PRESENTATION OVERVIEW
• Proposal Structure
• Evaluation Criteria Content
• Examples of TEB comments
• Link – ITT – Evaluation Criteria - Proposal
2
OVERALL STRUCTURE OF THE
PROPOSAL
A good proposal consists of the following, clearly
divided parts (or volumes):
3
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
1. The Cover Letter
1a. (Option): an Executive Summary
2. The Technical Proposal
3. The Administrative Proposal, consisting of:
3.1 The Management Proposal
3.2 The Financial Proposal
3.3 The Contractual Proposal
4
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
The Cover Letter
The CL is an important part of the proposal and plays a
key role at the time of tender opening, when proposals
are initially screened for admission. As specified in the
General and in the Special Conditions for Tender, the
letter should as a minimum include the following general
information, reflecting the detailed contents of the
proposal:
5
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o The names of the authors of the proposal, and the
names and coordinates of the contact persons during
tendering, as well as of the technical and contractual
managers in case of contract award
o Clear and unambiguous statements of compliance
with the Agency’s technical and management
requirements as well as with the applicable contract
conditions (i.e. the draft contract) and, if any, special
Industrial Policy measures as per the ITT
6
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o The recapitulation of the quoted price and price
type, including a breakdown by subcontractor, if
applicable
o A list of subcontractors, if applicable
o A confirmation of the required validity of the
proposal (normally 4 months)
7
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
The Administrative Proposal: Management Part
The Management Proposal consists of the following main
parts:
o Relevant background and experience of the company/ies
o Overall organisation of the company/ies, including the
position of the proposed team within the organisation
8
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Key personnel, their experience, functions and time
dedication
o List of deliverable items
o Management Plan, policies and procedures
o Facilities to be used during the execution of the work
9
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Work Breakdown Structure and Work Package
Descriptions (also in the Technical Proposal together with
the work logic and activity flow chart)
o Detailed Meeting and Review Plan
o Planning information, including a bar chart covering
the execution of the different tasks / Work Packages, the
major milestones, meetings and reviews and highlighting
items which are on the critical path
10
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
The Administrative Proposal: Financial Part
The Financial Proposal covers the following aspects:
o Overall pricing information, including price type,
total price and price breakdown by phase (if
applicable) and by company (if subcontractors are
proposed)
11
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Cost breakdown information using the standard PSS-A
forms
PSS-A1: Company cost element data sheet
PSS-A2: Company Price Breakdown Form
(+ exhibit A if applicable)
PSS-A8: Manpower and Price Summary at Work
Package Level
12
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o The commitment to carry out the required work for the
price quoted
13
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
The PSS-A forms must be provided, for each company, for
the total of the activity and, if applicable, for each of the
phases foreseen by the draft contract
o Travel and Subsistence Plan
14
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
The Administrative Proposal: Contract
The Contractual Proposal covers the Bidder’s response to
the conditions of the draft contract
Full, explicit and unconditional compliance is expected.
However, the Bidder has the possibility to:
15
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Comment on certain contractual conditions: proposed
deviations from the draft contract need to be clearly
justified and fully phrased, keeping in mind that such
deviations may have a negative effect on the evaluation
o Request the application of specific parts of the General
Clauses and Conditions (e.g. protection of background
information) provided this does not clash with the
explicit conditions of the draft contract
16
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Propose a payment plan based on the milestones
identified in the management proposal and in accordance
with the outline laid out in the draft contract
17
OVERALL STRUCTURE OF THE
PROPOSAL (continued)
o Integrate the parts of the draft contract which have
been left blank in the ITT (e.g. the name of the
company’s representative authorised to sign the
contract, the name of the company’s project manager
and contracts officer, the name of the companies
proposed as sub-contractors
18
Evaluation criteria content
Criterion 1: Background and experience (general and
related to the particular field concerned) of the company
(ies) and staff (including adequacy of proposed facilities)
• General experience of the company/ies
• Specific experience of the company/ies which is of
relevance for the specific tasks and objectives of the ITT
• General background/experience/suitability of proposed
staff
• Specific background/experience/suitability of proposed
staff
• Suitability of the proposed facilities
19
Evaluation Criteria content
Criterion 2: Understanding of the requirements and
objectives and discussion of problem areas
• Critical assessment of the SOW (in terms of
requirements and objectives)
• Overview of the technical content/current state of the art
• Trade-offs/requirement limitations/constraints/problem
areas
• Discussion on various options available
• Identification of possible concepts
20
Evaluation Criteria content
Criterion 3: Quality and suitability of proposed
programme of work; adequacy of engineering approach
• Identification of the selected baseline (based on
technical discussion),
• Detailed description of the selected baseline
– Specs, Work logic, Work Package Descriptions (input,
description, output)
• Compliance matrix
• Credibility of proposal wrt objectives of the activity
• Completeness/compliance of the deliverable list wrt to
the requirements and specs
21
Evaluation criteria content
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Team company organisation; team position within the
overall structure of the company (for each company)
– Responsibility of company and each individual
– Reporting and communication lines
– In case of sub’s – solidity and credibility of the management
approach of the team
22
Evaluation Criteria content
Criterion 4: Adequacy of management, costing and
planning for the execution of the work, cont’d
• Overall management effort
• Time dedication of keypersonnel and credibility in
relation to their task
• Work breakdown structure – management wise
• Name of company/WP manager per WP in the WBS
• Acceptance of management requirements
• Iteration of the management requirements in a
Management Plan
23
Evaluation Criteria content
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Completeness and clarity of cost breakdown
– PSS-forms and travel subsistence
– Other cost elements
– Travels total cost
– Economic conditions – if applicable
– Profit level/overheads/administration
• In case of co-funding – credibility of the total cost of the
work, evaluation of the balance ESA/Bidder funding
24
Evaluation criteria content
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Bar chart
– WBS- WPD reflection
– Major meetings/milestones/reviews
– Critical path (if applicable)
• Choice of milestones
– General, Specified wrt payment plan
• Duration wrt to ITT
• Credibility of planning including travel plan/meeting plan
25
Evaluation criteria content
• Criterion 5: Compliance with administrative tender
conditions and acceptance of contract conditions
• Tender
– All formal aspects not considered under previous criteria (CVs,
PSS forms etc)
– All remaining formal aspects
• Validity, ESA bidder code, support letters, geo. distribution table,
addressing announced ind. policy measures
26
Evaluation criteria content
Criterion 5: Compliance with administrative tender
conditions and acceptance of contract conditions
• Contract
– Statement of compliance and acceptance
– Reservations/non-compliances to specific parts of the contract
– Payment percentage as per draft contract
27
Examples of TEB Comments
Criterion 1: Background and Experience (General and
related to the particular field concerned) of the company
(ies) and staff (including adequacy of proposed facilities)
• Experience in a specific field of a company not
mentioned
• Company and/or key-personnel lacks
experience
• Vague and general CV of the key-personnel
• Description of facilities not clear
28
Examples of TEB comments,
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Organisational charts missing
• Unclear reporting lines within the project
team
• Unclear where the project is located within
the company
• No management policies and procedures
29
Example of TEB comments
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Absence of Management WP
• WPDs too fragmented/too
superficial/insufficiently broken down
• No clear list of key-personnel and no clear
description of role
• No/Insufficient time dedication of key personnel
30
Examples of TEB comments
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• Planning not in line with complexity of work
• Barchart schedule missing
• Barchart does not reflect the work packages,
major milestones, reviews
• Barchart reveals unrealistic planning (tasks are
starting before needed outputs from other WPDs
are finished)
31
Examples of TEB comments
Criterion 4: Adequacy of management, costing and
planning for the execution of the work
• PSS-A forms incomplete and/or unclear
• Exhibit A missing
• Number of hours as per time dedication higher than total
number of labour hours quoted in the PSS A forms
• Company’s own contribution not equally distributed
• Hourly rates quoted not in line with the approved rates
• Management effort too high
32
Examples of TEB comments
• Criterion 5: Compliance with administrative tender
conditions and acceptance of contract conditions
• Proposal not complete (as per special tender conditions)
• Non compliances with the tender conditions or with the
contract conditions
• SME certification missing
• SW license conditions not explained
• No clear acceptance of contact conditions
• Specific contract conditions ignored
33
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL?
ITT Evaluation Criteria Proposal
• Statement of Work 1) Background and • Management Part
Task Description Experience Company
Technical (general and description(s)
requirements related to the Key Personnel + CVs
particular field
Mgmt requirements concerned) of the Description of
• Special Tender company(ies) and technical facilities
Conditions staff (including needed to carry out the
Management adequacy of work proposed
Facilities proposed facilities
34
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Criteria Proposal
• Statement of 2) Understanding • Technical Part
Work of the Introduction
Introduction requirements and Objectives
Scope and objectives and Trade-offs (if applicable)
Objectives discussion of
Refinement of basic ITT
Task Description problem areas
requirements (if applicable)
Technical Discussion on potential
Requirements / problem areas and possible
Constraints solutions
Compliance Matrix vs.
technical requirements (if
applicable) 35
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Proposal
Criteria
• Statement of Work 3) Quality and • Technical Part
Objectives suitability of Compliance Statement &
Work organisation proposed Matrix (may also be repeated
Task description programme of in mgmt)
work; adequacy Study/Development Logic
• Special Tender
of engineering (chart)
Conditions
approach Detailed WP description
Work Breakdown
Structure (in mgmt) via PSS-A20 form (also in
mgmt)
Work Package
Description (in mgmt) Technical output
“Model Philosophy” (if
appl) 36
PA/QA approach (if appl.)
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Proposal
Criteria
• Statement of 4) Adequacy of • Management Part
Work Management, (Compliance Statement &
Objectives Costing and Matrix)
Work organisation Planning for the Organisation of
Task description execution of the company(ies), incl.
work organisation charts etc.
Mgmt. req. + Stds.
Schedule info. Mgmt. Plan and
and constraints Procedures
Sp. Tender Team org., incl. team
Conditions position within overall
organisation(s)
Management part
Key pers. role and time37
dedication
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Proposal
Criteria
(continued) (continued) • Management Part
Planning and Schedule, incl.
Planning bar-chart, milestones
definition, critical path items (if
applicable), etc.
Work Breakdown Structure
and Work Package Description
(also in Technical Proposal)
List of Deliverables
Meeting Plan
38
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Proposal
Criteria
• Statement of 4) Adequacy of • Financial Part
Work Management, Price summary (per
Objectives Costing and company and/or per phase if
Work organisation Planning for the applicable)
Task description execution of the Cost breakdown via PSS-A2,
work A8 forms (per company and/or
Mgmt. req. + Stds.
per phase if applicable)
Schedule info.
and constraints (continued) Milestone Payments Plan (in
accordance with Mgmt.
Special Tender Proposal and with draft
Conditions contract)
Financial part
39
WHAT IS THE LINK BETWEEN THE ITT, THE
EVALUATION CRITERIA AND THE
PROPOSAL? (continued)
ITT Evaluation Proposal
Criteria
• Cover Letter 5) Compliance • Whole proposal (regarding
E.g.: Special Ind. with formal response to all
Policy Measures administrative applicable tender conditions)
Other instructions tender • Contractual Proposal
regarding the conditions and Compliance statement
contents of the acceptance of Comments/Integrations
proposal contract
• Special Tender conditions
Conditions
All sections
• Draft Contract
40
Related docs
Get documents about "