Document Sample
scope of work template
							                            Information Technology Department
                                          601 McAllister Street, 2nd Floor
                                              San Francisco, CA 94102




San Francisco Unified School District

    Information Technology Department
          Request for Proposals

    Francisco Middle School
Technology Infrastructure Upgrade




        San Francisco Unified School District
        Information Technology Department
           601 McAllister Street, 2nd Floor
             San Francisco, CA 94102
                December 10, 2007




                                                                        1
Table of Contents

1.0 Background ...................................................................................................4
   1.1 Background and Overview................................................................................... 4
   1.2 Purpose and Expectations ................................................................................. 4
2.0 Terms and Conditions of Competition........................................................4
   2.1        Classification of RFP Requirements ............................................................. 4
      2.1.1      Prerequisite Qualification........................................................................................... 4
      2.1.2      Requirements............................................................................................................. 5
   2.2 Limits of the RFP................................................................................................. 5
   2.3 Proposal Requirements and Conditions............................................................ 5
      2.3.1      General Information ................................................................................................... 5
      2.3.2      Addendum to RFP ..................................................................................................... 6
      2.3.3      Questions Regarding the RFP................................................................................... 6
      2.3.4      Vendor’s Proprietary Questions................................................................................. 6
   2.4        Vendors’ Conference ...................................................................................... 6
   2.5        Submission of Proposals ............................................................................... 7
      2.5.1      Preparation ................................................................................................................ 7
      2.5.2      Vendor’s Costs........................................................................................................... 7
      2.5.3      Completion of the RFP............................................................................................... 7
      2.5.4       False and Misleading Statements........................................................................... 7
      2.5.5      Delivery to District ...................................................................................................... 8
      2.5.6      Withdrawal, Resubmission or Modification ................................................................ 8
3.0 General Contractual Requirements...........................................................8
   3.1        General ............................................................................................................. 8
   3.2        Contract Provisions ........................................................................................ 9
      3.2.1      Type and Term of Contract........................................................................................ 9
      3.2.2      Warranty ................................................................................................................... 9
4.0 Proposal Format ...........................................................................................9
   4.1    General................................................................................................................ 9
      4.1.1      Format of Requirements .......................................................................................... 10
      4.1.2      Format of Responses to Requirements ................................................................... 10
   4.2        Content and Sequence ................................................................................. 10
      4.2.1      Proposal Identification Statement ............................................................................ 11
      4.2.2      Response to Requirements ..................................................................................... 11
      4.2.3      Supplementary Information...................................................................................... 11
5.0      Evaluation and Selection Process ........................................................12
   5.1        General ........................................................................................................... 12
   5.2        Evaluation Scoring........................................................................................ 12
   5.3        Site Inspection............................................................................................... 13
   5.4        Final Selection ............................................................................................... 13
   5.5        Execution of Agreement ............................................................................... 14
6. 0 Projected Calendar of Events .................................................................14
   6.1 District Contacts ............................................................................................... 14
7.0 District Responsibilities ............................................................................15
8.0 Prerequisite Qualifications.........................................................................15
9.0 Requirements ..............................................................................................17
10.0 Cost Response..........................................................................................20
Appendix A: Standard Contracts.....................................................................21


                                                                                                                                             2
A1   Sample Contract........................................................................................... 21
A2   Performance Bond ....................................................................................... 22
A3   Payment Bond .............................................................................................. 24




                                                                                                                 3
1.0 Background

1.1 Background and Overview

      The San Francisco Unified School District (SFUSD), founded in 1851, educates
      approximately 55,000 of San Francisco’s pre-school, elementary, middle, and
      high school students. SFUSD has 104 K-12 school sites, and 37 pre-school
      sites.

      The technology infrastructure at many SFUSD schools is outdated and
      inadequate. The demand for technology at these sites, however, is increasing
      rapidly. Sites require adequate technology to support hundreds of simultaneous
      users, real-time access to data, streaming video, and interactive lessons.

      Francisco Middle School requires a complete technology infrastructure upgrade,
      including voice and data cabling and upgraded Local Area Network (LAN)
      equipment.

1.2 Purpose and Expectations
    The purpose of this Request for Proposals (RFP) is to solicit proposals to upgrade
    the technology infrastructure at Francisco Middle School, including:
          • Voice and data cabling materials and services in the school’s East and
             West wing;
          • Voice and data cabling materials and services in the school’s Annex
             building;
          • Purchase and delivery of Local Area Network hardware for the East wing,
             West wing, and Annex building.




2.0 Terms and Conditions of Competition

2.1 Classification of RFP Requirements
      The District has established two classes of requirements with respect to a
      Proposal to be submitted by a prospective Vendor.

      2.1.1    Prerequisite Qualification
               Vendors must have a valid eRate Service Provider Invoice Number
               (SPIN) and agree to the following terms and conditions:
                    (1) Purchase will be contingent upon SFUSD Board of Education
                        Approval, successful completion of the SFUSD contracting
                        procedures, and funding approval from the Schools and
                        Libraries Division (SLD).
                    (2) Vendor must agree to SLD’s Service Provider Invoicing (SPI)
                        format for reimbursement/payment.



                                                                                       4
                      (3) Vendor must guarantee that all fiber and copper cable
                          installation is done in compliance with applicable building
                          codes and by persons with the appropriate licensure.
                      (4) Vendor is responsible for providing all permits. Cost of such
                          permits must be included in Vendor’s proposal.
                      (5) Vendor must comply with prevailing wage regulations,
                          including adhering to the following requirements:
                          • Pay the prevailing wages applicable to the work being
                              done;
                          • Comply with all State laws in the payment and
                              administration of prevailing wages applicable to the work
                              being done;
                          • Submit certified payroll records;
                          • Keep documentation of fringe benefit payments, if any;
                          • Maintain a daily sign in sheet with the names and trades of
                              the employees, if any;
                          • Post or notify workers of the Prevailing Wage Rates at the
                              job site; and,
                          • Employ registered apprentices, if any.




       2.1.2    Requirements
                Requirements for vendor performance are defined in sections 8.0 and
                9.0. Each proposal meeting the Prerequisite Qualifications will be
                evaluated in its entirety according to the evaluation criteria defined in
                section 5.0.


2.2 Limits of the RFP
The San Francisco Unified School District (SFUSD) reserves the right to reject all
proposals and will determine what further action, if any, will be taken.

2.3 Proposal Requirements and Conditions

       2.3.1    General Information
                Issuance of this RFP, the evaluation of responses, and the award of any
                resultant Agreement shall be made in conformance with current
                competitive bidding procedures as they relate to the procurement of
                goods and services by the District.

                In addition to identifying the District's needs, this RFP includes
                instructions, which prescribe the format and content of a Proposal to be
                submitted and the description of the Agreement to be executed
                between the District and the Selected Vendor.




                                                                                            5
      2.3.2    Addendum to RFP
               The District may modify this RFP by issuance of one or more written
               addendum. Any such addendum will be sent to all vendors on the
               district’s Vendor List.

      2.3.3    Questions Regarding the RFP
               A Vendor requiring clarification of the intent or content of this RFP or on
               procedural matters regarding the Proposal process may request
               clarification by submitting questions electronically marked "Questions
               on RFP " to Mr. Sean Rozell, IT Infrastructure Director. Questions
               about specific topics or statements in this RFP must include the RFP
               document page number(s). Questions must be received by the
               Deadline for questions specified in Section 6.0, Projected Calendar of
               Events. Question and answer sets will be discussed at the Vendor
               Conference and subsequently posted on the SFUSD web.

      2.3.4    Vendor’s Proprietary Questions
               A Vendor who desires clarification or further information on the content
               of this RFP, but whose questions relate to the proprietary aspect of the
               Vendor's Proposal and which, if disclosed to other bidders, would
               expose the Vendor's Proposal, may submit such questions in an
               envelope clearly marked "Confidential Questions on RFP" to Mr.
               Sean Rozell not later than the Deadline for questions specified in
               Section 6.0, Projected Calendar of Events. The Vendor must explain
               why the questions are sensitive in nature.

               If the District concurs that the disclosure of the question or answer
               would expose the proprietary nature of the Proposal, the question will
               be answered and both the question and answer will be kept in
               confidence. If the District does not concur with the proprietary aspect of
               a question, the question will not be answered and the Vendor so
               notified. The Vendor may then re-phrase and re-submit the question, if
               desired, but only if such question is re-submitted within the time period
               Deadline for questions specified in Section 6.0, Projected Calendar of
               Events.
2.4   Vendors’ Conference
      A Vendor conference will be held, during which a Vendor will be afforded the
      opportunity to meet with District personnel and discuss the content of this RFP in
      further detail.

      The Vendor’s Conference will be held on the day and time specified in Section
      6.0, Projected Calendar of Events at the location list below:


              San Francisco Unified School District
              601 McAllister Street
              San Francisco, California 94102

      Written questions received on or before the Deadline for questions specified in
      Section 6.0, Projected Calendar of Events, will be answered at the conference


                                                                                          6
      without divulging the source of the query. The District may also accept oral
      questions during the conference and will make a reasonable attempt to provide
      answers prior to the conclusion of the conference.

      If changes to this RFP are deemed necessary following the Vendors'
      Conference, an RFP addendum will be sent to all vendors on the Vendor List.
      Questions asked at the conference that cannot be adequately answered during
      the conference will be addressed with an RFP addendum. Each Vendor is
      cautioned that no questions regarding the content of this RFP will be answered
      following the conclusion of the conference.


2.5   Submission of Proposals
      One (1) original, five (5) copies and (1) CD soft copy of a Vendor’s Proposal,
      including all accompanying documentation and related material, must be
      received in the Purchasing Department of San Francisco Unified School District,
      135 Van Ness Avenue, San Francisco, California 94102, by the Proposal
      Submission Deadline specified in Section 6.0, Projected Calendar of Events. A
      Proposal must be submitted under sealed cover bearing on the outside
      of the envelope, the name and address of the Vendor and indicating
      "Confidential Proposal in Response to Francisco MS IT Upgrade RFP". One
      copy of the Proposal must be clearly marked "Original Copy".

      2.5.1    Preparation
               A Proposal should be prepared in such a way as to provide a
               straightforward, concise description of Vendor capabilities to satisfy the
               requirements of this RFP. Emphasis should be concentrated on
               conformance to the RFP instructions, responsiveness to the RFP
               requirements, and on completeness and clarity of content.

      2.5.2    Vendor’s Costs
               All costs incurred in the preparation or submission of a Proposal shall
               be entirely the responsibility of the Vendor and shall not be chargeable
               either directly or indirectly to the District.

      2.5.3    Completion of the RFP
               A Vendor’s Proposal shall be completed in all respects as described in
               Section 4.0, Proposal Format. A Proposal may be rejected if it is
               conditional or incomplete, or if it contains any alterations of form or
               other irregularities of any kind. The Proposal may be rejected if any
               such defect or irregularity changes the prices submitted.

      2.5.4    False and Misleading Statements
               A Proposal which contain false or misleading statements, or which
               provide references which do not support an attribute or condition
               contended by the Vendor, may be rejected. If, in the opinion of the
               District, such information was intended to mislead the District in its
               evaluation of the Proposal and the attribute, which is a condition or
               capability of a requirement of this RFP, the Proposal shall be rejected.




                                                                                        7
     2.5.5    Delivery to District
              A written Proposal must be received by the Purchasing Department, no
              later than the Proposal Submission Deadline specified in Section 6.0,
              Projected Calendar of Events. No telegraphic, facsimile, or telephone
              Proposal will be accepted. If mailed, the Vendor should use certified or
              registered mail, UPS, Federal Express or other carrier with return
              receipt requested. The District assumes no responsibility for late
              delivery, for any reason whatsoever, including but not limited to weather
              or traffic conditions, illness, accident, delivery to wrong location, courier
              problems, etc.

              All copies of the Proposal must be under sealed cover, plainly
              marked "Confidential Proposal In Response to Francisco MS IT
              Upgrade RFP ".

              A Proposal submitted under improperly marked covers might be
              rejected. If discrepancies between two or more copies of the Proposal
              are found, the Proposal may be rejected. If, however, the Proposal is
              not rejected, the master copy will provide the basis for resolving such
              discrepancies.

     2.5.6    Withdrawal, Resubmission or Modification
              A Vendor may withdraw the Vendor's final Proposal at any time prior to
              the Proposal Submission Deadline specified in Section 6.0, Projected
              Calendar of Events, by submitting a written request for its withdrawal to
              Purchasing Department, signed by the Vendor or authorized agent.
              The Vendor may thereafter submit a new or modified Proposal prior to
              the Proposal Submission Deadline. Modification offered in any other
              manner, oral or written, will not be considered. A Proposal cannot be
              changed, corrected, or withdrawn after the Proposal Submission
              Deadline.


3.0 General Contractual Requirements
3.1 General

     The District will prepare and negotiate its own Agreement with the Selected
     Vendor, giving due consideration to the language of the Vendor’s standard
     contracts and associated legal documents. The Agreement with the Selected
     Vendor will be executed on or about the date of Board Approval. The contract
     must comply with all legal requirements and all applicable Board of Education
     Policies.

     In the event a protest is submitted, by the deadline specified in Section 6.0,
     Projected Calendar of Events, it may result in execution of the Agreement being
     delayed. Execution of the Agreement will be deferred until after resolution of the
     protest and will occur not earlier than the latest of a) the date of Board Approval
     of Contract Award or b) the date of the next available Board meeting following
     the date the protest is resolved.


                                                                                         8
3.2 Contract Provisions

      The District expects the following general terms to be part of any contract
      negotiated following selection of the Vendor. These general terms are not
      exhaustive but do represent important terms and conditions that shall be part of
      any contract executed between the District and the Selected Vendor. Each
      Proposal must identify which of the provisions, if any, is not acceptable. Vendors
      are instructed to review District’s Standard contract provided in Appendix A. A
      copy of the Vendor’s standard contract is required to be included with each
      Proposal.


      3.2.1     Type and Term of Contract
                The District desires to award purchase orders for:
                a) Purchase (not lease) of new network hardware;
                b) Installation services for cabling required in the Requirements section
                   of the RFP.

         3.2.2 Warranty
              The Selected Vendor will guarantee that the Proposed Products shall
              conform in all material respects to the District’s specifications in this
              RFP and the Selected Vendor’s Documentation accompanying or
              referred to in this RFP.

                If a contract is awarded as a result of this procurement process all
                warranties made by the Selected Vendor shall be incorporated into the
                Agreement and shall be binding upon the Selected Vendor. This
                commitment shall include any modification of, or affirmation or
                representation as to the above, which is made by the Selected Vendor
                in the course of this procurement process, including contract
                negotiations.



4.0 Proposal Format

4.1   General
      These instructions prescribe the mandatory Proposal format and the approach
      for the development and presentation of Proposal data. Proposal format
      instructions must be adhered to, all questions must be answered, and all
      requested data must be supplied. Vendor response to each of the requirements
      in this RFP is required. Failure to respond or non-adherence to any requirement
      in this section may be cause for the Proposal to be rejected.

      This RFP and the Selected Vendor’s Proposal will become a part of the
      Agreement. Any Proposal attachments, documents, letters and materials
      submitted by the Vendor shall be binding and may be included as part of the
      Agreement.



                                                                                          9
     To avoid any confusion as to the set of factual assumptions a Vendor uses in
     submitting its Proposal, each Proposal must state specifically those factual
     assumptions upon which each Proposal is based. A mere reference to this RFP
     will be considered non-responsive. It is expected that each representation of fact
     and of future performance will be incorporated completely within the Agreement
     as a warranty by the Selected Vendor. Any statement of fact or of future
     performance that is not intended by a Vendor as a warranty should be clearly
     identified. Submission of a successful Proposal is not the end of the contractual
     process; further negotiation over the Agreement terms and conditions will be
     necessary, which, in and of itself, could change the Selected Vendor.

     The Proposal must include detailed specifications of any required hardware, any
     required software packages not included as part of the Vendor’s Proposal, and
     any personnel time which will be required of District staff. The Vendor shall
     provide such specifications as attachments to the Proposal. Additional material
     may be submitted with the Proposal as attachments. Any additional descriptive
     matter used in the Proposal must be referenced by the appropriate publication
     name and page number.

     Each Vendor shall submit a Proposal with all information requested. The
     Proposal should be as clear, complete and consistent as possible.


     4.1.1    Format of Requirements
              Requirements are presented in a tabular format.

     4.1.2    Format of Responses to Requirements
              A Vendor must respond to each requirement by entering a “Yes” or “No”
              response in the column entitled “Response” for mandatory
              requirements. Each response should be accompanied with an
              explanation or a reference.

              Vendor shall use the electronic version of this RFP available on the
              District web page in compiling their Proposal, in which case the
              “Response” and “Explanation and/or Reference” columns can be used
              to provide required reference and/or supporting information. A Vendor
              may include this information directly below a requirement, or as an
              attachment identified by the requirement number.


4.2 Content and Sequence

     All information shall be entered in ink or typewritten. Mistakes may be crossed
     out and corrections inserted before submission of the Proposal. The person
     signing the Proposal should initial any corrections in ink.

     All Proposals shall be submitted under sealed cover bearing on the outside the
     name and address of the Vendor and indicating "Confidential Proposal in
     Response to Francisco MS IT Upgrade RFP ". A Vendor shall submit one (1)
     original, marked “Master Copy”, five (5) copies, One (1) CD soft copy of their



                                                                                       10
Proposal to the Purchasing Department. Please be advised that if a Vendor
responds to this RFP using the electronic file provided the appropriate number of
hard copies with the appropriate signatures of execution will still be required.

The completed Proposal must include the following items:

4.2.1    Proposal Identification Statement
         The Vendor should provide the organization name, mailing address,
         and primary contact person information.

4.2.2   Response to Requirements
        The response must contain all responses to the requirements in this RFP
        with organization in the same format and order as presented in this RFP.
        All cost information required must be included in the response.

        The Vendor shall submit “Master Copy” and five (5) copies of the
        proposal which will be organized in the following format:



        4.2.2.1   Table of Contents - The table of contents and Proposal will
                  conform to the same order as presented in this RFP.

        4.2.2.2   Exceptions- This section of the Proposal will note any
                  exceptions to the requirements and conditions taken by the
                  Vendor. Identify, with explanation, any requirements and/or
                  conditions of this RFP with which you cannot or will not comply.
                  If exceptions are not noted, the District will assume that a
                  Vendor’s Proposal meets those requirements and conditions.

        4.2.2.3   Prerequisite Qualifications Response- This section must
                  include a response to each requirement in Section 8.0,
                  Prerequisite Qualifications.

        4.2.2.4   Requirements Response- This section must include a
                  response to each requirement in Section 9.0, Requirements.

        4.2.2.5   Cost Response- This section must itemize all costs chargeable
                  to the District, as described in Section 10.0, Cost Data.

4.2.3   Supplementary Information

        4.2.3.1   Technical Literature - Literature required to substantiate the
                  Vendor’s response to the requirements, including fiber and
                  copper cable test results, qualifications of company and
                  installation/support personnel.

        4.2.3.2   Vendor Contract - The Vendor must submit a copy of their
                  standard contract.



                                                                                   11
             4.2.3.3   Customer References – The vendor must provide at least three
                       references from customers meeting the following criteria:

                       (1) Scope of project similar to the requirements outlined in this
                       RFP;

                       (2) Work is currently underway or was completed within the last
                       three years.

             4.2.3.4   Optional Exhibits and Attachments - Any other information
                       submitted beyond that required by this RFP, which the Vendor
                       deems applicable to their Proposal, should be placed in this
                       section.



5.0   Evaluation and Selection Process

5.1   General
      This section outlines the philosophy and general conduct of the evaluation and
      selection process, which the District will use to select a Vendor. All Proposals
      received in response to this RFP will receive a fair and impartial evaluation by the
      District, which shall make its evaluation in its sole discretion and its decision shall
      be final.

      In conducting this evaluation the District may obtain and use information, in
      addition to that contained in the Proposals, from any source desired. Customers
      on each Vendor’s customer list will be contacted, as may other customers
      selected by the District.


5.2   Evaluation Scoring
      Proposal responses will be weighed on either a pass/fail and/or scored basis in
      the sequence outlined below. Grading of each criterion is deemed as
      confidential to the District.

      A Proposal that is not responsive to those criteria judged on a pass/fail basis may
      be rejected, in its sole discretion and if rejected shall not be considered for further
      evaluation by the District. Alternatively, the District may, choose to ask
      clarification questions of a proposal, in writing, and may then take into
      consideration the additional information gathered in from its clarification
      questions its scoring process.

      Prerequisite Qualifications
       a. Conformance to Terms and Conditions of Competition as set
           forth in this
           RFP………………………………………………………………….…..(Pass/Fail)
           Vendor Acknowledgement that purchase will be contingent upon SFUSD
       b.
           Board of Education Approval, successful completion of the SFUSD
           contracting procedures, and funding approval from the Schools and



                                                                                          12
          Libraries Division (SLD)……………………………………………….(Pass/Fail)
          Vendor agreement to SLD’s Service Provider Invoicing (SPI) format for
       c.
          reimbursement/payment………………………………………………(Pass/Fail)
          Vendor guarantee that all cabling is done in compliance with applicable
       d.
          building codes and by persons with the appropriate licensure.
          ……………………………………...……………………………………(Pass/Fail)
          Vendor agrees to provide all permits within the scope and cost of the
       e.
          proposal submitted……………………………………………...……..(Pass/Fail)
          Vendor agrees to furnish performance/payment bond ……………(Pass/Fail)
       f.
          Vendor agrees to comply with prevailing wage regulations, including
       g.
          adhering to the following requirements:
                • Pay the prevailing wages applicable to the work being done;
                • Comply with all State laws in the payment and administration of
                    prevailing wages applicable to the work being done;
                • Submit certified payroll records;
                • Keep documentation of fringe benefit payments, if any;
                • Maintain a daily sign in sheet with the names and trades of the
                    employees, if any;
                • Post or notify workers of the Prevailing Wage Rates at the job site;
                    and,
                • Employ registered apprentices, if any.


      Qualifying vendors will be evaluated based on their responses to the
      requirements.

      Requirements
       a. Price of eligible goods and services meeting minimum
          requirements………………………………….…………………………..50%
       b. Vendor Ability to Perform
            - Customer References
            - Qualifications and Location of Support Personnel……………………30%
       c.   Capacity/Quality of goods and services exceeding
            requirements…………………………………………………………….…..20%


5.3   Site Inspection
      After Vendor demonstration of the Proposed Products is complete, the District
      reserves the right to inspect a system in operation at one or more customer sites
      prior to notification of the issuance of the award.


5.4   Final Selection
      The decision as to what Proposal is recommended for award of contract will be
      made on the basis of those Proposed Products and Proposed Services that are
      determined to be most responsive to the requirements of this RFP. Award will be
      made to the Vendor offering a Proposal deemed to be the most advantageous to


                                                                                     13
          the District. The District shall be the sole judge in making such determination
          and its decision shall be final. All respondents will be notified in writing of the
          District’s selection on or about the date of Notification of Selection specified in
          Section 6.0 projected Calendar of Events, of this RFP.

          If contracts result from this RFP the Selected Vendor will be required to provide
          the Proposed Products and Proposed Services at the prices and rates either
          submitted in their Proposal or as a result of negotiations based upon the
          Proposal.


5.5       Execution of Agreement
          After District selection, negotiations will ensue with the Selected Vendor
          regarding the terms and conditions of an Agreement for the Proposed Products
          and Proposed Services. Mutually acceptable contracts must be presented to the
          District Board of Education for approval. Terms and conditions, which do not
          comply in substance with all material requirements of this RFP, which are
          contrary to the best interest of the District, or which are in opposition to its policy,
          will not be accepted.



6. 0 Projected Calendar of Events

      1. RFP advertised ---------------------------------------   12/11/2007
      2. Site Walks (By Request) ---------------------------      12/31/2007-01/04/2008
      3. Vendor Conference----------------------------------      01/09/2008     3:30pm- 5pm
      4. Last Day to Submit Questions---------------------        01/10/2008
      5. Response to questions-------------------------------     01/11/2008
      6. Proposals submission deadline---------------------       01/21/2008
      7. Complete Reference Checks/Site Inspection---             01/31/2008
      8. Notification of Selection---------------------------     01/31/2008
      9. Protest selection deadline--------------------------     02/08/2008     11:00 am.
      10. Final Contract Negotiations and Board Approval          01/31/2008 to TBD

The District reserves the right to extend the above dates, if necessary. All changes will
be posted on our Website http://www.sfusd.edu.
.

6.1 District Contacts

      Contract Compliance Office
      Ms. Sue Moock                                        Voice (415) 355-6945
      135 Van Ness Avenue                                  Fax (415) 522-6711
      San Francisco, CA 94102                              Email: moocks@sfusd.edu

      Purchasing Office
      Mr. Rod Sarmiento                                    Voice: (415) 241-6468
      135 Van Ness Avenue                                  Fax: (415) 241-6487
      San Francisco, CA 94102                              Email: sarmientor@sfusd.edu



                                                                                                14
   Information Technology Department
   Infrastructure Director
   Mr. Sean Rozell                                  Voice: (415) 241-6220
   601 McAllister Street                            Fax: (415) 202-0758
   San Francisco, CA 94102                          Email: rozells@sfusd.edu

   Information Technology Department
   Chief Information Officer
   Ms. Brianne Meyer                                Voice: (415) 241-6169
   601 McAllister Street                            Fax: (415) 749-3415
   San Francisco, CA 94102                          Email: fordb@sfusd.edu




7.0 District Responsibilities
     The Vendor may assume at least the following tasks for the District and may
     propose additional tasks as appropriate.


     (1)    Provide District-specific information to the Vendor and access to facilities.

     (2)    Review all Contract Deliverables, equipment, and/or Vendor work
            products.
     (3)    Arrange meeting rooms and coordinate staff attendance.
     (4)    Document problems and/or approve test results.
     (5)    SFUSD will provide network hardware installation and integration
     (6)    SFUSD will provide end user and IDF patch cabling.



8.0 Prerequisite Qualifications

      Requirement                                       Vendor Acknowledgement
                                                        (Signature of Authorized
                                                        Agent)
      Vendor Acknowledgement that purchase
      will be contingent upon SFUSD Board of
      Education Approval, successful completion
      of the SFUSD contracting procedures, and
      funding approval from the Schools and
      Libraries Division (SLD)
      Vendor agreement to SLD’s Service
      Provider Invoicing (SPI) format for
      reimbursement/payment
      Vendor guarantee that all fiber installation is
      done in compliance with applicable building


                                                                                       15
codes
Vendor agrees to provide all permits within
the scope and cost of the proposal
submitted




                                              16
9.0 Requirements

     Section Requirement                        Vendor   Comments/Explanation
                                                Response

     1.0     Voice and Data cabling (East
             and West Wing)
     1.1     Furnish and Install:
                 • 19” Data Rack for New
                     East Wing IDF with the
                     following hardware:
                    o Four 48-port
                       CAT6/RJ45 patch
                       panels
                    o Four 2-Rack-Unit
                       horizontal Cable
                       Management Panels
                    o One 12-Port
                       (minimum) Fiber LIU
                       w/SC termination
                    o 12” Ladder Rack for
                       overhead cable
                       management and
                       support
                 • 6-Strand Multi-Mode
                     Fiber from East Wing
                     IDF to MDF
                       o Plenum 6-strand
                          Multi-Mode Fiber,
                          50/62.5 Microns,
                          Terminated on LIU
                          Shelf
                 • 6-Strand Multi-Mode
                     Fiber from 2nd Floor
                     West Wing IDF to MDF
                       o Plenum 6-strand
                            Multi-Mode Fiber,
                            50/62.5 Microns,
                            Terminated on
                            LIU Shelf
                 • 8 CAT6/RJ45 drops per
                     classroom from the
                     East Wing IDF to the
                     following:
                    o Two classrooms on
                          the 1st floor (16
                          drops total)
                    o Five classrooms on
                          the 2nd floor (40
                          drops total)
                    o Seven classrooms


                                                                           17
Section Requirement                         Vendor   Comments/Explanation
                                            Response

                    on the 3rd floor (56
                    drops total)
            •   16 CAT6/RJ45 drops
                from the East Wing IDF
                to the East Wing Library
            •   36 CAT6/RJ45 drops
                from the East Wing IDF
                to the East Wing
                Computer Lab
                o Delivered to Lab
                  computer
                  workbenches via three
                  vertical Power/Data
                  poles (12 Drops per
                  pole, one pole per row
                  of workbenches)


2.0     Voice and Data cabling
        (Annex Building)
2.1     •   19” Rack for New Annex IDF
            with the following hardware:
              o Two 48-port CAT6/RJ45
                 patch panels
              o Two 2-Rack-Unit
                 horizontal Cable
                 Management Panels
              o 12” Ladder Rack for
                 overhead cable
                 management and
                 support
        •   8 CAT6/RJ45 drops per
            classroom from the Annex
            IDF to the following:
              o One classroom in the
                 Basement (8 drops total)
              o Three classrooms on
                 the 1st floor (24 drops
                 total)
              o Two classrooms on the
                 second floor (16 drops
                 total)
        •   4 CAT6/RJ45 drops per
            office from the Annex IDF to
            the following:
              o Two offices on 1st floor
                 (8 drops total)
              o Three offices in the
                 Basement (12 Drops
                 total)
        •



                                                                       18
Section Requirement                       Vendor   Comments/Explanation
                                          Response

        •   8 CAT6/RJ45 drops from the
            Annex IDF to the Music
            Room

3.0     Local Area Network Switch
        Hardware (East Wing)
3.1     Furnish and deliver/ship to
        SFUSD main office:
            •   One HP ProCurve
                5372xl Switch (J4848B)
            •   One HP Procurve xl 2-
                Port Mini GBIC plus 14
                10/100/100 ports via
                RJ45 Switch Module
                (J4907A)
            •   Two HP Procurve xl
                switch module (J4820B)
                24-port via rj45 10/100
                Mbps
            •   One HP Procurve xl
                Redundant Power
                Supply (J4839A)
            •   Four HP Procurve
                Gigabit-SX-LC Mini
                GBIC module (J4858C)


4.0     Local Area Network Switch
        Hardware (Annex)
4.1     Furnish and deliver/ship to
        SFUSD main office:
            •   One HP ProCurve
                5348xl Switch (J4849A)
            •   One HP Procurve xl 2-
                Port Mini GBIC plus 14
                10/100/100 ports via
                RJ45 Switch Module
                (J4907A)
            •   One HP Procurve xl
                Redundant Power
                Supply (J4839A)




                                                                     19
10.0 Cost Response

     Requirements        Item                          Cost
     Section
     1.1                 Section Total Cost
     2.1                 Section Total Cost
     3.1                 Section Total Cost
     4.1                 Section Total Cost
     Total

    Cost must include all applicable taxes and fees.




                                                              20
Appendix A: Standard Contracts
     The SFUSD will require the vendor to use the SFUSD’s templates for
     contracting. The sample contract is currently under review and will be posted as
     an addendum to this RFP.

A1   Sample Contract
     To be added to this RFP by amendment no later than January 1st, 2008.




                                                                                   21
A2     Performance Bond


                                     PERFORMANCE BOND
                                 (100% of Contract Price)

(Note: Bidders must use this form, NOT a surety company form.)

KNOW ALL PERSONS BY THESE PRESENTS:

       That WHEREAS, the governing board (“Board”) of the San Francisco Unified
School District (“District”) and                                              (“Principal”)
have entered into a contract for the furnishing of all materials and labor, services and
transportation, necessary, convenient, and proper to perform the following project:

                           Francisco Middle School Upgrade

which Contract dated                          , 20___, and all of the Contract Documents
attached to or forming a part of the Contract, are hereby referred to and made a part
hereof, and

WHEREAS, said Principal is required under the terms of the Contract to furnish a bond
for the faithful performance of the Contract;

NOW, THEREFORE, the Principal and
(“Surety”) are held and firmly bound unto the Board of the District in the penal sum of
                                                                DOLLARS ($           ),
lawful money of the United States, for the payment of which sum well and truly to be
made we bind ourselves, our heirs, executors, administrators, successors, and assigns
jointly and severally, firmly by these presents, to perform all the work required to
complete the Project and to pay to the District all damages the District incurs as a result
of the Principal’s failure to perform all the Work required to complete the Project.

The condition of the obligation is such that, if the above bounden Principal, his or its
heirs, executors, administrators, successors, or assigns, shall in all things stand to and
abide by, and well and truly keep and perform the covenants, conditions, and
agreements in the Contract and any alteration thereof made as therein provided, on his
or their part to be kept and performed at the time and in the intent and meaning, and
shall indemnify and save harmless the District's Board, its officers and agents, as therein
stipulated, then this obligation shall become null and void, otherwise it shall be and
remain in full force and virtue.

And the Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration, or addition to the terms of the contract or to the work to be
performed thereunder or the specifications accompanying the same shall in any way
affect its obligation on this bond, and it does hereby waive notice of any such change,
extension of time, alteration, or addition to the terms of the Contract or to the work or to
the specifications.



                                                                                              22
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which
shall for all purposes be deemed an original thereof, have been duly executed by the
Principal and Surety above named, on the         day of                  , 20___.


(Affix Corporate Seal)
                                            Principal


                                            By


                                            Surety


                                            By


                                            Name of California Agent of Surety


                                            Address of California Agent of Surety


                                            Telephone Number of California Agent of
                                   Surety



Bidder must attach original Power of Attorney and Certificate of Authority for
Surety and a Notarial Acknowledgment for all Surety's signatures. The California
Department of Insurance must authorize the Surety to be an admitted surety
insurer.




                                                                                      23
A3      Payment Bond


                                     PAYMENT BOND


KNOW ALL MEN BY THESE PRESENTS:

Whereas, San Francisco Unified School District (hereinafter referred to as “Owner”) and



(hereinafter referred to as “contractor”) have entered into a written contract for furnishing
of all

labor, materials, equipment, transportation and services for the construction of


                       Francisco Middle School Upgrade Project

               (address of project here)
at
       project located in San Francisco, California (hereinafter referred to as the
“Construction Contract); and

WHEREAS, Contractor is required by the terms of the construction Contract to furnish a
bond for all work, labor, materials, equipment or services furnished in connection with
the Construction Contract;

NOW, THEREFORE, Contractor, as principal, and

(hereinafter referred to as “Surety”), as surety, are held and firmly bound unto
Claimants, as

defined herein, in the penal sum of
DOLLARS($____________),
lawful money of the United States, for the payment of which sum well and truly to be
made as provided in this Payment Bond.

     1. Contractor and Surety, jointly and severally, bind themselves, their heirs,
        executors, administrators, successors and assigns to Owner to pay for work,
        labor, materials, equipment, services or other items furnished for use and
        actually used in the performance of the Construction Contract, which is
        incorporated herein by reference.

     2. With respect to Owner, this obligation shall be null and void if Contractor.

               2.1 Promptly makes payment, directly or indirectly, for all sums due
                   claimants, and




                                                                                           24
          2.2 Defends, indemnifies and holds Owner harmless from claims,
              demands, liens or suits by any persons or entity whose claim,
              demand, lien or suit is for the payment for work, labor, materials,
              equipment, services or other items furnished for use in the
              performance of the Construction Contract, provided Owner has
              promptly notified Contractor and Surety (at the address described in
              Paragraph 12) of any claims, demands, liens or suits and tendered
              defense of such claims, demands, liens or suits to Contractor and
              Surety.

3. With respect to Claimants, this obligation shall be null and void if Contractor
   promptly makes payment, directly or indirectly, for all sums due.

4. Surety shall have no obligation to Claimants under this Bond until:

          4.1 Claimants who are employed by or have a direct contract with
              Contractor have given notice to Surety (at the address described
              below) and sent a copy, or notice thereof, to Owner, stating that a
              claim is being made under this Payment Bond and, with substantial
              accuracy, the amount of the claim.

          4.2 Claimants who do not have a direct contract with the Contractor:

                  .1 Have furnished written notice to Contractor and sent a copy, or
                    notice thereof, to Owner, as required by and conforming with
                    Civil Code sections 3252 and 3091; and

                  .2 Not having been paid within 30 days of sending the required
                    notice, have sent a written notice to Surety (at the address
                    described below) and sent a copy to the Owner, stating that a
                    claim is being made under this Payment Bond and enclosing a
                    coy of the previous written notice furnished to Contractor.

5. When the Claimant has satisfied the conditions of Paragraph 4, Surety shall
   promptly and at Surety’s expense take the following actions:

          5.1 Send an answer to the Claimant, with a copy to Owner, within 20 days
              after receipt of the claim, stating the amounts that are undisputed and
              the basis for challenging any amounts that are disputed.

          5.2 Pay or arrange for payment of any undisputed amounts.

6. Surety’s total obligation shall not exceed the amount of this Payment Bond, and
   the amount of this Payment Bond shall be credited for any payments made in
   good faith by Surety.

7. Amounts owed by Owner to Contractor under the Construction Contract shall be
   used for the performance of the Construction Contract and to satisfy claims, if
   any, under the Performance Bond. By Contractor furnishing and Owner
   accepting this Payment Bond, they agree that all funds earned by Contractor in
   the performance of the Construction Contract are dedicated to satisfy obligations


                                                                                     25
   of Contractor and Surety under this Bond, subject to the Owner’s priority to use
   the funds for the completion of the work or the satisfaction of Owner’s claims,
   including liquidated damages, under the Construction Contract.

8. Surety shall not be liable to Owner, Claimants or others for obligations of the
   Contractor that are unrelated to the Construction Contract. Owner shall not be
   liable for payment of any costs or expenses of any Claimants under this Payment
   Bond, and shall have under this Payment Bond no obligation to make payments
   to, give notices on behalf of, or otherwise have any obligation to Claimants under
   this Payment Bond.

9. Surety hereby waives notice of any change, including changes of time, to the
   Construction Contract or to related subcontracts, purchase orders and other
   obligations.

10. No suit or action shall be commenced by a Claimant under this bond other than
   in a court of competent jurisdiction. The prevailing party in any such action shall
   be entitled to recover its attorneys’ fees, to be taxed as costs.

11. Notice to Surety, Owner or Contractor shall be mailed or delivered to the address
   shown on the signature page.

12. This Payment Bond has been furnished to comply with Civil Code sections 3247
   through 3252. Any provision in this Payment Bond conflicting with those
   statutory requirements shall be deemed deleted and provisions conforming to
   such statutory or other legal requirement shall be deemed incorporated herein.
   The intent is that this Payment Bond shall be construed as a statutory bond and
   not as a common law bond.

13. Upon request by any person or entity appearing to be a potential beneficiary of
   this Payment Bond, the Contractor shall promptly furnish a copy of this Payment
   Bond or shall permit a copy to be made.

14. DEFINITIONS

           14.1 Claimant: An individual or entity identified in California Civil Code
                sections 3181 or 3248.
           14.2 Construction Contract: The agreement between Owner and
                Contractor identified above, including all Contract Documents and
                changes thereto.




                                                                                        26
CONTRACTOR, as principal                Surety

_________________________________       ___________________________________

By: ______________________________      By: ________________________________

Title: _____________________________    Title: _______________________________



Address:                                Address:

_________________________________       ___________________________________

_________________________________       ___________________________________

_________________________________       ___________________________________



Fax: _____________________________      Fax: _______________________________

Phone: ___________________________      Phone: _____________________________



OWNER:

San Francisco Unified School District
135 Van Ness Avenue
San Francisco, CA 94102
Phone: (415) 355-6979
Fax: (415) 355-6954




                                                                     27

						