PROJECT MANUAL CHECKLIST (PROPOSAL AND PSE)

PROJECT MANUAL CHECKLIST (PROPOSAL AND PS&E) The proposal package must include the following: 1. 2. 3. 4. Yes Yes Yes No No No Plans (Include temporary traffic control plans, when applicable.) Specifications (Use MPWSS or other approved specifications.) Instructions to bidders. Yes No Disadvantaged Business Enterprises and Schedule of Participation by DBE (MDT will determine the establish Disadvantaged Business Enterprises percentage goal for this project). Use standard DBE forms located on the MDT website. Yes No Quantity Sheets. (Show quantities, the unit price and total price columns on the Sheet.) Yes Yes Yes Yes No No No No Proposal (Bid Form). Use standard form located on the MDT website. Acknowledgment of Receipt of Addendum. Special Provisions (administrative and technical). Prevailing Wage Rate/Minimum Wage Limitation. 5. 6. 7. 8. 9. Reference labor compliance: Federal Davis Bacon Wage Rates must be included in the contract. Rates are subject to change weekly; therefore, obtain a copy of the most current rate from the Montana Department of Labor and Industry immediately prior to advertising the project. 10. 11. Yes No Special provision EEO Affirmative Action requirements. Use standard form located on the MDT website. Yes No Required Contract Provisions Federal-Aid Construction Contracts. After completing the preceding checklist, submit plans, specifications and cost estimates to the CTEP Section for review and comment. Upon completion of the final Project Manual (and drawings), submit the stamped, signed, and dated Manual and detailed estimate of construction costs to the CTEP Section for approval and authorization to proceed with Contract Letting (Advertisement and Award). Note: Allow MDT 30 calendar days for each review. DO NOT PROCEED TO BID LETTING WITHOUT WRITTEN CONCURRENCE FROM MDT. Preparer’s Name Title Date Date Local CTEP Program Administrator Title Page 1 of 1

Shared by: Jacquie Dore
Other docs by Jacquie Dore
Getting Prepared for GMAT: Tips and Resources
Views: 3028  |  Downloads: 215
dv145v
Views: 198  |  Downloads: 0
ch131
Views: 785  |  Downloads: 1
Installment sale and security agreement
Views: 279  |  Downloads: 7
cr117
Views: 112  |  Downloads: 0
Reading List for the College Bound
Views: 630  |  Downloads: 15
Midgett Schrader Briefs
Views: 200  |  Downloads: 0
de174
Views: 158  |  Downloads: 0
How to go to Graduate School in Biology
Views: 638  |  Downloads: 7
VENTURE CAPITAL TRENDS
Views: 429  |  Downloads: 23
What You Need to Know About the GMAT
Views: 2022  |  Downloads: 128
dv101c
Views: 168  |  Downloads: 0
Entire agreement settling all rights
Views: 354  |  Downloads: 5
Microbiology Simmons Citrate EMB FTM Test Results
Views: 2605  |  Downloads: 19
Ayers J STarasoff
Views: 201  |  Downloads: 1
Related docs
PROJECT MANUAL CHECKLIST (PROPOSAL AND PSE)
Views: 3  |  Downloads: 0
PSE Acceptance Measures proposal
Views: 4  |  Downloads: 0
COMMON PROPOSAL NARRATIVE
Views: 0  |  Downloads: 0
Provider Manual
Views: 0  |  Downloads: 0
Program Manual Final 12-10-02 2
Views: 0  |  Downloads: 0