $0.000
Charge per square foot                                                                    $0.000
ASPHALT SPEED HUMPS                                                                       $0.000
Mobilization Charge                                                                       $0.000
Charge per square foot                                                                    $0.000
ASPHALT REMOVE/REPLACE                                                                    $0.000
Mobilization Charge                                                                       $0.000
Charge per square foot 2 inch depth                                                       $0.000
Charge per square foot 2 inch depth (over 10,000 sq ft)                                   $0.000
Charge per square foot 3 inch depth                                                       $0.000
Charge per square foot 3 inch depth (over 10,000 sq ft)                                   $0.000
Charge per square foot 4 inch depth(2 lifts)                                              $0.000
Charge per square foot 4 inch depth (over 10,000 sq ft) (2 lifts)                         $0.000
ASPHALT CONCRETE OVERLAY                                                                  $0.000
Mobilization Charge                                                                       $0.000
Charge per square foot 1 1/2 inch depth                                                   $0.000
Charge per square foot 1 1/2 inch depth (over 50,000 sq ft)                               $0.000
Charge per square foot 2 inch depth                                                       $0.000
Charge per square foot 2 inch depth (over 50,000 sq ft)                                   $0.000
Charge per square foot 3 inch depth                               $0.000
Charge per square foot 3 inch depth (over 50,000 sq ft)           $0.000
Charge per square foot 4 inch depth                               $0.000
Charge per square foot 4 inch depth (over 50,000 sq ft)           $0.000
GEOTEXTILE FABRIC UNDERLAYMENT FOR ASPHALT CONCRETE
OVERLAY                                                           $0.000
Mobilization Charge                                               $0.000
Charge per square foot (ADD TO PAVING PRICE ABOVE)                $0.000
ASPHALT SAW CUTTING                                               $0.000
Mobilization Charge                                               $0.000
Charge per linear foot times thickness in inches                  $0.000
CONCRETE SAW CUTTING                                              $0.000
Mobilization Charge                                               $0.000
Charge per linear foot times thickness in inches                  $0.000
HOT RUBBER CRACKFILL                                              $0.000
Mobilization Charge                                               $0.000
Charge per Gallon used                                            $0.000
Crackfill Cleaning per gallon used ; add if no sealing / slurry   $0.000
ASPHALT EMULSION SEALER (SPRAY APPLIED                            $0.000
Mobilization Charge                                               $0.000
Charge per square foot for 1st Coat                               $0.000
Charge per square foot for 2nd Coat (add to 1st coat above)       $0.000
Charge per square foot for 1st Coat (over 50,000 sq ft)           $0.000
Charge per square foot for 2nd Coat (over 50,000 sq ft)           $0.000
Charge per square foot for 1st Coat (over 100,000 sq ft)          $0.000
Charge per square foot for 2nd Coat (over 100,000 sq ft)          $0.000
Charge per square foot for 1st Coat (over 250,000 sq ft)          $0.000
Charge per square foot for 2nd Coat (over 250,000 sq ft)          $0.000
TYPE II CATIONIC SLURRY SEAL                                      $0.000
Mobilization Charge                                               $0.000
Charge per square foot 0-100,000 sq ft                            $0.000
Charge per square foot over 100,000 sq ft                         $0.000
STRIPING                                                          $0.000
Mobilization Charge                                               $0.000
4" line, charge per linear foot (restripe)                        $0.000
4" line, charge per linear foot (new layout)                      $0.000
Curb (top and face), charge per linear foot                       $0.000
Handicap stencils, charge per each                                $0.000
Arrows, charge per each                                           $0.000
4 inch numbers/letters, charge per each                           $0.000
10 inch numbers/letters, charge per each                          $0.000
24 inch numbers/letters, charge per each                                     $0.000
Speed bump stripe, charge per each                                           $0.000
Speed Hump stripe, charge per each                                           $0.000
Wheel stops, charge to paint each                                            $0.000
Bollards, charge to paint each                                               $0.000
ASPHALT EDGE MILLING 2 FEET WIDE                                             $0.000
Mobilization Charge                                                          $0.000
Charge per square foot                                                       $0.000
ASPHALT MILLING 6 FEET WIDE                                                  $0.000
Mobilization Charge                                                          $0.000
Charge per square foot per 1 inch in depth of milling                        $0.000
ASPHALT PULVERIZING                                                          $0.000
Mobilization Charge                                                          $0.000
Charge per square foot 0-25,000 sf + mob charge min. 10,000 SF               $0.000
Charge per square foot over 25,000 - 50,000 sf + mob charge                  $0.000
Per square foot over 50,001 sf + mob charge                                  $0.000
LIME SOIL STABILIZATION (Lime SlurryMAG309, Soil Cement MAG311, Quicklime)   $0.000
Mobilization Charge                                                          $0.000
Charge per sf per 8 inch depth                                               $0.000
Charge per sf per 12 inch depth                                              $0.000
GRADE/PLACE ABC                                                              $0.000
Mobilization Charge (same as paving)                                         $0.000
Charge per square foot times thickness in inches of ABC                      $0.000
DEMO/HAUL ASPHALT, DIRT, ETC                                                 $0.000
Mobilization Charge                                                          $0.000
Charge per cubic yard of material                                            $0.000
Charge per cubic yard of material (over 500 cubic yards)                     $0.000
FINE GRADE AREA                                                              $0.000
Mobilization Charge (same as paving)                                         $0.000
Charge per square yard                                                       $0.000
Charge per square yard (over 5000 square yards)                              $0.000
MANHOLE ADJUSTMENTS                                                          $0.000
Mobilization Charge                                                          $0.000
Charge per each unit                                                         $0.000
WATER/SEWER COVER ADJUSTMENTS                                                $0.000
Mobilization Charge                                                          $0.000
Charge per each unit                                                         $0.000
SURVEY MONUMENTS                                                             $0.000
Mobilization Charge                                                          $0.000
Type A; Charge per each unit                                                 $0.000
Type B; Charge per each unit                                                 $0.000
SAFETY BOLLARDS PLACED IN ASPHALT                            $0.000
Mobilization Charge                                          $0.000
4-inch diameter, concrete filled,charge per each             $0.000
6-inch diameter, concrete filled,charge per each             $0.000
8-inch diameter, concrete filled,charge per each             $0.000
CONCRETE EXTRUDED CURB NO REBAR                              $0.000
Mobilization Charge                                          $0.000
1 to 300 lf                                                  $0.000
301 to 500 lf                                                $0.000
501lf+                                                       $0.000
CONCRETE EXTRUDED CURB WITH REBAR                            $0.000
Mobilization Charge                                          $0.000
1 to 300 lf                                                  $0.000
301 to 500 lf                                                $0.000
501lf+                                                       $0.000
CONCRETE 6 FOOT WHEEL STOPS                                  $0.000
Mobilization Charge                                          $0.000
Charge per each 1-20 each                                    $0.000
Charge per each over 20                                      $0.000
CONCRETE SINGLE CURB                                         $0.000
Mobilization Charge                                          $0.000
1-200 linear feet                                            $0.000
201-400 linear feet                                          $0.000
401-800 linear feet                                          $0.000
801+ linear feet                                             $0.000
CONCRETE CURB AND GUTTER                                     $0.000
Mobilization Charge                                          $0.000
1-200 linear feet                                            $0.000
201-400 linear feet                                          $0.000
401-800 linear feet                                          $0.000
801+ linear feet                                             $0.000
CONCRETE FLATWORK                                            $0.000
Mobilization Charge                                          $0.000
4 inch thick per square foot                                 $0.000
6 inch thick per square foot                                 $0.000
8 inch thick per square foot                                 $0.000
RATES FOR ADDITIONAL WORK                                    $0.000
Labor and equipment rate, $ per man hour                     $0.000

Add additional rows, as necessary for full price schedule.

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:26
posted:11/14/2010
language:English
pages:7
Description: Addendum to Contract document sample